W3F1-2013-0010, (Waterford 3), Entergy Response to NRC Technical Issues for Resolution Regarding Licensee Communication Submittals Associated with Near-Term Task Force Recommendation 9.3: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:W3F1-2013-0010 February 21, 2013 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852  
{{#Wiki_filter:Entergy Operations, Inc.
17265 River Road Killona, LA 70057-3093 Tel 504-739-6660 Fax 504-739-6678 djacob2@entergy.com Donna Jacobs Vice President - Operations Waterford 3 W3F1-2013-0010 February 21, 2013 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852


==SUBJECT:==
==SUBJECT:==
Entergy Response to NRC Technical Issues for Resolution Regarding Licensee Communication Submittals Associated with Near-Term Task Force Recommendation 9.3 Waterford Steam Electric Station, Unit 3 (Waterford 3)
Entergy Response to NRC Technical Issues for Resolution Regarding Licensee Communication Submittals Associated with Near-Term Task Force Recommendation 9.3 Waterford Steam Electric Station, Unit 3 (Waterford 3)
Docket No. 50-382 License No. NPF-38  
Docket No. 50-382 License No. NPF-38


==References:==
==References:==
: 1. NRC letter to All Power Reactor Licensees and holders of Construction Permits in Active or Deferred Status, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident", dated March 12, 2012 (ADAMS Accession No. ML12053A340)
: 1. NRC letter to All Power Reactor Licensees and holders of Construction Permits in Active or Deferred Status, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident, dated March 12, 2012 (ADAMS Accession No. ML12053A340)
: 2. Entergy letter to NRC, "Entergy's 60-Day Response to the March 12, 2012, Information Request, Action Plan for Completing Emergency Communication and Staffing Assessments", dated May 10, 2012 (W3F1-2012-0026) (ADAMS Accession No. ML12135A087)
: 2. Entergy letter to NRC, Entergys 60-Day Response to the March 12, 2012, Information Request, Action Plan for Completing Emergency Communication and Staffing Assessments, dated May 10, 2012 (W3F1-2012-0026) (ADAMS Accession No. ML12135A087)
: 3. Entergy letter to NRC, "Entergy's 90-Day Response to the March 12, 2012, Information Request, Action Plan for Completing Emergency Communication, and Staffing Assessments", dated June 7, 2012 (W3F1-2012-0042) (ADAMS Accession No. ML12164A683)
: 3. Entergy letter to NRC, Entergys 90-Day Response to the March 12, 2012, Information Request, Action Plan for Completing Emergency Communication, and Staffing Assessments, dated June 7, 2012 (W3F1-2012-0042) (ADAMS Accession No. ML12164A683)
: 4. Entergy letter to NRC, "Response to the March 12, 2012, Information Request Pursuant To 10 CFR 50.54(f) Regarding Recommendation 9.3 For Completing Emergency Communication Assessments", dated October 31, 2012 (W3F1-2012-0090)
: 4. Entergy letter to NRC, Response to the March 12, 2012, Information Request Pursuant To 10 CFR 50.54(f) Regarding Recommendation 9.3 For Completing Emergency Communication Assessments, dated October 31, 2012 (W3F1-2012-0090)
: 5. NRC letter to All Power Reactor Licensees and holders of Construction Permits in Active or Deferred Status, "Follow-up Letter on Technical Issues For Resolution Regarding Licensee Communication Submittals Associated with Near-Term Task Force Recommendation 9.3 (TAC NO. ME7951)", dated January 23, 2013 (Adams Accession No. ML13010A162)
: 5. NRC letter to All Power Reactor Licensees and holders of Construction Permits in Active or Deferred Status, Follow-up Letter on Technical Issues For Resolution Regarding Licensee Communication Submittals Associated with Near-Term Task Force Recommendation 9.3 (TAC NO. ME7951), dated January 23, 2013 (Adams Accession No. ML13010A162)
Entergy Operations, Inc.
17265 River Road Killona, LA 70057-3093 Tel 504-739-6660 Fax 504-739-6678 djacob2@entergy.com Donna Jacobs Vice President - Operations Waterford 3


W3F1-2013-0010 Page 2 of 3  
W3F1-2013-0010 Page 2 of 3


==Dear Sir or Madam:==
==Dear Sir or Madam:==


On March 12, 2012, the NRC issued a letter (Reference 1) entitled, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident. Enclosure 5 of Reference 1 delineated specific requested actions and requested information associated with Recommendation 9.3 for Emergency Preparedness programs communications. Addressees were requested to submit a written response within 90 days or to provide a response within 60 days describing the alternative course of action that it proposes to take.
On March 12, 2012, the NRC issued a letter (Reference 1) entitled, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident. Enclosure 5 of Reference 1 delineated specific requested actions and requested information associated with Recommendation 9.3 for Emergency Preparedness programs communications. Addressees were requested to submit a written response within 90 days or to provide a response within 60 days describing the alternative course of action that it proposes to take.
Entergy Nuclear Operations, Inc. (Entergy) responded within 60 days (Reference 2) proposing to take the alternative course of action for communications described in   of Reference 2. Entergy implemented this alternate course of action with the submittal of Reference 3 (described interim / planned actions to enhance existing communications systems power supplies pending the communications assessment and completion of actions) and Reference 4 (summarized the results of the communications assessment and the potential enhancements).
Entergy Nuclear Operations, Inc. (Entergy) responded within 60 days (Reference 2) proposing to take the alternative course of action for communications described in of Reference 2. Entergy implemented this alternate course of action with the submittal of Reference 3 (described interim / planned actions to enhance existing communications systems power supplies pending the communications assessment and completion of actions) and Reference 4 (summarized the results of the communications assessment and the potential enhancements).
The purpose of this letter is to respond to Reference 5, the NRC follow-up letter regarding technical issues to be resolved with respect to Reference 4. Responses to the eight technical issues in Reference 5 are provided in Attachment 1. The communications assessment, originally provided in Reference 4, has been revised to reflect the responses in Attachment 1 and is found in Attachment 2. These responses are subject to change as a result of Diverse and Flexible Coping Strategies developments, advances in technology, and progress in the manner of addressing the need for these enhancements.
The purpose of this letter is to respond to Reference 5, the NRC follow-up letter regarding technical issues to be resolved with respect to Reference 4. Responses to the eight technical issues in Reference 5 are provided in Attachment 1. The communications assessment, originally provided in Reference 4, has been revised to reflect the responses in and is found in Attachment 2. These responses are subject to change as a result of Diverse and Flexible Coping Strategies developments, advances in technology, and progress in the manner of addressing the need for these enhancements.
There are no new commitments identified in this submittal. Should you have any questions concerning the content of this letter, please contact Chester Fugate, Licensing Manager, at (504) 739-6685.
There are no new commitments identified in this submittal. Should you have any questions concerning the content of this letter, please contact Chester Fugate, Licensing Manager, at (504) 739-6685.
I declare under penalty of perjury that the foregoing is true and correct. Executed on February 21, 2013.
I declare under penalty of perjury that the foregoing is true and correct. Executed on February 21, 2013.
Sincerely,           DJ/WH Attachments: 1. Waterford 3 Communications Assessment - Addressing Eight Technical Issues 2. Supplemented Waterford 3 Communications Assessment  
Sincerely, DJ/WH Attachments: 1. Waterford 3 Communications Assessment - Addressing Eight Technical Issues
: 2. Supplemented Waterford 3 Communications Assessment


W3F1-2013-0010 Page 3 of 3 cc: Attn: Director, Office of Nuclear Reactor Regulation U. S. NRC RidsNrrMailCenter@nrc.gov Mr. Elmo E. Collins, Jr., Regional Administrator U. S. NRC, Region IV RidsRgn4MailCenter@nrc.gov NRC Program Manager for Waterford 3 Kaly.Kalyanam@nrc.gov NRC Senior Resident Inspector for Waterford 3 Marlone.Davis@nrc.gov  
W3F1-2013-0010 Page 3 of 3 cc:   Attn: Director, Office of Nuclear Reactor Regulation U. S. NRC RidsNrrMailCenter@nrc.gov Mr. Elmo E. Collins, Jr., Regional Administrator U. S. NRC, Region IV RidsRgn4MailCenter@nrc.gov NRC Program Manager for Waterford 3 Kaly.Kalyanam@nrc.gov NRC Senior Resident Inspector for Waterford 3 Marlone.Davis@nrc.gov


Attachment 1 to W3F1-2013-0010 Waterford 3 Communications Assessment - Addressing Eight Technical Issues   to W3F1-2013-0010 Page 1 of 5 Waterford 3 Communications Assessment - Addressing Eight Technical Issues Technical Issue 1:
Attachment 1 to W3F1-2013-0010 Waterford 3 Communications Assessment - Addressing Eight Technical Issues to W3F1-2013-0010 Page 1 of 5 Waterford 3 Communications Assessment - Addressing Eight Technical Issues Technical Issue 1:
The staff identified that licensees need to discuss how the power for the equipment analyzed is expected to be available, and how the planned communications enhancements are expected to be maintained. The following areas were identified:
The staff identified that licensees need to discuss how the power for the equipment analyzed is expected to be available, and how the planned communications enhancements are expected to be maintained. The following areas were identified:
A. A detailed description of how power will be maintained for (1) planned or potential enhancements to the communication links, and (2) existing equipment analyzed to be available. 1. The number of replacement batteries expected to be needed for a 24-hour duration, per the Nuclear Energy Institute (NEI) 12-01 "Guideline for Assessing Beyond Design Bass Accident Response Staffing and Communications Capabilities". 2. Generator availability to charge batteries without offsite equipment for a duration of 24 hours. 3. A description of how ancillary equipment supports operations for a 24-hour duration (e.g. adequacy of fuel supplies for the generators; and the minimum number of battery chargers expected to be necessary).
A. A detailed description of how power will be maintained for (1) planned or potential enhancements to the communication links, and (2) existing equipment analyzed to be available.
Response As stated in Section 2 of the October 31, 2012, submittal, "Communication links are assumed to be established via satellite phones and use of the existing site radio system(s)". Backup power was to be provided via uninterruptable power supplies (UPSs) initially and then by portable generators. Entergy has clarified that it plans to utilize UPS units to provide 24 hours of back-up power for radio system repeaters; see Sections 4.12.1 through 4.12.4. Hand-held equipment (radios and satellite phones) will have adequate spare batteries to provide for 24 hours; see Section 4.1. As such, no portable generator use is planned for the first 24 hours. The specific number of batteries will be determined during the detailed engineering activity of the project. If during detailed engineering and planning, it is identified that these enhancements are not feasible or practical; an alternate approach will be developed.
: 1. The number of replacement batteries expected to be needed for a 24-hour duration, per the Nuclear Energy Institute (NEI) 12-01 "Guideline for Assessing Beyond Design Bass Accident Response Staffing and Communications Capabilities".
: 2. Generator availability to charge batteries without offsite equipment for a duration of 24 hours.
: 3. A description of how ancillary equipment supports operations for a 24-hour duration (e.g. adequacy of fuel supplies for the generators; and the minimum number of battery chargers expected to be necessary).
 
===Response===
As stated in Section 2 of the October 31, 2012, submittal, Communication links are assumed to be established via satellite phones and use of the existing site radio system(s). Backup power was to be provided via uninterruptable power supplies (UPSs) initially and then by portable generators. Entergy has clarified that it plans to utilize UPS units to provide 24 hours of back-up power for radio system repeaters; see Sections 4.12.1 through 4.12.4. Hand-held equipment (radios and satellite phones) will have adequate spare batteries to provide for 24 hours; see Section 4.1. As such, no portable generator use is planned for the first 24 hours. The specific number of batteries will be determined during the detailed engineering activity of the project. If during detailed engineering and planning, it is identified that these enhancements are not feasible or practical; an alternate approach will be developed.
Technical Issue 2:
Technical Issue 2:
The use and function of the planned enhancements for the improvement of communications
The use and function of the planned enhancements for the improvement of communications:
A. A description of the use of the planned enhancements: 1. A discussion of whether each planned enhancement identified is only to be used for maintaining the communication link identified, or if it is expected to be shared among other communication links. to W3F1-2013-0010 Page 2 of 5
A. A description of the use of the planned enhancements:
: 2. A general description of the planned enhancement and how the equipment will be integrated. 3. The title and general description of the procedure that will be developed and used by plant personnel to describe protocols for shared usage of communication capabilities.
: 1. A discussion of whether each planned enhancement identified is only to be used for maintaining the communication link identified, or if it is expected to be shared among other communication links.
Response Communication links will be established using the existing site radio system and satellite phones. Adequate hand-held equipment (radios and satellite phones) will be provided for each link (i.e. no sharing required). As stated in Section 4.6 of our submittals, "Entergy has not identified any communication pathway assigned to support multiple functions". (Note that field teams will be using the same radio channel.) Entergy will not be implementing shared usage; therefore, a procedure is not required.
to W3F1-2013-0010 Page 2 of 5
: 2. A general description of the planned enhancement and how the equipment will be integrated.
: 3. The title and general description of the procedure that will be developed and used by plant personnel to describe protocols for shared usage of communication capabilities.
 
===Response===
Communication links will be established using the existing site radio system and satellite phones. Adequate hand-held equipment (radios and satellite phones) will be provided for each link (i.e. no sharing required). As stated in Section 4.6 of our submittals, Entergy has not identified any communication pathway assigned to support multiple functions. (Note that field teams will be using the same radio channel.) Entergy will not be implementing shared usage; therefore, a procedure is not required.
Technical Issue 3:
Technical Issue 3:
The protection of the new equipment purchased as a planned enhancement as well as the protection of existing communications equipment analyzed as being available:
The protection of the new equipment purchased as a planned enhancement as well as the protection of existing communications equipment analyzed as being available:
A. A discussion of how the existing equipment analyzed to be available and enhancements to these communication links as well as associated ancillary equipment will be stored in a manner that is protective from a large scale natural event: 1. A description of pre-identified areas that are considered protective for existing equipment and whether new equipment will be stored in a similar location. The title and brief description of a procedure for new communications equipment storage is acceptable, if this procedure is planned to be developed in the future; or a statement that this will be completed in alignment with NRC order EA-12-049. 2. Equipment stored off-site, should have an analysis of duration to set-up this equipment for use. 3. The analysis demonstrates that the existing equipment that is expected to be available will be functional.
A.     A discussion of how the existing equipment analyzed to be available and enhancements to these communication links as well as associated ancillary equipment will be stored in a manner that is protective from a large scale natural event:
Response New power supplies for radio equipment will be installed adjacent to the existing equipment and therefore are protected per the discussion provided in Section 4.12 of the assessment report. The enhancements identified for the existing equipment would also apply to the new power supplies. Section 4.5 of the report has been revised to clarify this point.
: 1. A description of pre-identified areas that are considered protective for existing equipment and whether new equipment will be stored in a similar location.
The title and brief description of a procedure for new communications equipment storage is acceptable, if this procedure is planned to be developed in the future; or a statement that this will be completed in alignment with NRC order EA-12-049.
: 2. Equipment stored off-site, should have an analysis of duration to set-up this equipment for use.
: 3. The analysis demonstrates that the existing equipment that is expected to be available will be functional.
 
===Response===
New power supplies for radio equipment will be installed adjacent to the existing equipment and therefore are protected per the discussion provided in Section 4.12 of the assessment report. The enhancements identified for the existing equipment would also apply to the new power supplies. Section 4.5 of the report has been revised to clarify this point.
No equipment is currently planned to be stored off site.
No equipment is currently planned to be stored off site.
Analysis is per section 4.12 of the assessment report.
Analysis is per section 4.12 of the assessment report.
Line 62: Line 78:
The programmatic controls for the use of the new equipment purchased as a planned enhancement:
The programmatic controls for the use of the new equipment purchased as a planned enhancement:
A. A description of planned proceduralization and training for the use of these planned enhancements. It is acceptable to provide a title and description of a new procedure for communications equipment.
A. A description of planned proceduralization and training for the use of these planned enhancements. It is acceptable to provide a title and description of a new procedure for communications equipment.
: 1. A description of any credited manual actions and their procedures. 2. A description of any maintenance for this equipment, including operability testing. 3. A description of periodic inventory checks. 4. A description of planned staff training.
: 1. A description of any credited manual actions and their procedures.
Response Section 4.8 has been revised to indicate that existing site procedures for inventory checks and testing will be updated and used for the new equipment. Site Maintenance programs will be used as appropriate for controlling required maintenance (e.g. replacing UPSs' batteries).
: 2. A description of any maintenance for this equipment, including operability testing.
: 3. A description of periodic inventory checks.
: 4. A description of planned staff training.
 
===Response===
Section 4.8 has been revised to indicate that existing site procedures for inventory checks and testing will be updated and used for the new equipment.
Site Maintenance programs will be used as appropriate for controlling required maintenance (e.g. replacing UPSs batteries).
Section 4.11 has been revised to indicate that training will be conducted to ensure personnel are familiar with the operation of the new equipment, storage location and any other requirements.
Section 4.11 has been revised to indicate that training will be conducted to ensure personnel are familiar with the operation of the new equipment, storage location and any other requirements.
Technical Issue 5:
Technical Issue 5:
A discussion on what assumptions are used as part of the Communications Assessment:
A discussion on what assumptions are used as part of the Communications Assessment:
A. A description of the assumptions used for the submitted Communications Assessment Summary, and technical justification for any differences from the assumptions within NEI 12-01, Sections 2.2 "Assumptions common to Both Assessments" and 2.4 "Assumptions for Communications Assessments."
A. A description of the assumptions used for the submitted Communications Assessment Summary, and technical justification for any differences from the assumptions within NEI 12-01, Sections 2.2 Assumptions common to Both Assessments and 2.4 Assumptions for Communications Assessments.
Response Section 3 has been revised to indicate that assumptions are as stipulated in NEI 12-01.       to W3F1-2013-0010 Page 4 of 5 Technical Issue 6:
 
===Response===
Section 3 has been revised to indicate that assumptions are as stipulated in NEI 12-01.
to W3F1-2013-0010 Page 4 of 5 Technical Issue 6:
How plant personnel will be notified in the event of a large scale natural event that causes a loss of all AC power:
How plant personnel will be notified in the event of a large scale natural event that causes a loss of all AC power:
A. A description and title of the procedure for emergency notification of essentially all plant staff within 30 minutes (if applicable to the site Emergency Plan). B. A description and title of procedure for notification of emergency response organization staff (i.e., self activation) (if applicable).
A. A description and title of the procedure for emergency notification of essentially all plant staff within 30 minutes (if applicable to the site Emergency Plan).
Response Plant personnel will become aware of the large scale natural event by personal observation. An update is being prepared for General Employee Training (GET) to include direction regarding actions to be taken by on-site personnel upon observation of the event. Site accountability processes will be implemented to ensure all personnel within the protected area are notified and accounted for.
B. A description and title of procedure for notification of emergency response organization staff (i.e., self activation) (if applicable).
 
===Response===
Plant personnel will become aware of the large scale natural event by personal observation. An update is being prepared for General Employee Training (GET) to include direction regarding actions to be taken by on-site personnel upon observation of the event. Site accountability processes will be implemented to ensure all personnel within the protected area are notified and accounted for.
Section 4.4 indicates that notification of the Emergency Response Organization (ERO) will be as discussed in Section 4.4 (second bullet) of NEI 12-01. This expectation has been communicated to the site ERO and has been included in initial and continuing ERO training.
Section 4.4 indicates that notification of the Emergency Response Organization (ERO) will be as discussed in Section 4.4 (second bullet) of NEI 12-01. This expectation has been communicated to the site ERO and has been included in initial and continuing ERO training.
Technical Issue 7:
Technical Issue 7:
How communications will be maintained during the period of final implementation of the communications enhancements:
How communications will be maintained during the period of final implementation of the communications enhancements:
A. Identification and description of the interim actions that will be in place to bridge the gap until all final mitigation strategies being proceduralized are implemented. This also includes equipment protection.
A. Identification and description of the interim actions that will be in place to bridge the gap until all final mitigation strategies being proceduralized are implemented. This also includes equipment protection.
Response Section 5 has been added to the submittal providing a summary of interim actions, including: Number of satellite phones provided (minimum of nine at single unit sites and 11 at dual unit sites). Existing radio system capability during loss of AC power (e.g. existence of UPS, talk around capability, etc.) ERO notification methodology established/implemented.
 
===Response===
Section 5 has been added to the submittal providing a summary of interim actions, including:
* Number of satellite phones provided (minimum of nine at single unit sites and 11 at dual unit sites).
* Existing radio system capability during loss of AC power (e.g. existence of UPS, talk around capability, etc.)
* ERO notification methodology established/implemented.
to W3F1-2013-0010 Page 5 of 5 Technical Issue 8:
to W3F1-2013-0010 Page 5 of 5 Technical Issue 8:
Descriptions are needed regarding how communications will be maintained with the on-site and in-plant response teams and offsite response organizations if their communication links are not expected to be available:
Descriptions are needed regarding how communications will be maintained with the on-site and in-plant response teams and offsite response organizations if their communication links are not expected to be available:
A. A timeline for when the evaluation for site specific improvements for on-site and in-plant response teams will be completed. B. A discussion of the enhancements that are planned for the offsite response organization communication links.
A. A timeline for when the evaluation for site specific improvements for on-site and in-plant response teams will be completed.
Response Section 6 has been added to the report and includes a table providing target dates for implementation of the identified enhancements.  
B. A discussion of the enhancements that are planned for the offsite response organization communication links.


Attachment 2 to W3F1-2013-0010 Supplemented Waterford 3 Communications Assessment   to W3F1-2013-0010 Page 1 of 27 Supplemented Waterford 3 Communications Assessment
===Response===
Section 6 has been added to the report and includes a table providing target dates for implementation of the identified enhancements.
 
Attachment 2 to W3F1-2013-0010 Supplemented Waterford 3 Communications Assessment to W3F1-2013-0010 Page 1 of 27 Supplemented Waterford 3 Communications Assessment
: 1. Executive Summary:
: 1. Executive Summary:
The purpose of this report is to document performance of an NRC-requested assessment of the current communications systems and equipment used at the Waterford 3 SES during an emergency event as defined by NEI 12-01, "Guideline for Assessing Beyond Design Basis Accident Response Staffing and Communications Capabilities.Power supplies for the existing communications equipment to be credited have been assessed to determine power availability during a prolonged Station Blackout (SBO) event.
The purpose of this report is to document performance of an NRC-requested assessment of the current communications systems and equipment used at the Waterford 3 SES during an emergency event as defined by NEI 12-01, Guideline for Assessing Beyond Design Basis Accident Response Staffing and Communications Capabilities. Power supplies for the existing communications equipment to be credited have been assessed to determine power availability during a prolonged Station Blackout (SBO) event.
The beyond design basis events assumed in this assessment introduce conditions that could render a significant portion of existing communications capabilities inoperable. The assessment identifies enhancements to maintain communications capabilities for responding to emergency events. These enhancements include:
The beyond design basis events assumed in this assessment introduce conditions that could render a significant portion of existing communications capabilities inoperable. The assessment identifies enhancements to maintain communications capabilities for responding to emergency events. These enhancements include:
Improvements to radio equipment power supplies including: UPS(s)/batteries for fixed equipment. Added satellite based communications capability. Re-locating flooding vulnerable equipment to locations above design flood level.
* Improvements to radio equipment power supplies including: UPS(s)/batteries for fixed equipment.
* Added satellite based communications capability.
* Re-locating flooding vulnerable equipment to locations above design flood level.
to W3F1-2013-0010 Page 2 of 27
to W3F1-2013-0010 Page 2 of 27
: 2. Methodology This report is based on the recommended criteria from NEI 12-01, for use in identifying enhancements that will ensure the availability of critical communications capabilities during an extended loss of AC power, including evaluation of power sources for communications equipment. This approach provides the flexibility to perform a communications capability assessment that accommodates specific site needs while, at the same time, ensuring consistency with industry-developed standards, and NRC regulations and guidance.
: 2. Methodology This report is based on the recommended criteria from NEI 12-01, for use in identifying enhancements that will ensure the availability of critical communications capabilities during an extended loss of AC power, including evaluation of power sources for communications equipment. This approach provides the flexibility to perform a communications capability assessment that accommodates specific site needs while, at the same time, ensuring consistency with industry-developed standards, and NRC regulations and guidance.
The assessment focused on the communication systems to be credited. For example, existing telephone communications are assumed to be inoperable and therefore are not credited or evaluated in this assessment. Communication links are assumed to be established via satellite phones and use of the existing site radio system(s). Walk downs to evaluate the equipment locations and function were performed. Enhancements identified within the assessment will be further developed as implementation progresses. Alternate approaches will be utilized if prudent (e.g. alternate/new technology, improved capability, cost savings, etc.).
The assessment focused on the communication systems to be credited. For example, existing telephone communications are assumed to be inoperable and therefore are not credited or evaluated in this assessment. Communication links are assumed to be established via satellite phones and use of the existing site radio system(s). Walk downs to evaluate the equipment locations and function were performed. Enhancements identified within the assessment will be further developed as implementation progresses. Alternate approaches will be utilized if prudent (e.g. alternate/new technology, improved capability, cost savings, etc.).
: 3. Assumptions: The assumptions as stated in NEI 12-01 form the basis for this assessment, including:
: 3. Assumptions: The assumptions as stated in NEI 12-01 form the basis for this assessment, including:
Extended loss of AC power event Successful plant shutdown No hostile action 6 hours post event - no site access 6-24 hours post event - limited site access, individual access by walking, personal transport or alternative transport 24+ hours post event - site access restored to near normal status Installed sources of AC power not available Non-essential loads from DC battery sources are stripped per station procedures Installed inverters and battery chargers remain available provided they are protected from external events Onsite diesel fuel oil is available provided it is stored in a protected manner from external events Portable equipment may be used provided it is stored onsite and protected from seismic, wind and flooding events. Includes portable AC and DC power sources Onsite communications infrastructure remains available provided it is protected from seismic, wind and flooding events. Offsite communications infrastructure is inoperable out to 25 miles Communications equipment located at an offsite response facility and supplied from a backup power source is assumed to be functional.
* Extended loss of AC power event
: 4. Communications During An Extended Loss Of AC Power NEI 12-01 Section 4, "Communications During an Extended Loss of AC Power," provides the basis for the following assessment.
* Successful plant shutdown
to W3F1-2013-0010 Page 3 of 27 4.1 Required Emergency Communication Capabilities (NEI 12-01 Section 4.1)
* No hostile action
* 6 hours post event - no site access
* 6-24 hours post event - limited site access, individual access by walking, personal transport or alternative transport
* 24+ hours post event - site access restored to near normal status
* Installed sources of AC power not available
* Non-essential loads from DC battery sources are stripped per station procedures
* Installed inverters and battery chargers remain available provided they are protected from external events
* Onsite diesel fuel oil is available provided it is stored in a protected manner from external events
* Portable equipment may be used provided it is stored onsite and protected from seismic, wind and flooding events. Includes portable AC and DC power sources
* Onsite communications infrastructure remains available provided it is protected from seismic, wind and flooding events.
* Offsite communications infrastructure is inoperable out to 25 miles
* Communications equipment located at an offsite response facility and supplied from a backup power source is assumed to be functional.
: 4. Communications During An Extended Loss Of AC Power NEI 12-01 Section 4, Communications During an Extended Loss of AC Power, provides the basis for the following assessment.
to W3F1-2013-0010 Page 3 of 27 4.1 Required Emergency Communication Capabilities (NEI 12-01 Section 4.1)
Entergy has reviewed the communications links and has determined the method of communications (i.e. radio or satellite phone) for each defined link and overall the number of satellite phones and radios needed. The analysis has determined in order to establish the required links, additional satellite phones and spare batteries are needed. The attached rollup tables provide additional detail on the identified communication links.
Entergy has reviewed the communications links and has determined the method of communications (i.e. radio or satellite phone) for each defined link and overall the number of satellite phones and radios needed. The analysis has determined in order to establish the required links, additional satellite phones and spare batteries are needed. The attached rollup tables provide additional detail on the identified communication links.
4.2 Plant Paging (Announcement) System (NEI 12-01 Section 4.2)
4.2 Plant Paging (Announcement) System (NEI 12-01 Section 4.2)
NEI 12-01 Section 4.2 requires notification of the plant staff at the onset of the event. The Waterford 3 plant paging system provides public address capability over a large portion of the site. Considering the event as defined by NEI 12-01, the system is limited primarily by the lack of system wide back up power. Although portions of the system may be available, it will not be credited as available for notification of plant personnel. Alternative measures should be established (non-essential plant personnel should be trained to report to site assembly areas during SBO conditions).
NEI 12-01 Section 4.2 requires notification of the plant staff at the onset of the event. The Waterford 3 plant paging system provides public address capability over a large portion of the site. Considering the event as defined by NEI 12-01, the system is limited primarily by the lack of system wide back up power. Although portions of the system may be available, it will not be credited as available for notification of plant personnel. Alternative measures should be established (non-essential plant personnel should be trained to report to site assembly areas during SBO conditions).
4.3 Communications Equipment at Offsite Response Organization (ORO) Facilities (NEI 12-01 Section 4.3)
4.3 Communications Equipment at Offsite Response Organization (ORO) Facilities (NEI 12-01 Section 4.3)
Per NEI 12-01, "Some communications capability should be available at the ORO facilities that normally receive licensee notifications of an emergency declaration or a Protective Action Recommendation.Entergy has assessed capabilities at their ORO facilities. All four (4) ORO facilities (St. Charles Parish, St. John the Baptist Parish, Governor's Office of Homeland Security & Emergency Preparedness, and Louisiana Department of Environmental Quality) have backup power and satellite phone communications. No additional communication capabilities will be required at the ORO facilities.
Per NEI 12-01, Some communications capability should be available at the ORO facilities that normally receive licensee notifications of an emergency declaration or a Protective Action Recommendation. Entergy has assessed capabilities at their ORO facilities. All four (4) ORO facilities (St. Charles Parish, St. John the Baptist Parish, Governors Office of Homeland Security & Emergency Preparedness, and Louisiana Department of Environmental Quality) have backup power and satellite phone communications. No additional communication capabilities will be required at the ORO facilities.
4.4 Notification of the Emergency Response Organization (ERO) (NEI 12-01 Section 4.4)
4.4 Notification of the Emergency Response Organization (ERO) (NEI 12-01 Section 4.4)
NEI 12-01 offers two potential options to promote timely staff augmentation by the ERO.
NEI 12-01 offers two potential options to promote timely staff augmentation by the ERO.
Waterford 3 will ensure that "ERO members are trained to automatically respond to their assigned facilities or a designated staging area when made aware of a wide loss-of-grid (e.g. by direct observation, media reports, word-of-mouth, etc.).This expectation has been communicated to the ERO and has been included in initial and annual ERO requalification training.
Waterford 3 will ensure that ERO members are trained to automatically respond to their assigned facilities or a designated staging area when made aware of a wide loss-of-grid (e.g. by direct observation, media reports, word-of-mouth, etc.). This expectation has been communicated to the ERO and has been included in initial and annual ERO requalification training.
4.5 Equipment Location Requirements (NEI 12-01 Section 4.5)
4.5 Equipment Location Requirements (NEI 12-01 Section 4.5)
Communication equipment to be used or considered operable, "should be in a location and maintained in a manner that maximizes survivability following a beyond design basis external event. In particular, the location or manner should reasonably preclude wetting from flooding or impact damage from a seismic event". The communication links as defined by NEI 12-01 should be established using satellite phones and radios. Existing, installed communications equipment to be credited (i.e. considered operable) is limited to the plant radio system(s). Assessments have been performed, including walkdowns, of the existing installed radio equipment. Enhancements are recommended to address some identified concerns associated with the equipment's ability to survive a seismic event.
Communication equipment to be used or considered operable, should be in a location and maintained in a manner that maximizes survivability following a beyond design basis external event. In particular, the location or manner should reasonably preclude wetting from flooding or impact damage from a seismic event. The communication links as defined by NEI 12-01 should be established using satellite phones and radios. Existing, installed communications equipment to be credited (i.e. considered operable) is limited to the plant radio system(s). Assessments have been performed, including walkdowns, of the existing installed radio equipment. Enhancements are recommended to address some identified concerns associated with the equipments ability to survive a seismic event.
Structural capability of the equipment support/mounting as well as impact from adjacent equipment and/or stored material should be addressed. Power supply enhancements are   to W3F1-2013-0010 Page 4 of 27 expected to be installed adjacent to the existing equipment and therefore would be subject to the same assessment findings and resulting enhancements. An issue associated with wetting from flooding was identified for the Information Technology Building and the Emergency Operations Facility. See Sections 4.12.1 - 4.12.4 and Table 9 in attached rollup tables for details. Programmatic requirements need to be established to ensure the credited equipment is maintained in a manner that maximizes survivability.
Structural capability of the equipment support/mounting as well as impact from adjacent equipment and/or stored material should be addressed. Power supply enhancements are to W3F1-2013-0010 Page 4 of 27 expected to be installed adjacent to the existing equipment and therefore would be subject to the same assessment findings and resulting enhancements. An issue associated with wetting from flooding was identified for the Information Technology Building and the Emergency Operations Facility. See Sections 4.12.1 - 4.12.4 and Table 9 in attached rollup tables for details. Programmatic requirements need to be established to ensure the credited equipment is maintained in a manner that maximizes survivability.
No equipment is currently planned to be stored off site for onsite use.
No equipment is currently planned to be stored off site for onsite use.
4.6 Performance Characteristics (NEI 12-01 Section 4.6)
4.6 Performance Characteristics (NEI 12-01 Section 4.6)
The performance characteristics as identified in this section of NEI 12-01 requires that communication pathways (e.g., radio channels, satellite phone) designated to support multiple functions must be analyzed to demonstrate that they can simultaneously support both functions. Entergy has not identified any communication pathway assigned to support multiple functions.
The performance characteristics as identified in this section of NEI 12-01 requires that communication pathways (e.g., radio channels, satellite phone) designated to support multiple functions must be analyzed to demonstrate that they can simultaneously support both functions. Entergy has not identified any communication pathway assigned to support multiple functions.
4.7 Other Assessment Considerations (NEI 12-01 Section 4.7)
4.7 Other Assessment Considerations (NEI 12-01 Section 4.7)
Enhancements (physical and programmatic) are recommended to ensure considerations, as identified in this section of NEI 12-01, are met. Provisions for portable backup power sources and batteries for battery operated equipment should be established.
Enhancements (physical and programmatic) are recommended to ensure considerations, as identified in this section of NEI 12-01, are met. Provisions for portable backup power sources and batteries for battery operated equipment should be established.
4.8 Quality and Maintenance-Related Requirements (NEI 12-01 Section 4.8)
4.8 Quality and Maintenance-Related Requirements (NEI 12-01 Section 4.8)
The requirements identified in this section of NEI 12-01 should be incorporated into the program for ensuring the credited equipment is maintained in a manner that maximizes survivability. Programmatic controls should be established to ensure that equipment remains available and operable. Existing site inventory and test procedures will be updated and used for the new equipment to ensure the equipment is available and operable. Site maintenance programs will be used as appropriate for controlling required maintenance (e.g. replacing UPS batteries).
The requirements identified in this section of NEI 12-01 should be incorporated into the program for ensuring the credited equipment is maintained in a manner that maximizes survivability. Programmatic controls should be established to ensure that equipment remains available and operable. Existing site inventory and test procedures will be updated and used for the new equipment to ensure the equipment is available and operable. Site maintenance programs will be used as appropriate for controlling required maintenance (e.g. replacing UPS batteries).
4.9 National Communications System (NCS) Services (NEI 12-01 Section 4.9)
4.9 National Communications System (NCS) Services (NEI 12-01 Section 4.9)
Waterford 3 currently has voice circuits that are TSP (Telecommunications Service Priority) protected. The GETS (Government Emergency Telecommunications Services) access card service, which aids in routing a phone call through a high traffic infrastructure, would have limited value in a natural disaster in which there was little infrastructure available. However, Waterford 3 maintains GETS access cards for the potential value added. Additional TSP protection is not planned.
Waterford 3 currently has voice circuits that are TSP (Telecommunications Service Priority) protected. The GETS (Government Emergency Telecommunications Services) access card service, which aids in routing a phone call through a high traffic infrastructure, would have limited value in a natural disaster in which there was little infrastructure available. However, Waterford 3 maintains GETS access cards for the potential value added. Additional TSP protection is not planned.
4.10 Communication Provider Emergency Services (NEI 12-01 Section 4.10)
4.10 Communication Provider Emergency Services (NEI 12-01 Section 4.10)
Entergy has contacted the major communications service providers which service the Entergy nuclear fleet (i.e. Verizon and AT&T). Neither company has a separate emergency services priority other than government TSP (Telecommunications Service Priority), which is addressed in Section 4.9. No further enhancements are planned.
Entergy has contacted the major communications service providers which service the Entergy nuclear fleet (i.e. Verizon and AT&T). Neither company has a separate emergency services priority other than government TSP (Telecommunications Service Priority), which is addressed in Section 4.9. No further enhancements are planned.
to W3F1-2013-0010 Page 5 of 27 4.11 Personnel Training (NEI 12-01 Section 4.11)
to W3F1-2013-0010 Page 5 of 27 4.11 Personnel Training (NEI 12-01 Section 4.11)
Additional training is needed to ensure ERO and plant staff is familiar with the credited equipment's use and storage location and other requirements. Training may include:   drills, tabletops, classroom and/or computer based training. Appropriate personnel will be familiarized with the communication equipment use, capabilities and limitations during the interim period prior to full implementation of the identified enhancements.
Additional training is needed to ensure ERO and plant staff is familiar with the credited equipments use and storage location and other requirements. Training may include:
drills, tabletops, classroom and/or computer based training. Appropriate personnel will be familiarized with the communication equipment use, capabilities and limitations during the interim period prior to full implementation of the identified enhancements.
4.12 Equipment Locations and Capabilities The communications functions, radio reception/transmission equipment, and protection of each location from seismic, wind, and flooding are discussed below. Specifically, the structural capacity of the equipment in its current configuration was evaluated in its ability to withstand the identified external hazards. These hazards include seismic, flooding, and high winds. The structural evaluation was based on engineering judgment developed by a consensus of two engineers experienced in structural design and construction.
4.12 Equipment Locations and Capabilities The communications functions, radio reception/transmission equipment, and protection of each location from seismic, wind, and flooding are discussed below. Specifically, the structural capacity of the equipment in its current configuration was evaluated in its ability to withstand the identified external hazards. These hazards include seismic, flooding, and high winds. The structural evaluation was based on engineering judgment developed by a consensus of two engineers experienced in structural design and construction.
It is required that EP Communication equipment be reasonably protected from a beyond design basis seismic event. To the extent possible, the existing guidance provided in EPRI NP-6041, " Nuclear Power Plant Seismic Margin " is used for determination of the seismic/wind design capabilities of structures containing Systems, Structures and Components (SSCs) in the vicinity (adjacent and overhead) of existing Emergency Plan (EP) Communication equipment. Additionally, existing seismic/wind housekeeping procedures should be used to establish secure storage of EP communication equipment. This includes consideration of adjacent SSCs that may pose a potential seismic/wind interaction hazard.
It is required that EP Communication equipment be reasonably protected from a beyond design basis seismic event. To the extent possible, the existing guidance provided in EPRI NP-6041, " Nuclear Power Plant Seismic Margin " is used for determination of the seismic/wind design capabilities of structures containing Systems, Structures and Components (SSCs) in the vicinity (adjacent and overhead) of existing Emergency Plan (EP) Communication equipment. Additionally, existing seismic/wind housekeeping procedures should be used to establish secure storage of EP communication equipment.
This includes consideration of adjacent SSCs that may pose a potential seismic/wind interaction hazard.
Where these procedures and guidance cannot be applied, it should be ensured that EP Communication equipment be contained within one or more of the configurations:
Where these procedures and guidance cannot be applied, it should be ensured that EP Communication equipment be contained within one or more of the configurations:
In an existing safety related structure designed for the Safe Shutdown Earthquake (SSE), or   In a structure designed to or evaluated equivalent to ASCE 7-10, "Minimum Design Loads for Buildings and Other Structures", or Outside a structure and evaluated for seismic interactions to ensure equipment is not damaged by non-seismically robust components or structures, and Equipment is located above the design basis flood elevation for the plant (29.25') or is otherwise protected and would not be subjected to localized flooding.
In an existing safety related structure designed for the Safe Shutdown Earthquake (SSE), or In a structure designed to or evaluated equivalent to ASCE 7-10, "Minimum Design Loads for Buildings and Other Structures", or Outside a structure and evaluated for seismic interactions to ensure equipment is not damaged by non-seismically robust components or structures, and Equipment is located above the design basis flood elevation for the plant (29.25) or is otherwise protected and would not be subjected to localized flooding.
The sections below provide a summary of the area walk downs and their potential configuration concerns that could present challenges in maintaining an operable communication system in the event of one or more of the identified environmental hazards. 4.12.1 Reactor Auxiliary Building (RAB) Location and General
The sections below provide a summary of the area walk downs and their potential configuration concerns that could present challenges in maintaining an operable communication system in the event of one or more of the identified environmental hazards.
4.12.1 Reactor Auxiliary Building (RAB)
Location and General


