ML13248A030: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML13248A030
| number = ML13248A030
| issue date = 09/04/2013
| issue date = 09/04/2013
| title = Oconee Initial Exam 2013-301 Draft Sim IN-Plant JPMs
| title = Initial Exam 2013-301 Draft Sim IN-Plant JPMs
| author name =  
| author name =  
| author affiliation = NRC/RGN-II
| author affiliation = NRC/RGN-II
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CRO-106 R 0 - a Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE
{{#Wiki_filter:CRO-106 R0 - a Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-106 Place Spare Deborating IX in Service CANDIDATE EXAMINER


CRO-106 Place Spare Deborating IX in Service
CRO-106 R0 - a Page 2 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
 
Place the Spare Deborating IX in service for purification Alternate Path:
CANDIDATE      EXAMINER 
No Facility JPM #:
 
CRO-106 K/A Rating(s):
CRO-106 R 0 - a Page 2 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:   Place the Spare Deborating IX in service for purification Alternate Path:
System: 004 K/A:     A4.17 Rating: 2.7/2.7 Task Standard:
No Facility JPM #:
CRO-106 K/A Rating(s):
System: 00 4 K/A: A4.17 Rating:   2.7/2.7 Task Standard:
Perform OP/1/A/1103/004 C (Deborating IXs) Encl. 4.9 (Spare Deborating IX For RCS Purification (Rx At Power))
Perform OP/1/A/1103/004 C (Deborating IXs) Encl. 4.9 (Spare Deborating IX For RCS Purification (Rx At Power))
to place the Spare Deborating IX in service
to place the Spare Deborating IX in service.
. Preferred Evaluation Location:
Preferred Evaluation Location:                                         Preferred Evaluation Method:
Preferred Evaluation Method:
Simulator __ X __ In-Plant __ ___                                       Perform __X___ Simulate ____
Simulator
__ X __ In-Plant __ ___     Perform __X___ Simulate ____


==References:==
==References:==


OP/1/A/1103/004 C (Deborating IXs) Encl. 4.9 (Spare Deborating IX For RCS Purification (Rx At Power)
OP/1/A/1103/004 C (Deborating IXs) Encl. 4.9 (Spare Deborating IX For RCS Purification (Rx At Power))
Validation Time:
Validation Time: 15 minutes                                             Time Critical: NO
15 minutes       Time Critical:
====================================================================================
NO ====================================================================================
Candidate:      _______________________________________                                Time Start: _________
NAME                                                  Time Finish: ________
Performance Rating: SAT ______ UNSAT ______                                    Performance Time: _________
Examiner: ______________________________                  ____________________________________/________
NAME                                            SIGNATURE                    DATE
====================================================================================
COMMENTS


Candidate:
CRO-106 R0 - a Page 3 of 9 SIMULATOR OPERATOR INSTRUCTIONS:
_______________________________________
Time Start: __
_______    NAME      Time Finish: ________
Performance Rating:
SAT ______ UNSAT ______
Performance Time
: _________
Examiner: ______________________________          ____________________________________/________
NAME      SIGNATURE                            DATE
====================================================================================
COMMENTS CRO-106 R 0 - a Page 3 of 9 SIMULATOR OPERATOR INSTRUCTIONS:
Consider providing a copy of OP/1/A/1103/004 C, Deborating IXs to allow a review of limits and precautions prior to entering the simulator area. This will prevent using simulator time to perform this review.
Consider providing a copy of OP/1/A/1103/004 C, Deborating IXs to allow a review of limits and precautions prior to entering the simulator area. This will prevent using simulator time to perform this review.
: 1. Recall Snap 205 (3% IC), BOL, 2. Import files for CRO
: 1. Recall Snap 205 (3% IC), BOL,
-106. 3. Update boron status board RCS = 1771 ppmb, A BHUT = 1950 ppmb  
: 2. Import files for CRO-106.
: 3. Update boron status board RCS = 1771 ppmb, A BHUT = 1950 ppmb
: 4. Verify ICS in Auto (diamond and both FDW Masters).
: 4. Verify ICS in Auto (diamond and both FDW Masters).
: 5. If not already done, provide a copy of OP/1/A/1103/004 C, Deborating IX s. a nd a working copy of Encl. 4.9, (Spare Deborating IX for RCS Purification)  
: 5. If not already done, provide a copy of OP/1/A/1103/004 C, Deborating IXs. and a working copy of Encl. 4.9, (Spare Deborating IX for RCS Purification)
: 6. Put completed IX status log and component boron log for the letdown filter to be place in service in appropriate logbooks.
: 6. Put completed IX status log and component boron log for the letdown filter to be place in service in appropriate logbooks.
: 7. Ensure reactivity management controls are established in the control room.
: 7. Ensure reactivity management controls are established in the control room.
: 8. Ensure blank cover on 1CS
: 8. Ensure blank cover on 1CS-32/37
-32/37 9. Go to Run CRO-106 R 0 - a Page 4 of 9 Tools/Equipment/Procedures Needed:
: 9. Go to Run
OP/1/A/1103/004 C (Deborating IXs)
 
Encl. 4.9 (Spare Deborating IX For RCS Purification (Rx At Power)) Demineralizer Log Sheet for Spare Deb IX Component Boron Concentration Log Sheet for 1B Letdown Filter READ TO OPERATOR DIRECTION TO TRAINEE:
CRO-106 R0 - a Page 4 of 9 Tools/Equipment/Procedures Needed:
OP/1/A/1103/004 C (Deborating IXs) Encl. 4.9 (Spare Deborating IX For RCS Purification (Rx At Power))
Demineralizer Log Sheet for Spare Deb IX Component Boron Concentration Log Sheet for 1B Letdown Filter READ TO OPERATOR DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
 
Unit 1 startup in progress following a refueling outage Unit 1 Power = 3% stable for the past 45 mins.
Unit 1 startup in progress following a refueling outage Unit 1 Power = 3% stable for the past 45 mins
Unit 1 RCS Boron = 1771 ppm Primary Chemistry requests that the Spare Deborating IX be placed in service for RCS purification for the next two (2) hrs.
. Unit 1 RCS Boron = 1 7 71 ppm Primary Chemistry requests that the Spare Deborating IX be placed in service for RCS purification for the next two (2) hrs. The Spare Deborating IX is loaded with cation resin.
The Spare Deborating IX is loaded with cation resin.
Unit 2 & 3 are at 100%.
Unit 2 & 3 are at 100%.
INITIATING CUES:
INITIATING CUES:
The Unit 1 CR SRO direct s you to Place the Spare Deborating IX in service for RCS purificatio n per OP/1/A/1103/004 C (Deborating IXs)
The Unit 1 CR SRO directs you to Place the Spare Deborating IX in service for RCS purification per OP/1/A/1103/004 C (Deborating IXs) Encl. 4.9 (Spare Deborating IX For RCS Purification (Rx At Power)) starting at step 2.4.
Encl. 4.9 (Spare Deborating IX For RCS Purification (Rx At Power))
starting at step 2.4
.
CRO-106 R 0 - a Page 5 of 9  START TIME: _______
NOTE:    gals of water at a different boron concentration. {5} {6} (R.M.)
STEP 1:  Step 2.4 IF two Letdown Filters are available AND NOT already in service , perform the following
: (1A Letdown Filter is not is service)  2.4.1  Review Component Boron Log for out
-of-service Letdown Filter boron. 2.4.2  Determine RCS boron based on placing second Letdown Filter in service. 2.4.3  RCS boron ____
17 71___ ppm 2.4.4  IF RCS makeup is required to achieve acceptable boron, determine RCS makeup sources and volumes per OP/1/A/1103/004 (Soluble Poison Control).
(not required)
STANDARD: Candidate reviews the Component Boron Log for the 1A Letdown Filter and determines that: it will have no affect on RCS boron, additional makeup is NOT required, and that acceptable RCS boron will exist. COMMENTS:
___ SAT 


___ UNSAT   STEP 2: Step 2.5 Perform one of the following (for all applicable steps 2.1 through 2.4):
CRO-106 R0 - a Page 5 of 9 START TIME: _______
_____ Verify acceptable RCS boron.
NOTE: Placing an idle Letdown Filter in service can affect core reactivity by adding  60 gals of water at a different boron concentration. {5} {6} (R.M.)
SRO _____ Ensure appropriate RCS makeup plans determined to ensure SRO   acceptable boron. STANDARD: Candidate has SRO sign the first block because all boron concentrations are acceptable
STEP 1:          Step 2.4 IF two Letdown Filters are available AND NOT already in service,
. Examiner Cue: Sign the first block and inform the candidate to proceed to the next step   COMMENTS:
___ SAT perform the following: (1A Letdown Filter is not is service) 2.4.1 Review Component Boron Log for out-of-service Letdown Filter boron.
___ SAT
2.4.2 Determine RCS boron based on placing second Letdown Filter in      ___ UNSAT service.
___ UNSAT CRO-106 R 0 - a Page 6 of 9   STEP 3: Step 2.6 IF two Letdown Filters are available AND NOT already in service, perform the following:
2.4.3 RCS boron ____1771___ ppm 2.4.4 IF RCS makeup is required to achieve acceptable boron, determine RCS makeup sources and volumes per OP/1/A/1103/004 (Soluble Poison Control). (not required)
Ensure 1HP
STANDARD:        Candidate reviews the Component Boron Log for the 1A Letdown Filter and determines that: it will have no affect on RCS boron, additional makeup is NOT required, and that acceptable RCS boron will exist.
-17 (1A LETDOWN FILTER INLET) switch to "OPEN" Ensure 1HP
COMMENTS:
-18 (1B LETDOWN FILTER INLET) switch to "OPEN" STANDARD: Candidate opens: 1HP
STEP 2:         Step 2.5 Perform one of the following (for all applicable steps 2.1 through 2.4):
-1 8 (already open) and 1HP-1 7 (must be opened); placing 1 A Letdown Filter in service COMMENTS:                 ___ SAT
_____ Verify acceptable RCS boron.                                               ___ SAT SRO
___ UNSAT  STEP 4: Step 2.7 IF RCS makeup is required to ensure acceptable boron, makeup per OP/1/A/1103/004 (Soluble Poison Control).
_____ Ensure appropriate RCS makeup plans determined to ensure SRO acceptable boron.
STANDARD: Candidate determines RCS makeup is not required and proceeds to step 2.8 COMMENTS:        
___ UNSAT STANDARD:       Candidate has SRO sign the first block because all boron concentrations are acceptable.
Examiner Cue: Sign the first block and inform the candidate to proceed to the next step COMMENTS:
 
CRO-106 R0 - a Page 6 of 9 STEP 3:       Step 2.6 IF two Letdown Filters are available AND NOT already in service, perform the following:                                               ___ SAT
* Ensure 1HP-17 (1A LETDOWN FILTER INLET) switch to "OPEN"
* Ensure 1HP-18 (1B LETDOWN FILTER INLET) switch to "OPEN"
___ UNSAT STANDARD:     Candidate opens: 1HP-18 (already open) and 1HP-17 (must be opened); placing 1A Letdown Filter in service COMMENTS:
STEP 4:       Step 2.7 IF RCS makeup is required to ensure acceptable boron, makeup per OP/1/A/1103/004 (Soluble Poison Control).                           ___ SAT STANDARD:     Candidate determines RCS makeup is not required and proceeds to step 2.8
___ UNSAT COMMENTS:
NOTE:  Anytime IX is placed in service CRD movement may result. (R.M.)
STEP 5:      Step 2.8                                                            ___ SAT WHILE placing Spare Deborating IX in service, monitor the following indications: (R.M.)
* Appropriate ranged NIs                                          ___ UNSAT
* Primary tank levels
* Neutron error
* CRD position STANDARD:    Candidate begins monitoring all above indications. No unexpected changes will occur.
COMMENTS:


___ SAT
CRO-106 R0 - a Page 7 of 9 STEP 6:       Step 2.9
___ UNSAT  NOTE:    Anytime IX is placed in service CRD movement may result. (R.M.)  STEP 5:  Step 2.8 WHILE placing Spare Deborating IX in service, monitor the following indications: (R.M.)
                                                                                  *CRITICAL STEP Align Spare Deborating IX for service:
Appropriate ranged NIs Primary tank levels Neutron error CRD position STANDARD: Candidate begins monitoring all above indications. No unexpected changes will occur.
* Verify closed 1CS-27 (DEBOR IX INLET).                         ___ SAT
COMMENTS:              ___ SAT        ___ UNSAT CRO-106 R 0 - a Page 7 of 9   STEP 6: Step 2.9 Align Spare Deborating IX for service:
                *    *Ensure closed 1CS-26 (LETDOWN TO RC BHUT).
Verify closed 1CS
                *    *Open 1CS-32 & 37 (SPARE DEBOR IX INLET & OUTLET).
-27 (DEBOR IX INLET).
___ UNSAT
  *Ensure closed 1 CS-26 (LETDOWN TO RC BHUT).  
* Verify 1HP-15 Controller in "MANUAL".
  *Open 1CS-32 & 37 (SPARE DEBOR IX INLET & OUTLET). Verify 1HP
                *    *Open 1HP-16 (LDST MAKEUP ISOLATION).
-15 Controller in "MANUAL".
STANDARD:     The candidate performs the above items to align the Spare Deb IX:
  *Open 1HP-16 (LDST MAKEUP ISOLATION).
* Verify closed 1CS-27 (already closed).
STANDARD: The candidate performs the above items to align the Spare Deb IX: Verify closed 1CS
* Ensure closed 1CS-26 (LETDOWN TO RC BHUT).
-27 (already closed
* Open 1CS-32 & 37 (SPARE DEBOR IX INLET & OUTLET).
). Ensure closed 1CS
* Verify 1HP-15 Controller in "MANUAL". (already in manual)
-26 (LETDOWN TO RC BHUT).
* Open 1HP-16 (LDST MAKEUP ISOLATION).
Open 1CS-32 & 37 (SPARE DEBOR IX INLET & OUTLET).
COMMENTS:
Verify 1HP
STEP 7:       Step 2.10 CRITICAL STEP Position 1HP-14 (LDST BYPASS) to "BLEED" to place Spare Deborating IX in service.
-15 Controller in "MANUAL".
___ SAT STANDARD:     The candidate positions 1HP-14 (LDST BYPASS) to "BLEED".
(already in manual
Examiner Cue: Given time for the candidate to monitor indications from step 10, and when he begins to inform chemistry, tell him another operator will continue     ___ UNSAT with this procedure.
Open 1HP-16 (LDST MAKEUP ISOLATION).
COMMENTS:        
*CRITICAL STEP
___ SAT
___ UNSAT  STEP 7: Step 2.10 Position 1HP
-14 (LDST BYPASS) to "BLEED" to place Spare Deborating IX in service.
STANDARD: The candidate positions 1HP-14 (LDST BYPASS) to "BLEED".
Examiner Cue: Given time for the candidate to monitor indications from step 10, and when he begins to inform chemistry, tell him another operator will continue with this procedure.
COMMENTS:
COMMENTS:
END TASK CRITICAL STEP
END TASK STOP TIME: ____________
___ SAT        ___ UNSAT  STOP TIME: ____________


CRO-106 R 0 - a Page 8 of 9 CRITICAL STEP EXPLANATIONS:
CRO-106 R0 - a Page 8 of 9 CRITICAL STEP EXPLANATIONS:
STEP # Explanation 6 Aligns the Spare Deborating IX 7 Initiates flow through the Spare Deborating IX
STEP #                                     Explanation 6   Aligns the Spare Deborating IX 7   Initiates flow through the Spare Deborating IX


a   CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
a CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit 1 startup in progress following a refueling outage Unit 1 Power = 3% stable for the past 45 mins.
Unit 1 startup in progress following a refueling outage Unit 1 Power = 3% stable for the past 45 mins.
Line 137: Line 124:
Unit 2 & 3 are at 100%.
Unit 2 & 3 are at 100%.
INITIATING CUES:
INITIATING CUES:
The Unit 1 CR SRO direct s you to Place the Spare Deborating IX in service for RCS purificatio n per OP/1/A/1103/004 C (Deborating IXs)
The Unit 1 CR SRO directs you to Place the Spare Deborating IX in service for RCS purification per OP/1/A/1103/004 C (Deborating IXs) Encl. 4.9 (Spare Deborating IX For RCS Purification (Rx At Power)) starting at step 2.4.
Encl. 4.9 (Spare Deborating IX For RCS Purification (Rx At Power))
starting at step 2.4.
 
CRO-204 R0 - b Page 1 of 15 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE


CRO-204 E S Recovery    
CRO-204 R0 - b Page 1 of 15 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-204 ES Recovery CANDIDATE EXAMINER


CANDIDATE      EXAMINER CRO-204 R0 - b Page 2 of 15 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:   ES Recovery Alternate Path: No Facility JPM #:
CRO-204 R0 - b Page 2 of 15 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
CRO-204 K/A Rating(s):
ES Recovery Alternate Path:
System: 006 K/A: A4.08 Rating:
No Facility JPM #:
4.2/4.3 Task Standard:
CRO-204 K/A Rating(s):
System: 006 K/A:     A4.08 Rating: 4.2/4.3 Task Standard:
ES Channels 1 and 2 are returned to normal using EOP Enclosure 5.41 (ES Recovery).
ES Channels 1 and 2 are returned to normal using EOP Enclosure 5.41 (ES Recovery).
Preferred Evaluation Location:
Preferred Evaluation Location:                                       Preferred Evaluation Method:
Preferred Evaluation Method: Simulator __X__ In-Plant __ ___     Perform __X___ Simulate ____
Simulator __X__ In-Plant __ ___                                     Perform __X___ Simulate ____


==References:==
==References:==


EOP Encl. 5.41 (ES Recovery)
EOP Encl. 5.41 (ES Recovery)
Validation Time
Validation Time: 15 minutes                                         Time Critical: NO
: 15 minutes       Time Critical:
====================================================================================
NO ====================================================================================
Candidate:     _______________________________________                             Time Start: _________
Candidate:
NAME                                                 Time Finish: ________
_______________________________________
Performance Rating: SAT ______ UNSAT ______                                 Performance Time: _________
Time Start: __
Examiner: ______________________________           ____________________________________/________
_______    NAME       Time Finish: ________
NAME                                         SIGNATURE                   DATE
Performance Rating:
====================================================================================
SAT ______ UNSAT ______
COMMENTS
Performance Time
 
: _________   Examiner: ______________________________         ____________________________________/________
CRO-204 R0 - b Page 3 of 15 SIMULATOR OPERATOR INSTRUCTIONS:
NAME     SIGNATURE                           DATE
: 1. Recall Snap 206
====================================================================================
: 2. Go to Run
COMMENTS CRO-204 R0 - b Page 3 of 15 SIMULATOR OPERATOR INSTRUCTIONS:
 
: 1. Recall Snap 206 2. Go to Run CRO-204 R0 - b Page 4 of 15 Tools/Equipment/Procedures Needed:
CRO-204 R0 - b Page 4 of 15 Tools/Equipment/Procedures Needed:
EOP Encl. 5.41 (ES Recovery)
EOP Encl. 5.41 (ES Recovery)
READ TO OPERATOR DIRECTION TO TRAINEE:
READ TO OPERATOR DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
A transient has occurred.
A transient has occurred.
The Reactor has tripped ES Channels 1 and 2 have actuated on low RCS pressure.
The Reactor has tripped ES Channels 1 and 2 have actuated on low RCS pressure.
Line 183: Line 164:
The OSM concurs that reset of ES Channels 1 and 2 is desired.
The OSM concurs that reset of ES Channels 1 and 2 is desired.
INITIATING CUES:
INITIATING CUES:
The SRO directs you to perform EOP Encl.
The SRO directs you to perform EOP Encl. 5.41 (ES Recovery).
5.41 (ES Recovery).
The OSM has directed that Keowee Hydro Unit Shutdown is NOT desired.
The OSM has directed that Keowee Hydro Unit Shutdown is NOT desired.
CRO-204 R0 - b Page 5 of 15   START TIME: _______
 
NOTE Technical Specification entry is required when any ES component is in Manual while ES signal is present or ES Voters are in OVERRIDE. These conditions are exited when all channels are reset.
CRO-204 R0 - b Page 5 of 15 START TIME: _______
STEP 1: Step 1 WHEN all the following exist:
NOTE Technical Specification entry is required when any ES component is in Manual while ES signal is present or ES Voters are in OVERRIDE. These conditions are exited when all   ___ SAT channels are reset.
ES Channels have actuated Condition causing ES Channel actuation has cleared ES Channel reset is desired OSM concurs THEN continue. STANDARD: Determine ES Channels 1 and 2 have actuated by observing the White and Blue lights of Channels 1 and 2 on the Status Control Panel. Also Statalarms 1SA
STEP 1:         Step 1 WHEN all the following exist:                                         ___ UNSAT
-1/A-10 (ES CHANNEL 1 TRIP and 1SA
* ES Channels have actuated
-1/B-10 (ES CHANNEL 1 TRIP) are illuminated.
* Condition causing ES Channel actuation has cleared
* ES Channel reset is desired
* OSM concurs THEN continue.
STANDARD:       Determine ES Channels 1 and 2 have actuated by observing the White and Blue lights of Channels 1 and 2 on the Status Control Panel. Also Statalarms 1SA-1/A-10 (ES CHANNEL 1 TRIP and 1SA-1/B-10 (ES CHANNEL 1 TRIP) are illuminated.
Determine that RCS pressure is now above ES Channel 1 and 2 actuation setpoint (1600 psig).
Determine that RCS pressure is now above ES Channel 1 and 2 actuation setpoint (1600 psig).
Determine the OSM concurs.
Determine the OSM concurs.
Continue to Step 2.
Continue to Step 2.
COMMENTS:               ___ SAT        ___ UNSAT  STEP 2: Step 2 Verify reset of any of the following is desired
COMMENTS:
:  ES Channel 1 ES Channel 2 Diverse HPI STANDARD: Determine reset of ES Channels 1 & 2 and Diverse HPI is desired by data on the cue sheet.
STEP 2:         Step 2 Verify reset of any of the following is desired:
Continue to step 3 COMMENTS:              ___ SAT        ___ UNSAT CRO-204 R0 - b Page 6 of 15  STEP 3:  Step 3 Verify the following Stat Alarms have cleared:  1SA-7/A-1 (1A1 ES TRIP) 1SA-7/B-1 (1B1 ES TRIP) 1SA-7/C-1 (1C1 ES TRIP) 1SA-7/A-2 (1A2 ES TRIP) 1SA-7/B-2 (1B2 ES TRIP) 1SA-7/C-2 (1C2 ES TRIP)
STANDARD: Candidate determine s that the above Statalarms located on 1SA
-7 are not illuminated.
Continue to Step
: 4. COMMENTS:                ___ SAT
___ UNSAT  STEP 4:  Step 4 Perform the following to reset ES (1UB1):
Depress RESET for CH 1.
Depress RESET for CH 2.
STANDARD:  Depress digital channel RESET pushbuttons for the Channels 1 and 2 located on 1UB1.
Continue to Step
: 5. COMMENTS:
CRTICAL STEP
 
___ SAT
___ SAT
___ UNSAT  STEP 5:  Step 5 Verify Diverse HPI Bypass BISTABLE TRIPPED light is off.
* ES Channel 1
STANDARD: Candidate verifies Diverse HPI Bypass BISTABLE TRIPPED light is off
* ES Channel 2
. Continue to Step
* Diverse HPI
: 6. COMMENTS:    
___ UNSAT STANDARD:       Determine reset of ES Channels 1 & 2 and Diverse HPI is desired by data on the cue sheet.
Continue to step 3 COMMENTS:


CRO-204 R0 - b Page 6 of 15 STEP 3:  Step 3 Verify the following Stat Alarms have cleared:
___ SAT
___ SAT
___ UNSAT CRO-204 R0 - b Page 7 of 15  STEP 6:  Step 6 Perform the following to reset Diverse HPI:
* 1SA-7/A-1 (1A1 ES TRIP)
Depress BYPASS. Depress ENABLE.
* 1SA-7/B-1 (1B1 ES TRIP)
STANDARD: Candidate depresses BYPASS and ENABLE for Diverse HPI.
* 1SA-7/C-1 (1C1 ES TRIP)
Continue to Step  
* 1SA-7/A-2 (1A2 ES TRIP)                                      ___ UNSAT
: 7. COMMENTS:         CRITICAL STEP
* 1SA-7/B-2 (1B2 ES TRIP)
* 1SA-7/C-2 (1C2 ES TRIP)
STANDARD: Candidate determines that the above Statalarms located on 1SA-7 are not illuminated.
Continue to Step 4.
COMMENTS:
STEP 4:   Step 4                                                              CRTICAL STEP Perform the following to reset ES (1UB1):
___ SAT
___ SAT
___ UNSAT   STEP 7: Step 7 Verify both Statalarms are off:  1SA-1 E-8 (DIVERSE HPI BYP) 1SA-1 E-9 (DIVERSE HPI TRIP)
* Depress RESET for CH 1.
STANDARD: Candidate verifies both Statalarms are off. Continue to Step 8. COMMENTS:
* Depress RESET for CH 2.
___ SAT        ___ UNSAT  STEP 8: Step 8 Depress RESET on the DIVERSE HPI OVERRIDE switch.
___ UNSAT STANDARD: Depress digital channel RESET pushbuttons for the Channels 1 and 2 located on 1UB1.
STANDARD: Candidate depresses RESET
Continue to Step 5.
. Continue to Step 9
COMMENTS:
. COMMENTS:    
STEP 5:   Step 5 Verify Diverse HPI Bypass BISTABLE TRIPPED light is off.
___ SAT STANDARD: Candidate verifies Diverse HPI Bypass BISTABLE TRIPPED light is off.
Continue to Step 6.
___ UNSAT COMMENTS:


CRO-204 R0 - b Page 7 of 15 STEP 6:  Step 6                                                CRITICAL STEP Perform the following to reset Diverse HPI:            ___ SAT
* Depress BYPASS.
* Depress ENABLE.
___ UNSAT STANDARD: Candidate depresses BYPASS and ENABLE for Diverse HPI.
Continue to Step 7.
COMMENTS:
STEP 7:  Step 7 Verify both Statalarms are off:
___ SAT
___ SAT
___ UNSAT CRO-204 R0 - b Page 8 of 15  STEP 9:  Step 9 Verify:  CH 1 TRIPPED light off CH 2 TRIPPED light off DIVERSE HPI OVERRIDE light off STANDARD: Candidate verifies above lights are off Continue to Step  
* 1SA-1 E-8 (DIVERSE HPI BYP)
: 10. COMMENTS:               ___ SAT
* 1SA-1 E-9 (DIVERSE HPI TRIP)
___ UNSAT  STEP 10: Step 10 Dispatch an operator to perform Enclosure (SSF Restoration) of AP/1/A/1700/042 (Inadvertent ES Actuation).
___ UNSAT STANDARD: Candidate verifies both Statalarms are off.
STANDARD: Candidate calls kitchen to dispatch an operator to perform Enclosure (SSF Restoration) of AP/42. Continue to Step  
Continue to Step 8.
: 11. Booth Cue:  Inform candidate that an operator has been dispatched with Enclosure SSF Restoration,  COMMENTS:                ___ SAT
COMMENTS:
___ UNSAT   STEP 11:  Step 11 Verify both exist:
STEP 8:   Step 8 Depress RESET on the DIVERSE HPI OVERRIDE switch.
Keowee Hydro shutdown is desired.
___ SAT STANDARD: Candidate depresses RESET.
OSM concurs STANDARD: Candidate determines from cue that Keowee Hydro shutdown is not desired. Continue to Step 11 RNO.
Continue to Step 9.                                     ___ UNSAT COMMENTS:
Examiner Cue: If asked, inform the candidate that Keowee Hydro shutdown is not desired (Information also provided in the Initiating Cue)
 
. COMMENTS:
CRO-204 R0 - b Page 8 of 15 STEP 9:       Step 9 Verify:
___ SAT        ___ UNSAT CRO-204 R0 - b Page 9 of 15   STEP 12: Step 11 RNO  GO TO Step 2 3  STANDARD: Continue to Step 2
: 3. COMMENTS:
___ SAT
___ SAT
___ UNSAT   STEP 1 3:  Step 2 3 Stop the 1C HPI Pump.
* CH 1 TRIPPED light off
STANDARD: Verifies that 1C HPI Pump is NOT operating by observing the red ON light not illuminated and no amps are indicated.
* CH 2 TRIPPED light off
Continue to Step 2
* DIVERSE HPI OVERRIDE light off STANDARD:      Candidate verifies above lights are off                              ___ UNSAT Continue to Step 10.
: 4. COMMENTS:               ___ SAT
COMMENTS:
___ UNSAT  STEP 1 4:  Step 2 4 Open 1HP-27. STANDARD: Verifies 1HP-27 located on 1UB1 is open by observing the red OPEN light is lit or OAC indication
STEP 10:      Step 10 Dispatch an operator to perform Enclosure (SSF Restoration) of AP/1/A/1700/042 (Inadvertent ES Actuation).                          ___ SAT STANDARD:      Candidate calls kitchen to dispatch an operator to perform Enclosure (SSF Restoration) of AP/42.                                          ___ UNSAT Continue to Step 11.
. Continue to Step 2
Booth Cue: Inform candidate that an operator has been dispatched with Enclosure SSF Restoration, COMMENTS:
: 5. COMMENTS:               ___ SAT        ___ UNSAT  STEP 1 5:  Step 2 5 Close 1HP-409. STANDARD: Verifies 1HP-409 located on 1UB1 is closed by observing the green CLOSED light is lit or OAC indication
STEP 11:      Step 11 Verify both exist:
. Continue to Step 2
___ SAT Keowee Hydro shutdown is desired.
: 6. COMMENTS:
OSM concurs STANDARD:      Candidate determines from cue that Keowee Hydro shutdown is not desired.                                                            ___ UNSAT Continue to Step 11 RNO.
___ SAT
Examiner Cue: If asked, inform the candidate that Keowee Hydro shutdown is not desired (Information also provided in the Initiating Cue).
___ UNSAT CRO-204 R0 - b Page 10 of 15   NOTE The following steps will reset HPI pump ES logic.
COMMENTS:
STEP 1 6:  Step 2 6 Verify 1A HPI PUMP operating.
 
STANDARD: Determine s that the 1A HPI pump is operating by observing the red on light is lit and normal amps are indicated.
CRO-204 R0 - b Page 9 of 15 STEP 12:  Step 11 RNO
Continue to Step 2
* GO TO Step 23
: 7. COMMENTS:               ___ SAT
___ SAT STANDARD: Continue to Step 23.
___ UNSAT  STEP 1 7:  Step 2 7 Perform the following
___ UNSAT COMMENTS:
: A. Ensure 1A HPI PUMP switch in AUTO.
STEP 13:  Step 23 Stop the 1C HPI Pump.
___ SAT STANDARD: Verifies that 1C HPI Pump is NOT operating by observing the red ON light not illuminated and no amps are indicated.
Continue to Step 24.                                               ___ UNSAT COMMENTS:
STEP 14:  Step 24 Open 1HP-27.
___ SAT STANDARD: Verifies 1HP-27 located on 1UB1 is open by observing the red OPEN light is lit or OAC indication.
Continue to Step 25.                                               ___ UNSAT COMMENTS:
STEP 15:  Step 25 Close 1HP-409.
___ SAT STANDARD: Verifies 1HP-409 located on 1UB1 is closed by observing the green CLOSED light is lit or OAC indication.
Continue to Step 26.                                               ___ UNSAT COMMENTS:
 
CRO-204 R0 - b Page 10 of 15 NOTE The following steps will reset HPI pump ES logic.
___ SAT STEP 16:  Step 26 Verify 1A HPI PUMP operating.
STANDARD: Determines that the 1A HPI pump is operating by observing the red on   ___ UNSAT light is lit and normal amps are indicated.
Continue to Step 27.
COMMENTS:
STEP 17:  Step 27                                                              CRITICAL STEP Perform the following:                                               ___ SAT A. Ensure 1A HPI PUMP switch in AUTO.
B. Place 1A HPI PUMP switch to ON.
B. Place 1A HPI PUMP switch to ON.
C. Ensure 1B HPI PUMP switch to OFF.
___ UNSAT C. Ensure 1B HPI PUMP switch to OFF.
D. Place 1B HPI PUMP switch to AUTO.
D. Place 1B HPI PUMP switch to AUTO.
STANDARD: Position the switch for the 1 A HPI pump to AUTO and then to the ON position.
STANDARD: Position the switch for the 1A HPI pump to AUTO and then to the ON position.
Position the switch for the 1B HPI pump to OFF and then to the AUTO position. Continue to Step 2
Position the switch for the 1B HPI pump to OFF and then to the AUTO position.
: 8. COMMENTS:
Continue to Step 28.
CRITICAL STEP
COMMENTS:
___ SAT        ___ UNSAT CRO-204 R0 - b Page 11 of 15   STEP 1 8:  Step 2 8 Verify both of the following breakers open:
 
SL-1 CT5 STBY BUS 1 FEEDER SL-2 CT5 STBY BUS 2 FEEDER STANDARD: Verifies SL-1 and SL-2 located on 2AB3 are open by observing the green OPEN light is illuminated.
CRO-204 R0 - b Page 11 of 15 STEP 18:  Step 28 Verify both of the following breakers open:
Continue to Step 2
___ SAT
: 9. COMMENTS:               ___ SAT
* SL-1 CT5 STBY BUS 1 FEEDER
___ UNSAT  STEP 1 9:  Step 2 9 Verify both:
* SL-2 CT5 STBY BUS 2 FEEDER
CC system operating with CC TOTAL FLOW > 575 gpm.
___ UNSAT STANDARD: Verifies SL-1 and SL-2 located on 2AB3 are open by observing the green OPEN light is illuminated.
Continue to Step 29.
COMMENTS:
STEP 19:  Step 29 Verify both:
___ SAT CC system operating with CC TOTAL FLOW > 575 gpm.
RCP seal injection flow is between 6 and 12 gpm/RCP.
RCP seal injection flow is between 6 and 12 gpm/RCP.
STANDARD: Candidate verifies CC flow >575 gpm by observing flow gauge on panel 1AB3. Candidate verifies RCP seal injection flow 6
___ UNSAT STANDARD: Candidate verifies CC flow >575 gpm by observing flow gauge on panel 1AB3.
-12 gpm/RCP by observing gauges on panel 1VB3, or OAC indications.
Candidate verifies RCP seal injection flow 6-12 gpm/RCP by observing gauges on panel 1VB3, or OAC indications.
Continue to Step  
Continue to Step 30.
: 30. COMMENTS:               ___ SAT 
COMMENTS:


___ UNSAT CRO-204 R0 - b Page 12 of 15   STEP 20:  Step 30 Perform the following:
CRO-204 R0 - b Page 12 of 15 STEP 20:  Step 30 Perform the following:                                               ___ SAT A. Open:
A. Open: 1HP-20 1HP-21 B. Op en: 1HP-228 1HP-226 1HP-232 1HP-230 STANDARD: Candidate verifies open the following valves
* 1HP-20
1HP-20 red open light lit on the status control panel 1HP-21 red open light lit on 1UB1 1HP-228, 1HP-226, 1HP232, and 1HP
* 1HP-21                                               ___ UNSAT B. Open:
-230 red open lights are lit on 1VB3. Continue to Step
* 1HP-228
: 31. COMMENTS:               ___ SAT
* 1HP-226
___ UNSAT CRO-204 R0 - b Page 13 of 15   STEP 21: Step 31 Restore RB RIAs as follows: A. Open: 1PR-7 1PR-9 1PR-8 1PR-10 B. Start the RB RIA sample pump from the ENABLE CONTROLS screen on the RIA View Node as follows. 1) Click on the Sample pump OFF icon.
* 1HP-232
* 1HP-230 STANDARD: Candidate verifies open the following valves:
* 1HP-20 red open light lit on the status control panel
* 1HP-21 red open light lit on 1UB1
* 1HP-228, 1HP-226, 1HP232, and 1HP-230 red open lights are lit on 1VB3.
Continue to Step 31.
COMMENTS:
 
CRO-204 R0 - b Page 13 of 15 STEP 21:     Step 31                                                           CRITICAL STEP Restore RB RIAs as follows:
___ SAT A. Open:
* 1PR-7
* 1PR-9
___ UNSAT
* 1PR-8
* 1PR-10 B. Start the RB RIA sample pump from the ENABLE CONTROLS screen on the RIA View Node as follows.
: 1) Click on the Sample pump OFF icon.
: 2) WHEN "Processing Request" dialog is complete, THEN click on the Sample pump ON icon.
: 2) WHEN "Processing Request" dialog is complete, THEN click on the Sample pump ON icon.
STANDARD: Open 1PR-7 and 1PR-9 on ES Channel 1 RZ Module by depressing the red OPEN push button. Verify the red OPEN light illuminates.
STANDARD:     Open 1PR-7 and 1PR-9 on ES Channel 1 RZ Module by depressing the red OPEN push button. Verify the red OPEN light illuminates.
Open 1PR-8 and 1PR-10 on ES Channel 2 RZ Module by depressing the red OPEN push button. Verify the red OPEN light illuminates. Select ENABLE CONTROLS screen on the RIA View Node.
Open 1PR-8 and 1PR-10 on ES Channel 2 RZ Module by depressing the red OPEN push button. Verify the red OPEN light illuminates.
Select ENABLE CONTROLS screen on the RIA View Node.
Click on the Sample pump OFF icon.
Click on the Sample pump OFF icon.
WHEN "Processing Request" dialog is complete, THEN click on the Sample pump ON icon Cue: Another RO will complete Enclosure 5.41, this JPM is complete COMMENTS:
WHEN Processing Request dialog is complete, THEN click on the Sample pump ON icon Cue: Another RO will complete Enclosure 5.41, this JPM is complete COMMENTS:
END TASK CRITICAL STEP
END TASK STOP TIME: ____________
___ SAT
 
___ UNSAT   STOP TIME: ____________
CRO-204 R0 - b Page 14 of 15 CRITICAL STEP EXPLANATIONS:
STEP #                                      Explanation 4    This step is required to reset the ES channels.
6    This step is required to reset Diverse HPI.
17   This step is required to reset the 1A and 1B HPI pump.
21  This step is required to return the RB RIAs to service.


CRO-204 R0 - b Page 14 of 15  CRITICAL STEP EXPLANATIONS:
b CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
STEP # Explanation 4 This step is required to reset the ES channels.
6 This step is required to reset Diverse HPI
. 1 7 This step is required to reset the 1A and 1B HPI pump. 21 This step is required to return the RB RIAs to service
.
CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
INITIAL CONDITIONS:
A transient has occurred.
A transient has occurred.
Line 310: Line 329:
The OSM has directed that Keowee Hydro Unit Shutdown is NOT desired.
The OSM has directed that Keowee Hydro Unit Shutdown is NOT desired.


CRO-303 R0 - c Page 1 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE
CRO-303 R0 - c Page 1 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-303 Perform Required Actions for a Failed LPI Train CANDIDATE EXAMINER


CRO-303 Perform Required Actions for a Failed L PI Train       
CRO-303 R0 - c Page 2 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Perform Required Actions For A Failed LPI Train Alternate Path:
Yes Facility JPM #:
CRO-004 K/A Rating(s):
System: EPE 011 K/A:     EA1.04 Rating: 4.4/4.4 Task Standard:
1C LPI pump is aligned and started. Time-critical clock starts when the second LPI pump fails to start and stops when 1C LPI pump is started.
Preferred Evaluation Location:                                    Preferred Evaluation Method:
Simulator __X__ In-Plant __ ___                                    Perform __X___ Simulate ____


CANDIDATE      EXAMINER CRO-303 R0 - c Page 2 of 12  REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:   Perform Required Actions For A Failed LPI Train Alternate Path:
==References:==
Yes  Facility JPM #:
CRO-004  K/A Rating(s):
System: EPE 011 K/A:  EA1.04 Rating:
4.4/4.4  Task Standard:
1C LPI pump is aligned and started. Time
-critical clock starts when the second LPI pump fails to start and stops when 1C LPI pump is started
. Preferred Evaluation Location:
Preferred Evaluation Method:
Simulator __X__ In-Plant __ ___      Perform __X___ Simulate ____ 


==References:==
EOP Encl. 5.1 (ES Actuation)
Validation Time: 10 minutes                                        Time Critical: YES
====================================================================================
Candidate:     _______________________________________                          Time Start: _________
NAME                                              Time Finish: ________
Performance Rating: SAT ______ UNSAT ______                                Performance Time: _________
Examiner: ______________________________          ____________________________________/________
NAME                                        SIGNATURE                    DATE
====================================================================================
COMMENTS


EOP Encl. 5.1 (ES Actuation
CRO-303 R0 - c Page 3 of 12 SIMULATOR OPERATOR INSTRUCTIONS:
)  Validation Time
: 1. Recall Snap 207
: 10 minutes        Time Critical
: 2. Import files for CRO-303
:  YES ====================================================================================
: 3. Call up BWST Level (SHOWDIG O1P1600) on OAC screen
Candidate:
_______________________________________
Time Start: __
_______    NAME      Time Finish: ________
Performance Rating:
SAT ______ UNSAT ______
Performance Time
: _________
Examiner: ______________________________          ____________________________________/________
NAME      SIGNATURE                            DATE
====================================================================================
COMMENTS CRO-303 R0 - c Page 3 of 12 SIMULATOR OPERATOR INSTRUCTIONS:
: 1. Recall Snap 207 2. Import files for CRO-303 3. Call up BWST Level (SHOWDIG O1P1600
) on OAC screen
: 4. Go to Run and acknowledge alarms
: 4. Go to Run and acknowledge alarms
: 5. Go to Freeze  
: 5. Go to Freeze
: 6. Go to Run when directed by lead examiner
: 6. Go to Run when directed by lead examiner
: 7. IMMEDIATELY Fire Timer 1 CRO-303 R0 - c Page 4 of 12 Tools/Equipment/Procedures Needed:
: 7. IMMEDIATELY Fire Timer 1
EOP Encl. 5.1 (ES Actuation
 
)
CRO-303 R0 - c Page 4 of 12 Tools/Equipment/Procedures Needed:
EOP Encl. 5.1 (ES Actuation)
READ TO OPERATOR DIRECTION TO TRAINEE:
READ TO OPERATOR DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
A LOCA is in progress and RCS Pressure has stabilized at 1000 psig ES Channels 1-6 have actuated on high RB pressure Steam Generator levels are being raised to the Loss of Subcooling Margin setpoint by another Reactor Operator EOP Encl. 5.1(ES Actuation) has been completed up to Step 122 Rule 2 (Loss of SCM) is complete INITIATING CUES:
The Control Room SRO instructs you to continue in Encl. 5.1 (ES Actuation) and respond to plant conditions.
THIS JPM IS TIME CRITICAL


A LOCA is in progress and RCS Pressure has stabilized at 1000 psig ES Channels 1
CRO-303 R0 - c Page 5 of 12 START TIME: _______
-6 have actuated on high RB pressure Steam Generator levels are being raised to the Loss of Subcooling Margin setpoint by another Reactor Operator EOP Encl. 5.1(ES Actuation) has been completed up to Step 122 Rule 2 (Loss of SCM) is complete
STEP 1:      Step 122 REFER TO Enclosure 5.1 IAAT Steps prior to Step 122.
___ SAT STANDARD:    Checks IAAT steps to determine if any apply Determines that IAAT Step 3 now applies
___ UNSAT Continue to Step 3.
COMMENTS:
STEP 2:      Step 3 IAAT additional ES actuation setpoints are exceeded,
___ SAT THEN perform Steps 1 - 2.
STANDARD:    Determines that ES Channels 7 and 8 have actuated
___ UNSAT Continue to Step 1.
COMMENTS:
STEP 3:      Step 1 Determine all ES channels that should have actuated based on RCS pressure and RB pressure.                                       ___ SAT Actuation          Associated ES Setpoint (psig)    Channel                            ___ UNSAT 1600    (RCS)      1&2 550    (RCS)      3&4 3      (RB)      1, 2, 3, 4, 5, & 6 10      (RB)      7&8 STANDARD:    Determines that ES Channels 7 and 8 have actuated.
Continue to Step 2.
COMMENTS:


INITIATING CUES:
CRO-303 R0 - c Page 6 of 12 STEP 4:   Step 2 Verify all ES channels associated with actuation setpoints have actuated.
 
___ SAT STANDARD: Determine ES Channels 7 & 8 have actuated by observing tripped lights on UB1 are illuminated.
The Control Room SRO instructs you to continue in Encl.
Continue to Step 122.                                                    ___ UNSAT COMMENTS:
5.1 (ES Actuation) and respond to plant conditions.
STEP 5:   Step 122 REFER TO Enclosure 5.1 IAAT Steps prior to Step 122.
 
___ SAT STANDARD: Checks IAAT steps to determine if any apply Determines that IAAT Step 89 now applies Continue to Step 89.                                                     ___ UNSAT COMMENTS:
THIS JPM IS TIME CRITICAL CRO-303 R0 - c Page 5 of 12  START TIME:
STEP 6:   Step 89 IAAT RCS pressure is < LPI pump shutoff head, THEN perform Steps 90 - 91.                                               ___ SAT STANDARD: Determine that RCS pressure is < LPI pump shutoff head. (less than 180 psig)                                                                 ___ UNSAT Continue to Step 90.
_______  STEP 1: Step 122 REFER TO Enclosure 5.1 IAAT Steps prior to Step 122. STANDARD: Checks IAAT steps to determine if any apply Determines that IAAT Step 3 now applies Continue to Step  
COMMENTS:
: 3. COMMENTS:               ___ SAT        ___ UNSAT  STEP 2: Step 3 IAAT additional ES actuation setpoints are exceeded, THEN perform Steps 1
- 2. STANDARD: Determines that ES Channels 7 and 8 have actuated Continue to Step
: 1. COMMENTS:                ___ SAT
___ UNSAT  STEP 3: Step 1 Determine all ES channels that should have actuated based on RCS pressure and RB pressure.
Actuation Setpoint (psig) Associated ES Channel  1600  (RCS) 1 & 2  550  (RCS) 3 & 4  3  (RB) 1, 2, 3, 4, 5, & 6 10  (RB) 7 & 8  STANDARD: Determines that ES Channels 7 and 8 have actuated.
Continue to Step  
: 2. COMMENTS:  


CRO-303 R0 - c Page 7 of 12 STEP 7:        Step 90 Perform the following:
___ SAT
___ SAT
___ UNSAT CRO-303 R0 - c Page 6 of 12  STEP 4:  Step 2 Verify all ES channels associated with actuation setpoints have actuated.
* Open 1LP-17
STANDARD: Determine ES Channels 7 & 8 have actuated by observing tripped lights on UB1 are illuminated.
* Start 1A LPI Pump
Continue to Step 122. COMMENTS:
___ UNSAT STANDARD:     Determine that 1LP-17 is open by observing the Red open light is lit located on 1UB2.
___ SAT        ___ UNSAT  STEP 5:  Step 122 REFER TO Enclosure 5.1 IAAT Steps prior to Step 122. STANDARD: Checks IAAT steps to determine if any apply Determines that IAAT Step 89 now applies Continue to Step 89.
COMMENTS:                ___ SAT
___ UNSAT  STEP 6:  Step 89 IAAT RCS pressure is < LPI pump shutoff head, THEN perform Steps 90
- 91. STANDARD: Determine that RCS pressure is < LPI pump shutoff head. (less than 180 psig) Continue to Step
: 90.
COMMENTS:
___ SAT        ___ UNSAT CRO-303 R0 - c Page 7 of 12  STEP 7:  Step 90 Perform the following:
Open 1LP-17 Start 1A LPI Pump STANDARD: Determine that 1LP-17 is open by observing the Red open light is lit located on 1UB2.
Places 1A LPI Pump switch to START and observes Red lights remains off and white light on.
Places 1A LPI Pump switch to START and observes Red lights remains off and white light on.
Continue to Step 20 RNO. Note: 1 A LPI Pump fails to start COMMENTS:
Continue to Step 20 RNO.
___ SAT        ___ UNSAT  ALTERNATE PATH STEP 8: Step 90 RNO Stop 1A LPI Pump Close 1LP-17 STANDARD: Determine the1A LPI Pump is stopped by observing the green "off" light lit and close 1LP
Note: 1A LPI Pump fails to start COMMENTS:
-17 located on 1UB2.
ALTERNATE PATH STEP 8:       Step 90 RNO                                                         ___ SAT Stop 1A LPI Pump Close 1LP-17
Continue to Step 9 1  COMMENTS:
___ UNSAT STANDARD:     Determine the1A LPI Pump is stopped by observing the green off light lit and close 1LP-17 located on 1UB2.
___ SAT
Continue to Step 91 COMMENTS:
___ UNSAT CRO-303 R0 - c Page 8 of 12   STEP 9: Step 91 Perform the following:
 
Open 1LP-18 Start 1B LPI Pump STANDARD: Determine that 1LP-1 8 is open by observing the red open light is lit located on 1UB2.
CRO-303 R0 - c Page 8 of 12 STEP 9:       Step 91 Perform the following:                                               ___ SAT
* Open 1LP-18
* Start 1B LPI Pump
___ UNSAT STANDARD:     Determine that 1LP-18 is open by observing the red open light is lit located on 1UB2.
Places 1B LPI pump switch to START and observes Red lights remain off and white light on.
Places 1B LPI pump switch to START and observes Red lights remain off and white light on.
Continue to Step 9 1 RNO. TIME CRITICAL clock Starts:________
Continue to Step 91 RNO.
TIME CRITICAL clock Starts:________
Note: 1B LPI Pump fails to start. Required completion time to start 1C LPI Pump is 60 minutes from failure of 1B LPI Pump.
Note: 1B LPI Pump fails to start. Required completion time to start 1C LPI Pump is 60 minutes from failure of 1B LPI Pump.
COMMENTS:
COMMENTS:
___ SAT   
ALTERNATE PATH STEP 10:      Step 91 RNO                                                          ___ SAT Stop 1B LPI Pump Close 1LP-18 STANDARD:      Determine the1B LPI Pump is stopped by observing the green off    ___ UNSAT light lit and close 1LP-18 located on 1UB2.
Continue to Step 122 COMMENTS:
 
CRO-303 R0 - c Page 9 of 12 STEP 11:  Step 122 REFER TO Enclosure 5.1 IAAT Steps prior to Step 122.
___ SAT STANDARD: Checks IAAT steps to determine if any apply Determines that IAAT Step 92 now applies Continue to Step 92.                                ___ UNSAT COMMENTS:
STEP 12: Step 92 IAAT 1A and 1B LPI PUMPs are off/tripped,            ___ SAT AND all of the following exist
* RCS pressure < LPI pump shutoff head
* 1LP-19 closed                                    ___ UNSAT
* 1LP-20 closed THEN perform Steps 93 - 94.
STANDARD: Student determines the following:
* RCS pressure is < LPI pump shutoff head and
* 1LP-19 and 1LP-20 green closed lights lit.
Continue to Step 93 COMMENTS:


___ UNSAT  ALTERNATE PATH STEP 10:  Step 91 RNO Stop 1B LPI Pump Close 1LP-18 STANDARD: Determine the1B LPI Pump is stopped by observing the green "off" light lit and close 1LP
CRO-303 R0 - c Page 10 of 12 STEP 13:         Step 93                                                                    *CRITICAL STEP Open the following:
-18 located on 1UB2.
* 1LP-9 and 1LP-10                                                         ___ SAT
Continue to Step 122  COMMENTS:
* 1LP-6 and 1LP-7
___ SAT        ___ UNSAT CRO-303 R0 - c Page 9 of 12  STEP 11:  Step 122 REFER TO Enclosure 5.1 IAAT Steps prior to Step 122. STANDARD: Checks IAAT steps to determine if any apply Determines that IAAT Step 92 now applies Continue to Step 92. COMMENTS:
* 1LP-17 and 1LP-18
___ SAT        ___ UNSAT  STEP 12:  Step 9 2 IAAT 1A and 1B LPI PUMPs are off/tripped, AND all of the following exist RCS pressure < LPI pump shutoff head 1LP-19 closed  1LP-20 closed THEN perform Steps 9 3 - 9 4. STANDARD: Student determines the following:
___ UNSAT
RCS pressure is < LPI pump shutoff head and  1LP-19 and 1LP
* 1LP-21 and 1LP-22 STANDARD:         Candidate opens the following valves (located on 1UB2) and verifies red open lights lit:
-20 green closed lights lit.
                  *   *1LP-9
Continue to Step 9 3  COMMENTS:                ___ SAT
                  *  *1LP-10
___ UNSAT CRO-303 R0 - c Page 10 of 12   STEP 13: Step 9 3 Open the following:
                  *  *1LP-6
1LP-9 and 1LP-10 1LP-6 and 1LP-7 1LP-17 and 1LP-18   1LP-21 and 1LP-22 STANDARD: Candidate opens the following valves (located on 1UB2) and verifies red open lights lit:
                  *  *1LP-7
   *1LP-9 *1LP-10 *1LP-6 *1LP-7 *1LP-18  *1LP-17 Candidate verifies red open lights lit for the following valves (located on 1UB2):: 1LP-21 1LP-22 Continue to Step 9 4  COMMENTS:         *CRITICAL STEP
                  *  *1LP-18
___ SAT
                  *   *1LP-17 Candidate verifies red open lights lit for the following valves (located on 1UB2)::
___ UNSAT  STEP 14: Step 9 4 Start 1C LPI Pump STANDARD: Start the 1C LPI Pump located on 1UB2.
* 1LP-21
Verify the red on light is lit and the pump develops discharge pressure and flow.
* 1LP-22 Continue to Step 94 COMMENTS:
TIME CRITICAL clock Stopped:________
STEP 14:         Step 94                                                                    CRITICAL STEP Start 1C LPI Pump
___ SAT STANDARD:         Start the 1C LPI Pump located on 1UB2. Verify the red on light is lit and the pump develops discharge pressure and flow.
___ UNSAT TIME CRITICAL clock Stopped:________
Examiner Note: 1C LPI pump must be started within 60 minutes of the 1B LPI pump failure to start.
Examiner Note: 1C LPI pump must be started within 60 minutes of the 1B LPI pump failure to start.
COMMENTS:     Examiner Cue: Another operator will continue with this procedure END TASK   CRITICAL STEP
COMMENTS:
 
Examiner Cue: Another operator will continue with this procedure END TASK STOP TIME: ____________
___ SAT        ___ UNSAT STOP TIME: ____________


CRO-303 R0 - c Page 11 of 12 CRITICAL STEP EXPLANATIONS:
CRO-303 R0 - c Page 11 of 12 CRITICAL STEP EXPLANATIONS:
STEP # Explanation 13 Necessary to align a suction source and a discharge flow path from the 1C LPI pump for its use since 1A and 1B LPI pumps are failed 14 Necessary to start the 1C LPI pump to provide LPI flow to the core (Must be completed within 60 minutes of A and B LPI pump failure.
STEP #                                     Explanation 13   Necessary to align a suction source and a discharge flow path from the 1C LPI pump for its use since 1A and 1B LPI pumps are failed 14   Necessary to start the 1C LPI pump to provide LPI flow to the core (Must be completed within 60 minutes of A and B LPI pump failure.


c   CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
c CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
INITIAL CONDITIONS:
A LOCA is in progress and RCS Pressure has stabilized at 1000 psig ES Channels 1
A LOCA is in progress and RCS Pressure has stabilized at 1000 psig ES Channels 1-6 have actuated on high RB pressure Steam Generator levels are being raised to the Loss of Subcooling Margin setpoint by another Reactor Operator EOP Encl. 5.1(ES Actuation) has been completed up to Step 122 Rule 2 (Loss of SCM) is complete INITIATING CUES:
-6 have actuated on high RB pressure Steam Generator levels are being raised to the Loss of Subcooling Margin setpoint by another Reactor Operator EOP Encl. 5.1(ES Actuation) has been completed up to Step 122 Rule 2 (Loss of SCM) is complete
The Control Room SRO instructs you, to continue in Encl. 5.1 (ES Actuation) and respond to plant conditions.
 
INITIATING CUES:
 
The Control Room SRO instructs you, to continue in Encl.
5.1 (ES Actuation) and respond to plant conditions.
 
THIS JPM IS TIME CRITICAL
THIS JPM IS TIME CRITICAL


CRO-409 R0 - d Page 1 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE
CRO-409 R0 - d Page 1 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-409 Depressurize SGs and Feed with CBPs CANDIDATE EXAMINER


CRO-409 Depressurize SGs and Feed with CBPs       
CRO-409 R0 - d Page 2 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Depressurize S/Gs and Feed With CBPs Alternate Path:
No Facility JPM #:
CRO-014 K/A Rating(s):
System: APE 054 K/A:     AA1.01 Rating: 4.5/4.4 Task Standard:
Both OTSG's are depressurized and fed with the CBP's until RCS temperature is controlled while maintaining RCS pressure between 2300 psig and 1600 psig.
Preferred Evaluation Location:                                      Preferred Evaluation Method:
Simulator __X__ In-Plant __ ___                                      Perform __X___ Simulate ____


CANDIDATE      EXAMINER 
==References:==
 
CRO-409 R0 - d Page 2 of 12  REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:  Depressurize S/G's and Feed With CBPs Alternate Path
:  No  Facility JPM #
:
CRO-014  K/A Rating(s)
:  System: APE 054 K/A:  AA1.01 Rating:
4.5/4.4  Task Standard
: Both OTSG's are depressurized and fed with the CBP's until RCS temperature is controlled while maintaining RCS pressure between 2300 psig and 1600 psig.
Preferred Evaluation Location
:    Preferred Evaluation Method
:  Simulator __X__ In-Plant __ ___      Perform __X___ Simulate ____  References
: EOP Rule 3 (Loss of Main or Emergency FDW)
Validation Time:
1 2 minutes      Time Critical:
NO ====================================================================================
 
Candidate: _______________________________________
Time Start: __
_______    NAME      Time Finish: ________  Performance Rating
:  SAT ______ UNSAT ______
Performance Time
: _________
Examiner: ______________________________          ____________________________________/________
NAME      SIGNATURE                            DATE
====================================================================================
COMMENTS CRO-409 R0 - d Page 3 of 12 SIMULATOR OPERATOR INSTRUCTIONS
: 1. Recall Snap 208  2. Import files for CRO-409  3. Provide a clean copy of Rule 3 (Loss of Main or Emergency FDW) on the front board
: 4. G o to run when directed by lead examiner


CRO-409 R0 - d Page 4 of 12 Tools/Equipment/Procedures Needed
EOP Rule 3 (Loss of Main or Emergency FDW)
: EOP Rule 3, Loss of Main or Emergency FDW
Validation Time: 12 minutes                                          Time Critical: NO
====================================================================================
Candidate:      _______________________________________                                Time Start: _________
NAME                                                    Time Finish: ________
Performance Rating: SAT ______ UNSAT ______                                  Performance Time: _________
Examiner: ______________________________            ____________________________________/________
NAME                                          SIGNATURE                      DATE
====================================================================================
COMMENTS


READ TO OPERATOR DIRECTION TO TRAINEE
CRO-409 R0 - d Page 3 of 12 SIMULATOR OPERATOR INSTRUCTIONS
 
: 1. Recall Snap 208
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
: 2. Import files for CRO-409
 
: 3. Provide a clean copy of Rule 3 (Loss of Main or Emergency FDW) on the front board
INITIAL CONDITIONS The reactor has tripped. 
: 4. Go to run when directed by lead examiner


CRO-409 R0 - d Page 4 of 12 Tools/Equipment/Procedures Needed:
EOP Rule 3, Loss of Main or Emergency FDW READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS The reactor has tripped.
The SRO directs you to perform a Symptom Check.
The SRO directs you to perform a Symptom Check.
INITIATING CUES You are to respond to the plant conditions found during the Symptom Check.


INITIATING CUES
CRO-409 R0 - d Page 5 of 12 START TIME: _______
 
STEP 1:     Step 1 Perform a Symptoms Check
You are to respond to the plant conditions found during the Symptom Check.
___ SAT STANDARD:   Candidate ensures Power Range NIs are < 5% and decreasing.
 
Candidate ensures Subcooling Margin > 0&deg;F.
CRO-409 R0 - d Page 5 of 12   START TIME: _______
___ UNSAT Candidate diagnoses a Loss of Heat Transfer and attempts to start available EFDW pumps per OMP 1-18.
STEP 1: Step 1 Perform a Symptoms Check STANDARD: Candidate ensures Power Range NIs are < 5% and decreasing
Candidate requests concurrence to perform Rule 3.
. Candidate ensures Subcooling Margin > 0
Examiner Cue: As CRSRO, Concur with the performance of Rule 3.
&deg;F. Candidate diagnoses a Loss of Heat Transfer and attempts to start available EFDW pumps per OMP 1
Note: EFDW pumps will not start.
-18. Candidate requests concurrence to perform Rule 3.
COMMENTS:
Examiner Cue: As CRSRO, Concur with the performance of Rule 3
STEP 2:      Rule 3 Step 1 Verify loss of Main FDW/EFDW is due to Turbine Building Flooding.
. Note: EFDW pumps will not start.
___ SAT STANDARD:    Candidate determines that loss of Main/EFDW is not due to Turbine Building Flooding by determining that 2SA-18/A-11 (TURBINE BST WATER EMERGENCY HIGH LEVEL) in not illuminated and continues to
___ UNSAT Step 1 RNO.
COMMENTS:
COMMENTS:
___ SAT        ___ UNSAT  STEP 2:  Rule 3 Step 1 Verify loss of Main FDW/EFDW is due to Turbine Building Flooding.
STEP 3:     Rule 3 Step 1 RNO GO TO Step 3.
STANDARD: Candidate determines that loss of Main/EFDW is not due to Turbine Building Flooding by determining that 2SA
___ SAT STANDARD:   Candidate continues to Step 3
-18/A-11 (TURBINE BST WATER EMERGENCY HIGH LEVEL) in not illuminated and continues to Step 1 RNO. COMMENTS:                ___ SAT 
___ UNSAT COMMENTS:
 
___ UNSAT  STEP 3: Rule 3 Step 1 RNO GO TO Step 3. STANDARD: Candidate continues to Step 3


CRO-409 R0 - d Page 6 of 12 STEP 4:  Rule 3 Step 3 IAAT NO SGs can be fed with FDW (Main/CBP/Emergency), AND any of the following exist:                                                    ___ SAT
* RCS pressure reaches 2300 psig OR NDT limit
* Pzr level reaches 375 THEN PERFORM Rule 4 (Initiation of HPI Forced Cooling)                  ___ UNSAT STANDARD: Candidate determines that the IAAT step does not apply at this time and continues to Step 4.
COMMENTS:
COMMENTS:
___ SAT        ___ UNSAT CRO-409 R0 - d Page 6 of 12  STEP 4:  Rule 3 Step 3 IAAT NO SGs can be fed with FDW (Main/CBP/Emergency), AND any of the following exist:
STEP 5:  Rule 3 Step 4 Start operable EFDW pumps, as required, to feed all intact SGs.
RCS pressure reaches 2300 psig OR NDT limit  Pzr level reaches 375" THEN PERFORM Rule 4 (Initiation of HPI Forced Cooling)
___ SAT STANDARD: Candidate determines that both SGs are intact and that no EFDW pumps will start and continues to Step 5.
STANDARD: Candidate determines that the IAAT step does not apply at this time and continues to Step 4.
___ UNSAT COMMENTS:
COMMENTS:
STEP 6:   Rule 3 Step 5 Verify any EFDW pump operating.
___ SAT        ___ UNSAT   STEP 5:  Rule 3 Step 4 Start operable EFDW pumps, as required, to feed all intact SGs. STANDARD: Candidate determines that both SGs are intact and that no EFDW pumps will start and continues to Step 5.
___ SAT STANDARD: Candidate determines that no EFDW pump is operating and continues to Step 5 RNO.
 
___ UNSAT COMMENTS:
COMMENTS:               ___ SAT        ___ UNSAT  STEP 6: Rule 3 Step 5 Verify any EFDW pump operating.
STANDARD: Candidate determines that no EFDW pump is operating and continues to Step 5 RNO. COMMENTS:    


CRO-409 R0 - d Page 7 of 12 STEP 7:      Rule 3 Step 5 RNO GO TO Step 7
___ SAT STANDARD:    Candidate continues to Step 7
___ UNSAT COMMENTS:
STEP 8:      Rule 3 Step 7 Place in MANUAL and close:
___ SAT
___ SAT
___ UNSAT CRO-409 R0 - d Page 7 of 12  STEP 7:  Rule 3 Step 5 RNO GO TO Step 7  STANDARD: Candidate continues to Step 7  COMMENTS:              ___ SAT        ___ UNSAT  STEP 8:  Rule 3 Step 7 Place in MANUAL and close:
* 1FDW-315
1FDW-315 1FDW-316 STANDARD: Candidate locates 1FDW
* 1FDW-316
-315 and 1FDW
___ UNSAT STANDARD:     Candidate locates 1FDW-315 and 1FDW-316 Moore controllers on 1UB1 and places them in manual.
-316 Moore controllers on 1UB1 and places them in manual.
Candidate closes 1FDW-315 and 1FDW-316 by reducing demand on the Moore controllers to zero.
Candidate closes 1FDW
Continues to Step 8.
-315 and 1FDW
-316 by reducing demand on the Moore controllers to zero. Continues to Step 8.
Note: These valves may be operated simultaneously.
Note: These valves may be operated simultaneously.
COMMENTS:               ___ SAT        ___ UNSAT  STEP 9: Rule 3 Step 8 Verify both: Any CBP operating TBVs available on an intact SG STANDARD: Candidate determines that CBPs are operating by observing light indication and pump amps located on 1AB1
COMMENTS:
. Candidate determines that both SGs are intact with TBVs available and continues to Step 9.
STEP 9:       Rule 3 Step 8 Verify both:
COMMENTS:               ___ SAT        ___ UNSAT CRO-409 R0 - d Page 8 of 12  STEP 10:  Rule 3 Step 9 Select OFF for both digital channels on AFIS HEADER A STANDARD: Candidate locates AFIS Header A switches located on 1UB1 and depresses the OFF pushbutton for Channels 1 & 2.
___ SAT
Candidate continues to Step 10.
* Any CBP operating
COMMENTS:        CRITICAL STEP
* TBVs available on an intact SG
___ SAT        ___ UNSAT  STEP 11:  Rule 3 Step 1 0 Select OFF for both digital channels on AFIS HEADER B STANDARD: Candidate locates AFIS Header B switches located on 1UB1 and depresses the OFF pushbutton for Channels 1 & 2.
___ UNSAT STANDARD:     Candidate determines that CBPs are operating by observing light indication and pump amps located on 1AB1.
Candidate continues to Step 11.
Candidate determines that both SGs are intact with TBVs available and continues to Step 9.
COMMENTS:


COMMENTS:         CRITICAL STEP
CRO-409 R0 - d Page 8 of 12 STEP 10:  Rule 3 Step 9                                                        CRITICAL STEP Select OFF for both digital channels on AFIS HEADER A
___ SAT       ___ UNSAT   STEP 12:  Rule 3 Step 1 1 Place Startup Block valve control switch for all intact SGs in OPEN:
___ SAT STANDARD: Candidate locates AFIS Header A switches located on 1UB1 and depresses the OFF pushbutton for Channels 1 & 2.
1A SG 1B SG 1FDW-33 1FDW-42 STANDARD: Candidate determines that both SGs are intact and locates the Startup Block valve switches on 1UB1 and rotates the switches to the OPEN position. Candidate continues to Step 12.
Candidate continues to Step 10.                                        ___ UNSAT COMMENTS:
STEP 11:  Rule 3 Step 10                                                        CRITICAL STEP Select OFF for both digital channels on AFIS HEADER B
___ SAT STANDARD: Candidate locates AFIS Header B switches located on 1UB1 and depresses the OFF pushbutton for Channels 1 & 2.
Candidate continues to Step 11.                                        ___ UNSAT COMMENTS:
STEP 12:  Rule 3 Step 11                                                        CRITICAL STEP Place Startup Block valve control switch for all intact SGs in OPEN:
1A SG             1B SG                                       ___ SAT 1FDW-33           1FDW-42 STANDARD: Candidate determines that both SGs are intact and locates the Startup ___ UNSAT Block valve switches on 1UB1 and rotates the switches to the OPEN position.
Candidate continues to Step 12.
COMMENTS:


COMMENTS:         CRITICAL STEP
CRO-409 R0 - d Page 9 of 12 STEP 13:    Rule 3 Step 12                                                        CRITICAL STEP Simultaneously position Startup Control valves 10 - 20% open on all intact SGs:                                                            ___ SAT 1A SG            1B SG 1FDW-35            1FDW-44                                      ___ UNSAT STANDARD:    Candidate determines that both SGs are intact and locates the Startup Control valve controllers on 1UB1 and simultaneously places the controllers in manual.
Candidate positions Startup Control Valves 10 - 20% open.
Candidate continues to Step 13.
Note: Two handed operations are allowed for Startup Control valves.
COMMENTS:
STEP 14:    Rule 3 Step 13 Perform the following:
___ SAT
___ SAT
___ UNSAT CRO-409 R0 - d Page 9 of 12  STEP 1 3:  Rule 3 Step 12 Simultaneously position Startup Control valves 10
* Place 1FDW-31 switch in CLOSE
- 20% open on all intact SGs:  1A SG  1B SG  1FDW-35  1FDW-44  STANDARD: Candidate determines that both SGs are intact and locates the Startup Control valve controllers on 1UB1 and simultaneously places the controllers in manual.
* Place 1FDW-40 switch in CLOSE
Candidate positions Startup Control Valves 10
* Close 1FDW-32                                                     ___ UNSAT
- 20% open. Candidate continues to Step 13.
* Close 1FDW-41 STANDARD:   Candidate locates the control switches for 1FDW-31 and 1FDW-40 on 1UB1 and places the switches in CLOSE.
Note:  Two handed operations are allowed for Startup Control valves.
Candidate locates the controllers for 1FDW-32 and 1FDW-41 on 1UB1 and places the controllers in manual and ensures demand is zero.
COMMENTS:          CRITICAL STEP
___ SAT        ___ UNSAT  STEP 1 4:  Rule 3 Step 13 Perform the following:
Place 1FDW
-31 switch in CLOSE Place 1FDW
-40 switch in CLOSE Close 1FDW
-32 Close 1FDW
-41 STANDARD: Candidate locates the control switches for 1FDW
-31 and 1FDW
-40 on 1UB1 and places the switches in CLOSE.
Candidate locates the controllers for 1FDW
-32 and 1FDW
-41 on 1UB1 and places the controllers in manual and ensures demand is zero.
Candidate continues to Step 14.
Candidate continues to Step 14.
COMMENTS:    
COMMENTS:


___ SAT        ___ UNSAT CRO-409 R0 - d Page 10 of 12   STEP 1 5: Rule 3 Step 14 Verify Rule 4 (Initiation of HPI Forced Cooling) in progress.
CRO-409 R0 - d Page 10 of 12 STEP 15:     Rule 3 Step 14 Verify Rule 4 (Initiation of HPI Forced Cooling) in progress.
STANDARD: Candidate determines that Rule 4 is not in progress and continues to Step 14 RNO. COMMENTS:               ___ SAT        ___ UNSAT  STEP 1 6: Rule 3 Step 14 RNO CAUTION Until SGs are dry, lower SG pressure slowly to prevent overcooling.
___ SAT STANDARD: Candidate determines that Rule 4 is not in progress and continues to Step 14 RNO.
: 1. Lower SG pressure in available . 2. Control FDW flow to stabilize RCS P/T by throttling the following as necessary:
___ UNSAT COMMENTS:
Startup Control valves TBVs 3. Notify CR SRO that CBP feed is in progress. STANDARD: Candidate locates the Bailey controllers for 1A and 1B Turbine Bypass Valves on 1UB1 and places the controllers in HAND by depressing the white HAND pushbuttons.
STEP 16:     Rule 3 Step 14 RNO                                                     CRITICAL STEP CAUTION
___ SAT Until SGs are dry, lower SG pressure slowly to prevent overcooling.
: 1. Lower SG pressure in available SGs to  500 psig.
: 2. Control FDW flow to stabilize RCS P/T by throttling the following as ___ UNSAT necessary:
* Startup Control valves
* TBVs
: 3. Notify CR SRO that CBP feed is in progress.
STANDARD:     Candidate locates the Bailey controllers for 1A and 1B Turbine Bypass Valves on 1UB1 and places the controllers in HAND by depressing the white HAND pushbuttons.
Candidate lowers SG pressure by using the raise/lower toggle switches on the 1A/1B TBVs to increase position demand to open the valves.
Candidate lowers SG pressure by using the raise/lower toggle switches on the 1A/1B TBVs to increase position demand to open the valves.
Candidate controls FDW flow to stabilize RCS P/T by throttling Startup Control valves (1FDW
Candidate controls FDW flow to stabilize RCS P/T by throttling Startup Control valves (1FDW-35 and 1FDW-44) and throttles TBVs to control steam pressure at  500 psig.
-35 and 1FDW
Examiner Note: Once the candidate demonstrates that they have gained control of RCS P/T and has notified the CR SRO CBP feed is in progress, inform the Candidate another operator will continue with this procedure.
-44) and throttles TBVs to control steam pressure at  500 psig. Examiner Note: Once the candidate demonstrates that they have gained control of RCS P/T and has notified the CR SRO CBP feed is in progress , inform the Candidate another operator will continue with this procedure
COMMENTS:
. COMMENTS:
END OF TASK STOP TIME: ____________
END OF TASK   CRITICAL STEP
 
___ SAT        ___ UNSAT  STOP TIME: ____________
 
CRO-409 R0 - d Page 11 of 12  CRITICAL STEP EXPLANATIONS STEP # Explanation 10 & 11 Steps prevent actuation of AFIS circuit which would block feed from the CBPs if actuated.
12 Step aligns flow path to the Startup FDW valves. 13 Step decreases Startup FDW valve position to prevent excessive flow while allowing feed to enter the SG.
16 Step required to decrease SG pressure to below shutoff head of the CBPs and throttle FDW flow to stabilize RCS P/T.
 
d  CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS


The reactor has tripped.
CRO-409 R0 - d Page 11 of 12 CRITICAL STEP EXPLANATIONS STEP #                                          Explanation 10 & 11 Steps prevent actuation of AFIS circuit which would block feed from the CBPs if actuated.
12    Step aligns flow path to the Startup FDW valves.
13    Step decreases Startup FDW valve position to prevent excessive flow while allowing feed to enter the SG.
16    Step required to decrease SG pressure to below shutoff head of the CBPs and throttle FDW flow to stabilize RCS P/T.


d CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS The reactor has tripped.
The SRO directs you to perform a Symptom Check.
The SRO directs you to perform a Symptom Check.
INITIATING CUES You are to respond to the plant conditions found during the Symptom Check.


INITIATING CUES
CRO-413 R0 - e Page 1 of 14 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-413 Initiate HPI Forced Cooling CANDIDATE EXAMINER


You are to respond to the plant conditions found during the Symptom Check.
CRO-413 R0 - e Page 2 of 14 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Initiate HPI Forced Cooling Alternate Path:
Yes Facility JPM #:
CRO-019, CRO-020 K/A Rating(s):
System: EPE 074 K/A:      EA1.08 Rating: 4.2/4.2 Task Standard:
Perform Rule 4 (Initiate HPI Forced Cooling).
Preferred Evaluation Location:                                    Preferred Evaluation Method:
Simulator __X___ In-Plant ___ __                                  Perform __X___ Simulate ____


CRO-413 R0 - e Page 1 of 14 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE
==References:==
 
CRO-413  Initiate HPI Forced Cooling
 
CANDIDATE      EXAMINER CRO-413 R0 - e Page 2 of 14  REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:   Initiate HPI Forced Cooling  Alternate Path:
Yes  Facility JPM #:
CRO-019, CRO-020  K/A Rating(s):
System: EPE 0 74 K/A:  EA1.08 Rating:
4.2/4.2  Task Standard:
Perform Rule 4 (Initiate HPI Forced Cooling
). Preferred Evaluation Location:
Preferred Evaluation Method:  Simulator
__X___ In-Plant ___ __      Perform __X___ Simulate ____ 


==References:==
EOP Rule 3 (Loss of Main or Emergency FDW)
EOP Rule 4 (Initiate HPI Forced Cooling)
TCA #26, Initiate HPI Forced Cooling when required Validation Time: 3 minutes                                        Time Critical: YES
====================================================================================
Candidate:       _______________________________________                        Time Start: _________
NAME                                    Time Finish: ________
Performance Rating: SAT ______ UNSAT ______                              Performance Time: _________
Examiner: ______________________________            ____________________________________/________
NAME                                    SIGNATURE                    DATE
====================================================================================
COMMENTS


EOP Rule 3 (Loss of Main or Emergency FDW
CRO-413 R0 - e Page 3 of 14 SIMULATOR OPERATOR INSTRUCTIONS:
) EOP Rule 4 (Initiate HPI Forced Cooling
: 1. Recall Snap 209
) TCA #26, Initiate HPI Forced Cooling when required Validation Time
: 2. Import simulator files for CRO-413
: 3 minutes        Time Critical:
: 3. Go to run when directed by lead examiner
YES ====================================================================================
Candidate:
_______________________________________
Time Start: __
_______    NAME      Time Finish: ________
Performance Rating:
SAT ______ UNSAT ______
Performance Time
: _________
Examiner: ______________________________          ____________________________________/________
NAME      SIGNATURE                            DATE
====================================================================================
COMMENTS CRO-413 R0 - e Page 3 of 14 SIMULATOR OPERATOR INSTRUCTIONS:
: 1. Recall Snap 209 2. Import simulator files for CRO
-413
: 3. Go t o run when directed by lead examiner


CRO-413 R0 - e Page 4 of 14 Tools/Equipment/Procedures Needed:
CRO-413 R0 - e Page 4 of 14 Tools/Equipment/Procedures Needed:
EOP Rule 3 (Loss of Main or Emergency FDW
EOP Rule 3 (Loss of Main or Emergency FDW)
) EOP Rule 4 (Initiate HPI Forced Cooling
EOP Rule 4 (Initiate HPI Forced Cooling)
)    READ TO OPERATOR DIRECTION TO TRAINEE:
READ TO OPERATOR DIRECTION TO TRAINEE:
 
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit 1 has tripped following a total loss of feedwater.
* Unit 1 has tripped following a total loss of feedwater.
IMAs are complete.
* IMAs are complete.
You have been performing Rule # 3 (Loss of Main or Emergency FDW
* You have been performing Rule # 3 (Loss of Main or Emergency FDW) to regain heat transfer.
) to regain heat transfer. CBP feed could not be established and efforts to restore steam generator heat transfer per Rule # 3 have not been successful.
* CBP feed could not be established and efforts to restore steam generator heat transfer per Rule # 3 have not been successful.
You are at the step 22 "WHEN" step in Rule 3 (Loss of Main or Emergency FDW
* You are at the step 22 WHEN step in Rule 3 (Loss of Main or Emergency FDW).
). INITIATING CUES:
INITIATING CUES:
The CR SRO directs you to review outstanding IAAT's
The CR SRO directs you to review outstanding IAATs.
.
This JPM is Time Critical
This JPM is Time Critical


CRO-413 R0 - e Page 5 of 14 START TIME: _______ STEP 1: The candidate determines that it is necessary to perform Rule 4 based on IAAT in Rule 3 or in OMP 1-18 STANDARD: Candidate announces the initiation of Rule 4. Examiner Cue: If requested, provide concurrence (as CR SRO) for initiation of Rule 4.
CRO-413 R0 - e Page 5 of 14 START TIME: _______
EXAMINER NOTE: This starts the 5 minute "Time critical" time clock.
STEP 1:       The candidate determines that it is necessary to perform Rule 4 based on IAAT in Rule 3 or in OMP 1-18 STANDARD: Candidate announces the initiation of Rule 4.                             ___ SAT Examiner Cue: If requested, provide concurrence (as CR SRO) for initiation of Rule 4.
 
___ UNSAT EXAMINER NOTE: This starts the 5 minute Time critical time clock.
Time = ___________.
Time = ___________.
COMMENTS:
COMMENTS:
___ SAT
STEP 2:       Step 1 Verify any HPI pump can be operated.
___ UNSAT  STEP 2: Step 1 Verify any HPI pump can be operated.
___ SAT STANDARD: The candidate recognizes one HPI pump is in operation.
STANDARD: The candidate recognizes one HPI pump is in operation.
COMMENTS:
COMMENTS:             ___ SAT
___ UNSAT STEP 3:       Step 2                                                               CRITICAL STEP OPEN the following:
___ UNSAT   STEP 3: Step 2 OPEN the following:
* 1HP-24                                                       ___ SAT
1HP-24 1HP-25 STANDARD: The candidate:
* 1HP-25 STANDARD: The candidate:                                                             ___ UNSAT
Rotates 1HP
* Rotates 1HP-24 switch on 1UB1 to the OPEN position and observes that the red open light comes ON and the green closed light goes OFF.
-24 switch on 1UB1 to the OPEN position and observes that the red open light comes ON and the green closed light goes OFF. Rotates 1HP
* Rotates 1HP-25 switch on 1UB1 to the OPEN position and observes that the red open light comes ON and the green closed light goes OFF.
-25 switch on 1UB1 to the OPEN position and observes that the red open light comes ON and the green closed light goes OFF. COMMENTS:       CRITICAL STEP
COMMENTS:
___ SAT 


___ UNSAT CRO-413 R0 - e Page 6 of 14   STEP 4: Step 3 Start all available HPI pumps STANDARD: The candidate:
CRO-413 R0 - e Page 6 of 14 STEP 4:       Step 3 Start all available HPI pumps
Starts any non
___ SAT STANDARD: The candidate:
-running HPI pump by the control switches located on 1UB1. The running HPI pump amps are verified stable.
* Starts any non-running HPI pump by the control switches located on 1UB1.
COMMENTS:               ___ SAT
___ UNSAT
___ UNSAT  STEP 5: Step 4 OPEN the following:
* The running HPI pump amps are verified stable.
1HP-26 1HP-27 STANDARD: The candidate:
COMMENTS:
Rotates and holds 1HP
STEP 5:       Step 4 OPEN the following:
-26 switch on 1UB1 to the OPEN position Candidate notes that 1HP
* 1HP-26
-26 did not open by observing the green "CLOSED indication is still illuminated and the red "OPEN" light is extinguished
* 1HP-27                                                       ___ SAT STANDARD: The candidate:
. Locates 1HP
* Rotates and holds 1HP-26 switch on 1UB1 to the OPEN position           ___ UNSAT Candidate notes that 1HP-26 did not open by observing the green CLOSED indication is still illuminated and the red OPEN light is extinguished.
-27 ('1B' HP Injection) on 1UB1 and verifies red 'OPEN' indication is illuminated, and the green 'CLOSED' indication is extinguished,. Examiner Note: 1HP
* Locates 1HP-27 ('1B' HP Injection) on 1UB1 and verifies red 'OPEN' indication is illuminated, and the green 'CLOSED' indication is extinguished,.
-26 is failed closed.
Examiner Note: 1HP-26 is failed closed.
COMMENTS:
COMMENTS:
___ SAT
STEP 6:       Step 5 OPEN 1RC-4
___ UNSAT  STEP 6: Step 5 OPEN 1RC-4 STANDARD: The candidate locates 1RC
___ SAT STANDARD: The candidate locates 1RC-4 control switch on 1UB1 and verifies that the red "OPEN" indication is illuminated and the green "CLOSED" indication is extinguished.
-4 control switch on 1UB1 and verifies that the red "OPEN" indication is illuminated and the green "CLOSED" indication is extinguished.
___ UNSAT Examiner Note: This valve should already be open COMMENTS:


Examiner Note: This valve should already be open COMMENTS:             ___ SAT
CRO-413 R0 - e Page 7 of 14 STEP 7:      Step 6                                                                CRITICAL STEP VERIFY flow exists in any HPI header.
STANDARD: The candidate locates HPI Flow Train A and B flow meters on 1UB1.
___ SAT Loop B flow is verified.
COMMENTS:
___ UNSAT STEP 8:      Step 7                                                                CRITICAL STEP Perform the following:
A. Place 1RC-66 SETPOINT SELECTOR to OPEN
___ SAT B. Depress 1RC-66 OPEN PERMIT pushbutton STANDARD: The candidate:
* Rotates 1RC-66 SETPOINT SELECTOR switch on 1UB1 to the OPEN            ___ UNSAT position
* Depresses 1RC-66 OPEN PERMIT pushbutton on 1UB1
* Verifies PORV is open by verifying that the red "OPEN" indication is illuminated and the PORV Flow Statalarm (1SA18/A1) is in alarm.
EXAMINER NOTE: This stops the 5 minute Time Critical time clock.
Time = _____________.
COMMENTS:
STEP 9:      Step 8 Verify at least two HPI pumps operating.
___ SAT STANDARD: The candidate verifies that three HPI pumps are operating.
COMMENTS:
___ UNSAT


___ UNSAT CRO-413 R0 - e Page 7 of 14   STEP 7: Step 6 VERIFY flow exists in any HPI header.
CRO-413 R0 - e Page 8 of 14 STEP 10:       Step 9 Verify flow in both HPI headers is in the acceptable region of Figure 1 (Required HPI Flow Per Header).
STANDARD: The candidate locates HPI Flow Train A and B flow meters on 1UB1. Loop B flow is verified.
___ SAT STANDARD: The candidate verifies HPI flow in the B HPI header is in the acceptable region of Figure 1 below, but that there is no flow in HPI header A, so he proceeds to step 9 RNO.                                                   ___ UNSAT Examiner Note: Since 1HP-26 failed closed earlier, there is no flow in HPI header A, so the candidate must go to the RNO to open 1HP-410.
COMMENTS:        CRITICAL STEP
COMMENTS:
 
___ SAT 
 
___ UNSAT   STEP 8: Step 7 Perform the following:
A. Place 1RC-66 SETPOINT SELECTOR to OPEN B. Depress 1RC
-66 OPEN PERMIT pushbutton STANDARD: The candidate:
Rotates 1RC
-66 SETPOINT SELECTOR switch on 1UB1 to the OPEN position  Depresses 1RC
-66 OPEN PERMIT pushbutton on 1UB1 Verifies PORV is open by verifying that the red "OPEN" indication is illuminated and the PORV Flow Statalarm (1SA18/A1) is in alarm.
EXAMINER NOTE:  This stops the 5 minute "Time Critical" time clock.
Time = _____________.
COMMENTS:       CRITICAL STEP


CRO-413 R0 - e Page 9 of 14 ALTERNATE PATH:                                                                CRITICAL STEP STEP 11:      Step 9 RNO
: 1. IF 1A HPI header flow is unacceptable, THEN open 1HP-410.
___ SAT
___ SAT
___ UNSAT  STEP 9: Step 8 Verify at least two HPI pumps operating.
: 2. IF 1B HPI header flow is unacceptable, THEN open 1HP-409.
STANDARD: The candidate verifies that three HPI pumps are operating.
STANDARD: The candidate determines that 1A HPI header flow is unacceptable and  ___ UNSAT opens 1HP-410.
COMMENTS:               ___ SAT        ___ UNSAT CRO-413 R0 - e Page 8 of 14  STEP 10: Step 9 Verify flow in both HPI headers is in the acceptable region of Figure 1 (Required HPI Flow Per Header).
COMMENTS:
STANDARD: The candidate verifies HPI flow in the B HPI header is in the acceptable region of Figure 1 below, but that there is no flow in HPI header A, so he proceeds to step 9 RNO. Examiner Note:
STEP 12:     Step 10 Verify flow exists in any HPI header.
Since 1HP-26 failed closed earlier, there is no flow in HPI header A, so the candidate must go to the RNO to open 1HP
STANDARD: The candidate locates HPI Flow Train A and B flow meters on 1UB1. ___ SAT Loop A and Loop B flow is verified.
-410. COMMENTS:
Examiner Note: This flow has already been verified in step 7
___ SAT
___ UNSAT COMMENTS:
___ UNSAT CRO-413 R0 - e Page 9 of 14  ALTERNATE PATH:
STEP 13:      Step 11 Perform the following:
STEP 11: Step 9 RNO 1. IF 1A HPI header flow is unacceptable, THEN open 1HP-410. 2. IF 1B HPI header flow is unacceptable, THEN open 1HP-409. STANDARD: The candidate determines that 1A HPI header flow is unacceptable and opens 1HP-410. COMMENTS:       CRITICAL STEP
A. Place 1RC-66 SETPOINT SELECTOR to OPEN B. Depress 1RC-66 OPEN PERMIT pushbutton                      ___ SAT STANDARD: The candidate verifies 1RC-66 open. These actions have already been taken in step 8:
___ UNSAT COMMENTS:


___ SAT       ___ UNSAT   STEP 1 2: Step 10 Verify flow exists in any HPI header.
CRO-413 R0 - e Page 10 of 14 STEP 14:      Step 12 Verify > one RCP operating.
STANDARD: The candidate locates HPI Flow Train A and B flow meters on 1UB1. Loop A and Loop B flow is verified.
___ SAT STANDARD:    Candidate determines that all four RCPs are operating.
 
COMMENTS:
Examiner Note:  This flow has already been verified in step 7 COMMENTS:
___ UNSAT NOTE:                                        CRITICAL STEP 1A1 RCP provides the best Pzr spray and is preferred to be left running in case recovery from HPI forced cooling is performed and a Pzr bubble drawn.
STEP 15:     Step 13
___ SAT Stop all but one RCP.
STANDARD: The candidate stops three RCPs by rotating their control switches to OFF    ___ UNSAT position on the three of the four RCPs.
COMMENTS:
STEP 16:     Step 14 IAAT the following limits are exceeded
___ SAT
___ SAT
___ UNSAT   STEP 1 3:  Step 11 Perform the following:
___ UNSAT THEN throttle HPI to maximize flow  flow limit.
A. Place 1RC-66 SETPOINT SELECTOR to OPEN B. Depress 1RC-66 OPEN PERMIT pushbutton STANDARD: The candidate verifies 1RC
-66 open. These actions have already been taken in step 8:
 
COMMENTS:                ___ SAT        ___ UNSAT CRO-413 R0 - e Page 10 of 14  STEP 1 4:  Step 12 Verify > one RCP operating.
STANDARD: Candidate determines that all four RCPs are operating.
COMMENTS:              ___ SAT
___ UNSAT  NOTE: 1A1 RCP provides the best Pzr spray and is preferred to be left running in case recovery from HPI forced cooling is performed and a Pzr bubble drawn.
STEP 1 5:  Step 13 Stop all but one RCP. STANDARD: The candidate stops three RCPs by rotating their control switches to "OFF" position on the three of the four RCPs. COMMENTS:        CRITICAL STEP
___ SAT        ___ UNSAT  STEP 1 6:  Step 1 4 IAAT the following limits are exceeded THEN throttle HPI to maximize flow  flow limit.
STANDARD: The candidate verifies header flows less than the limits in the table above.
STANDARD: The candidate verifies header flows less than the limits in the table above.
COMMENTS:


CRO-413 R0 - e Page 11 of 14 STEP 17:    Step 15                                                              CRITICAL STEP De-energize all PZR heaters.
STANDARD: The candidate:                                                          ___ SAT
* Rotates the PZR heater bank #1 on 1UB1 switch to the "OFF" position.
___ UNSAT
* Presses the OFF pushbutton controls for PZR heater banks 2, 3 and 4 on 1UB1 COMMENTS:
STEP 18:    Step 16                                                              CRITICAL STEP Close 1HP-5 (LETDOWN ISOLATION)
STANDARD:  The candidate:                                                        ___ SAT
* Rotates the switch for 1HP-5 on 1UB1 to the closed position.
* Observes the red OPEN light go off and the green CLOSED light come on.                                                            ___ UNSAT COMMENTS:
STEP 19:    Step 17 Close the following:
* TBVs                                                              ___ SAT
* 1FDW-35
* 1FDW-44
___ UNSAT STANDARD:  Take the TBVs to HAND and reduce demand to zero using the toggle switch Take 1FDW-35 and 1FDW-44 to HAND and reduce demands to zero using the toggle switches.
COMMENTS:
COMMENTS:
___ SAT
___ UNSAT CRO-413 R0 - e Page 11 of 14  STEP 1 7:  Step 15 De-energize all PZR heaters.
STANDARD: The candidate:
Rotates the PZR heater bank #1 on 1UB1 switch to the "OFF" position. Presses the OFF pushbutton controls for PZR heater banks 2, 3 and 4 on 1UB1  COMMENTS:        CRITICAL STEP
___ SAT 
___ UNSAT  STEP 1 8:  Step 1 6 Close 1HP-5 (LETDOWN ISOLATION)
STANDARD: The candidate:
Rotates the switch for 1HP
-5 on 1UB1 to the closed position.
Observes the red OPEN light go off and the green CLOSED light come on. COMMENTS:        CRITICAL STEP
___ SAT        ___ UNSAT  STEP 1 9:  Step 1 7 Close the following:
TBVs  1FDW-35  1FDW-44  STANDARD: Take the TBVs to HAND and reduce demand to zero using the toggle switch  Take 1FDW-35 and 1FDW-44 to HAND and reduce demands to zero using the toggle switches.
COMMENTS:              ___ SAT        ___ UNSAT CRO-413 R0 - e Page 12 of 14  STEP 20:  Step 1 8 IAAT all HPI is lost,  THEN: A. Stop all RCPs B. Position 1RC
-66 SETPOINT SELECTOR to HIGH  STANDARD: The candidate verifies HPI is available and operating and the IAAT step does not apply at this time.
COMMENTS:              ___ SAT
___ UNSAT  STEP 2 1:  Step 1 9 WHEN directed by CR SRO,  THEN EXIT this rule.
STANDARD: The candidate announces that Rule 4 is complete with outstanding IAATs and returns the Cue sheet to the examiner indicating he has completed his JPM.


COMMENTS:
CRO-413 R0 - e Page 12 of 14 STEP 20:    Step 18 IAAT all HPI is lost, THEN:
END TASK
A. Stop all RCPs                                                  ___ SAT B. Position 1RC-66 SETPOINT SELECTOR to HIGH STANDARD: The candidate verifies HPI is available and operating and the IAAT step does not apply at this time.                                          ___ UNSAT COMMENTS:
___ SAT
STEP 21:    Step 19 WHEN directed by CR SRO, THEN EXIT this rule.
___ UNSAT   STOP TIME: ____________
___ SAT STANDARD:  The candidate announces that Rule 4 is complete with outstanding IAATs and returns the Cue sheet to the examiner indicating he has completed his JPM.
___ UNSAT COMMENTS:
END TASK STOP TIME: ____________


CRO-413 R0 - e Page 13 of 14 CRITICAL STEP EXPLANATIONS:
CRO-413 R0 - e Page 13 of 14 CRITICAL STEP EXPLANATIONS:
STEP # Explanation 3 Step is required provide proper system alignment for HPI forced cooling flow 7 Step is required to verify HPI flow available for forced cooling.
STEP #                                       Explanation 3   Step is required provide proper system alignment for HPI forced cooling flow 7   Step is required to verify HPI flow available for forced cooling.
8 Step is required to open the PORV to initiate HPI forced cooling through the core (TCA #26).
8   Step is required to open the PORV to initiate HPI forced cooling through the core (TCA #26).
1 1 Step required to allow flow in both HPI headers 1 5 Step required to limit the heat input to the RCS 1 7 Step required to limit the heat input to the RCS  1 8 Step required to Reduce the amount of heat energy added to the RB Containment
11  Step required to allow flow in both HPI headers 15  Step required to limit the heat input to the RCS 17  Step required to limit the heat input to the RCS 18   Step required to Reduce the amount of heat energy added to the RB Containment


e   CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
e CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit 1 has tripped following a total loss of feedwater.
* Unit 1 has tripped following a total loss of feedwater.
IMAs are complete.
* IMAs are complete.
You have been performing Rule # 3 (Loss of Main or Emergency FDW) to regain heat transfer. CBP feed could not be established and efforts to restore steam generator heat transfer per Rule # 3 have not been successful.
* You have been performing Rule # 3 (Loss of Main or Emergency FDW) to regain heat transfer.
You are at the step 22 "WHEN" step in Rule 3 (Loss of Main or Emergency FDW).
* CBP feed could not be established and efforts to restore steam generator heat transfer per Rule # 3 have not been successful.
* You are at the step 22 WHEN step in Rule 3 (Loss of Main or Emergency FDW).
INITIATING CUES:
INITIATING CUES:
 
The CR SRO directs you to review outstanding IAATs.
The CR SRO directs you to review outstanding IAAT's
.
This JPM is Time Critical
This JPM is Time Critical


CRO-50 7 R 0 - f   Page 1 of 9       REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE
CRO-507 R0 - f Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-507 Perform EOP Encl. 5.35 (Containment Isolation)
CANDIDATE EXAMINER


CRO-50 7  Perform EOP Encl. 5.35 (Containment Isolation)
CRO-507 R0 - f Page 2 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
 
Perform EOP Encl 5.35 (Containment Isolation)
CANDIDATE    EXAMINER CRO-50 7 R 0 - f   Page 2 of 9   REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: Perform EOP Encl 5.35 (Containment Isolation)
Alternate Path:
Alternate Path:
Yes       Facility JPM #:
Yes Facility JPM #:
CRO-503 K/A Rating(s):
CRO-503 K/A Rating(s):
System:    103 K/A:     G2.1.23 Rating:     4.3/4.4 Task Standard:
System:    103 K/A:       G2.1.23 Rating:   4.3/4.4 Task Standard:
Perform EOP Encl 5.35 (Containment Isolation)
Perform EOP Encl 5.35 (Containment Isolation).
. Preferred Evaluation Location:
Preferred Evaluation Location:                                   Preferred Evaluation Method:
Preferred Evaluation Method:
Simulator ___ X___ In-Plant ___ ___                             Perform __X___ Simulate __ __
Simulator
___ X___ In-Plant ___ ___     Perform __X___ Simulate __ __


==References:==
==References:==


EOP Encl 5.35 (Containment Isolation)
EOP Encl 5.35 (Containment Isolation)
Validation Time:
Validation Time: 10 min.                                                     Time Critical: NO
10 min. Time Critical:
====================================================================================
N O ====================================================================================
Candidate:       _______________________________________                 Time Start: _______________
Candidate:
NAME                                     Time Finish: ______________
_______________________________________
Performance Rating: SAT ______ UNSAT ______                             Performance Time: _________
Time Start: ____
Examiner: ______________________________           ___________________________________/_________
___________    NAME     Time Finish: ______________ Performance Rating:
NAME                                     SIGNATURE                   DATE
SAT ______ UNSAT ______
====================================================================================
Performance Time
Comments
: _________   Examiner: ______________________________         ___________________________________/____
 
_____    NAME     SIGNATURE                           DATE
CRO-507 R0 - f Page 3 of 9 SIMULATOR OPERATOR INSTRUCTIONS
====================================================================================
: 1. Recall Snap 210
Comments CRO-50 7 R 0 - f   Page 3 of 9 SIMULATOR OPERATOR INSTRUCTIONS
: 2. Import Simulator files for CRO-507
: 1. Recall Snap 2 10  2. Import Simulator files for CRO
-50 7 
: 3. Go to Run and Acknowledge alarms
: 3. Go to Run and Acknowledge alarms
: 4. Go to Freeze
: 4. Go to Freeze
: 5. Go to Run when directed by lead examiner
: 5. Go to Run when directed by lead examiner


CRO-50 7 R 0 - f   Page 4 of 9 Tools/Equipment/Procedures Needed EOP Encl 5.35 (Containment Isolation)
CRO-507 R0 - f Page 4 of 9 Tools/Equipment/Procedures Needed EOP Encl 5.35 (Containment Isolation)
READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS Unit 1 reactor trips from 100% power due to a spurious Main Turbine trip RCS leak of 190 gpm occurs as result of the trip EOP LOCA CD tab is in progress ES Actuation has NOT occurred INITIATING CUE The CR SRO directs you to perform EOP Encl 5.35 (Containment Isolation)


READ TO OPERATOR DIRECTIONS TO STUDENT
CRO-507 R0 - f Page 5 of 9 START TIME: _______
STEP 1:    Step 1 Verify Encl 5.1 (ES Actuation) is in progress or complete.
STANDARD:  Determine ES has NOT actuated and perform the RNO step.      ___ SAT Continue to Step 1 RNO 1.
COMMENTS:                                                                ___ UNSAT STEP 2:    Step 1 RNO 1.                                              *CRITICAL STEP
: 1. Close the following ES operated RB isolation valves:
ES Chan 1              ES Chan 2 1HP-3                  1HP-5 1HP-4*
1GWD-12                1GWD-13 1LWD-1                  1LWD-2            ___ SAT 1CS-5                  1CS-6 1PR-1                  1PR-2 1PR-6                  1PR-3 1PR-4            ___ UNSAT 1PR-5 1PR-7*                  1PR-8*
1PR-9*                  1PR-10*
1RC-5                  1RC-7 1RC-6 1FDW-105                1FDW-106 1FDW-107                1FDW-108 1FDW-103 1FDW-104 STANDARD:  The above valves are closed.
ALTERNATE PATH: 1HP-3 will NOT close.
Continue to Step 1 RNO 2.
COMMENTS:


I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
CRO-507 R0 - f Page 6 of 9 STEP 3:  Step 1 RNO 2.                                                            CRITICAL STEP
: 2. IF 1HP-3 fails to close, THEN close 1HP-1 STANDARD: Determine 1HP-3 is open by observing red open light on and green closed light off.
___ SAT Position 1HP-1 switch in closed position and verify green closed light on and red open light off.
Continue to Step 1 RNO 3.                                                  ___ UNSAT COMMENTS:
STEP 4:  Step 1 RNO 3.
: 1. IF 1HP-4 fails to close, THEN close 1HP-2 STANDARD: Observe that 1HP-4 is closed with red light off and green light on.       ___ SAT Continue to Step 1 RNO 4.
___ UNSAT COMMENTS:
STEP 5:  Step 1 RNO 4.
: 2. IF 1HP-5 fails to close, THEN close 1HP-7 and 1HP-6 STANDARD: Observe that 1HP-5 is closed with red light off and green light on.       ___ SAT Continue to Step 2.
___ UNSAT COMMENTS:
STEP 6:  Step 2 Verify all RCPs off.
STANDARD: Determine that all RCPs are operating by observing red on light lit and
___ SAT RCP amps indicate normal. Perform RNO.
GO TO Step 5
___ UNSAT COMMENTS:


INITIAL CONDITIONS Unit 1 reactor trips from 100% power due to a spurious Main Turbine trip
CRO-507 R0 - f Page 7 of 9 STEP 7:        Step 5                                                                *CRITICAL STEP Rotate switches to the closed position for the following components.
 
* 1LPSW-1054
RCS leak of 190 gpm occurs as result of the trip
* 1LPSW-1055
 
* 1LPSW-1061
EOP LOCA CD tab is in progress
* 1LPSW-1062                                                          ___ SAT
 
  *Note: Either 1LPSW-1054 or 1LPSW-55 and 1LPSW-1061 or 1LPSW-1062 must be closed to satisfy this critical step.
ES Actuation has NOT occurred INITIATING CUE
___ UNSAT STANDARD:      Rotate the above switches to the closed position located on 1VB3.
 
Continue to Step 6 COMMENTS:
The CR SRO directs you to perform EOP Encl 5.35 (Containment Isolation)
STEP 8:         Step 6 Verify the following components indicate closed.
 
* 1LPSW-1054
CRO-50 7 R 0 - f  Page 5 of 9  START TIME: _______
* 1LPSW-1055
STEP 1: Step 1 Verify Encl 5.1 (ES Actuation) is in progress or complete.
* 1LPSW-1061
STANDARD: Determine ES has NOT actuated and perform the RNO step.
* 1LPSW-1062                                                            ___ SAT STANDARD:       Verify the above valves indicate closed by observing the green closed light is lit located on 1VB3.
Continue to Step 1 RNO 1.
___ UNSAT Continue to Step 7 COMMENTS:
STEP 9:        Step 7 EXIT this enclosure.
___ SAT STANDARD:      Exit the enclosure.
COMMENTS:
COMMENTS:
___ SAT    ___ UNSAT STEP 2: Step 1 RNO 1. 1. Close the following ES operated RB isolation valves:
___ UNSAT END OF TASK TIME STOP: ________
ES Chan 1  ES Chan 2  1HP-3  1HP-5  1HP-4*    1GWD-12  1GWD-13  1LWD-1  1LWD-2  1CS-5  1CS-6  1PR-1  1PR-2  1PR-6  1PR-3    1PR-4    1PR-5  1PR-7*  1PR-8*  1PR-9*  1PR-10*  1RC-5  1RC-7  1RC-6    1FDW-105  1FDW-106  1FDW-107  1FDW-108    1FD W-103    1FDW-104  STANDARD: The above valves are closed.
ALTERNATE PATH
: 1HP-3 will NOT close. Continue to Step 1 RNO 2.
COMMENTS:        *CRITICAL STEP
 
___ SAT        ___ UNSAT CRO-50 7 R 0 - f  Page 6 of 9  STEP 3: Step 1 RNO 2.
: 2. IF 1HP-3 fails to close, THEN close 1HP-1  STANDARD: Determine 1HP
-3 is open by observing red open light on and green closed light off.
Position 1HP
-1 switch in closed position and verify green closed light on and red open light off.
Continue to Step 1 RNO 3.
COMMENTS:      CRITICAL STEP
 
___ SAT 
 
___ UNSAT  STEP 4: Step 1 RNO 3.
: 1. IF 1HP-4 fails to close, THEN close 1HP-2  STANDARD: Observe that 1HP
-4 is closed with red light off and green light on.
Continue to Step 1 RNO 4.
COMMENTS:            ___ SAT        ___ UNSAT  STEP 5: Step 1 RNO
: 4. 2. IF 1HP-5 fails to close, THEN close 1HP-7 and 1HP-6  STANDARD: Observe that 1HP
-5 is closed with red light off and green light on.
Continue to Step 2. COMMENTS:            ___ SAT
___ UNSAT  STEP 6: Step 2 Verify all RCPs off. STANDARD: Determine that all RCPs are operating by observing red on light lit and RCP amps indicate normal. Perform RNO.
GO TO Step 5  COMMENTS:
___ SAT    ___ UNSAT CRO-50 7 R 0 - f  Page 7 of 9  STEP 7: Step 5 Rotate switches to the closed position for the following components.
1LPSW-1054  1LPSW-1055  1LPSW-1061  1LPSW-1062  *Note: Either 1LPSW
-1054 or 1LPSW
-55 and 1LPSW
-1061 or 1LPSW
-1062 must be closed to satisfy th is critical step.
STANDARD: Rotate the above switches to the closed position located on 1VB3
. Continue to Step 6  COMMENTS:        *CRITICAL STEP
___ SAT        ___ UNSAT  STEP 8: Step 6  Verify the following components indicate closed.
1LPSW-1054  1LPSW-1055  1LPSW-1061  1LPSW-1062  STANDARD: Verify the above valves indicate closed by observing the green closed light is lit located on 1VB3
. Continue to Step 7 COMMENTS:
___ SAT
___ UNSAT  STEP 9: Step 7  EXIT this enclosure.
STANDARD: Exit the enclosure.
COMMENTS:      END OF TASK
___ SAT    ___ UNSAT  TIME STOP: ________
 
CRO-50 7 R 0 - f  Page 8 of 9  CRITICAL STEP EXPLANATIONS STEP # Explanation 2 This step is critical to isolate the Reactor Building.
3 This step is critical since 1HP-3 is failed open 1HP
-1 isolates this pathway.
7 This step is critical to isolate the Reactor Building.
 
f    CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS


Unit 1 reactor trips from 100% power due to a spurious Main Turbine trip
CRO-507 R0 - f Page 8 of 9 CRITICAL STEP EXPLANATIONS STEP #                                          Explanation 2  This step is critical to isolate the Reactor Building.
3  This step is critical since 1HP-3 is failed open 1HP-1 isolates this pathway.
7  This step is critical to isolate the Reactor Building.


RCS leak of 190 gpm occurs as result of the trip
f CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS Unit 1 reactor trips from 100% power due to a spurious Main Turbine trip RCS leak of 190 gpm occurs as result of the trip EOP LOCA CD tab is in progress ES Actuation has NOT occurred INITIATING CUE The CR SRO directs you to perform EOP Encl 5.35 (Containment Isolation)


EOP LOCA CD tab is in progress
CRO-605 R0 - g Page 1 of 15 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-605 Energize Main Feeder Buses from CT-4 CANDIDATE EXAMINER


ES Actuation has NOT occurred INITIATING CUE
CRO-605 R0 - g Page 2 of 15 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
 
Energize Main Feeder Buses From CT-4 Alternate Path:
The CR SRO directs you to perform EOP Encl 5.35 (Containment Isolation)
No Facility JPM #:
 
CRO-007 K/A Rating(s):
CRO-605 R0 - g Page 1 of 15      REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-605  Energize Main Feeder Buses from CT-4       
System: EPE 055 K/A:     EA2.03 Rating: 3.9/4.7 Task Standard:
 
Energize Main Feeder Buses from CT-4 Preferred Evaluation Location:                                 Preferred Evaluation Method:
CANDIDATE      EXAMINER CRO-605 R0 - g Page 2 of 15 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:   Energize Main Feeder Buses From CT
Simulator __X___ In-Plant ______                               Perform __X__ Simulate _____
-4 Alternate Path:
No Facility JPM #:
CRO-007 K/A Rating(s):  
 
System: EPE 0 55 K/A: E A 2.0 3 Rating:   3.9/4.7 Task Standard:
 
Energize Main Feeder Buses from CT
-4 Preferred Evaluation Location:
Preferred Evaluation Method:
Simulator __X___ In-Plant ______     Perform __X__ Simulate _____


==References:==
==References:==


EOP Encl 5.38 (Restoration of Power)
EOP Encl 5.38 (Restoration of Power)
Validation Time
Validation Time: 15 minutes                                     Time Critical: NO
: 15 minutes     Time Critical
====================================================================================
:  N O ====================================================================================
Candidate:     _______________________________________                       Time Start: _________
Candidate:
NAME                                           Time Finish: ________
_______________________________________
Performance Rating: SAT ______ UNSAT ______                             Performance Time: _________
Time Start: _________     NAME       Time Finish: ________
Performance Rating:
SAT ______ UNSAT ______
Performance Time
: _________
Examiner: ______________________________          ____________________________________/________
Examiner: ______________________________          ____________________________________/________
NAME     SIGNATURE                           DATE
NAME                                     SIGNATURE                   DATE
====================================================================================
====================================================================================
COMMENTS CRO-605 R0 - g Page 3 of 15 SIMULATOR OPERATOR INSTRUCTIONS:
COMMENTS
: 1. Recall Snap 211 2. Import Files for CRO-605
 
CRO-605 R0 - g Page 3 of 15 SIMULATOR OPERATOR INSTRUCTIONS:
: 1. Recall Snap 211
: 2. Import Files for CRO-605
: 3. Place simulator in Run and acknowledge alarms
: 3. Place simulator in Run and acknowledge alarms
: 4. Go to Freeze  
: 4. Go to Freeze
: 5. Go to Run when directed by lead examiner
: 5. Go to Run when directed by lead examiner


CRO-605 R0 - g Page 4 of 15 Tools/Equipment/Procedures Needed:
CRO-605 R0 - g Page 4 of 15 Tools/Equipment/Procedures Needed:
EOP Encl 5.38 (Restoration of Power)
EOP Encl 5.38 (Restoration of Power)
READ TO OPERATOR DIRECTION TO TRAINEE:
READ TO OPERATOR DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
 
Unit 1 experienced a lockout on CT-1 followed by a unit trip.
Unit 1 experienced a lockout on CT
Keowee Unit 2 emergency Locks Out Blackout tab of the EOP is in progress The Blackout tab directs the initiation of Encl. 5.38 (Restoration of Power).
-1 followed by a unit trip.
 
