Request for Additional Information
ML070930349
Person / Time
Site: Dresden, Peach Bottom, Oyster Creek, Byron, Braidwood, Limerick, Clinton, Quad Cities, Zion, LaSalle, Crane  Constellation icon.png
Issue date: 04/19/2007
From: Gratton C
NRC/NRR/ADRO/DORL/LPLIII-2
To: Crane C
Exelon Generation Co
Gratton C, NRR/DORL, 415-1055
References
TAC MD4400, TAC MD4401, TAC MD4402, TAC MD4403, TAC MD4404, TAC MD4405, TAC MD4406, TAC MD4407, TAC MD4408, TAC MD4409, TAC MD4410, TAC MD4411, TAC MD4412, TAC MD4413, TAC MD4414, TAC MD4415, TAC MD4416
Download: ML070930349 (12)


Text

April 19, 2007 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

BRAIDWOOD STATION, UNITS 1 AND 2; BYRON STATION, UNIT NOS. 1 AND 2; CLINTON POWER STATION, UNIT NO. 1; DRESDEN NUCLEAR POWER STATION, UNITS 1, 2 AND 3; LASALLE COUNTY STATION, UNITS 1 AND 2; LIMERICK GENERATING STATION, UNITS 1 AND 2; OYSTER CREEK NUCLEAR GENERATING STATION; PEACH BOTTOM ATOMIC POWER STATION, UNITS 1, 2, AND 3; QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2; THREE MILE ISLAND NUCLEAR STATION, UNIT 1; ZION NUCLEAR POWER STATION UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION RELATED TO THE REQUEST FOR APPROVAL OF A CHANGE TO THE EXELON GENERATION COMPANY, LLC, AND THE AMERGEN ENERGY COMPANY, LLC, QUALITY ASSURANCE TOPICAL REPORT (TAC NOS. MD4400 THRU MD4416)

Dear Mr. Crane:

By letter to the Nuclear Regulatory Commission (NRC) dated January 22, 2007, Exelon Generation Company, LLC, and AmerGen Energy Company, LLC (the licensees), requested approval for a change to the Quality Assurance Topical Report. Approval of this request would be applied to licensed activities under Title 10 of the Code of Federal Regulations (10 CFR),

Parts 50, 71, and 72, for the subject units. The licensees stated in their letter that the change requested for approval is a reduction in commitment. In accordance with 10 CFR 50, Section 50.54(a)(4), NRC prior approval is required prior to implementation. This change request also affects licensed activities under Parts 71 and 72. Review of this change as it pertains to Parts 71 and 72 will be addressed, by the NRCs Office of Nuclear Material Safety and Safeguards, in a separate correspondence.

The NRC staff has reviewed the information contained in the request and has determined that additional information is required to complete the review as it pertains to Part 50. The specific information requested is addressed in the enclosure to this letter. The NRC staff faxed a draft copy of the information request to Mr. David Chrzanowski on March 21, 2007. On March 23, 2007, the NRC staff held a conference call with Mr. Darin Benyak and Mr. Chrzanowski to clarify the information request. During that conference call, it was agreed that your staff would respond to the request by April 23, 2007.

The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRCs goal of efficient and effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-1055.

Sincerely,

/RA/

Christopher Gratton, Senior Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-456 and STN 50-457; STN 50-454 and STN 50-455; 50-461;50-010, 50-237, and 50-249; 50-373 and 50-374; 50-352 and 50-353; 50-219; 50-171, 50-277, and 50-278; 50-254 and 50-265; 50-289; 50-295 and 50-304

Enclosure:

Request for Additional Information cc w/encl: See next page The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRCs goal of efficient and effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-1055.

Sincerely,

/RA/

Christopher Gratton, Senior Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-456 and STN 50-457; STN 50-454 and STN 50-455; 50-461;50-010, 50-237, and 50-249; 50-373 and 50-374; 50-352 and 50-353; 50-219; 50-171, 50-277, and 50-278; 50-254 and 50-265; 50-289; 50-295 and 50-304

Enclosure:

Request for Additional Information cc w/encl: See next page DISTRIBUTION:

PUBLIC RidsNrrDorlLpl3-2 RidsNrrPMCGratton RidsRgn3MailCenter LPL3-2 R/F RidsNrrLAEWhitt RidsOgcRp RidsAcrsAcnwMailCenter CCraig, FSME JHickman, FSME KWilliams, NMSS ADAMS ACCESSION #: ML070930349

  • Memo dated OFFICE LPL3-2/PM LPL3-2/LA DSS/SBPB/BC NMSS/LID/BC (A)

