| number = ML13191A104
| number = ML13191A104
| issue date = 07/10/2013
| issue date = 07/10/2013
| title = Point Beach Nuclear Plant, Unit 1 - Notification of an NRC Supplemental Inspection and Information Request
| title = Notification of an NRC Supplemental Inspection and Information Request
| author name = Cameron J L
| author name = Cameron J
| author affiliation = NRC/RGN-III/DRP/B6
| author affiliation = NRC/RGN-III/DRP/B6
| addressee name = Meyer L
| addressee name = Meyer L
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 July 10, 2013  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 July 10, 2013 Mr. Larry Meyer Site Vice President NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241
 
Mr. Larry Meyer Site Vice President NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241  


==SUBJECT:==
==SUBJECT:==
POINT BEACH NUCLEAR PLANT, UNIT 1- NOTIFICATION OF AN NRC SUPPLEMENTAL INSPECTION AND INFORMATION REQUEST  
POINT BEACH NUCLEAR PLANT, UNIT 1- NOTIFICATION OF AN NRC SUPPLEMENTAL INSPECTION AND INFORMATION REQUEST


==Dear Mr. Meyer:==
==Dear Mr. Meyer:==


By letter dated January 2, 2013 (ADAMS ML13004A280), the NRC communicated to you the final significance determination for a finding having low-to-moderate safety significance (White) at your Point Beach Nuclear Plant, Unit 1. The finding involved the failure to have work instructions and procedures appropriate to the circumstances to ensure that, following the final alignment of the turbine to the Unit 1 turbi ne-driven auxiliary feedwater pump during a refueling outage in November 2011. This ultimately resulted in failure of the turbine-to-pump coupling on May 21, 2012.  
By letter dated January 2, 2013 (ADAMS ML13004A280), the NRC communicated to you the final significance determination for a finding having low-to-moderate safety significance (White) at your Point Beach Nuclear Plant, Unit 1. The finding involved the failure to have work instructions and procedures appropriate to the circumstances to ensure that, following the final alignment of the turbine to the Unit 1 turbine-driven auxiliary feedwater pump during a refueling outage in November 2011. This ultimately resulted in failure of the turbine-to-pump coupling on May 21, 2012.
 
By letter dated April 16, 2013, we were notified by your staff that you were ready for the NRC to conduct our supplemental inspection to review the actions taken to address the White finding.
By letter dated April 16, 2013, we were notified by your staff that you were ready for the NRC to conduct our supplemental inspection to review the actions taken to address the White finding. Accordingly, we plan to conduct a supplemental inspection, beginning on August 5, 2013, at the Point Beach Nuclear Plant using Inspection Procedure 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area.This on-site inspection is scheduled to be performed August 5 through August 9, 2013, and the inspection will be led by Diana Betancourt-Roldán, Point Beach Senior Resident Inspector (Acting). The results of this inspection will be documented in NRC Inspection Report 05000266/2013009. In order to minimize the impact to your on-site resources and to ensure a productive inspection for both organizations, we have enclosed a request for documents needed for this inspection.
Accordingly, we plan to conduct a supplemental inspection, beginning on August 5, 2013, at the Point Beach Nuclear Plant using Inspection Procedure 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area. This on-site inspection is scheduled to be performed August 5 through August 9, 2013, and the inspection will be led by Diana Betancourt-Roldán, Point Beach Senior Resident Inspector (Acting). The results of this inspection will be documented in NRC Inspection Report 05000266/2013009. In order to minimize the impact to your on-site resources and to ensure a productive inspection for both organizations, we have enclosed a request for documents needed for this inspection.
The documents identified are those that the inspectors will need prior to and upon arrival at the site. It is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the on-site portion of the inspection. We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mrs. Kim Locke of your organization. If there are any questions about this inspection or the material requested, please call or email Mrs. Betancourt at (920) 755-2309 or Diana.Betancourt@nrc.gov
The documents identified are those that the inspectors will need prior to and upon arrival at the site. It is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the on-site portion of the inspection.
.
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mrs. Kim Locke of your organization. If there are any questions about this inspection or the material requested, please call or email Mrs. Betancourt at (920) 755-2309 or Diana.Betancourt@nrc.gov.
M. Meyer   
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Record s System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,        /RA/
Jamnes L. Cameron, Chief      Branch 6      Division of Reactor Projects


Docket No. 50-266 License No. DPR-24  
M. Meyer                                      In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
                                              /RA/
Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket No. 50-266 License No. DPR-24


