(One intermediate revision by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 11/13/2014 | | | issue date = 11/13/2014 |
| | title = Letter to L. Criscione from L. Jarriel Callaway Action Request System (Cars) 200702606 Document | | | title = Letter to L. Criscione from L. Jarriel Callaway Action Request System (Cars) 200702606 Document |
| | author name = Jarriel L M | | | author name = Jarriel L |
| | author affiliation = NRC/OE | | | author affiliation = NRC/OE |
| | addressee name = Criscione L S | | | addressee name = Criscione L |
| | addressee affiliation = - No Known Affiliation | | | addressee affiliation = - No Known Affiliation |
| | docket = 05000483 | | | docket = 05000483 |
| | license number = NPF-030 | | | license number = NPF-030 |
| | contact person = Jarriel L M | | | contact person = Jarriel L |
| | document type = Letter | | | document type = Letter |
| | page count = 2 | | | page count = 2 |
Line 15: |
Line 15: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON , D.C. 20555-0001 Mr. Lawrence S. Criscione , PE [NOTE: HOME ADDRESS DELETED UNDER 10 CFR 2.390] | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON , D.C. 20555-0001 November 13, 2014 Mr. Lawrence S. Criscione, PE |
| | [NOTE: HOME ADDRESS DELETED UNDER 10 CFR 2.390] |
|
| |
|
| ==Dear Mr. Criscione:== | | ==Dear Mr. Criscione:== |
| November 13 , 2014 On July 8, 2014 , you sent an email to Missouri State Representative Jeanne Kirkton and copied several others including U.S. Nuclear Regulatory Commission (NRC) Chairman Allison Macfarlane (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 14232A390 , redacted version without attachments). The email was referred to the NRC's Office of Enforcement (OE). You asserted that despite having previously raised the concern to the NRC , the NRC did not evaluate the accuracy of the statements made i n the Callaway Action Request System (CARS) 200702606 document.
| | |
| You alleged that licensee personnel intentionally entered inaccurate information into the quality assurance document in a continued effort to hide information from licensee management concerning the October 21, 2003 Callaway shutdown. As previously discussed with you on July 10, 2014 , the NRC OE conducted a review of the allegation files and discussed the issue with knowledgeable members of the NRC staff. The OE concluded that the staff did indeed evaluate CARS 200702606 and did not substantiate your concern. NRC records on the allegation in question contained correspondence that verified the agency's review of this document in the context of the original allegation of cover up (RIV-2007 -A-0096 , Concern 1 ). The NRC found the statements in CARS 20072606 , which were provided nearly 4 years after the 2003 event , reflected the general understanding of the operators that a shutdown sequence was in progress. | | On July 8, 2014, you sent an email to Missouri State Representative Jeanne Kirkton and copied several others including U.S. Nuclear Regulatory Commission (NRC) Chairman Allison Macfarlane (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14232A390, redacted version without attachments). The email was referred to the NRC's Office of Enforcement (OE). |
| While the NRC's review of the event , as you are aware , did ultimately conclude that the operators did not effectively control reactivity during this shutdown sequence , the NRC did not conclude that the statements in the CARS document were inaccurate or intentionally misleading. As described and referenced in Chairman Macfarlane | | You asserted that despite having previously raised the concern to the NRC, the NRC did not evaluate the accuracy of the statements made in the Callaway Action Request System (CARS) 200702606 document. You alleged that licensee personnel intentionally entered inaccurate information into the quality assurance document in a continued effort to hide information from licensee management concerning the October 21, 2003 Callaway shutdown. As previously discussed with you on July 10, 2014, the NRC OE conducted a review of the allegation files and discussed the issue with knowledgeable members of the NRC staff. The OE concluded that the staff did indeed evaluate CARS 200702606 and did not substantiate your concern . |
| 's letter to Representative Kirkton dated July 1 , 2014 (ADAMS Accession No. ML 14139A395), the NRC has addressed your concerns regarding the October 21 , 2003 , Callaway plant shutdown multiple times through correspondence and meetings. You may disagree with some of the NRC staff's findings , but the NRC has concluded, based on its independent inspection and investigation , that there is no evidence that would indicate that there was wrongdoing , such as a cover-up , concerning the shutdown event. In the absence of new information, there is no regulatory or safety basis for the NRC to expend further resources related to the October 21 , 2003 , Callaway plant shutdown. Therefore, the NRC has closed th i s matter , and the staff plans to provide no additional feedback regarding this issue. Docket No. 50-483 cc: The Honorab l e Mike Bernskoetter Missouri House of Representatives 201 West Capitol Avenue Room 414 Jefferson City , MO 65101 The Honorable Jeanne Kirkton Missouri House of Representatives 659 Tuxedo Blvd St. Louis , MO 63119 Mr. Fadi Diya Sincerely , | | NRC records on the allegation in question contained correspondence that verified the agency's review of this document in the context of the original allegation of cover up (RIV-2007 -A-0096 , |
| ___ Lisamarie L. Jarriel , Agency All Office of Enforcement Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 62521}}