LPL3-2/BC NAME CGratton EWhitt DThatcher*

KWilliams RGibbs DATE 4/17/07 4/17/07 3/15/2007 4/19/07 4/19/07

REQUEST FOR ADDITIONAL INFORMATION REGARDING A REQUEST FOR APPROVAL OF A CHANGE TO THE QUALITY ASSURANCE TOPICAL REPORT EXELON GENERATION COMPANY, LLC AMERGEN ENERGY COMPANY, LLC BRAIDWOOD STATION, UNITS 1 AND 2; BYRON STATION, UNIT NOS. 1 AND 2; CLINTON POWER STATION, UNIT NO. 1; DRESDEN NUCLEAR POWER STATION, UNITS 1, 2, AND 3; LASALLE COUNTY STATION, UNITS 1 AND 2; LIMERICK GENERATING STATION, UNITS 1 AND 2; OYSTER CREEK NUCLEAR GENERATING STATION; PEACH BOTTOM ATOMIC POWER STATION, UNITS 1, 2, AND 3; QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2; THREE MILE ISLAND NUCLEAR STATION, UNIT 1; AND ZION NUCLEAR POWER STATION, UNITS 1 AND 2; DOCKET NOS. STN 50-456 AND STN 50-457; STN 50-454 AND STN 50-455; 50-461;50-010, 50-237, AND 50-249; 50-373 AND 50-374; 50-352 AND 50-353; 50-219; 50-171, 50-277, AND 50-278; 50-254 AND 50-265; 50-289; 50-295 AND 50-304 The Nuclear Regulatory Commission (NRC) staff reviewed Exelon Generation Company, LLCs, and AmerGen Energy Company, LLCs, request for approval dated January 22, 2007, regarding Enclosure changes to the fire protection program procedure change approval process and determined that additional information was needed to complete its review:

Regulatory Issue Summary (RIS)99-002, Relaxation of the Technical Specification [TS]

Requirements for [Plant Operating Review Committee] PORC Review of Fire Protection Program Changes, identifies a method of meeting requirements for PORC review of the fire protection program and its implementing procedure.

RIS 99-002, Background Information, states:

The following regulatory controls in effect contribute to ensuring the continued effectiveness of the FitzPatrick fire protection program:

(1)

The FitzPatrick license includes a license condition that the licensee may make changes to the approved fire protection program without prior Commission approval only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

(2)

Since the fire protection program is included in the FitzPatrick final safety analysis report, the provisions of 10 CFR 50.59 apply; this regulation prohibits changes to the facility without prior Commission approval if it is determined that the change constitutes an unreviewed safety question.

(3)

The FitzPatrick technical specifications require the Safety Review Committee to inspect and audit the fire protection program.

(4)

The FitzPatrick technical specifications require written procedures and administrative policies to implement the fire protection program.

The NRC staff noted that item (3) above was not discussed in your January 22, 2007, letter.

Please describe how the Quality Assurance Topical Report establishes a requirement for the inspection and audit of the fire protection program.

Byron/Braidwood Stations cc:

Dwain W. Alexander, Project Manager Westinghouse Electric Corporation Energy Systems Business Unit Post Office Box 355 Pittsburgh, PA 15230-0355 Howard A. Learner Environmental Law and Policy Center of the Midwest 35 East Wacker Dr., Suite 1300 Chicago, IL 60601-2110 U.S. Nuclear Regulatory Commission Byron Resident Inspectors Office 4448 N. German Church Road Byron, IL 61010-9750 Regional Administrator, Region III U.S. Nuclear Regulatory Commission Suite 210 2443 Warrenville Road Lisle, IL 60532-4352 Ms. Lorraine Creek RR 1, Box 182 Manteno, IL 60950 Chairman, Ogle County Board Post Office Box 357 Oregon, IL 61061 Mrs. Phillip B. Johnson 1907 Stratford Lane Rockford, IL 61107 Attorney General 500 S. Second Street Springfield, IL 62701 Illinois Emergency Management Agency Division of Disaster Assistance &

Preparedness 110 East Adams Street Springfield, IL 62701-1109 Plant Manager - Byron Station Exelon Generation Company, LLC 4450 N. German Church Road Byron, IL 61010-9794 Site Vice President - Byron Exelon Generation Company, LLC 4450 N. German Church Road Byron, IL 61010-9794 U.S. Nuclear Regulatory Commission Braidwood Resident Inspectors Office 35100 S. Rt. 53, Suite 79 Braceville, IL 60407 County Executive Will County Office Building 302 N. Chicago Street Joliet, IL 60432 Plant Manager - Braidwood Station Exelon Generation Company, LLC 35100 S. Rt. 53, Suite 84 Braceville, IL 60407-9619 Ms. Bridget Little Rorem Appleseed Coordinator 117 N. Linden Street Essex, IL 60935 Document Control Desk - Licensing Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Site Vice President - Braidwood Exelon Generation Company, LLC 35100 S. Rt. 53, Suite 84 Braceville, IL 60407-9619 Senior Vice President - Operations Support Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

