| issue date = 04/27/2018
| issue date = 04/27/2018
| title = Palo Verde Nuclear Generating Station (Pvngs), Units 1, 2, and 3, 2017 Annual Environmental Operating Report
| title = Annual Environmental Operating Report
| author name = DiLorenzo M D
| author name = Dilorenzo M
| author affiliation = Arizona Public Service Co
| author affiliation = Arizona Public Service Co
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:A member of the STARS Alliance LLC Callaway  Diablo Canyon  Palo Verde  Wolf Creek Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 Mail Station 7636 Tel: (623) 393-3495 102-07689-MDD/MSC April 27, 2018 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001  
{{#Wiki_filter:Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 Mail Station 7636 Tel: (623) 393-3495 102-07689-MDD/MSC April 27, 2018 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001


==Dear Sirs:==
==Dear Sirs:==


==Subject:==
==Subject:==
Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 2017 Annual Environmental Operating Report Enclosed please find the 2017 Annual Environmental Operating Report for PVNGS Units 1, 2, and 3. Arizona Public Service Company is submitting this report pursuant to Section 5.4.1 of Appendix B to the PVNGS Units 1, 2, and 3 Renewed Operating License Nos. NPF-41, NPF-51, and NPF-74, respectively. No new commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact Matthew S. Cox, Licensing Section Leader, at (623) 393-5753. Sincerely, Michael D. DiLorenzo Department Leader, Regulatory Affairs MDD/MSC/sma  
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 2017 Annual Environmental Operating Report Enclosed please find the 2017 Annual Environmental Operating Report for PVNGS Units 1, 2, and 3. Arizona Public Service Company is submitting this report pursuant to Section 5.4.1 of Appendix B to the PVNGS Units 1, 2, and 3 Renewed Operating License Nos. NPF-41, NPF-51, and NPF-74, respectively.
No new commitments are being made to the NRC by this letter.
Should you need further information regarding this submittal, please contact Matthew S. Cox, Licensing Section Leader, at (623) 393-5753.
Sincerely, Digitally signed by Dilorenzo, Dilorenzo, Michael Michael D(Z99838)
DN: cn=Dilorenzo, Michael D(Z99838)          D(Z99838)
Date: 2018.04.27 14:37:15 -07'00' Michael D. DiLorenzo Department Leader, Regulatory Affairs MDD/MSC/sma


==Enclosure:==
==Enclosure:==
Palo Verde Nuclear Generating Station Units 1, 2, and 3 2017 Annual Environmental Operating Report cc: K. M. Kennedy NRC Region IV Regional Administrator S. P. Lingam NRC NRR Project Manager for PVNGS M. M. O'Banion NRC NRR Project Manager C. A. Peabody NRC Senior Resident Inspector for PVNGS  Dilorenzo, Michael D(Z99838)Digitally signed by Dilorenzo, Michael D(Z99838)
Palo Verde Nuclear Generating Station Units 1, 2, and 3 2017 Annual Environmental Operating Report cc: K. M. Kennedy                 NRC       Region IV Regional Administrator S. P. Lingam               NRC       NRR Project Manager for PVNGS M. M. OBanion              NRC       NRR Project Manager C. A. Peabody               NRC       Senior Resident Inspector for PVNGS A member of the STARS Alliance LLC Callaway  Diablo Canyon  Palo Verde Wolf Creek
DN: cn=Dilorenzo, Michael D(Z99838)
 
Date: 2018.04.27 14:37:15 -07'00' Enclosure Palo Verde Nuclear Generating Station Units 1, 2, and 3 2017 Annual Environmental Operating Report Enclosure   2017 Annual Environmental Operating Report 1 I. INTRODUCTION Palo Verde Nuclear Generating Station (PVNGS) is located in Maricopa County, Arizona, approximately 50 miles west of the Phoenix metropolitan area. The PVNGS site comprises approximately 4,280 acres. Site elevations range from 890 feet above mean sea level at the southern boundary to 1,030 feet above mean sea level at the northern boundary. The station consists of three pressurized water reactor electrical generating units. Units 1, 2, and 3 have a rated thermal power of 3,990 MW. Arizona Public Service (APS) was issued low power operating licenses NPF-34, NPF-46 and NPF-65 for Units 1, 2, and 3 by the United States Nuclear Regulatory Commission (NRC) on December 31, 1984, December 9, 1985, and March 25, 1987, respectively. APS was issued full power operating licenses NPF-41, NPF-51 and NPF-74 for Units 1, 2, and 3 on June 1, 1985, April 24, 1986, and November 25, 1987, respectively. These licenses were renewed on April 21, 2011. Appendix B to these operating licenses is entitled the Environmental Protection Plan (Non Radiological). The environmental protection plans (EPP) for each of the current operating licenses are identical. The purpose of the EPP is to provide for the protection of environmental values during the construction and operation of the nuclear facility. The principal objectives of the EPP are as follows: (1) Verify that the station is operated in an environmentally acceptable manner, as established by the final environmental statement (FES) and other NRC environmental impact assessments. (2) Coordinate NRC requirements and maintain consistency with other federal, state and local requirements for environmental protection. (3) Keep the NRC informed of the environmental effects of facility construction and operation and actions taken to control those effects. This Annual Environmental Operating Report is required by Section 5.4.1 of the EPP. This report describes the activities related to the PVNGS EPP during the 2017 calendar year. For purposes of this report, references to the EPP are considered to be the EPP of NPF-41, NPF-51, and NPF-74.
Enclosure Palo Verde Nuclear Generating Station Units 1, 2, and 3 2017 Annual Environmental Operating Report
Enclosure   2017 Annual Environmental Operating Report 2 II. ENVIRONMENTAL MONITORING SUMMARIES AND ANALYSIS A. Cultural Resources Section 4.2.1 of the EPP requires that an archaeological survey be performed when final alignment of the PVNGS-to-Saguaro transmission line is completed. As of the date of this report, plans for this transmission line have been indefinitely suspended. Therefore, there has been no activity with regard to this requirement of the EPP. B. Terrestrial Ecology Monitoring As communicated in a letter to the NRC dated December 30, 1991 (Reference 1), the salt deposition monitoring program was discontinued at the end of 1991. III. PLANT DESIGN AND OPERATION CHANGES Section 3.1 of the EPP allows changes in station design, operation, or the performance of tests or experiments affecting the environment provided that such changes, tests, or experiments do not involve an unreviewed environmental question and do not involve a change to the EPP. Changes, tests, or experiments in which all measurable non-radiological effects are confined to the onsite areas previously disturbed during site preparation and plant construction or in which the environment is not affected are exempt from the evaluation and reporting requirements of Section 3.1. Section 3.2 of the EPP also exempts changes, tests, or experiments which are required to comply with other federal, state, or local environmental regulations. No design and operational changes were initiated in 2017 that required an evaluation to determine if they involved either an unreviewed environmental question or constituted a change in the EPP. IV. EPP NON-COMPLIANCES There were no instances of non-compliance with the EPP identified during 2017.
 
