ML13119A189: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 04/29/2013
| issue date = 04/29/2013
| title = Notification of NRC Initial Operator Licensing Examination 05000416-13-302
| title = Notification of NRC Initial Operator Licensing Examination 05000416-13-302
| author name = Gaddy V G
| author name = Gaddy V
| author affiliation = NRC/RGN-IV/DRS/OB
| author affiliation = NRC/RGN-IV/DRS/OB
| addressee name = Mulligan K
| addressee name = Mulligan K
Line 14: Line 14:
| page count = 3
| page count = 3
}}
}}
See also: [[followed by::IR 05000416/2013302]]
See also: [[see also::IR 05000416/2013302]]


=Text=
=Text=
{{#Wiki_filter:April 29, 2013  
{{#Wiki_filter:UNITE D S TATE S
Kevin Mulligan Vice President Operations Entergy Operations, Inc.  
                                  NUC LEAR RE GULATOR Y C OMMI S SI ON
Grand Gulf Nuclear Station  
                                                      R E G IO N I V
P.O. Box 756  
                                                1600 EAST LAMAR BLVD
Port Gibson, MS 39150  
                                          AR L I NGTON , TEXAS 7 601 1- 4511
                                                  April 29, 2013
Kevin Mulligan
Vice President Operations
Entergy Operations, Inc.
Grand Gulf Nuclear Station
P.O. Box 756
Port Gibson, MS 39150
SUBJECT:        GRAND GULF NUCLEAR STATION - NOTIFICATION OF NRC INITIAL
                OPERATOR LICENSING EXAMINATION 05000416/2013302
Dear Mr. Mulligan:
In a telephone conversation on April 25, 2013, between Messrs. Steve Reeves, Exam
Developer and Steve Garchow, Chief Examiner, arrangements were made for the
administration of licensing examinations at Grand Gulf Nuclear Generating Station during the
week of November 11, 2013.
As agreed during the telephone conversation, the NRC will provide the written examination
outlines and your staff will prepare the examinations based on the guidelines in NUREG-1021,
Operator Licensing Examination Standards for Power Reactors, Revision 9, Supplement 1,
and NUREG-1123, Knowledge and Abilities Catalog for Nuclear Power Plant Operators,
Revision 2, Supplement 1. The NRCs regional office will discuss with your staff any changes
that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the Operating Test
outlines by August 23, 2013. The written examinations, operating tests, and supporting
reference materials identified in Attachment 3 to ES-201 will be due by September 20, 2013.
Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations
(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the
outlines, examinations, and tests before they are submitted to the NRC for review and approval.
All materials shall be complete and ready-to-use. We request that any personal, proprietary,
sensitive unclassified, or safeguards information in your response be contained in a separate
enclosure and appropriately marked. Any delay in receiving the required examinations and
reference materials, or the submittal of inadequate or incomplete materials, may cause the
examinations to be rescheduled. In addition, your support for on-site validation of the
examinations is required during the week of October 7, 2013.
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.


SUBJECT: GRAND GULF NUCLEAR STATION - NOTIFICATION OF NRC INITIAL
K. Mulligan                                  -2-
OPERATOR LICENSING EXAMINATION 05000416/2013302 
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
Dear Mr. Mulligan:  
To permit timely NRC review and evaluation, your staff should submit preliminary operator and
senior operator license applications (Office of Management and Budget (OMB) approval
number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver
requests (if any) (OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number 3150-0018, which expires on February 28, 2013. The public reporting burden
for this collection of information is estimated to average 50 hours per response, including the
time for reviewing instructions, gathering and maintaining the data needed, and completing and
reviewing the collection of information. Send comments regarding this burden estimate or any
other aspect of these information collections, including suggestions for reducing the burden, to
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by Internet electronic mail to
INFOCOLLECTS@NRC.GOV.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRCs Public Document Room or from the
Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access
and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room
page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Mr. Reeves has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRCs examination
procedures and guidelines, please contact Mr. Garchow, Chief Examiner at 817-200-1426, or
myself at 817-200-1159.
                                                Sincerely,
                                                    /RA/
                                                Vincent Gaddy, Chief
                                                Operations Branch
                                                Division of Reactor Safety
Docket: 50-416
License: NPF-29


In a telephone conversation on April 25, 2013, between Messrs. Steve Reeves, Exam Developer and Steve Garchow, Chief Examiner, arrangements were made for the
K. Mulligan                                 -3-
administration of licensing examinations at Grand Gulf Nuclear Generating Station during the
DISTRIBUTION:
week of November 11, 2013.
Director (Art.Howell@nrc.gov)
 
Acting Deputy Regional Administrator (Robert.Lewis@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
As agreed during the telephone conversation, the NRC will provide the written examination
Acting DRP Deputy Director (Michael.Scott@nrc.gov)
outlines and your staff will prepare the ex
DRS Director (Tom.Blount@nrc.gov)
aminations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1,
Acting DRS Deputy Director (Jeff.Clark@nrc.gov)
and NUREG-1123, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators,"
Senior Resident Inspector (Rich.Smith@nrc.gov)
Revision 2, Supplement 1.  The NRC's regional office
Resident Inspector (Blake.Rice@nrc.gov)
will discuss with your staff any changes that might be necessary before the examinations are administered.
Branch Chief, DRP/C (David.Proulx@nrc.gov)
To meet the above schedule, it will be necessary for your staff to furnish the Operating Test
Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov)
outlines by August 23, 2013.  The written examinations, operating tests, and supporting
Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov)
reference materials identified in Attachment 3 to ES-201 will be due by September 20, 2013. 
GG Administrative Assistant (Alley.Farrell@nrc.gov)
Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval.  All materials shall be complete and ready-to-use.  We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked.  Any delay in receiving the required examinations and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.  In addition, your support for on-site validation of the examinations is required during the week of October 7, 2013.
Public Affairs Officer (Victor.Dricks@nrc.gov)
 
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Alan.Wang@nrc.gov)
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above.  In accordance with ES-302, your staff should retain the original simulator
Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)
performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511
RITS Coordinator (Marisa.Herrera@nrc.gov)
K. Mulligan  - 2 -
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
Technical Support Assistant (Loretta.Williams@nrc.gov)
 
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV/ETA: OEDO (Doug.Huyck@nrc.gov)
To permit timely NRC review and evaluation, your staff should submit preliminary operator and senior operator license applications (Office
  S:\DRS\REPORTS\Reports Drafts\GG-2013-11-Exam Notification Ltr.docx ML13119A189
of Management and Budget (OMB) approval number 3150-0090), medical certifications (O
  ADAMS: No           Yes         SUNSI Review Complete Reviewer Initials: VGG
MB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date.  If the applications are not received at least 30 days before the examination date, a postponement may be necessary.  Signed applications certifying that all training has
                                    Publicly Available     Non-Sensitive
been completed should be submitted at least 14
                                    Non-publicly Available Sensitive
days before the first examination date.
OB/SOE                                                           OB/C
This letter contains information collections that are subject to the Paperwork Reduction Act of
SGarchow                                                         VGaddy
1995 (44 U.S.C. 3501 et seq.).  These information collections were approved by OMB, under approval number 3150-0018, which expires on February 28, 2013.  The public reporting burden for this collection of information is estimated to average 50 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information.  Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to
/RA/                                                             /RA/
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory
4/29/13                                                           4/29/13
Commission, Washington, DC 20555-0001, or by Internet electronic mail to
INFOCOLLECTS@NRC.GOV.  The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
 
available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).  ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html. 
Thank you for your cooperation in this matter.  Mr. Reeves has been advised of the policies and guidelines referenced in this letter.  If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Ga
rchow, Chief Examiner at 817-200-1426, or
myself at 817-200-1159.
 
      Sincerely, 
 
  /RA/ 
      Vincent Gaddy, Chief
Operations Branch      Division of Reactor Safety
 
Docket:  50-416 License:  NPF-29
 
 
K. Mulligan - 3 -  
DISTRIBUTION:  
Director (Art.Howell@nrc.gov) Acting Deputy Regional Administrator (Robert.Lewis@nrc.gov)  
DRP Director (Kriss.Kennedy@nrc.gov)  
Acting DRP Deputy Director (Michael.Scott@nrc.gov)  
DRS Director (Tom.Blount@nrc.gov)  
Acting DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Rich.Smith@nrc.gov) Resident Inspector (Blake.Rice@nrc.gov)  
 
Branch Chief, DRP/C (David.Proulx@nrc.gov)  
Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov)  
Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov) GG Administrative Assistant (Alley.Farrell@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov)  
Public Affairs Officer (Lara.Uselding@nrc.gov)  
 
Project Manager (Alan.Wang@nrc.gov)  
Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov)  
ACES (R4Enforcement.Resource@nrc.gov)  
Regional Counsel (Karla.Fuller@nrc.gov)  
Technical Support Assistant (Loretta.Williams@nrc.gov)  
Congressional Affairs Officer (Jenny.Weil@nrc.gov)  
RIV/ETA: OEDO (Doug.Huyck@nrc.gov)  
 
   
 
  ADAMS:   No       Yes SUNSI Review Complete Reviewer Initials:   VGG  
  Publicly Available   Non-Sensitive  
  Non-publicly Available   Sensitive OB/SOE   OB/C SGarchow   VGaddy /RA/   /RA/ 4/29/13   4/29/13  
S:\DRS\REPORTS\Reports Drafts\GG-2013-11-Exam Notification Ltr.docx    ML13119A189
}}
}}

