| issue date = 09/19/2012 | | issue date = 09/19/2012 | ||
| title = Dairyland Power Cooperative, La Crosse Boiling Water Reactor (Lacbwr), Request for Rescission of NRC Orders EA-02-077 and EA-03-099 | | title = Dairyland Power Cooperative, La Crosse Boiling Water Reactor (Lacbwr), Request for Rescission of NRC Orders EA-02-077 and EA-03-099 | ||
| author name = Berg W | | author name = Berg W | ||
| author affiliation = Dairyland Power Cooperative | | author affiliation = Dairyland Power Cooperative | ||
| addressee name = | | addressee name = | ||
Line 13: | Line 13: | ||
| document type = Letter | | document type = Letter | ||
| page count = 2 | | page count = 2 | ||
| project = | |||
| stage = Request | |||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:WILLIAM L. BERG President and CEO DAIRYLAND POWER COOPERATIVE September 19, 2012 In reply, please refer to LAC-14254 DOCKET NO. 50-409 and 72-046 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 | |||
==SUBJECT:== | |||
Dairyland Power Cooperative La Crosse Boiling Water Reactor (LACBWR) | |||
Possession-Only License DPR-45 Request for Rescission of NRC Orders EA-02-077 and EA-03-099 | |||
==REFERENCE:== | |||
: 1) Letter, NRC to DPC, dated June 20, 2012, "La Crosse Boiling Water Reactor-Issuance of Exemption from Certain Requirements of 10 CFR 73.55 (TAC No. | |||
J00388)" | |||
The security requirements of NRC Order EA-02-077, "Interim Compensatory Measures for the Current Threat Environment," and NRC Order EA-03-099, "Issuance of Order for Implementation of Additional Security Measures Associated with Access Authorization, Fitness for Duty and Behavior Observation," | |||
are applicable to LACBWR as long as spent fuel is stored in the spent fuel pool. As of September 19, 2012, Dairyland Power Cooperative (DPC) has completed the transfer of all spent nuclear fuel from the LACBWR spent fuel pool to dry cask storage at the on-site Independent Spent Fuel Storage Installation (ISFSI). | |||
As a result of the completion of spent fuel transfer to dry cask storage at the ISFSI, the scope of NRC Orders EA-02-077 and EA-03-099 is no longer applicable to LACBWR. Continued application of the requirements of NRC Orders EA-02-077 and EA-03-099 to LACBWR is no longer necessary to achieve the underlying purpose of the orders after spent fuel is in dry cask storage at the LACBWR ISFSI. | |||
Consequently, DPC requests the NRC to rescind Orders EA-02-077 and EA-03-099 for LACBWR, effective immediately. | |||
Protection of the spent fuel in dry cask storage at the LACBWR ISFSI shall continue in accordance with the Physical Security Plan for the La Crosse Boiling Water Reactor (revised February 2011); Addendum III, "ISFSI Security Plan," which includes Appendix I, "ISFSI Contingency Plan," and Appendix II, "ISFSI Training & Qualification Plan." The LACBWR Physical Security Plan complies with the requirements 10 CFR 73.55, as exempted by Reference 1. | |||
A Touchstone Energyo Cooperative 3200 East Ave. S. 9 PO Box 817 e La Crosse, WI 54602-0817 - 608-787-1258 9 608-787-1469 fax | |||
* www.dairynet.com | |||
Document Control Desk LAC-14254 Page 2 September 19, 2012 If you have any questions concerning this request, please contact Don Egge, LACBWR Plant/ISFSI Manager at (608) 689-4207. | |||
Sincerely, William L. Berg, President CEO WLB:JBM:jkl cc: John Hickman Project Manager U.S. Nuclear Regulator Commission STATE OF WISCONSIN ) | |||
) | |||
COUNTY OF LA CROSSE ) | |||
Personally came before me this day of A9(Y, 1d12, the above named, William L. Berg, to me known to be the person who executed the foregoing instrument and acknowledged the same. | |||
MICHELLE A. BECK Notary Public Notary Public, La Crosse County Wisconsin State of Wisconsin My commission expires 0--3, 1"S. 1ý}} |
Latest revision as of 22:16, 11 November 2019
ML12264A575 | |
Person / Time | |
---|---|
Site: | La Crosse File:Dairyland Power Cooperative icon.png |
Issue date: | 09/19/2012 |
From: | Berg W Dairyland Power Cooperative |
To: | Document Control Desk, NRC/FSME |
References | |
EA-02-077, EA-03-099, LAC-14254 | |
Download: ML12264A575 (2) | |
Text
WILLIAM L. BERG President and CEO DAIRYLAND POWER COOPERATIVE September 19, 2012 In reply, please refer to LAC-14254 DOCKET NO. 50-409 and 72-046 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Dairyland Power Cooperative La Crosse Boiling Water Reactor (LACBWR)
Possession-Only License DPR-45 Request for Rescission of NRC Orders EA-02-077 and EA-03-099
REFERENCE:
- 1) Letter, NRC to DPC, dated June 20, 2012, "La Crosse Boiling Water Reactor-Issuance of Exemption from Certain Requirements of 10 CFR 73.55 (TAC No.
J00388)"
The security requirements of NRC Order EA-02-077, "Interim Compensatory Measures for the Current Threat Environment," and NRC Order EA-03-099, "Issuance of Order for Implementation of Additional Security Measures Associated with Access Authorization, Fitness for Duty and Behavior Observation,"
are applicable to LACBWR as long as spent fuel is stored in the spent fuel pool. As of September 19, 2012, Dairyland Power Cooperative (DPC) has completed the transfer of all spent nuclear fuel from the LACBWR spent fuel pool to dry cask storage at the on-site Independent Spent Fuel Storage Installation (ISFSI).
As a result of the completion of spent fuel transfer to dry cask storage at the ISFSI, the scope of NRC Orders EA-02-077 and EA-03-099 is no longer applicable to LACBWR. Continued application of the requirements of NRC Orders EA-02-077 and EA-03-099 to LACBWR is no longer necessary to achieve the underlying purpose of the orders after spent fuel is in dry cask storage at the LACBWR ISFSI.
Consequently, DPC requests the NRC to rescind Orders EA-02-077 and EA-03-099 for LACBWR, effective immediately.
Protection of the spent fuel in dry cask storage at the LACBWR ISFSI shall continue in accordance with the Physical Security Plan for the La Crosse Boiling Water Reactor (revised February 2011); Addendum III, "ISFSI Security Plan," which includes Appendix I, "ISFSI Contingency Plan," and Appendix II, "ISFSI Training & Qualification Plan." The LACBWR Physical Security Plan complies with the requirements 10 CFR 73.55, as exempted by Reference 1.
A Touchstone Energyo Cooperative 3200 East Ave. S. 9 PO Box 817 e La Crosse, WI 54602-0817 - 608-787-1258 9 608-787-1469 fax
- www.dairynet.com
Document Control Desk LAC-14254 Page 2 September 19, 2012 If you have any questions concerning this request, please contact Don Egge, LACBWR Plant/ISFSI Manager at (608) 689-4207.
Sincerely, William L. Berg, President CEO WLB:JBM:jkl cc: John Hickman Project Manager U.S. Nuclear Regulator Commission STATE OF WISCONSIN )
)
COUNTY OF LA CROSSE )
Personally came before me this day of A9(Y, 1d12, the above named, William L. Berg, to me known to be the person who executed the foregoing instrument and acknowledged the same.
MICHELLE A. BECK Notary Public Notary Public, La Crosse County Wisconsin State of Wisconsin My commission expires 0--3, 1"S. 1ý