Keowee Unit 2 emergency Locks Out
 
Blackout tab of the EOP is in progress
 
The Blackout tab directs the initiation of Encl. 5.38 (Restoration of Power).
 
INITIATING CUES:
INITIATING CUES:
The CRS directs you to initiate Encl. 5.38 (Restoration of Power) to regain power to the Main Feeder Buses.


The CRS directs you to initiate Encl. 5.38 (Restoration of Power
CRO-605 R0 - g Page 5 of 15 START TIME: _______
) to regain power to the Main Feeder Buses.
STEP 1:      Step 1 Verify power has been restored.
___ SAT STANDARD:    Determine power has NOT been restored by observing MFB voltage on 1AB1. Perform RNO step.
___ UNSAT COMMENTS:
STEP 2:      Step 1 RNO GO TO Step 3.
___ SAT STANDARD:    GO TO Step 3.
___ UNSAT COMMENTS:
STEP 3:      Step 3                                                                    CRITICAL STEP Place 1HP-31 in HAND and reduce demand to 0.
___ SAT STANDARD:    Place 1HP-31 in HAND and reduce demand to 0 using the toggle switch.
Located on 1UB1.
Continues to Step 4                                                        ___ UNSAT COMMENTS:
STEP 4:      Step 4 Close 1HP-21.
___ SAT STANDARD:    Close 1HP-21 by rotating the switch to the close position and verifying the red open light goes out and the green closed light illuminates. Switch is located on 1UB2.                                                         ___ UNSAT Continues to Step 5 COMMENTS:


CRO-605 R0 - g Page 5 of 15  START TIME: _______
CRO-605 R0 - g Page 6 of 15 STEP 5:   Step 5 Verify any of the following energized:
STEP 1:  Step 1 Verify power has been restored.
___ SAT
STANDARD: Determine power has NOT been restored by observing MFB voltage on 1AB1. Perform RNO step. COMMENTS:              ___ SAT
* MFB1
___ UNSAT  STEP 2:  Step 1 RNO GO TO Step 3. STANDARD: GO TO Step 3. COMMENTS:              ___ SAT
* MFB2
___ UNSAT  STEP 3:  Step 3 Place 1HP-31 in HAND and reduce demand to 0.
___ UNSAT STANDARD: Observes that zero (0) volts are indicated on both MFBs meters located on 1AB1 and performs RNO.
STANDARD: Place 1HP-31 in HAND and reduce demand to 0 using the toggle switch. Located on 1UB1.
COMMENTS:
Continue s to Step 4 COMMENTS:        CRITICAL STEP      ___ SAT        ___ UNSAT  STEP 4:  Step 4 Close 1HP-21. STANDARD: Close 1HP-21 by rotating the switch to the close position and verifying the red open light goes out and the green closed light illuminates. Switch is located on 1 U B2. Continue s to Step 5  COMMENTS:              ___ SAT        ___ UNSAT CRO-605 R0 - g Page 6 of 15   STEP 5: Step 5 Verify any of the following energized:
STEP 6:   Step 5 RNO GO TO Step 8.
MFB1 MFB2 STANDARD: Observes that zero (0) volts are indicated on both MFBs meters located on 1AB1 and performs RNO. COMMENTS:             ___ SAT        ___ UNSAT  STEP 6: Step 5 RNO GO TO Step 8. STANDARD: GO TO Step 8.
___ SAT STANDARD: GO TO Step 8.
COMMENTS:             ___ SAT
___ UNSAT COMMENTS:
___ UNSAT  STEP 7: Step 8 Verify CT-  STANDARD: Observes that zero (0) volts is indicated on CT
STEP 7:   Step 8 Verify CT-1 indicates 4160 volts.
-1 on 1AB1 and performs RNO.
___ SAT STANDARD: Observes that zero (0) volts is indicated on CT-1 on 1AB1 and performs RNO.
COMMENTS:     
___ UNSAT COMMENTS:
STEP 8:    Step 8 RNO GO TO Step 18.
___ SAT STANDARD:  GO TO Step 18.
___ UNSAT COMMENTS:


___ SAT        ___ UNSAT  STEP 8:  Step 8 RNO GO TO Step 18. STANDARD: GO TO Step 18. COMMENTS:              ___ SAT        ___ UNSAT CRO-605 R0 - g Page 7 of 15   STEP 9: Step 1 8 Verify both Standby Bus #1 and Standby Bus #2 are de
CRO-605 R0 - g Page 7 of 15 STEP 9:     Step 18 Verify both Standby Bus #1 and Standby Bus #2 are de-energized.
-energized.
___ SAT STANDARD:   Observes that zero (0) volts is indicated on both Standby Buses located on 2AB3.
STANDARD: Observes that zero (0) volts is indicated on both Standby Buses located on 2AB3. Continue s to Step 19 COMMENTS:             ___ SAT        ___ UNSAT  STEP 10: Step 1 9 Verify both Keowee units operating.
Continues to Step 19                                                   ___ UNSAT COMMENTS:
STANDARD: Determine that Keowee Unit 1 is operating
STEP 10:   Step 19 Verify both Keowee units operating.
. Determine that Keowee Unit 2 is NOT operating (Emergency Lockout
___ SAT STANDARD:   Determine that Keowee Unit 1 is operating.
) by observing Statalarm 2SA-18/A1 is actuated. Perform RNO step.
Determine that Keowee Unit 2 is NOT operating (Emergency Lockout) by observing Statalarm 2SA-18/A1 is actuated. Perform RNO step.           ___ UNSAT COMMENTS:
COMMENTS:             ___ SAT
STEP 11:   Step 19 RNO
___ UNSAT  STEP 11: Step 1 9 RNO 1. Emergency start Keowee units:
: 1. Emergency start Keowee units:
KEOWEE EMER START CHANNEL A KEOWEE EMER START CHANNEL B
___ SAT
: 2. IF NO Keowee units are operating, THEN GO TO Step 3 6. STANDARD: Place the KEOWEE EMER START CHANNEL A switch to start located on 1UB1. Continue s to Step 20.
* KEOWEE EMER START CHANNEL A
* KEOWEE EMER START CHANNEL B
: 2. IF NO Keowee units are operating,                                   ___ UNSAT THEN GO TO Step 36.
STANDARD:   Place the KEOWEE EMER START CHANNEL A switch to start located on 1UB1.
Continues to Step 20.
Note: KEOWEE EMER START CHANNEL B switch is not modeled.
Note: KEOWEE EMER START CHANNEL B switch is not modeled.
COMMENTS:             ___ SAT        ___ UNSAT CRO-605 R0 - g Page 8 of 15  STEP 12:  Step 20  0BVerify both Keowee units in Oconee Control (statalarms on):
COMMENTS:
UNIT 1 OCONEE CONTROL (2SA-17/E-1)  UNIT 2 OCONEE CONTROL (2SA-18/E-1). STANDARD: Determine that 2SA-17/E-1 and 2SA-18/E-1 are not actuated.
Perform RNO step. COMMENTS:              ___ SAT        ___ UNSAT  STEP 13:  Step 20 RNO Notify Keowee Operator to place both Keowee units Master Transfer switches to remote.
STANDARD: Call Keowee and ask the Keowee Operator to place both Keowee units Master Transfer switches to remote.
Verify that statalarm 2SA-17/E-1 and 2SA-18/E-1 actuate..
Booth Cue: When directed by the candidate, use Quick Strike and place both KHU's in Remote.


COMMENTS:        CRITICAL STEP      ___ SAT 
CRO-605 R0 - g Page 8 of 15 STEP 12:        Step 20 Verify both Keowee units in Oconee Control (statalarms on):
 
___ SAT 0B
___ UNSAT  STEP 14:  Step 21 Verify both Keowee units operating.
* UNIT 1 OCONEE CONTROL (2SA-17/E-1)
STANDARD: Determine that Keowee Unit 1 is operating.
* UNIT 2 OCONEE CONTROL (2SA-18/E-1).
Determine that Keowee Unit 2 is NOT operating (Emergency Lockout) by observing Statalarm 2SA
___ UNSAT STANDARD: Determine that 2SA-17/E-1 and 2SA-18/E-1 are not actuated.
-18/A1 is actuated. Perform RNO step   COMMENTS:             ___ SAT        ___ UNSAT CRO-605 R0 - g Page 9 of 15  STEP 15: Step 21 RNO 1. IF UNIT 1 EMER FDR ACB 3 is closed,  AND Unit 1 Keowee is NOT operating,  THEN open UNIT 1 EMER FDR ACB 3.
Perform RNO step.
: 2. IF UNIT 2 EMER FDR ACB 4 is closed,  AND Unit 2 Keowee is NOT operating,  THEN open UNIT 2 EMER FDR ACB 4.
COMMENTS:
STANDARD: Determine Unit 2 Keowee is NOT operating and open UNIT 2 EMER FDR ACB 4 located on 2AB3.
STEP 13:       Step 20 RNO                                                         CRITICAL STEP Notify Keowee Operator to place both Keowee units Master Transfer
Continues to Step 22
___ SAT switches to remote.
 
STANDARD:       Call Keowee and ask the Keowee Operator to place both Keowee units Master Transfer switches to remote. Verify that statalarm 2SA-17/E-1 ___ UNSAT and 2SA-18/E-1 actuate..
COMMENTS:              ___ SAT        ___ UNSAT  STEP 16:  Step 22 1BEnsure one of the following is closed for an operating Keowee unit:
Booth Cue: When directed by the candidate, use Quick Strike and place both KHUs in Remote.
Unit 1  Unit 2  UNIT 1 EMER FDR ACB 3  UNIT 2 EMER FDR ACB 4  STANDARD: Determine that KHU #1 is operating and close s ACB-3 located on 2AB3. Continue s to Step 23 COMMENTS:        CRITICAL STEP      ___ SAT
___ UNSAT  STEP 17:  Step 23 Verify 4160 volt power has been restored to the MFB
. STANDARD: Candidate determines that 4160 volts has not been restored to the MFB
. Continue s to Step 2 3 RNO  COMMENTS:              ___ SAT        ___ UNSAT CRO-605 R0 - g Page 10 of 15  STEP 18: Step 23 RNO GO TO step 25. STANDARD: Continues to Step 25 COMMENTS:
___ SAT        ___ UNSAT   STEP 19:  Step 25 Verify CT-4 indicates  4160 volts.
STANDARD: Verify CT-4 indicates  4160 volts by observing CT
-4 voltage gauge located on 2AB3.
Continues to Step 2 6
COMMENTS:
COMMENTS:
___ SAT        ___ UNSAT  STEP 20: Step 2 6  2BPlace the following transfer switches in MAN:
STEP 14:       Step 21 Verify both Keowee units operating.
CT4 BUS 1 AUTO/MAN CT4 BUS 2 AUTO/MAN STANDARD: Place the above transfer switches located on 2AB3 in MAN. Continue s to Step 2 7  COMMENTS:  
___ SAT STANDARD:       Determine that Keowee Unit 1 is operating.
Determine that Keowee Unit 2 is NOT operating (Emergency Lockout) by observing Statalarm 2SA-18/A1 is actuated. Perform RNO step          ___ UNSAT COMMENTS:


___ SAT
CRO-605 R0 - g Page 9 of 15 STEP 15:    Step 21 RNO
___ UNSAT   STEP 21: Step 2 7 3BPlace the following switches in ON:
: 1. IF UNIT 1 EMER FDR ACB 3 is closed,
STBY BUS 1 SYNCHRONIZING STBY BUS 2 SYNCHRONIZING STANDARD: Place the above switches located on 2AB3 in ON. Continue s to Step 2 8 COMMENTS:     
___ SAT AND Unit 1 Keowee is NOT operating, THEN open UNIT 1 EMER FDR ACB 3.
: 2. IF UNIT 2 EMER FDR ACB 4 is closed,
___ UNSAT AND Unit 2 Keowee is NOT operating, THEN open UNIT 2 EMER FDR ACB 4.
STANDARD:    Determine Unit 2 Keowee is NOT operating and open UNIT 2 EMER FDR ACB 4 located on 2AB3.
Continues to Step 22 COMMENTS:
STEP 16:     Step 22                                                                CRITICAL STEP Ensure one of the following is closed for an operating Keowee unit:
___ SAT 1B Unit 1              Unit 2 UNIT 1             UNIT 2 EMER FDR          EMER FDR                                      ___ UNSAT ACB 3              ACB 4 STANDARD:   Determine that KHU #1 is operating and closes ACB-3 located on 2AB3.
Continues to Step 23 COMMENTS:
STEP 17:    Step 23 Verify 4160 volt power has been restored to the MFB.
___ SAT STANDARD:    Candidate determines that 4160 volts has not been restored to the MFB.
Continues to Step 23 RNO
___ UNSAT COMMENTS:


___ SAT        ___ UNSAT CRO-605 R0 - g Page 11 of 15   STEP 2 2:  Step 2 8 4BClose the following breakers:
CRO-605 R0 - g Page 10 of 15 STEP 18:        Step 23 RNO GO TO step 25.
5BSK1 CT4 STBY BUS 1 FEEDER  SK2 CT4 STDY BUS 2 FEEDER STANDARD: Candidate observes that both SK1 and SK2 are already closed by observing both red "closed" lights are illuminated.
___ SAT STANDARD:      Continues to Step 25
. Continue s to Step 2 9  COMMENTS:
___ UNSAT COMMENTS:
___ SAT        ___ UNSAT  STEP 2 3: Step 2 9 6BPlace the following switches in OFF:
STEP 19:        Step 25 Verify CT-4 indicates  4160 volts.                                      ___ SAT STANDARD:       Verify CT-4 indicates 4160 volts by observing CT-4 voltage gauge located on 2AB3.
STBY BUS 1 SYNCHRONIZING STBY BUS 2 SYNCHRONIZING STANDARD: Place the above switches located on 2AB3 in OFF. Continue s to Step 30 COMMENTS:             ___ SAT 
Continues to Step 26                                                    ___ UNSAT COMMENTS:
STEP 20:        Step 26 Place the following transfer switches in MAN:
___ SAT 2B
* CT4 BUS 1 AUTO/MAN
* CT4 BUS 2 AUTO/MAN
___ UNSAT STANDARD:       Place the above transfer switches located on 2AB3 in MAN.
Continues to Step 27 COMMENTS:
STEP 21:       Step 27 Place the following switches in ON:
___ SAT 3B
* STBY BUS 1 SYNCHRONIZING
* STBY BUS 2 SYNCHRONIZING
___ UNSAT STANDARD:       Place the above switches located on 2AB3 in ON.
Continues to Step 28 COMMENTS:


___ UNSAT   STEP 2 4: Step 30 Verify Standby Bus #1 energized.
CRO-605 R0 - g Page 11 of 15 STEP 22:        Step 28 Close the following breakers:
STANDARD: Observes that  4160 volts are indicated for Standby Bus #1 located on 2AB3. Continue s to Step 31
___ SAT 4B
* SK1 CT4 STBY BUS 1 FEEDER 5B
* SK2 CT4 STDY BUS 2 FEEDER
___ UNSAT STANDARD:      Candidate observes that both SK1 and SK2 are already closed by observing both red closed lights are illuminated..
Continues to Step 29 COMMENTS:
STEP 23:        Step 29 Place the following switches in OFF:
___ SAT 6B
* STBY BUS 1 SYNCHRONIZING
* STBY BUS 2 SYNCHRONIZING
___ UNSAT STANDARD:      Place the above switches located on 2AB3 in OFF.
Continues to Step 30 COMMENTS:
STEP 24:        Step 30 Verify Standby Bus #1 energized.
___ SAT STANDARD:       Observes that  4160 volts are indicated for Standby Bus #1 located on 2AB3.
Continues to Step 31                                                   ___ UNSAT COMMENTS:


COMMENTS:              ___ SAT
CRO-605 R0 - g Page 12 of 15 STEP 25:             Step 31 Notify CR SRO in each unit where a blackout exists that Standby Bus #1
___ UNSAT CRO-605 R0 - g Page 12 of 15   STEP 2 5: Step 31 Notify CR SRO in each unit where a blackout exists that Standby Bus #1 is energized.
___ SAT is energized.
STANDARD: Notifies CR SRO that Standby Bus #1 is energized.
STANDARD:             Notifies CR SRO that Standby Bus #1 is energized.
Continues to Step 3 2  Cue: If asked, inform candidate that only Unit 1 is affected.
Continues to Step 32                                                  ___ UNSAT Cue: If asked, inform candidate that only Unit 1 is affected.
COMMENTS:             ___ SAT        ___ UNSAT  STEP 2 6: Step 3 2 7BPlace the following switches in MAN:
COMMENTS:
MFB1 AUTO/MAN MFB2 AUTO/MAN STANDBY 1 AUTO/MAN STANDBY 2 AUTO/MAN STANDARD: Place the above switches located on 1UB2 in MAN.
STEP 26:             Step 32 Place the following switches in MAN:
Continues to Step 3 3  COMMENTS:             ___ SAT        ___ UNSAT  STEP 2 7: Step 3 3 8BOpen the following breakers:
___ SAT 7B
N1 1 MFB1 NORMAL FDR N21 MFB2 NORMAL FDR E1 1 MFB1 STARTUP FDR E2 1 MFB2 STARTUP FDR STANDARD: Verify the above breakers located on 1UB2 are OPEN.
* MFB1 AUTO/MAN
Continues to Step 3 4  COMMENTS:              ___ SAT
* MFB2 AUTO/MAN
___ UNSAT CRO-605 R0 - g Page 13 of 15  STEP 2 8:  Step 3 4 Close the following breakers:
* STANDBY 1 AUTO/MAN                                           ___ UNSAT
S1 1 STBY BUS 1 TO MFB1 S2 1 STBY BUS 2 TO MFB2 STANDARD: Goes to the CLOSED position for each of the switches listed above. Continues to Step 3 5  *Note: Only 1 of the Stby Busses must be energized to restore power to MFBs, and therefore only one (either one) of the above breaker closures is critical
* STANDBY 2 AUTO/MAN STANDARD:             Place the above switches located on 1UB2 in MAN.
. COMMENTS:      *CRITICAL STEP      ___ SAT        ___ UNSAT  STEP 2 9:  Step 3 5 Verify any of the following energized:
Continues to Step 33 COMMENTS:
1TC  1TD  1TE  STANDARD: Observes that  4160 volts indicated on either MFB voltmeters or OAC
STEP 27:             Step 33 Open the following breakers:
. Continues to Step 3 6  COMMENTS:             ___ SAT
___ SAT 8B
___ UNSAT  STEP 30:  Step 3 6 Notify Unit 1 CR SRO of status of 4160V SWGR.
* N11 MFB1 NORMAL FDR
9BSTANDARD: Notifies CR SRO of status of 4160V SWGR Continues to Step 3 7  COMMENTS:              ___ SAT 
* N21 MFB2 NORMAL FDR
* E11 MFB1 STARTUP FDR                                         ___ UNSAT
* E21 MFB2 STARTUP FDR STANDARD:             Verify the above breakers located on 1UB2 are OPEN.
Continues to Step 34 COMMENTS:


___ UNSAT   STEP 31: Step 3 7 EXIT this enclosure, 10BSTANDARD: Notifies CR S RO that Encl. 5.38 is complete.
CRO-605 R0 - g Page 13 of 15 STEP 28:          Step 34                                                              *CRITICAL STEP Close the following breakers:
COMMENTS:     END TASK         ___ SAT        ___ UNSAT  STOP TIME: ____________
___ SAT
* S11 STBY BUS 1 TO MFB1
* S21 STBY BUS 2 TO MFB2
___ UNSAT STANDARD:          Goes to the CLOSED position for each of the switches listed above.
Continues to Step 35
*Note: Only 1 of the Stby Busses must be energized to restore power to MFBs, and therefore only one (either one) of the above breaker closures is critical.
COMMENTS:
STEP 29:          Step 35 Verify any of the following energized:
___ SAT
* 1TC
* 1TD
* 1TE                                                                ___ UNSAT STANDARD:          Observes that  4160 volts indicated on either MFB voltmeters or OAC.
Continues to Step 36 COMMENTS:
STEP 30:          Step 36 Notify Unit 1 CR SRO of status of 4160V SWGR.
___ SAT STANDARD:
9B                Notifies CR SRO of status of 4160V SWGR Continues to Step 37
___ UNSAT COMMENTS:
STEP 31:       Step 37 EXIT this enclosure,
___ SAT STANDARD:
10B            Notifies CR SRO that Encl. 5.38 is complete.
COMMENTS:                                                                           ___ UNSAT END TASK STOP TIME: ____________


CRO-605 R0 - g Page 14 of 15 CRITICAL STEP EXPLANATIONS:
CRO-605 R0 - g Page 14 of 15 CRITICAL STEP EXPLANATIONS:
STEP # Explanation 3 Step is required to protect the RCP seals.
STEP #                                       Explanation 3   Step is required to protect the RCP seals.
13 Step is required to satisfy power switching logic.
13   Step is required to satisfy power switching logic.
1 6 Step is required to satisfy power switching logic.
16  Step is required to satisfy power switching logic.
2 8 Step is required to energize the Main Feeder Bus.
28  Step is required to energize the Main Feeder Bus.


g   CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
g CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit 1 experienced a lockout on CT
Unit 1 experienced a lockout on CT-1 followed by a unit trip.
-1 followed by a unit trip.
Keowee Unit 2 emergency Locks Out Blackout tab of the EOP is in progress The Blackout tab directs the initiation of Encl. 5.38 (Restoration of Power).
 
Keowee Unit 2 emergency Locks Out
 
Blackout tab of the EOP is in progress
 
The Blackout tab directs the initiation of Encl. 5.38 (Restoration of Power).
 
INITIATING CUES:
INITIATING CUES:
The CRS directs you to initiate Encl. 5.38 (Restoration of Power) to regain power to the Main Feeder Buses


The CRS directs you to initiate Encl. 5.38 (Restoration of Power
CRO-902 R0 - h Page 1 of 14 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-902 Place Reactor Building Purge in Operation CANDIDATE EXAMINER
) to regain power to the Main Feeder Buses
 
CRO-902 R0 - h Page 1 of 14     REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CR O-90 2  Place Reactor Building Purge in Operation


CANDIDATE    EXAMINER CRO-902 R0 - h Page 2 of 14   REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: Place the Reactor Building Purge In Operation Alternate Path:
CRO-902 R0 - h Page 2 of 14 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Yes       Facility JPM #:
Place the Reactor Building Purge In Operation Alternate Path:
CRO-100 K/A Rating(s):
Yes Facility JPM #:
System:    029 K/A:     A2.03 Rating:     2.7/3.1 Task Standard:
CRO-100 K/A Rating(s):
RB Purge is placed in operation in accordance with OP/1/A/1102/014 (RB Purge System) and the RB Purge Fan secured and valves closed following 1 RI A-45 HIGH alarm. Preferred Evaluation Location:
System:    029 K/A:       A2.03 Rating:   2.7/3.1 Task Standard:
Preferred Evaluation Method:
RB Purge is placed in operation in accordance with OP/1/A/1102/014 (RB Purge System) and the RB Purge Fan secured and valves closed following 1RIA-45 HIGH alarm.
Simulator
Preferred Evaluation Location:                                       Preferred Evaluation Method:
___X ___ In-Plant ____ ___     Perform __X___ Simulate __ __
Simulator ___X ___ In-Plant ____ ___                                 Perform __X___ Simulate __ __


==References:==
==References:==


OP/1/A/1102/014 (RB Purge System
OP/1/A/1102/014 (RB Purge System)
) PT/0/A/0230/001 (Radiation Monitor Check
PT/0/A/0230/001 (Radiation Monitor Check)
) AP/1/A/1700/0 18 (Abnormal Release of Radioactivity
AP/1/A/1700/018 (Abnormal Release of Radioactivity)
) OP/1/A/6101/008 (Alarm Response Guide 1SA
OP/1/A/6101/008 (Alarm Response Guide 1SA-08) B-9 and D-9 Validation Time: 15 min.                                                     Time Critical: NO
-08) B-9 and D-9 Validation Time:
====================================================================================
1 5 min.       Time Critical:
Candidate:       _______________________________________                     Time Start: _______________
N O ====================================================================================
NAME                                         Time Finish: ______________
Candidate:
Performance Rating: SAT ______ UNSAT ______                                   Performance Time: _________
_______________________________________
Examiner: ______________________________             ___________________________________/_________
Time Start: ____
NAME                                         SIGNATURE                   DATE
___________    NAME     Time Finish: ______________ Performance Rating:
====================================================================================
SAT ______ UNSAT ______
Comments
Performance Time
: _________
Examiner: ______________________________         ___________________________________/____
_____    NAME     SIGNATURE                           DATE
====================================================================================
Comments CRO-902 R0 - h Page 3 of 14  SIMULATOR OPERATOR INSTRUCTIONS
: 1. Recall Snap 212  2. Import files for CRO-902 
: 3. Go to run CRO-902 R0 - h Page 4 of 14  Tools/Equipment/Procedures Needed OP/1/A/1102/014 (RB Purge System
) Encl. 4.1 (RB Purge Release
) AP/1/A/1700/018 (Abnormal Release of Radioactivity)
READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.


INITIAL CONDITIONS RCS temperature = 1 14&deg;F RCS pressure =
CRO-902 R0 - h Page 3 of 14 SIMULATOR OPERATOR INSTRUCTIONS
45 psig No Gaseous or Liquid releases are in progress RB Hatch is closed Continuous release is NOT in progress RB Purge startup is in progress using OP/1/A/1102/014 (RB Purge System), Encl.
: 1. Recall Snap 212
4.1 (RB Purge Release)
: 2. Import files for CRO-902
: 3. Go to run


INITIATING CUE The CRS directs you to place the RB Purge in operation at 1/3 Station Limit using OP/1/A/1102/014 (RB Purge System) Encl. 4.1 (RB Purge Release) starting at Step 3.
CRO-902 R0 - h Page 4 of 14 Tools/Equipment/Procedures Needed OP/1/A/1102/014 (RB Purge System) Encl. 4.1 (RB Purge Release)
: 8. 
AP/1/A/1700/018 (Abnormal Release of Radioactivity)
 
READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
CRO-902 R0 - h Page 5 of 14  START TIME: _______
INITIAL CONDITIONS RCS temperature = 114&deg;F RCS pressure = 45 psig No Gaseous or Liquid releases are in progress RB Hatch is closed Continuous release is NOT in progress RB Purge startup is in progress using OP/1/A/1102/014 (RB Purge System), Encl. 4.1 (RB Purge Release)
STEP 1: Step 3.8 Perform the following:
INITIATING CUE The CRS directs you to place the RB Purge in operation at 1/3 Station Limit using OP/1/A/1102/014 (RB Purge System) Encl. 4.1 (RB Purge Release) starting at Step 3.8.
 
====3.8.1. Ensure====
one of the following:
1A RB AUX FAN is Off.
1B RB AUX FAN is Off.
 
====3.8.2. Ensure====
"T/O Sheet" Control Room Tag on 1A RB AUX FAN.
 
====3.8.3. Ensure====
"T/O Sheet" Control Room Tag on 1B RB AUX FAN.
 
====3.8.4. Ensure====
note on Turnover sheet: "If RB Purge Fan is operating, 1A RB Aux Fan or 1B RB Aux Fan should be off."  STANDARD: *Secure the 1A or 1B RB AUX FAN and place a "T/O Sheet" Control Room Tag on the 1A and 1B RB AUX FAN control room switch es. Note: Placing tags on the RB Aux Fan switches in NOT critical.
Candidate should state they would place note on Turnover sheet: "If RB Purge Fan is operating, 1A RB Aux Fan or 1B RB Aux Fan should be off."  Continue to Step 3.9
 
Examiner Cue s:  If asked as the SRO, inform the candidate that the 1A RB Aux Fan should be secured.


CRO-902 R0 - h Page 5 of 14 START TIME: _______
STEP 1:        Step 3.8                                                                *CRITICAL STEP Perform the following:
3.8.1. Ensure one of the following:
* 1A RB AUX FAN is Off.
* 1B RB AUX FAN is Off.
3.8.2. Ensure "T/O Sheet" Control Room Tag on 1A RB AUX FAN.
3.8.3. Ensure "T/O Sheet" Control Room Tag on 1B RB AUX FAN.            ___ SAT 3.8.4. Ensure note on Turnover sheet: "If RB Purge Fan is operating, 1A RB Aux Fan or 1B RB Aux Fan should be off."
___ UNSAT STANDARD:      *Secure the 1A or 1B RB AUX FAN and place a "T/O Sheet" Control Room Tag on the 1A and 1B RB AUX FAN control room switches.
Note: Placing tags on the RB Aux Fan switches in NOT critical.
Candidate should state they would place note on Turnover sheet: "If RB Purge Fan is operating, 1A RB Aux Fan or 1B RB Aux Fan should be off."
Continue to Step 3.9 Examiner Cues:
If asked as the SRO, inform the candidate that the 1A RB Aux Fan should be secured.
When appropriate, inform candidate that note has been placed on Turnover sheet per 3.8.4.
When appropriate, inform candidate that note has been placed on Turnover sheet per 3.8.4.
COMMENTS:       *CRITICAL STEP
COMMENTS:
___ SAT        ___ UNSAT  NOTE: Completion of Step 3.9 establishes an appropriate vent path during Fuel Movement Operations with any Transfer Tube open per the Shutdown Protection Plan. This prevents FTC and SFP level variations caused by differential pressures between RB and SFP.
CRITICAL STEP NOTE: Completion of Step 3.9 establishes an appropriate vent path during Fuel Movement Operations with any Transfer Tube open per the Shutdown Protection Plan. This prevents FTC and SFP level variations caused by differential pressures between RB and SFP.
STEP 2: Step 3.9 Perform the following:
STEP 2:       Step 3.9 Perform the following:                                           ___ SAT 3.9.1 - Open 1PR-1 (RB PURGE OUTLET (RB)).
3.9.1 - Open 1PR-1 (RB PURGE OUTLET (RB)).
STANDARD:     Open 1PR-1 by rotating the switch located on 1AB3 to open and             ___ UNSAT verifying that the red open light illuminates and the green closed light goes out. May verify 1PR-1 open on the OAC.
STANDARD: Open 1PR-1 by rotating the switch located on 1AB3 to open and verifying that the red open light illuminates and the green closed light goes out. May verify 1PR
-1 open on the OAC.
 
Continue to Step 3.9.2 COMMENTS:
Continue to Step 3.9.2 COMMENTS:
CRITICAL STEP
___ SAT
___ UNSAT CRO-902 R0 - h Page 6 of 14  STEP 3: Step 3.9.2 Open 1PR-2 (RB PURGE OUTLET (PR)).
STANDARD: Open 1PR-2 by rotating the switch located on 1AB3 to open and verifying that the red open light illuminates and the green closed light goes out. May verify 1PR
-2 open on the OAC.
Continue to Step 3.9.3 COMMENTS:   
CRITICAL STEP
___ SAT
___ UNSAT  STEP 4: Step 3.9.3 Ensure closed 1PR
-3 (RB PURGE FLOW). (Bailey Controller)
STANDARD: Rotate 1PR
-3 controller knob until the position indication indicates zero.
Continue to Step 3.9.4 COMMENTS:
___ SAT    ___ UNSAT  STEP 5: Step 3.9.4 Verify 1PR
-3 closed using alternate indication.
STANDARD: Verify 1PR
-3 is closed by observing the closed light is lit on the ES Component Status Panel on 1VB2 or verifying 1PR
-3 position on the OAC. Continue to Step 3.9.5 COMMENTS:                ___ SAT
___ UNSAT  STEP 6: Step 3.9.5 WHILE RB Purge operating, monitor unit vent RIAs
. STANDARD: Candidate monitors unit vent RIAs.
Continue to Step 3.9.6 COMMENTS:   


___ SAT
CRO-902 R0 - h Page 6 of 14 STEP 3:  Step 3.9.2                                                                CRITICAL STEP Open 1PR-2 (RB PURGE OUTLET (PR)).
___ SAT STANDARD: Open 1PR-2 by rotating the switch located on 1AB3 to open and verifying that the red open light illuminates and the green closed light goes out. May verify 1PR-2 open on the OAC.
___ UNSAT Continue to Step 3.9.3 COMMENTS:
STEP 4:  Step 3.9.3 Ensure closed 1PR-3 (RB PURGE FLOW). (Bailey Controller)
STANDARD: Rotate 1PR-3 controller knob until the position indication indicates zero. ___ SAT Continue to Step 3.9.4 COMMENTS:                                                                              ___ UNSAT STEP 5:  Step 3.9.4 Verify 1PR-3 closed using alternate indication.
STANDARD: Verify 1PR-3 is closed by observing the closed light is lit on the ES Component Status Panel on 1VB2 or verifying 1PR-3 position on the
___ SAT OAC.
Continue to Step 3.9.5
___ UNSAT COMMENTS:
STEP 6:  Step 3.9.5 WHILE RB Purge operating, monitor unit vent RIAs.
STANDARD: Candidate monitors unit vent RIAs.
___ SAT Continue to Step 3.9.6 COMMENTS:
___ UNSAT


___ UNSAT CRO-902 R0 - h Page 7 of 14 STEP 7: Step 3.9.6 Perform the following:
CRO-902 R0 - h Page 7 of 14 STEP 7:       Step 3.9.6                                                             CRITICAL STEP Perform the following:
NOTE: When 1PR-3 (RB PURGE OUTLET SWITCH) is positioned to open, 1PR
NOTE: When 1PR-3 (RB PURGE OUTLET SWITCH) is positioned to open, 1PR-3 will remain in the closed position since 1PR-3 Bailey Controller is closed.
-3 will remain in the closed position since 1PR
___ SAT A. Position 1PR-3 (RB PURGE OUTLET SWITCH) to open.
-3 Bailey Controller is closed.
B. Throttle > 60% open 1PR-3 (RB PURGE FLOW). (Bailey Controller)
A. Position 1PR
___ UNSAT STANDARD:     Position 1PR-3 (RB PURGE OUTLET SWITCH) to open on 1VB2.
-3 (RB PURGE OUTLET SWITCH) to open.
Rotate knob on the Bailey Controller for 1PR-3 until it indicates > 60%
B. Throttle > 60% open 1PR
open on 1AB3.
-3 (RB PURGE FLOW). (Bailey Controller
Continue to Step 3.10 COMMENTS:
STANDARD: Position 1PR
-3 (RB PURGE OUTLET SWITCH) to open on 1VB2. Rotate knob on the Bailey Controller for 1PR-3 until it indicates > 60% open on 1AB3. Continue to Step 3.10 COMMENTS:       CRITICAL STEP


___ SAT        ___ UNSAT CRO-902 R0 - h Page 8 of 14 STEP 8: Step 3.10 IF required to operate the RB Purge Fan, perform the following:
CRO-902 R0 - h Page 8 of 14 STEP 8:         Step 3.10                                                             *CRITICAL STEP IF required to operate the RB Purge Fan, perform the following:
3.10.1 Perform one of the following:
3.10.1 Perform one of the following:
A. Perform the following:
A. Perform the following:
  *Open 1PR-4 (RB PURGE INLET)
                          *    *Open 1PR-4 (RB PURGE INLET)
  *Open 1PR-5 (RB PURGE INLET (PR))
                          *    *Open 1PR-5 (RB PURGE INLET (PR))
  *Open 1PR-6 (RB PURGE INLET (RB))
                          *    *Open 1PR-6 (RB PURGE INLET (RB))
B. Ensure the following:
B. Ensure the following: (these steps will be N/Aed)
(these steps will be N/Aed
___ SAT
1PR-4 (RB PURGE INLET) valve position interlock jumpered per IP/0/A/0161/004 (Outage Interlock Bypass For Purge Isolation Valves) 1PR-5 (RB PURGE INLET (PR)) valve position interlock jumpered per IP/0/A/0161/004 (Outage Interlock Bypass For Purge Isolation Valves) 1PR-6 (RB PURGE INLET (RB)) valve position interlock jumpered per IP/0/A/0161/004 (Outage Interlock Bypass For Purge Isolation Valves) Open RB Equipment Hatch Examiner Cue: If asked, inform the candidate that there is no information regarding the purge valves on the turnover sheet.
* 1PR-4 (RB PURGE INLET) valve position interlock jumpered per IP/0/A/0161/004 (Outage Interlock Bypass For Purge Isolation Valves)
NOTE: Starting/Stopping RB Purge may cause SFP level changes. Entry into AP/1&2/A/1700/35 not required if SFP level changes are evaluated and stabilizes as expected. 3.10.2 *Start RB Purge Fan.
* 1PR-5 (RB PURGE INLET (PR)) valve position interlock   ___ UNSAT jumpered per IP/0/A/0161/004 (Outage Interlock Bypass For Purge Isolation Valves)
Examiner Note: The RB Purge fan has a 20 second delay to allow dampers to operate. 3.10.3 Ensure 1PR
* 1PR-6 (RB PURGE INLET (RB)) valve position interlock jumpered per IP/0/A/0161/004 (Outage Interlock Bypass For Purge Isolation Valves)
-3 (RB PURGE FLOW) (Bailey Controller) adjusted to
* Open RB Equipment Hatch Examiner Cue: If asked, inform the candidate that there is no information regarding the purge valves on the turnover sheet.
< recommended release rate.
NOTE: Starting/Stopping RB Purge may cause SFP level changes. Entry into AP/1&2/A/1700/35 not required if SFP level changes are evaluated and stabilizes as expected.
STANDARD: Open 1PR-4, 5, and 6 by rotating the switches located on 1AB3 to open and verifying that the red open lights are illuminated and the green closed lights go out.
3.10.2 *Start RB Purge Fan.
May verify 1PR
Examiner Note: The RB Purge fan has a 20 second delay to allow dampers to operate.
-4, 5, and 6 open on the OAC.
3.10.3 Ensure 1PR-3 (RB PURGE FLOW) (Bailey Controller) adjusted to
Start RB Purge Fan by placing the switch located on 1AB3 to start and verifying that the red on light illuminates.
                        < recommended release rate.
 
STANDARD:       Open 1PR-4, 5, and 6 by rotating the switches located on 1AB3 to open and verifying that the red open lights are illuminated and the green closed lights go out. May verify 1PR-4, 5, and 6 open on the OAC.
Start RB Purge Fan by placing the switch located on 1AB3 to start and verifying that the red on light illuminates.
Adjust 1PR-3 (RB PURGE FLOW) (Bailey Controller) < recommended release rate as read on Chessell Misc. System Recorder 1 located on 1VB1.
Adjust 1PR-3 (RB PURGE FLOW) (Bailey Controller) < recommended release rate as read on Chessell Misc. System Recorder 1 located on 1VB1.
Continue to Step 3.11 Note: After the RB Purge Fan is started, the HIGH alarm for 1RIA
Continue to Step 3.11 Note: After the RB Purge Fan is started, the HIGH alarm for 1RIA-45 will actuate.
-45 will actuate. The associated interlock will not occur
The associated interlock will not occur.
. COMMENTS:       *CRITICAL STEP
COMMENTS:


___ SAT        ___ UNSAT CRO-902 R0 - h Page 9 of 14 ATLERNATE PATH The following Statalarms will actuate:
CRO-902 R0 - h Page 9 of 14 ATLERNATE PATH CRITICAL STEP The following Statalarms will actuate:
1SA-08/D-9 (RM Reactor Building Purge Discharge Radiation Inhibit) 1SA-08/B-9 (Process Monitor Radiation High)
* 1SA-08/D-9 (RM Reactor Building Purge Discharge Radiation Inhibit)
Examiner Cue: IF SRO is informed of the alarms actuating, inform the candidate that the SRO reply is to "Refer to the alarm response guides".
* 1SA-08/B-9 (Process Monitor Radiation High)
Examiners Note: The candidate may refer to one or both ARGs.
Examiner Cue: IF SRO is informed of the alarms actuating, inform the candidate that the SRO reply is to Refer to the alarm response guides.
If 1SA-08/D-9 is selected, then STEP 9 will be performed and that will end the task. If 1SA08/B
Examiners Note: The candidate may refer to one or both ARGs. If 1SA-08/D-9 is selected, then STEP 9 will be performed and that will end the task.
-9 is selected, then STEPs 10 - 13 will be performed and that will end the task. Either step 9 or step 13 is Critical but not both. STEP 9: Refer to 1SA-08/D-9 (RM Reactor Building Purge Discharge Radiation Inhibit) 3.1 Ensure auto action has taken place.
If 1SA08/B-9 is selected, then STEPs 10 - 13 will be performed and that will end the task. Either step 9 or step 13 is Critical but not ___ SAT both.
STEP 9:       Refer to 1SA-08/D-9 (RM Reactor Building Purge Discharge Radiation Inhibit)                                                                 ___ UNSAT 3.1     Ensure auto action has taken place.
3.2    Observe Reactor Building RIAs and evacuate personnel as it becomes necessary.
3.3    Determine cause of inhibit and correct.
STANDARD:      Determine that the automatic actions have NOT taken place and using ARG guidance perform the following:
* Stop the RB Purge Fan
* Close 1PR-2
* Close 1PR-3
* Close 1PR-4
* Close 1PR-5 COMMENTS:
END OF TASK


===3.2 Observe===
CRO-902 R0 - h Page 10 of 14 STEP 10:     Refer to 1SA-08/B-9 (Process Monitor Radiation High 3.1 Perform one of the following:
Reactor Building RIAs and evacuate personnel as it becomes necessary.
3.1.1.Determine radiation monitors in alarm.
 
3.1.2.IF Radiation Monitoring data from the PMC System is NOT in service, refer to OP/1/A/1103/026, (Loss of Sorrento Radiation Monitor).
===3.3 Determine===
NOTE: Loss of power to a process monitor skid actuates the Process Monitor Fault alarm, causes the associated RIA to activate the High alarm, and actuates any associated interlocks from the High alarm. The actual RIA readout may indicate magenta with readings of negative values.
cause of inhibit and correct.
3.2 IF 1SA-08/B-10 (Process Monitor Fault) has occurred for the same monitor, Go To the ARG for 1SA-08/B-10 (Process Monitor Fault). {3}
STANDARD: Determine that the automatic actions have NOT taken place and using ARG guidance perform the following:
Stop the RB Purge Fan Close 1PR-2  Close 1PR-3  Close 1PR-4  Close 1PR-5 COMMENTS:   
 
END OF TASK CRITICAL STEP
 
___ SAT
___ UNSAT CRO-902 R0 - h Page 10 of 14 STEP 10: Refer to 1SA-08/B-9 (Process Monitor Radiation High
 
===3.1 Perform===
one of the following:
 
====3.1.1. Determine====
radiation monitors in alarm.
3.1.2. IF Radiation Monitoring data from the PMC System is NOT in service, refer to OP/1/A/1103/026, (Loss of Sorrento Radiation Monitor). NOTE: Loss of power to a process monitor skid actuates the Process Monitor Fault alarm, causes the associated RIA to activate the High alarm, and actuates any associated interlocks from the High alarm. The actual RIA readout may indicate magenta with readings of negative values. 3.2 IF 1SA-08/B-10 (Process Monitor Fault) has occurred for the same monitor, Go To the ARG for 1SA
-08/B-10 (Process Monitor Fault). {3}
3.3 IF 1RIA-40 alarms, Go To the appropriate procedure:
3.3 IF 1RIA-40 alarms, Go To the appropriate procedure:
  < 25 gpm (36,000 gpd)  
            * < 25 gpm (36,000 gpd) - AP/1/A/1700/031 (Primary To Secondary Leakage)
- AP/1/A/1700/031 (Primary To Secondary Leakage) - EP/1/A/1800/001 (Emergency Operating Procedure) 3.4 IF any of the following RIAs have valid alarms, Go To AP/1/A/1700/018 (Abnormal Release of Radioactivity).
* 25 gpm (36,000 gpd) - EP/1/A/1800/001 (Emergency Operating Procedure) 3.4 IF any of the following RIAs have valid alarms, Go To AP/1/A/1700/018 (Abnormal Release of Radioactivity).
RIA RIA-31 1RIA-35 1RIA-39 1RIA-41 1RIA-42 1RIA-45, 46 1RIA-49A 1RIA-50 1RIA-54 STANDARD: Determine 1RIA
RIA                                                   ___ SAT RIA-31 1RIA-35 1RIA-39 1RIA-41                                                     ___ UNSAT 1RIA-42 1RIA-45, 46 1RIA-49A 1RIA-50 1RIA-54 STANDARD:   Determine 1RIA-45 is in HIGH alarm Determine that Radiation Monitoring data from the PMC System is in service Determine 1SA-08/B-10 (Process Monitor Fault) is NOT in alarm Determine 1RIA-40 is NOT is alarm Determine 1RIA-45 is in alarm and Go To AP/1/A/1700/018 (Abnormal Release of Radioactivity).
-45 is in HIGH alarm Determine that Radiation Monitoring data from the PMC System is in service Determine 1SA-08/B-10 (Process Monitor Fault) is NOT in alarm Determine 1RIA
-40 is NOT is alarm Determine 1RIA
-45 is in alarm and Go To AP/1/A/1700/018 (Abnormal Release of Radioactivity).
COMMENTS:
COMMENTS:
___ SAT    ___ UNSAT CRO-902 R0 - h Page 11 of 14 STEP 1 1: AP/1/A/1700/018 (Abnormal Release of Radioactivity)
 
CRO-902 R0 - h Page 11 of 14 STEP 11: AP/1/A/1700/018 (Abnormal Release of Radioactivity)
Step 4.1 - Perform the following:
Step 4.1 - Perform the following:
At the discretion of the CRS, make a PA announcement of the event including any necessary precautions to be observed.
* At the discretion of the CRS, make a PA announcement of the event including any necessary precautions to be observed.
Notify OSM to reference the following:
* Notify OSM to reference the following:
o RP/0/B/1000/001 (Emergency Classification).
o RP/0/B/1000/001 (Emergency Classification).
o NSD-202 (Reportability) o OMP 1-14 (Notifications)
o NSD-202 (Reportability)                                 ___ SAT o OMP 1-14 (Notifications)
STANDARD: Candidate makes announcement and notifies OSM Continue to Step 4.2 COMMENTS:       ___ SAT    ___ UNSAT  STEP 1 2 Step 4.2 GO TO appropriate sections for any monitors in High or Alert alarm:
STANDARD: Candidate makes announcement and notifies OSM
Section Monitor 4A RIA-31 4B 1RIA-32 4C 1RIA-35 4D 1RIA-39 4E 1RIA-41 4F 1RIA-42 4G 1RIA-45 or 46 4H 1RIA-47, 1RIA-48, 1RIA-49, or 1RIA
___ UNSAT Continue to Step 4.2 COMMENTS:
-49A 4I 1RIA-50 4J 1RIA-54 STANDARD: Candidate determines that 1RIA
STEP 12  Step 4.2 GO TO appropriate sections for any monitors in High or Alert alarm:
-45 is the alarming monitor and that he must proceed to Section 4G Continue to Section 4G COMMENTS:
Section             Monitor 4A       RIA-31                                         ___ SAT 4B       1RIA-32 4C       1RIA-35 4D       1RIA-39 4E       1RIA-41                                         ___ UNSAT 4F       1RIA-42 4G       1RIA-45 or 46 4H       1RIA-47, 1RIA-48, 1RIA-49, or 1RIA-49A 4I       1RIA-50 4J       1RIA-54 STANDARD: Candidate determines that 1RIA-45 is the alarming monitor and that he must proceed to Section 4G Continue to Section 4G COMMENTS:
___ SAT 


___ UNSAT CRO-902 R0 - h Page 12 of 14 STEP 1 3: AP/1/A/1700/018 (Abnormal Release of Radioactivity)
CRO-902 R0 - h Page 12 of 14 STEP 13:     AP/1/A/1700/018 (Abnormal Release of Radioactivity)
Section 4G Step 1 IAAT 1RIA-45 or 1RIA
CRITICAL STEP Section 4G Step 1 IAAT 1RIA-45 or 1RIA-46 reaches the High set point, THEN ensure automatic actions occurred:
-46 reaches the High set point, THEN ensure automatic actions occurred:
A. RB PURGE FAN secured.
A. RB PURGE FAN secured.
B. 1PR-2 closed. C. 1PR-3 closed. D. 1PR-4 closed. E. 1PR-5 closed. STANDARD: Determine 1RIA
B. 1PR-2 closed.
-45 is in High alarm and perform the following:
C. 1PR-3 closed.
Stop the RB Purge Fan Close 1PR-2 Close 1PR-3 Close 1PR-4 Close 1PR-5 Cue: Another operator will continue with this procedure.
D. 1PR-4 closed.
COMMENTS:     END OF TASK   CRITICAL STEP
E. 1PR-5 closed.
___ SAT STANDARD:     Determine 1RIA-45 is in High alarm and perform the following:
* Stop the RB Purge Fan
___ UNSAT
* Close 1PR-2
* Close 1PR-3
* Close 1PR-4
* Close 1PR-5 Cue: Another operator will continue with this procedure.
COMMENTS:
END OF TASK TIME STOP: ________


___ SAT          ___ UNSAT  TIME STOP: ________
CRO-902 R0 - h Page 13 of 14 CRITICAL STEP EXPLANATIONS STEP #                                           Explanation 1   This step is required to prevent tripping 1XR incoming feeder breaker.
 
2   This step is required to establish RB Purge flow.
CRO-902 R0 - h Page 13 of 14       CRITICAL STEP EXPLANATIONS STEP # Explanation 1 This step is required to prevent tripping 1XR incoming feeder breaker.
3   This step is required to establish RB Purge flow.
2 This step is required to establish RB Purge flow.
7   This step is required to establish desired RB Purge flow.
3 This step is required to establish RB Purge flow.
8   This step is required to start the RB Purge fan.
7 This step is required to establish desired RB Purge flow.
8 This step is required to start the RB Purge fan.
9 or 13 One of these steps is required to stop the RB Purge fan and isolate the RB.
9 or 13 One of these steps is required to stop the RB Purge fan and isolate the RB.


h   CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
h CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS RCS temperature = 114&deg;F RCS pressure = 45 psig No Gaseous or Liquid releases are in progress RB Hatch is Closed Continuous release is NOT in progress RB Purge startup is in progress using OP/1/A/1102/014 (RB Purge System), Encl.
INITIAL CONDITIONS RCS temperature = 114&deg;F RCS pressure = 45 psig No Gaseous or Liquid releases are in progress RB Hatch is Closed Continuous release is NOT in progress RB Purge startup is in progress using OP/1/A/1102/014 (RB Purge System), Encl. 4.1 (RB Purge Release)
4.1 (RB Purge Release)
INITIATING CUE The CRS directs you to place the RB Purge in operation at 1/3 Station Limit using OP/1/A/1102/014 (RB Purge System) Encl. 4.1 (RB Purge Release) starting at Step 3.8.
INITIATING CUE The CRS directs you to place the RB Purge in operation at 1/3 Station Limit using OP/1/A/1102/014 (RB Purge System) Encl. 4.1 (RB Purge Release) starting at Step 3.8.


NLO-100 R0 - i Page 1 of 7     REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE
NLO-100 R0 - i Page 1 of 7 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE NLO-100 Trip the Reactor from the Control Rod Drive Breakers CANDIDATE EXAMINER


NLO-100  Trip the Reactor from the Control Rod Drive Breakers CANDIDATE    EXAMINER NLO-100 R0 - i Page 2 of 7   REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: Trip the Reactor from the Control Rod Drive Breakers Alternate Path:
NLO-100 R0 - i Page 2 of 7 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
No       Facility JPM #:
Trip the Reactor from the Control Rod Drive Breakers Alternate Path:
Modified K/A Rating(s):
No Facility JPM #:
System:    EPE 029 K/A:     EA1.11 Rating:     3.9*/4.1 Task Standard:
Modified K/A Rating(s):
System:    EPE 029 K/A:       EA1.11 Rating:   3.9*/4.1 Task Standard:
Both 600 volt CRD breakers are opened.
Both 600 volt CRD breakers are opened.
 
Preferred Evaluation Location:                                   Preferred Evaluation Method:
Preferred Evaluation Location:
Simulator __ ___ In-Plant ___X ___                               Perform _____ Simulate __ X__
Preferred Evaluation Method:
Simulator
__ ___ In-Plant ___X ___     Perform _____ Simulate __ X__


==References:==
==References:==


Unit 3 EOP Rule 1 (ATWS/Unanticipated Nuclear Power Production
Unit 3 EOP Rule 1 (ATWS/Unanticipated Nuclear Power Production)
Validation Time:
Validation Time: 4 min.                                                 Time Critical: NO
4 min.       Time Critical:
====================================================================================
N O ====================================================================================
Candidate:      _______________________________________                Time Start: _______________
NAME                                    Time Finish: ______________
Performance Rating: SAT ______ UNSAT ______                              Performance Time: _________
Examiner: ______________________________          ___________________________________/_________
NAME                                    SIGNATURE                    DATE
====================================================================================
Comments


Candidate:
NLO-100 R0 - i Page 3 of 7 SIMULATOR OPERATOR INSTRUCTIONS:
_______________________________________
NONE
Time Start: ____
___________    NAME      Time Finish: ______________
Performance Rating:
SAT ______ UNSAT ______
Performance Time
: _________
Examiner: ______________________________          ___________________________________/____
_____    NAME      SIGNATURE                            DATE
====================================================================================
Comments NLO-100 R0 - i Page 3 of 7 SIMULATOR OPERATOR INSTRUCTIONS:
NONE NLO-100 R0 - i Page 4 of 7  Tools/Equipment/Procedures Needed:
None  READ TO OPERATOR DIRECTIONS TO STUDENT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you hav e completed your assigned task return the handout sheet I provided you.


NLO-100 R0 - i Page 4 of 7 Tools/Equipment/Procedures Needed:
None READ TO OPERATOR DIRECTIONS TO STUDENT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit 3 is at 100% power
Unit 3 is at 100% power The reactor should have tripped.
Rule 1 (ATWS/Unanticipated Nuclear Power Production) in progress INITIATING CUE:
The OATC directs you to open 600V CRD breakers (without wearing Arc Flash PPE):
* 3X9-5C (U-3 CRD Trip Bkr A) (U3 Equipment Rm)
* 2X2-5D (U-3 CRD Alternate Fdr Bkr) (T-3/Fa-28)


The reactor should have tripped.
NLO-100 R0 - i Page 5 of 7 START TIME: _______
 
CRITICAL STEP STEP 1:     Open 3X9-5C (U-3 CRD Trip Bkr A) (U3 Equipment Rm)
Rule 1 (ATWS/Unanticipated Nuclear Power Production) in progress
___ SAT STANDARD:    Locates and opens 3X9-5C by rotating switch to the trip position.
 
COMMENTS:
INITIATING CUE:
___ UNSAT CRITICAL STEP STEP 2:      Open 2X2-5D (U-3 CRD Alternate Fdr Bkr) (T-3/Fa-28)
The OATC directs you to open 600V CRD breakers (without wearing Arc Flash PPE
STANDARD:    Locates and opens 2X2-5D by rotating switch to the trip position. ___ SAT COMMENTS:
):    3X9-5C (U-3 CRD Trip Bkr A) (U3 Equipment Rm) 2X2-5D (U-3 CRD Alternate Fdr Bkr) (T
END OF TASK                                        ___ UNSAT TIME STOP: ________
-3/Fa-28)  


NLO-100 R0 - i Page 5 of 7 START TIME: _______  STEP 1: Open 3X9-5C (U-3 CRD Trip Bkr A) (U3 Equipment Rm)   STANDARD: Locates and opens 3X9-5C by rotating switch to the trip position.
NLO-100 R0 - i Page 6 of 7 CRITICAL STEP EXPLANATIONS STEP #                                          Explanation This step is required to trip the reactor.
COMMENTS:    CRITICAL STEP
2  This step is required to trip the reactor.


___ SAT
i CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
___ UNSAT  STEP 2: Open 2X2-5D (U-3 CRD Alternate Fdr Bkr) (T
-3/Fa-28)  STANDARD: Locates and opens 2X2-5D by rotating switch to the trip position.
COMMENTS:    END OF TASK CRITICAL STEP
___ SAT
___ UNSAT  TIME STOP: ________
 
NLO-100 R0 - i Page 6 of 7      CRITICAL STEP EXPLANATIONS STEP # Explanation 1 This step is required to trip the reactor.
2 This step is required to trip the reactor.
 
i    CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit 3 is at 100% power The reactor should have tripped.
Unit 3 is at 100% power The reactor should have tripped.
Rule 1 (ATWS/Unanticipated Nuclear Power Production) in progress INITIATING CUE:
The OATC directs you to open 600V CRD breakers (without wearing Arc Flash PPE):
* 3X9-5C (U-3 CRD Trip Bkr A) (U3 Equipment Rm)
* 2X2-5D (U-3 CRD Alternate Fdr Bkr) (T-3/Fa-28)


Rule 1 (ATWS/Unanticipated Nuclear Power Production) in progress
NLO-606 R0 - j Page 1 of 8 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE NLO-606 Makeup to Unit 1 CBAST from Unit 1 & 2 BAMT During a Unit 2 Blackout CANDIDATE EXAMINER
 
INITIATING CUE:
 
The OATC directs you to open 600V CRD breakers (without wearing Arc Flash PPE
):    3X9-5C (U-3 CRD Trip Bkr A) (U3 Equipment Rm) 2X2-5D (U-3 CRD Alternate Fdr Bkr) (T
-3/Fa-28)
NLO-606 R0 - j Page 1 of 8     REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE
 
NLO-606   Makeup to Unit 1 CBAST from Unit 1 & 2 BAMT During a Unit 2 Blackout
 
CANDIDATE   EXAMINER NLO-606 R0 - j Page 2 of 8  REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE  Task: Makeup to Unit 1 CBAST From Unit 1 & 2 BAMT during a Unit 2 blackout  Alternate Path:
No      Facility JPM #:


New K/A Rating(s):
NLO-606 R0 - j Page 2 of 8 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
System:
Makeup to Unit 1 CBAST From Unit 1 & 2 BAMT during a Unit 2 blackout Alternate Path:
B/WE14 K/A:     EA1.1 Rating:
No Facility JPM #:
3.8/3.6 Task Standard:
New K/A Rating(s):
Makeup to Unit 1 CBAST from Unit 1 & 2 BAMT in accordance with Unit 2 EOP Encl. 5.39
System:   B/WE14 K/A:       EA1.1 Rating:   3.8/3.6 Task Standard:
.
Makeup to Unit 1 CBAST from Unit 1 & 2 BAMT in accordance with Unit 2 EOP Encl. 5.39.
Preferred Evaluation Location:
Preferred Evaluation Location:                                       Preferred Evaluation Method:
Preferred Evaluation Method:
Simulator __ ___ In-Plant ___X ___                                   Perform _____ Simulate __ X__
Simulator
__ ___ In-Plant ___X ___     Perform _____ Simulate __ X__


==References:==
==References:==


Unit 2 EOP Encl. 5.39 (Makeup to the BWST During Blackout)
Unit 2 EOP Encl. 5.39 (Makeup to the BWST During Blackout)
Validation Time:
Validation Time: 12 min.                                                     Time Critical: No
12 min.       Time Critical:
====================================================================================
No ====================================================================================
Candidate:      _______________________________________                    Time Start: _______________
NAME                                          Time Finish: ______________
Performance Rating: SAT ______ UNSAT ______                                  Performance Time: _________
Examiner: ______________________________            ___________________________________/_________
NAME                                        SIGNATURE                    DATE
====================================================================================
Comments
 
NLO-606 R0 - j Page 3 of 8 SIMULATOR OPERATOR INSTRUCTIONS:
NONE


Candidate:
NLO-606 R0 - j Page 4 of 8 Tools/Equipment/Procedures Needed:
_______________________________________
Time Start: ____
___________    NAME      Time Finish: ______________
Performance Rating:
SAT ______ UNSAT ______
Performance Time
: _________
Examiner: ______________________________          ___________________________________/____
_____    NAME      SIGNATURE DATE ====================================================================================
Comments NLO-606 R0 - j Page 3 of 8  SIMULATOR OPERATOR INSTRUCTIONS:
NONE NLO-606 R0 - j Page 4 of 8 Tools/Equipment/Procedures Needed:
Unit 2 EOP Encl. 5.39 (Makeup to the BWST During Blackout)
Unit 2 EOP Encl. 5.39 (Makeup to the BWST During Blackout)
READ TO OPERATOR DIRECTIONS TO STUDENT:
READ TO OPERATOR DIRECTIONS TO STUDENT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
A blackout is in progress on Oconee Unit 2 EOP Enclosure 5.39 (Makeup to the BWST During Blackout) is in progress and is complete up thru Step 16.
A blackout is in progress on Oconee Unit 2 EOP Enclosure 5.39 (Makeup to the BWST During Blackout) is in progress and is complete up thru Step 16.
It is necessary to pump the BAMT to Unit 1's CBAST The BAMT is filled and mixed and ready to be transferred INITIATING CUE:
It is necessary to pump the BAMT to Unit 1s CBAST The BAMT is filled and mixed and ready to be transferred INITIATING CUE:
The CRS directs you to continue with EOP Enclosure 5.39 (Makeup to the BWST During Blackout) beginning at Step 17 to transfer the entire contents of the BAMT to Unit 1s CBAST using the B LP Boric Acid Pump


The CRS directs you to continue with EOP Enclosure 5.39 (Makeup to the BWST During Blackout) beginning at St ep 1 7 to transfer the entire contents of the BAMT to Unit 1's CBAST using the B LP Boric Acid Pump
NLO-606 R0 - j Page 5 of 8 START TIME: _______
STEP 1:          Step 17                                                                  CRITICAL STEP Locally perform the following (A-1, 1&2 BAMT Rm):
0B A. Close CA-38 (Unit 1/2 HP Boric Acid Pump Suction Tell Tale).
1B                                                                  ___ SAT B. Open the following:
4B
* CA-4 (Unit 1/2 BAMT Outlet)
___ UNSAT
* CA-20 (Boric Acid Hdr To CBAST)
STANDARD:
2B                  Locate and Close CA-38 (Unit 1/2 HP Boric Acid Pump Suction Tell Tale).
Locate and open:
* CA-4 (Unit 1/2 BAMT Outlet)
* CA-20 (Boric Acid Hdr To CBAST)
Cue: Inform the candidate that CA-38 is closed and CA-4 and CA-20 are open.
COMMENTS:
STEP 2:          Step 18 Verify B LP Boric Acid Pump will be used for transfer of BAMT to CBAST.
___ SAT STANDARD:        Determine that B LP Boric Acid Pump will be used for transfer of BAMT to CBAST using the cue sheet.
___ UNSAT COMMENTS:
STEP 3:          Step 19                                                                CRITICAL STEP Locally open CA-11 (A/B LP BAMT Pumps Disch Tie) (A-1, 1&2 BAMT Rm).
___ SAT STANDARD:        Locate and open CA-11 Cue: Inform the candidate that CA-11 is open.                                              ___ UNSAT COMMENTS:
STEP 4:          Step 20                                                                CRITICAL STEP Locally start B LP Boric Acid Pump (A-2, 1&2 Chem Add Panel).
___ SAT STANDARD:        Start B LP Boric Acid Pump by taking the switch to the start position.
COMMENTS:
___ UNSAT


NLO-606 R0 - j Page 5 of 8 START TIME: _______
NLO-606 R0 - j Page 6 of 8 STEP 5:         Step 21 Locally cycle DW-119 (Boric Acid Mix Pumps Suction Hdr Flush) (A-1,
STEP 1: Step 17 0BLocally perform the following (A
___ SAT 1&2 BAMT Rm).
-1, 1&2 BAMT Rm):
STANDARD:         Candidate cycles DW-119 fully open and then fully closed.
A. 1BClose CA-38 (Unit 1/2 HP Boric Acid Pump Suction Tell Tale).
___ UNSAT Note: This is a quarter turn valve and a stop has to be pulled out ot allow the valve to operate.
B. 4BOpen the following:
COMMENTS:
CA-4 (Unit 1/2 BAMT Outlet)
STEP 6:         Step 22 Notify Units 1 and 2 to monitor for reactivity effects due to possible leakage of 1&2 BAMT into LDST.
CA-20 (Boric Acid Hdr To CBAST) 2BSTANDARD: Locate and Close CA
___ SAT STANDARD:         Candidate notifies Units 1 and 2 to monitor for possible reactivity effects.
-38 (Unit 1/2 HP Boric Acid Pump Suction Tell Tale). Locate and open:  CA-4 (Unit 1/2 BAMT Outlet)
COMMENTS:                                                                                         ___ UNSAT STEP 7:         Step 23                                                                        CRITICAL STEP Locally perform the following (A-2, 1&2 Chem Add Panel):
CA-20 (Boric Acid Hdr To CBAST)
3B
Cue: Inform the candidate that CA
* Place Unit 1&2 BAMT Heater switch in OFF.
-38 is closed and CA
5B
-4 and CA-20 are open.
COMMENTS:     CRITICAL STEP
___ SAT
___ UNSAT  STEP 2: Step 18 Verify B LP Boric Acid Pump will be used for transfer of BAMT to CBAST. STANDARD: Determine that B LP Boric Acid Pump will be used for transfer of BAMT to CBAST using the cue sheet.
COMMENTS:           ___ SAT        ___ UNSAT STEP 3: Step 19 Locally open CA-11 (A/B LP BAMT Pumps Disch Tie) (A
-1, 1&2 BAMT Rm). STANDARD: Locate and open CA-11  Cue: Inform the candidate that C A-11 is open. COMMENTS:    CRITICAL STEP
___ SAT
___ SAT
___ UNSAT  STEP 4: Step 2 0  Locally start B LP Boric Acid Pump (A
* Stop Unit 1&2 BAMT Agitator.
-2, 1&2 Chem Add Panel).
STANDARD:         Candidate places the Unit 1&2 BAMT Heater switch to the OFF position          ___ UNSAT and turns the Unit 1 & 2 BAMT Agitator to the STOP position (spring return to neutral).
STANDARD: Start B LP Boric Acid Pump by taking the switch to the start position.
COMMENTS:    CRITICAL STEP
___ SAT        ___ UNSAT NLO-606 R0 - j Page 6 of 8  STEP 5: Step 2 1  Locally cycle DW
-119 (Boric Acid Mix Pumps Suction Hdr Flush) (A
-1, 1&2 BAMT Rm).
STANDARD: Candidate cycles DW
-119 fully open and then fully closed.
Note: This is a quarter turn valve and a stop has to be pulled out ot allow the valve to operate.
COMMENTS:        ___ SAT        ___ UNSAT STEP 6: Step 22  Notify Units 1 and 2 to monitor for reactivity effects due to possible leakage of 1&2 BAMT into LDST.
STANDARD: Candidate notifies Units 1 and 2 to monitor for possible reactivity effects.
COMMENTS:
COMMENTS:
___ SAT        ___ UNSAT  STEP 7: Step 2 3  3BLocally perform the following (A
STEP 8:           Step 24                                                                      CRITICAL STEP WHEN transfer is complete, THEN locally stop the selected LP Boric Acid Pump (A-2, 1&2 Chem Add Panel).
-2, 1&2 Chem Add Panel):
___ SAT STANDARD:         Determine that the transfer is complete and stop the B LP Boric Acid Pump.
5BPlace Unit 1&2 BAMT Heater switch in OFF.
___ UNSAT Cue: Indicate that BAMT level is zero inches.
Stop Unit 1&2 BAMT Agitator.
STANDARD: Candidate places the Unit 1&2 BAMT Heater switch to the OFF position and turns the Unit 1 & 2 BAMT Agitator to the STOP position (spring return to neutral).
COMMENTS:    CRITICAL STEP
 
___ SAT        ___ UNSAT  STEP 8: Step 2 4  WHEN transfer is complete, THEN locally stop the selected LP Boric Acid Pump (A
-2, 1&2 Chem Add Panel). STANDARD: Determine that the transfer is complete and stop the B LP Boric Acid Pump. Cue: Indicate that BAMT level is zero inches.
 
COMMENTS:
COMMENTS:
END OF TASK CRITICAL STEP
END OF TASK TIME STOP: ________
___ SAT
___ UNSAT  TIME STOP: ________


NLO-606 R0 - j Page 7 of 8       CRITICAL STEP EXPLANATIONS STEP # Explanation 1 This step is required to align the BAMT to Unit 1's CBAST. 3 This step is required to align the BAMT to Unit 1's CBAST. 4 This step is required to start the B Boric Acid Pump.
NLO-606 R0 - j Page 7 of 8 CRITICAL STEP EXPLANATIONS STEP #                                         Explanation 1   This step is required to align the BAMT to Unit 1s CBAST.
7 This step is required to prevent equipment damage.
3   This step is required to align the BAMT to Unit 1s CBAST.
8 This step is required to prevent equipment damage.
4   This step is required to start the B Boric Acid Pump.
7   This step is required to prevent equipment damage.
8   This step is required to prevent equipment damage.


j   CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
j CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
INITIAL CONDITIONS:
A blackout is in progress on Oconee Unit 2 EOP Enclosure 5.39 (Makeup to the BWST During Blackout) is in progress and is complete up thru Step 16.
A blackout is in progress on Oconee Unit 2 EOP Enclosure 5.39 (Makeup to the BWST During Blackout) is in progress and is complete up thru Step 16.
It is necessary to pump the BAMT to Unit 1's CBAST The BAMT is filled and mixed and ready to be transferred INITIATING CUE:
It is necessary to pump the BAMT to Unit 1s CBAST The BAMT is filled and mixed and ready to be transferred INITIATING CUE:
The CRS directs you to continue with EOP Enclosure 5.39 (Makeup to the BWST During Blackout) beginning at Step 17 to transfer the entire contents of the BAMT to Unit 1s CBAST using the B LP Boric Acid Pump


The CRS directs yo u to continue with EOP Enclosure 5.39 (Makeup to the BWST During Blackout) beginning at St ep 1 7 to transfer the entire contents of the BAMT to Unit 1's CBAST using the B LP Boric Acid Pump
NLO-802 R0 - k Page 1 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE NLO-802 Start Diesel Air Compressor and Align to Service Air Header CANDIDATE:
EXAMINER:


NLO-802 R0 - k Page 1 of 12   REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE
NLO-802 R0 - k Page 2 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Start Diesel Air Compressor and Align to Service Air Header Alternate Path:
Yes Facility JPM #:
NLO-007 K/A Rating(s):
System: APE 065 K/A:      AA1.04 Rating: 3.5*/3.4*
Task Standard:
The Diesel Air Compressor NOT operating is started and aligned to the Service Air Header correctly per procedure.
Preferred Evaluation Location:                                          Preferred Evaluation Method:
Simulator _____ In-Plant __X___                                          Perform _____ Simulate __X__


NLO-802  Start Diesel Air Compressor and Align to Service Air Header
==References:==
 
CANDIDATE:    EXAMINER:
NLO-802 R0 - k Page 2 of 12  REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:  Start Diesel A ir Compressor and Align to Service Air H eader  Alternate Path:
Yes  Facility JPM #:
NLO-007  K/A Rating(s):
 
System: APE 065 K/A:  AA1.04 Rating:    3.
5*/3.4*  Task Standard:


The Diesel Air Compressor NOT operating is started and aligned to the Service Air Header correctly per procedure.
AP/2/A/1700/022 (Loss of Instrument Air) Encl. 5.4 (Emergency Start of the Diesel Air Compressor)
Preferred Evaluation Location:
AP/2/A/1700/022 (Loss of Instrument Air) Encl. 5.7 (Manual Start of Diesel Air Compressors)
Preferred Evaluation Method:
Validation Time: 20 minutes                                              Time Critical: NO
Simulator _____ In-Plant __X___      Perform _____ Simulate __X__ 
======================================================================================
Candidate:       _______________________________________                            Time Start: _____________
NAME                                                Time Finish: _____________
Performance Rating: SAT ______ UNSAT ______                                      Performance Time: __________
Examiner: ______________________________              ____________________________________/________
NAME                                            SIGNATURE                    DATE
======================================================================================
COMMENTS


==References:==
NLO-802 R0 - k Page 3 of 12 SIMULATOR OPERATOR INSTRUCTIONS:
None


AP/2/A/1700/0 22 (Loss of Instrument Air) Encl. 5.4 (Emergency Start of the Diesel Air Compressor)
NLO-802 R0 - k Page 4 of 12 Tools/Equipment/Procedures Needed:
AP/2/A/1700/
AP/2/A/1700/022 (Loss of Instrument Air) Encl. 5.4 (Emergency Start of the Diesel Air Compressor)
0 22 (Loss of Instrument Air) Encl. 5.7 (Manual Start of Diesel Air Compressors)
AP/2/A/1700/022 (Loss of Instrument Air) Encl. 5.7 (Manual Start of Diesel Air Compressors)
Validation Time:
20 minutes      Time Critical:
N O ======================================================================================
Candidate:
_______________________________________
Time Start:
_____________    NAME  Time Finish:
_____________  Performance Rating:  SAT ______ UNSAT ______
Performance Time
: __________
Examiner: ______________________________          ____________________________________/________
NAME      SIGNATURE                            DATE
======================================================================================
COMMENTS NLO-802 R0 - k Page 3 of 12  SIMULATOR OPERATOR INSTRUCTIONS:
None NLO-802 R0 - k Page 4 of 12 Tools/Equipment/Procedures Needed:
AP/2/A/1700/
0 22 (Loss of Instrument Air) Encl. 5.4 (Emergency Start of the Diesel Air Compressor)
AP/2/A/1700/
0 22 (Loss of Instrument Air) Encl. 5.7 (Manual Start of Diesel Air Compressors)
READ TO OPERATOR DIRECTION TO TRAINEE:
READ TO OPERATOR DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
 
Units 1, 2, and 3 are operating at 100% power.
Units 1, 2, and 3 are operating at 100% power.
 