Enclosure   2017 Annual Environmental Operating Report 3 V. NON-ROUTINE REPORTS There were no non-routine reports required by Section 5.4.2 of the EPP during 2017. VI. REFERENCES 1. Letter from W.F. Conway (APS) to U.S. NRC, Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2, and 3, Salt Deposition and Impact Monitoring Plan, dated December 30, 1991 [NRC Agency wide Documents Access and Management System (ADAMS) No. 9201070077]
Enclosure 2017 Annual Environmental Operating Report I. INTRODUCTION Palo Verde Nuclear Generating Station (PVNGS) is located in Maricopa County, Arizona, approximately 50 miles west of the Phoenix metropolitan area. The PVNGS site comprises approximately 4,280 acres. Site elevations range from 890 feet above mean sea level at the southern boundary to 1,030 feet above mean sea level at the northern boundary. The station consists of three pressurized water reactor electrical generating units. Units 1, 2, and 3 have a rated thermal power of 3,990 MW.
A member of the STARS Alliance LLC Callaway  Diablo Canyon  Palo Verde  Wolf Creek Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 Mail Station 7636 Tel: (623) 393-3495 102-07689-MDD/MSC April 27, 2018 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001  
Arizona Public Service (APS) was issued low power operating licenses NPF-34, NPF-46 and NPF-65 for Units 1, 2, and 3 by the United States Nuclear Regulatory Commission (NRC) on December 31, 1984, December 9, 1985, and March 25, 1987, respectively. APS was issued full power operating licenses NPF-41, NPF-51 and NPF-74 for Units 1, 2, and 3 on June 1, 1985, April 24, 1986, and November 25, 1987, respectively. These licenses were renewed on April 21, 2011.
Appendix B to these operating licenses is entitled the Environmental Protection Plan (Non Radiological). The environmental protection plans (EPP) for each of the current operating licenses are identical.
The purpose of the EPP is to provide for the protection of environmental values during the construction and operation of the nuclear facility. The principal objectives of the EPP are as follows:
(1)   Verify that the station is operated in an environmentally acceptable manner, as established by the final environmental statement (FES) and other NRC environmental impact assessments.
(2)   Coordinate NRC requirements and maintain consistency with other federal, state and local requirements for environmental protection.
(3)   Keep the NRC informed of the environmental effects of facility construction and operation and actions taken to control those effects.
This Annual Environmental Operating Report is required by Section 5.4.1 of the EPP. This report describes the activities related to the PVNGS EPP during the 2017 calendar year. For purposes of this report, references to the EPP are considered to be the EPP of NPF-41, NPF-51, and NPF-74.
1
 
Enclosure 2017 Annual Environmental Operating Report II. ENVIRONMENTAL MONITORING SUMMARIES AND ANALYSIS A. Cultural Resources Section 4.2.1 of the EPP requires that an archaeological survey be performed when final alignment of the PVNGS-to-Saguaro transmission line is completed. As of the date of this report, plans for this transmission line have been indefinitely suspended. Therefore, there has been no activity with regard to this requirement of the EPP.
B. Terrestrial Ecology Monitoring As communicated in a letter to the NRC dated December 30, 1991 (Reference 1), the salt deposition monitoring program was discontinued at the end of 1991.
III. PLANT DESIGN AND OPERATION CHANGES Section 3.1 of the EPP allows changes in station design, operation, or the performance of tests or experiments affecting the environment provided that such changes, tests, or experiments do not involve an unreviewed environmental question and do not involve a change to the EPP. Changes, tests, or experiments in which all measurable non-radiological effects are confined to the onsite areas previously disturbed during site preparation and plant construction or in which the environment is not affected are exempt from the evaluation and reporting requirements of Section 3.1.
Section 3.2 of the EPP also exempts changes, tests, or experiments which are required to comply with other federal, state, or local environmental regulations.
No design and operational changes were initiated in 2017 that required an evaluation to determine if they involved either an unreviewed environmental question or constituted a change in the EPP.
IV. EPP NON-COMPLIANCES There were no instances of non-compliance with the EPP identified during 2017.
2
 
Enclosure 2017 Annual Environmental Operating Report V. NON-ROUTINE REPORTS There were no non-routine reports required by Section 5.4.2 of the EPP during 2017.
VI. REFERENCES
: 1. Letter from W.F. Conway (APS) to U.S. NRC, Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2, and 3, Salt Deposition and Impact Monitoring Plan, dated December 30, 1991 [NRC Agency wide Documents Access and Management System (ADAMS)
No. 9201070077]
3
 
Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 Mail Station 7636 Tel: (623) 393-3495 102-07689-MDD/MSC April 27, 2018 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001