==Enclosure:==
==Enclosure:==
Supplemental Inspection Document Request  
Supplemental Inspection Document Request cc w/encl: Distribution via ListServTM


cc w/encl:  Distribution via ListServ TM Enclosure SUPPLEMENTAL INSPECTION DOCUMENT REQUEST Please assemble the following documents, preferably on a CD-ROM, and send to the lead inspector, Diana Betancourt-Roldán, at the NRC Point Beach Resident Office. The information sent should be current as of the date of your mailing. Information provided should be the latest approved documentation. The information should be mailed in such a manner as to reach the addressee by August 1, 2013. Proprietary information should be clearly marked and stored on a separate CD-ROM. Draft documentation should not be provided as part of this information request.
SUPPLEMENTAL INSPECTION DOCUMENT REQUEST Please assemble the following documents, preferably on a CD-ROM, and send to the lead inspector, Diana Betancourt-Roldán, at the NRC Point Beach Resident Office. The information sent should be current as of the date of your mailing. Information provided should be the latest approved documentation. The information should be mailed in such a manner as to reach the addressee by August 1, 2013. Proprietary information should be clearly marked and stored on a separate CD-ROM. Draft documentation should not be provided as part of this information request.
Information Requested Prior to Inspection
Information Requested Prior to Inspection:
:
Procedures:
Procedures:
* Administrative procedure(s) governing the site's corrective action program;
* Administrative procedure(s) governing the sites corrective action program;
* Administrative procedure(s) governing the identification and resolution of problems;
* Administrative procedure(s) governing the identification and resolution of problems;
* Administrative procedure(s) governing root cause and apparent cause evaluations;
* Administrative procedure(s) governing root cause and apparent cause evaluations;
* Administrative procedure(s) governing common cause assessments, effectiveness reviews, and self-assessments;
* Administrative procedure(s) governing common cause assessments, effectiveness reviews, and self-assessments;
* Administrative procedure(s) governing the use of vendor documents and recommendations; and
* Administrative procedure(s) governing the use of vendor documents and recommendations; and
* A copy of all revisions since November 2011, of procedure RMP 9044-1, "Auxiliary Feedwater Pump Terry Turbine Overhaul."
* A copy of all revisions since November 2011, of procedure RMP 9044-1, Auxiliary Feedwater Pump Terry Turbine Overhaul.
 
Reports:
Reports:
* A copy of Work Order 40101094, including worker comments/completion notes;
* A copy of Work Order 40101094, including worker comments/completion notes;
Line 61: Line 55:
* Documentation supporting completion of any corrective actions for the turbine-driven auxiliary feedwater pump failure;
* Documentation supporting completion of any corrective actions for the turbine-driven auxiliary feedwater pump failure;
* Current schedule and resource commitment documents for open corrective actions associated with the turbine-driven auxiliary feedwater pump; and
* Current schedule and resource commitment documents for open corrective actions associated with the turbine-driven auxiliary feedwater pump; and
* Schedule and status of any ongoing, planned or completed effectiveness reviews stemming from the root cause evaluation for the White finding.  
* Schedule and status of any ongoing, planned or completed effectiveness reviews stemming from the root cause evaluation for the White finding.
 
Also, please have the following documents available for the inspectors upon the start of the on-site inspection:
Also, please have the following documents available for the inspectors upon the start of the on-site inspection
:
* Drawings;
* Drawings;
* Any previously provided documents that have been revised.  
* Any previously provided documents that have been revised.
 
Enclosure
M. Meyer   
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Record s System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,        /RA/
Jamnes L. Cameron, Chief      Branch 6 Division of Reactor Projects


Docket No. 50-266 License No. DPR-24  
M. Meyer                                                                  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
                                                                          /RA/
Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket No. 50-266 License No. DPR-24


==Enclosure:==
==Enclosure:==
Supplemental Inspection Document Request  
Supplemental Inspection Document Request cc w/encl: Distribution via ListServTM DISTRIBUTION:
 
See next page DOCUMENT NAME: Pt. Beach - Notification of An NRC Supplemental Inspection Publicly Available                           Non-Publicly Available                     Sensitive               Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE             RIII                                         RIII                         RIII                         RIII NAME               JCameron for                                 JCameron DBetancourt-Roldán:rj DATE               07/10/13                                     07/10/13 OFFICIAL RECORD COPY
cc w/encl: Distribution via ListServ TM  DISTRIBUTION:
See next page  
 
DOCUMENT NAME: Pt. Beach - Notification of An NRC Supplemental Inspection Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME JCameron for DBetancourt-Roldán:rj JCameron  DATE 07/10/13 07/10/13   OFFICIAL RECORD COPY


Letter to L. Meyer from J. Cameron dated July 10, 2013  
Letter to L. Meyer from J. Cameron dated July 10, 2013


==SUBJECT:==
==SUBJECT:==
POINT BEACH NUCLEAR PLANT, UNIT 1- NOTIFICATION OF AN NRC SUPPLEMENTAL INSPECTION AND INFORMATION REQUEST  
POINT BEACH NUCLEAR PLANT, UNIT 1- NOTIFICATION OF AN NRC SUPPLEMENTAL INSPECTION AND INFORMATION REQUEST DISTRIBUTION:
 
Vivian Campbell RidsNrrDorlLpl3-1 Resource RidsNrrPMPointBeach RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov}}
DISTRIBUTION
: Vivian Campbell  
 
RidsNrrDorlLpl3-1 Resource RidsNrrPMPointBeach RidsNrrDirsIrib Resource  
 
Chuck Casto Cynthia Pederson Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov}}

