ML14177A721: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 12: Line 12:
| document type = E-Mail
| document type = E-Mail
| page count = 27
| page count = 27
| project =
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:1 NRR-PMDAPEm Resource From: Grange, Briana Sent: Tuesday, June 24, 2014 1:25 PM To: Finfera, Jennifer (jennifer_finfera@fws.gov)
{{#Wiki_filter:NRR-PMDAPEm Resource From:                     Grange, Briana Sent:                     Tuesday, June 24, 2014 1:25 PM To:                       Finfera, Jennifer (jennifer_finfera@fws.gov)


==Subject:==
==Subject:==
RE: Davis Besse operating license renewal Attachments:
RE: Davis Besse operating license renewal Attachments:             Toledo Edison 1980 - Bird Collision Study.pdf; NRC 1981 Letter regarding Bird Collision Study.pdf Hi Jenny, I was able to obtain a copy of Toledo Edisons 1980 bird mortality report, which documents the 1972-1979 surveys conducted at Davis-Besse. This report is attached as well as a 1981 letter from the NRC indicating that the NRC would no longer require Toledo Edison to conduct bird mortality surveys because the surveys had found no significant adverse effect on bird populations.
Toledo Edison 1980 - Bird Collision Study.pdf; NRC 1981 Letter regarding Bird Collision Study.pdf Hi Jenny, I was able to obtain a copy of Toledo Edison's 1980 bird mortality report, which documents the 1972-1979 surveys conducted at Davis-Besse. This report is attached as well as a 1981 letter from the NRC indicating  
Please let me know if you need any other references or if I can answer any other questions for you during your review of NRCs effect determinations for Federally listed species that could be affected by the proposed Davis-Besse license renewal.
Briana
______________
Briana A. Grange Biologist U.S. Nuclear Regulatory Commission NRR/DLR/RERB (301) 415-1042 briana.grange@nrc.gov 1


that the NRC would no longer require Toledo Edison to c onduct bird mortality surveys because the surveys had found "no significant adverse effect on bird populations."
Hearing Identifier:       NRR_PMDA Email Number:             1403 Mail Envelope Properties         (Briana.Grange@nrc.gov20140624132500)
 
Please let me know if you need any other references or if I can answer any other questions for you during your review of NRC's effect determinations for Federally listed species that could be affected by the proposed Davis-Besse license renewal.
 
Briana ______________ Briana A. Grange Biologist U.S. Nuclear Regulatory Commission NRR/DLR/RERB (301) 415-1042 briana.grange@nrc.gov
 
Hearing Identifier: NRR_PMDA Email Number: 1403   Mail Envelope Properties   (Briana.Grange@nrc.gov20140624132500)


==Subject:==
==Subject:==
RE: Davis Besse operating license renewal Sent Date:   6/24/2014 1:25:26 PM Received Date: 6/24/2014 1:25:00 PM From:   Grange, Briana Created By:   Briana.Grange@nrc.gov Recipients:     "Finfera, Jennifer (jennifer_finfera@fws.gov)" <jennifer_finfera@fws.gov> Tracking Status: None Post Office:     Files     Size     Date & Time MESSAGE   856     6/24/2014 1:25:00 PM Toledo Edison 1980 - Bird Collision Study.pdf   567511 NRC 1981 Letter regarding Bird Collision Study.pdf   71387
RE: Davis Besse operating license renewal Sent Date:               6/24/2014 1:25:26 PM Received Date:           6/24/2014 1:25:00 PM From:                     Grange, Briana Created By:               Briana.Grange@nrc.gov Recipients:
 
"Finfera, Jennifer (jennifer_finfera@fws.gov)" <jennifer_finfera@fws.gov>
Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:}}
Tracking Status: None Post Office:
Files                             Size                     Date & Time MESSAGE                           856                       6/24/2014 1:25:00 PM Toledo Edison 1980 - Bird Collision Study.pdf                     567511 NRC 1981 Letter regarding Bird Collision Study.pdf                       71387 Options Priority:                         Standard Return Notification:               No Reply Requested:                   No Sensitivity:                       Normal Expiration Date:
Recipients Received:}}

Latest revision as of 08:03, 11 November 2019

Operating License Renewal
ML14177A721
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/24/2014
From: Briana Grange
NRC/NRR/DLR/RERGUB
To: Finfera J
US Dept of Interior, Fish & Wildlife Service
References
Download: ML14177A721 (27)


Text

NRR-PMDAPEm Resource From: Grange, Briana Sent: Tuesday, June 24, 2014 1:25 PM To: Finfera, Jennifer (jennifer_finfera@fws.gov)

Subject:

RE: Davis Besse operating license renewal Attachments: Toledo Edison 1980 - Bird Collision Study.pdf; NRC 1981 Letter regarding Bird Collision Study.pdf Hi Jenny, I was able to obtain a copy of Toledo Edisons 1980 bird mortality report, which documents the 1972-1979 surveys conducted at Davis-Besse. This report is attached as well as a 1981 letter from the NRC indicating that the NRC would no longer require Toledo Edison to conduct bird mortality surveys because the surveys had found no significant adverse effect on bird populations.

Please let me know if you need any other references or if I can answer any other questions for you during your review of NRCs effect determinations for Federally listed species that could be affected by the proposed Davis-Besse license renewal.

Briana

______________

Briana A. Grange Biologist U.S. Nuclear Regulatory Commission NRR/DLR/RERB (301) 415-1042 briana.grange@nrc.gov 1

Hearing Identifier: NRR_PMDA Email Number: 1403 Mail Envelope Properties (Briana.Grange@nrc.gov20140624132500)

Subject:

RE: Davis Besse operating license renewal Sent Date: 6/24/2014 1:25:26 PM Received Date: 6/24/2014 1:25:00 PM From: Grange, Briana Created By: Briana.Grange@nrc.gov Recipients:

"Finfera, Jennifer (jennifer_finfera@fws.gov)" <jennifer_finfera@fws.gov>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 856 6/24/2014 1:25:00 PM Toledo Edison 1980 - Bird Collision Study.pdf 567511 NRC 1981 Letter regarding Bird Collision Study.pdf 71387 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: