Information Request to Support Upcoming Problem Identification and Resolution Inspection at Zion Nuclear Power Station
ML15236A348
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 08/24/2015
From: Robert Orlikowski
NRC/RGN-III/DNMS/MCID
To: Sauger J
ZionSolutions
Edwards R
References
Download: ML15236A348 (5)


Text

J. Sau UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 August 24, 2015 Mr. John Sauger General Manager Zion Restoration Project ZionSolutions, LLC 101 Shiloh Boulevard Zion, IL 60099

SUBJECT:

INFORMATION REQUEST TO SUPPORT UPCOMING PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION AT ZION NUCLEAR POWER STATION

Dear Mr. Sauger:

This letter is to request information to support the U.S. Nuclear Regulatory Commissions (NRCs) Problem Identification and Resolution (PI&R) inspection beginning September 14, 2015, at the permanently shut down Zion Nuclear Power Station, as previously discussed with members of your staff. This inspection will be performed using NRC Inspection Procedure (IP)

Nos. 71152 and 40801.

Experience has shown that these inspections are resource intensive both for the NRC inspectors and licensee staff. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents required to support the inspection effort.

The documents requested are copies of condition reports, procedures, self-assessment and audit reports, safety culture surveys and other information relevant to our evaluation of your corrective action program and Zion Station safety culture. The documents are necessary to ensure the NRC inspection team is provided with information sufficient to conduct an effective inspection. We request that the information be provided electronically for our inspection team on September 9, 2015.

If there are any questions about the material requested, or the inspection, please do not hesitate to contact Mr. Rhex Edwards, the lead inspector for this effort. Mr. Edwards can be reached at 630-829-9722 or at Rhex.Edwards@nrc.gov. Mr. Bill Lin can also be contacted at 630-829-9829 or at Bill.Lin@nrc.gov should Mr. Edwards be unavailable.

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011.

J. Sauger The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter, its enclosure, and your response, will be made available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRCs website at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA Michael LaFranzo Acting for/

Robert J. Orlikowski, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket No: 050-00295; 050-00304 License No: DPR-39; DPR-48

Enclosure:

Requested Information to Support PI&R Inspection cc w/encl: ZionSolutions, Service List

J. Sauger The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter, its enclosure, and your response, will be made available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRCs website at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA Michael LaFranzo Acting for/

Robert J. Orlikowski, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket No: 050-00295; 050-00304 License No: DPR-39; DPR-48

Enclosure:

Requested Information to Support PI&R Inspection cc w/encl: ZionSolutions, Service List DISTRIBUTION w/encl: Bruce Watson Carole Ariano Darrell Roberts John Hickman Ken Lambert Patrick Louden Harral Logaras Carmen Olteanu Julio Lara Rick Skokowski Jim Clay John Giessner Alan Barker MCID Inspectors ADAMS Accession Number: ML15236A348 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl N" = No copy OFFICE RIII DNMS RIII DNMS RIII DNMS RIII NAME Blin:ps*BL REdwards*RE ROrlikowski MML for DATE 08/24/15 08/24/15 08/24/15

  • review and concurrence received via e-mail (08/24/15)

OFFICIAL RECORD COPY

Requested Information to Support Problem Identification and Resolution (PI&R) Inspection

1. A copy of administrative procedure(s) for the corrective action program (CAP), trending program, quality assurance audit program, self-assessment program, corrective action effectiveness review program, operating experience review program, maintenance rule program, and operability determination process.
2. Description of changes made to the CAP since the last PI&R Inspection.
3. A copy of the employee concerns program and the procedures that governs the activities of the Management Review Committee (MRC).
4. A copy of quality assurance (QA) audits of the CAP completed since January 1, 2013.
5. A copy of any performance reports for the past two years used to track the CAP effectiveness.
6. A list of all open condition reports (CRs) sorted by significance level and then initiation date. Include the date initiated, a description of the issue, system affected, the significance level, the priority level and the responsible department.
7. A list of all CRs reports closed since January 1, 2013, sorted by significance level and then initiation date. Include the date initiated and closed, a description of the issue, system affected, the significance level, the priority level, and the responsible department.
8. A list of CRs initiated since January 1, 2013 that involve inadequate or ineffective corrective actions. Include the date initiated, a brief description, status, significance level of the issue, priority level and the assigned department.
9. A list of CRs initiated since January 1, 2013, that identify trends of conditions adverse to quality (and/or are important to the defueled condition). Include the date initiated, a brief description, status, significance level, priority level for each item and the responsible department.
10. A list of all outstanding corrective actions sorted by significance level and then initiation date. Include the date initiated, a description of the issue, system affected, the significance level, the priority level and the responsible department.
11. A list of root cause evaluations completed since January 1, 2013 with a brief description of the issue.
12. A list of apparent cause evaluations completed since January 1, 2013, with a brief description of the issue.
13. A list of common cause evaluations completed since January 1, 2013, with a brief description of the issue.
14. A list of effectiveness reviews completed since January 1, 2013, with a brief description of areas where findings were identified.

Enclosure

15. A list showing the number and titles of CRs generated since January 1, 2013 sorted by department (i.e., operations, D&D, ISFSI, etc.).
16. A list showing the number and titles of CRs generated since January 1, 2013 sorted by CAP trend codes.
17. The plan for self-assessments of the CAP and a copy of completed self-assessments of the CAP since January 1, 2013.
18. A list of current operability and functionality determinations. Include the date initiated, a brief description, system affected, status, significance level, priority level for each item and the responsible department.
19. Copies of corrective action closeout package for all NRC identified and licensee identified violations since January 1, 2013.
20. Copies of corrective action closeout package for all licensee event reports issued since January 1, 2013.
21. A list of operating experience documents received since January 1, 2013, and any associated CRs.
22. A list of the dates, times, and location for all scheduled meetings associated with the implementation of the CAP.
23. A copy of the latest Zion Nuclear Power Station organizational chart, phone listing and MRC membership.
24. Results of any safety culture/safety conscious work environment survey or self-assessment completed since January 1, 2013, including completed or planned corrective actions. Include any organizational effectiveness surveys conducted by internal or external organization.

Documents requested to be available on-site during the inspection:

a. Procedure index.
b. Copies of self-assessments and associated CRs generated in preparation for this inspection, if not already provided.
c. A list of issues brought to the ECP since 2013, and a summary of the actions taken for resolution.

2