ML14254A076: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 09/11/2014
| issue date = 09/11/2014
| title = Notification of NRC Retake Operator Licensing Examination 05000445/2015301, 05000446/2015301
| title = Notification of NRC Retake Operator Licensing Examination 05000445/2015301, 05000446/2015301
| author name = Gaddy V G
| author name = Gaddy V
| author affiliation = NRC/RGN-IV/DRS
| author affiliation = NRC/RGN-IV/DRS
| addressee name = Flores R G
| addressee name = Flores R
| addressee affiliation = Luminant Generation Co, LLC
| addressee affiliation = Luminant Generation Co, LLC
| docket = 05000445, 05000446
| docket = 05000445, 05000446
Line 14: Line 14:
| page count = 3
| page count = 3
}}
}}
See also: [[followed by::IR 05000445/2015301]]
See also: [[see also::IR 05000445/2015301]]


=Text=
=Text=
{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES
NUCLEAR REGULATORY COMMISSION
                            NUCLEAR REGULATORY COMMISSION
REGION IV 1600 E LAMAR BLVD
                                              REGION IV
ARLINGTON, TX 76011
                                          1600 E LAMAR BLVD
-4511 September 11, 2014
                                        ARLINGTON, TX 76011-4511
  Rafael Flores, Senior Vice President
                                        September 11, 2014
  and Chief Nuclear Officer
Rafael Flores, Senior Vice President
Attention: Regulatory Affairs
  and Chief Nuclear Officer
Luminant Generation Company LLC
Attention: Regulatory Affairs
Comanche Peak Nuclear Power Plant
Luminant Generation Company LLC
P.O. Box 1002
Comanche Peak Nuclear Power Plant
Glen Rose, TX 76043
P.O. Box 1002
  SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2
Glen Rose, TX 76043
- NOTIFICATION OF NRC RETAKE OPERATOR LICENSING EXAMINATION  
SUBJECT:         COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 -
05000 445/201 5 30 1; 05000 446/201 5 30 1 
                NOTIFICATION OF NRC RETAKE OPERATOR LICENSING EXAMINATION
Dear Mr. Flores:
                05000445/2015301; 05000446/2015301
In a telephone conversation on September 10, 2014
Dear Mr. Flores:
, between Mess r s. Gary Struble, Simulator and Licensing Examination Manager, and Sean Hedger , Chief Examiner
In a telephone conversation on September 10, 2014, between Messrs. Gary Struble, Simulator
, arrangements were made for the administration of a retake licensing examination at Comanche Peak Nuclear Power Plant, Units 1 and 2, during the week of February 9, 2015
and Licensing Examination Manager, and Sean Hedger, Chief Examiner, arrangements were
.
made for the administration of a retake licensing examination at Comanche Peak Nuclear Power
As agreed during the telephone conversation, your staff
Plant, Units 1 and 2, during the week of February 9, 2015.
will prepare the retake examination (written examination for two reactor operator applicants) based on the guidelines in  
As agreed during the telephone conversation, your staff will prepare the retake examination
NUREG-1021, "Operator Licensing Examination Standards for Power Reactors
(written examination for two reactor operator applicants) based on the guidelines in
," Revision 9 , Supplement 1, and
NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9,
NUREG-11 22, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators ," Revision 2, Supplement 1.
Supplement 1, and NUREG-1122, Knowledge and Abilities Catalog for Nuclear Power Plant
  The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
Operators, Revision 2, Supplement 1. The NRCs regional office will discuss with your staff any
 
changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination
To meet the above schedule, it will be necessary for your staff to furnish the examination
outlines by November 24, 2014. The written examination and supporting reference materials
outlines by November 24, 2014. The written examination and supporting reference
identified in Attachment 3 to ES-201 will be due by December 22, 2014. Pursuant to Title 10,
materials identified in Attachment  
Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized
3 to ES-201 will be due by December 22, 2014. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized
representative of the facility licensee shall approve the outlines, examinations, and tests before
they are submitted to the NRC for review and approval. All materials shall be complete and
representative of the facility licensee shall approve the outlines, examinations, and tests
ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards
before they are submitted to the NRC for review and approval. All materials shall be complete
information in your response be contained in a separate enclosure and appropriately marked.
and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked.
Any delay in receiving the required examinations and reference materials, or the submittal of
Any delay in receiving the required examination
inadequate or incomplete materials, may cause the examinations to be rescheduled.
s and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations
 
