| issue date = 12/16/2013
| issue date = 12/16/2013
| title = J. Sauger Ltr. Request for Additional Information for Decommissioning Funding Status Report for Zion Units 1 and 2
| title = J. Sauger Ltr. Request for Additional Information for Decommissioning Funding Status Report for Zion Units 1 and 2
| author name = Hickman J B
| author name = Hickman J
| author affiliation = NRC/FSME/DWMEP/DURLD/RDB
| author affiliation = NRC/FSME/DWMEP/DURLD/RDB
| addressee name = Sauger J
| addressee name = Sauger J
Line 12: Line 12:
| document type = Letter, Request for Additional Information (RAI)
| document type = Letter, Request for Additional Information (RAI)
| page count = 4
| page count = 4
| project =
| stage = RAI
}}
}}


=Text=
=Text=
{{#Wiki_filter:December 16, 2013  
{{#Wiki_filter:December 16, 2013 Mr. John Sauger General Manager Zion Restoration Project ZionSolutions LLC 101 Shiloh Blvd.
 
Zion, IL 60099-2797
Mr. John Sauger General Manager Zion Restoration Project ZionSolutions LLC 101 Shiloh Blvd.
Zion, IL 60099-2797  


==SUBJECT:==
==SUBJECT:==
ZION NUCLEAR POWER STATION, UNITS 1 AND 2 DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION  
ZION NUCLEAR POWER STATION, UNITS 1 AND 2 DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION


==Dear Mr. Sauger:==
==Dear Mr. Sauger:==


On March 26, 2013, ZionSolutions, LLC submitted to the U.S. Nuclear Regulatory Commission the 2013 Decommissioning Funding Status (DFS) report for the Zion Nuclear Power Station, Units 1 and 2, as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your DFS report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.  
On March 26, 2013, ZionSolutions, LLC submitted to the U.S. Nuclear Regulatory Commission the 2013 Decommissioning Funding Status (DFS) report for the Zion Nuclear Power Station, Units 1 and 2, as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your DFS report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.
 
In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
In accordance with 10 CFR 2.390 of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electroni cally for public inspection in the NRC Public Document Room or from the Publicly Avail able Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.       Sincerely,
Sincerely,
 
                                                /RA/
      /RA/ John B. Hickman, Project Manager  
John B. Hickman, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket Nos. 50-295 and 50-304
 
Reactor Decommissioning Branch Decommissioning and Uranium Recovery           Licensing Directorate Division of Waste Management           and Environmental Protection Office of Federal and State Materials   and Environmental Management Programs  
 
Docket Nos. 50-295 and 50-304  


==Enclosure:==
==Enclosure:==
Request for Additional Information


cc w/enclosure: Zion Service List  
Request for Additional Information cc w/enclosure: Zion Service List


Mr. John Sauger General Manager Zion Restoration Project ZionSolutions LLC 101 Shiloh Blvd.
Mr. John Sauger General Manager Zion Restoration Project ZionSolutions LLC 101 Shiloh Blvd.
Zion, IL 60099-2797  
Zion, IL 60099-2797


==SUBJECT:==
==SUBJECT:==
ZION NUCLEAR POWER STATION, UNITS 1 AND 2 DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION  
ZION NUCLEAR POWER STATION, UNITS 1 AND 2 DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION


==Dear Mr. Sauger:==
==Dear Mr. Sauger:==


On March 26, 2013, ZionSolutions, LLC submitted to the U.S. Nuclear Regulatory Commission the 2013 Decommissioning Funding Status (DFS) report for the Zion Nuclear Power Station, Units 1 and 2, as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your DFS report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.  
On March 26, 2013, ZionSolutions, LLC submitted to the U.S. Nuclear Regulatory Commission the 2013 Decommissioning Funding Status (DFS) report for the Zion Nuclear Power Station, Units 1 and 2, as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your DFS report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.
 
In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
In accordance with 10 CFR 2.390 of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electroni cally for public inspection in the NRC Public Document Room or from the Publicly Avail able Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
Sincerely,
                                                /RA/
 
John B. Hickman, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket Nos. 50-295 and 50-304
      /RA/ John B. Hickman, Project Manager  
 
Reactor Decommissioning Branch Decommissioning and Uranium Recovery           Licensing Directorate Division of Waste Management           and Environmental Protection Office of Federal and State Materials   and Environmental Management Programs  
 
Docket Nos. 50-295 and 50-304  


==Enclosure:==
==Enclosure:==
Request for Additional Information
cc w/enclosure:  Zion Service List
DISTRIBUTION:  ROrlikowski, RIII AKock, NRR KLois, NRR ML13347B300 OFC DWMEP DWMEP DWMEP DWMEP NAME JHickman CHolston BWatson JHickman DATE 12 /16 / 2013 12 /16 / 2013 12 / 16 / 2013 12 / 16 / 2013 OFFICIAL RECORD COPY Zion Nuclear Power Station, Units 1 and 2 Service List
cc:  Mr. John Sauger General Manager Zion Restoration Project ZionSolutions LLC 101 Shiloh Blvd. Zion, IL  60099-2797
Patrick Thurman, Esq.
VP Regulatory Affairs, Licensing and
Document Control Zion Solutions , LLC 101 Shiloh Blvd.
Zion, IL  60099-2797
Gary Bouchard VP Engineering, Ops & Nuclear Security and Decommissioning Plant Manager
Zion Solutions , LLC 101 Shiloh Blvd.
Zion, IL  60099
Russ Workman General Counsel EnergySolutions 423 West 300 South, Suite 200 Salt Lake City, UT  84101 Mayor of Zion Zion, IL  60099
Mr. Kent McKenzie, Emergency Management Coordinator Lake County Emergency Management Agency 1303 N. Milwaukee Avenue
Libertyville, IL  60048-1308
Regional Administrator U.S. NRC, Region III
2443 Warrenville Road Lisle, IL  60532-4352
John E. Matthews Morgan, Lewis & Bockius LLP
1111 Pennsylvania Avenue, NW Washington, DC 20004
Matias F. Travieso-Diaz Pillsbury Winthrop Shaw Pittman LLP
2300 N St., NW Washington, DC  20037
Tom Reilly, Executive Principal Vista 360 649 Innsbruck
Libertyville, IL  60048
Director Spent Fuel & Decommissioning Strategy Exelon Generation Company, LLC
4300 Winfield Road
Warrenville, IL  60555
J. Bradley Fewell Associate General Counsel Exelon Corporation, LLC
4300 Winfield Rd.
Warrenville, IL  60555
Document Control Desk - Licensing Exelon Generation Company, LLC
4300 Winfield Road
Warrenville, IL  60555
Enclosure REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION 2013 DECOMMISSIONING FUNDING STATUS REPORT FOR ZION NUCLEAR POWER STATION, UNITS 1 AND 2
The request for additional information (RAI) is in response to the 2013 Decommissioning Funding Status (DFS) report for Zion Nuclear Power Station, Units 1 and 2. On March 26, 2013, ZionSolutions, LLC submitted to the U.S. Nuclear Regulatory Commission (NRC) the 2013 Decommissioning Funding Status (DFS) report for the Zion Nuclear Power Station, Units 1 and 2, as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii).


RAI #1: Decommissioning Costs On March 26, 2013, ZionSolutions, LLC did not provide the difference between actual and
Request for Additional Information cc w/enclosure: Zion Service List DISTRIBUTION: ROrlikowski, RIII          AKock, NRR KLois, NRR ML13347B300 OFC            DWMEP            DWMEP              DWMEP              DWMEP NAME          JHickman          CHolston            BWatson            JHickman DATE      12 /16 / 2013      12 /16 / 2013      12 / 16 / 2013      12 / 16 / 2013 OFFICIAL RECORD COPY