Latest revision as of 16:11, 4 November 2019

Notification of an NRC Supplemental Inspection and Information Request
ML13191A104
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 07/10/2013
From: Jamnes Cameron
NRC/RGN-III/DRP/B6
To: Meyer L
Point Beach
References
Download: ML13191A104 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 July 10, 2013 Mr. Larry Meyer Site Vice President NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241

SUBJECT:

POINT BEACH NUCLEAR PLANT, UNIT 1- NOTIFICATION OF AN NRC SUPPLEMENTAL INSPECTION AND INFORMATION REQUEST

Dear Mr. Meyer:

By letter dated January 2, 2013 (ADAMS ML13004A280), the NRC communicated to you the final significance determination for a finding having low-to-moderate safety significance (White) at your Point Beach Nuclear Plant, Unit 1. The finding involved the failure to have work instructions and procedures appropriate to the circumstances to ensure that, following the final alignment of the turbine to the Unit 1 turbine-driven auxiliary feedwater pump during a refueling outage in November 2011. This ultimately resulted in failure of the turbine-to-pump coupling on May 21, 2012.

By letter dated April 16, 2013, we were notified by your staff that you were ready for the NRC to conduct our supplemental inspection to review the actions taken to address the White finding.

Accordingly, we plan to conduct a supplemental inspection, beginning on August 5, 2013, at the Point Beach Nuclear Plant using Inspection Procedure 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area. This on-site inspection is scheduled to be performed August 5 through August 9, 2013, and the inspection will be led by Diana Betancourt-Roldán, Point Beach Senior Resident Inspector (Acting). The results of this inspection will be documented in NRC Inspection Report 05000266/2013009. In order to minimize the impact to your on-site resources and to ensure a productive inspection for both organizations, we have enclosed a request for documents needed for this inspection.

The documents identified are those that the inspectors will need prior to and upon arrival at the site. It is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the on-site portion of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mrs. Kim Locke of your organization. If there are any questions about this inspection or the material requested, please call or email Mrs. Betancourt at (920) 755-2309 or Diana.Betancourt@nrc.gov.

M. Meyer In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket No. 50-266 License No. DPR-24

Enclosure:

Supplemental Inspection Document Request cc w/encl: Distribution via ListServTM

SUPPLEMENTAL INSPECTION DOCUMENT REQUEST Please assemble the following documents, preferably on a CD-ROM, and send to the lead inspector, Diana Betancourt-Roldán, at the NRC Point Beach Resident Office. The information sent should be current as of the date of your mailing. Information provided should be the latest approved documentation. The information should be mailed in such a manner as to reach the addressee by August 1, 2013. Proprietary information should be clearly marked and stored on a separate CD-ROM. Draft documentation should not be provided as part of this information request.

Information Requested Prior to Inspection:

Procedures:

  • Administrative procedure(s) governing the sites corrective action program;
  • Administrative procedure(s) governing the identification and resolution of problems;
  • Administrative procedure(s) governing root cause and apparent cause evaluations;
  • Administrative procedure(s) governing common cause assessments, effectiveness reviews, and self-assessments;
  • Administrative procedure(s) governing the use of vendor documents and recommendations; and
  • A copy of all revisions since November 2011, of procedure RMP 9044-1, Auxiliary Feedwater Pump Terry Turbine Overhaul.

Reports:

  • The root cause investigation report(s) for the White finding related to the turbine-driven auxiliary feedwater pump failure;
  • A copy of all documents referenced in the root cause report for the White finding;
  • A copy of any corrective action documents related to the root cause investigation report;
  • A list of all condition reports associated with the Unit 1 and Unit 2 turbine-driven auxiliary feedwater pump since May 21, 2012, including a title or brief description, organized by date;
  • A copy of any Quality Assurance or Nuclear Oversight assessments of the root cause investigation for the turbine-driven auxiliary feedwater pump failure;
  • Documentation supporting completion of any corrective actions for the turbine-driven auxiliary feedwater pump failure;
  • Current schedule and resource commitment documents for open corrective actions associated with the turbine-driven auxiliary feedwater pump; and
  • Schedule and status of any ongoing, planned or completed effectiveness reviews stemming from the root cause evaluation for the White finding.

Also, please have the following documents available for the inspectors upon the start of the on-site inspection:

  • Drawings;
  • Any previously provided documents that have been revised.

Enclosure

M. Meyer In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket No. 50-266 License No. DPR-24

Enclosure:

Supplemental Inspection Document Request cc w/encl: Distribution via ListServTM DISTRIBUTION:

See next page DOCUMENT NAME: Pt. Beach - Notification of An NRC Supplemental Inspection Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME JCameron for JCameron DBetancourt-Roldán:rj DATE 07/10/13 07/10/13 OFFICIAL RECORD COPY

Letter to L. Meyer from J. Cameron dated July 10, 2013

SUBJECT:

POINT BEACH NUCLEAR PLANT, UNIT 1- NOTIFICATION OF AN NRC SUPPLEMENTAL INSPECTION AND INFORMATION REQUEST DISTRIBUTION:

Vivian Campbell RidsNrrDorlLpl3-1 Resource RidsNrrPMPointBeach RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov