ML14254A076: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 09/11/2014 | | issue date = 09/11/2014 | ||
| title = Notification of NRC Retake Operator Licensing Examination 05000445/2015301, 05000446/2015301 | | title = Notification of NRC Retake Operator Licensing Examination 05000445/2015301, 05000446/2015301 | ||
| author name = Gaddy V | | author name = Gaddy V | ||
| author affiliation = NRC/RGN-IV/DRS | | author affiliation = NRC/RGN-IV/DRS | ||
| addressee name = Flores R | | addressee name = Flores R | ||
| addressee affiliation = Luminant Generation Co, LLC | | addressee affiliation = Luminant Generation Co, LLC | ||
| docket = 05000445, 05000446 | | docket = 05000445, 05000446 | ||
Line 14: | Line 14: | ||
| page count = 3 | | page count = 3 | ||
}} | }} | ||
See also: [[ | See also: [[see also::IR 05000445/2015301]] | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES | {{#Wiki_filter:UNITED STATES | ||
NUCLEAR REGULATORY COMMISSION | |||
REGION IV | |||
1600 E LAMAR BLVD | |||
-4511 | ARLINGTON, TX 76011-4511 | ||
September 11, 2014 | |||
Rafael Flores, Senior Vice President | |||
and Chief Nuclear Officer | |||
Attention: Regulatory Affairs | |||
Luminant Generation Company LLC | |||
Comanche Peak Nuclear Power Plant | |||
P.O. Box 1002 | |||
Glen Rose, TX 76043 | |||
SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 - | |||
NOTIFICATION OF NRC RETAKE OPERATOR LICENSING EXAMINATION | |||
Dear Mr. Flores: | 05000445/2015301; 05000446/2015301 | ||
In a telephone conversation on September 10, 2014 | Dear Mr. Flores: | ||
, between | In a telephone conversation on September 10, 2014, between Messrs. Gary Struble, Simulator | ||
, arrangements were made for the administration of a retake licensing examination at Comanche Peak Nuclear Power Plant, Units 1 and 2, during the week of February 9, 2015 | and Licensing Examination Manager, and Sean Hedger, Chief Examiner, arrangements were | ||
. | made for the administration of a retake licensing examination at Comanche Peak Nuclear Power | ||
As agreed during the telephone conversation, your staff | Plant, Units 1 and 2, during the week of February 9, 2015. | ||
As agreed during the telephone conversation, your staff will prepare the retake examination | |||
(written examination for two reactor operator applicants) based on the guidelines in | |||
, | NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, | ||
Supplement 1, and NUREG-1122, Knowledge and Abilities Catalog for Nuclear Power Plant | |||
Operators, Revision 2, Supplement 1. The NRCs regional office will discuss with your staff any | |||
changes that might be necessary before the examinations are administered. | |||
To meet the above schedule, it will be necessary for your staff to furnish the examination | To meet the above schedule, it will be necessary for your staff to furnish the examination | ||
outlines by November 24, 2014. The written examination and supporting reference materials | |||
outlines by November 24, 2014. | identified in Attachment 3 to ES-201 will be due by December 22, 2014. Pursuant to Title 10, | ||
Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized | |||
3 to ES-201 will be due by December 22, 2014. | representative of the facility licensee shall approve the outlines, examinations, and tests before | ||
they are submitted to the NRC for review and approval. All materials shall be complete and | |||
representative of the facility licensee shall approve the outlines, examinations, and tests | ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards | ||
information in your response be contained in a separate enclosure and appropriately marked. | |||
Any delay in receiving the required examinations and reference materials, or the submittal of | |||
Any delay in receiving the required | inadequate or incomplete materials, may cause the examinations to be rescheduled. | ||
R. Flores -2- | |||
In order to conduct the requested written examination, it will be necessary for your staff to | |||
R. Flores -2- In order to conduct the requested written examination, it will be necessary | provide adequate space and accommodations in accordance with ES-402. In addition, | ||
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in | |||
-402. | effect while the written examination is being administered. | ||
-1021 contains a number of NRC policies and guidelines that will be | To permit timely NRC review and evaluation, your staff should submit preliminary operator | ||
license applications [Office of Management and Budget (OMB) approval number 3150-0090], | |||
is being administered. | medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB | ||
approval number 3150-0090) by January 5, 2015. Signed applications certifying that all training | |||
license applications | has been completed should be submitted by January 26, 2015. If the final signed applications | ||
[Office of Management and Budget | are not received by that date, a postponement may be necessary. | ||
This letter contains information collections that are subject to the Paperwork Reduction Act of | |||
-0090], medical certifications (OMB approval number 3150 | 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under | ||
-0024), and waiver requests (if any) | approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for | ||
this collection of information is estimated to average 50 hours per response, including the time | |||
-0090) by January 5, 2015. | for reviewing instructions, gathering and maintaining the data needed, and completing and | ||
has been completed should be submitted by January 26, 2015 | reviewing the collection of information. Send comments regarding this burden estimate or any | ||
. | other aspect of these information collections, including suggestions for reducing the burden, to | ||
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory | |||