estimated costs for decommissioning work performed during the previous year.  
Zion Nuclear Power Station, Units 1 and 2 Service List cc:
Mr. John Sauger                                    Regional Administrator General Manager                                    U.S. NRC, Region III Zion Restoration Project                          2443 Warrenville Road ZionSolutions LLC                                  Lisle, IL 60532-4352 101 Shiloh Blvd.
Zion, IL 60099-2797                                John E. Matthews Morgan, Lewis & Bockius LLP Patrick Thurman, Esq.                              1111 Pennsylvania Avenue, NW VP Regulatory Affairs, Licensing and              Washington, DC 20004 Document Control ZionSolutions, LLC                                Matias F. Travieso-Diaz 101 Shiloh Blvd.                                  Pillsbury Winthrop Shaw Pittman LLP Zion, IL 60099-2797                                2300 N St., NW Washington, DC 20037 Gary Bouchard VP Engineering, Ops & Nuclear Security            Tom Reilly, Executive Principal and Decommissioning Plant Manager                Vista 360 ZionSolutions, LLC                                649 Innsbruck 101 Shiloh Blvd.                                  Libertyville, IL 60048 Zion, IL 60099 Director Spent Fuel & Decommissioning Russ Workman                                        Strategy General Counsel                                    Exelon Generation Company, LLC EnergySolutions                                    4300 Winfield Road 423 West 300 South, Suite 200                      Warrenville, IL 60555 Salt Lake City, UT 84101 J. Bradley Fewell Mayor of Zion                                      Associate General Counsel Zion, IL 60099                                    Exelon Corporation, LLC 4300 Winfield Rd.
Mr. Kent McKenzie, Emergency                      Warrenville, IL 60555 Management Coordinator Lake County Emergency Management                  Document Control Desk - Licensing Agency                                            Exelon Generation Company, LLC 1303 N. Milwaukee Avenue                          4300 Winfield Road Libertyville, IL 60048-1308                        Warrenville, IL 60555


Per 10 CFR 50.82(a)(8)(v), The report must include the following information, current through the end of the previous calendar year: an estimate of the costs to complete decommissioning, reflecting any difference between actual and estimated costs for work performed during the year, and the decommissioning criteria upon which the estimate is based. Provide the difference between actual and estimated costs for decommissioning work performed during the previous year.}}
REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION 2013 DECOMMISSIONING FUNDING STATUS REPORT FOR ZION NUCLEAR POWER STATION, UNITS 1 AND 2 The request for additional information (RAI) is in response to the 2013 Decommissioning Funding Status (DFS) report for Zion Nuclear Power Station, Units 1 and 2. On March 26, 2013, ZionSolutions, LLC submitted to the U.S. Nuclear Regulatory Commission (NRC) the 2013 Decommissioning Funding Status (DFS) report for the Zion Nuclear Power Station, Units 1 and 2, as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii).
RAI #1: Decommissioning Costs On March 26, 2013, ZionSolutions, LLC did not provide the difference between actual and estimated costs for decommissioning work performed during the previous year.
Per 10 CFR 50.82(a)(8)(v),
The report must include the following information, current through the end of the previous calendar year: an estimate of the costs to complete decommissioning, reflecting any difference between actual and estimated costs for work performed during the year, and the decommissioning criteria upon which the estimate is based.
Provide the difference between actual and estimated costs for decommissioning work performed during the previous year.
Enclosure}}

Latest revision as of 10:26, 4 November 2019

J. Sauger Ltr. Request for Additional Information for Decommissioning Funding Status Report for Zion Units 1 and 2
ML13347B300
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 12/16/2013
From: John Hickman
NRC/FSME/DWMEP/DURLD/RDB
To: Sauger J
ZionSolutions
Hickman J
References
Download: ML13347B300 (4)


Text

December 16, 2013 Mr. John Sauger General Manager Zion Restoration Project ZionSolutions LLC 101 Shiloh Blvd.

Zion, IL 60099-2797

SUBJECT:

ZION NUCLEAR POWER STATION, UNITS 1 AND 2 DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION

Dear Mr. Sauger:

On March 26, 2013, ZionSolutions, LLC submitted to the U.S. Nuclear Regulatory Commission the 2013 Decommissioning Funding Status (DFS) report for the Zion Nuclear Power Station, Units 1 and 2, as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your DFS report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.

