ML13030A457: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML13030A457
| number = ML13030A457
| issue date = 03/01/2013
| issue date = 03/01/2013
| title = Columbia - Correction to Amendment Letter and Safety Evaluation Pages for Amendment No. 225, Administrative and Editorial Changes to Technical Specifications Related to Change in Software and to Adopt TSTF-GG-05-01 Revision 2 Writer'S Guide
| title = Correction to Amendment Letter and Safety Evaluation Pages for Amendment No. 225, Administrative and Editorial Changes to Technical Specifications Related to Change in Software and to Adopt TSTF-GG-05-01 Revision 2 Writer'S Guide
| author name = Lyon C F
| author name = Lyon C
| author affiliation = NRC/NRR/DORL/LPLIV
| author affiliation = NRC/NRR/DORL/LPLIV
| addressee name = Reddeman M E
| addressee name = Reddeman M
| addressee affiliation = Energy Northwest
| addressee affiliation = Energy Northwest
| docket = 05000397
| docket = 05000397
| license number = NPF-021
| license number = NPF-021
| contact person = Gibson L K
| contact person = Gibson L
| case reference number = TAC ME7904
| case reference number = TAC ME7904
| document type = Letter, License-Operating (New/Renewal/Amendments) DKT 50
| document type = Letter, License-Operating (New/Renewal/Amendments) DKT 50
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 1, 2013 Mr. Mark E. Reddemann Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023) Richland, WA 99352-0968 SUB..COLUMBIA GENERATING STATION -CORRECTION TO AMENDMENT LETTER AND SAFETY EVALUATION PAGES RELATED TO LICENSE AMENDMENT NO. 225 (TAC NO. ME7904)  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 1, 2013 Mr. Mark E. Reddemann Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023)
Richland, WA 99352-0968 SUB..IECT:      COLUMBIA GENERATING STATION - CORRECTION TO AMENDMENT LETTER AND SAFETY EVALUATION PAGES RELATED TO LICENSE AMENDMENT NO. 225 (TAC NO. ME7904)


==Dear Mr. Reddemann:==
==Dear Mr. Reddemann:==


By letter dated January 29, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 12269A254), the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 225 to Renewed Facility Operating License No. NPF-21 for the Columbia Generating Station. The amendment consisted of changes to the Technical Specifications (TSs) and Operating License in response to your application dated January 9, 2012, as supplemented by letters dated July 30 and November 14, 2012. The amendment implements formatting changes to the Operating License and TSs resulting from a change in the word processing programs and the adoption of TSTF-GG-05-01, "Writers Guide for Plant-Specific Improved Technical Specifications," Revision 1. In addition to these administrative changes, the amendment implements editorial changes which do not result in any changes to the technical or operating requirements.
By letter dated January 29, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12269A254), the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 225 to Renewed Facility Operating License No. NPF-21 for the Columbia Generating Station. The amendment consisted of changes to the Technical Specifications (TSs) and Operating License in response to your application dated January 9, 2012, as supplemented by letters dated July 30 and November 14, 2012.
Enclosure 1 (amendment letter) and Enclosure 2 (safety evaluation) to Amendment No. 225 inadvertently omitted one of the approved changes that we intended to include. Specifically, Paragraph 2.E of the Operating License was revised to remove the revision number and date of submittal of the "Columbia Generating Station Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Plan." We have enclosed corrected pages of the amendment letter and associated safety evaluation dated January 29, 2013, to address this omission.
The amendment implements formatting changes to the Operating License and TSs resulting from a change in the word processing programs and the adoption of TSTF-GG-05-01, "Writers Guide for Plant-Specific Improved Technical Specifications," Revision 1. In addition to these administrative changes, the amendment implements editorial changes which do not result in any changes to the technical or operating requirements. (amendment letter) and Enclosure 2 (safety evaluation) to Amendment No. 225 inadvertently omitted one of the approved changes that we intended to include. Specifically, Paragraph 2.E of the Operating License was revised to remove the revision number and date of submittal of the "Columbia Generating Station Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Plan."
The areas of change are marked with revision bars in the margin on the corrected pages. This administrative error on the part of the NRC does not affect the staffs overall conclusions associated with approval of Amendment No. 225. The change is within the scope of the application as originally noticed in the Federal Register on July 24,2012 (77 FR 43374). We regret any inconvenience this error may have caused.
We have enclosed corrected pages of the amendment letter and associated safety evaluation dated January 29, 2013, to address this omission. The areas of change are marked with revision bars in the margin on the corrected pages.
M. Reddemann  
This administrative error on the part of the NRC does not affect the staffs overall conclusions associated with approval of Amendment No. 225. The change is within the scope of the application as originally noticed in the Federal Register on July 24,2012 (77 FR 43374). We regret any inconvenience this error may have caused.
-If you have any questions, please contact me at (301) 415-1056 or via e-mail at lauren.gibson@nrc.gov. Sincerely, Carl F. Lyon, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-397  
 
M. Reddemann                                 - 2 If you have any questions, please contact me at (301) 415-1056 or via e-mail at lauren.gibson@nrc.gov.
Sincerely, Carl F. Lyon, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-397


==Enclosure:==
==Enclosure:==


As stated cc w/encl: Distribution via Listserv ENCLOSURE CORRECTED PAGES RELATED TO AMENDMENT NO. Amendment Letter, pages dated January 29, 2013 Safety Evaluation, pages dated January 29, 2013
As stated cc w/encl: Distribution via Listserv
-2 Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-21 is hereby amended to read as follows: (2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 225 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan. In addition, the license is amended by changes as indicated in the attachment to this license amendment, and Paragraph 2.E of Renewed Facility Operating License No. NPF-21 is hereby amended to read as follows: The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
 
The plan, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Columbia Generating Station Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Plan." Energy Northwest shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
ENCLOSURE CORRECTED PAGES RELATED TO AMENDMENT NO. 225 Amendment Letter, pages   2~3, dated January 29, 2013 Safety Evaluation, pages 5~6,  dated January 29, 2013
The Energy Northwest CSP was approved by License Amendment No. 222.
 
-3 The license amendment is effective as of its date of issuance and shall be implemented within 30 days from the date of issuance.
                                            -2
FOR THE NUCLEAR REGULATORY COMMISSION IRA! Michael T. Markley, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation  
: 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-21 is hereby amended to read as follows:
(2)     Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 225 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
In addition, the license is amended by changes as indicated in the attachment to this license amendment, and Paragraph 2.E of Renewed Facility Operating License No. NPF-21 is hereby amended to read as follows:
E.      The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plan, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Columbia Generating Station Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Plan." Energy Northwest shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The Energy Northwest CSP was approved by License Amendment No. 222.
 
                                              -3
: 3. The license amendment is effective as of its date of issuance and shall be implemented within 30 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION IRA!
Michael T. Markley, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation


==Attachment:==
==Attachment:==


Changes to the Facility Operating License No. NPF-21 and Technical Specifications Date of Issuance:
Changes to the Facility Operating License No. NPF-21 and Technical Specifications Date of Issuance: January 29, 2013
January 29, 2013
 
-3.2.16 TS 5.3.2 As the licensee stated in the January 9, 2012, submittal:
                                                - 5 3.2.16 TS 5.3.2 As the licensee stated in the January 9, 2012, submittal:
The acronym 'TS" is not defined in Section 5.3 and is not standard usage. This acronym is replaced with the word "Specification" to conform to standard language in other places in Chapter 5. This is an editorial change. 3.2.17 TS 5.7.1.e and 5.7.2.e As the licensee stated in the January 9, 2012, submittal:
The acronym 'TS" is not defined in Section 5.3 and is not standard usage. This acronym is replaced with the word "Specification" to conform to standard language in other places in Chapter 5.
This is an editorial change.
3.2.17 TS 5.7.1.e and 5.7.2.e As the licensee stated in the January 9, 2012, submittal:
The final sentence in both specifications contains a typographical error in that the word "dose" in the following sentence "and pre-job briefing dose not require documentation." should be replaced with the word "does". This error is corrected.
The final sentence in both specifications contains a typographical error in that the word "dose" in the following sentence "and pre-job briefing dose not require documentation." should be replaced with the word "does". This error is corrected.
This is an editorial change. 3.2.18 TS 5.7.2 As the licensee stated in the January 9,2012, submittal:
This is an editorial change.
3.2.18 TS 5.7.2 As the licensee stated in the January 9,2012, submittal:
The phrase "radiation source" in the title should be plural to conform to the language in TS 5.7.1. This formatting error is corrected.
The phrase "radiation source" in the title should be plural to conform to the language in TS 5.7.1. This formatting error is corrected.
This is an editorial change. 3.2.19 Operating License Condition 2.E The licensee is proposing to revise Paragraph 2.E of the facility operating license to remove the revision number and date of the "Columbia Generating Station Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Plan." This change is an editorial change. 3.3 Conclusion The NRC staff concludes that the global administrative changes and editorial changes are acceptable.  
This is an editorial change.
3.2.19 Operating License Condition 2.E The licensee is proposing to revise Paragraph 2.E of the facility operating license to remove the revision number and date of the "Columbia Generating Station Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Plan." This change is an editorial change.
3.3     Conclusion The NRC staff concludes that the global administrative changes and editorial changes are acceptable.
 
