ML15104A352: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(9 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML15104A352
| number = ML15104A352
| issue date = 04/07/2015
| issue date = 04/07/2015
| title = Pilgrim, Withdrawal of Request for Approval of Relief Request (PRR)-23, Use of Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines in Lieu of Specific ASME Code Requirements Pursuant to 10 CFR 50.55a(a)(3)(i)
| title = Withdrawal of Request for Approval of Relief Request (PRR)-23, Use of Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines in Lieu of Specific ASME Code Requirements Pursuant to 10 CFR 50.55a(a)(3)(i)
| author name = Perkins E P
| author name = Perkins E
| author affiliation = Entergy Nuclear Operations, Inc
| author affiliation = Entergy Nuclear Operations, Inc
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 2
| page count = 2
| project = TAC:MF3543
| project = TAC:MF3543
| stage = Withdrawal
}}
}}


=Text=
=Text=
{{#Wiki_filter:vEntergyEntergy Nuclear Operations, Inc.Pilgrim Nuclear Power Station600 Rocky Hill RoadPlymouth, MA 02360LETTER NUMBER 2.15.026April 7, 2015U.S. Nuclear Regulatory CommissionATTN: Document Control DeskWashington, DC 20555-0001SUBJECT:Withdrawal of Request for Approval of Pilgrim Relief Request (PRR)-23, Use ofBoiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines in Lieu ofSpecific ASME Code Requirements Pursuant to 10 CFR 50.55a(a)(3)(i)(TAC NO. MF3543)Pilgrim Nuclear Power StationDocket No. 50-293License No. DPR-35Reference:Entergy Letter to NRC, "Request for Approval of Pilgrim Relief Request (PRR)-23,Use of Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines inLieu of Specific ASME Code Requirements Pursuant to 10 CFR 50.55a(a)(3)(i),dated February 11, 2014 (2.14.002)Dear Sir or Madam:On February 11, 2014, Entergy Nuclear Operations, Inc. (Entergy) submitted Pilgrim ReliefRequest (PRR)-23 in the referenced letter requesting NRC authorization to implement BWRVIPguidelines in lieu of specific ASME Code requirements pursuant to 10 CFR 50.55a(a)(3)(i). Uponfurther review, Entergy has determined that the relief from the ASME requirements is not requiredfor the remainder of the Fourth Inservice Inspection Interval.This letter serves to notify the NRC staff that Entergy is withdrawing request for relief PRR-23.If you have any questions or require additional information, please contact me at (508) 830-8323.Sincerely,Everett P. Perkins, Jr.Regulatory Assurance ManagerEPP/mewA!
{{#Wiki_filter:vEntergy                                                                          Entergy Nuclear Operations, Inc.
Letter 2.15.026 Page 2 of 2cc: Mr. Daniel H. DormanRegional Administrator, Region IU. S. Nuclear Regulatory Commission2100 Renaissance Boulevard, Suite 100King of Prussia, PA 19406-1415Ms. Nadiyah S. MorganOffice of Nuclear Reactor RegulationU. S. Nuclear Regulatory CommissionMS O-8C2AWashington, DC 20555NRC Senior Resident InspectorPilgrim Nuclear Power Station  
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 LETTER NUMBER 2.15.026 April 7, 2015 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
}}
 
==SUBJECT:==
Withdrawal of Request for Approval of Pilgrim Relief Request (PRR)-23, Use of Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines in Lieu of Specific ASME Code Requirements Pursuant to 10 CFR 50.55a(a)(3)(i)
(TAC NO. MF3543)
Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35
 
==Reference:==
Entergy Letter to NRC, "Request for Approval of Pilgrim Relief Request (PRR)-23, Use of Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines in Lieu of Specific ASME Code Requirements Pursuant to 10 CFR 50.55a(a)(3)(i),
dated February 11, 2014 (2.14.002)
 
==Dear Sir or Madam:==
 
On February 11, 2014, Entergy Nuclear Operations, Inc. (Entergy) submitted Pilgrim Relief Request (PRR)-23 in the referenced letter requesting NRC authorization to implement BWRVIP guidelines in lieu of specific ASME Code requirements pursuant to 10 CFR 50.55a(a)(3)(i). Upon further review, Entergy has determined that the relief from the ASME requirements is not required for the remainder of the Fourth Inservice Inspection Interval.
This letter serves to notify the NRC staff that Entergy is withdrawing request for relief PRR-23.
If you have any questions or require additional information, please contact me at (508) 830-8323.
Sincerely, Everett P. Perkins, Jr.
Regulatory Assurance Manager EPP/mew A!
 
Letter 2.15.026                               Page 2 of 2 cc:     Mr. Daniel H. Dorman Regional Administrator, Region I U. S. Nuclear Regulatory Commission 2100 Renaissance Boulevard, Suite 100 King of Prussia, PA 19406-1415 Ms. Nadiyah S. Morgan Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission MS O-8C2A Washington, DC 20555 NRC Senior Resident Inspector Pilgrim Nuclear Power Station}}

Latest revision as of 13:02, 31 October 2019

Withdrawal of Request for Approval of Relief Request (PRR)-23, Use of Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines in Lieu of Specific ASME Code Requirements Pursuant to 10 CFR 50.55a(a)(3)(i)
ML15104A352
Person / Time
Site: Pilgrim
Issue date: 04/07/2015
From: Perkins E
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
TAC MF3543
Download: ML15104A352 (2)


Text

vEntergy Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 LETTER NUMBER 2.15.026 April 7, 2015 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Withdrawal of Request for Approval of Pilgrim Relief Request (PRR)-23, Use of Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines in Lieu of Specific ASME Code Requirements Pursuant to 10 CFR 50.55a(a)(3)(i)

(TAC NO. MF3543)

Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35

Reference:

Entergy Letter to NRC, "Request for Approval of Pilgrim Relief Request (PRR)-23, Use of Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines in Lieu of Specific ASME Code Requirements Pursuant to 10 CFR 50.55a(a)(3)(i),

dated February 11, 2014 (2.14.002)

Dear Sir or Madam:

On February 11, 2014, Entergy Nuclear Operations, Inc. (Entergy) submitted Pilgrim Relief Request (PRR)-23 in the referenced letter requesting NRC authorization to implement BWRVIP guidelines in lieu of specific ASME Code requirements pursuant to 10 CFR 50.55a(a)(3)(i). Upon further review, Entergy has determined that the relief from the ASME requirements is not required for the remainder of the Fourth Inservice Inspection Interval.

This letter serves to notify the NRC staff that Entergy is withdrawing request for relief PRR-23.

If you have any questions or require additional information, please contact me at (508) 830-8323.

Sincerely, Everett P. Perkins, Jr.

Regulatory Assurance Manager EPP/mew A!

Letter 2.15.026 Page 2 of 2 cc: Mr. Daniel H. Dorman Regional Administrator, Region I U. S. Nuclear Regulatory Commission 2100 Renaissance Boulevard, Suite 100 King of Prussia, PA 19406-1415 Ms. Nadiyah S. Morgan Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission MS O-8C2A Washington, DC 20555 NRC Senior Resident Inspector Pilgrim Nuclear Power Station