The Unit 1 Control Room Operator receives the "INSTRUMENT AIR SYSTEM TROUBLE" Statalarm and observes that Instrument Air pressure is decreasing on the Control Room IA pressure gauge.
The Unit 1 Control Room Operator receives the "INSTRUMENT AIR SYSTEM TROUBLE" Statalarm and observes that Instrument Air pressure is decreasing on the Control Room IA pressure gauge.
INITIATING CUES:
INITIATING CUES:
The Unit 2 Control Room Operator directs you to perform Encl. 5.4 (Emergency Start of the Diesel Air Compressor) of AP/2/A/1700/022 (Loss Of Instrument Air).


The Unit 2 Control Room Operator directs you to perform Encl. 5.4 (Emergency Start of the Diesel Air Compressor) of AP/2/A/1700/
NLO-802 R0 - k Page 5 of 12 START TIME: _______
022 (Loss Of Instrument Air).
Note: The procedure is pre-staged at the Diesel Air Compressor. After the candidate locates the procedure, hand him a copy of the procedure to use.
NOTE Ingersoll-Rand Diesel Air Compressor SNs 340574, 339718 and 339713 have Auto Start      ___ SAT capability.
STEP 1:        Encl. 5.4 Step 1
___ UNSAT Verify all Diesel Air Compressors with Auto / Manual switches in Auto are running.
STANDARD:      Determine that Ingersoll-Rand Diesel Air Compressor SN 340574 is in AUTO and NOT operating and perform RNO step.
Cue:  Indicate to the operator that Ingersoll-Rand Diesel Air Compressor SN 340574 is in AUTO and NOT operating. (No noise, RPMs, or discharge pressure) and the other two compressors are in AUTO and operating.
COMMENTS:
ALTERNATE PATH
___ SAT STEP 2:        Encl. 5.4 Step 1 RNO Perform one manual start on each Diesel Air Compressor that did NOT Auto start using Encl 5.7 (Manual Start of Diesel Air Compressors).
___ UNSAT STANDARD:      Perform a manual start on Ingersoll-Rand Diesel Air Compressor SN 340574 using Encl 5.7 (Manual Start of Diesel Air Compressors).
COMMENTS:


NLO-802 R0 - k Page 5 of 12  START TIME: _______
NLO-802 R0 - k Page 6 of 12 STEP 3:   Encl. 5.7 Step 1 GO TO applicable step to manually start Diesel Air Compressor:           ___ SAT Compressor             Step Ingersoll-Rand (Auto start         2 capability) SNs 340574,                                         ___ UNSAT 339718 and 339713 Ingersoll-Rand (5421)             10 Any other Diesel Air             19 Compressor STANDARD: Note the compressor that did not start from the table (340574) and GO TO Step 2.
Note: The procedure is pre
COMMENTS:
-staged at the Diesel Air Compressor. After the candidate locates the procedure, hand him a copy of the procedure to use.
STEP 4:   Encl. 5.7 Step 2                                                       CRITICAL STEP Position Auto / Manual toggle switch to Manual.
NOTE Ingersoll-Rand Diesel Air Compressor SN s 340574 , 339718 and 339713 have Auto Start capability.
___ SAT STANDARD: Locate and position Auto / Manual toggle switch to Manual.
STEP 1:  Encl. 5.4 Step 1 Verify all Diesel Air Compressors with Auto / Manual switches in Auto are running. STANDARD: Determine that Ingersoll-Rand Diesel Air Compressor SN 340574 is in AUTO and NOT operating and perform RNO step.
___ UNSAT COMMENTS:
Cue: Indicate to the operator that Ingersoll-Rand Diesel Air Compressor SN 340574 is in AUTO and NOT operating. (No noise, RPMs, or discharge pressure) and the other two compressors are in AUTO and operating.
STEP 5:  Encl. 5.7 Step 3 Ensure Battery Switch is in ON position (Behind panel door on West side  ___ SAT of Diesel Air Compressor).
COMMENTS:              ___ SAT
STANDARD: Open panel door on West side of compressor and ensure the battery        ___ UNSAT Switch is in ON position.
___ UNSAT  ALTERNATE PATH STEP 2:  Encl. 5.4 Step 1 RNO Perform one manual start on each Diesel Air Compressor that did NOT Auto start using Encl 5.7 (Manual Start of Diesel Air Compressors).
STANDARD: Perform a manual start on Ingersoll-Rand Diesel Air Compressor SN 340574 using Encl 5.7 (Manual Start of Diesel Air Compressors).
COMMENTS:              ___ SAT
___ UNSAT NLO-802 R0 - k Page 6 of 12   STEP 3: Encl. 5.7 Step 1 GO TO applicable step to manually start Diesel Air Compressor:
Compressor Step Ingersoll-Rand (Auto start capability) SNs 340574, 339718 and 339713 Ingersoll-Rand (5421) 10 Any other Diesel Air Compressor 19  STANDARD: Note the compressor that did not start from the table (340574) and GO TO Step 2. COMMENTS:    
 
___ SAT
___ UNSAT  STEP 4: Encl. 5.7 Step 2 Position Auto / Manual toggle switch to Manual.
STANDARD: Locate and position Auto / Manual toggle switch to Manual.
COMMENTS:
COMMENTS:
CRITICAL STEP
___ SAT        ___ UNSAT  STEP 5:  Encl. 5.7 Step 3 Ensure Battery Switch is in ON position (Behind panel door on West side of Diesel Air Compressor).
STANDARD: Open panel door on West side of compressor and ensure the battery Switch is in ON position.
COMMENTS:   
___ SAT 


___ UNSAT NLO-802 R0 - k Page 7 of 12   NOTE Engine ignition switch has 3 positions, STOP, ON, and ENGINE START.
NLO-802 R0 - k Page 7 of 12 NOTE Engine ignition switch has 3 positions, STOP, ON, and ENGINE START.                         ___ SAT The engine ignition switch must be ON to have panel indication. All warning lamps will illuminate briefly to test the lamps: the Low Engine Oil Pressure light and the Low Battery
The engine ignition switch must be ON to have panel indication. All warning lamps will illuminate briefly to test the lamps: the Low Engine Oil Pressure light and the Low Battery Voltage light will remain flashing until the engine is started.
___ UNSAT Voltage light will remain flashing until the engine is started.
Control panel display will display 1.70 when engine ignition switch is turned to the ON position and then clear, if no fault is present.
Control panel display will display 1.70 when engine ignition switch is turned to the ON position and then clear, if no fault is present.
The (LAMPS) switch may be used to illuminate the panel for night operation.
The (LAMPS) switch may be used to illuminate the panel for night operation.
STEP 6: Encl. 5.7 Step 4 Position engine ignition switch to ON.
STEP 6:           Encl. 5.7 Step 4 Position engine ignition switch to ON.
STANDARD: Position engine ignition switch to ON (already ON).
STANDARD:         Position engine ignition switch to ON (already ON).
COMMENTS:
COMMENTS:
___ SAT
CAUTION                                         CRITICAL STEP The engine starter motor should NOT be operated continuously for more than 10 seconds.                                                                                     ___ SAT STEP 7:           Encl. 5.7 Step 5 Position engine ignition switch to ENGINE START position until engine     ___ UNSAT starts, then release.
___ UNSAT  CAUTION The engine starter motor should NOT be operated continuously for more than 10 seconds. STEP 7: Encl. 5.7 Step 5 Position engine ignition switch to ENGINE START position until engine starts, then release.
STANDARD:         Position engine ignition switch to ENGINE START position after verifying that engine start release switch.
STANDARD: Position engine ignition switch to ENGINE START position after verifying that engine start release switch.
Examiner Cue: Indicate that the compressor starts when engine ignition switch is placed in the ENGINE START position.
Examiner Cue: Indicate that the compressor starts when engine ignition switch is placed in the ENGINE START position
* RPMs increase
. RPMs increase Oil pressure increases Air pressure increases COMMENTS:         CRITICAL STEP
* Oil pressure increases
___ SAT        ___ UNSAT NLO-802 R0 - k Page 8 of 12  STEP 8:  Encl. 5.7 Step 6 Depress PRESSURE CONTROL button to allow compressor to load fully. STANDARD: Locate and depress PRESSURE CONTROL pushbutton. Cue: Indicate to the candidate that the compressor is loaded by the change in the sound.
* Air pressure increases COMMENTS:
COMMENTS:        CRITICAL STEP
___ SAT        ___ UNSAT  STEP 9:  Encl. 5.7 Step 7 Open SA-2955; SERVICE AIR VALVE (South end of compressor at discharge hose)
. STANDARD: Locate and verify SA-2955 is open by observing the handle parallel with the hose. COMMENTS:     


___ SAT
NLO-802 R0 - k Page 8 of 12 STEP 8:        Encl. 5.7 Step 6                                                        CRITICAL STEP Depress PRESSURE CONTROL button to allow compressor to load fully.                                                                  ___ SAT STANDARD:      Locate and depress PRESSURE CONTROL pushbutton.
___ UNSAT  STEP 10: Encl. 5.7 Step 8 Locate check valve at end of compressor discharge hose and open associated block valve per table below:
___ UNSAT Cue:   Indicate to the candidate that the compressor is loaded by the change in the sound.
Check Valve Block Valve SA-2944 SA-2797 SA-2947 SA-2945 SA-2950 SA-2948 STANDARD: Verify SA-2948 is open by observing the handle parallel with the hose and then GO TO Encl. 5.4 Step 2.
COMMENTS:
STEP 9:        Encl. 5.7 Step 7 Open SA-2955; SERVICE AIR VALVE (South end of compressor at              ___ SAT discharge hose).
STANDARD:      Locate and verify SA-2955 is open by observing the handle parallel with  ___ UNSAT the hose.
COMMENTS:
STEP 10:       Encl. 5.7 Step 8 Locate check valve at end of compressor discharge hose and open         ___ SAT associated block valve per table below:
Check Valve       Block Valve
___ UNSAT SA-2944             SA-2797 SA-2947             SA-2945 SA-2950             SA-2948 STANDARD:     Verify SA-2948 is open by observing the handle parallel with the hose and then GO TO Encl. 5.4 Step 2.
COMMENTS:
COMMENTS:
___ SAT
___ UNSAT NLO-802 R0 - k Page 9 of 12  STEP 11:  Encl. 5.4 Step 2 Position Auto / Manual toggle switches to Manual for all running Diesel Air Compressors.
STANDARD: Position Auto / Manual toggle switches to Manual for ALL Ingersoll-Rand Diesel Air Compressor
: s. COMMENTS:     


___ SAT
NLO-802 R0 - k Page 9 of 12 STEP 11:        Encl. 5.4 Step 2 Position Auto / Manual toggle switches to Manual for all running Diesel    ___ SAT Air Compressors.
___ UNSAT   STEP 12: Encl. 5.4 Step 3 Verify any Diesel Air Compressor running.
STANDARD:        Position Auto / Manual toggle switches to Manual for ALL Ingersoll-Rand
STANDARD: Determine that ALL Diesel Air Compressors are running by observing RPMs, discharge pressure, etc.
___ UNSAT Diesel Air Compressors.
Cue: Indicate that the compressor s ha ve normal RPMs and discharge pressure.
COMMENTS:
STEP 12:         Encl. 5.4 Step 3 Verify any Diesel Air Compressor running.                                 ___ SAT STANDARD:       Determine that ALL Diesel Air Compressors are running by observing RPMs, discharge pressure, etc.                                             ___ UNSAT Cue: Indicate that the compressors have normal RPMs and discharge pressure.
COMMENTS:
NOTE When the SA system is operational, SA-141 (SA TO IA CONTROLLER) automatically regulates IA header pressure to 85 psig if IA pressure decreases to < 85 psig. Opening SA-143 will bypass SA-141 and allow the SA header to pressurize the IA header greater      ___ SAT than 85 psig.
During some SA tag outs for maintenance, SA-143 may be red tagged closed. If SA-143 is red tagged closed, then the Diesel Air Compressors will already be aligned (via an      ___ UNSAT alternate flow path) to supply directly into the IA system and opening SA-143 is not required.
STEP 13:        Encl. 5.4 Step 4 Verify SA-143 (SA TO IA CONTROLLER BYPASS) (T-1/L-33, 15 E on chain) is red tagged closed.
STANDARD:        Valve is located in the Turbine Building basement and determine that it is not red tagged closed. Continue to the RNO step.
COMMENTS:
COMMENTS:
___ SAT
___ UNSAT  NOTE When the SA system is operational, SA
-141 (SA TO IA CONTROLLER) automatically regulates IA header pressure to 85 psig if IA pressure decreases to  <
85 psig. Opening SA-143 will bypass SA
-141 and allow the SA header to pressurize the IA header greater than 85 psig.
During some SA tag outs for maintenance, SA
-143 may be red tagged closed. If SA
-143 is red tagged closed, then the Diesel Air Compressors will already be aligned (via an alternate flow path) to supply directly into the IA system and opening SA
-143 is not required. STEP 1 3:  Encl. 5.4 Step 4 Verify SA-143 (SA TO IA CONTROLLER BYPASS) (T-1/L-33, 15' E on chain) is red tagged closed.
STANDARD: Valve is located in the Turbine Building basement and determine that it is not red tagged closed
. Continue to the RNO step. COMMENTS: 


___ SAT        ___ UNSAT NLO-802 R0 - k Page 10 of 12   STEP 14: Encl. 5.4 Step 4 RNO Open SA-143 (SA TO IA CONTROLLER BYPASS) (T-1/L-33, 15' E on chain)   STANDARD: SA-143 chain is pulled to rotate the valve counter clockwise until it reaches a hard stop.
NLO-802 R0 - k Page 10 of 12 STEP 14:     Encl. 5.4 Step 4 RNO Open SA-143 (SA TO IA CONTROLLER BYPASS) (T-1/L-33, 15 E on
Cue: After the operator indicates that he will open SA
___ SAT chain)
-143, inform operator that valve is open COMMENTS:
STANDARD:     SA-143 chain is pulled to rotate the valve counter clockwise until it reaches a hard stop.                                                 ___ UNSAT Cue: After the operator indicates that he will open SA-143, inform operator that valve is open COMMENTS:
___ SAT        ___ UNSAT    STEP 1 4: Encl. 5.4 Step 5 Notify Unit 2 CR of Diesel Air Compressor status. STANDARD: Unit 2 CR is notified that ALL Diesel Air Compressors are operating using a phone or radio.
STEP 14:     Encl. 5.4 Step 5 Notify Unit 2 CR of Diesel Air Compressor status.
Cue: Inform the candidate that another operator will continue with this procedure.
___ SAT STANDARD:     Unit 2 CR is notified that ALL Diesel Air Compressors are operating using a phone or radio.
COMMENTS:     END TASK
___ UNSAT Cue: Inform the candidate that another operator will continue with this procedure.
___ SAT        ___ UNSAT STOP TIME: ____________
COMMENTS:
END TASK STOP TIME: ____________


NLO-802 R0 - k Page 11 of 12 CRITICAL STEP EXPLANATIONS:
NLO-802 R0 - k Page 11 of 12 CRITICAL STEP EXPLANATIONS:
STEP # Explanation 4 Required to manually start compressor 7 Required to manually start compressor 8 Required to manually start compressor
STEP #                                       Explanation 4   Required to manually start compressor 7   Required to manually start compressor 8   Required to manually start compressor


k   CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
k CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Units 1, 2, and 3 are operating at 100% power.
Units 1, 2, and 3 are operating at 100% power.
 
The Unit 1 Control Room Operator receives the "INSTRUMENT AIR SYSTEM TROUBLE" Statalarm and observes that Instrument Air pressure is decreasing on the Control Room IA pressure gauge.
The Unit 1 Control Room Operator receives the "INSTRUMENT AIR SYSTEM TROUBLE" Statalarm and observes that Instrument Air pressure is decreasing on the Control Room IA pressure gauge.
INITIATING CUES:
INITIATING CUES:
 
The Unit 2 Control Room Operator directs you to perform Encl. 5.4 (Emergency Start of the Diesel Air Compressor) of AP/2/A/1700/022 (Loss Of Instrument Air).}}
The Unit 2 Control Room Operator directs you to perform Encl. 5.4 (Emergency Start of the Diesel Air Compressor) of AP/2/A/1700/
022 (Loss Of Instrument Air).}}

Latest revision as of 14:53, 4 November 2019

Initial Exam 2013-301 Draft Sim IN-Plant JPMs
ML13248A030
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 09/04/2013
From:
NRC/RGN-II
To:
Duke Energy Carolinas
References
50-269/13-301, 50-270/13-301, 50-287/13-301
Download: ML13248A030 (127)


Text

CRO-106 R0 - a Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-106 Place Spare Deborating IX in Service CANDIDATE EXAMINER

CRO-106 R0 - a Page 2 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Place the Spare Deborating IX in service for purification Alternate Path:

No Facility JPM #:

CRO-106 K/A Rating(s):

System: 004 K/A: A4.17 Rating: 2.7/2.7 Task Standard:

Perform OP/1/A/1103/004 C (Deborating IXs) Encl. 4.9 (Spare Deborating IX For RCS Purification (Rx At Power))

to place the Spare Deborating IX in service.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator __ X __ In-Plant __ ___ Perform __X___ Simulate ____

References:

OP/1/A/1103/004 C (Deborating IXs) Encl. 4.9 (Spare Deborating IX For RCS Purification (Rx At Power))

Validation Time: 15 minutes Time Critical: NO

========================================================================

Candidate: _______________________________________ Time Start: _________

NAME Time Finish: ________

Performance Rating: SAT ______ UNSAT ______ Performance Time: _________

Examiner: ______________________________ ____________________________________/________

NAME SIGNATURE DATE

========================================================================

COMMENTS

CRO-106 R0 - a Page 3 of 9 SIMULATOR OPERATOR INSTRUCTIONS:

Consider providing a copy of OP/1/A/1103/004 C, Deborating IXs to allow a review of limits and precautions prior to entering the simulator area. This will prevent using simulator time to perform this review.

1. Recall Snap 205 (3% IC), BOL,
2. Import files for CRO-106.
3. Update boron status board RCS = 1771 ppmb, A BHUT = 1950 ppmb
4. Verify ICS in Auto (diamond and both FDW Masters).
5. If not already done, provide a copy of OP/1/A/1103/004 C, Deborating IXs. and a working copy of Encl. 4.9, (Spare Deborating IX for RCS Purification)
6. Put completed IX status log and component boron log for the letdown filter to be place in service in appropriate logbooks.
7. Ensure reactivity management controls are established in the control room.
8. Ensure blank cover on 1CS-32/37
9. Go to Run

CRO-106 R0 - a Page 4 of 9 Tools/Equipment/Procedures Needed:

OP/1/A/1103/004 C (Deborating IXs) Encl. 4.9 (Spare Deborating IX For RCS Purification (Rx At Power))

Demineralizer Log Sheet for Spare Deb IX Component Boron Concentration Log Sheet for 1B Letdown Filter READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 startup in progress following a refueling outage Unit 1 Power = 3% stable for the past 45 mins.

Unit 1 RCS Boron = 1771 ppm Primary Chemistry requests that the Spare Deborating IX be placed in service for RCS purification for the next two (2) hrs.

The Spare Deborating IX is loaded with cation resin.

Unit 2 & 3 are at 100%.

INITIATING CUES:

The Unit 1 CR SRO directs you to Place the Spare Deborating IX in service for RCS purification per OP/1/A/1103/004 C (Deborating IXs) Encl. 4.9 (Spare Deborating IX For RCS Purification (Rx At Power)) starting at step 2.4.

CRO-106 R0 - a Page 5 of 9 START TIME: _______

NOTE: Placing an idle Letdown Filter in service can affect core reactivity by adding 60 gals of water at a different boron concentration. {5} {6} (R.M.)

STEP 1: Step 2.4 IF two Letdown Filters are available AND NOT already in service,

___ SAT perform the following: (1A Letdown Filter is not is service) 2.4.1 Review Component Boron Log for out-of-service Letdown Filter boron.

2.4.2 Determine RCS boron based on placing second Letdown Filter in ___ UNSAT service.

2.4.3 RCS boron ____1771___ ppm 2.4.4 IF RCS makeup is required to achieve acceptable boron, determine RCS makeup sources and volumes per OP/1/A/1103/004 (Soluble Poison Control). (not required)

STANDARD: Candidate reviews the Component Boron Log for the 1A Letdown Filter and determines that: it will have no affect on RCS boron, additional makeup is NOT required, and that acceptable RCS boron will exist.

COMMENTS:

STEP 2: Step 2.5 Perform one of the following (for all applicable steps 2.1 through 2.4):

_____ Verify acceptable RCS boron. ___ SAT SRO

_____ Ensure appropriate RCS makeup plans determined to ensure SRO acceptable boron.

___ UNSAT STANDARD: Candidate has SRO sign the first block because all boron concentrations are acceptable.

Examiner Cue: Sign the first block and inform the candidate to proceed to the next step COMMENTS:

CRO-106 R0 - a Page 6 of 9 STEP 3: Step 2.6 IF two Letdown Filters are available AND NOT already in service, perform the following: ___ SAT

  • Ensure 1HP-17 (1A LETDOWN FILTER INLET) switch to "OPEN"
  • Ensure 1HP-18 (1B LETDOWN FILTER INLET) switch to "OPEN"

___ UNSAT STANDARD: Candidate opens: 1HP-18 (already open) and 1HP-17 (must be opened); placing 1A Letdown Filter in service COMMENTS:

STEP 4: Step 2.7 IF RCS makeup is required to ensure acceptable boron, makeup per OP/1/A/1103/004 (Soluble Poison Control). ___ SAT STANDARD: Candidate determines RCS makeup is not required and proceeds to step 2.8

___ UNSAT COMMENTS:

NOTE: Anytime IX is placed in service CRD movement may result. (R.M.)

STEP 5: Step 2.8 ___ SAT WHILE placing Spare Deborating IX in service, monitor the following indications: (R.M.)

  • Appropriate ranged NIs ___ UNSAT
  • Primary tank levels
  • Neutron error
  • CRD position STANDARD: Candidate begins monitoring all above indications. No unexpected changes will occur.

COMMENTS:

CRO-106 R0 - a Page 7 of 9 STEP 6: Step 2.9

  • CRITICAL STEP Align Spare Deborating IX for service:
  • Verify closed 1CS-27 (DEBOR IX INLET). ___ SAT
  • *Ensure closed 1CS-26 (LETDOWN TO RC BHUT).
  • *Open 1CS-32 & 37 (SPARE DEBOR IX INLET & OUTLET).

___ UNSAT

  • Verify 1HP-15 Controller in "MANUAL".
  • *Open 1HP-16 (LDST MAKEUP ISOLATION).

STANDARD: The candidate performs the above items to align the Spare Deb IX:

  • Verify closed 1CS-27 (already closed).
  • Ensure closed 1CS-26 (LETDOWN TO RC BHUT).
  • Open 1CS-32 & 37 (SPARE DEBOR IX INLET & OUTLET).
  • Verify 1HP-15 Controller in "MANUAL". (already in manual)
  • Open 1HP-16 (LDST MAKEUP ISOLATION).

COMMENTS:

STEP 7: Step 2.10 CRITICAL STEP Position 1HP-14 (LDST BYPASS) to "BLEED" to place Spare Deborating IX in service.

___ SAT STANDARD: The candidate positions 1HP-14 (LDST BYPASS) to "BLEED".

Examiner Cue: Given time for the candidate to monitor indications from step 10, and when he begins to inform chemistry, tell him another operator will continue ___ UNSAT with this procedure.

COMMENTS:

END TASK STOP TIME: ____________

CRO-106 R0 - a Page 8 of 9 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 6 Aligns the Spare Deborating IX 7 Initiates flow through the Spare Deborating IX

a CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Unit 1 startup in progress following a refueling outage Unit 1 Power = 3% stable for the past 45 mins.

Unit 1 RCS Boron = 1771 ppm Primary Chemistry requests that the Spare Deborating IX be placed in service for RCS purification for the next two (2) hrs.

The Spare Deborating IX is loaded with cation resin.

Unit 2 & 3 are at 100%.

INITIATING CUES:

The Unit 1 CR SRO directs you to Place the Spare Deborating IX in service for RCS purification per OP/1/A/1103/004 C (Deborating IXs) Encl. 4.9 (Spare Deborating IX For RCS Purification (Rx At Power)) starting at step 2.4.

CRO-204 R0 - b Page 1 of 15 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-204 ES Recovery CANDIDATE EXAMINER

CRO-204 R0 - b Page 2 of 15 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

ES Recovery Alternate Path:

No Facility JPM #:

CRO-204 K/A Rating(s):

System: 006 K/A: A4.08 Rating: 4.2/4.3 Task Standard:

ES Channels 1 and 2 are returned to normal using EOP Enclosure 5.41 (ES Recovery).

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator __X__ In-Plant __ ___ Perform __X___ Simulate ____

References:

EOP Encl. 5.41 (ES Recovery)

Validation Time: 15 minutes Time Critical: NO

========================================================================

Candidate: _______________________________________ Time Start: _________

NAME Time Finish: ________

Performance Rating: SAT ______ UNSAT ______ Performance Time: _________

Examiner: ______________________________ ____________________________________/________

NAME SIGNATURE DATE

========================================================================

COMMENTS

CRO-204 R0 - b Page 3 of 15 SIMULATOR OPERATOR INSTRUCTIONS:

1. Recall Snap 206
2. Go to Run

CRO-204 R0 - b Page 4 of 15 Tools/Equipment/Procedures Needed:

EOP Encl. 5.41 (ES Recovery)

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

A transient has occurred.

The Reactor has tripped ES Channels 1 and 2 have actuated on low RCS pressure.

EOP Encl. 5.1 (ES Actuation) is in progress.

The OSM concurs that reset of ES Channels 1 and 2 is desired.

INITIATING CUES:

The SRO directs you to perform EOP Encl. 5.41 (ES Recovery).

The OSM has directed that Keowee Hydro Unit Shutdown is NOT desired.

CRO-204 R0 - b Page 5 of 15 START TIME: _______

NOTE Technical Specification entry is required when any ES component is in Manual while ES signal is present or ES Voters are in OVERRIDE. These conditions are exited when all ___ SAT channels are reset.

STEP 1: Step 1 WHEN all the following exist: ___ UNSAT

  • ES Channels have actuated
  • Condition causing ES Channel actuation has cleared
  • ES Channel reset is desired
  • OSM concurs THEN continue.

STANDARD: Determine ES Channels 1 and 2 have actuated by observing the White and Blue lights of Channels 1 and 2 on the Status Control Panel. Also Statalarms 1SA-1/A-10 (ES CHANNEL 1 TRIP and 1SA-1/B-10 (ES CHANNEL 1 TRIP) are illuminated.

Determine that RCS pressure is now above ES Channel 1 and 2 actuation setpoint (1600 psig).

Determine the OSM concurs.

Continue to Step 2.

COMMENTS:

STEP 2: Step 2 Verify reset of any of the following is desired:

___ SAT

  • ES Channel 1
  • ES Channel 2

___ UNSAT STANDARD: Determine reset of ES Channels 1 & 2 and Diverse HPI is desired by data on the cue sheet.

Continue to step 3 COMMENTS:

CRO-204 R0 - b Page 6 of 15 STEP 3: Step 3 Verify the following Stat Alarms have cleared:

___ SAT

STANDARD: Candidate determines that the above Statalarms located on 1SA-7 are not illuminated.

Continue to Step 4.

COMMENTS:

STEP 4: Step 4 CRTICAL STEP Perform the following to reset ES (1UB1):

___ SAT

  • Depress RESET for CH 1.
  • Depress RESET for CH 2.

___ UNSAT STANDARD: Depress digital channel RESET pushbuttons for the Channels 1 and 2 located on 1UB1.

Continue to Step 5.

COMMENTS:

STEP 5: Step 5 Verify Diverse HPI Bypass BISTABLE TRIPPED light is off.

___ SAT STANDARD: Candidate verifies Diverse HPI Bypass BISTABLE TRIPPED light is off.

Continue to Step 6.

___ UNSAT COMMENTS:

CRO-204 R0 - b Page 7 of 15 STEP 6: Step 6 CRITICAL STEP Perform the following to reset Diverse HPI: ___ SAT

  • Depress BYPASS.
  • Depress ENABLE.

___ UNSAT STANDARD: Candidate depresses BYPASS and ENABLE for Diverse HPI.

Continue to Step 7.

COMMENTS:

STEP 7: Step 7 Verify both Statalarms are off:

___ SAT

___ UNSAT STANDARD: Candidate verifies both Statalarms are off.

Continue to Step 8.

COMMENTS:

STEP 8: Step 8 Depress RESET on the DIVERSE HPI OVERRIDE switch.

___ SAT STANDARD: Candidate depresses RESET.

Continue to Step 9. ___ UNSAT COMMENTS:

CRO-204 R0 - b Page 8 of 15 STEP 9: Step 9 Verify:

___ SAT

  • CH 1 TRIPPED light off
  • CH 2 TRIPPED light off
  • DIVERSE HPI OVERRIDE light off STANDARD: Candidate verifies above lights are off ___ UNSAT Continue to Step 10.

COMMENTS:

STEP 10: Step 10 Dispatch an operator to perform Enclosure (SSF Restoration) of AP/1/A/1700/042 (Inadvertent ES Actuation). ___ SAT STANDARD: Candidate calls kitchen to dispatch an operator to perform Enclosure (SSF Restoration) of AP/42. ___ UNSAT Continue to Step 11.

Booth Cue: Inform candidate that an operator has been dispatched with Enclosure SSF Restoration, COMMENTS:

STEP 11: Step 11 Verify both exist:

___ SAT Keowee Hydro shutdown is desired.

OSM concurs STANDARD: Candidate determines from cue that Keowee Hydro shutdown is not desired. ___ UNSAT Continue to Step 11 RNO.

Examiner Cue: If asked, inform the candidate that Keowee Hydro shutdown is not desired (Information also provided in the Initiating Cue).

COMMENTS:

CRO-204 R0 - b Page 9 of 15 STEP 12: Step 11 RNO

  • GO TO Step 23

___ SAT STANDARD: Continue to Step 23.

___ UNSAT COMMENTS:

STEP 13: Step 23 Stop the 1C HPI Pump.

___ SAT STANDARD: Verifies that 1C HPI Pump is NOT operating by observing the red ON light not illuminated and no amps are indicated.

Continue to Step 24. ___ UNSAT COMMENTS:

STEP 14: Step 24 Open 1HP-27.

___ SAT STANDARD: Verifies 1HP-27 located on 1UB1 is open by observing the red OPEN light is lit or OAC indication.

Continue to Step 25. ___ UNSAT COMMENTS:

STEP 15: Step 25 Close 1HP-409.

___ SAT STANDARD: Verifies 1HP-409 located on 1UB1 is closed by observing the green CLOSED light is lit or OAC indication.

Continue to Step 26. ___ UNSAT COMMENTS:

CRO-204 R0 - b Page 10 of 15 NOTE The following steps will reset HPI pump ES logic.

___ SAT STEP 16: Step 26 Verify 1A HPI PUMP operating.

STANDARD: Determines that the 1A HPI pump is operating by observing the red on ___ UNSAT light is lit and normal amps are indicated.

Continue to Step 27.

COMMENTS:

STEP 17: Step 27 CRITICAL STEP Perform the following: ___ SAT A. Ensure 1A HPI PUMP switch in AUTO.

B. Place 1A HPI PUMP switch to ON.

___ UNSAT C. Ensure 1B HPI PUMP switch to OFF.

D. Place 1B HPI PUMP switch to AUTO.

STANDARD: Position the switch for the 1A HPI pump to AUTO and then to the ON position.

Position the switch for the 1B HPI pump to OFF and then to the AUTO position.

Continue to Step 28.

COMMENTS:

CRO-204 R0 - b Page 11 of 15 STEP 18: Step 28 Verify both of the following breakers open:

___ SAT

  • SL-1 CT5 STBY BUS 1 FEEDER
  • SL-2 CT5 STBY BUS 2 FEEDER

___ UNSAT STANDARD: Verifies SL-1 and SL-2 located on 2AB3 are open by observing the green OPEN light is illuminated.

Continue to Step 29.

COMMENTS:

STEP 19: Step 29 Verify both:

___ SAT CC system operating with CC TOTAL FLOW > 575 gpm.

RCP seal injection flow is between 6 and 12 gpm/RCP.

___ UNSAT STANDARD: Candidate verifies CC flow >575 gpm by observing flow gauge on panel 1AB3.

Candidate verifies RCP seal injection flow 6-12 gpm/RCP by observing gauges on panel 1VB3, or OAC indications.

Continue to Step 30.

COMMENTS:

CRO-204 R0 - b Page 12 of 15 STEP 20: Step 30 Perform the following: ___ SAT A. Open:

  • 1HP-230 STANDARD: Candidate verifies open the following valves:
  • 1HP-20 red open light lit on the status control panel
  • 1HP-21 red open light lit on 1UB1

Continue to Step 31.

COMMENTS:

CRO-204 R0 - b Page 13 of 15 STEP 21: Step 31 CRITICAL STEP Restore RB RIAs as follows:

___ SAT A. Open:

___ UNSAT

  • 1PR-10 B. Start the RB RIA sample pump from the ENABLE CONTROLS screen on the RIA View Node as follows.
1) Click on the Sample pump OFF icon.
2) WHEN "Processing Request" dialog is complete, THEN click on the Sample pump ON icon.

STANDARD: Open 1PR-7 and 1PR-9 on ES Channel 1 RZ Module by depressing the red OPEN push button. Verify the red OPEN light illuminates.

Open 1PR-8 and 1PR-10 on ES Channel 2 RZ Module by depressing the red OPEN push button. Verify the red OPEN light illuminates.

Select ENABLE CONTROLS screen on the RIA View Node.

Click on the Sample pump OFF icon.

WHEN Processing Request dialog is complete, THEN click on the Sample pump ON icon Cue: Another RO will complete Enclosure 5.41, this JPM is complete COMMENTS:

END TASK STOP TIME: ____________

CRO-204 R0 - b Page 14 of 15 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 4 This step is required to reset the ES channels.

6 This step is required to reset Diverse HPI.

17 This step is required to reset the 1A and 1B HPI pump.

21 This step is required to return the RB RIAs to service.

b CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

A transient has occurred.

The Reactor has tripped ES Channels 1 and 2 have actuated on low RCS pressure.

EOP Encl. 5.1 (ES Actuation) is in progress.

The OSM concurs that reset of ES Channels 1 and 2 is desired.

INITIATING CUES:

The SRO directs you to perform EOP Encl. 5.41 (ES Recovery).

The OSM has directed that Keowee Hydro Unit Shutdown is NOT desired.

CRO-303 R0 - c Page 1 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-303 Perform Required Actions for a Failed LPI Train CANDIDATE EXAMINER

CRO-303 R0 - c Page 2 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Perform Required Actions For A Failed LPI Train Alternate Path:

Yes Facility JPM #:

CRO-004 K/A Rating(s):

System: EPE 011 K/A: EA1.04 Rating: 4.4/4.4 Task Standard:

1C LPI pump is aligned and started. Time-critical clock starts when the second LPI pump fails to start and stops when 1C LPI pump is started.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator __X__ In-Plant __ ___ Perform __X___ Simulate ____

References:

EOP Encl. 5.1 (ES Actuation)

Validation Time: 10 minutes Time Critical: YES

========================================================================

Candidate: _______________________________________ Time Start: _________

NAME Time Finish: ________

Performance Rating: SAT ______ UNSAT ______ Performance Time: _________

Examiner: ______________________________ ____________________________________/________

NAME SIGNATURE DATE

========================================================================

COMMENTS

CRO-303 R0 - c Page 3 of 12 SIMULATOR OPERATOR INSTRUCTIONS:

1. Recall Snap 207
2. Import files for CRO-303
3. Call up BWST Level (SHOWDIG O1P1600) on OAC screen
4. Go to Run and acknowledge alarms
5. Go to Freeze
6. Go to Run when directed by lead examiner
7. IMMEDIATELY Fire Timer 1

CRO-303 R0 - c Page 4 of 12 Tools/Equipment/Procedures Needed:

EOP Encl. 5.1 (ES Actuation)

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

A LOCA is in progress and RCS Pressure has stabilized at 1000 psig ES Channels 1-6 have actuated on high RB pressure Steam Generator levels are being raised to the Loss of Subcooling Margin setpoint by another Reactor Operator EOP Encl. 5.1(ES Actuation) has been completed up to Step 122 Rule 2 (Loss of SCM) is complete INITIATING CUES:

The Control Room SRO instructs you to continue in Encl. 5.1 (ES Actuation) and respond to plant conditions.

THIS JPM IS TIME CRITICAL

CRO-303 R0 - c Page 5 of 12 START TIME: _______

STEP 1: Step 122 REFER TO Enclosure 5.1 IAAT Steps prior to Step 122.