==Dear Sirs:==
==Dear Sirs:==


==Subject:==
==Subject:==
Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 2017 Annual Environmental Operating Report Enclosed please find the 2017 Annual Environmental Operating Report for PVNGS Units 1, 2, and 3. Arizona Public Service Company is submitting this report pursuant to Section 5.4.1 of Appendix B to the PVNGS Units 1, 2, and 3 Renewed Operating License Nos. NPF-41, NPF-51, and NPF-74, respectively. No new commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact Matthew S. Cox, Licensing Section Leader, at (623) 393-5753. Sincerely, Michael D. DiLorenzo Department Leader, Regulatory Affairs MDD/MSC/sma  
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 2017 Annual Environmental Operating Report Enclosed please find the 2017 Annual Environmental Operating Report for PVNGS Units 1, 2, and 3. Arizona Public Service Company is submitting this report pursuant to Section 5.4.1 of Appendix B to the PVNGS Units 1, 2, and 3 Renewed Operating License Nos. NPF-41, NPF-51, and NPF-74, respectively.
No new commitments are being made to the NRC by this letter.
Should you need further information regarding this submittal, please contact Matthew S. Cox, Licensing Section Leader, at (623) 393-5753.
Sincerely, Digitally signed by Dilorenzo, Dilorenzo, Michael Michael D(Z99838)
DN: cn=Dilorenzo, Michael D(Z99838)          D(Z99838)
Date: 2018.04.27 14:37:15 -07'00' Michael D. DiLorenzo Department Leader, Regulatory Affairs MDD/MSC/sma


==Enclosure:==
==Enclosure:==
Palo Verde Nuclear Generating Station Units 1, 2, and 3 2017 Annual Environmental Operating Report cc: K. M. Kennedy NRC Region IV Regional Administrator S. P. Lingam NRC NRR Project Manager for PVNGS M. M. O'Banion NRC NRR Project Manager C. A. Peabody NRC Senior Resident Inspector for PVNGS  Dilorenzo, Michael D(Z99838)Digitally signed by Dilorenzo, Michael D(Z99838)
Palo Verde Nuclear Generating Station Units 1, 2, and 3 2017 Annual Environmental Operating Report cc: K. M. Kennedy                 NRC       Region IV Regional Administrator S. P. Lingam               NRC       NRR Project Manager for PVNGS M. M. OBanion              NRC       NRR Project Manager C. A. Peabody               NRC       Senior Resident Inspector for PVNGS A member of the STARS Alliance LLC Callaway  Diablo Canyon  Palo Verde Wolf Creek
DN: cn=Dilorenzo, Michael D(Z99838)
 
Date: 2018.04.27 14:37:15 -07'00' Enclosure Palo Verde Nuclear Generating Station Units 1, 2, and 3 2017 Annual Environmental Operating Report Enclosure   2017 Annual Environmental Operating Report 1 I. INTRODUCTION Palo Verde Nuclear Generating Station (PVNGS) is located in Maricopa County, Arizona, approximately 50 miles west of the Phoenix metropolitan area. The PVNGS site comprises approximately 4,280 acres. Site elevations range from 890 feet above mean sea level at the southern boundary to 1,030 feet above mean sea level at the northern boundary. The station consists of three pressurized water reactor electrical generating units. Units 1, 2, and 3 have a rated thermal power of 3,990 MW. Arizona Public Service (APS) was issued low power operating licenses NPF-34, NPF-46 and NPF-65 for Units 1, 2, and 3 by the United States Nuclear Regulatory Commission (NRC) on December 31, 1984, December 9, 1985, and March 25, 1987, respectively. APS was issued full power operating licenses NPF-41, NPF-51 and NPF-74 for Units 1, 2, and 3 on June 1, 1985, April 24, 1986, and November 25, 1987, respectively. These licenses were renewed on April 21, 2011. Appendix B to these operating licenses is entitled the Environmental Protection Plan (Non Radiological). The environmental protection plans (EPP) for each of the current operating licenses are identical. The purpose of the EPP is to provide for the protection of environmental values during the construction and operation of the nuclear facility. The principal objectives of the EPP are as follows: (1) Verify that the station is operated in an environmentally acceptable manner, as established by the final environmental statement (FES) and other NRC environmental impact assessments. (2) Coordinate NRC requirements and maintain consistency with other federal, state and local requirements for environmental protection. (3) Keep the NRC informed of the environmental effects of facility construction and operation and actions taken to control those effects. This Annual Environmental Operating Report is required by Section 5.4.1 of the EPP. This report describes the activities related to the PVNGS EPP during the 2017 calendar year. For purposes of this report, references to the EPP are considered to be the EPP of NPF-41, NPF-51, and NPF-74.
Enclosure Palo Verde Nuclear Generating Station Units 1, 2, and 3 2017 Annual Environmental Operating Report
Enclosure   2017 Annual Environmental Operating Report 2 II. ENVIRONMENTAL MONITORING SUMMARIES AND ANALYSIS A. Cultural Resources Section 4.2.1 of the EPP requires that an archaeological survey be performed when final alignment of the PVNGS-to-Saguaro transmission line is completed. As of the date of this report, plans for this transmission line have been indefinitely suspended. Therefore, there has been no activity with regard to this requirement of the EPP. B. Terrestrial Ecology Monitoring As communicated in a letter to the NRC dated December 30, 1991 (Reference 1), the salt deposition monitoring program was discontinued at the end of 1991. III. PLANT DESIGN AND OPERATION CHANGES Section 3.1 of the EPP allows changes in station design, operation, or the performance of tests or experiments affecting the environment provided that such changes, tests, or experiments do not involve an unreviewed environmental question and do not involve a change to the EPP. Changes, tests, or experiments in which all measurable non-radiological effects are confined to the onsite areas previously disturbed during site preparation and plant construction or in which the environment is not affected are exempt from the evaluation and reporting requirements of Section 3.1. Section 3.2 of the EPP also exempts changes, tests, or experiments which are required to comply with other federal, state, or local environmental regulations. No design and operational changes were initiated in 2017 that required an evaluation to determine if they involved either an unreviewed environmental question or constituted a change in the EPP. IV. EPP NON-COMPLIANCES There were no instances of non-compliance with the EPP identified during 2017.
 
Enclosure   2017 Annual Environmental Operating Report 3 V. NON-ROUTINE REPORTS There were no non-routine reports required by Section 5.4.2 of the EPP during 2017. VI. REFERENCES 1. Letter from W.F. Conway (APS) to U.S. NRC, Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2, and 3, Salt Deposition and Impact Monitoring Plan, dated December 30, 1991 [NRC Agency wide Documents Access and Management System (ADAMS) No. 9201070077]}}
Enclosure 2017 Annual Environmental Operating Report I. INTRODUCTION Palo Verde Nuclear Generating Station (PVNGS) is located in Maricopa County, Arizona, approximately 50 miles west of the Phoenix metropolitan area. The PVNGS site comprises approximately 4,280 acres. Site elevations range from 890 feet above mean sea level at the southern boundary to 1,030 feet above mean sea level at the northern boundary. The station consists of three pressurized water reactor electrical generating units. Units 1, 2, and 3 have a rated thermal power of 3,990 MW.
Arizona Public Service (APS) was issued low power operating licenses NPF-34, NPF-46 and NPF-65 for Units 1, 2, and 3 by the United States Nuclear Regulatory Commission (NRC) on December 31, 1984, December 9, 1985, and March 25, 1987, respectively. APS was issued full power operating licenses NPF-41, NPF-51 and NPF-74 for Units 1, 2, and 3 on June 1, 1985, April 24, 1986, and November 25, 1987, respectively. These licenses were renewed on April 21, 2011.
Appendix B to these operating licenses is entitled the Environmental Protection Plan (Non Radiological). The environmental protection plans (EPP) for each of the current operating licenses are identical.
The purpose of the EPP is to provide for the protection of environmental values during the construction and operation of the nuclear facility. The principal objectives of the EPP are as follows:
(1)   Verify that the station is operated in an environmentally acceptable manner, as established by the final environmental statement (FES) and other NRC environmental impact assessments.
(2)   Coordinate NRC requirements and maintain consistency with other federal, state and local requirements for environmental protection.
(3)   Keep the NRC informed of the environmental effects of facility construction and operation and actions taken to control those effects.
This Annual Environmental Operating Report is required by Section 5.4.1 of the EPP. This report describes the activities related to the PVNGS EPP during the 2017 calendar year. For purposes of this report, references to the EPP are considered to be the EPP of NPF-41, NPF-51, and NPF-74.
1
 
Enclosure 2017 Annual Environmental Operating Report II. ENVIRONMENTAL MONITORING SUMMARIES AND ANALYSIS A. Cultural Resources Section 4.2.1 of the EPP requires that an archaeological survey be performed when final alignment of the PVNGS-to-Saguaro transmission line is completed. As of the date of this report, plans for this transmission line have been indefinitely suspended. Therefore, there has been no activity with regard to this requirement of the EPP.
B. Terrestrial Ecology Monitoring As communicated in a letter to the NRC dated December 30, 1991 (Reference 1), the salt deposition monitoring program was discontinued at the end of 1991.
III. PLANT DESIGN AND OPERATION CHANGES Section 3.1 of the EPP allows changes in station design, operation, or the performance of tests or experiments affecting the environment provided that such changes, tests, or experiments do not involve an unreviewed environmental question and do not involve a change to the EPP. Changes, tests, or experiments in which all measurable non-radiological effects are confined to the onsite areas previously disturbed during site preparation and plant construction or in which the environment is not affected are exempt from the evaluation and reporting requirements of Section 3.1.
Section 3.2 of the EPP also exempts changes, tests, or experiments which are required to comply with other federal, state, or local environmental regulations.
No design and operational changes were initiated in 2017 that required an evaluation to determine if they involved either an unreviewed environmental question or constituted a change in the EPP.
IV. EPP NON-COMPLIANCES There were no instances of non-compliance with the EPP identified during 2017.
2
 
Enclosure 2017 Annual Environmental Operating Report V. NON-ROUTINE REPORTS There were no non-routine reports required by Section 5.4.2 of the EPP during 2017.
VI. REFERENCES
: 1. Letter from W.F. Conway (APS) to U.S. NRC, Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2, and 3, Salt Deposition and Impact Monitoring Plan, dated December 30, 1991 [NRC Agency wide Documents Access and Management System (ADAMS)
No. 9201070077]
3}}

Latest revision as of 14:57, 2 November 2019

Annual Environmental Operating Report
ML18117A515
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/27/2018
From: Dilorenzo M
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
102-07689-MDD/MSC
Download: ML18117A515 (5)


Text

Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 Mail Station 7636 Tel: (623) 393-3495 102-07689-MDD/MSC April 27, 2018 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 2017 Annual Environmental Operating Report Enclosed please find the 2017 Annual Environmental Operating Report for PVNGS Units 1, 2, and 3. Arizona Public Service Company is submitting this report pursuant to Section 5.4.1 of Appendix B to the PVNGS Units 1, 2, and 3 Renewed Operating License Nos. NPF-41, NPF-51, and NPF-74, respectively.

No new commitments are being made to the NRC by this letter.

Should you need further information regarding this submittal, please contact Matthew S. Cox, Licensing Section Leader, at (623) 393-5753.

Sincerely, Digitally signed by Dilorenzo, Dilorenzo, Michael Michael D(Z99838)

DN: cn=Dilorenzo, Michael D(Z99838) D(Z99838)

Date: 2018.04.27 14:37:15 -07'00' Michael D. DiLorenzo Department Leader, Regulatory Affairs MDD/MSC/sma

Enclosure:

Palo Verde Nuclear Generating Station Units 1, 2, and 3 2017 Annual Environmental Operating Report cc: K. M. Kennedy NRC Region IV Regional Administrator S. P. Lingam NRC NRR Project Manager for PVNGS M. M. OBanion NRC NRR Project Manager C. A. Peabody NRC Senior Resident Inspector for PVNGS A member of the STARS Alliance LLC Callaway Diablo Canyon Palo Verde Wolf Creek

Enclosure Palo Verde Nuclear Generating Station Units 1, 2, and 3 2017 Annual Environmental Operating Report

Enclosure 2017 Annual Environmental Operating Report I. INTRODUCTION Palo Verde Nuclear Generating Station (PVNGS) is located in Maricopa County, Arizona, approximately 50 miles west of the Phoenix metropolitan area. The PVNGS site comprises approximately 4,280 acres. Site elevations range from 890 feet above mean sea level at the southern boundary to 1,030 feet above mean sea level at the northern boundary. The station consists of three pressurized water reactor electrical generating units. Units 1, 2, and 3 have a rated thermal power of 3,990 MW.

Arizona Public Service (APS) was issued low power operating licenses NPF-34, NPF-46 and NPF-65 for Units 1, 2, and 3 by the United States Nuclear Regulatory Commission (NRC) on December 31, 1984, December 9, 1985, and March 25, 1987, respectively. APS was issued full power operating licenses NPF-41, NPF-51 and NPF-74 for Units 1, 2, and 3 on June 1, 1985, April 24, 1986, and November 25, 1987, respectively. These licenses were renewed on April 21, 2011.