Commission, Washington, DC 20555-0001, or by Internet electronic mail to | |||
Paperwork Reduction Act of | INFOCOLLECTS@NRC.GOV. | ||
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an | |||
information collection, unless it displays a currently valid OMB control number. | |||
-0018, which expires on April 30, 2016. | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its | ||
enclosures will be available electronically for public inspection in the NRCs Public Document | |||
Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide | |||
other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T | Documents Access and Management System (ADAMS). ADAMS is accessible from the | ||
-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555 | electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading- | ||
-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV. | rm/adams.html. | ||
Thank you for your cooperation in this matter. Mr. Struble has been advised of the policies and | |||
In accordance with 10 CFR 2.390 of the | guidelines referenced in this letter. If you have any questions regarding the NRCs examination | ||
procedures and guidelines, please contact Mr. Hedger at 817-200-1556, or myself at 817-200- | |||
1159. | |||
Thank you for your cooperation in this matter. | Sincerely, | ||
/RA/ | |||
Vincent Gaddy, Chief | |||
procedures and guidelines, please contact Mr. Hedger at 817-200-1556, or myself at 817 | Operations Branch | ||
-200- | Division of Reactor Safety | ||
Dockets: 50-445; 50-446 | |||
Licenses: NPF-87; NPF-89 | |||
-445; 50-446 Licenses: | |||
-87; NPF-89 | ML14254A076 | ||
}} | }} |
Latest revision as of 00:26, 4 November 2019
ML14254A076 | |
Person / Time | |
---|---|
Site: | Comanche Peak |
Issue date: | 09/11/2014 |
From: | Vincent Gaddy Division of Reactor Safety IV |
To: | Flores R Luminant Generation Co |
Gaddy V | |
References | |
IR-2015-301 | |
Download: ML14254A076 (3) | |
See also: IR 05000445/2015301
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E LAMAR BLVD
ARLINGTON, TX 76011-4511
September 11, 2014
Rafael Flores, Senior Vice President
and Chief Nuclear Officer
Attention: Regulatory Affairs
Luminant Generation Company LLC
Comanche Peak Nuclear Power Plant
P.O. Box 1002
Glen Rose, TX 76043
SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 -
NOTIFICATION OF NRC RETAKE OPERATOR LICENSING EXAMINATION
05000445/2015301; 05000446/2015301
Dear Mr. Flores:
In a telephone conversation on September 10, 2014, between Messrs. Gary Struble, Simulator
and Licensing Examination Manager, and Sean Hedger, Chief Examiner, arrangements were
made for the administration of a retake licensing examination at Comanche Peak Nuclear Power
Plant, Units 1 and 2, during the week of February 9, 2015.
As agreed during the telephone conversation, your staff will prepare the retake examination
(written examination for two reactor operator applicants) based on the guidelines in
NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9,
Supplement 1, and NUREG-1122, Knowledge and Abilities Catalog for Nuclear Power Plant
Operators, Revision 2, Supplement 1. The NRCs regional office will discuss with your staff any
changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination
outlines by November 24, 2014. The written examination and supporting reference materials
identified in Attachment 3 to ES-201 will be due by December 22, 2014. Pursuant to Title 10,
Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized
representative of the facility licensee shall approve the outlines, examinations, and tests before
they are submitted to the NRC for review and approval. All materials shall be complete and
ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards
information in your response be contained in a separate enclosure and appropriately marked.
Any delay in receiving the required examinations and reference materials, or the submittal of
inadequate or incomplete materials, may cause the examinations to be rescheduled.
R. Flores -2-
In order to conduct the requested written examination, it will be necessary for your staff to
provide adequate space and accommodations in accordance with ES-402. In addition,
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examination is being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary operator
license applications [Office of Management and Budget (OMB) approval number 3150-0090],
medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB
approval number 3150-0090) by January 5, 2015. Signed applications certifying that all training
has been completed should be submitted by January 26, 2015. If the final signed applications
are not received by that date, a postponement may be necessary.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for
this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time
for reviewing instructions, gathering and maintaining the data needed, and completing and
reviewing the collection of information. Send comments regarding this burden estimate or any
other aspect of these information collections, including suggestions for reducing the burden, to
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by Internet electronic mail to
INFOCOLLECTS@NRC.GOV.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosures will be available electronically for public inspection in the NRCs Public Document
Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the
electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-
rm/adams.html.
Thank you for your cooperation in this matter. Mr. Struble has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRCs examination
procedures and guidelines, please contact Mr. Hedger at 817-200-1556, or myself at 817-200-
1159.
Sincerely,
/RA/
Vincent Gaddy, Chief
Operations Branch
Division of Reactor Safety
Dockets: 50-445; 50-446