== Description:==
== Description:==


The RAB is classified as a safety-related structure and is designed Seismic Category I. The communications equipment is located in a limited access, air conditioned   to W3F1-2013-0010 Page 6 of 27 communication equipment room in the RAB (+7 ft. elevation). The room is bounded by the building exterior on two sides and two masonry block walls (North and West side) with steel angle restraints on the other two sides. Entrance is through an interior fire door (Door 123) from the corridor. The room is normally ventilated via a fan in the ceiling. The antennae for the repeaters are located on the top of the structure. The RAB structure provides reasonable assurance that the EP Communications Equipment is protected during a seismic event, as defined in NEI 12-01.
The RAB is classified as a safety-related structure and is designed Seismic Category I.
The communications equipment is located in a limited access, air conditioned to W3F1-2013-0010 Page 6 of 27 communication equipment room in the RAB (+7 ft. elevation). The room is bounded by the building exterior on two sides and two masonry block walls (North and West side) with steel angle restraints on the other two sides. Entrance is through an interior fire door (Door 123) from the corridor. The room is normally ventilated via a fan in the ceiling. The antennae for the repeaters are located on the top of the structure.
The RAB structure provides reasonable assurance that the EP Communications Equipment is protected during a seismic event, as defined in NEI 12-01.
Equipment & Functionality:
Equipment & Functionality:
The communication equipment room located in RAB (+7 ft. elevation) houses radio cabinets, plant paging system, and the Public Automatic Branch Exchange (PABX) system. The radio cabinet contains five repeaters (operations and maintenance, secondary radiological field monitoring, radiation protection, and security) and combiner equipment. The operations and maintenance radio system is the primary radio communications network for normal onsite communication for operations and maintenance personnel. When an emergency is declared, the maintenance radio frequency is assigned to emergency communications. The secondary radiological field monitoring radio network is used to transmit offsite radiological data during an emergency. The security radio system is to communicate with security personnel during normal and emergency conditions.
The communication equipment room located in RAB (+7 ft. elevation) houses radio cabinets, plant paging system, and the Public Automatic Branch Exchange (PABX) system. The radio cabinet contains five repeaters (operations and maintenance, secondary radiological field monitoring, radiation protection, and security) and combiner equipment. The operations and maintenance radio system is the primary radio communications network for normal onsite communication for operations and maintenance personnel. When an emergency is declared, the maintenance radio frequency is assigned to emergency communications. The secondary radiological field monitoring radio network is used to transmit offsite radiological data during an emergency. The security radio system is to communicate with security personnel during normal and emergency conditions.
Remote radio stations are located inside and outside of the protected area. These stations provide coverage to interior and exterior areas of the plant.
Remote radio stations are located inside and outside of the protected area. These stations provide coverage to interior and exterior areas of the plant.
Power: Power to the radio system equipment is supplied from RAB Distribution Panel PDP-387-2A, circuits 3, 4, 11, and 12. Distribution Panel PDP-387-2A is powered from a 120 VAC source from the Computer Static Uninterruptible Power Supply (SUPS) System. The Computer SUPS rated at 200 KVA having maximum output of 1666.7 Amps at 120V AC.
Power:
Power to the radio system equipment is supplied from RAB Distribution Panel PDP-387-2A, circuits 3, 4, 11, and 12. Distribution Panel PDP-387-2A is powered from a 120 VAC source from the Computer Static Uninterruptible Power Supply (SUPS) System. The Computer SUPS rated at 200 KVA having maximum output of 1666.7 Amps at 120V AC.
It is recommended that the UPS batteries will be sized to provide adequate amp hour capacity as required.
It is recommended that the UPS batteries will be sized to provide adequate amp hour capacity as required.
Seismic Protection:
Seismic Protection:
Computer Equipment Rooms RAB (+7 ft. and +21 ft. elevation)
Computer Equipment Rooms RAB (+7 ft. and +21 ft. elevation)
Seismic - ENHANCEMENT RECOMMENDED Anchorages - ENHANCEMENT RECOMMENDED Issues: The Meridian PABX cabinets are on wheels with jacked up leveling screws. The Meridian PABX cabinets are not anchored. The walkdown team did not enter into the AB Battery room since it required a key from the Control Room. The walkdown team has taken into consideration that since the batteries are located in the RAB, they would be seismically mounted. Need to verify that the AB Batteries are seismically mounted.
Seismic - ENHANCEMENT RECOMMENDED Anchorages - ENHANCEMENT RECOMMENDED Issues:
Acceptable Anchorage:   to W3F1-2013-0010 Page 7 of 27 The Motorola radio cabinets, plant paging system and old PABX racks are anchored to floor. The anchorage of this equipment is seismically acceptable. There are no concerns regarding degraded anchorages. The wall mounted electrical panels anchorage is seismically acceptable. The switches, connectors and small transformers mounted to plywood panel boards attached to Unistrut anchored to wall judged acceptable. The AB SUPS cabinets are anchored to the floor and are considered seismically adequate.
* The Meridian PABX cabinets are on wheels with jacked up leveling screws. The Meridian PABX cabinets are not anchored.
* The walkdown team did not enter into the AB Battery room since it required a key from the Control Room. The walkdown team has taken into consideration that since the batteries are located in the RAB, they would be seismically mounted. Need to verify that the AB Batteries are seismically mounted.
Acceptable Anchorage:
to W3F1-2013-0010 Page 7 of 27
* The Motorola radio cabinets, plant paging system and old PABX racks are anchored to floor. The anchorage of this equipment is seismically acceptable. There are no concerns regarding degraded anchorages.
* The wall mounted electrical panels anchorage is seismically acceptable.
* The switches, connectors and small transformers mounted to plywood panel boards attached to Unistrut anchored to wall judged acceptable.
* The AB SUPS cabinets are anchored to the floor and are considered seismically adequate.
Spatial Interactions:
Spatial Interactions:
Issues: None Acceptable Spatial Interactions: Cable raceways are approximately 50% filled and are mounted using standard Unistruct rod hanger hardware. There are coiled fiber optic cables tie wrapped to the outside of the cable tray above the new PABX cabinets. Per discussion with Waterford 3 site representative during the walkdown, the coil fiber optic cables are for new connections and this condition is temporary. There are no concerns with electrical conduits. The fluorescent lighting hung with rigid conduits is judged acceptable. There are no ceiling tiles in the communication room. There are no ceiling tiles in the AB SUPS area. The two-masonry walls (North and West Walls) have steel angle restraints at the ceiling intersections. Per discussion with Waterford 3 site representative during the walkdown, the masonry walls are reinforced block wall. Therefore, there is no seismic II/I concerns.
Issues:
* None Acceptable Spatial Interactions:
* Cable raceways are approximately 50% filled and are mounted using standard Unistruct rod hanger hardware. There are coiled fiber optic cables tie wrapped to the outside of the cable tray above the new PABX cabinets. Per discussion with Waterford 3 site representative during the walkdown, the coil fiber optic cables are for new connections and this condition is temporary. There are no concerns with electrical conduits.
* The fluorescent lighting hung with rigid conduits is judged acceptable. There are no ceiling tiles in the communication room.
* There are no ceiling tiles in the AB SUPS area.
* The two-masonry walls (North and West Walls) have steel angle restraints at the ceiling intersections. Per discussion with Waterford 3 site representative during the walkdown, the masonry walls are reinforced block wall. Therefore, there is no seismic II/I concerns.
Housekeeping:
Housekeeping:
Issues: Area needs to be cleaned up and organized - Housekeeping type activities. (Housekeeping issues have been resolved) There is an unanchored storage cabinet near the radio cabinet. There is a metal desk on wheels and chair on wheels next to the PABX rack. The chair has a bicycle cable with lock tied to the fiber optic channel equipment rack. There is a six-foot ladder leaning against the wall next to the plant paging system rack. No ladder storage hook or tie-down observed in the area. (Ladder has been removed from room)
Issues:
* Area needs to be cleaned up and organized - Housekeeping type activities. (Housekeeping issues have been resolved)
* There is an unanchored storage cabinet near the radio cabinet.
* There is a metal desk on wheels and chair on wheels next to the PABX rack. The chair has a bicycle cable with lock tied to the fiber optic channel equipment rack.
* There is a six-foot ladder leaning against the wall next to the plant paging system rack. No ladder storage hook or tie-down observed in the area. (Ladder has been removed from room)
There are no seismic concerns for the RAB since the structure is designed seismic category I.
There are no seismic concerns for the RAB since the structure is designed seismic category I.
to W3F1-2013-0010 Page 8 of 27 Flood Protection ACCEPTABLE:
to W3F1-2013-0010 Page 8 of 27 Flood Protection ACCEPTABLE:
Computer Equipment Room RAB (+7 ft. elevation)
Computer Equipment Room RAB (+7 ft. elevation)
There is a 10 in. nominal pipe size pipe running overhead in the back of the room above the radio cabinets. The piping is a drain line for the fire protection sprinklers and has Victaulic couplings.
* There is a 10 in. nominal pipe size pipe running overhead in the back of the room above the radio cabinets. The piping is a drain line for the fire protection sprinklers and has Victaulic couplings.
The piping is dry. There is also a 4-inch nominal pipe size acid waste line overhead center of room. Piping is drain line for Computer Battery room located above at El. 21 ft. This line is dry.
The piping is dry.
* There is also a 4-inch nominal pipe size acid waste line overhead center of room. Piping is drain line for Computer Battery room located above at El. 21 ft. This line is dry.
SUPS Room RAB (+21 ft. elevation)
SUPS Room RAB (+21 ft. elevation)
Walkdown of the immediate area of the AB SUPS located one overhead fire sprinkler greater than 10 feet away, judged acceptable.
* Walkdown of the immediate area of the AB SUPS located one overhead fire sprinkler greater than 10 feet away, judged acceptable.
There are no flooding concerns for the RAB since the structure is designed seismic category I. The design basis flood level for Waterford 3 is El. +29.25 ft. and the RAB is protected from external flooding to EL. +30 ft. flood elevation. Site grade is approximately at +17.5 ft. elevation.
There are no flooding concerns for the RAB since the structure is designed seismic category I. The design basis flood level for Waterford 3 is El. +29.25 ft. and the RAB is protected from external flooding to EL. +30 ft. flood elevation. Site grade is approximately at +17.5 ft. elevation.
High Winds Protection ACCEPTABLE:
High Winds Protection ACCEPTABLE:
The Computer Equipment Room is located inside the safety-related RAB at El. +7 ft. The SUPS area is located inside the safety-related RAB at El. +21 ft. There are no high winds concerns since the structure is designed seismic category I.
The Computer Equipment Room is located inside the safety-related RAB at El. +7 ft.
The SUPS area is located inside the safety-related RAB at El. +21 ft. There are no high winds concerns since the structure is designed seismic category I.
4.12.2 Technical Support Center (TSC)
4.12.2 Technical Support Center (TSC)
Location and General
Location and General


== Description:==
== Description:==
The TSC is located on the +46.0 ft. elevation in the RAB. It is contained entirely within the Control Room emergency ventilation system envelope but separate from the Control Room. Fixture installations within the various areas of the TSC prevent the TSC from being seismic Category I qualified. The size of the TSC provides sufficient storage space and access to data displays, plant records and historical data. The TSC has facilities to support the plant management and technical personnel who are assigned there during an emergency and is the primary onsite communications center for the plant during the emergency.
The TSC is located on the +46.0 ft. elevation in the RAB. It is contained entirely within the Control Room emergency ventilation system envelope but separate from the Control Room. Fixture installations within the various areas of the TSC prevent the TSC from being seismic Category I qualified. The size of the TSC provides sufficient storage space and access to data displays, plant records and historical data. The TSC has facilities to support the plant management and technical personnel who are assigned there during an emergency and is the primary onsite communications center for the plant during the emergency.
In addition, the TSC is used to provide technical support during the recovery operations following an emergency. The TSC acts as a complete and up-to-date repository of plant records and procedures and is at the disposal of TSC personnel to aid in their technical analysis and evaluation of emergency conditions.
In addition, the TSC is used to provide technical support during the recovery operations following an emergency. The TSC acts as a complete and up-to-date repository of plant records and procedures and is at the disposal of TSC personnel to aid in their technical analysis and evaluation of emergency conditions.
The TSC structure provides reasonable assurance that the EP Communications Equipment is protected during a seismic event, as defined in NEI 12-01. to W3F1-2013-0010 Page 9 of 27 Equipment & Functionality: The communication equipment consists of a desk set connection to the operations and maintenance radio system and civil defense radio system.
The TSC structure provides reasonable assurance that the EP Communications Equipment is protected during a seismic event, as defined in NEI 12-01.
Power: The power supply source documents for the TSC communication is supplied from RAB Distribution Panel PDP-387-2A and is covered in Section 4.12.1 of this document.
to W3F1-2013-0010 Page 9 of 27 Equipment & Functionality:
Seismic Protection ACCEPTABLE: The TSC is located inside the safety-related RAB at El. +46ft. There are no seismic concerns for the RAB since the structure is designed seismic category I.
The communication equipment consists of a desk set connection to the operations and maintenance radio system and civil defense radio system.
Flood Protection ACCEPTABLE: The TSC is located inside the safety-related RAB at El. +46ft. There are no flooding concerns for the RAB since the structure is designed seismic category I. The design basis flood level for Waterford 3 is El. +29.25 ft. and the RAB is protected from external flooding to EL. +30 ft. flood elevation. Site grade is approximately at +17.5 ft. elevation.
Power:
The power supply source documents for the TSC communication is supplied from RAB Distribution Panel PDP-387-2A and is covered in Section 4.12.1 of this document.
Seismic Protection ACCEPTABLE:
The TSC is located inside the safety-related RAB at El. +46ft. There are no seismic concerns for the RAB since the structure is designed seismic category I.
Flood Protection ACCEPTABLE:
The TSC is located inside the safety-related RAB at El. +46ft. There are no flooding concerns for the RAB since the structure is designed seismic category I. The design basis flood level for Waterford 3 is El. +29.25 ft. and the RAB is protected from external flooding to EL. +30 ft. flood elevation. Site grade is approximately at +17.5 ft. elevation.
High Winds Protection ACCEPTABLE:
High Winds Protection ACCEPTABLE:
The TSC is located inside the safety-related RAB at El. +46ft. There are no high winds concerns since the structure is designed seismic category I.
The TSC is located inside the safety-related RAB at El. +46ft. There are no high winds concerns since the structure is designed seismic category I.
Line 165: Line 247:


== Description:==
== Description:==
The IT Building is a non safety-related steel framed brick faced single story office type building installed on a concrete slab located inside of the owner controlled area on the south side of the Generation Support Building. Although the structure is non safety-related, its relative low aspect ratio (height to width) was judged to be favorable in terms of seismic resistance. The IT Building is at approximately +15 ft elevation. Therefore, the IT building is below the Waterford 3 design flood level of +29.25 ft. The equipment is located within the computer room inside of the IT Building. The IT structure provides reasonable assurance that the EP Communications Equipment is protected during a seismic event, as defined in NEI 12-01. However, flooding is a concern for the IT building because it is below the Waterford 3 design flood level of  
 
+29.25 ft.
The IT Building is a non safety-related steel framed brick faced single story office type building installed on a concrete slab located inside of the owner controlled area on the south side of the Generation Support Building. Although the structure is non safety-related, its relative low aspect ratio (height to width) was judged to be favorable in terms of seismic resistance. The IT Building is at approximately +15 ft elevation. Therefore, the IT building is below the Waterford 3 design flood level of +29.25 ft. The equipment is located within the computer room inside of the IT Building.
The IT structure provides reasonable assurance that the EP Communications Equipment is protected during a seismic event, as defined in NEI 12-01. However, flooding is a concern for the IT building because it is below the Waterford 3 design flood level of
      +29.25 ft.
Equipment & Functionality:
Equipment & Functionality:
The IT Building computer room contains a primary field monitoring team radio, Qualcomm satellite phone, primary civil defense radio, and construction radio repeater.
The IT Building computer room contains a primary field monitoring team radio, Qualcomm satellite phone, primary civil defense radio, and construction radio repeater.
The purpose of the primary field monitoring team radio network is to transmit offsite radiological data. This radio operates in the FM band. The transmitter and antenna is located in the IT Building. The purpose of the construction radio repeater is to provide maintenance support to locations inside and outside the protected area. The purpose of the primary civil defense radio is to provide radio communication with offsite agencies.
The purpose of the primary field monitoring team radio network is to transmit offsite radiological data. This radio operates in the FM band. The transmitter and antenna is located in the IT Building. The purpose of the construction radio repeater is to provide maintenance support to locations inside and outside the protected area. The purpose of the primary civil defense radio is to provide radio communication with offsite agencies.
The purpose of the Qualcomm satellite phone is to provide telephone communication to and from the control room and TSC and anywhere within the worldwide coverage area. to W3F1-2013-0010 Page 10 of 27 Power: Per verbal discussion with Waterford 3 engineering personnel during walk down, AREVA team was informed that communication equipment is fed from local distribution panel in the IT Building and is backed by UPS and a local diesel generator unit. The power supply source documents for the communication equipment were not made available during the walkdown. In addition, Waterford 3 engineering personnel noted that no documentation exist to show the electrical interface between the IT Building and the local diesel generator unit. It is recommended that the UPS batteries be sized to provide adequate amp hour capacity as required.
The purpose of the Qualcomm satellite phone is to provide telephone communication to and from the control room and TSC and anywhere within the worldwide coverage area.
Seismic Protection: Seismic - ENHANCEMENT RECOMMENDED Anchorages ENHANCEMENT RECOMMENDED Issues: The existing 18 KVA Uninterruptible Power Supply unit on wheels with jacked up leveling screws. The UPS unit is not anchored. The construction radio repeater is just sitting on the desk shelf that is on wheels. The repeater is not mounted to the shelf and the desk wheels are not locked.
to W3F1-2013-0010 Page 10 of 27 Power:
Acceptable Anchorage: The anchorage of the primary field monitoring team radio, primary civil defense radio and Qualcomm satellite phone to the panelboard is judged acceptable. No concerns regarding degraded anchorages for equipment in the computer room.
Per verbal discussion with Waterford 3 engineering personnel during walk down, AREVA team was informed that communication equipment is fed from local distribution panel in the IT Building and is backed by UPS and a local diesel generator unit. The power supply source documents for the communication equipment were not made available during the walkdown. In addition, Waterford 3 engineering personnel noted that no documentation exist to show the electrical interface between the IT Building and the local diesel generator unit. It is recommended that the UPS batteries be sized to provide adequate amp hour capacity as required.
Seismic Protection:
Seismic - ENHANCEMENT RECOMMENDED Anchorages ENHANCEMENT RECOMMENDED Issues:
* The existing 18 KVA Uninterruptible Power Supply unit on wheels with jacked up leveling screws. The UPS unit is not anchored.
* The construction radio repeater is just sitting on the desk shelf that is on wheels. The repeater is not mounted to the shelf and the desk wheels are not locked.
Acceptable Anchorage:
* The anchorage of the primary field monitoring team radio, primary civil defense radio and Qualcomm satellite phone to the panelboard is judged acceptable.
* No concerns regarding degraded anchorages for equipment in the computer room.
Spatial Interactions:
Spatial Interactions:
Issues: None Acceptable Spatial Interactions: The acoustic ceiling tiles and bent ceiling grids are judged acceptable. No potentially adverse seismic interactions associated with the wall mounted primary field monitoring team radio, primary civil defense radio and Qualcomm satellite phone equipment.
Issues:
* None Acceptable Spatial Interactions:
* The acoustic ceiling tiles and bent ceiling grids are judged acceptable.
* No potentially adverse seismic interactions associated with the wall mounted primary field monitoring team radio, primary civil defense radio and Qualcomm satellite phone equipment.
Housekeeping:
Housekeeping:
Issues: There is a trash can, plant paging rack, and excess computer cables located near the 18 KVA UPS unit. (Items have been moved away from UPS unit) to W3F1-2013-0010 Page 11 of 27 Flood Protection ENHANCEMENT REQUIRED:
Issues:
The IT Building is at approximately +15 ft elevation. The IT building is below the Waterford 3 design flood level of +29.25 ft. In addition, the primary field monitoring team radio is located near the fire protection valves, piping, and sprinklers inside of the computer room. It is recommended that the IT Building communication equipment be moved to Generation Support Build 3 RD Floor which is above the design flood level of +29.25 ft. In addition, install a new UPS unit with backup batteries to provide an adequate amp hour capacity to meet the NEI 12-01 requirements.
* There is a trash can, plant paging rack, and excess computer cables located near the 18 KVA UPS unit. (Items have been moved away from UPS unit) to W3F1-2013-0010 Page 11 of 27 Flood Protection ENHANCEMENT REQUIRED:
High Winds Protection ACCEPTABLE: Per verbal discussion with WF3 engineering personnel during walkdown, the AREVA team was informed that the IT building was designed to 100 mph winds and survived hurricane Katrina with no wind or flood damages.
The IT Building is at approximately +15 ft elevation. The IT building is below the Waterford 3 design flood level of +29.25 ft. In addition, the primary field monitoring team radio is located near the fire protection valves, piping, and sprinklers inside of the computer room. It is recommended that the IT Building communication equipment be moved to Generation Support Build 3RD Floor which is above the design flood level of
      +29.25 ft. In addition, install a new UPS unit with backup batteries to provide an adequate amp hour capacity to meet the NEI 12-01 requirements.
High Winds Protection ACCEPTABLE:
Per verbal discussion with WF3 engineering personnel during walkdown, the AREVA team was informed that the IT building was designed to 100 mph winds and survived hurricane Katrina with no wind or flood damages.
4.12.4 Emergency Operations Facility (EOF)
4.12.4 Emergency Operations Facility (EOF)
Location and General
Location and General
Line 186: Line 283:
The EOF is located within the James M. Cain Energy Education Center (EEC) approximately one mile southwest of the Waterford 3 site. The EOF is a non safety-related single story office type concrete structure with a brick exterior. Although the structure is non safety-related, its relative low aspect ratio (height to width) was judged to be favorable in terms of seismic resistance. The EOF is at approximately +12 ft elevation, which is below the Waterford 3 design flood level of +29.25 ft. The communication equipment is located within the computer room inside of the EOF. There is a diesel generator located on the southeast side of the EOF. Since the Waterford 3 site does not provide power to the EOF, credit is taken for this generator in this assessment.
The EOF is located within the James M. Cain Energy Education Center (EEC) approximately one mile southwest of the Waterford 3 site. The EOF is a non safety-related single story office type concrete structure with a brick exterior. Although the structure is non safety-related, its relative low aspect ratio (height to width) was judged to be favorable in terms of seismic resistance. The EOF is at approximately +12 ft elevation, which is below the Waterford 3 design flood level of +29.25 ft. The communication equipment is located within the computer room inside of the EOF. There is a diesel generator located on the southeast side of the EOF. Since the Waterford 3 site does not provide power to the EOF, credit is taken for this generator in this assessment.
Equipment & Functionality:
Equipment & Functionality:
The EOF equipment room contains a secondary civil defense radio, civil defense radio transmitter, and operational hotline for communications between onsite and offsite facilities. The secondary civil defense radio is used to communicate with offsite agencies during any type of emergency. It can provide communication links with local parishes only. The civil defense radio serves as a backup to the operational hotline. The operational hotline is used to communicate with the following agencies: GOHSEP, LDEQ, St. Charles Parish, St. John the Baptist Parish, and Waterford 1 & 2. In the event of an emergency, the operational hotline serves as the primary method of notification.
The EOF equipment room contains a secondary civil defense radio, civil defense radio transmitter, and operational hotline for communications between onsite and offsite facilities. The secondary civil defense radio is used to communicate with offsite agencies during any type of emergency. It can provide communication links with local parishes only. The civil defense radio serves as a backup to the operational hotline.
Power: Primary power supply to the secondary civil defense radio and civil defense radio transmitter equipment in the EOF is fed from Distribution Panel EH1, circuit 1 through step down transformer T1 to Distribution Panel EL1, circuit 64. Backup power supply is supplied by the local 230 KVA diesel generator unit. Primary power supply to the operational hotline equipment in the EOF is fed from Distribution Panel EH1 (circuits 7 and 8) through step down transformers (T7 and T8) through local 1KVA SUPS Inverter to Distribution Panel LV1. Backup power supply is supplied by the local 230 KVA diesel   to W3F1-2013-0010 Page 12 of 27 generator unit and 48 volt batteries. In addition, an alternate feed to the local 1KVA SUPS Inverter is fed from Distribution Panel L3. It is recommended that the UPS batteries be sized to provide adequate amp hour capacity as required.
The operational hotline is used to communicate with the following agencies: GOHSEP, LDEQ, St. Charles Parish, St. John the Baptist Parish, and Waterford 1 & 2. In the event of an emergency, the operational hotline serves as the primary method of notification.
Power:
Primary power supply to the secondary civil defense radio and civil defense radio transmitter equipment in the EOF is fed from Distribution Panel EH1, circuit 1 through step down transformer T1 to Distribution Panel EL1, circuit 64. Backup power supply is supplied by the local 230 KVA diesel generator unit. Primary power supply to the operational hotline equipment in the EOF is fed from Distribution Panel EH1 (circuits 7 and 8) through step down transformers (T7 and T8) through local 1KVA SUPS Inverter to Distribution Panel LV1. Backup power supply is supplied by the local 230 KVA diesel to W3F1-2013-0010 Page 12 of 27 generator unit and 48 volt batteries. In addition, an alternate feed to the local 1KVA SUPS Inverter is fed from Distribution Panel L3. It is recommended that the UPS batteries be sized to provide adequate amp hour capacity as required.
Seismic Protection:
Seismic Protection:
EOF - Inside Seismic - ENHANCEMENT RECOMMENDED Anchorages ENHANCEMENT RECOMMENDED Issues: The power supply to the secondary civil defense radio is sitting on top of a rolling cart. It is recommended that the power supply equipment be permanently mounted. The1KVA SUPS Inverter is not anchored to the floor. The 48 volt batteries inside the battery room are not seismically restrained. The batteries are sitting on the racks.
EOF - Inside Seismic - ENHANCEMENT RECOMMENDED Anchorages ENHANCEMENT RECOMMENDED Issues:
Acceptable Anchorage: The secondary civil defense radio, radio transmitter and the ring down line module inside the communication room are wall mounted. Anchorage of this small equipment judged acceptable. Electrical panels inside the electrical room are seismically anchored. No concerns on outside diesel engine or antennas mounted on microwave tower. No concerns regarding degraded anchorages for electrical panel in the electrical room.
* The power supply to the secondary civil defense radio is sitting on top of a rolling cart. It is recommended that the power supply equipment be permanently mounted.
* The1KVA SUPS Inverter is not anchored to the floor.
* The 48 volt batteries inside the battery room are not seismically restrained. The batteries are sitting on the racks.
Acceptable Anchorage:
* The secondary civil defense radio, radio transmitter and the ring down line module inside the communication room are wall mounted. Anchorage of this small equipment judged acceptable.
* Electrical panels inside the electrical room are seismically anchored.
* No concerns on outside diesel engine or antennas mounted on microwave tower.
* No concerns regarding degraded anchorages for electrical panel in the electrical room.
Spatial Interactions:
Spatial Interactions:
Issues: None Acceptable Spatial Interactions: Overhead lighting deemed acceptable. There are no other seismic spatial interaction concerns identified.
Issues:
* None Acceptable Spatial Interactions:
* Overhead lighting deemed acceptable. There are no other seismic spatial interaction concerns identified.
Housekeeping:
Housekeeping:
Issues: There is a storage cabinet and spare equipment in boxes near the 1KVA SUPS Inverter. (CR-WF3-2012-5132 has been initiated to move or remove items away from 1KVA SUPS Inverter)
Issues:
EOF - Outside Seismic - ACCEPTABLE Anchorages Issues:   to W3F1-2013-0010 Page 13 of 27 None Acceptable Spatial Interactions: The diesel generator is anchored appropriately.
* There is a storage cabinet and spare equipment in boxes near the 1KVA SUPS Inverter. (CR-WF3-2012-5132 has been initiated to move or remove items away from 1KVA SUPS Inverter)
EOF - Outside Seismic - ACCEPTABLE Anchorages Issues:
to W3F1-2013-0010 Page 13 of 27
* None Acceptable Spatial Interactions:
* The diesel generator is anchored appropriately.
Spatial Interactions - No Concerns:
Spatial Interactions - No Concerns:
There are no cable raceways in the vicinity.
* There are no cable raceways in the vicinity.
Housekeeping Issues: Noticed heavy corrosion on the diesel engine exhaust muffler but deemed acceptable based on regular testing schedule and that the corrosion is uniform without heavy pitting. Regular testing and inspection should continue.
Housekeeping Issues:
The EEC is located outside the site owner control area approximately one mile away, this is consider to be under "near site" category. Although the structure is non safety-related, its relatively low aspect ratio (Height to Width) was judged favorable in terms of seismic resistance.
* Noticed heavy corrosion on the diesel engine exhaust muffler but deemed acceptable based on regular testing schedule and that the corrosion is uniform without heavy pitting. Regular testing and inspection should continue.
The EEC is located outside the site owner control area approximately one mile away, this is consider to be under near site category. Although the structure is non safety-related, its relatively low aspect ratio (Height to Width) was judged favorable in terms of seismic resistance.
Flood Protection ENHANCEMENT REQUIRED:
Flood Protection ENHANCEMENT REQUIRED:
The EOF is at approximately +12 ft elevation, which is below the Waterford 3 design flood level of +29.25 ft. This included the backup battery room and the diesel generator located outside of the building. It is recommended that the EOF communication equipment be moved to a location that is above the design flood level of +29.25 ft. In addition, install a new UPS unit with backup batteries to provide an adequate amp hour capacity to meet the NEI 12-01 requirements.
The EOF is at approximately +12 ft elevation, which is below the Waterford 3 design flood level of +29.25 ft. This included the backup battery room and the diesel generator located outside of the building. It is recommended that the EOF communication equipment be moved to a location that is above the design flood level of +29.25 ft. In addition, install a new UPS unit with backup batteries to provide an adequate amp hour capacity to meet the NEI 12-01 requirements.
High Winds Protection ACCEPTABLE: Per verbal discussion with WF3 engineering personal during walkdown, AREVA team was informed that the EEC building was designed to 100 mph winds and survived Hurricane Katrina with no wind or flood damages.
High Winds Protection ACCEPTABLE:
to W3F1-2013-0010 Page 14 of 27 5.0 INTERIM ACTIONS Interim measures were initially provided under letter W3F1-2012-0042, Entergy's 90-Day Response to the March 12, 2012 Information Request, Action Plan for Completing Emergency Communication and Staffing Assessments, dated June 7, 2012. Interim measures include:   In addition to existing emergency response radios, 10 additional portable digital radios including extra batteries/chargers have been purchased, received, and deployed to be used for communications with onsite response teams or offsite field monitoring teams. Hand held radios are programmed with talk around capability (allows usage without repeaters for limited distances). The primary repeater for the onsite radios is equipped with a UPS that provides some backup power capability. In addition to the existing eleven satellite phones currently on site at Waterford 3, 11 additional battery-operated satellite phones have been purchased, received, and deployed for emergency response personnel for onsite and offsite communications. User aids are located with the phones for ease of use. ERO notification methodology (per NEI 12-01, Section 4.4, second bullet) has been determined and implemented (see section 4.4 above).
Per verbal discussion with WF3 engineering personal during walkdown, AREVA team was informed that the EEC building was designed to 100 mph winds and survived Hurricane Katrina with no wind or flood damages.
to W3F1-2013-0010 Page 15 of 27 6.0 SCHEDULE The above assessment has identified potential enhancements to provide the required communications capability during a beyond design basis event consistent with the assumptions specified in NEI 12-01. The table below summarizes required actions and provides target completion dates.
to W3F1-2013-0010 Page 14 of 27 5.0   INTERIM ACTIONS Interim measures were initially provided under letter W3F1-2012-0042, Entergys 90-Day Response to the March 12, 2012 Information Request, Action Plan for Completing Emergency Communication and Staffing Assessments, dated June 7, 2012. Interim measures include:
Implementing Actions Target Completion Date Communication Equipment Additional satellite phones (11) staged in ERFs. complete  Additional radios/batteries deployed complete Resolve non-engineering spatial interactions 12/31/13 Complete engineering for indentified enhancements (e.g. power supplies and structural upgrades).
* In addition to existing emergency response radios, 10 additional portable digital radios including extra batteries/chargers have been purchased, received, and deployed to be used for communications with onsite response teams or offsite field monitoring teams.
1/18/15 Procure additional portable equipment  (e.g. radios, satellite phones, batteries, generators) as required.
* Hand held radios are programmed with talk around capability (allows usage without repeaters for limited distances).
4/18/15  Complete installation of engineered upgrades.
* The primary repeater for the onsite radios is equipped with a UPS that provides some backup power capability.
11/12/15 Communication with OROs Ensure ORO facilities are equipped with satellite phones ORO Facilities are equipped with Satellite Phones Miscellaneous ERO notification methodology implemented complete  Finalize storage location(s) of portable generators 4/18/15 Finalize training needs 1/18/15 Implement required training 11/12/15 Revise procedures to incorporate new equipment 11/12/15 Revise GET to include assembly requirements during a large scale external event. 12/31/13  Ensure adequate GETS cards are available.
* In addition to the existing eleven satellite phones currently on site at Waterford 3, 11 additional battery-operated satellite phones have been purchased, received, and deployed for emergency response personnel for onsite and offsite communications. User aids are located with the phones for ease of use.
12/31/13 Complete evaluation of TSP circuits 12/31/13 Implement TSP enhancements per evaluation results 12/31/14     to W3F1-2013-0010 Page 16 of 27 Rollup Document Consistent with emergency planning standard requirements, communications systems and equipment associated with the following emergency response functions should be available during an extended loss of AC power. Availability should be determined after a review of existing capabilities and consistent with the assumptions listed in NEI 12-01 Rev. 0 Section 2. In particular, it is important that the primary and backup power source (if applicable) for each communications system or piece of equipment be identified.
* ERO notification methodology (per NEI 12-01, Section 4.4, second bullet) has been determined and implemented (see section 4.4 above).
to W3F1-2013-0010 Page 15 of 27 6.0     SCHEDULE The above assessment has identified potential enhancements to provide the required communications capability during a beyond design basis event consistent with the assumptions specified in NEI 12-01. The table below summarizes required actions and provides target completion dates.
Implementing Actions                 Target Completion Date Communication Equipment
* Additional satellite phones (11) staged in       complete ERFs.
* Additional radios/batteries deployed             complete
* Resolve non-engineering spatial                   12/31/13 interactions
* Complete engineering for indentified               1/18/15 enhancements (e.g. power supplies and structural upgrades).
* Procure additional portable equipment              4/18/15 (e.g. radios, satellite phones, batteries, generators) as required.
* Complete installation of engineered               11/12/15 upgrades.
Communication with OROs
* Ensure ORO facilities are equipped with       ORO Facilities are satellite phones                              equipped with Satellite Phones Miscellaneous
* ERO notification methodology                     complete implemented
* Finalize storage location(s) of portable           4/18/15 generators
* Finalize training needs                           1/18/15
* Implement required training                       11/12/15
* Revise procedures to incorporate new             11/12/15 equipment
* Revise GET to include assembly                   12/31/13 requirements during a large scale external event.
* Ensure adequate GETS cards are                   12/31/13 available.
* Complete evaluation of TSP circuits               12/31/13
* Implement TSP enhancements per                   12/31/14 evaluation results to W3F1-2013-0010 Page 16 of 27 Rollup Document Consistent with emergency planning standard requirements, communications systems and equipment associated with the following emergency response functions should be available during an extended loss of AC power. Availability should be determined after a review of existing capabilities and consistent with the assumptions listed in NEI 12-01 Rev. 0 Section 2. In particular, it is important that the primary and backup power source (if applicable) for each communications system or piece of equipment be identified.
End-point equipment identified for a communications link listed below should be used solely for the purpose indicated. For example, a satellite telephone assigned to the Control Room should not be credited for performing both Offsite Response Organization (ORO) and NRC notifications.
End-point equipment identified for a communications link listed below should be used solely for the purpose indicated. For example, a satellite telephone assigned to the Control Room should not be credited for performing both Offsite Response Organization (ORO) and NRC notifications.
Note: Enhancements have been identified for power supplies for credited equipment (i.e.
Note: Enhancements have been identified for power supplies for credited equipment (i.e.
equipment expected to be operable following Assumed Large Scale External Event (LSEE). Detailed engineering should be performed to finalize the approach for these enhancements (e.g. UPS/batteries and/or portable generators). to W3F1-2013-0010 Page 17 of 27 Table-1: Offsite Response Organization Notifications to, and communications with, OROs [per 10 CFR 50 Appendix E.IV.D and E.9.a]
equipment expected to be operable following Assumed Large Scale External Event (LSEE).
Emergency Response Facility Minimum Communications Links Primary Method Described in site E-Plan Primary Method Available following Assumed Large Scale External Event (LSEE)
Detailed engineering should be performed to finalize the approach for these enhancements (e.g. UPS/batteries and/or portable generators).
Backup Method(s)
to W3F1-2013-0010 Page 17 of 27 Table-1: Offsite Response Organization Notifications to, and communications with, OROs [per 10 CFR 50 Appendix E.IV.D and E.9.a]
Described in site E-Plan Backup Method(s)
Emergency           Minimum         Primary Method    Primary Method Backup            Backup      Planned or Potential Response            Communications  Described in     Available      Method(s)         Method(s)   Improvement Facility            Links            site E-Plan      following      Described in       Available    Identified?
Available following Assumed LSEE Planned or Potential Improvement Identified?
Assumed Large  site E-Plan       following Scale External                    Assumed LSEE Event (LSEE)
Control Room 1 per Control Room for Shift Communicator Dedicated Circuit with Two Digit Dial Access NO PABX or Civil Defense Radio Network  NO   YES - Satellite Phones Technical Support Center (TSC) 1 for Key TSC Communicator Dedicated Circuit with Two Digit Dial Access NO PABX or Civil Defense Radio Network  NO YES - Satellite Phones Emergency Operations Facility (EOF) 1 for Key EOF Communicator Dedicated Circuit with Two Digit Dial Access NO PABX or Civil Defense Radio Network NO YES - Satellite Phones to W3F1-2013-0010 Page 18 of 27 Table-2: Nuclear Regulatory Commission Notifications to, and communications with, the Nuclear Regulatory Commission (NRC) Headquarters Incident Response Center and the appropriate NRC Regional Office Operations Center [per 10 CFR 50 Appendix E.IV.D and E.9.d]
Control Room       1 per Control   Dedicated Circuit NO              PABX or Civil      NO          YES - Satellite Phones Room for Shift   with Two Digit                   Defense Radio Communicator    Dial Access                       Network Technical          1 for Key TSC    Dedicated Circuit NO             PABX or Civil     NO           YES - Satellite Phones Support Center     Communicator    with Two Digit                    Defense Radio (TSC)                               Dial Access                      Network Emergency          1 for Key EOF    Dedicated Circuit NO             PABX or Civil     NO           YES - Satellite Phones Operations         Communicator    with Two Digit                    Defense Radio Facility (EOF)                       Dial Access                       Network to W3F1-2013-0010 Page 18 of 27 Table-2: Nuclear Regulatory Commission Notifications to, and communications with, the Nuclear Regulatory Commission (NRC) Headquarters Incident Response Center and the appropriate NRC Regional Office Operations Center [per 10 CFR 50 Appendix E.IV.D and E.9.d]
Emergency Response Facility Minimum Communications Links Primary Method Described in site E-Plan Primary Method Available following Assumed LSEE Backup Method(s)
Emergency           Minimum         Primary Method    Primary Method Backup          Backup            Planned or Potential Response            Communications  Described in       Available      Method(s)      Method(s)          Improvement Facility            Links            site E-Plan       following      Described in    Available         Identified?
Described in site E-Plan Backup Method(s)
Assumed LSEE   site E-Plan     following Assumed LSEE Control Room       1 per Control   ENS Bridge -       NO             Commercial     NO                 YES -Satellite Phone Room for ENS    Dedicated phone                    Telephone Communicator Technical           1 for ENS       ENS Bridge -       NO             Commercial     NO                 YES -Satellite Phone Support Center      Communicator    Dedicated phone                    Telephone Location(s) where   2 for HPN       HPN Bridge -      NO              Commercial      NO                YES -Satellite Phone HPN                Communicator    Dedicated phone                    Telephone communications are performed (TSC, EOF, OSC,
Available following Assumed LSEE Planned or Potential Improvement Identified?
-4 RAB) to W3F1-2013-0010 Page 19 of 27 Table-3: Licensee Emergency Response Facilities Communications between licensee emergency response facilities [per 10 CFR 50 Appendix E.9.c]. Additional links that support performance of critical response functions are also specified]. The minimum communications links to support this function are listed below by facility. For example, if the normally used telephone system cannot be restored to service, these links could rely upon some combination of radio, sound-powered and satellite-based communications systems.
Control Room 1 per Control Room for ENS Communicator ENS Bridge -
Emergency       Minimum               Primary         Primary Method     Backup        Backup Method(s)     Planned or Response        Communications        Method          Available following Method(s)     Available following   Potential Facility        Links                  Described in    Assumed LSEE        Described in  Assumed LSEE         Improvement site E-Plan                          site E-Plan                        Identified?
Dedicated phone NO   Commercial Telephone NO   YES -Satellite Phone Technical Support Center 1 for ENS Communicator ENS Bridge -
Control Room     1 per unit             Intercom         NO                 Sound Powered YES                   YES -Satellite Phone Circuits                            Phones 1 each for:
Dedicated phone NO Commercial Telephone NO   YES -Satellite Phone Location(s) where HPN communications are performed (TSC, EOF, OSC, -4 RAB) 2 for HPN Communicator HPN Bridge -
Technical
Dedicated phone NO Commercial Telephone NO YES -Satellite Phone to W3F1-2013-0010 Page 19 of 27 Table-3: Licensee Emergency Response Facilities Communications between licensee emergency response facilities [per 10 CFR 50 Appendix E.9.c]. Additional links that support performance of critical response functions are also specified]. The minimum communications links to support this function are listed below by facility. For example, if the normally used telephone system cannot be restored to service, these links could rely upon some combination of radio, sound-powered and satellite-based communications systems.
* Senior/Lead TSC      Hotline Circuits NO                  PABX          NO                    YES -Satellite Phone Support Center Manager (TSC)                                                                                                           YES -Satellite Phone
Emergency Response Facility Minimum Communications Links Primary Method Described in site E-Plan Primary Method Available following Assumed LSEE Backup Method(s)
* Operations          Hotline Circuits NO                  PABX          NO Coordination
Described in site E-Plan Backup Method(s)
* Maintenance          Hotline Circuits NO                  PABX          NO                    YES - Satellite Phone
Available following Assumed LSEE Planned or Potential Improvement Identified? Control Room 1 per unit Intercom Circuits NO Sound Powered Phones YES YES -Satellite Phone Technical Support Center (TSC) 1 each for:
                                                                                                                & Radio Coordination
Manager Coordination Coordination Coordination Support   Additional response coordination links for multi-unit sites:
* Engineering          Hotline Circuits NO                  PABX          NO                    YES -Satellite Phone Coordination
providing Unit Response Coordination.
* Radiological        Health Physics  NO                  PABX          NO                    YES -Satellite Phone Support               Intercom Additional response coordination links for multi-unit sites:
Hotline Circuits Hotline Circuits Hotline Circuits Hotline Circuits Health Physics Intercom    N/A NO  NO  NO  NO  NO      N/A PABX  PABX  PABX  PABX  PABX      N/A NO  NO  NO  NO  NO      N/A YES -Satellite Phone YES -Satellite Phone YES - Satellite Phone 
* 1 for each position  N/A             N/A                 N/A           N/A                   N/A providing Unit
& Radio    YES -Satellite Phone YES -Satellite Phone N/A   to W3F1-2013-0010 Page 20 of 27 Emergency Response Facility Minimum Communications Links Primary Method Described in site E-Plan Primary Method Available following Assumed LSEE Backup Method(s)
 