| | Concern 1). The NRC found the statements in CARS 20072606, which were provided nearly 4 years after the 2003 event, reflected the general understanding of the operators that a shutdown sequence was in progress. While the NRC's review of the event, as you are aware, did ultimately conclude that the operators did not effectively control reactivity during this shutdown sequence, the NRC did not conclude that the statements in the CARS document were inaccurate or intentionally misleading . |
| | As described and referenced in Chairman Macfarlane's letter to Representative Kirkton dated July 1, 2014 (ADAMS Accession No. ML14139A395), the NRC has addressed your concerns regarding the October 21 , 2003, Callaway plant shutdown multiple times through correspondence and meetings. You may disagree with some of the NRC staff's findings, but the NRC has concluded, based on its independent inspection and investigation , that there is no evidence that would indicate that there was wrongdoing , such as a cover-up , concerning the shutdown event. In the absence of new information, there is no regulatory or safety basis for |
| | |
| | L. Criscione the NRC to expend further resources related to the October 21 , 2003, Callaway plant shutdown . |
| | Therefore, the NRC has closed this matter, and the staff plans to provide no additional feedback regarding this issue. |
| | Sincerely, |
| | ~am~£.___ |
| | Lisamarie L. Jarriel , Agency All Office of Enforcement Docket No. 50-483 cc: The Honorable Mike Bernskoetter Missouri House of Representatives 201 West Capitol Avenue Room 414 Jefferson City, MO 65101 The Honorable Jeanne Kirkton Missouri House of Representatives 659 Tuxedo Blvd St. Louis , MO 63119 Mr. Fadi Diya Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 62521}} |
|
---|
Category:Letter
MONTHYEARULNRC-06853, Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.7172024-01-29029 January 2024 Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.717 IR 05000483/20230042024-01-19019 January 2024 Integrated Inspection Report 05000483/2023004 ML24008A0552024-01-19019 January 2024 Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code (EPID L-2023-LLR- 0061) ML23353A1712024-01-18018 January 2024 Issuance of Amendment No. 237 to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23317A0012024-01-12012 January 2024 Audit Summary Regarding LAR to Clarify Support System Requirements for the Residual Heat Removal and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23347A1212024-01-11011 January 2024 Issuance of Amendment No. 236 to Adopt TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Volume Values to Licensee Control EPID L-2023-LLA-0046) ML24011A1492024-01-11011 January 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information (05000483/2024011) ULNRC-06847, Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01)2023-12-21021 December 2023 Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01) ULNRC-06849, License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds2023-12-20020 December 2023 License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds ML23346A0392023-12-14014 December 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Request for Relief from Requirements of ASME Code, Section Xl, Examination and Testing Unbonded Post-Tensioning System ULNRC-06844, Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification2023-12-0707 December 2023 Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification 05000483/LER-2023-001, Submittal of LER 2023-001-00 for Callaway, Unit 1, Inoperable Instrument Tunnel Sump Level Indication Resulted in Condition Prohibited by Technical Specifications2023-11-29029 November 2023 Submittal of LER 2023-001-00 for Callaway, Unit 1, Inoperable Instrument Tunnel Sump Level Indication Resulted in Condition Prohibited by Technical Specifications ULNRC-06827, Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029)2023-11-20020 November 2023 Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029) IR 05000483/20230102023-11-15015 November 2023 NRC License Renewal Phase 1 Inspection Report 05000483 2023010 IR 05000483/20233012023-11-0909 November 2023 NRC Examination Report 05000483-2023301 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23297A2502023-11-0606 November 2023 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination and Opportunity for a Hearing (EPID L-2022-LLA-0176) - Letter IR 05000483/20240122023-10-24024 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (05000483/2024012) ML23293A2652023-10-24024 October 2023 3rd Quarter 2023 Integrated Inspection Report ML23240A3692023-10-0505 October 2023 Issuance of Amendment No. 235 to Revise Technical Specifications to Use of Framatome Gaia Fuel (EPID L-2022-LLA-0150) (Non-Proprietary) ML23234A1522023-10-0505 October 2023 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2022-LLE-0030) (Letter) ML23305A0942023-10-0202 October 2023 10-CW-2023-09 Post-Exam Submittal ML23270B9662023-09-27027 September 2023 10 CFR 50.55a(z)(I) Request for Relief from ASME OM Code Pump and Valve Testing Requirements for Fifth 120-Month Inservice Testing Interval ML23228A0252023-09-25025 September 2023 Issuance of Amendment No. 234 to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23261C3852023-09-25025 September 2023 Safety Evaluation for Operating Quality Assurance Manual Revision 36A ML23166B0882023-09-20020 September 2023 Issuance of Amendment No. 233 for Adoption of Alternative Source Term and Revision of Technical Specifications ML23206A1992023-09-15015 September 2023 Regulatory Audit Summary Regarding License Amendment and Regulatory Exemptions Request for Fuel Transition to Framatome Gaia Fuel (Epids L-2022-LLA-0150 and L-2022-LLE-0030) IR 05000483/20234012023-09-13013 September 2023 NRC Security Baseline Inspection Report 05000483/2023401 ML23240A7572023-08-31031 August 2023 NRC Initial Operator Licensing Examination Approval 05000483/2023301 IR 05000483/20230052023-08-23023 August 2023 Updated Inspection Plan for Callaway Nuclear