==4.0      STATE CONSULTATION==
 
In accordance with the Commission's regulations, the Washington State official was notified of the proposed issuance of the amendment. The State official had no comments.


==4.0 STATE CONSULTATION==
                                                  - 6


In accordance with the Commission's regulations, the Washington State official was notified of the proposed issuance of the amendment.
==5.0     ENVIRONMENTAL CONSIDERATION==
The State official had no comments. 
-5.0 ENVIRONMENTAL CONSIDERATION The amendment changes a requirement with respect to the installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure.
The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration and there has been no public comment on such finding published in the Federal Register on July 24,2012 (77 FR 43374). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22{c){9).
Pursuant to 10 CFR 51.22{b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.


==6.0 CONCLUSION==
The amendment changes a requirement with respect to the installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration and there has been no public comment on such finding published in the Federal Register on July 24,2012 (77 FR 43374). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22{c){9). Pursuant to 10 CFR 51.22{b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.


The Commission has concluded, based on the descriptions and changes discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public. Principal Contributor:
==6.0    CONCLUSION==
S. Anderson Date: January 29, 2013 M. Reddemann -2 If you have any questions, please contact me at (301) 415-1056 or via e-mail at lauren.gibson@nrc.gov. Docket No. 50-397


==Enclosure:==
The Commission has concluded, based on the descriptions and changes discussed above, that:
(1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: S. Anderson Date: January 29, 2013


As stated cc w/encl: Distribution via Listserv DISTRIBUTION:
ML13030A457                    *via e-mail dated OFFICE       NRR/DORLlLPL4/PM                     RLlLPL4/LA          NSIRIDSP/RSLB/BC NAME         LGibson                                                 RFelts*
PUBLIC LPLIV Reading RidsAcrsAcnw_MailCTR Resource RidsNrrDoriDpr Resource RidsNrrDorlLpl4 Resource RidsNrrDssStsb Resource RidsNrrLAJBurkhardt Resource RidsNrrPMColumbia Resource RidsOgcRp Resource RidsRgn4MailCenter Resource SAnderson, NRR/DSS/STSB RFelts, NSIR ADAMS Accession No.: ML 13030A457 OFFICE NRR/DORLlLPL4/PM NAME LGibson DATE 2/12/13 2/12/13 OGC NLO NRR/DORLlLPL4/BC E LSubin MMarkley 2/28/13 3/1113 Sincerely, IRA by Lauren Kate Gibson forI Carl F. Lyon, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
DATE         2/12/13                     2/12/13                      2/19/13 OGC NLO                     NRR/DORLlLPL4/BC             NRR/DORLlLPL4/PM E       LSubin                     MMarkley                                     r) 2/28/13                     3/1113}}
*via e-mail dated NSIRIDSP/RSLB/BC RFelts* 2/19/13 NRR/DORLlLPL4/PM r) OFFICIAL RECORD}}

Latest revision as of 22:58, 4 November 2019

Correction to Amendment Letter and Safety Evaluation Pages for Amendment No. 225, Administrative and Editorial Changes to Technical Specifications Related to Change in Software and to Adopt TSTF-GG-05-01 Revision 2 Writer'S Guide
ML13030A457
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/01/2013
From: Lyon C
Plant Licensing Branch IV
To: Reddeman M
Energy Northwest
Gibson L
References
TAC ME7904
Download: ML13030A457 (8)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 1, 2013 Mr. Mark E. Reddemann Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023)

Richland, WA 99352-0968 SUB..IECT: COLUMBIA GENERATING STATION - CORRECTION TO AMENDMENT LETTER AND SAFETY EVALUATION PAGES RELATED TO LICENSE AMENDMENT NO. 225 (TAC NO. ME7904)

Dear Mr. Reddemann:

By letter dated January 29, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12269A254), the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 225 to Renewed Facility Operating License No. NPF-21 for the Columbia Generating Station. The amendment consisted of changes to the Technical Specifications (TSs) and Operating License in response to your application dated January 9, 2012, as supplemented by letters dated July 30 and November 14, 2012.

The amendment implements formatting changes to the Operating License and TSs resulting from a change in the word processing programs and the adoption of TSTF-GG-05-01, "Writers Guide for Plant-Specific Improved Technical Specifications," Revision 1. In addition to these administrative changes, the amendment implements editorial changes which do not result in any changes to the technical or operating requirements. (amendment letter) and Enclosure 2 (safety evaluation) to Amendment No. 225 inadvertently omitted one of the approved changes that we intended to include. Specifically, Paragraph 2.E of the Operating License was revised to remove the revision number and date of submittal of the "Columbia Generating Station Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Plan."

We have enclosed corrected pages of the amendment letter and associated safety evaluation dated January 29, 2013, to address this omission. The areas of change are marked with revision bars in the margin on the corrected pages.

This administrative error on the part of the NRC does not affect the staffs overall conclusions associated with approval of Amendment No. 225. The change is within the scope of the application as originally noticed in the Federal Register on July 24,2012 (77 FR 43374). We regret any inconvenience this error may have caused.

M. Reddemann - 2 If you have any questions, please contact me at (301) 415-1056 or via e-mail at lauren.gibson@nrc.gov.

Sincerely, Carl F. Lyon, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-397

Enclosure:

As stated cc w/encl: Distribution via Listserv

ENCLOSURE CORRECTED PAGES RELATED TO AMENDMENT NO. 225 Amendment Letter, pages 2~3, dated January 29, 2013 Safety Evaluation, pages 5~6, dated January 29, 2013

-2

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-21 is hereby amended to read as follows:

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 225 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

In addition, the license is amended by changes as indicated in the attachment to this license amendment, and Paragraph 2.E of Renewed Facility Operating License No. NPF-21 is hereby amended to read as follows:

E. The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plan, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Columbia Generating Station Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Plan." Energy Northwest shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The Energy Northwest CSP was approved by License Amendment No. 222.

-3

3. The license amendment is effective as of its date of issuance and shall be implemented within 30 days from the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION IRA!

Michael T. Markley, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Facility Operating License No. NPF-21 and Technical Specifications Date of Issuance: January 29, 2013

- 5 3.2.16 TS 5.3.2 As the licensee stated in the January 9, 2012, submittal:

The acronym 'TS" is not defined in Section 5.3 and is not standard usage. This acronym is replaced with the word "Specification" to conform to standard language in other places in Chapter 5.

This is an editorial change.

3.2.17 TS 5.7.1.e and 5.7.2.e As the licensee stated in the January 9, 2012, submittal:

The final sentence in both specifications contains a typographical error in that the word "dose" in the following sentence "and pre-job briefing dose not require documentation." should be replaced with the word "does". This error is corrected.

This is an editorial change.

3.2.18 TS 5.7.2 As the licensee stated in the January 9,2012, submittal:

The phrase "radiation source" in the title should be plural to conform to the language in TS 5.7.1. This formatting error is corrected.

This is an editorial change.

3.2.19 Operating License Condition 2.E The licensee is proposing to revise Paragraph 2.E of the facility operating license to remove the revision number and date of the "Columbia Generating Station Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Plan." This change is an editorial change.

3.3 Conclusion The NRC staff concludes that the global administrative changes and editorial changes are acceptable.

4.0 STATE CONSULTATION

In accordance with the Commission's regulations, the Washington State official was notified of the proposed issuance of the amendment. The State official had no comments.

- 6

5.0 ENVIRONMENTAL CONSIDERATION

The amendment changes a requirement with respect to the installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration and there has been no public comment on such finding published in the Federal Register on July 24,2012 (77 FR 43374). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22{c){9). Pursuant to 10 CFR 51.22{b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.

6.0 CONCLUSION

The Commission has concluded, based on the descriptions and changes discussed above, that:

(1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.

Principal Contributor: S. Anderson Date: January 29, 2013

ML13030A457 *via e-mail dated OFFICE NRR/DORLlLPL4/PM RLlLPL4/LA NSIRIDSP/RSLB/BC NAME LGibson RFelts*

DATE 2/12/13 2/12/13 2/19/13 OGC NLO NRR/DORLlLPL4/BC NRR/DORLlLPL4/PM E LSubin MMarkley r) 2/28/13 3/1113