___ SAT STANDARD: Checks IAAT steps to determine if any apply Determines that IAAT Step 3 now applies

___ UNSAT Continue to Step 3.

COMMENTS:

STEP 2: Step 3 IAAT additional ES actuation setpoints are exceeded,

___ SAT THEN perform Steps 1 - 2.

STANDARD: Determines that ES Channels 7 and 8 have actuated

___ UNSAT Continue to Step 1.

COMMENTS:

STEP 3: Step 1 Determine all ES channels that should have actuated based on RCS pressure and RB pressure. ___ SAT Actuation Associated ES Setpoint (psig) Channel ___ UNSAT 1600 (RCS) 1&2 550 (RCS) 3&4 3 (RB) 1, 2, 3, 4, 5, & 6 10 (RB) 7&8 STANDARD: Determines that ES Channels 7 and 8 have actuated.

Continue to Step 2.

COMMENTS:

CRO-303 R0 - c Page 6 of 12 STEP 4: Step 2 Verify all ES channels associated with actuation setpoints have actuated.

___ SAT STANDARD: Determine ES Channels 7 & 8 have actuated by observing tripped lights on UB1 are illuminated.

Continue to Step 122. ___ UNSAT COMMENTS:

STEP 5: Step 122 REFER TO Enclosure 5.1 IAAT Steps prior to Step 122.

___ SAT STANDARD: Checks IAAT steps to determine if any apply Determines that IAAT Step 89 now applies Continue to Step 89. ___ UNSAT COMMENTS:

STEP 6: Step 89 IAAT RCS pressure is < LPI pump shutoff head, THEN perform Steps 90 - 91. ___ SAT STANDARD: Determine that RCS pressure is < LPI pump shutoff head. (less than 180 psig) ___ UNSAT Continue to Step 90.

COMMENTS:

CRO-303 R0 - c Page 7 of 12 STEP 7: Step 90 Perform the following:

___ SAT

  • Start 1A LPI Pump

___ UNSAT STANDARD: Determine that 1LP-17 is open by observing the Red open light is lit located on 1UB2.

Places 1A LPI Pump switch to START and observes Red lights remains off and white light on.

Continue to Step 20 RNO.

Note: 1A LPI Pump fails to start COMMENTS:

ALTERNATE PATH STEP 8: Step 90 RNO ___ SAT Stop 1A LPI Pump Close 1LP-17

___ UNSAT STANDARD: Determine the1A LPI Pump is stopped by observing the green off light lit and close 1LP-17 located on 1UB2.

Continue to Step 91 COMMENTS:

CRO-303 R0 - c Page 8 of 12 STEP 9: Step 91 Perform the following: ___ SAT

  • Start 1B LPI Pump

___ UNSAT STANDARD: Determine that 1LP-18 is open by observing the red open light is lit located on 1UB2.

Places 1B LPI pump switch to START and observes Red lights remain off and white light on.

Continue to Step 91 RNO.

TIME CRITICAL clock Starts:________

Note: 1B LPI Pump fails to start. Required completion time to start 1C LPI Pump is 60 minutes from failure of 1B LPI Pump.

COMMENTS:

ALTERNATE PATH STEP 10: Step 91 RNO ___ SAT Stop 1B LPI Pump Close 1LP-18 STANDARD: Determine the1B LPI Pump is stopped by observing the green off ___ UNSAT light lit and close 1LP-18 located on 1UB2.

Continue to Step 122 COMMENTS:

CRO-303 R0 - c Page 9 of 12 STEP 11: Step 122 REFER TO Enclosure 5.1 IAAT Steps prior to Step 122.

___ SAT STANDARD: Checks IAAT steps to determine if any apply Determines that IAAT Step 92 now applies Continue to Step 92. ___ UNSAT COMMENTS:

STEP 12: Step 92 IAAT 1A and 1B LPI PUMPs are off/tripped, ___ SAT AND all of the following exist

  • RCS pressure < LPI pump shutoff head
  • 1LP-20 closed THEN perform Steps 93 - 94.

STANDARD: Student determines the following:

  • RCS pressure is < LPI pump shutoff head and

Continue to Step 93 COMMENTS:

CRO-303 R0 - c Page 10 of 12 STEP 13: Step 93 *CRITICAL STEP Open the following:

___ UNSAT

  • 1LP-21 and 1LP-22 STANDARD: Candidate opens the following valves (located on 1UB2) and verifies red open lights lit:
  • *1LP-9
  • *1LP-10
  • *1LP-6
  • *1LP-7
  • *1LP-18
  • *1LP-17 Candidate verifies red open lights lit for the following valves (located on 1UB2)::
  • 1LP-22 Continue to Step 94 COMMENTS:

STEP 14: Step 94 CRITICAL STEP Start 1C LPI Pump

___ SAT STANDARD: Start the 1C LPI Pump located on 1UB2. Verify the red on light is lit and the pump develops discharge pressure and flow.

___ UNSAT TIME CRITICAL clock Stopped:________

Examiner Note: 1C LPI pump must be started within 60 minutes of the 1B LPI pump failure to start.

COMMENTS:

Examiner Cue: Another operator will continue with this procedure END TASK STOP TIME: ____________

CRO-303 R0 - c Page 11 of 12 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 13 Necessary to align a suction source and a discharge flow path from the 1C LPI pump for its use since 1A and 1B LPI pumps are failed 14 Necessary to start the 1C LPI pump to provide LPI flow to the core (Must be completed within 60 minutes of A and B LPI pump failure.

c CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

A LOCA is in progress and RCS Pressure has stabilized at 1000 psig ES Channels 1-6 have actuated on high RB pressure Steam Generator levels are being raised to the Loss of Subcooling Margin setpoint by another Reactor Operator EOP Encl. 5.1(ES Actuation) has been completed up to Step 122 Rule 2 (Loss of SCM) is complete INITIATING CUES:

The Control Room SRO instructs you, to continue in Encl. 5.1 (ES Actuation) and respond to plant conditions.

THIS JPM IS TIME CRITICAL

CRO-409 R0 - d Page 1 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-409 Depressurize SGs and Feed with CBPs CANDIDATE EXAMINER

CRO-409 R0 - d Page 2 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Depressurize S/Gs and Feed With CBPs Alternate Path:

No Facility JPM #:

CRO-014 K/A Rating(s):

System: APE 054 K/A: AA1.01 Rating: 4.5/4.4 Task Standard:

Both OTSG's are depressurized and fed with the CBP's until RCS temperature is controlled while maintaining RCS pressure between 2300 psig and 1600 psig.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator __X__ In-Plant __ ___ Perform __X___ Simulate ____

References:

EOP Rule 3 (Loss of Main or Emergency FDW)

Validation Time: 12 minutes Time Critical: NO

========================================================================

Candidate: _______________________________________ Time Start: _________

NAME Time Finish: ________

Performance Rating: SAT ______ UNSAT ______ Performance Time: _________

Examiner: ______________________________ ____________________________________/________

NAME SIGNATURE DATE

========================================================================

COMMENTS

CRO-409 R0 - d Page 3 of 12 SIMULATOR OPERATOR INSTRUCTIONS

1. Recall Snap 208
2. Import files for CRO-409
3. Provide a clean copy of Rule 3 (Loss of Main or Emergency FDW) on the front board
4. Go to run when directed by lead examiner

CRO-409 R0 - d Page 4 of 12 Tools/Equipment/Procedures Needed:

EOP Rule 3, Loss of Main or Emergency FDW READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS The reactor has tripped.

The SRO directs you to perform a Symptom Check.

INITIATING CUES You are to respond to the plant conditions found during the Symptom Check.

CRO-409 R0 - d Page 5 of 12 START TIME: _______

STEP 1: Step 1 Perform a Symptoms Check

___ SAT STANDARD: Candidate ensures Power Range NIs are < 5% and decreasing.

Candidate ensures Subcooling Margin > 0°F.

___ UNSAT Candidate diagnoses a Loss of Heat Transfer and attempts to start available EFDW pumps per OMP 1-18.

Candidate requests concurrence to perform Rule 3.

Examiner Cue: As CRSRO, Concur with the performance of Rule 3.

Note: EFDW pumps will not start.

COMMENTS:

STEP 2: Rule 3 Step 1 Verify loss of Main FDW/EFDW is due to Turbine Building Flooding.

___ SAT STANDARD: Candidate determines that loss of Main/EFDW is not due to Turbine Building Flooding by determining that 2SA-18/A-11 (TURBINE BST WATER EMERGENCY HIGH LEVEL) in not illuminated and continues to

___ UNSAT Step 1 RNO.

COMMENTS:

STEP 3: Rule 3 Step 1 RNO GO TO Step 3.

___ SAT STANDARD: Candidate continues to Step 3

___ UNSAT COMMENTS:

CRO-409 R0 - d Page 6 of 12 STEP 4: Rule 3 Step 3 IAAT NO SGs can be fed with FDW (Main/CBP/Emergency), AND any of the following exist: ___ SAT

  • RCS pressure reaches 2300 psig OR NDT limit
  • Pzr level reaches 375 THEN PERFORM Rule 4 (Initiation of HPI Forced Cooling) ___ UNSAT STANDARD: Candidate determines that the IAAT step does not apply at this time and continues to Step 4.

COMMENTS:

STEP 5: Rule 3 Step 4 Start operable EFDW pumps, as required, to feed all intact SGs.

___ SAT STANDARD: Candidate determines that both SGs are intact and that no EFDW pumps will start and continues to Step 5.

___ UNSAT COMMENTS:

STEP 6: Rule 3 Step 5 Verify any EFDW pump operating.

___ SAT STANDARD: Candidate determines that no EFDW pump is operating and continues to Step 5 RNO.

___ UNSAT COMMENTS:

CRO-409 R0 - d Page 7 of 12 STEP 7: Rule 3 Step 5 RNO GO TO Step 7

___ SAT STANDARD: Candidate continues to Step 7

___ UNSAT COMMENTS:

STEP 8: Rule 3 Step 7 Place in MANUAL and close:

___ SAT

___ UNSAT STANDARD: Candidate locates 1FDW-315 and 1FDW-316 Moore controllers on 1UB1 and places them in manual.

Candidate closes 1FDW-315 and 1FDW-316 by reducing demand on the Moore controllers to zero.

Continues to Step 8.

Note: These valves may be operated simultaneously.

COMMENTS:

STEP 9: Rule 3 Step 8 Verify both:

___ SAT

  • Any CBP operating
  • TBVs available on an intact SG

___ UNSAT STANDARD: Candidate determines that CBPs are operating by observing light indication and pump amps located on 1AB1.

Candidate determines that both SGs are intact with TBVs available and continues to Step 9.

COMMENTS:

CRO-409 R0 - d Page 8 of 12 STEP 10: Rule 3 Step 9 CRITICAL STEP Select OFF for both digital channels on AFIS HEADER A

___ SAT STANDARD: Candidate locates AFIS Header A switches located on 1UB1 and depresses the OFF pushbutton for Channels 1 & 2.

Candidate continues to Step 10. ___ UNSAT COMMENTS:

STEP 11: Rule 3 Step 10 CRITICAL STEP Select OFF for both digital channels on AFIS HEADER B

___ SAT STANDARD: Candidate locates AFIS Header B switches located on 1UB1 and depresses the OFF pushbutton for Channels 1 & 2.

Candidate continues to Step 11. ___ UNSAT COMMENTS:

STEP 12: Rule 3 Step 11 CRITICAL STEP Place Startup Block valve control switch for all intact SGs in OPEN:

1A SG 1B SG ___ SAT 1FDW-33 1FDW-42 STANDARD: Candidate determines that both SGs are intact and locates the Startup ___ UNSAT Block valve switches on 1UB1 and rotates the switches to the OPEN position.

Candidate continues to Step 12.

COMMENTS:

CRO-409 R0 - d Page 9 of 12 STEP 13: Rule 3 Step 12 CRITICAL STEP Simultaneously position Startup Control valves 10 - 20% open on all intact SGs: ___ SAT 1A SG 1B SG 1FDW-35 1FDW-44 ___ UNSAT STANDARD: Candidate determines that both SGs are intact and locates the Startup Control valve controllers on 1UB1 and simultaneously places the controllers in manual.

Candidate positions Startup Control Valves 10 - 20% open.

Candidate continues to Step 13.

Note: Two handed operations are allowed for Startup Control valves.

COMMENTS:

STEP 14: Rule 3 Step 13 Perform the following:

___ SAT

  • Close 1FDW-41 STANDARD: Candidate locates the control switches for 1FDW-31 and 1FDW-40 on 1UB1 and places the switches in CLOSE.

Candidate locates the controllers for 1FDW-32 and 1FDW-41 on 1UB1 and places the controllers in manual and ensures demand is zero.

Candidate continues to Step 14.

COMMENTS:

CRO-409 R0 - d Page 10 of 12 STEP 15: Rule 3 Step 14 Verify Rule 4 (Initiation of HPI Forced Cooling) in progress.

___ SAT STANDARD: Candidate determines that Rule 4 is not in progress and continues to Step 14 RNO.

___ UNSAT COMMENTS:

STEP 16: Rule 3 Step 14 RNO CRITICAL STEP CAUTION

___ SAT Until SGs are dry, lower SG pressure slowly to prevent overcooling.

1. Lower SG pressure in available SGs to 500 psig.
2. Control FDW flow to stabilize RCS P/T by throttling the following as ___ UNSAT necessary:
  • Startup Control valves
3. Notify CR SRO that CBP feed is in progress.

STANDARD: Candidate locates the Bailey controllers for 1A and 1B Turbine Bypass Valves on 1UB1 and places the controllers in HAND by depressing the white HAND pushbuttons.

Candidate lowers SG pressure by using the raise/lower toggle switches on the 1A/1B TBVs to increase position demand to open the valves.

Candidate controls FDW flow to stabilize RCS P/T by throttling Startup Control valves (1FDW-35 and 1FDW-44) and throttles TBVs to control steam pressure at 500 psig.

Examiner Note: Once the candidate demonstrates that they have gained control of RCS P/T and has notified the CR SRO CBP feed is in progress, inform the Candidate another operator will continue with this procedure.

COMMENTS:

END OF TASK STOP TIME: ____________

CRO-409 R0 - d Page 11 of 12 CRITICAL STEP EXPLANATIONS STEP # Explanation 10 & 11 Steps prevent actuation of AFIS circuit which would block feed from the CBPs if actuated.

12 Step aligns flow path to the Startup FDW valves.

13 Step decreases Startup FDW valve position to prevent excessive flow while allowing feed to enter the SG.

16 Step required to decrease SG pressure to below shutoff head of the CBPs and throttle FDW flow to stabilize RCS P/T.

d CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS The reactor has tripped.

The SRO directs you to perform a Symptom Check.

INITIATING CUES You are to respond to the plant conditions found during the Symptom Check.

CRO-413 R0 - e Page 1 of 14 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-413 Initiate HPI Forced Cooling CANDIDATE EXAMINER

CRO-413 R0 - e Page 2 of 14 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Initiate HPI Forced Cooling Alternate Path:

Yes Facility JPM #:

CRO-019, CRO-020 K/A Rating(s):

System: EPE 074 K/A: EA1.08 Rating: 4.2/4.2 Task Standard:

Perform Rule 4 (Initiate HPI Forced Cooling).

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator __X___ In-Plant ___ __ Perform __X___ Simulate ____

References:

EOP Rule 3 (Loss of Main or Emergency FDW)

EOP Rule 4 (Initiate HPI Forced Cooling)

TCA #26, Initiate HPI Forced Cooling when required Validation Time: 3 minutes Time Critical: YES

========================================================================

Candidate: _______________________________________ Time Start: _________

NAME Time Finish: ________

Performance Rating: SAT ______ UNSAT ______ Performance Time: _________

Examiner: ______________________________ ____________________________________/________

NAME SIGNATURE DATE

========================================================================

COMMENTS

CRO-413 R0 - e Page 3 of 14 SIMULATOR OPERATOR INSTRUCTIONS:

1. Recall Snap 209
2. Import simulator files for CRO-413
3. Go to run when directed by lead examiner

CRO-413 R0 - e Page 4 of 14 Tools/Equipment/Procedures Needed:

EOP Rule 3 (Loss of Main or Emergency FDW)

EOP Rule 4 (Initiate HPI Forced Cooling)

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Unit 1 has tripped following a total loss of feedwater.
  • You have been performing Rule # 3 (Loss of Main or Emergency FDW) to regain heat transfer.
  • CBP feed could not be established and efforts to restore steam generator heat transfer per Rule # 3 have not been successful.
  • You are at the step 22 WHEN step in Rule 3 (Loss of Main or Emergency FDW).

INITIATING CUES:

The CR SRO directs you to review outstanding IAATs.

This JPM is Time Critical

CRO-413 R0 - e Page 5 of 14 START TIME: _______

STEP 1: The candidate determines that it is necessary to perform Rule 4 based on IAAT in Rule 3 or in OMP 1-18 STANDARD: Candidate announces the initiation of Rule 4. ___ SAT Examiner Cue: If requested, provide concurrence (as CR SRO) for initiation of Rule 4.

___ UNSAT EXAMINER NOTE: This starts the 5 minute Time critical time clock.

Time = ___________.

COMMENTS:

STEP 2: Step 1 Verify any HPI pump can be operated.

___ SAT STANDARD: The candidate recognizes one HPI pump is in operation.

COMMENTS:

___ UNSAT STEP 3: Step 2 CRITICAL STEP OPEN the following:

  • 1HP-25 STANDARD: The candidate: ___ UNSAT
  • Rotates 1HP-24 switch on 1UB1 to the OPEN position and observes that the red open light comes ON and the green closed light goes OFF.
  • Rotates 1HP-25 switch on 1UB1 to the OPEN position and observes that the red open light comes ON and the green closed light goes OFF.

COMMENTS:

CRO-413 R0 - e Page 6 of 14 STEP 4: Step 3 Start all available HPI pumps

___ SAT STANDARD: The candidate:

  • Starts any non-running HPI pump by the control switches located on 1UB1.

___ UNSAT

  • The running HPI pump amps are verified stable.

COMMENTS:

STEP 5: Step 4 OPEN the following:

  • Rotates and holds 1HP-26 switch on 1UB1 to the OPEN position ___ UNSAT Candidate notes that 1HP-26 did not open by observing the green CLOSED indication is still illuminated and the red OPEN light is extinguished.
  • Locates 1HP-27 ('1B' HP Injection) on 1UB1 and verifies red 'OPEN' indication is illuminated, and the green 'CLOSED' indication is extinguished,.

Examiner Note: 1HP-26 is failed closed.

COMMENTS:

STEP 6: Step 5 OPEN 1RC-4

___ SAT STANDARD: The candidate locates 1RC-4 control switch on 1UB1 and verifies that the red "OPEN" indication is illuminated and the green "CLOSED" indication is extinguished.

___ UNSAT Examiner Note: This valve should already be open COMMENTS:

CRO-413 R0 - e Page 7 of 14 STEP 7: Step 6 CRITICAL STEP VERIFY flow exists in any HPI header.

STANDARD: The candidate locates HPI Flow Train A and B flow meters on 1UB1.

___ SAT Loop B flow is verified.

COMMENTS:

___ UNSAT STEP 8: Step 7 CRITICAL STEP Perform the following:

A. Place 1RC-66 SETPOINT SELECTOR to OPEN

___ SAT B. Depress 1RC-66 OPEN PERMIT pushbutton STANDARD: The candidate:

  • Rotates 1RC-66 SETPOINT SELECTOR switch on 1UB1 to the OPEN ___ UNSAT position
  • Depresses 1RC-66 OPEN PERMIT pushbutton on 1UB1
  • Verifies PORV is open by verifying that the red "OPEN" indication is illuminated and the PORV Flow Statalarm (1SA18/A1) is in alarm.

EXAMINER NOTE: This stops the 5 minute Time Critical time clock.

Time = _____________.

COMMENTS:

STEP 9: Step 8 Verify at least two HPI pumps operating.

___ SAT STANDARD: The candidate verifies that three HPI pumps are operating.

COMMENTS:

___ UNSAT

CRO-413 R0 - e Page 8 of 14 STEP 10: Step 9 Verify flow in both HPI headers is in the acceptable region of Figure 1 (Required HPI Flow Per Header).

___ SAT STANDARD: The candidate verifies HPI flow in the B HPI header is in the acceptable region of Figure 1 below, but that there is no flow in HPI header A, so he proceeds to step 9 RNO. ___ UNSAT Examiner Note: Since 1HP-26 failed closed earlier, there is no flow in HPI header A, so the candidate must go to the RNO to open 1HP-410.

COMMENTS:

CRO-413 R0 - e Page 9 of 14 ALTERNATE PATH: CRITICAL STEP STEP 11: Step 9 RNO

1. IF 1A HPI header flow is unacceptable, THEN open 1HP-410.

___ SAT

2. IF 1B HPI header flow is unacceptable, THEN open 1HP-409.

STANDARD: The candidate determines that 1A HPI header flow is unacceptable and ___ UNSAT opens 1HP-410.

COMMENTS:

STEP 12: Step 10 Verify flow exists in any HPI header.

STANDARD: The candidate locates HPI Flow Train A and B flow meters on 1UB1. ___ SAT Loop A and Loop B flow is verified.

Examiner Note: This flow has already been verified in step 7

___ UNSAT COMMENTS:

STEP 13: Step 11 Perform the following:

A. Place 1RC-66 SETPOINT SELECTOR to OPEN B. Depress 1RC-66 OPEN PERMIT pushbutton ___ SAT STANDARD: The candidate verifies 1RC-66 open. These actions have already been taken in step 8:

___ UNSAT COMMENTS:

CRO-413 R0 - e Page 10 of 14 STEP 14: Step 12 Verify > one RCP operating.

___ SAT STANDARD: Candidate determines that all four RCPs are operating.

COMMENTS:

___ UNSAT NOTE: CRITICAL STEP 1A1 RCP provides the best Pzr spray and is preferred to be left running in case recovery from HPI forced cooling is performed and a Pzr bubble drawn.

STEP 15: Step 13

___ SAT Stop all but one RCP.

STANDARD: The candidate stops three RCPs by rotating their control switches to OFF ___ UNSAT position on the three of the four RCPs.

COMMENTS:

STEP 16: Step 14 IAAT the following limits are exceeded

___ SAT

___ UNSAT THEN throttle HPI to maximize flow flow limit.

STANDARD: The candidate verifies header flows less than the limits in the table above.

COMMENTS:

CRO-413 R0 - e Page 11 of 14 STEP 17: Step 15 CRITICAL STEP De-energize all PZR heaters.

STANDARD: The candidate: ___ SAT

  • Rotates the PZR heater bank #1 on 1UB1 switch to the "OFF" position.

___ UNSAT

  • Presses the OFF pushbutton controls for PZR heater banks 2, 3 and 4 on 1UB1 COMMENTS:

STEP 18: Step 16 CRITICAL STEP Close 1HP-5 (LETDOWN ISOLATION)

STANDARD: The candidate: ___ SAT

  • Rotates the switch for 1HP-5 on 1UB1 to the closed position.
  • Observes the red OPEN light go off and the green CLOSED light come on. ___ UNSAT COMMENTS:

STEP 19: Step 17 Close the following:

___ UNSAT STANDARD: Take the TBVs to HAND and reduce demand to zero using the toggle switch Take 1FDW-35 and 1FDW-44 to HAND and reduce demands to zero using the toggle switches.

COMMENTS:

CRO-413 R0 - e Page 12 of 14 STEP 20: Step 18 IAAT all HPI is lost, THEN:

A. Stop all RCPs ___ SAT B. Position 1RC-66 SETPOINT SELECTOR to HIGH STANDARD: The candidate verifies HPI is available and operating and the IAAT step does not apply at this time. ___ UNSAT COMMENTS:

STEP 21: Step 19 WHEN directed by CR SRO, THEN EXIT this rule.

___ SAT STANDARD: The candidate announces that Rule 4 is complete with outstanding IAATs and returns the Cue sheet to the examiner indicating he has completed his JPM.

___ UNSAT COMMENTS:

END TASK STOP TIME: ____________

CRO-413 R0 - e Page 13 of 14 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 3 Step is required provide proper system alignment for HPI forced cooling flow 7 Step is required to verify HPI flow available for forced cooling.

8 Step is required to open the PORV to initiate HPI forced cooling through the core (TCA #26).

11 Step required to allow flow in both HPI headers 15 Step required to limit the heat input to the RCS 17 Step required to limit the heat input to the RCS 18 Step required to Reduce the amount of heat energy added to the RB Containment

e CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • Unit 1 has tripped following a total loss of feedwater.
  • You have been performing Rule # 3 (Loss of Main or Emergency FDW) to regain heat transfer.
  • CBP feed could not be established and efforts to restore steam generator heat transfer per Rule # 3 have not been successful.
  • You are at the step 22 WHEN step in Rule 3 (Loss of Main or Emergency FDW).

INITIATING CUES:

The CR SRO directs you to review outstanding IAATs.

This JPM is Time Critical

CRO-507 R0 - f Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-507 Perform EOP Encl. 5.35 (Containment Isolation)

CANDIDATE EXAMINER

CRO-507 R0 - f Page 2 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Perform EOP Encl 5.35 (Containment Isolation)

Alternate Path:

Yes Facility JPM #:

CRO-503 K/A Rating(s):

System: 103 K/A: G2.1.23 Rating: 4.3/4.4 Task Standard:

Perform EOP Encl 5.35 (Containment Isolation).

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator ___ X___ In-Plant ___ ___ Perform __X___ Simulate __ __

References:

EOP Encl 5.35 (Containment Isolation)

Validation Time: 10 min. Time Critical: NO

========================================================================

Candidate: _______________________________________ Time Start: _______________

NAME Time Finish: ______________

Performance Rating: SAT ______ UNSAT ______ Performance Time: _________

Examiner: ______________________________ ___________________________________/_________

NAME SIGNATURE DATE

========================================================================

Comments

CRO-507 R0 - f Page 3 of 9 SIMULATOR OPERATOR INSTRUCTIONS

1. Recall Snap 210
2. Import Simulator files for CRO-507
3. Go to Run and Acknowledge alarms
4. Go to Freeze
5. Go to Run when directed by lead examiner

CRO-507 R0 - f Page 4 of 9 Tools/Equipment/Procedures Needed EOP Encl 5.35 (Containment Isolation)

READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS Unit 1 reactor trips from 100% power due to a spurious Main Turbine trip RCS leak of 190 gpm occurs as result of the trip EOP LOCA CD tab is in progress ES Actuation has NOT occurred INITIATING CUE The CR SRO directs you to perform EOP Encl 5.35 (Containment Isolation)

CRO-507 R0 - f Page 5 of 9 START TIME: _______

STEP 1: Step 1 Verify Encl 5.1 (ES Actuation) is in progress or complete.

STANDARD: Determine ES has NOT actuated and perform the RNO step. ___ SAT Continue to Step 1 RNO 1.

COMMENTS: ___ UNSAT STEP 2: Step 1 RNO 1. *CRITICAL STEP

1. Close the following ES operated RB isolation valves:

ES Chan 1 ES Chan 2 1HP-3 1HP-5 1HP-4*

1GWD-12 1GWD-13 1LWD-1 1LWD-2 ___ SAT 1CS-5 1CS-6 1PR-1 1PR-2 1PR-6 1PR-3 1PR-4 ___ UNSAT 1PR-5 1PR-7* 1PR-8*

1PR-9* 1PR-10*

1RC-5 1RC-7 1RC-6 1FDW-105 1FDW-106 1FDW-107 1FDW-108 1FDW-103 1FDW-104 STANDARD: The above valves are closed.

ALTERNATE PATH: 1HP-3 will NOT close.

Continue to Step 1 RNO 2.

COMMENTS:

CRO-507 R0 - f Page 6 of 9 STEP 3: Step 1 RNO 2. CRITICAL STEP

2. IF 1HP-3 fails to close, THEN close 1HP-1 STANDARD: Determine 1HP-3 is open by observing red open light on and green closed light off.

___ SAT Position 1HP-1 switch in closed position and verify green closed light on and red open light off.

Continue to Step 1 RNO 3. ___ UNSAT COMMENTS:

STEP 4: Step 1 RNO 3.

1. IF 1HP-4 fails to close, THEN close 1HP-2 STANDARD: Observe that 1HP-4 is closed with red light off and green light on. ___ SAT Continue to Step 1 RNO 4.

___ UNSAT COMMENTS:

STEP 5: Step 1 RNO 4.

2. IF 1HP-5 fails to close, THEN close 1HP-7 and 1HP-6 STANDARD: Observe that 1HP-5 is closed with red light off and green light on. ___ SAT Continue to Step 2.

___ UNSAT COMMENTS:

STEP 6: Step 2 Verify all RCPs off.

STANDARD: Determine that all RCPs are operating by observing red on light lit and

___ SAT RCP amps indicate normal. Perform RNO.

GO TO Step 5

___ UNSAT COMMENTS:

CRO-507 R0 - f Page 7 of 9 STEP 7: Step 5 *CRITICAL STEP Rotate switches to the closed position for the following components.

___ UNSAT STANDARD: Rotate the above switches to the closed position located on 1VB3.

Continue to Step 6 COMMENTS:

STEP 8: Step 6 Verify the following components indicate closed.

  • 1LPSW-1062 ___ SAT STANDARD: Verify the above valves indicate closed by observing the green closed light is lit located on 1VB3.

___ UNSAT Continue to Step 7 COMMENTS:

STEP 9: Step 7 EXIT this enclosure.

___ SAT STANDARD: Exit the enclosure.

COMMENTS:

___ UNSAT END OF TASK TIME STOP: ________

CRO-507 R0 - f Page 8 of 9 CRITICAL STEP EXPLANATIONS STEP # Explanation 2 This step is critical to isolate the Reactor Building.

3 This step is critical since 1HP-3 is failed open 1HP-1 isolates this pathway.

7 This step is critical to isolate the Reactor Building.

f CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS Unit 1 reactor trips from 100% power due to a spurious Main Turbine trip RCS leak of 190 gpm occurs as result of the trip EOP LOCA CD tab is in progress ES Actuation has NOT occurred INITIATING CUE The CR SRO directs you to perform EOP Encl 5.35 (Containment Isolation)

CRO-605 R0 - g Page 1 of 15 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-605 Energize Main Feeder Buses from CT-4 CANDIDATE EXAMINER

CRO-605 R0 - g Page 2 of 15 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Energize Main Feeder Buses From CT-4 Alternate Path:

No Facility JPM #:

CRO-007 K/A Rating(s):

System: EPE 055 K/A: EA2.03 Rating: 3.9/4.7 Task Standard:

Energize Main Feeder Buses from CT-4 Preferred Evaluation Location: Preferred Evaluation Method:

Simulator __X___ In-Plant ______ Perform __X__ Simulate _____

References:

EOP Encl 5.38 (Restoration of Power)

Validation Time: 15 minutes Time Critical: NO

========================================================================

Candidate: _______________________________________ Time Start: _________

NAME Time Finish: ________

Performance Rating: SAT ______ UNSAT ______ Performance Time: _________

Examiner: ______________________________ ____________________________________/________

NAME SIGNATURE DATE

========================================================================

COMMENTS

CRO-605 R0 - g Page 3 of 15 SIMULATOR OPERATOR INSTRUCTIONS:

1. Recall Snap 211
2. Import Files for CRO-605
3. Place simulator in Run and acknowledge alarms
4. Go to Freeze
5. Go to Run when directed by lead examiner

CRO-605 R0 - g Page 4 of 15 Tools/Equipment/Procedures Needed:

EOP Encl 5.38 (Restoration of Power)

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 experienced a lockout on CT-1 followed by a unit trip.

Keowee Unit 2 emergency Locks Out Blackout tab of the EOP is in progress The Blackout tab directs the initiation of Encl. 5.38 (Restoration of Power).

INITIATING CUES:

The CRS directs you to initiate Encl. 5.38 (Restoration of Power) to regain power to the Main Feeder Buses.

CRO-605 R0 - g Page 5 of 15 START TIME: _______

STEP 1: Step 1 Verify power has been restored.

___ SAT STANDARD: Determine power has NOT been restored by observing MFB voltage on 1AB1. Perform RNO step.

___ UNSAT COMMENTS:

STEP 2: Step 1 RNO GO TO Step 3.

___ SAT STANDARD: GO TO Step 3.

___ UNSAT COMMENTS:

STEP 3: Step 3 CRITICAL STEP Place 1HP-31 in HAND and reduce demand to 0.

___ SAT STANDARD: Place 1HP-31 in HAND and reduce demand to 0 using the toggle switch.

Located on 1UB1.

Continues to Step 4 ___ UNSAT COMMENTS:

STEP 4: Step 4 Close 1HP-21.

___ SAT STANDARD: Close 1HP-21 by rotating the switch to the close position and verifying the red open light goes out and the green closed light illuminates. Switch is located on 1UB2. ___ UNSAT Continues to Step 5 COMMENTS:

CRO-605 R0 - g Page 6 of 15 STEP 5: Step 5 Verify any of the following energized:

___ SAT

  • MFB1
  • MFB2

___ UNSAT STANDARD: Observes that zero (0) volts are indicated on both MFBs meters located on 1AB1 and performs RNO.

COMMENTS:

STEP 6: Step 5 RNO GO TO Step 8.

___ SAT STANDARD: GO TO Step 8.

___ UNSAT COMMENTS:

STEP 7: Step 8 Verify CT-1 indicates 4160 volts.

___ SAT STANDARD: Observes that zero (0) volts is indicated on CT-1 on 1AB1 and performs RNO.

___ UNSAT COMMENTS:

STEP 8: Step 8 RNO GO TO Step 18.

___ SAT STANDARD: GO TO Step 18.

___ UNSAT COMMENTS:

CRO-605 R0 - g Page 7 of 15 STEP 9: Step 18 Verify both Standby Bus #1 and Standby Bus #2 are de-energized.

___ SAT STANDARD: Observes that zero (0) volts is indicated on both Standby Buses located on 2AB3.

Continues to Step 19 ___ UNSAT COMMENTS:

STEP 10: Step 19 Verify both Keowee units operating.

___ SAT STANDARD: Determine that Keowee Unit 1 is operating.

Determine that Keowee Unit 2 is NOT operating (Emergency Lockout) by observing Statalarm 2SA-18/A1 is actuated. Perform RNO step. ___ UNSAT COMMENTS:

STEP 11: Step 19 RNO

1. Emergency start Keowee units:

___ SAT

  • KEOWEE EMER START CHANNEL A
  • KEOWEE EMER START CHANNEL B
2. IF NO Keowee units are operating, ___ UNSAT THEN GO TO Step 36.

STANDARD: Place the KEOWEE EMER START CHANNEL A switch to start located on 1UB1.

Continues to Step 20.

Note: KEOWEE EMER START CHANNEL B switch is not modeled.

COMMENTS:

CRO-605 R0 - g Page 8 of 15 STEP 12: Step 20 Verify both Keowee units in Oconee Control (statalarms on):

___ SAT 0B

  • UNIT 1 OCONEE CONTROL (2SA-17/E-1)
  • UNIT 2 OCONEE CONTROL (2SA-18/E-1).

___ UNSAT STANDARD: Determine that 2SA-17/E-1 and 2SA-18/E-1 are not actuated.

Perform RNO step.

COMMENTS:

STEP 13: Step 20 RNO CRITICAL STEP Notify Keowee Operator to place both Keowee units Master Transfer

___ SAT switches to remote.

STANDARD: Call Keowee and ask the Keowee Operator to place both Keowee units Master Transfer switches to remote. Verify that statalarm 2SA-17/E-1 ___ UNSAT and 2SA-18/E-1 actuate..

Booth Cue: When directed by the candidate, use Quick Strike and place both KHUs in Remote.

COMMENTS:

STEP 14: Step 21 Verify both Keowee units operating.

___ SAT STANDARD: Determine that Keowee Unit 1 is operating.

Determine that Keowee Unit 2 is NOT operating (Emergency Lockout) by observing Statalarm 2SA-18/A1 is actuated. Perform RNO step ___ UNSAT COMMENTS:

CRO-605 R0 - g Page 9 of 15 STEP 15: Step 21 RNO

1. IF UNIT 1 EMER FDR ACB 3 is closed,

___ SAT AND Unit 1 Keowee is NOT operating, THEN open UNIT 1 EMER FDR ACB 3.

2. IF UNIT 2 EMER FDR ACB 4 is closed,

___ UNSAT AND Unit 2 Keowee is NOT operating, THEN open UNIT 2 EMER FDR ACB 4.

STANDARD: Determine Unit 2 Keowee is NOT operating and open UNIT 2 EMER FDR ACB 4 located on 2AB3.

Continues to Step 22 COMMENTS:

STEP 16: Step 22 CRITICAL STEP Ensure one of the following is closed for an operating Keowee unit:

___ SAT 1B Unit 1 Unit 2 UNIT 1 UNIT 2 EMER FDR EMER FDR ___ UNSAT ACB 3 ACB 4 STANDARD: Determine that KHU #1 is operating and closes ACB-3 located on 2AB3.

Continues to Step 23 COMMENTS:

STEP 17: Step 23 Verify 4160 volt power has been restored to the MFB.

___ SAT STANDARD: Candidate determines that 4160 volts has not been restored to the MFB.

Continues to Step 23 RNO

___ UNSAT COMMENTS:

CRO-605 R0 - g Page 10 of 15 STEP 18: Step 23 RNO GO TO step 25.