Appendix B to these operating licenses is entitled the Environmental Protection Plan (Non Radiological). The environmental protection plans (EPP) for each of the current operating licenses are identical.

The purpose of the EPP is to provide for the protection of environmental values during the construction and operation of the nuclear facility. The principal objectives of the EPP are as follows:

(1) Verify that the station is operated in an environmentally acceptable manner, as established by the final environmental statement (FES) and other NRC environmental impact assessments.

(2) Coordinate NRC requirements and maintain consistency with other federal, state and local requirements for environmental protection.

(3) Keep the NRC informed of the environmental effects of facility construction and operation and actions taken to control those effects.

This Annual Environmental Operating Report is required by Section 5.4.1 of the EPP. This report describes the activities related to the PVNGS EPP during the 2017 calendar year. For purposes of this report, references to the EPP are considered to be the EPP of NPF-41, NPF-51, and NPF-74.

1

Enclosure 2017 Annual Environmental Operating Report II. ENVIRONMENTAL MONITORING SUMMARIES AND ANALYSIS A. Cultural Resources Section 4.2.1 of the EPP requires that an archaeological survey be performed when final alignment of the PVNGS-to-Saguaro transmission line is completed. As of the date of this report, plans for this transmission line have been indefinitely suspended. Therefore, there has been no activity with regard to this requirement of the EPP.

B. Terrestrial Ecology Monitoring As communicated in a letter to the NRC dated December 30, 1991 (Reference 1), the salt deposition monitoring program was discontinued at the end of 1991.

III. PLANT DESIGN AND OPERATION CHANGES Section 3.1 of the EPP allows changes in station design, operation, or the performance of tests or experiments affecting the environment provided that such changes, tests, or experiments do not involve an unreviewed environmental question and do not involve a change to the EPP. Changes, tests, or experiments in which all measurable non-radiological effects are confined to the onsite areas previously disturbed during site preparation and plant construction or in which the environment is not affected are exempt from the evaluation and reporting requirements of Section 3.1.

Section 3.2 of the EPP also exempts changes, tests, or experiments which are required to comply with other federal, state, or local environmental regulations.

No design and operational changes were initiated in 2017 that required an evaluation to determine if they involved either an unreviewed environmental question or constituted a change in the EPP.

IV. EPP NON-COMPLIANCES There were no instances of non-compliance with the EPP identified during 2017.

2

Enclosure 2017 Annual Environmental Operating Report V. NON-ROUTINE REPORTS There were no non-routine reports required by Section 5.4.2 of the EPP during 2017.

VI. REFERENCES

1. Letter from W.F. Conway (APS) to U.S. NRC, Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2, and 3, Salt Deposition and Impact Monitoring Plan, dated December 30, 1991 [NRC Agency wide Documents Access and Management System (ADAMS)

No. 9201070077]

3

Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 Mail Station 7636 Tel: (623) 393-3495 102-07689-MDD/MSC April 27, 2018 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 2017 Annual Environmental Operating Report Enclosed please find the 2017 Annual Environmental Operating Report for PVNGS Units 1, 2, and 3. Arizona Public Service Company is submitting this report pursuant to Section 5.4.1 of Appendix B to the PVNGS Units 1, 2, and 3 Renewed Operating License Nos. NPF-41, NPF-51, and NPF-74, respectively.

No new commitments are being made to the NRC by this letter.

Should you need further information regarding this submittal, please contact Matthew S. Cox, Licensing Section Leader, at (623) 393-5753.

