ML14233A192: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML14233A192
| number = ML14233A192
| issue date = 08/20/2014
| issue date = 08/20/2014
| title = Nine Mile Point Nuclear Station Unit 1: Requalification Program Inspection
| title = Requalification Program Inspection
| author name = Jackson D E
| author name = Jackson D
| author affiliation = NRC/RGN-I/DRS
| author affiliation = NRC/RGN-I/DRS
| addressee name = Costanzo C
| addressee name = Costanzo C
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:C. Costanz UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406
{{#Wiki_filter:C. Costanz UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 August 20, 2014 Mr. Christopher Costanzo, Site Vice President Nine Mile Point Nuclear Station, LLC Exelon Generation Company, LLC P.O. Box 63 Lycoming, NY 13093-0063
-2713   August 20, 2014 Mr. Christopher Costanzo , Site Vice President Nine Mile Point Nuclear Station, LLC Exelon Generation Company, LLC P.O. Box 63 Lycoming, NY 13093
-0063


==SUBJECT:==
==SUBJECT:==
REQUALIFICATION PROGRAM INSPECTION
REQUALIFICATION PROGRAM INSPECTION - NINE MILE POINT NUCLEAR STATION UNIT 1
- NINE MILE POINT NUCLEAR STATION UNIT 1


==Dear Mr. Costanzo:==
==Dear Mr. Costanzo:==
In a n e-mail exchange between August 11, 2014 and August 18, 2014, Mr. J. D'Antonio , Senior Operations Engineer, and Mr. J. Rizzo , Lead Examiner , made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at Nine Mile Point , Unit 1. The inspection is planned for the week of October 13, 20 14, which coincides with the scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC
-approved requalification program.
In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish:
: 1) an index or summary of condition reports written in the past two years in which licensed operator errors were determined to be the root or contributing cause; 2) an index or summary of condition reports written in the past two years on simulator performance problems; 3) an index or summary of simulator performance test results in the past two years; and 4) the examination schedule, sample plan, written examinations and operating test scheduled for the week of the inspection to the NRC by October 6, 2014. Mr. Rizzo has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150
-0018. The public reporting burden for this collection of information is estimated to average 4 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T
-5 F52), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555
-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB
-10202, (3150
-0018), Office of Management and Budget, Washington, D.C. 20503.
C. Costanzo 2  The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC
's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC
's document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (The Public Electronic Reading Room).


Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. D'Antonio at (610) 337
In an e-mail exchange between August 11, 2014 and August 18, 2014, Mr. J. DAntonio, Senior Operations Engineer, and Mr. J. Rizzo, Lead Examiner, made arrangements for the U.S.
-5085. Sincerely,
Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at Nine Mile Point, Unit 1. The inspection is planned for the week of October 13, 2014, which coincides with the scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.
/RA/  Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No.
In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish: 1) an index or summary of condition reports written in the past two years in which licensed operator errors were determined to be the root or contributing cause; 2) an index or summary of condition reports written in the past two years on simulator performance problems; 3) an index or summary of simulator performance test results in the past two years; and 4) the examination schedule, sample plan, written examinations and operating test scheduled for the week of the inspection to the NRC by October 6, 2014.
50-220 License No. DPR
Mr. Rizzo has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
-63 cc:  Distribution via ListServ
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018.
The public reporting burden for this collection of information is estimated to average 4 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52),
U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503.


C. Costanzo 2 The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
C. Costanzo                                       2 The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).
-rm/adams.html (The Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. DAntonio at (610) 337-5085.
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. DAntonio at (610) 337
Sincerely,
-5085. Sincerely, /RA/   Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-220 License No. DPR
                                                      /RA/
-63 cc: Distribution via ListServ Distribution w/encl
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-220 License No. DPR-63 cc: Distribution via ListServ
: W. Dean, RA D. Lew, DRA H. Nieh, DRP M. Scott, DRP J. Trapp, DRS P. Krohn, DRS D. Schroeder, DRP A. Rosebrook, DRP K. Kolaczyk, DRP, SRI E. Miller, DRP, RI G. Stock, DRP, RI DRP, AA J. DAntonio, DRS C. Bixler, DRS D. Jackson, DRS A. Bowers, RI OEDO RidsNrrPMNineMilePoint Resource RidsNrrDorlLpl1
 
-1 Resource ROPReports Resource ADAMS PKG:ML14231A299 ADAMS NO.:
C. Costanzo                                      2 The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).
ML14233A192 DOCUMENT NAME:
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. DAntonio at (610) 337-5085.
G:\DRS\Operations Branch
Sincerely,
\DANTONIO\Requal FY14  
                                                      /RA/
- NMP1 Oct2014\NMP160dayrpi.docx SUNSI Review Non-Sensitive Sensitive  Publicly Available Non-Publicly Available OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB   NAME CBixler JDAntonio DJackson   DATE 08/19/2014 08/19/2014 08/20/2014   OFFICIAL RECORD COPY}}
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-220 License No. DPR-63 cc: Distribution via ListServ Distribution w/encl:
W. Dean, RA                          K. Kolaczyk, DRP, SRI             RidsNrrPMNineMilePoint D. Lew, DRA                          E. Miller, DRP, RI                 Resource H. Nieh, DRP                        G. Stock, DRP, RI                 RidsNrrDorlLpl1-1 M. Scott, DRP                        DRP, AA                           Resource J. Trapp, DRS                        J. DAntonio, DRS                   ROPReports Resource P. Krohn, DRS                        C. Bixler, DRS D. Schroeder, DRP                    D. Jackson, DRS A. Rosebrook, DRP                    A. Bowers, RI OEDO ADAMS PKG:ML14231A299                                 ADAMS NO.: ML14233A192 DOCUMENT NAME: G:\DRS\Operations Branch\DANTONIO\Requal FY14 - NMP1 Oct2014\NMP160dayrpi.docx Non-Sensitive                 Publicly Available SUNSI Review                                                        Non-Publicly Sensitive Available OFFICE             RI/DRS/OB           RI/DRS/OB     RI/DRS/OB NAME               CBixler             JDAntonio     DJackson DATE               08/19/2014           08/19/2014   08/20/2014 OFFICIAL RECORD COPY}}

Latest revision as of 02:13, 4 November 2019

Requalification Program Inspection
ML14233A192
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 08/20/2014
From: Diane Jackson
Division of Reactor Safety I
To: Costanzo C
Exelon Generation Co, Nine Mile Point
Shared Package
ML14231A299 List:
References
Download: ML14233A192 (3)


Text

C. Costanz UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 August 20, 2014 Mr. Christopher Costanzo, Site Vice President Nine Mile Point Nuclear Station, LLC Exelon Generation Company, LLC P.O. Box 63 Lycoming, NY 13093-0063

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - NINE MILE POINT NUCLEAR STATION UNIT 1

Dear Mr. Costanzo:

In an e-mail exchange between August 11, 2014 and August 18, 2014, Mr. J. DAntonio, Senior Operations Engineer, and Mr. J. Rizzo, Lead Examiner, made arrangements for the U.S.

Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at Nine Mile Point, Unit 1. The inspection is planned for the week of October 13, 2014, which coincides with the scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish: 1) an index or summary of condition reports written in the past two years in which licensed operator errors were determined to be the root or contributing cause; 2) an index or summary of condition reports written in the past two years on simulator performance problems; 3) an index or summary of simulator performance test results in the past two years; and 4) the examination schedule, sample plan, written examinations and operating test scheduled for the week of the inspection to the NRC by October 6, 2014.

Mr. Rizzo has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52),

U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503.

C. Costanzo 2 The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. DAntonio at (610) 337-5085.

Sincerely,

/RA/

Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-220 License No. DPR-63 cc: Distribution via ListServ

C. Costanzo 2 The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. DAntonio at (610) 337-5085.

Sincerely,

/RA/

Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-220 License No. DPR-63 cc: Distribution via ListServ Distribution w/encl:

W. Dean, RA K. Kolaczyk, DRP, SRI RidsNrrPMNineMilePoint D. Lew, DRA E. Miller, DRP, RI Resource H. Nieh, DRP G. Stock, DRP, RI RidsNrrDorlLpl1-1 M. Scott, DRP DRP, AA Resource J. Trapp, DRS J. DAntonio, DRS ROPReports Resource P. Krohn, DRS C. Bixler, DRS D. Schroeder, DRP D. Jackson, DRS A. Rosebrook, DRP A. Bowers, RI OEDO ADAMS PKG:ML14231A299 ADAMS NO.: ML14233A192 DOCUMENT NAME: G:\DRS\Operations Branch\DANTONIO\Requal FY14 - NMP1 Oct2014\NMP160dayrpi.docx Non-Sensitive Publicly Available SUNSI Review Non-Publicly Sensitive Available OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CBixler JDAntonio DJackson DATE 08/19/2014 08/19/2014 08/20/2014 OFFICIAL RECORD COPY