Byron/Braidwood Stations cc:

Director - Licensing and Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Manager Regulatory Assurance - Braidwood Exelon Generation Company, LLC 35100 S. Rt. 53, Suite 84 Braceville, IL 60407-9619 Manager Regulatory Assurance - Byron Exelon Generation Company, LLC 4450 N. German Church Road Byron, IL 61010-9794 Associate General Counsel Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President - Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Manager Licensing Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Senior Vice President - Midwest Operations Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Clinton Power Station, Unit 1 cc:

Manager Regulatory Assurance - Clinton AmerGen Energy Company, LLC Clinton Power Station RR3, Box 228 Clinton, IL 61727-9351 Site Vice President - Clinton Power Station AmerGen Energy Company, LLC Clinton Power Station RR 3, Box 228 Clinton, IL 61727-9351 Plant Manager - Clinton Power Station AmerGen Energy Company, LLC Clinton Power Station RR 3, Box 228 Clinton, IL 61727-9351 Resident Inspector U.S. Nuclear Regulatory Commission RR #3, Box 229A Clinton, IL 61727 Chairman of DeWitt County c/o County Clerks Office DeWitt County Courthouse Clinton, IL 61727 J. W. Blattner Project Manager Sargent & Lundy Engineers 55 East Monroe Street Chicago, IL 60603

Dresden and Quad Cities Nuclear Power Stations, Units 1 and 2 cc:

Site Vice President - Dresden Nuclear Power Station Exelon Generation Company, LLC 6500 N. Dresden Road Morris, IL 60450-9765 Plant Manager - Dresden Nuclear Power Station Exelon Generation Company, LLC 6500 N. Dresden Road Morris, IL 60450-9765 Manager Regulatory Assurance - Dresden Exelon Generation Company, LLC 6500 N. Dresden Road Morris, IL 60450-9765 U.S. Nuclear Regulatory Commission Dresden Resident Inspectors Office 6500 N. Dresden Road Morris, IL 60450-9766 Chairman Grundy County Board Administration Building 1320 Union Street Morris, IL 60450 Site Vice President - Quad Cities Exelon Generation Company, LLC 22710 206th Avenue N.

Cordova, IL 61242-9740 Plant Manager - Quad Cities Exelon Generation Company, LLC 22710 206th Avenue N.

Cordova, IL 61242-9740 Regulatory Assurance Manager - Quad Cities Exelon Generation Company, LLC 22710 206th Avenue N.

Cordova, IL 61242-9740 Quad Cities Resident Inspectors Office U.S. Nuclear Regulatory Commission 22712 206th Avenue N.

Cordova, IL 61242 David C. Tubbs MidAmerican Energy Company One River Center Place 106 E. Second, P.O. Box 4350 Davenport, IA 52808-4350 Vice President - Law and Regulatory Affairs MidAmerican Energy Company One River Center Place 106 E. Second Street P.O. Box 4350 Davenport, IA 52808 Chairman Rock Island County Board of Supervisors 1504 3rd Avenue Rock Island County Office Bldg.

Rock Island, IL 61201 LaSalle County Station, Units 1 and 2 cc:

Site Vice President - LaSalle County Station Exelon Generation Company, LLC 2601 North 21st Road Marseilles, IL 61341-9757 Plant Manager - LaSalle County Station Exelon Generation Company, LLC 2601 North 21st Road Marseilles, IL 61341-9757

LaSalle County Station, Units 1 and 2 cc:

Manager Regulatory Assurance - LaSalle Exelon Generation Company, LLC 2601 North 21st Road Marseilles, IL 61341-9757 U.S. Nuclear Regulatory Commission LaSalle Resident Inspectors Office 2605 North 21st Road Marseilles, IL 61341-9756 Phillip P. Steptoe, Esquire Sidley and Austin One First National Plaza Chicago, IL 60603 Assistant Attorney General 100 W. Randolph St. Suite 12 Chicago, IL 60601 Chairman LaSalle County Board 707 Etna Road Ottawa, IL 61350 Chairman Illinois Commerce Commission 527 E. Capitol Avenue, Leland Building Springfield, IL 62706 Robert Cushing, Chief, Public Utilities Division Illinois Attorney General's Office 100 W. Randolph Street Chicago, IL 60601 Zion Nuclear Power Station cc:

Decommissioning Plant Manager - Zion Exelon Generation Company, LLC 101 Shiloh Boulevard Zion, IL 60099-2797 Regulatory Assurance Engineer - Zion Exelon Generation Company, LLC 101 Shiloh Boulevard Zion, IL 60099-2797

Limerick Generating Station, Unit Nos. 1 and 2 cc:

Site Vice President Limerick Generating Station Exelon Generation Company, LLC P.O. Box 2300 Sanatoga, PA 19464 Plant Manager Limerick Generating Station Exelon Generation Company, LLC P.O. Box 2300 Sanatoga, PA 19464 Regulatory Assurance Manager - Limerick Exelon Generation Company, LLC P.O. Box 2300 Sanatoga, PA 19464 Director Licensing and Regulatory Affairs Exelon Generation Company, LLC 200 Exelon Way, KSA 3-E Kennett Square, PA 19348 Manager Licensing Limerick Generating Station Exelon Generation Company, LLC 200 Exelon Way, KSA 3-E Kennett Square, PA 19348 Correspondence Control Desk Exelon Generation Company, LLC P.O. Box 160 Kennett Square, PA 19348 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector U.S. Nuclear Regulatory Commission Limerick Generating Station P.O. Box 596 Pottstown, PA 19464 Library U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Director, Bureau of Radiation Protection Pennsylvania Dept. of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Chairman Board of Supervisors of Limerick Township 646 West Ridge Pike Linfield, PA 19468 Dr. Judith Johnsrud National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803 Oyster Creek Nuclear Generating Station cc:

Site Vice President - Oyster Creek Nuclear Generating Station AmerGen Energy Company, LLC P.O. Box 388 Forked River, NJ 08731 Senior Vice President of Operations AmerGen Energy Company, LLC 200 Exelon Way, KSA 3-N Kennett Square, PA 19348 Kathryn M. Sutton, Esquire Morgan, Lewis, & Bockius LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004

Oyster Creek Nuclear Generating Station cc:

Kent Tosch, Chief New Jersey Department of Environmental Protection Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Mayor of Lacey Township 818 West Lacey Road Forked River, NJ 08731 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 445 Forked River, NJ 08731 Director - Licensing and Regulatory Affairs AmerGen Energy Company, LLC Correspondence Control P.O. Box 160 Kennett Square, PA 19348 Manager Licensing - Oyster Creek Exelon Generation Company, LLC Correspondence Control P.O. Box 160 Kennett Square, PA 19348 Regulatory Assurance Manager Oyster Creek AmerGen Energy Company, LLC P.O. Box 388 Forked River, NJ 08731 Ron Bellamy, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Correspondence Control Desk AmerGen Energy Company, LLC 200 Exelon Way, KSA 1--1 Kennett Square, PA 19348 Oyster Creek Nuclear Generating Station Plant Manager AmerGen Energy Company, LLC P.O. Box 388 Forked River, NJ 08731 Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 cc:

Site Vice President Peach Bottom Atomic Power Station Exelon Generation Company, LLC 1848 Lay Road Delta, PA 17314 Plant Manager Peach Bottom Atomic Power Station Exelon Generation Company, LLC 1848 Lay Road Delta, PA 17314 Regulatory Assurance Manager Peach Bottom Atomic Power Station Exelon Generation Company, LLC 1848 Lay Road Delta, PA 17314 Resident Inspector U.S. Nuclear Regulatory Commission Peach Bottom Atomic Power Station P.O. Box 399 Delta, PA 17314 Mr. Roland Fletcher Department of Environment Radiological Health Program 2400 Broening Highway Baltimore, MD 21224

Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 cc:

Board of Supervisors Peach Bottom Township 545 Broad Street Ext.

Delta, PA 17314-9203 Mr. Richard McLean Power Plant and Environmental Review Division Department of Natural Resources B-3, Tawes State Office Building Annapolis, MD 21401 Manager-Financial Control & Co-Owner Affairs Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, NJ 08038-0236 Three Mile Island Nuclear Station, Unit 1 cc:

Site Vice President - Three Mile Island Nuclear Station, Unit 1 AmerGen Energy Company, LLC P. O. Box 480 Middletown, PA 17057 Chairman Board of County Commissioners of Dauphin County Dauphin County Courthouse Harrisburg, PA 17120 Chairman Board of Supervisors of Londonderry Township R.D. #1, Geyers Church Road Middletown, PA 17057 Senior Resident Inspector (TMI-1)

U.S. Nuclear Regulatory Commission P.O. Box 219 Middletown, PA 17057 Plant Manager - Three Mile Island Nuclear Station, Unit 1 AmerGen Energy Company, LLC P. O. Box 480 Middletown, PA 17057 Regulatory Assurance Manager - Three Mile Island Nuclear Station, Unit 1 AmerGen Energy Company, LLC P.O. Box 480 Middletown, PA 17057 Michael A. Schoppman Framatome ANP Suite 705 1911 North Ft. Myer Drive Rosslyn, VA 22209 Vice President, General Counsel and Secretary AmerGen Energy Company, LLC 2301 Market Street, S23-1 Philadelphia, PA 19101 Eric Epstein TMI Alert 4100 Hillsdale Road Harrisburg, PA 17112