In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

John B. Hickman, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket Nos. 50-295 and 50-304

Enclosure:

Request for Additional Information cc w/enclosure: Zion Service List

Mr. John Sauger General Manager Zion Restoration Project ZionSolutions LLC 101 Shiloh Blvd.

Zion, IL 60099-2797

SUBJECT:

ZION NUCLEAR POWER STATION, UNITS 1 AND 2 DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION

Dear Mr. Sauger:

On March 26, 2013, ZionSolutions, LLC submitted to the U.S. Nuclear Regulatory Commission the 2013 Decommissioning Funding Status (DFS) report for the Zion Nuclear Power Station, Units 1 and 2, as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your DFS report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.

In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

John B. Hickman, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket Nos. 50-295 and 50-304

Enclosure:

Request for Additional Information cc w/enclosure: Zion Service List DISTRIBUTION: ROrlikowski, RIII AKock, NRR KLois, NRR ML13347B300 OFC DWMEP DWMEP DWMEP DWMEP NAME JHickman CHolston BWatson JHickman DATE 12 /16 / 2013 12 /16 / 2013 12 / 16 / 2013 12 / 16 / 2013 OFFICIAL RECORD COPY

Zion Nuclear Power Station, Units 1 and 2 Service List cc:

Mr. John Sauger Regional Administrator General Manager U.S. NRC, Region III Zion Restoration Project 2443 Warrenville Road ZionSolutions LLC Lisle, IL 60532-4352 101 Shiloh Blvd.

Zion, IL 60099-2797 John E. Matthews Morgan, Lewis & Bockius LLP Patrick Thurman, Esq. 1111 Pennsylvania Avenue, NW VP Regulatory Affairs, Licensing and Washington, DC 20004 Document Control ZionSolutions, LLC Matias F. Travieso-Diaz 101 Shiloh Blvd. Pillsbury Winthrop Shaw Pittman LLP Zion, IL 60099-2797 2300 N St., NW Washington, DC 20037 Gary Bouchard VP Engineering, Ops & Nuclear Security Tom Reilly, Executive Principal and Decommissioning Plant Manager Vista 360 ZionSolutions, LLC 649 Innsbruck 101 Shiloh Blvd. Libertyville, IL 60048 Zion, IL 60099 Director Spent Fuel & Decommissioning Russ Workman Strategy General Counsel Exelon Generation Company, LLC EnergySolutions 4300 Winfield Road 423 West 300 South, Suite 200 Warrenville, IL 60555 Salt Lake City, UT 84101 J. Bradley Fewell Mayor of Zion Associate General Counsel Zion, IL 60099 Exelon Corporation, LLC 4300 Winfield Rd.

Mr. Kent McKenzie, Emergency Warrenville, IL 60555 Management Coordinator Lake County Emergency Management Document Control Desk - Licensing Agency Exelon Generation Company, LLC 1303 N. Milwaukee Avenue 4300 Winfield Road Libertyville, IL 60048-1308 Warrenville, IL 60555

REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION 2013 DECOMMISSIONING FUNDING STATUS REPORT FOR ZION NUCLEAR POWER STATION, UNITS 1 AND 2 The request for additional information (RAI) is in response to the 2013 Decommissioning Funding Status (DFS) report for Zion Nuclear Power Station, Units 1 and 2. On March 26, 2013, ZionSolutions, LLC submitted to the U.S. Nuclear Regulatory Commission (NRC) the 2013 Decommissioning Funding Status (DFS) report for the Zion Nuclear Power Station, Units 1 and 2, as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii).

RAI #1: Decommissioning Costs On March 26, 2013, ZionSolutions, LLC did not provide the difference between actual and estimated costs for decommissioning work performed during the previous year.

Per 10 CFR 50.82(a)(8)(v),

The report must include the following information, current through the end of the previous calendar year: an estimate of the costs to complete decommissioning, reflecting any difference between actual and estimated costs for work performed during the year, and the decommissioning criteria upon which the estimate is based.

Provide the difference between actual and estimated costs for decommissioning work performed during the previous year.

Enclosure