Sincerely, Digitally signed by Dilorenzo, Dilorenzo, Michael Michael D(Z99838)

DN: cn=Dilorenzo, Michael D(Z99838) D(Z99838)

Date: 2018.04.27 14:37:15 -07'00' Michael D. DiLorenzo Department Leader, Regulatory Affairs MDD/MSC/sma

Enclosure:

Palo Verde Nuclear Generating Station Units 1, 2, and 3 2017 Annual Environmental Operating Report cc: K. M. Kennedy NRC Region IV Regional Administrator S. P. Lingam NRC NRR Project Manager for PVNGS M. M. OBanion NRC NRR Project Manager C. A. Peabody NRC Senior Resident Inspector for PVNGS A member of the STARS Alliance LLC Callaway Diablo Canyon Palo Verde Wolf Creek

Enclosure Palo Verde Nuclear Generating Station Units 1, 2, and 3 2017 Annual Environmental Operating Report

Enclosure 2017 Annual Environmental Operating Report I. INTRODUCTION Palo Verde Nuclear Generating Station (PVNGS) is located in Maricopa County, Arizona, approximately 50 miles west of the Phoenix metropolitan area. The PVNGS site comprises approximately 4,280 acres. Site elevations range from 890 feet above mean sea level at the southern boundary to 1,030 feet above mean sea level at the northern boundary. The station consists of three pressurized water reactor electrical generating units. Units 1, 2, and 3 have a rated thermal power of 3,990 MW.

Arizona Public Service (APS) was issued low power operating licenses NPF-34, NPF-46 and NPF-65 for Units 1, 2, and 3 by the United States Nuclear Regulatory Commission (NRC) on December 31, 1984, December 9, 1985, and March 25, 1987, respectively. APS was issued full power operating licenses NPF-41, NPF-51 and NPF-74 for Units 1, 2, and 3 on June 1, 1985, April 24, 1986, and November 25, 1987, respectively. These licenses were renewed on April 21, 2011.

Appendix B to these operating licenses is entitled the Environmental Protection Plan (Non Radiological). The environmental protection plans (EPP) for each of the current operating licenses are identical.

The purpose of the EPP is to provide for the protection of environmental values during the construction and operation of the nuclear facility. The principal objectives of the EPP are as follows:

(1) Verify that the station is operated in an environmentally acceptable manner, as established by the final environmental statement (FES) and other NRC environmental impact assessments.

(2) Coordinate NRC requirements and maintain consistency with other federal, state and local requirements for environmental protection.

(3) Keep the NRC informed of the environmental effects of facility construction and operation and actions taken to control those effects.

This Annual Environmental Operating Report is required by Section 5.4.1 of the EPP. This report describes the activities related to the PVNGS EPP during the 2017 calendar year. For purposes of this report, references to the EPP are considered to be the EPP of NPF-41, NPF-51, and NPF-74.

1

Enclosure 2017 Annual Environmental Operating Report II. ENVIRONMENTAL MONITORING SUMMARIES AND ANALYSIS A. Cultural Resources Section 4.2.1 of the EPP requires that an archaeological survey be performed when final alignment of the PVNGS-to-Saguaro transmission line is completed. As of the date of this report, plans for this transmission line have been indefinitely suspended. Therefore, there has been no activity with regard to this requirement of the EPP.

B. Terrestrial Ecology Monitoring As communicated in a letter to the NRC dated December 30, 1991 (Reference 1), the salt deposition monitoring program was discontinued at the end of 1991.

III. PLANT DESIGN AND OPERATION CHANGES Section 3.1 of the EPP allows changes in station design, operation, or the performance of tests or experiments affecting the environment provided that such changes, tests, or experiments do not involve an unreviewed environmental question and do not involve a change to the EPP. Changes, tests, or experiments in which all measurable non-radiological effects are confined to the onsite areas previously disturbed during site preparation and plant construction or in which the environment is not affected are exempt from the evaluation and reporting requirements of Section 3.1.

Section 3.2 of the EPP also exempts changes, tests, or experiments which are required to comply with other federal, state, or local environmental regulations.

No design and operational changes were initiated in 2017 that required an evaluation to determine if they involved either an unreviewed environmental question or constituted a change in the EPP.

IV. EPP NON-COMPLIANCES There were no instances of non-compliance with the EPP identified during 2017.

2

Enclosure 2017 Annual Environmental Operating Report V. NON-ROUTINE REPORTS There were no non-routine reports required by Section 5.4.2 of the EPP during 2017.

VI. REFERENCES

1. Letter from W.F. Conway (APS) to U.S. NRC, Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2, and 3, Salt Deposition and Impact Monitoring Plan, dated December 30, 1991 [NRC Agency wide Documents Access and Management System (ADAMS)

No. 9201070077]

3