Latest revision as of 20:10, 4 November 2019

Notification of NRC Initial Operator Licensing Examination 05000416-13-302
ML13119A189
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 04/29/2013
From: Vincent Gaddy
Operations Branch IV
To: Kevin Mulligan
Entergy Operations
References
IR-13-302
Download: ML13119A189 (3)


See also: IR 05000416/2013302

Text

UNITE D S TATE S

NUC LEAR RE GULATOR Y C OMMI S SI ON

R E G IO N I V

1600 EAST LAMAR BLVD

AR L I NGTON , TEXAS 7 601 1- 4511

April 29, 2013

Kevin Mulligan

Vice President Operations

Entergy Operations, Inc.

Grand Gulf Nuclear Station

P.O. Box 756

Port Gibson, MS 39150

SUBJECT: GRAND GULF NUCLEAR STATION - NOTIFICATION OF NRC INITIAL

OPERATOR LICENSING EXAMINATION 05000416/2013302

Dear Mr. Mulligan:

In a telephone conversation on April 25, 2013, between Messrs. Steve Reeves, Exam

Developer and Steve Garchow, Chief Examiner, arrangements were made for the

administration of licensing examinations at Grand Gulf Nuclear Generating Station during the

week of November 11, 2013.

As agreed during the telephone conversation, the NRC will provide the written examination

outlines and your staff will prepare the examinations based on the guidelines in NUREG-1021,

Operator Licensing Examination Standards for Power Reactors, Revision 9, Supplement 1,

and NUREG-1123, Knowledge and Abilities Catalog for Nuclear Power Plant Operators,

Revision 2, Supplement 1. The NRCs regional office will discuss with your staff any changes

that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the Operating Test

outlines by August 23, 2013. The written examinations, operating tests, and supporting

reference materials identified in Attachment 3 to ES-201 will be due by September 20, 2013.

Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations

(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the

outlines, examinations, and tests before they are submitted to the NRC for review and approval.

All materials shall be complete and ready-to-use. We request that any personal, proprietary,

sensitive unclassified, or safeguards information in your response be contained in a separate

enclosure and appropriately marked. Any delay in receiving the required examinations and

reference materials, or the submittal of inadequate or incomplete materials, may cause the

examinations to be rescheduled. In addition, your support for on-site validation of the

examinations is required during the week of October 7, 2013.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

K. Mulligan -2-

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary operator and

senior operator license applications (Office of Management and Budget (OMB) approval

number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver

requests (if any) (OMB approval number 3150-0090) at least 30 days before the first

examination date. If the applications are not received at least 30 days before the examination

date, a postponement may be necessary. Signed applications certifying that all training has

been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018, which expires on February 28, 2013. The public reporting burden

for this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the

time for reviewing instructions, gathering and maintaining the data needed, and completing and

reviewing the collection of information. Send comments regarding this burden estimate or any

other aspect of these information collections, including suggestions for reducing the burden, to

the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory

Commission, Washington, DC 20555-0001, or by Internet electronic mail to

INFOCOLLECTS@NRC.GOV.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be

available electronically for public inspection in the NRCs Public Document Room or from the

Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access

and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room

page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matter. Mr. Reeves has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRCs examination

procedures and guidelines, please contact Mr. Garchow, Chief Examiner at 817-200-1426, or

myself at 817-200-1159.

Sincerely,

/RA/

Vincent Gaddy, Chief

Operations Branch

Division of Reactor Safety

Docket: 50-416

License: NPF-29

K. Mulligan -3-

DISTRIBUTION:

Director (Art.Howell@nrc.gov)

Acting Deputy Regional Administrator (Robert.Lewis@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

Acting DRP Deputy Director (Michael.Scott@nrc.gov)

DRS Director (Tom.Blount@nrc.gov)

Acting DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Rich.Smith@nrc.gov)

Resident Inspector (Blake.Rice@nrc.gov)

Branch Chief, DRP/C (David.Proulx@nrc.gov)

Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov)

Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov)

GG Administrative Assistant (Alley.Farrell@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Alan.Wang@nrc.gov)

Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV/ETA: OEDO (Doug.Huyck@nrc.gov)

S:\DRS\REPORTS\Reports Drafts\GG-2013-11-Exam Notification Ltr.docx ML13119A189

ADAMS: No Yes SUNSI Review Complete Reviewer Initials: VGG

Publicly Available Non-Sensitive

Non-publicly Available Sensitive

OB/SOE OB/C

SGarchow VGaddy

/RA/ /RA/

4/29/13 4/29/13