Power Plant, Unit 1 (Report 05000483/2023005) - Mid Cycle Letter 2023 ULNRC-06824, Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A2023-08-17017 August 2023 Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A ML23219A1392023-08-15015 August 2023 Request for Withholding Information from Public Disclosure ULNRC-06830, Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak2023-08-15015 August 2023 Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak ML23215A1972023-08-0303 August 2023 Supplement to License Amendment and Exemption Request Regarding Use of Framatome Gaia Fuel (LDCN 22-0002) ULNRC-06223, Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004)2023-07-25025 July 2023 Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004) ULNRC-06799, Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications2023-07-13013 July 2023 Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications IR 05000483/20230022023-07-10010 July 2023 Integrated Inspection Report 05000483/2023002 ML23174A1272023-06-23023 June 2023 Cw FFD Document Request List 2023 ML23171A9942023-06-22022 June 2023 Acceptance of Request for Approval of Operating Quality Assurance Manual Revision 36a ULNRC-06821, Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301)2023-06-21021 June 2023 Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301) IR 05000483/20230112023-06-15015 June 2023 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000483/2023011 ULNRC-06822, Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a2023-06-14014 June 2023 Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a ML23158A1462023-06-13013 June 2023 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000483/2023010) ULNRC-06815, Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a2023-06-0505 June 2023 Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a ULNRC-06818, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate .2023-06-0505 June 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate . ML23093A0952023-05-10010 May 2023 Issuance of Amendment No. 232 Regarding Technical Specification Changes for Spent Fuel Storage ULNRC-06816, Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015)2023-05-0909 May 2023 Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015) ML23129A7942023-05-0909 May 2023 Post-Audit Supplement to License Amendment Request and Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (Iepid L-2022-LLA-0150 and EPID L-2022-LLE-0030) ML23122A3172023-05-0808 May 2023 Review of the Spring 2022 Steam Generator Tube Inservice Inspections ML23118A3492023-05-0808 May 2023 Request for Withholding Information from Public Disclosure 2024-01-29
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON , D.C. 20555-0001 November 13, 2014 Mr. Lawrence S. Criscione, PE
[NOTE: HOME ADDRESS DELETED UNDER 10 CFR 2.390]
Dear Mr. Criscione:
On July 8, 2014, you sent an email to Missouri State Representative Jeanne Kirkton and copied several others including U.S. Nuclear Regulatory Commission (NRC) Chairman Allison Macfarlane (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14232A390, redacted version without attachments). The email was referred to the NRC's Office of Enforcement (OE).
You asserted that despite having previously raised the concern to the NRC, the NRC did not evaluate the accuracy of the statements made in the Callaway Action Request System (CARS) 200702606 document. You alleged that licensee personnel intentionally entered inaccurate information into the quality assurance document in a continued effort to hide information from licensee management concerning the October 21, 2003 Callaway shutdown. As previously discussed with you on July 10, 2014, the NRC OE conducted a review of the allegation files and discussed the issue with knowledgeable members of the NRC staff. The OE concluded that the staff did indeed evaluate CARS 200702606 and did not substantiate your concern .
NRC records on the allegation in question contained correspondence that verified the agency's review of this document in the context of the original allegation of cover up (RIV-2007 -A-0096 ,
Concern 1). The NRC found the statements in CARS 20072606, which were provided nearly 4 years after the 2003 event, reflected the general understanding of the operators that a shutdown sequence was in progress. While the NRC's review of the event, as you are aware, did ultimately conclude that the operators did not effectively control reactivity during this shutdown sequence, the NRC did not conclude that the statements in the CARS document were inaccurate or intentionally misleading .
As described and referenced in Chairman Macfarlane's letter to Representative Kirkton dated July 1, 2014 (ADAMS Accession No. ML14139A395), the NRC has addressed your concerns regarding the October 21 , 2003, Callaway plant shutdown multiple times through correspondence and meetings. You may disagree with some of the NRC staff's findings, but the NRC has concluded, based on its independent inspection and investigation , that there is no evidence that would indicate that there was wrongdoing , such as a cover-up , concerning the shutdown event. In the absence of new information, there is no regulatory or safety basis for
L. Criscione the NRC to expend further resources related to the October 21 , 2003, Callaway plant shutdown .
Therefore, the NRC has closed this matter, and the staff plans to provide no additional feedback regarding this issue.
Sincerely,
~am~£.___
Lisamarie L. Jarriel , Agency All Office of Enforcement Docket No. 50-483 cc: The Honorable Mike Bernskoetter Missouri House of Representatives 201 West Capitol Avenue Room 414 Jefferson City, MO 65101 The Honorable Jeanne Kirkton Missouri House of Representatives 659 Tuxedo Blvd St. Louis , MO 63119 Mr. Fadi Diya Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 62521