to be rescheduled.
R. Flores                                     -2-
 
In order to conduct the requested written examination, it will be necessary for your staff to
R. Flores -2- In order to conduct the requested written examination, it will be necessary
provide adequate space and accommodations in accordance with ES-402. In addition,
for your staff to provide adequate space and accommodations in accordance with ES
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in
-402. In addition, Appendix E to NUREG
effect while the written examination is being administered.
-1021 contains a number of NRC policies and guidelines that will be
To permit timely NRC review and evaluation, your staff should submit preliminary operator
in effect while the written examination  
license applications [Office of Management and Budget (OMB) approval number 3150-0090],
is being administered.
medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB
  To permit timely NRC review and evaluation, your staff should submit preliminary operator  
approval number 3150-0090) by January 5, 2015. Signed applications certifying that all training
license applications  
has been completed should be submitted by January 26, 2015. If the final signed applications
[Office of Management and Budget
are not received by that date, a postponement may be necessary.
(OMB) approval number 3150
This letter contains information collections that are subject to the Paperwork Reduction Act of
-0090], medical certifications (OMB approval number 3150
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
-0024), and waiver requests (if any)
approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for
(OMB approval number 3150
this collection of information is estimated to average 50 hours per response, including the time
-0090) by January 5, 2015. Signed applications certifying that all training  
for reviewing instructions, gathering and maintaining the data needed, and completing and
has been completed should be submitted by January 26, 2015
reviewing the collection of information. Send comments regarding this burden estimate or any
. If the final signed applications are not received by that date, a postponement may be necessary.
other aspect of these information collections, including suggestions for reducing the burden, to
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory
This letter contains information collections that are subject to the  
Commission, Washington, DC 20555-0001, or by Internet electronic mail to
Paperwork Reduction Act of
INFOCOLLECTS@NRC.GOV.
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
approval number 3150
information collection, unless it displays a currently valid OMB control number.
-0018, which expires on April 30, 2016. The public reporting burden for
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
this collection of information is estimated to average 50 hours per response, including
enclosures will be available electronically for public inspection in the NRCs Public Document
the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any  
Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide
other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T
Documents Access and Management System (ADAMS). ADAMS is accessible from the
-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555
electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-
-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV.   The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
rm/adams.html.
 
Thank you for your cooperation in this matter. Mr. Struble has been advised of the policies and
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible
guidelines referenced in this letter. If you have any questions regarding the NRCs examination
from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading
procedures and guidelines, please contact Mr. Hedger at 817-200-1556, or myself at 817-200-
-rm/adams.html.  
1159.
Thank you for your cooperation in this matter. Mr. Struble has been advised of the policies and
                                                Sincerely,
guidelines referenced in this letter. If you have any questions regarding the NRC's examination
                                                /RA/
                                                Vincent Gaddy, Chief
procedures and guidelines, please contact Mr. Hedger at 817-200-1556, or myself at 817
                                                Operations Branch
-200-1 159.       Sincerely,         /RA/       Vincent Gaddy, Chief Operations Branch
                                                Division of Reactor Safety
      Division of Reactor Safety
Dockets: 50-445; 50-446
  Dockets:   50
Licenses: NPF-87; NPF-89
-445; 50-446 Licenses: NPF
 
-87; NPF-89
ML14254A076
}}
}}

Latest revision as of 00:26, 4 November 2019

Notification of NRC Retake Operator Licensing Examination 05000445/2015301, 05000446/2015301
ML14254A076
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/11/2014
From: Vincent Gaddy
Division of Reactor Safety IV
To: Flores R
Luminant Generation Co
Gaddy V
References
IR-2015-301
Download: ML14254A076 (3)


See also: IR 05000445/2015301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E LAMAR BLVD

ARLINGTON, TX 76011-4511

September 11, 2014

Rafael Flores, Senior Vice President

and Chief Nuclear Officer

Attention: Regulatory Affairs

Luminant Generation Company LLC

Comanche Peak Nuclear Power Plant

P.O. Box 1002

Glen Rose, TX 76043

SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 -

NOTIFICATION OF NRC RETAKE OPERATOR LICENSING EXAMINATION

05000445/2015301; 05000446/2015301

Dear Mr. Flores:

In a telephone conversation on September 10, 2014, between Messrs. Gary Struble, Simulator

and Licensing Examination Manager, and Sean Hedger, Chief Examiner, arrangements were

made for the administration of a retake licensing examination at Comanche Peak Nuclear Power

Plant, Units 1 and 2, during the week of February 9, 2015.

As agreed during the telephone conversation, your staff will prepare the retake examination

(written examination for two reactor operator applicants) based on the guidelines in

NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9,

Supplement 1, and NUREG-1122, Knowledge and Abilities Catalog for Nuclear Power Plant

Operators, Revision 2, Supplement 1. The NRCs regional office will discuss with your staff any

changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination

outlines by November 24, 2014. The written examination and supporting reference materials

identified in Attachment 3 to ES-201 will be due by December 22, 2014. Pursuant to Title 10,

Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized

representative of the facility licensee shall approve the outlines, examinations, and tests before

they are submitted to the NRC for review and approval. All materials shall be complete and

ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards

information in your response be contained in a separate enclosure and appropriately marked.

Any delay in receiving the required examinations and reference materials, or the submittal of

inadequate or incomplete materials, may cause the examinations to be rescheduled.

R. Flores -2-

In order to conduct the requested written examination, it will be necessary for your staff to

provide adequate space and accommodations in accordance with ES-402. In addition,

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examination is being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary operator

license applications [Office of Management and Budget (OMB) approval number 3150-0090],

medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB

approval number 3150-0090) by January 5, 2015. Signed applications certifying that all training

has been completed should be submitted by January 26, 2015. If the final signed applications

are not received by that date, a postponement may be necessary.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for

this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time

for reviewing instructions, gathering and maintaining the data needed, and completing and

reviewing the collection of information. Send comments regarding this burden estimate or any

other aspect of these information collections, including suggestions for reducing the burden, to

the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory

Commission, Washington, DC 20555-0001, or by Internet electronic mail to

INFOCOLLECTS@NRC.GOV.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRCs Public Document

Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the

electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-

rm/adams.html.

Thank you for your cooperation in this matter. Mr. Struble has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRCs examination

procedures and guidelines, please contact Mr. Hedger at 817-200-1556, or myself at 817-200-

1159.

Sincerely,

/RA/

Vincent Gaddy, Chief

Operations Branch

Division of Reactor Safety

Dockets: 50-445; 50-446

Licenses: NPF-87; NPF-89

ML14254A076