___ SAT STANDARD: Continues to Step 25

___ UNSAT COMMENTS:

STEP 19: Step 25 Verify CT-4 indicates 4160 volts. ___ SAT STANDARD: Verify CT-4 indicates 4160 volts by observing CT-4 voltage gauge located on 2AB3.

Continues to Step 26 ___ UNSAT COMMENTS:

STEP 20: Step 26 Place the following transfer switches in MAN:

___ SAT 2B

  • CT4 BUS 1 AUTO/MAN
  • CT4 BUS 2 AUTO/MAN

___ UNSAT STANDARD: Place the above transfer switches located on 2AB3 in MAN.

Continues to Step 27 COMMENTS:

STEP 21: Step 27 Place the following switches in ON:

___ SAT 3B

  • STBY BUS 1 SYNCHRONIZING
  • STBY BUS 2 SYNCHRONIZING

___ UNSAT STANDARD: Place the above switches located on 2AB3 in ON.

Continues to Step 28 COMMENTS:

CRO-605 R0 - g Page 11 of 15 STEP 22: Step 28 Close the following breakers:

___ SAT 4B

  • SK1 CT4 STBY BUS 1 FEEDER 5B
  • SK2 CT4 STDY BUS 2 FEEDER

___ UNSAT STANDARD: Candidate observes that both SK1 and SK2 are already closed by observing both red closed lights are illuminated..

Continues to Step 29 COMMENTS:

STEP 23: Step 29 Place the following switches in OFF:

___ SAT 6B

  • STBY BUS 1 SYNCHRONIZING
  • STBY BUS 2 SYNCHRONIZING

___ UNSAT STANDARD: Place the above switches located on 2AB3 in OFF.

Continues to Step 30 COMMENTS:

STEP 24: Step 30 Verify Standby Bus #1 energized.

___ SAT STANDARD: Observes that 4160 volts are indicated for Standby Bus #1 located on 2AB3.

Continues to Step 31 ___ UNSAT COMMENTS:

CRO-605 R0 - g Page 12 of 15 STEP 25: Step 31 Notify CR SRO in each unit where a blackout exists that Standby Bus #1

___ SAT is energized.

STANDARD: Notifies CR SRO that Standby Bus #1 is energized.

Continues to Step 32 ___ UNSAT Cue: If asked, inform candidate that only Unit 1 is affected.

COMMENTS:

STEP 26: Step 32 Place the following switches in MAN:

___ SAT 7B

  • MFB1 AUTO/MAN
  • MFB2 AUTO/MAN
  • STANDBY 1 AUTO/MAN ___ UNSAT
  • STANDBY 2 AUTO/MAN STANDARD: Place the above switches located on 1UB2 in MAN.

Continues to Step 33 COMMENTS:

STEP 27: Step 33 Open the following breakers:

___ SAT 8B

  • N11 MFB1 NORMAL FDR
  • N21 MFB2 NORMAL FDR
  • E11 MFB1 STARTUP FDR ___ UNSAT
  • E21 MFB2 STARTUP FDR STANDARD: Verify the above breakers located on 1UB2 are OPEN.

Continues to Step 34 COMMENTS:

CRO-605 R0 - g Page 13 of 15 STEP 28: Step 34 *CRITICAL STEP Close the following breakers:

___ SAT

  • S11 STBY BUS 1 TO MFB1
  • S21 STBY BUS 2 TO MFB2

___ UNSAT STANDARD: Goes to the CLOSED position for each of the switches listed above.

Continues to Step 35

  • Note: Only 1 of the Stby Busses must be energized to restore power to MFBs, and therefore only one (either one) of the above breaker closures is critical.

COMMENTS:

STEP 29: Step 35 Verify any of the following energized:

___ SAT

  • 1TC
  • 1TD
  • 1TE ___ UNSAT STANDARD: Observes that 4160 volts indicated on either MFB voltmeters or OAC.

Continues to Step 36 COMMENTS:

STEP 30: Step 36 Notify Unit 1 CR SRO of status of 4160V SWGR.

___ SAT STANDARD:

9B Notifies CR SRO of status of 4160V SWGR Continues to Step 37

___ UNSAT COMMENTS:

STEP 31: Step 37 EXIT this enclosure,

___ SAT STANDARD:

10B Notifies CR SRO that Encl. 5.38 is complete.

COMMENTS: ___ UNSAT END TASK STOP TIME: ____________

CRO-605 R0 - g Page 14 of 15 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 3 Step is required to protect the RCP seals.

13 Step is required to satisfy power switching logic.

16 Step is required to satisfy power switching logic.

28 Step is required to energize the Main Feeder Bus.

g CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Unit 1 experienced a lockout on CT-1 followed by a unit trip.

Keowee Unit 2 emergency Locks Out Blackout tab of the EOP is in progress The Blackout tab directs the initiation of Encl. 5.38 (Restoration of Power).

INITIATING CUES:

The CRS directs you to initiate Encl. 5.38 (Restoration of Power) to regain power to the Main Feeder Buses

CRO-902 R0 - h Page 1 of 14 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-902 Place Reactor Building Purge in Operation CANDIDATE EXAMINER

CRO-902 R0 - h Page 2 of 14 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Place the Reactor Building Purge In Operation Alternate Path:

Yes Facility JPM #:

CRO-100 K/A Rating(s):

System: 029 K/A: A2.03 Rating: 2.7/3.1 Task Standard:

RB Purge is placed in operation in accordance with OP/1/A/1102/014 (RB Purge System) and the RB Purge Fan secured and valves closed following 1RIA-45 HIGH alarm.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator ___X ___ In-Plant ____ ___ Perform __X___ Simulate __ __

References:

OP/1/A/1102/014 (RB Purge System)

PT/0/A/0230/001 (Radiation Monitor Check)

AP/1/A/1700/018 (Abnormal Release of Radioactivity)

OP/1/A/6101/008 (Alarm Response Guide 1SA-08) B-9 and D-9 Validation Time: 15 min. Time Critical: NO

========================================================================

Candidate: _______________________________________ Time Start: _______________

NAME Time Finish: ______________

Performance Rating: SAT ______ UNSAT ______ Performance Time: _________

Examiner: ______________________________ ___________________________________/_________

NAME SIGNATURE DATE

========================================================================

Comments

CRO-902 R0 - h Page 3 of 14 SIMULATOR OPERATOR INSTRUCTIONS

1. Recall Snap 212
2. Import files for CRO-902
3. Go to run

CRO-902 R0 - h Page 4 of 14 Tools/Equipment/Procedures Needed OP/1/A/1102/014 (RB Purge System) Encl. 4.1 (RB Purge Release)

AP/1/A/1700/018 (Abnormal Release of Radioactivity)

READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS RCS temperature = 114°F RCS pressure = 45 psig No Gaseous or Liquid releases are in progress RB Hatch is closed Continuous release is NOT in progress RB Purge startup is in progress using OP/1/A/1102/014 (RB Purge System), Encl. 4.1 (RB Purge Release)

INITIATING CUE The CRS directs you to place the RB Purge in operation at 1/3 Station Limit using OP/1/A/1102/014 (RB Purge System) Encl. 4.1 (RB Purge Release) starting at Step 3.8.

CRO-902 R0 - h Page 5 of 14 START TIME: _______

STEP 1: Step 3.8 *CRITICAL STEP Perform the following:

3.8.1. Ensure one of the following:

  • 1A RB AUX FAN is Off.
  • 1B RB AUX FAN is Off.

3.8.2. Ensure "T/O Sheet" Control Room Tag on 1A RB AUX FAN.

3.8.3. Ensure "T/O Sheet" Control Room Tag on 1B RB AUX FAN. ___ SAT 3.8.4. Ensure note on Turnover sheet: "If RB Purge Fan is operating, 1A RB Aux Fan or 1B RB Aux Fan should be off."

___ UNSAT STANDARD: *Secure the 1A or 1B RB AUX FAN and place a "T/O Sheet" Control Room Tag on the 1A and 1B RB AUX FAN control room switches.

Note: Placing tags on the RB Aux Fan switches in NOT critical.

Candidate should state they would place note on Turnover sheet: "If RB Purge Fan is operating, 1A RB Aux Fan or 1B RB Aux Fan should be off."

Continue to Step 3.9 Examiner Cues:

If asked as the SRO, inform the candidate that the 1A RB Aux Fan should be secured.

When appropriate, inform candidate that note has been placed on Turnover sheet per 3.8.4.

COMMENTS:

CRITICAL STEP NOTE: Completion of Step 3.9 establishes an appropriate vent path during Fuel Movement Operations with any Transfer Tube open per the Shutdown Protection Plan. This prevents FTC and SFP level variations caused by differential pressures between RB and SFP.

STEP 2: Step 3.9 Perform the following: ___ SAT 3.9.1 - Open 1PR-1 (RB PURGE OUTLET (RB)).

STANDARD: Open 1PR-1 by rotating the switch located on 1AB3 to open and ___ UNSAT verifying that the red open light illuminates and the green closed light goes out. May verify 1PR-1 open on the OAC.

Continue to Step 3.9.2 COMMENTS:

CRO-902 R0 - h Page 6 of 14 STEP 3: Step 3.9.2 CRITICAL STEP Open 1PR-2 (RB PURGE OUTLET (PR)).

___ SAT STANDARD: Open 1PR-2 by rotating the switch located on 1AB3 to open and verifying that the red open light illuminates and the green closed light goes out. May verify 1PR-2 open on the OAC.

___ UNSAT Continue to Step 3.9.3 COMMENTS:

STEP 4: Step 3.9.3 Ensure closed 1PR-3 (RB PURGE FLOW). (Bailey Controller)

STANDARD: Rotate 1PR-3 controller knob until the position indication indicates zero. ___ SAT Continue to Step 3.9.4 COMMENTS: ___ UNSAT STEP 5: Step 3.9.4 Verify 1PR-3 closed using alternate indication.

STANDARD: Verify 1PR-3 is closed by observing the closed light is lit on the ES Component Status Panel on 1VB2 or verifying 1PR-3 position on the

___ SAT OAC.

Continue to Step 3.9.5

___ UNSAT COMMENTS:

STEP 6: Step 3.9.5 WHILE RB Purge operating, monitor unit vent RIAs.

STANDARD: Candidate monitors unit vent RIAs.

___ SAT Continue to Step 3.9.6 COMMENTS:

___ UNSAT

CRO-902 R0 - h Page 7 of 14 STEP 7: Step 3.9.6 CRITICAL STEP Perform the following:

NOTE: When 1PR-3 (RB PURGE OUTLET SWITCH) is positioned to open, 1PR-3 will remain in the closed position since 1PR-3 Bailey Controller is closed.

___ SAT A. Position 1PR-3 (RB PURGE OUTLET SWITCH) to open.

B. Throttle > 60% open 1PR-3 (RB PURGE FLOW). (Bailey Controller)

___ UNSAT STANDARD: Position 1PR-3 (RB PURGE OUTLET SWITCH) to open on 1VB2.

Rotate knob on the Bailey Controller for 1PR-3 until it indicates > 60%

open on 1AB3.

Continue to Step 3.10 COMMENTS:

CRO-902 R0 - h Page 8 of 14 STEP 8: Step 3.10 *CRITICAL STEP IF required to operate the RB Purge Fan, perform the following:

3.10.1 Perform one of the following:

A. Perform the following:

B. Ensure the following: (these steps will be N/Aed)

___ SAT

  • 1PR-4 (RB PURGE INLET) valve position interlock jumpered per IP/0/A/0161/004 (Outage Interlock Bypass For Purge Isolation Valves)
  • 1PR-5 (RB PURGE INLET (PR)) valve position interlock ___ UNSAT jumpered per IP/0/A/0161/004 (Outage Interlock Bypass For Purge Isolation Valves)
  • 1PR-6 (RB PURGE INLET (RB)) valve position interlock jumpered per IP/0/A/0161/004 (Outage Interlock Bypass For Purge Isolation Valves)
  • Open RB Equipment Hatch Examiner Cue: If asked, inform the candidate that there is no information regarding the purge valves on the turnover sheet.

NOTE: Starting/Stopping RB Purge may cause SFP level changes. Entry into AP/1&2/A/1700/35 not required if SFP level changes are evaluated and stabilizes as expected.

3.10.2 *Start RB Purge Fan.

Examiner Note: The RB Purge fan has a 20 second delay to allow dampers to operate.

3.10.3 Ensure 1PR-3 (RB PURGE FLOW) (Bailey Controller) adjusted to

< recommended release rate.

STANDARD: Open 1PR-4, 5, and 6 by rotating the switches located on 1AB3 to open and verifying that the red open lights are illuminated and the green closed lights go out. May verify 1PR-4, 5, and 6 open on the OAC.

Start RB Purge Fan by placing the switch located on 1AB3 to start and verifying that the red on light illuminates.

Adjust 1PR-3 (RB PURGE FLOW) (Bailey Controller) < recommended release rate as read on Chessell Misc. System Recorder 1 located on 1VB1.

Continue to Step 3.11 Note: After the RB Purge Fan is started, the HIGH alarm for 1RIA-45 will actuate.

The associated interlock will not occur.

COMMENTS:

CRO-902 R0 - h Page 9 of 14 ATLERNATE PATH CRITICAL STEP The following Statalarms will actuate:

  • 1SA-08/D-9 (RM Reactor Building Purge Discharge Radiation Inhibit)
  • 1SA-08/B-9 (Process Monitor Radiation High)

Examiner Cue: IF SRO is informed of the alarms actuating, inform the candidate that the SRO reply is to Refer to the alarm response guides.

Examiners Note: The candidate may refer to one or both ARGs. If 1SA-08/D-9 is selected, then STEP 9 will be performed and that will end the task.

If 1SA08/B-9 is selected, then STEPs 10 - 13 will be performed and that will end the task. Either step 9 or step 13 is Critical but not ___ SAT both.

STEP 9: Refer to 1SA-08/D-9 (RM Reactor Building Purge Discharge Radiation Inhibit) ___ UNSAT 3.1 Ensure auto action has taken place.

3.2 Observe Reactor Building RIAs and evacuate personnel as it becomes necessary.

3.3 Determine cause of inhibit and correct.

STANDARD: Determine that the automatic actions have NOT taken place and using ARG guidance perform the following:

  • Stop the RB Purge Fan

END OF TASK

CRO-902 R0 - h Page 10 of 14 STEP 10: Refer to 1SA-08/B-9 (Process Monitor Radiation High 3.1 Perform one of the following:

3.1.1.Determine radiation monitors in alarm.

3.1.2.IF Radiation Monitoring data from the PMC System is NOT in service, refer to OP/1/A/1103/026, (Loss of Sorrento Radiation Monitor).

NOTE: Loss of power to a process monitor skid actuates the Process Monitor Fault alarm, causes the associated RIA to activate the High alarm, and actuates any associated interlocks from the High alarm. The actual RIA readout may indicate magenta with readings of negative values.

3.2 IF 1SA-08/B-10 (Process Monitor Fault) has occurred for the same monitor, Go To the ARG for 1SA-08/B-10 (Process Monitor Fault). {3}

3.3 IF 1RIA-40 alarms, Go To the appropriate procedure:

  • < 25 gpm (36,000 gpd) - AP/1/A/1700/031 (Primary To Secondary Leakage)
  • 25 gpm (36,000 gpd) - EP/1/A/1800/001 (Emergency Operating Procedure) 3.4 IF any of the following RIAs have valid alarms, Go To AP/1/A/1700/018 (Abnormal Release of Radioactivity).

RIA ___ SAT RIA-31 1RIA-35 1RIA-39 1RIA-41 ___ UNSAT 1RIA-42 1RIA-45, 46 1RIA-49A 1RIA-50 1RIA-54 STANDARD: Determine 1RIA-45 is in HIGH alarm Determine that Radiation Monitoring data from the PMC System is in service Determine 1SA-08/B-10 (Process Monitor Fault) is NOT in alarm Determine 1RIA-40 is NOT is alarm Determine 1RIA-45 is in alarm and Go To AP/1/A/1700/018 (Abnormal Release of Radioactivity).

COMMENTS:

CRO-902 R0 - h Page 11 of 14 STEP 11: AP/1/A/1700/018 (Abnormal Release of Radioactivity)

Step 4.1 - Perform the following:

  • At the discretion of the CRS, make a PA announcement of the event including any necessary precautions to be observed.
  • Notify OSM to reference the following:

o RP/0/B/1000/001 (Emergency Classification).

o NSD-202 (Reportability) ___ SAT o OMP 1-14 (Notifications)

STANDARD: Candidate makes announcement and notifies OSM

___ UNSAT Continue to Step 4.2 COMMENTS:

STEP 12 Step 4.2 GO TO appropriate sections for any monitors in High or Alert alarm:

Section Monitor 4A RIA-31 ___ SAT 4B 1RIA-32 4C 1RIA-35 4D 1RIA-39 4E 1RIA-41 ___ UNSAT 4F 1RIA-42 4G 1RIA-45 or 46 4H 1RIA-47, 1RIA-48, 1RIA-49, or 1RIA-49A 4I 1RIA-50 4J 1RIA-54 STANDARD: Candidate determines that 1RIA-45 is the alarming monitor and that he must proceed to Section 4G Continue to Section 4G COMMENTS:

CRO-902 R0 - h Page 12 of 14 STEP 13: AP/1/A/1700/018 (Abnormal Release of Radioactivity)

CRITICAL STEP Section 4G Step 1 IAAT 1RIA-45 or 1RIA-46 reaches the High set point, THEN ensure automatic actions occurred:

A. RB PURGE FAN secured.

B. 1PR-2 closed.

C. 1PR-3 closed.

D. 1PR-4 closed.

E. 1PR-5 closed.

___ SAT STANDARD: Determine 1RIA-45 is in High alarm and perform the following:

  • Stop the RB Purge Fan

___ UNSAT

  • Close 1PR-5 Cue: Another operator will continue with this procedure.

COMMENTS:

END OF TASK TIME STOP: ________

CRO-902 R0 - h Page 13 of 14 CRITICAL STEP EXPLANATIONS STEP # Explanation 1 This step is required to prevent tripping 1XR incoming feeder breaker.

2 This step is required to establish RB Purge flow.

3 This step is required to establish RB Purge flow.

7 This step is required to establish desired RB Purge flow.

8 This step is required to start the RB Purge fan.

9 or 13 One of these steps is required to stop the RB Purge fan and isolate the RB.

h CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS RCS temperature = 114°F RCS pressure = 45 psig No Gaseous or Liquid releases are in progress RB Hatch is Closed Continuous release is NOT in progress RB Purge startup is in progress using OP/1/A/1102/014 (RB Purge System), Encl. 4.1 (RB Purge Release)

INITIATING CUE The CRS directs you to place the RB Purge in operation at 1/3 Station Limit using OP/1/A/1102/014 (RB Purge System) Encl. 4.1 (RB Purge Release) starting at Step 3.8.

NLO-100 R0 - i Page 1 of 7 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE NLO-100 Trip the Reactor from the Control Rod Drive Breakers CANDIDATE EXAMINER

NLO-100 R0 - i Page 2 of 7 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Trip the Reactor from the Control Rod Drive Breakers Alternate Path:

No Facility JPM #:

Modified K/A Rating(s):

System: EPE 029 K/A: EA1.11 Rating: 3.9*/4.1 Task Standard:

Both 600 volt CRD breakers are opened.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator __ ___ In-Plant ___X ___ Perform _____ Simulate __ X__

References:

Unit 3 EOP Rule 1 (ATWS/Unanticipated Nuclear Power Production)

Validation Time: 4 min. Time Critical: NO

========================================================================

Candidate: _______________________________________ Time Start: _______________

NAME Time Finish: ______________

Performance Rating: SAT ______ UNSAT ______ Performance Time: _________

Examiner: ______________________________ ___________________________________/_________

NAME SIGNATURE DATE

========================================================================

Comments

NLO-100 R0 - i Page 3 of 7 SIMULATOR OPERATOR INSTRUCTIONS:

NONE

NLO-100 R0 - i Page 4 of 7 Tools/Equipment/Procedures Needed:

None READ TO OPERATOR DIRECTIONS TO STUDENT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 3 is at 100% power The reactor should have tripped.

Rule 1 (ATWS/Unanticipated Nuclear Power Production) in progress INITIATING CUE:

The OATC directs you to open 600V CRD breakers (without wearing Arc Flash PPE):

  • 3X9-5C (U-3 CRD Trip Bkr A) (U3 Equipment Rm)
  • 2X2-5D (U-3 CRD Alternate Fdr Bkr) (T-3/Fa-28)

NLO-100 R0 - i Page 5 of 7 START TIME: _______

CRITICAL STEP STEP 1: Open 3X9-5C (U-3 CRD Trip Bkr A) (U3 Equipment Rm)

___ SAT STANDARD: Locates and opens 3X9-5C by rotating switch to the trip position.

COMMENTS:

___ UNSAT CRITICAL STEP STEP 2: Open 2X2-5D (U-3 CRD Alternate Fdr Bkr) (T-3/Fa-28)

STANDARD: Locates and opens 2X2-5D by rotating switch to the trip position. ___ SAT COMMENTS:

END OF TASK ___ UNSAT TIME STOP: ________

NLO-100 R0 - i Page 6 of 7 CRITICAL STEP EXPLANATIONS STEP # Explanation 1 This step is required to trip the reactor.

2 This step is required to trip the reactor.

i CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Unit 3 is at 100% power The reactor should have tripped.

Rule 1 (ATWS/Unanticipated Nuclear Power Production) in progress INITIATING CUE:

The OATC directs you to open 600V CRD breakers (without wearing Arc Flash PPE):

  • 3X9-5C (U-3 CRD Trip Bkr A) (U3 Equipment Rm)
  • 2X2-5D (U-3 CRD Alternate Fdr Bkr) (T-3/Fa-28)

NLO-606 R0 - j Page 1 of 8 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE NLO-606 Makeup to Unit 1 CBAST from Unit 1 & 2 BAMT During a Unit 2 Blackout CANDIDATE EXAMINER

NLO-606 R0 - j Page 2 of 8 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Makeup to Unit 1 CBAST From Unit 1 & 2 BAMT during a Unit 2 blackout Alternate Path:

No Facility JPM #:

New K/A Rating(s):

System: B/WE14 K/A: EA1.1 Rating: 3.8/3.6 Task Standard:

Makeup to Unit 1 CBAST from Unit 1 & 2 BAMT in accordance with Unit 2 EOP Encl. 5.39.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator __ ___ In-Plant ___X ___ Perform _____ Simulate __ X__

References:

Unit 2 EOP Encl. 5.39 (Makeup to the BWST During Blackout)

Validation Time: 12 min. Time Critical: No

========================================================================

Candidate: _______________________________________ Time Start: _______________

NAME Time Finish: ______________

Performance Rating: SAT ______ UNSAT ______ Performance Time: _________

Examiner: ______________________________ ___________________________________/_________

NAME SIGNATURE DATE

========================================================================

Comments

NLO-606 R0 - j Page 3 of 8 SIMULATOR OPERATOR INSTRUCTIONS:

NONE

NLO-606 R0 - j Page 4 of 8 Tools/Equipment/Procedures Needed:

Unit 2 EOP Encl. 5.39 (Makeup to the BWST During Blackout)

READ TO OPERATOR DIRECTIONS TO STUDENT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

A blackout is in progress on Oconee Unit 2 EOP Enclosure 5.39 (Makeup to the BWST During Blackout) is in progress and is complete up thru Step 16.

It is necessary to pump the BAMT to Unit 1s CBAST The BAMT is filled and mixed and ready to be transferred INITIATING CUE:

The CRS directs you to continue with EOP Enclosure 5.39 (Makeup to the BWST During Blackout) beginning at Step 17 to transfer the entire contents of the BAMT to Unit 1s CBAST using the B LP Boric Acid Pump

NLO-606 R0 - j Page 5 of 8 START TIME: _______

STEP 1: Step 17 CRITICAL STEP Locally perform the following (A-1, 1&2 BAMT Rm):

0B A. Close CA-38 (Unit 1/2 HP Boric Acid Pump Suction Tell Tale).

1B ___ SAT B. Open the following:

4B

  • CA-4 (Unit 1/2 BAMT Outlet)

___ UNSAT

STANDARD:

2B Locate and Close CA-38 (Unit 1/2 HP Boric Acid Pump Suction Tell Tale).

Locate and open:

  • CA-4 (Unit 1/2 BAMT Outlet)

Cue: Inform the candidate that CA-38 is closed and CA-4 and CA-20 are open.

COMMENTS:

STEP 2: Step 18 Verify B LP Boric Acid Pump will be used for transfer of BAMT to CBAST.

___ SAT STANDARD: Determine that B LP Boric Acid Pump will be used for transfer of BAMT to CBAST using the cue sheet.

___ UNSAT COMMENTS:

STEP 3: Step 19 CRITICAL STEP Locally open CA-11 (A/B LP BAMT Pumps Disch Tie) (A-1, 1&2 BAMT Rm).

___ SAT STANDARD: Locate and open CA-11 Cue: Inform the candidate that CA-11 is open. ___ UNSAT COMMENTS:

STEP 4: Step 20 CRITICAL STEP Locally start B LP Boric Acid Pump (A-2, 1&2 Chem Add Panel).

___ SAT STANDARD: Start B LP Boric Acid Pump by taking the switch to the start position.

COMMENTS:

___ UNSAT

NLO-606 R0 - j Page 6 of 8 STEP 5: Step 21 Locally cycle DW-119 (Boric Acid Mix Pumps Suction Hdr Flush) (A-1,

___ SAT 1&2 BAMT Rm).

STANDARD: Candidate cycles DW-119 fully open and then fully closed.

___ UNSAT Note: This is a quarter turn valve and a stop has to be pulled out ot allow the valve to operate.

COMMENTS:

STEP 6: Step 22 Notify Units 1 and 2 to monitor for reactivity effects due to possible leakage of 1&2 BAMT into LDST.

___ SAT STANDARD: Candidate notifies Units 1 and 2 to monitor for possible reactivity effects.

COMMENTS: ___ UNSAT STEP 7: Step 23 CRITICAL STEP Locally perform the following (A-2, 1&2 Chem Add Panel):

3B

  • Place Unit 1&2 BAMT Heater switch in OFF.

5B

___ SAT

  • Stop Unit 1&2 BAMT Agitator.

STANDARD: Candidate places the Unit 1&2 BAMT Heater switch to the OFF position ___ UNSAT and turns the Unit 1 & 2 BAMT Agitator to the STOP position (spring return to neutral).

COMMENTS:

STEP 8: Step 24 CRITICAL STEP WHEN transfer is complete, THEN locally stop the selected LP Boric Acid Pump (A-2, 1&2 Chem Add Panel).

___ SAT STANDARD: Determine that the transfer is complete and stop the B LP Boric Acid Pump.

___ UNSAT Cue: Indicate that BAMT level is zero inches.

COMMENTS:

END OF TASK TIME STOP: ________

NLO-606 R0 - j Page 7 of 8 CRITICAL STEP EXPLANATIONS STEP # Explanation 1 This step is required to align the BAMT to Unit 1s CBAST.

3 This step is required to align the BAMT to Unit 1s CBAST.

4 This step is required to start the B Boric Acid Pump.

7 This step is required to prevent equipment damage.

8 This step is required to prevent equipment damage.

j CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

A blackout is in progress on Oconee Unit 2 EOP Enclosure 5.39 (Makeup to the BWST During Blackout) is in progress and is complete up thru Step 16.

It is necessary to pump the BAMT to Unit 1s CBAST The BAMT is filled and mixed and ready to be transferred INITIATING CUE:

The CRS directs you to continue with EOP Enclosure 5.39 (Makeup to the BWST During Blackout) beginning at Step 17 to transfer the entire contents of the BAMT to Unit 1s CBAST using the B LP Boric Acid Pump

NLO-802 R0 - k Page 1 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE NLO-802 Start Diesel Air Compressor and Align to Service Air Header CANDIDATE:

EXAMINER:

NLO-802 R0 - k Page 2 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Start Diesel Air Compressor and Align to Service Air Header Alternate Path:

Yes Facility JPM #:

NLO-007 K/A Rating(s):

System: APE 065 K/A: AA1.04 Rating: 3.5*/3.4*

Task Standard:

The Diesel Air Compressor NOT operating is started and aligned to the Service Air Header correctly per procedure.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator _____ In-Plant __X___ Perform _____ Simulate __X__

References:

AP/2/A/1700/022 (Loss of Instrument Air) Encl. 5.4 (Emergency Start of the Diesel Air Compressor)

AP/2/A/1700/022 (Loss of Instrument Air) Encl. 5.7 (Manual Start of Diesel Air Compressors)

Validation Time: 20 minutes Time Critical: NO

==========================================================================

Candidate: _______________________________________ Time Start: _____________

NAME Time Finish: _____________

Performance Rating: SAT ______ UNSAT ______ Performance Time: __________

Examiner: ______________________________ ____________________________________/________

NAME SIGNATURE DATE

==========================================================================

COMMENTS

NLO-802 R0 - k Page 3 of 12 SIMULATOR OPERATOR INSTRUCTIONS:

None

NLO-802 R0 - k Page 4 of 12 Tools/Equipment/Procedures Needed:

AP/2/A/1700/022 (Loss of Instrument Air) Encl. 5.4 (Emergency Start of the Diesel Air Compressor)

AP/2/A/1700/022 (Loss of Instrument Air) Encl. 5.7 (Manual Start of Diesel Air Compressors)

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Units 1, 2, and 3 are operating at 100% power.

The Unit 1 Control Room Operator receives the "INSTRUMENT AIR SYSTEM TROUBLE" Statalarm and observes that Instrument Air pressure is decreasing on the Control Room IA pressure gauge.

INITIATING CUES:

The Unit 2 Control Room Operator directs you to perform Encl. 5.4 (Emergency Start of the Diesel Air Compressor) of AP/2/A/1700/022 (Loss Of Instrument Air).

NLO-802 R0 - k Page 5 of 12 START TIME: _______

Note: The procedure is pre-staged at the Diesel Air Compressor. After the candidate locates the procedure, hand him a copy of the procedure to use.

NOTE Ingersoll-Rand Diesel Air Compressor SNs 340574, 339718 and 339713 have Auto Start ___ SAT capability.

STEP 1: Encl. 5.4 Step 1

___ UNSAT Verify all Diesel Air Compressors with Auto / Manual switches in Auto are running.

STANDARD: Determine that Ingersoll-Rand Diesel Air Compressor SN 340574 is in AUTO and NOT operating and perform RNO step.

Cue: Indicate to the operator that Ingersoll-Rand Diesel Air Compressor SN 340574 is in AUTO and NOT operating. (No noise, RPMs, or discharge pressure) and the other two compressors are in AUTO and operating.

COMMENTS:

ALTERNATE PATH

___ SAT STEP 2: Encl. 5.4 Step 1 RNO Perform one manual start on each Diesel Air Compressor that did NOT Auto start using Encl 5.7 (Manual Start of Diesel Air Compressors).

___ UNSAT STANDARD: Perform a manual start on Ingersoll-Rand Diesel Air Compressor SN 340574 using Encl 5.7 (Manual Start of Diesel Air Compressors).

COMMENTS:

NLO-802 R0 - k Page 6 of 12 STEP 3: Encl. 5.7 Step 1 GO TO applicable step to manually start Diesel Air Compressor: ___ SAT Compressor Step Ingersoll-Rand (Auto start 2 capability) SNs 340574, ___ UNSAT 339718 and 339713 Ingersoll-Rand (5421) 10 Any other Diesel Air 19 Compressor STANDARD: Note the compressor that did not start from the table (340574) and GO TO Step 2.

COMMENTS:

STEP 4: Encl. 5.7 Step 2 CRITICAL STEP Position Auto / Manual toggle switch to Manual.

___ SAT STANDARD: Locate and position Auto / Manual toggle switch to Manual.

___ UNSAT COMMENTS:

STEP 5: Encl. 5.7 Step 3 Ensure Battery Switch is in ON position (Behind panel door on West side ___ SAT of Diesel Air Compressor).

STANDARD: Open panel door on West side of compressor and ensure the battery ___ UNSAT Switch is in ON position.

COMMENTS:

NLO-802 R0 - k Page 7 of 12 NOTE Engine ignition switch has 3 positions, STOP, ON, and ENGINE START. ___ SAT The engine ignition switch must be ON to have panel indication. All warning lamps will illuminate briefly to test the lamps: the Low Engine Oil Pressure light and the Low Battery

___ UNSAT Voltage light will remain flashing until the engine is started.

Control panel display will display 1.70 when engine ignition switch is turned to the ON position and then clear, if no fault is present.

The (LAMPS) switch may be used to illuminate the panel for night operation.

STEP 6: Encl. 5.7 Step 4 Position engine ignition switch to ON.

STANDARD: Position engine ignition switch to ON (already ON).

COMMENTS:

CAUTION CRITICAL STEP The engine starter motor should NOT be operated continuously for more than 10 seconds. ___ SAT STEP 7: Encl. 5.7 Step 5 Position engine ignition switch to ENGINE START position until engine ___ UNSAT starts, then release.

STANDARD: Position engine ignition switch to ENGINE START position after verifying that engine start release switch.

Examiner Cue: Indicate that the compressor starts when engine ignition switch is placed in the ENGINE START position.

  • Oil pressure increases
  • Air pressure increases COMMENTS:

NLO-802 R0 - k Page 8 of 12 STEP 8: Encl. 5.7 Step 6 CRITICAL STEP Depress PRESSURE CONTROL button to allow compressor to load fully. ___ SAT STANDARD: Locate and depress PRESSURE CONTROL pushbutton.

___ UNSAT Cue: Indicate to the candidate that the compressor is loaded by the change in the sound.

COMMENTS:

STEP 9: Encl. 5.7 Step 7 Open SA-2955; SERVICE AIR VALVE (South end of compressor at ___ SAT discharge hose).

STANDARD: Locate and verify SA-2955 is open by observing the handle parallel with ___ UNSAT the hose.

COMMENTS:

STEP 10: Encl. 5.7 Step 8 Locate check valve at end of compressor discharge hose and open ___ SAT associated block valve per table below:

Check Valve Block Valve

___ UNSAT SA-2944 SA-2797 SA-2947 SA-2945 SA-2950 SA-2948 STANDARD: Verify SA-2948 is open by observing the handle parallel with the hose and then GO TO Encl. 5.4 Step 2.

COMMENTS:

NLO-802 R0 - k Page 9 of 12 STEP 11: Encl. 5.4 Step 2 Position Auto / Manual toggle switches to Manual for all running Diesel ___ SAT Air Compressors.

STANDARD: Position Auto / Manual toggle switches to Manual for ALL Ingersoll-Rand

___ UNSAT Diesel Air Compressors.

COMMENTS:

STEP 12: Encl. 5.4 Step 3 Verify any Diesel Air Compressor running. ___ SAT STANDARD: Determine that ALL Diesel Air Compressors are running by observing RPMs, discharge pressure, etc. ___ UNSAT Cue: Indicate that the compressors have normal RPMs and discharge pressure.

COMMENTS:

NOTE When the SA system is operational, SA-141 (SA TO IA CONTROLLER) automatically regulates IA header pressure to 85 psig if IA pressure decreases to < 85 psig. Opening SA-143 will bypass SA-141 and allow the SA header to pressurize the IA header greater ___ SAT than 85 psig.

During some SA tag outs for maintenance, SA-143 may be red tagged closed. If SA-143 is red tagged closed, then the Diesel Air Compressors will already be aligned (via an ___ UNSAT alternate flow path) to supply directly into the IA system and opening SA-143 is not required.

STEP 13: Encl. 5.4 Step 4 Verify SA-143 (SA TO IA CONTROLLER BYPASS) (T-1/L-33, 15 E on chain) is red tagged closed.

STANDARD: Valve is located in the Turbine Building basement and determine that it is not red tagged closed. Continue to the RNO step.

COMMENTS:

NLO-802 R0 - k Page 10 of 12 STEP 14: Encl. 5.4 Step 4 RNO Open SA-143 (SA TO IA CONTROLLER BYPASS) (T-1/L-33, 15 E on

___ SAT chain)

STANDARD: SA-143 chain is pulled to rotate the valve counter clockwise until it reaches a hard stop. ___ UNSAT Cue: After the operator indicates that he will open SA-143, inform operator that valve is open COMMENTS:

STEP 14: Encl. 5.4 Step 5 Notify Unit 2 CR of Diesel Air Compressor status.

___ SAT STANDARD: Unit 2 CR is notified that ALL Diesel Air Compressors are operating using a phone or radio.

___ UNSAT Cue: Inform the candidate that another operator will continue with this procedure.

COMMENTS:

END TASK STOP TIME: ____________

NLO-802 R0 - k Page 11 of 12 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 4 Required to manually start compressor 7 Required to manually start compressor 8 Required to manually start compressor

k CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Units 1, 2, and 3 are operating at 100% power.

The Unit 1 Control Room Operator receives the "INSTRUMENT AIR SYSTEM TROUBLE" Statalarm and observes that Instrument Air pressure is decreasing on the Control Room IA pressure gauge.

INITIATING CUES:

The Unit 2 Control Room Operator directs you to perform Encl. 5.4 (Emergency Start of the Diesel Air Compressor) of AP/2/A/1700/022 (Loss Of Instrument Air).