Described in site E-Plan Backup Method(s)
===Response===
Available following Assumed LSEE Planned or Potential Improvement Identified?
Coordination.
Operations Support Center (OSC) 1 each for:
to W3F1-2013-0010 Page 20 of 27 Emergency       Minimum               Primary         Primary Method     Backup      Backup Method(s)   Planned or Response        Communications        Method          Available following Method(s)   Available following Potential Facility        Links                  Described in    Assumed LSEE        Described in Assumed LSEE       Improvement site E-Plan                          site E-Plan                      Identified?
Manager Support   Additional response coordination links for multi-unit sites:
Operations     1 each for:
providing Unit In-Plant Team Coordination.
Support Center
Hotline Circuits Health Physics Intercom    N/A NO  NO      N/A PABX  PABX      N/A NO  NO      N/A YES -Satellite Phone YES -Satellite Phone N/A Emergency Operations Facility (EOF) 1 each for:
* Senior/Lead OSC      Hotline Circuits NO                  PABX        NO                  YES -Satellite Phone (OSC)           Manager
Manager Measures Technical Support (as needed to support performance of dose projections, formulation of PARs and plant status updates to ORO authorities).
* Radiological        Health Physics  NO                  PABX        NO                  YES -Satellite Phone Support               Intercom Additional response coordination links for multi-unit sites:
Hotline Circuits Hotline Circuits Hotline Circuits NO  NO  NO   PABX  PABX  PABX   NO  NO NO  YES -Satellite Phone YES -Satellite Phone YES -Satellite Phone
* 1 for each position  N/A              N/A                 N/A         N/A                 N/A providing Unit In-Plant Team Coordination.
& Radio Joint Information Center (JIC) 1 for Senior Manager Hotline Circuits NO PABX NO YES -Satellite Phone to W3F1-2013-0010 Page 21 of 27 Table-4: Field / Offsite Monitoring Teams Communications with field/offsite monitoring teams [per 10 CFR 50 Appendix E.9.c].
1 each for:
Emergency Response Facility Minimum Communications Links Primary Method Described in site E-Plan Primary Method Available following Assumed LSEE Backup Method(s)
Emergency                                                                                                    YES -Satellite Phone
Described in site E-Plan Backup Method(s)
* Senior/Lead          Hotline Circuits NO                  PABX        NO Operations Manager Facility (EOF)                                                                                               YES -Satellite Phone
Available following Assumed LSEE Planned or Potential Improvement Identified?
* Key Protective      Hotline Circuits NO                  PABX        NO Measures
Primary location where field/offsite monitoring team coordination is performed (EOF)
* Operations or        Hotline Circuits NO                  PABX        NO                  YES -Satellite Phone
Field/offsite monitoring team coordination FM Band Radio NO PABX/Low Band Radio/Pay Phone Lowband - Yes PABX - NO YES -Satellite Phone or Radio Enhancement The location from which field/ offsite monitoring teams are deployed (OSC/BU OSC) 1 for each field/offsite monitoring team FM Band Radio NO PABX/Low Band Radio/Pay Phone Lowband - Yes PABX - NO YES -Satellite Phone or Radio Enhancement to W3F1-2013-0010 Page 22 of 27 Table-5: Other Federal Agencies Communications with other Federal agencies as described in the site emergency plan (e.g., the US Coast Guard) [per 10 CFR 50 Appendix E.9.b]
                                                                                                            & Radio Technical Support (as needed to support performance of dose projections, formulation of PARs and plant status updates to ORO authorities).
Emergency Response Facility Minimum Communications Links Primary Method Described in site E-Plan Primary Method Available following Assumed LSEE Backup Method(s)
Joint          1 for Senior Manager  Hotline Circuits NO                 PABX         NO                 YES -Satellite Phone Information Center (JIC) to W3F1-2013-0010 Page 21 of 27 Table-4: Field / Offsite Monitoring Teams Communications with field/offsite monitoring teams [per 10 CFR 50 Appendix E.9.c].
Described in site E-Plan Backup Method(s)
Emergency           Minimum         Primary Method    Primary Method Backup          Backup        Planned or Potential Response            Communications  Described in       Available      Method(s)      Method(s)    Improvement Facility            Links          site E-Plan       following      Described in    Available     Identified?
Available following Assumed LSEE Planned or Potential Improvement Identified?
Assumed LSEE   site E-Plan     following Assumed LSEE Primary location     Field/offsite   FM Band Radio     NO             PABX/Low Band   Lowband - Yes YES -Satellite Phone or where field/offsite monitoring team                                    Radio/Pay Phone PABX - NO    Radio Enhancement monitoring team      coordination coordination is performed (EOF)
Primary location where communication with Federal agencies is performed Coordination with Federal agencies PABX Telephone NO Commercial Telephone NO YES -Satellite Phone to W3F1-2013-0010 Page 23 of 27 Table-6: On-site and In-plant Response Teams Coordination and direction of on-site and in-plant response teams. This includes teams necessary to affect emergency repairs, firefighting, search and rescue, radiological monitoring, and implementation of Transition Phase coping and severe accident management strategies.
The location from    1 for each     FM Band Radio     NO             PABX/Low Band   Lowband - Yes YES -Satellite Phone or which field/ offsite field/offsite                                      Radio/Pay Phone PABX - NO    Radio Enhancement monitoring teams    monitoring team are deployed (OSC/BU OSC) to W3F1-2013-0010 Page 22 of 27 Table-5: Other Federal Agencies Communications with other Federal agencies as described in the site emergency plan (e.g., the US Coast Guard) [per 10 CFR 50 Appendix E.9.b]
Emergency       Minimum           Primary Method  Primary Method     Backup              Backup          Planned or Potential Response        Communications    Described in     Available          Method(s)          Method(s)      Improvement Facility        Links              site E-Plan     following          Described in        Available       Identified?
Assumed LSEE       site E-Plan         following Assumed LSEE Primary location Coordination with PABX Telephone   NO                 Commercial         NO             YES -Satellite Phone where            Federal agencies                                      Telephone communication with Federal agencies is performed to W3F1-2013-0010 Page 23 of 27 Table-6: On-site and In-plant Response Teams Coordination and direction of on-site and in-plant response teams. This includes teams necessary to affect emergency repairs, firefighting, search and rescue, radiological monitoring, and implementation of Transition Phase coping and severe accident management strategies.
To accommodate the timeline associated with NRC Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (as discussed in Section 1).
To accommodate the timeline associated with NRC Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (as discussed in Section 1).
Emergency Response Facility Minimum Communications Links Primary Method Described in site E-Plan Primary Method Available following Assumed LSEE Backup Method(s)
Emergency         Minimum             Primary Method    Primary Method     Backup          Backup            Planned or Potential Response          Communications      Described in     Available          Method(s)      Method(s)          Improvement Facility          Links                site E-Plan       following          Described in    Available         Identified?
Described in site E-Plan Backup Method(s)
Assumed LSEE       site E-Plan     following Assumed LSEE On-shift staff   Number               RADIO            YES                NONE            N/A                YES - Satellite Phone necessary for the                                                                           and Additional Radios on-shift staff to perform Initial Phase coping actions (reflecting current staff &
Available following Assumed LSEE Planned or Potential Improvement Identified? On-shift staff Number necessary for the on-shift staff to perform Initial Phase coping actions (reflecting current staff &
strategies) to W3F1-2013-0010 Page 24 of 27 Emergency       Minimum               Primary Method Primary Method Backup      Backup      Planned or Potential Response        Communications        Described in   Available      Method(s)    Method(s)    Improvement Facility        Links                site E-Plan   following      Described in Available   Identified?
strategies)
Assumed LSEE   site E-Plan following Assumed LSEE Operational    1 each for:
RADIO YES NONE N/A YES - Satellite Phone and Additional Radios      to W3F1-2013-0010 Page 24 of 27 Emergency Response Facility Minimum Communications Links Primary Method Described in site E-Plan Primary Method Available following Assumed LSEE Backup Method(s)
Support Center
Described in site E-Plan Backup Method(s)
* On-site            RADIO          YES            NONE        N/A          YES - Spare Radio (OSC) and       radiological                                                                  Batteries other site-     monitoring specific 2 each for:
Available following Assumed LSEE Planned or Potential Improvement Identified?
locations as
Operational Support Center (OSC) and other site-specific locations as necessary 1 each for:
* Firefighting (1 for RADIO          YES            NONE        N/A          YES - Spare Radio necessary      brigade leader                                                               Batteries and 1 for the brigade) 2 each per unit       RADIO          YES            NONE        N/A          YES - Spare Radio for:                                                                         Batteries
radiological monitoring 2 each for:
* In-plant radiological monitoring
brigade leader and 1 for the brigade) 2 each per unit for:
* Search and Rescue
radiological monitoring Rescue repairs   Site-specific number needed to implement any 2 severe accident mitigation strategies RADIO    RADIO      RADIO        RADIO  YES    YES    YES        YES  NONE      NONE    NONE        NONE    N/A    N/A    N/A        N/A  YES - Spare Radio Batteries YES - Spare Radio Batteries YES - Spare Radio Batteries YES - Spare Radio Batteries to W3F1-2013-0010 Page 25 of 27 Table-7: Plant Paging (Announcement) System Emergency Response Facility Minimum Communications Links Is this system available following assumed LSEE Planned or Potential Improvement Identified?
* Emergency repairs               RADIO          YES            NONE        N/A          YES - Spare Radio Batteries Site-specific number needed to implement any 2 severe accident mitigation strategies to W3F1-2013-0010 Page 25 of 27 Table-7: Plant Paging (Announcement) System Emergency Response       Minimum Communications   Is this system available Planned or Potential Improvement Facility                  Links                    following assumed LSEE  Identified?
N/A See assumptions and discussion in NEI 12-01.
N/A                       See assumptions and     NO                       YES - alternate approach see Section 4.2 discussion in NEI 12-01.
NO YES - alternate approach see Section 4.2 to W3F1-2013-0010 Page 26 of 27 Table-8: Communications Equipment at ORO Facilities Emergency Response Facility Minimum Communications Links Primary Method Described in site E-Plan Primary Method Available following Assumed LSEE Backup Method(s)
to W3F1-2013-0010 Page 26 of 27 Table-8: Communications Equipment at ORO Facilities Emergency           Minimum            Primary      Primary Method Backup        Backup      Planned or Potential Response Facility   Communications     Method      Available      Method(s)    Method(s)    Improvement Links             Described in following      Described in Available    Identified?
Described in site E-Plan Backup Method(s)
site E-Plan Assumed LSEE   site E-Plan   following Assumed LSEE Location where       At least one. See OROs receive         assumptions and notifications of an discussion in NEI emergency           12-01.
Available following Assumed LSEE Planned or Potential Improvement Identified?
declaration or a Protective Action   ORO FACILITY Recommendation (as described in the St. Charles Parish Operational  NO            Civil Defense NO          NO - All OROs have site emergency plan)                   Hotline                    Radio                      backup power and satellite phones St. John the       Operational  NO            Civil Defense NO Baptist Parish     Hotline                    Radio GOHSEP             Operational NO             Civil Defense NO Hotline                    Radio LDEQ              Operational  NO            Civil Defense NO Hotline                    Radio to W3F1-2013-0010 Page 27 of 27 Table-9: Equipment Locations and Protection Primary System          Equipment protected from the below hazards System/Equipment Component     Protected from         Protected from       Protected from Location      Seismic              Flooding                Wind EP Communications    EOF                     Yes                     No                   Yes Equipment: (Radios, Repeaters,           TSC                    Yes                    Yes                  Yes Transmitters, Batteries, Hotline   CR                      Yes                    Yes                  Yes Phones Systems, UPS, etc.)           IT BLDG                Yes                    No                  Yes
Location where OROs receive notifications of an emergency declaration or a Protective Action Recommendation (as described in the site emergency plan)
                        +7 RAB                  Yes                    Yes                  Yes
At least one. See assumptions and discussion in NEI 12-01. ORO FACILITY St. Charles Parish St. John the Baptist Parish GOHSEP   LDEQ        Operational Hotline  Operational Hotline  Operational Hotline  Operational Hotline        NO    NO   NO    NO        Civil Defense Radio   Civil Defense Radio  Civil Defense Radio  Civil Defense Radio         NO    NO    NO    NO        NO - All OROs have backup power and satellite phones    to W3F1-2013-0010 Page 27 of 27 Table-9: Equipment Locations and Protection Equipment protected from the below hazards System/Equipment Primary System Component Location Protected from Seismic  Protected from Flooding Protected from Wind   EOF Yes No Yes TSC Yes Yes Yes CR Yes Yes Yes IT BLDG Yes No Yes +7 RAB Yes Yes Yes EP Communications Equipment: (Radios, Repeaters, Transmitters, Batteries, Hotline Phones Systems, UPS, etc.)  
                        +21 RAB                 Yes                   Yes                   Yes}}
+21 RAB Yes Yes Yes}}

Revision as of 22:53, 4 November 2019

(Waterford 3), Entergy Response to NRC Technical Issues for Resolution Regarding Licensee Communication Submittals Associated with Near-Term Task Force Recommendation 9.3
ML13053A204
Person / Time
Site: Waterford Entergy icon.png
Issue date: 02/21/2013
From: Jacobs D
Entergy Operations
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
W3F1-2013-0010
Download: ML13053A204 (37)


Text

Entergy Operations, Inc.

17265 River Road Killona, LA 70057-3093 Tel 504-739-6660 Fax 504-739-6678 djacob2@entergy.com Donna Jacobs Vice President - Operations Waterford 3 W3F1-2013-0010 February 21, 2013 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852

SUBJECT:

Entergy Response to NRC Technical Issues for Resolution Regarding Licensee Communication Submittals Associated with Near-Term Task Force Recommendation 9.3 Waterford Steam Electric Station, Unit 3 (Waterford 3)

Docket No. 50-382 License No. NPF-38

References:

1. NRC letter to All Power Reactor Licensees and holders of Construction Permits in Active or Deferred Status, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident, dated March 12, 2012 (ADAMS Accession No. ML12053A340)
2. Entergy letter to NRC, Entergys 60-Day Response to the March 12, 2012, Information Request, Action Plan for Completing Emergency Communication and Staffing Assessments, dated May 10, 2012 (W3F1-2012-0026) (ADAMS Accession No. ML12135A087)
3. Entergy letter to NRC, Entergys 90-Day Response to the March 12, 2012, Information Request, Action Plan for Completing Emergency Communication, and Staffing Assessments, dated June 7, 2012 (W3F1-2012-0042) (ADAMS Accession No. ML12164A683)
4. Entergy letter to NRC, Response to the March 12, 2012, Information Request Pursuant To 10 CFR 50.54(f) Regarding Recommendation 9.3 For Completing Emergency Communication Assessments, dated October 31, 2012 (W3F1-2012-0090)
5. NRC letter to All Power Reactor Licensees and holders of Construction Permits in Active or Deferred Status, Follow-up Letter on Technical Issues For Resolution Regarding Licensee Communication Submittals Associated with Near-Term Task Force Recommendation 9.3 (TAC NO. ME7951), dated January 23, 2013 (Adams Accession No. ML13010A162)

W3F1-2013-0010 Page 2 of 3

Dear Sir or Madam:

On March 12, 2012, the NRC issued a letter (Reference 1) entitled, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident. Enclosure 5 of Reference 1 delineated specific requested actions and requested information associated with Recommendation 9.3 for Emergency Preparedness programs communications. Addressees were requested to submit a written response within 90 days or to provide a response within 60 days describing the alternative course of action that it proposes to take.

Entergy Nuclear Operations, Inc. (Entergy) responded within 60 days (Reference 2) proposing to take the alternative course of action for communications described in of Reference 2. Entergy implemented this alternate course of action with the submittal of Reference 3 (described interim / planned actions to enhance existing communications systems power supplies pending the communications assessment and completion of actions) and Reference 4 (summarized the results of the communications assessment and the potential enhancements).

The purpose of this letter is to respond to Reference 5, the NRC follow-up letter regarding technical issues to be resolved with respect to Reference 4. Responses to the eight technical issues in Reference 5 are provided in Attachment 1. The communications assessment, originally provided in Reference 4, has been revised to reflect the responses in and is found in Attachment 2. These responses are subject to change as a result of Diverse and Flexible Coping Strategies developments, advances in technology, and progress in the manner of addressing the need for these enhancements.

There are no new commitments identified in this submittal. Should you have any questions concerning the content of this letter, please contact Chester Fugate, Licensing Manager, at (504) 739-6685.

I declare under penalty of perjury that the foregoing is true and correct. Executed on February 21, 2013.

Sincerely, DJ/WH Attachments: 1. Waterford 3 Communications Assessment - Addressing Eight Technical Issues

2. Supplemented Waterford 3 Communications Assessment

W3F1-2013-0010 Page 3 of 3 cc: Attn: Director, Office of Nuclear Reactor Regulation U. S. NRC RidsNrrMailCenter@nrc.gov Mr. Elmo E. Collins, Jr., Regional Administrator U. S. NRC, Region IV RidsRgn4MailCenter@nrc.gov NRC Program Manager for Waterford 3 Kaly.Kalyanam@nrc.gov NRC Senior Resident Inspector for Waterford 3 Marlone.Davis@nrc.gov

Attachment 1 to W3F1-2013-0010 Waterford 3 Communications Assessment - Addressing Eight Technical Issues to W3F1-2013-0010 Page 1 of 5 Waterford 3 Communications Assessment - Addressing Eight Technical Issues Technical Issue 1:

The staff identified that licensees need to discuss how the power for the equipment analyzed is expected to be available, and how the planned communications enhancements are expected to be maintained. The following areas were identified:

A. A detailed description of how power will be maintained for (1) planned or potential enhancements to the communication links, and (2) existing equipment analyzed to be available.

1. The number of replacement batteries expected to be needed for a 24-hour duration, per the Nuclear Energy Institute (NEI) 12-01 "Guideline for Assessing Beyond Design Bass Accident Response Staffing and Communications Capabilities".
2. Generator availability to charge batteries without offsite equipment for a duration of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
3. A description of how ancillary equipment supports operations for a 24-hour duration (e.g. adequacy of fuel supplies for the generators; and the minimum number of battery chargers expected to be necessary).

Response

As stated in Section 2 of the October 31, 2012, submittal, Communication links are assumed to be established via satellite phones and use of the existing site radio system(s). Backup power was to be provided via uninterruptable power supplies (UPSs) initially and then by portable generators. Entergy has clarified that it plans to utilize UPS units to provide 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of back-up power for radio system repeaters; see Sections 4.12.1 through 4.12.4. Hand-held equipment (radios and satellite phones) will have adequate spare batteries to provide for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />; see Section 4.1. As such, no portable generator use is planned for the first 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. The specific number of batteries will be determined during the detailed engineering activity of the project. If during detailed engineering and planning, it is identified that these enhancements are not feasible or practical; an alternate approach will be developed.

Technical Issue 2:

The use and function of the planned enhancements for the improvement of communications:

A. A description of the use of the planned enhancements:

1. A discussion of whether each planned enhancement identified is only to be used for maintaining the communication link identified, or if it is expected to be shared among other communication links.

to W3F1-2013-0010 Page 2 of 5

2. A general description of the planned enhancement and how the equipment will be integrated.
3. The title and general description of the procedure that will be developed and used by plant personnel to describe protocols for shared usage of communication capabilities.

Response

Communication links will be established using the existing site radio system and satellite phones. Adequate hand-held equipment (radios and satellite phones) will be provided for each link (i.e. no sharing required). As stated in Section 4.6 of our submittals, Entergy has not identified any communication pathway assigned to support multiple functions. (Note that field teams will be using the same radio channel.) Entergy will not be implementing shared usage; therefore, a procedure is not required.

Technical Issue 3:

The protection of the new equipment purchased as a planned enhancement as well as the protection of existing communications equipment analyzed as being available:

A. A discussion of how the existing equipment analyzed to be available and enhancements to these communication links as well as associated ancillary equipment will be stored in a manner that is protective from a large scale natural event:

1. A description of pre-identified areas that are considered protective for existing equipment and whether new equipment will be stored in a similar location.

The title and brief description of a procedure for new communications equipment storage is acceptable, if this procedure is planned to be developed in the future; or a statement that this will be completed in alignment with NRC order EA-12-049.

2. Equipment stored off-site, should have an analysis of duration to set-up this equipment for use.
3. The analysis demonstrates that the existing equipment that is expected to be available will be functional.

Response

New power supplies for radio equipment will be installed adjacent to the existing equipment and therefore are protected per the discussion provided in Section 4.12 of the assessment report. The enhancements identified for the existing equipment would also apply to the new power supplies. Section 4.5 of the report has been revised to clarify this point.

No equipment is currently planned to be stored off site.

Analysis is per section 4.12 of the assessment report.

to W3F1-2013-0010 Page 3 of 5 Technical Issue 4:

The programmatic controls for the use of the new equipment purchased as a planned enhancement:

A. A description of planned proceduralization and training for the use of these planned enhancements. It is acceptable to provide a title and description of a new procedure for communications equipment.

1. A description of any credited manual actions and their procedures.
2. A description of any maintenance for this equipment, including operability testing.
3. A description of periodic inventory checks.
4. A description of planned staff training.

Response

Section 4.8 has been revised to indicate that existing site procedures for inventory checks and testing will be updated and used for the new equipment.

Site Maintenance programs will be used as appropriate for controlling required maintenance (e.g. replacing UPSs batteries).

Section 4.11 has been revised to indicate that training will be conducted to ensure personnel are familiar with the operation of the new equipment, storage location and any other requirements.

Technical Issue 5:

A discussion on what assumptions are used as part of the Communications Assessment:

A. A description of the assumptions used for the submitted Communications Assessment Summary, and technical justification for any differences from the assumptions within NEI 12-01, Sections 2.2 Assumptions common to Both Assessments and 2.4 Assumptions for Communications Assessments.

Response

Section 3 has been revised to indicate that assumptions are as stipulated in NEI 12-01.

to W3F1-2013-0010 Page 4 of 5 Technical Issue 6:

How plant personnel will be notified in the event of a large scale natural event that causes a loss of all AC power:

A. A description and title of the procedure for emergency notification of essentially all plant staff within 30 minutes (if applicable to the site Emergency Plan).

B. A description and title of procedure for notification of emergency response organization staff (i.e., self activation) (if applicable).

Response

Plant personnel will become aware of the large scale natural event by personal observation. An update is being prepared for General Employee Training (GET) to include direction regarding actions to be taken by on-site personnel upon observation of the event. Site accountability processes will be implemented to ensure all personnel within the protected area are notified and accounted for.

Section 4.4 indicates that notification of the Emergency Response Organization (ERO) will be as discussed in Section 4.4 (second bullet) of NEI 12-01. This expectation has been communicated to the site ERO and has been included in initial and continuing ERO training.

Technical Issue 7:

How communications will be maintained during the period of final implementation of the communications enhancements:

A. Identification and description of the interim actions that will be in place to bridge the gap until all final mitigation strategies being proceduralized are implemented. This also includes equipment protection.

Response

Section 5 has been added to the submittal providing a summary of interim actions, including:

  • Number of satellite phones provided (minimum of nine at single unit sites and 11 at dual unit sites).
  • Existing radio system capability during loss of AC power (e.g. existence of UPS, talk around capability, etc.)
  • ERO notification methodology established/implemented.

to W3F1-2013-0010 Page 5 of 5 Technical Issue 8:

Descriptions are needed regarding how communications will be maintained with the on-site and in-plant response teams and offsite response organizations if their communication links are not expected to be available:

A. A timeline for when the evaluation for site specific improvements for on-site and in-plant response teams will be completed.

B. A discussion of the enhancements that are planned for the offsite response organization communication links.

Response

Section 6 has been added to the report and includes a table providing target dates for implementation of the identified enhancements.

Attachment 2 to W3F1-2013-0010 Supplemented Waterford 3 Communications Assessment to W3F1-2013-0010 Page 1 of 27 Supplemented Waterford 3 Communications Assessment

1. Executive Summary:

The purpose of this report is to document performance of an NRC-requested assessment of the current communications systems and equipment used at the Waterford 3 SES during an emergency event as defined by NEI 12-01, Guideline for Assessing Beyond Design Basis Accident Response Staffing and Communications Capabilities. Power supplies for the existing communications equipment to be credited have been assessed to determine power availability during a prolonged Station Blackout (SBO) event.

The beyond design basis events assumed in this assessment introduce conditions that could render a significant portion of existing communications capabilities inoperable. The assessment identifies enhancements to maintain communications capabilities for responding to emergency events. These enhancements include:

  • Improvements to radio equipment power supplies including: UPS(s)/batteries for fixed equipment.
  • Added satellite based communications capability.
  • Re-locating flooding vulnerable equipment to locations above design flood level.

to W3F1-2013-0010 Page 2 of 27

2. Methodology This report is based on the recommended criteria from NEI 12-01, for use in identifying enhancements that will ensure the availability of critical communications capabilities during an extended loss of AC power, including evaluation of power sources for communications equipment. This approach provides the flexibility to perform a communications capability assessment that accommodates specific site needs while, at the same time, ensuring consistency with industry-developed standards, and NRC regulations and guidance.

The assessment focused on the communication systems to be credited. For example, existing telephone communications are assumed to be inoperable and therefore are not credited or evaluated in this assessment. Communication links are assumed to be established via satellite phones and use of the existing site radio system(s). Walk downs to evaluate the equipment locations and function were performed. Enhancements identified within the assessment will be further developed as implementation progresses. Alternate approaches will be utilized if prudent (e.g. alternate/new technology, improved capability, cost savings, etc.).

3. Assumptions: The assumptions as stated in NEI 12-01 form the basis for this assessment, including:
  • Extended loss of AC power event
  • Successful plant shutdown
  • No hostile action
  • 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> post event - no site access
  • 6-24 hours post event - limited site access, individual access by walking, personal transport or alternative transport
  • 24+ hours post event - site access restored to near normal status
  • Installed sources of AC power not available
  • Non-essential loads from DC battery sources are stripped per station procedures
  • Installed inverters and battery chargers remain available provided they are protected from external events
  • Onsite diesel fuel oil is available provided it is stored in a protected manner from external events
  • Portable equipment may be used provided it is stored onsite and protected from seismic, wind and flooding events. Includes portable AC and DC power sources
  • Onsite communications infrastructure remains available provided it is protected from seismic, wind and flooding events.
  • Offsite communications infrastructure is inoperable out to 25 miles
  • Communications equipment located at an offsite response facility and supplied from a backup power source is assumed to be functional.
4. Communications During An Extended Loss Of AC Power NEI 12-01 Section 4, Communications During an Extended Loss of AC Power, provides the basis for the following assessment.

to W3F1-2013-0010 Page 3 of 27 4.1 Required Emergency Communication Capabilities (NEI 12-01 Section 4.1)

Entergy has reviewed the communications links and has determined the method of communications (i.e. radio or satellite phone) for each defined link and overall the number of satellite phones and radios needed. The analysis has determined in order to establish the required links, additional satellite phones and spare batteries are needed. The attached rollup tables provide additional detail on the identified communication links.

4.2 Plant Paging (Announcement) System (NEI 12-01 Section 4.2)

NEI 12-01 Section 4.2 requires notification of the plant staff at the onset of the event. The Waterford 3 plant paging system provides public address capability over a large portion of the site. Considering the event as defined by NEI 12-01, the system is limited primarily by the lack of system wide back up power. Although portions of the system may be available, it will not be credited as available for notification of plant personnel. Alternative measures should be established (non-essential plant personnel should be trained to report to site assembly areas during SBO conditions).

4.3 Communications Equipment at Offsite Response Organization (ORO) Facilities (NEI 12-01 Section 4.3)

Per NEI 12-01, Some communications capability should be available at the ORO facilities that normally receive licensee notifications of an emergency declaration or a Protective Action Recommendation. Entergy has assessed capabilities at their ORO facilities. All four (4) ORO facilities (St. Charles Parish, St. John the Baptist Parish, Governors Office of Homeland Security & Emergency Preparedness, and Louisiana Department of Environmental Quality) have backup power and satellite phone communications. No additional communication capabilities will be required at the ORO facilities.

4.4 Notification of the Emergency Response Organization (ERO) (NEI 12-01 Section 4.4)

NEI 12-01 offers two potential options to promote timely staff augmentation by the ERO.

Waterford 3 will ensure that ERO members are trained to automatically respond to their assigned facilities or a designated staging area when made aware of a wide loss-of-grid (e.g. by direct observation, media reports, word-of-mouth, etc.). This expectation has been communicated to the ERO and has been included in initial and annual ERO requalification training.

4.5 Equipment Location Requirements (NEI 12-01 Section 4.5)

Communication equipment to be used or considered operable, should be in a location and maintained in a manner that maximizes survivability following a beyond design basis external event. In particular, the location or manner should reasonably preclude wetting from flooding or impact damage from a seismic event. The communication links as defined by NEI 12-01 should be established using satellite phones and radios. Existing, installed communications equipment to be credited (i.e. considered operable) is limited to the plant radio system(s). Assessments have been performed, including walkdowns, of the existing installed radio equipment. Enhancements are recommended to address some identified concerns associated with the equipments ability to survive a seismic event.

Structural capability of the equipment support/mounting as well as impact from adjacent equipment and/or stored material should be addressed. Power supply enhancements are to W3F1-2013-0010 Page 4 of 27 expected to be installed adjacent to the existing equipment and therefore would be subject to the same assessment findings and resulting enhancements. An issue associated with wetting from flooding was identified for the Information Technology Building and the Emergency Operations Facility. See Sections 4.12.1 - 4.12.4 and Table 9 in attached rollup tables for details. Programmatic requirements need to be established to ensure the credited equipment is maintained in a manner that maximizes survivability.

No equipment is currently planned to be stored off site for onsite use.

4.6 Performance Characteristics (NEI 12-01 Section 4.6)

The performance characteristics as identified in this section of NEI 12-01 requires that communication pathways (e.g., radio channels, satellite phone) designated to support multiple functions must be analyzed to demonstrate that they can simultaneously support both functions. Entergy has not identified any communication pathway assigned to support multiple functions.

4.7 Other Assessment Considerations (NEI 12-01 Section 4.7)

Enhancements (physical and programmatic) are recommended to ensure considerations, as identified in this section of NEI 12-01, are met. Provisions for portable backup power sources and batteries for battery operated equipment should be established.

4.8 Quality and Maintenance-Related Requirements (NEI 12-01 Section 4.8)

The requirements identified in this section of NEI 12-01 should be incorporated into the program for ensuring the credited equipment is maintained in a manner that maximizes survivability. Programmatic controls should be established to ensure that equipment remains available and operable. Existing site inventory and test procedures will be updated and used for the new equipment to ensure the equipment is available and operable. Site maintenance programs will be used as appropriate for controlling required maintenance (e.g. replacing UPS batteries).

4.9 National Communications System (NCS) Services (NEI 12-01 Section 4.9)

Waterford 3 currently has voice circuits that are TSP (Telecommunications Service Priority) protected. The GETS (Government Emergency Telecommunications Services) access card service, which aids in routing a phone call through a high traffic infrastructure, would have limited value in a natural disaster in which there was little infrastructure available. However, Waterford 3 maintains GETS access cards for the potential value added. Additional TSP protection is not planned.

4.10 Communication Provider Emergency Services (NEI 12-01 Section 4.10)

Entergy has contacted the major communications service providers which service the Entergy nuclear fleet (i.e. Verizon and AT&T). Neither company has a separate emergency services priority other than government TSP (Telecommunications Service Priority), which is addressed in Section 4.9. No further enhancements are planned.

to W3F1-2013-0010 Page 5 of 27 4.11 Personnel Training (NEI 12-01 Section 4.11)

Additional training is needed to ensure ERO and plant staff is familiar with the credited equipments use and storage location and other requirements. Training may include:

drills, tabletops, classroom and/or computer based training. Appropriate personnel will be familiarized with the communication equipment use, capabilities and limitations during the interim period prior to full implementation of the identified enhancements.

4.12 Equipment Locations and Capabilities The communications functions, radio reception/transmission equipment, and protection of each location from seismic, wind, and flooding are discussed below. Specifically, the structural capacity of the equipment in its current configuration was evaluated in its ability to withstand the identified external hazards. These hazards include seismic, flooding, and high winds. The structural evaluation was based on engineering judgment developed by a consensus of two engineers experienced in structural design and construction.

It is required that EP Communication equipment be reasonably protected from a beyond design basis seismic event. To the extent possible, the existing guidance provided in EPRI NP-6041, " Nuclear Power Plant Seismic Margin " is used for determination of the seismic/wind design capabilities of structures containing Systems, Structures and Components (SSCs) in the vicinity (adjacent and overhead) of existing Emergency Plan (EP) Communication equipment. Additionally, existing seismic/wind housekeeping procedures should be used to establish secure storage of EP communication equipment.

This includes consideration of adjacent SSCs that may pose a potential seismic/wind interaction hazard.

Where these procedures and guidance cannot be applied, it should be ensured that EP Communication equipment be contained within one or more of the configurations:

In an existing safety related structure designed for the Safe Shutdown Earthquake (SSE), or In a structure designed to or evaluated equivalent to ASCE 7-10, "Minimum Design Loads for Buildings and Other Structures", or Outside a structure and evaluated for seismic interactions to ensure equipment is not damaged by non-seismically robust components or structures, and Equipment is located above the design basis flood elevation for the plant (29.25) or is otherwise protected and would not be subjected to localized flooding.

The sections below provide a summary of the area walk downs and their potential configuration concerns that could present challenges in maintaining an operable communication system in the event of one or more of the identified environmental hazards.

4.12.1 Reactor Auxiliary Building (RAB)

Location and General

Description:

The RAB is classified as a safety-related structure and is designed Seismic Category I.

The communications equipment is located in a limited access, air conditioned to W3F1-2013-0010 Page 6 of 27 communication equipment room in the RAB (+7 ft. elevation). The room is bounded by the building exterior on two sides and two masonry block walls (North and West side) with steel angle restraints on the other two sides. Entrance is through an interior fire door (Door 123) from the corridor. The room is normally ventilated via a fan in the ceiling. The antennae for the repeaters are located on the top of the structure.

The RAB structure provides reasonable assurance that the EP Communications Equipment is protected during a seismic event, as defined in NEI 12-01.

Equipment & Functionality:

The communication equipment room located in RAB (+7 ft. elevation) houses radio cabinets, plant paging system, and the Public Automatic Branch Exchange (PABX) system. The radio cabinet contains five repeaters (operations and maintenance, secondary radiological field monitoring, radiation protection, and security) and combiner equipment. The operations and maintenance radio system is the primary radio communications network for normal onsite communication for operations and maintenance personnel. When an emergency is declared, the maintenance radio frequency is assigned to emergency communications. The secondary radiological field monitoring radio network is used to transmit offsite radiological data during an emergency. The security radio system is to communicate with security personnel during normal and emergency conditions.

Remote radio stations are located inside and outside of the protected area. These stations provide coverage to interior and exterior areas of the plant.

Power:

Power to the radio system equipment is supplied from RAB Distribution Panel PDP-387-2A, circuits 3, 4, 11, and 12. Distribution Panel PDP-387-2A is powered from a 120 VAC source from the Computer Static Uninterruptible Power Supply (SUPS) System. The Computer SUPS rated at 200 KVA having maximum output of 1666.7 Amps at 120V AC.

It is recommended that the UPS batteries will be sized to provide adequate amp hour capacity as required.

Seismic Protection:

Computer Equipment Rooms RAB (+7 ft. and +21 ft. elevation)

Seismic - ENHANCEMENT RECOMMENDED Anchorages - ENHANCEMENT RECOMMENDED Issues:

  • The Meridian PABX cabinets are on wheels with jacked up leveling screws. The Meridian PABX cabinets are not anchored.
  • The walkdown team did not enter into the AB Battery room since it required a key from the Control Room. The walkdown team has taken into consideration that since the batteries are located in the RAB, they would be seismically mounted. Need to verify that the AB Batteries are seismically mounted.

Acceptable Anchorage:

to W3F1-2013-0010 Page 7 of 27

  • The Motorola radio cabinets, plant paging system and old PABX racks are anchored to floor. The anchorage of this equipment is seismically acceptable. There are no concerns regarding degraded anchorages.
  • The wall mounted electrical panels anchorage is seismically acceptable.
  • The switches, connectors and small transformers mounted to plywood panel boards attached to Unistrut anchored to wall judged acceptable.
  • The AB SUPS cabinets are anchored to the floor and are considered seismically adequate.

Spatial Interactions:

Issues:

  • None Acceptable Spatial Interactions:
  • Cable raceways are approximately 50% filled and are mounted using standard Unistruct rod hanger hardware. There are coiled fiber optic cables tie wrapped to the outside of the cable tray above the new PABX cabinets. Per discussion with Waterford 3 site representative during the walkdown, the coil fiber optic cables are for new connections and this condition is temporary. There are no concerns with electrical conduits.
  • The fluorescent lighting hung with rigid conduits is judged acceptable. There are no ceiling tiles in the communication room.
  • There are no ceiling tiles in the AB SUPS area.
  • The two-masonry walls (North and West Walls) have steel angle restraints at the ceiling intersections. Per discussion with Waterford 3 site representative during the walkdown, the masonry walls are reinforced block wall. Therefore, there is no seismic II/I concerns.

Housekeeping:

Issues:

  • Area needs to be cleaned up and organized - Housekeeping type activities. (Housekeeping issues have been resolved)
  • There is an unanchored storage cabinet near the radio cabinet.
  • There is a metal desk on wheels and chair on wheels next to the PABX rack. The chair has a bicycle cable with lock tied to the fiber optic channel equipment rack.
  • There is a six-foot ladder leaning against the wall next to the plant paging system rack. No ladder storage hook or tie-down observed in the area. (Ladder has been removed from room)

There are no seismic concerns for the RAB since the structure is designed seismic category I.

to W3F1-2013-0010 Page 8 of 27 Flood Protection ACCEPTABLE:

Computer Equipment Room RAB (+7 ft. elevation)

  • There is a 10 in. nominal pipe size pipe running overhead in the back of the room above the radio cabinets. The piping is a drain line for the fire protection sprinklers and has Victaulic couplings.

The piping is dry.

  • There is also a 4-inch nominal pipe size acid waste line overhead center of room. Piping is drain line for Computer Battery room located above at El. 21 ft. This line is dry.

SUPS Room RAB (+21 ft. elevation)

  • Walkdown of the immediate area of the AB SUPS located one overhead fire sprinkler greater than 10 feet away, judged acceptable.

There are no flooding concerns for the RAB since the structure is designed seismic category I. The design basis flood level for Waterford 3 is El. +29.25 ft. and the RAB is protected from external flooding to EL. +30 ft. flood elevation. Site grade is approximately at +17.5 ft. elevation.

High Winds Protection ACCEPTABLE:

The Computer Equipment Room is located inside the safety-related RAB at El. +7 ft.

The SUPS area is located inside the safety-related RAB at El. +21 ft. There are no high winds concerns since the structure is designed seismic category I.

4.12.2 Technical Support Center (TSC)

Location and General

Description:

The TSC is located on the +46.0 ft. elevation in the RAB. It is contained entirely within the Control Room emergency ventilation system envelope but separate from the Control Room. Fixture installations within the various areas of the TSC prevent the TSC from being seismic Category I qualified. The size of the TSC provides sufficient storage space and access to data displays, plant records and historical data. The TSC has facilities to support the plant management and technical personnel who are assigned there during an emergency and is the primary onsite communications center for the plant during the emergency.

In addition, the TSC is used to provide technical support during the recovery operations following an emergency. The TSC acts as a complete and up-to-date repository of plant records and procedures and is at the disposal of TSC personnel to aid in their technical analysis and evaluation of emergency conditions.

The TSC structure provides reasonable assurance that the EP Communications Equipment is protected during a seismic event, as defined in NEI 12-01.

to W3F1-2013-0010 Page 9 of 27 Equipment & Functionality:

The communication equipment consists of a desk set connection to the operations and maintenance radio system and civil defense radio system.

Power:

The power supply source documents for the TSC communication is supplied from RAB Distribution Panel PDP-387-2A and is covered in Section 4.12.1 of this document.

Seismic Protection ACCEPTABLE:

The TSC is located inside the safety-related RAB at El. +46ft. There are no seismic concerns for the RAB since the structure is designed seismic category I.

Flood Protection ACCEPTABLE:

The TSC is located inside the safety-related RAB at El. +46ft. There are no flooding concerns for the RAB since the structure is designed seismic category I. The design basis flood level for Waterford 3 is El. +29.25 ft. and the RAB is protected from external flooding to EL. +30 ft. flood elevation. Site grade is approximately at +17.5 ft. elevation.

High Winds Protection ACCEPTABLE:

The TSC is located inside the safety-related RAB at El. +46ft. There are no high winds concerns since the structure is designed seismic category I.

4.12.3 Information Technology (IT) Building Location and General

Description:

The IT Building is a non safety-related steel framed brick faced single story office type building installed on a concrete slab located inside of the owner controlled area on the south side of the Generation Support Building. Although the structure is non safety-related, its relative low aspect ratio (height to width) was judged to be favorable in terms of seismic resistance. The IT Building is at approximately +15 ft elevation. Therefore, the IT building is below the Waterford 3 design flood level of +29.25 ft. The equipment is located within the computer room inside of the IT Building.

The IT structure provides reasonable assurance that the EP Communications Equipment is protected during a seismic event, as defined in NEI 12-01. However, flooding is a concern for the IT building because it is below the Waterford 3 design flood level of

+29.25 ft.

Equipment & Functionality:

The IT Building computer room contains a primary field monitoring team radio, Qualcomm satellite phone, primary civil defense radio, and construction radio repeater.

The purpose of the primary field monitoring team radio network is to transmit offsite radiological data. This radio operates in the FM band. The transmitter and antenna is located in the IT Building. The purpose of the construction radio repeater is to provide maintenance support to locations inside and outside the protected area. The purpose of the primary civil defense radio is to provide radio communication with offsite agencies.

The purpose of the Qualcomm satellite phone is to provide telephone communication to and from the control room and TSC and anywhere within the worldwide coverage area.

to W3F1-2013-0010 Page 10 of 27 Power:

Per verbal discussion with Waterford 3 engineering personnel during walk down, AREVA team was informed that communication equipment is fed from local distribution panel in the IT Building and is backed by UPS and a local diesel generator unit. The power supply source documents for the communication equipment were not made available during the walkdown. In addition, Waterford 3 engineering personnel noted that no documentation exist to show the electrical interface between the IT Building and the local diesel generator unit. It is recommended that the UPS batteries be sized to provide adequate amp hour capacity as required.

Seismic Protection:

Seismic - ENHANCEMENT RECOMMENDED Anchorages ENHANCEMENT RECOMMENDED Issues:

  • The existing 18 KVA Uninterruptible Power Supply unit on wheels with jacked up leveling screws. The UPS unit is not anchored.
  • The construction radio repeater is just sitting on the desk shelf that is on wheels. The repeater is not mounted to the shelf and the desk wheels are not locked.

Acceptable Anchorage:

  • The anchorage of the primary field monitoring team radio, primary civil defense radio and Qualcomm satellite phone to the panelboard is judged acceptable.
  • No concerns regarding degraded anchorages for equipment in the computer room.

Spatial Interactions:

Issues:

  • None Acceptable Spatial Interactions:
  • The acoustic ceiling tiles and bent ceiling grids are judged acceptable.
  • No potentially adverse seismic interactions associated with the wall mounted primary field monitoring team radio, primary civil defense radio and Qualcomm satellite phone equipment.

Housekeeping:

Issues:

  • There is a trash can, plant paging rack, and excess computer cables located near the 18 KVA UPS unit. (Items have been moved away from UPS unit) to W3F1-2013-0010 Page 11 of 27 Flood Protection ENHANCEMENT REQUIRED:

The IT Building is at approximately +15 ft elevation. The IT building is below the Waterford 3 design flood level of +29.25 ft. In addition, the primary field monitoring team radio is located near the fire protection valves, piping, and sprinklers inside of the computer room. It is recommended that the IT Building communication equipment be moved to Generation Support Build 3RD Floor which is above the design flood level of

+29.25 ft. In addition, install a new UPS unit with backup batteries to provide an adequate amp hour capacity to meet the NEI 12-01 requirements.

High Winds Protection ACCEPTABLE:

Per verbal discussion with WF3 engineering personnel during walkdown, the AREVA team was informed that the IT building was designed to 100 mph winds and survived hurricane Katrina with no wind or flood damages.

4.12.4 Emergency Operations Facility (EOF)

Location and General

Description:

The EOF is located within the James M. Cain Energy Education Center (EEC) approximately one mile southwest of the Waterford 3 site. The EOF is a non safety-related single story office type concrete structure with a brick exterior. Although the structure is non safety-related, its relative low aspect ratio (height to width) was judged to be favorable in terms of seismic resistance. The EOF is at approximately +12 ft elevation, which is below the Waterford 3 design flood level of +29.25 ft. The communication equipment is located within the computer room inside of the EOF. There is a diesel generator located on the southeast side of the EOF. Since the Waterford 3 site does not provide power to the EOF, credit is taken for this generator in this assessment.

Equipment & Functionality:

The EOF equipment room contains a secondary civil defense radio, civil defense radio transmitter, and operational hotline for communications between onsite and offsite facilities. The secondary civil defense radio is used to communicate with offsite agencies during any type of emergency. It can provide communication links with local parishes only. The civil defense radio serves as a backup to the operational hotline.

The operational hotline is used to communicate with the following agencies: GOHSEP, LDEQ, St. Charles Parish, St. John the Baptist Parish, and Waterford 1 & 2. In the event of an emergency, the operational hotline serves as the primary method of notification.

Power:

Primary power supply to the secondary civil defense radio and civil defense radio transmitter equipment in the EOF is fed from Distribution Panel EH1, circuit 1 through step down transformer T1 to Distribution Panel EL1, circuit 64. Backup power supply is supplied by the local 230 KVA diesel generator unit. Primary power supply to the operational hotline equipment in the EOF is fed from Distribution Panel EH1 (circuits 7 and 8) through step down transformers (T7 and T8) through local 1KVA SUPS Inverter to Distribution Panel LV1. Backup power supply is supplied by the local 230 KVA diesel to W3F1-2013-0010 Page 12 of 27 generator unit and 48 volt batteries. In addition, an alternate feed to the local 1KVA SUPS Inverter is fed from Distribution Panel L3. It is recommended that the UPS batteries be sized to provide adequate amp hour capacity as required.

Seismic Protection:

EOF - Inside Seismic - ENHANCEMENT RECOMMENDED Anchorages ENHANCEMENT RECOMMENDED Issues:

  • The power supply to the secondary civil defense radio is sitting on top of a rolling cart. It is recommended that the power supply equipment be permanently mounted.
  • The1KVA SUPS Inverter is not anchored to the floor.
  • The 48 volt batteries inside the battery room are not seismically restrained. The batteries are sitting on the racks.

Acceptable Anchorage:

  • The secondary civil defense radio, radio transmitter and the ring down line module inside the communication room are wall mounted. Anchorage of this small equipment judged acceptable.
  • Electrical panels inside the electrical room are seismically anchored.
  • No concerns on outside diesel engine or antennas mounted on microwave tower.
  • No concerns regarding degraded anchorages for electrical panel in the electrical room.

Spatial Interactions:

Issues:

  • None Acceptable Spatial Interactions:
  • Overhead lighting deemed acceptable. There are no other seismic spatial interaction concerns identified.

Housekeeping:

Issues:

  • There is a storage cabinet and spare equipment in boxes near the 1KVA SUPS Inverter. (CR-WF3-2012-5132 has been initiated to move or remove items away from 1KVA SUPS Inverter)

EOF - Outside Seismic - ACCEPTABLE Anchorages Issues:

to W3F1-2013-0010 Page 13 of 27

  • None Acceptable Spatial Interactions:
  • The diesel generator is anchored appropriately.

Spatial Interactions - No Concerns:

  • There are no cable raceways in the vicinity.

Housekeeping Issues:

  • Noticed heavy corrosion on the diesel engine exhaust muffler but deemed acceptable based on regular testing schedule and that the corrosion is uniform without heavy pitting. Regular testing and inspection should continue.

The EEC is located outside the site owner control area approximately one mile away, this is consider to be under near site category. Although the structure is non safety-related, its relatively low aspect ratio (Height to Width) was judged favorable in terms of seismic resistance.

Flood Protection ENHANCEMENT REQUIRED:

The EOF is at approximately +12 ft elevation, which is below the Waterford 3 design flood level of +29.25 ft. This included the backup battery room and the diesel generator located outside of the building. It is recommended that the EOF communication equipment be moved to a location that is above the design flood level of +29.25 ft. In addition, install a new UPS unit with backup batteries to provide an adequate amp hour capacity to meet the NEI 12-01 requirements.

High Winds Protection ACCEPTABLE:

Per verbal discussion with WF3 engineering personal during walkdown, AREVA team was informed that the EEC building was designed to 100 mph winds and survived Hurricane Katrina with no wind or flood damages.

to W3F1-2013-0010 Page 14 of 27 5.0 INTERIM ACTIONS Interim measures were initially provided under letter W3F1-2012-0042, Entergys 90-Day Response to the March 12, 2012 Information Request, Action Plan for Completing Emergency Communication and Staffing Assessments, dated June 7, 2012. Interim measures include:

  • In addition to existing emergency response radios, 10 additional portable digital radios including extra batteries/chargers have been purchased, received, and deployed to be used for communications with onsite response teams or offsite field monitoring teams.
  • Hand held radios are programmed with talk around capability (allows usage without repeaters for limited distances).
  • The primary repeater for the onsite radios is equipped with a UPS that provides some backup power capability.
  • In addition to the existing eleven satellite phones currently on site at Waterford 3, 11 additional battery-operated satellite phones have been purchased, received, and deployed for emergency response personnel for onsite and offsite communications. User aids are located with the phones for ease of use.
  • ERO notification methodology (per NEI 12-01, Section 4.4, second bullet) has been determined and implemented (see section 4.4 above).

to W3F1-2013-0010 Page 15 of 27 6.0 SCHEDULE The above assessment has identified potential enhancements to provide the required communications capability during a beyond design basis event consistent with the assumptions specified in NEI 12-01. The table below summarizes required actions and provides target completion dates.

Implementing Actions Target Completion Date Communication Equipment

  • Additional satellite phones (11) staged in complete ERFs.
  • Additional radios/batteries deployed complete
  • Resolve non-engineering spatial 12/31/13 interactions
  • Complete engineering for indentified 1/18/15 enhancements (e.g. power supplies and structural upgrades).
  • Procure additional portable equipment 4/18/15 (e.g. radios, satellite phones, batteries, generators) as required.
  • Complete installation of engineered 11/12/15 upgrades.

Communication with OROs

  • Ensure ORO facilities are equipped with ORO Facilities are satellite phones equipped with Satellite Phones Miscellaneous
  • ERO notification methodology complete implemented
  • Finalize storage location(s) of portable 4/18/15 generators
  • Finalize training needs 1/18/15
  • Implement required training 11/12/15
  • Revise procedures to incorporate new 11/12/15 equipment
  • Revise GET to include assembly 12/31/13 requirements during a large scale external event.
  • Ensure adequate GETS cards are 12/31/13 available.
  • Complete evaluation of TSP circuits 12/31/13
  • Implement TSP enhancements per 12/31/14 evaluation results to W3F1-2013-0010 Page 16 of 27 Rollup Document Consistent with emergency planning standard requirements, communications systems and equipment associated with the following emergency response functions should be available during an extended loss of AC power. Availability should be determined after a review of existing capabilities and consistent with the assumptions listed in NEI 12-01 Rev. 0 Section 2. In particular, it is important that the primary and backup power source (if applicable) for each communications system or piece of equipment be identified.

End-point equipment identified for a communications link listed below should be used solely for the purpose indicated. For example, a satellite telephone assigned to the Control Room should not be credited for performing both Offsite Response Organization (ORO) and NRC notifications.

Note: Enhancements have been identified for power supplies for credited equipment (i.e.

equipment expected to be operable following Assumed Large Scale External Event (LSEE).

Detailed engineering should be performed to finalize the approach for these enhancements (e.g. UPS/batteries and/or portable generators).

to W3F1-2013-0010 Page 17 of 27 Table-1: Offsite Response Organization Notifications to, and communications with, OROs [per 10 CFR 50 Appendix E.IV.D and E.9.a]

Emergency Minimum Primary Method Primary Method Backup Backup Planned or Potential Response Communications Described in Available Method(s) Method(s) Improvement Facility Links site E-Plan following Described in Available Identified?

Assumed Large site E-Plan following Scale External Assumed LSEE Event (LSEE)

Control Room 1 per Control Dedicated Circuit NO PABX or Civil NO YES - Satellite Phones Room for Shift with Two Digit Defense Radio Communicator Dial Access Network Technical 1 for Key TSC Dedicated Circuit NO PABX or Civil NO YES - Satellite Phones Support Center Communicator with Two Digit Defense Radio (TSC) Dial Access Network Emergency 1 for Key EOF Dedicated Circuit NO PABX or Civil NO YES - Satellite Phones Operations Communicator with Two Digit Defense Radio Facility (EOF) Dial Access Network to W3F1-2013-0010 Page 18 of 27 Table-2: Nuclear Regulatory Commission Notifications to, and communications with, the Nuclear Regulatory Commission (NRC) Headquarters Incident Response Center and the appropriate NRC Regional Office Operations Center [per 10 CFR 50 Appendix E.IV.D and E.9.d]

Emergency Minimum Primary Method Primary Method Backup Backup Planned or Potential Response Communications Described in Available Method(s) Method(s) Improvement Facility Links site E-Plan following Described in Available Identified?

Assumed LSEE site E-Plan following Assumed LSEE Control Room 1 per Control ENS Bridge - NO Commercial NO YES -Satellite Phone Room for ENS Dedicated phone Telephone Communicator Technical 1 for ENS ENS Bridge - NO Commercial NO YES -Satellite Phone Support Center Communicator Dedicated phone Telephone Location(s) where 2 for HPN HPN Bridge - NO Commercial NO YES -Satellite Phone HPN Communicator Dedicated phone Telephone communications are performed (TSC, EOF, OSC,

-4 RAB) to W3F1-2013-0010 Page 19 of 27 Table-3: Licensee Emergency Response Facilities Communications between licensee emergency response facilities [per 10 CFR 50 Appendix E.9.c]. Additional links that support performance of critical response functions are also specified]. The minimum communications links to support this function are listed below by facility. For example, if the normally used telephone system cannot be restored to service, these links could rely upon some combination of radio, sound-powered and satellite-based communications systems.

Emergency Minimum Primary Primary Method Backup Backup Method(s) Planned or Response Communications Method Available following Method(s) Available following Potential Facility Links Described in Assumed LSEE Described in Assumed LSEE Improvement site E-Plan site E-Plan Identified?

Control Room 1 per unit Intercom NO Sound Powered YES YES -Satellite Phone Circuits Phones 1 each for:

Technical

  • Senior/Lead TSC Hotline Circuits NO PABX NO YES -Satellite Phone Support Center Manager (TSC) YES -Satellite Phone
  • Operations Hotline Circuits NO PABX NO Coordination
  • Maintenance Hotline Circuits NO PABX NO YES - Satellite Phone

& Radio Coordination

  • Engineering Hotline Circuits NO PABX NO YES -Satellite Phone Coordination
  • Radiological Health Physics NO PABX NO YES -Satellite Phone Support Intercom Additional response coordination links for multi-unit sites:
  • 1 for each position N/A N/A N/A N/A N/A providing Unit

Response

Coordination.

to W3F1-2013-0010 Page 20 of 27 Emergency Minimum Primary Primary Method Backup Backup Method(s) Planned or Response Communications Method Available following Method(s) Available following Potential Facility Links Described in Assumed LSEE Described in Assumed LSEE Improvement site E-Plan site E-Plan Identified?

Operations 1 each for:

Support Center

  • Senior/Lead OSC Hotline Circuits NO PABX NO YES -Satellite Phone (OSC) Manager
  • Radiological Health Physics NO PABX NO YES -Satellite Phone Support Intercom Additional response coordination links for multi-unit sites:
  • 1 for each position N/A N/A N/A N/A N/A providing Unit In-Plant Team Coordination.

1 each for:

Emergency YES -Satellite Phone

  • Senior/Lead Hotline Circuits NO PABX NO Operations Manager Facility (EOF) YES -Satellite Phone
  • Key Protective Hotline Circuits NO PABX NO Measures
  • Operations or Hotline Circuits NO PABX NO YES -Satellite Phone

& Radio Technical Support (as needed to support performance of dose projections, formulation of PARs and plant status updates to ORO authorities).

Joint 1 for Senior Manager Hotline Circuits NO PABX NO YES -Satellite Phone Information Center (JIC) to W3F1-2013-0010 Page 21 of 27 Table-4: Field / Offsite Monitoring Teams Communications with field/offsite monitoring teams [per 10 CFR 50 Appendix E.9.c].

Emergency Minimum Primary Method Primary Method Backup Backup Planned or Potential Response Communications Described in Available Method(s) Method(s) Improvement Facility Links site E-Plan following Described in Available Identified?

Assumed LSEE site E-Plan following Assumed LSEE Primary location Field/offsite FM Band Radio NO PABX/Low Band Lowband - Yes YES -Satellite Phone or where field/offsite monitoring team Radio/Pay Phone PABX - NO Radio Enhancement monitoring team coordination coordination is performed (EOF)

The location from 1 for each FM Band Radio NO PABX/Low Band Lowband - Yes YES -Satellite Phone or which field/ offsite field/offsite Radio/Pay Phone PABX - NO Radio Enhancement monitoring teams monitoring team are deployed (OSC/BU OSC) to W3F1-2013-0010 Page 22 of 27 Table-5: Other Federal Agencies Communications with other Federal agencies as described in the site emergency plan (e.g., the US Coast Guard) [per 10 CFR 50 Appendix E.9.b]

Emergency Minimum Primary Method Primary Method Backup Backup Planned or Potential Response Communications Described in Available Method(s) Method(s) Improvement Facility Links site E-Plan following Described in Available Identified?

Assumed LSEE site E-Plan following Assumed LSEE Primary location Coordination with PABX Telephone NO Commercial NO YES -Satellite Phone where Federal agencies Telephone communication with Federal agencies is performed to W3F1-2013-0010 Page 23 of 27 Table-6: On-site and In-plant Response Teams Coordination and direction of on-site and in-plant response teams. This includes teams necessary to affect emergency repairs, firefighting, search and rescue, radiological monitoring, and implementation of Transition Phase coping and severe accident management strategies.

To accommodate the timeline associated with NRC Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (as discussed in Section 1).

Emergency Minimum Primary Method Primary Method Backup Backup Planned or Potential Response Communications Described in Available Method(s) Method(s) Improvement Facility Links site E-Plan following Described in Available Identified?

Assumed LSEE site E-Plan following Assumed LSEE On-shift staff Number RADIO YES NONE N/A YES - Satellite Phone necessary for the and Additional Radios on-shift staff to perform Initial Phase coping actions (reflecting current staff &

strategies) to W3F1-2013-0010 Page 24 of 27 Emergency Minimum Primary Method Primary Method Backup Backup Planned or Potential Response Communications Described in Available Method(s) Method(s) Improvement Facility Links site E-Plan following Described in Available Identified?

Assumed LSEE site E-Plan following Assumed LSEE Operational 1 each for:

Support Center

  • On-site RADIO YES NONE N/A YES - Spare Radio (OSC) and radiological Batteries other site- monitoring specific 2 each for:

locations as

  • Firefighting (1 for RADIO YES NONE N/A YES - Spare Radio necessary brigade leader Batteries and 1 for the brigade) 2 each per unit RADIO YES NONE N/A YES - Spare Radio for: Batteries
  • In-plant radiological monitoring
  • Search and Rescue
  • Emergency repairs RADIO YES NONE N/A YES - Spare Radio Batteries Site-specific number needed to implement any 2 severe accident mitigation strategies to W3F1-2013-0010 Page 25 of 27 Table-7: Plant Paging (Announcement) System Emergency Response Minimum Communications Is this system available Planned or Potential Improvement Facility Links following assumed LSEE Identified?

N/A See assumptions and NO YES - alternate approach see Section 4.2 discussion in NEI 12-01.

to W3F1-2013-0010 Page 26 of 27 Table-8: Communications Equipment at ORO Facilities Emergency Minimum Primary Primary Method Backup Backup Planned or Potential Response Facility Communications Method Available Method(s) Method(s) Improvement Links Described in following Described in Available Identified?

site E-Plan Assumed LSEE site E-Plan following Assumed LSEE Location where At least one. See OROs receive assumptions and notifications of an discussion in NEI emergency 12-01.

declaration or a Protective Action ORO FACILITY Recommendation (as described in the St. Charles Parish Operational NO Civil Defense NO NO - All OROs have site emergency plan) Hotline Radio backup power and satellite phones St. John the Operational NO Civil Defense NO Baptist Parish Hotline Radio GOHSEP Operational NO Civil Defense NO Hotline Radio LDEQ Operational NO Civil Defense NO Hotline Radio to W3F1-2013-0010 Page 27 of 27 Table-9: Equipment Locations and Protection Primary System Equipment protected from the below hazards System/Equipment Component Protected from Protected from Protected from Location Seismic Flooding Wind EP Communications EOF Yes No Yes Equipment: (Radios, Repeaters, TSC Yes Yes Yes Transmitters, Batteries, Hotline CR Yes Yes Yes Phones Systems, UPS, etc.) IT BLDG Yes No Yes

+7 RAB Yes Yes Yes

+21 RAB Yes Yes Yes