ML15231A839: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:NUREG-1021, R9 Supplement 1 FENOC Facsimile Rev. 1 ES-301 Control Room/In
{{#Wiki_filter:ES-301                         Control Room/In-Plant Systems Outline                       Form ES-301-2 Facility:       Davis Besse                                       Date of Examination:__6/15/15 thru 6/26/15 __
-Plant Systems Outline Form ES-301-2 Facility:         Davis Besse Date of Examination:
Exam Level: RO SRO(I) SRO(U)                                   Operating Test No.: __DB NRC 2015__
__6/15/15 thru 6/26/15
Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U)
__ Exam Level:  RO  SRO(I)     SRO(U)         Operating Test No.:
System / JPM Title                                       Type Code*             Safety Function S1 - (001) / Transfer Rods from the Auxiliary Power Supply (Alt Path - Undesired rod motion)                                   (JPM New)               N, A, S               1 S2 - (004) / Recover from Letdown Isolation on High Temp (JPM 017)               D, S                 2 S3 - (005) / Start Decay Heat Pump 1 following a loss of DHR (Alt Path - Cooler Outlet Valve Fails open)                           (JPM New)           N, A, S, L             4P S4 - (055) / Actions for Steam Leak on Gland Steam Header (Alt Path - Trip Reactor)                                             (JPM 020)           D, A, S, L             4S S5 - (026) / Initiate Containment Spray (Alt Path - Spray header develops leak)                               (JPM New)           N, A, S, EN               5 S6 - (062) / Transfer Essential 4160Kv Bus C1 to Alternate D, S                  6 (JPM 017)
__DB NRC 2015__ Control Room Systems
S8 - (029) / Purge Containment in Mode 5 (Alt Path - Supply fan fails to start)                               (JPM 162)           D, A, S, L               8 In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
@ (8 for RO); (7 for SRO
P1 - (004) / Perform Att. 5 of Control Room Evacuation                                       D, E, R 2
-I); (2 or 3 for SRO
DB-OP-02508, CTRM Evacuation                             (JPM 048)
-U) System / JPM Title Type Code*
P2 - (064) / Restore EDG to supply 4160 Essential Bus D, E                  6 DB-OP-02538, Loss of D2P and DBP                         (JPM 079)
Safety Function S1 - (001) / Transfer Rods from the Auxiliary Power Supply (Alt Path - Undesired rod motion)
P3 - (078) / Bypass and isolate the in service air dryers D, E                  8 DB-OP-02528, IA Malfunctions                           (JPM 078)
(JPM New)         N, A, S 1 S2 - (004) / Recover from Letdown Isolation on Hi gh Temp                       (JPM 017) D, S 2 S3 - (005) / Start Decay Heat Pump 1 following a loss of DHR (Alt Path - Cooler Outlet Valve Fails open
@       All RO and SRO control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
)         (JPM New)       N, A, S, L 4P S4 - (055) / Actions for Steam Leak on Gland Steam Header (Alt Path  
                        *Type Codes                                       Criteria for RO / SRO-I / SRO-U (A)lternate Path                                                                     4-6 /4-6 /2-3 (C)ontrol room (D)irect from bank                                                                   9/8/4 (E)mergency or abnormal in-plant                                                     1/1/1 (EN)gineered safety feature                                                           1 /  1 / > 1 (control room system)
- Trip Reactor)
(L)ow-power / Shutdown                                                               1/1/1 (N)ew or (M)odified from bank including 1(A)                                         2/2/1 (P)revious 2 exams                                                                     3/  3 /  2 (randomly selected)
(JPM 020) D, A, S, L 4S S5 - (026) / Initiate Containment Spray (Alt Path - Spray header develops leak
(R)CA                                                                                 1/1/1 (S)imulator NUREG-1021, R9 Supplement 1                                                                  FENOC Facsimile Rev. 1}}
)         (JPM New)
N, A, S, EN 5 S6 - (062) / Transfer Essential 4160Kv Bus C1 to Alternate (JPM 017) D, S  6    S8 - (029) / Purge Containment in Mode 5 (Alt Path - Supply fan fails to start
)           (JPM 162)
D, A, S, L 8 In-Plant Systems
@ (3 for RO); (3 for SRO
-I); (3 or 2 for SRO
-U) P1 - (004) / Perform Att
. 5 of Control Room Evacuation
 
DB-OP-02508, CTRM Evacuation (JPM 048) D, E, R  2  P2 - (0 64) / Restore EDG to supply 4160 Essential Bus
 
DB-OP-02538, Loss of D2P and DBP (JPM 079) D, E  6  P3 - (078) / Bypass and isolate the in service air dryers DB-OP-02528 , IA Malfunctions (JPM 078) D, E  8 @ All RO and SRO control room (and in
-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
*Type Codes Criteria for RO
/ SRO-I / SRO-U (A)lternate Path (C)ontrol room (D)irect from bank (E)mergency or abnormal in
-plant (EN)gineered safety feature (L)ow-power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 /4-6 /2-3      /  / > 1 (control room system)
(randomly selected)}}

Latest revision as of 08:42, 31 October 2019

2015 Davis-Besse Nuclear Power Station Initial License Examination ES-301-2 Sroi Systems Outline
ML15231A839
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/06/2015
From:
NRC/RGN-III
To:
FirstEnergy Nuclear Operating Co
Reeser D
Shared Package
ML15217A099 List:
References
Download: ML15231A839 (1)


Text

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Davis Besse Date of Examination:__6/15/15 thru 6/26/15 __

Exam Level: RO SRO(I) SRO(U) Operating Test No.: __DB NRC 2015__

Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U)

System / JPM Title Type Code* Safety Function S1 - (001) / Transfer Rods from the Auxiliary Power Supply (Alt Path - Undesired rod motion) (JPM New) N, A, S 1 S2 - (004) / Recover from Letdown Isolation on High Temp (JPM 017) D, S 2 S3 - (005) / Start Decay Heat Pump 1 following a loss of DHR (Alt Path - Cooler Outlet Valve Fails open) (JPM New) N, A, S, L 4P S4 - (055) / Actions for Steam Leak on Gland Steam Header (Alt Path - Trip Reactor) (JPM 020) D, A, S, L 4S S5 - (026) / Initiate Containment Spray (Alt Path - Spray header develops leak) (JPM New) N, A, S, EN 5 S6 - (062) / Transfer Essential 4160Kv Bus C1 to Alternate D, S 6 (JPM 017)

S8 - (029) / Purge Containment in Mode 5 (Alt Path - Supply fan fails to start) (JPM 162) D, A, S, L 8 In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

P1 - (004) / Perform Att. 5 of Control Room Evacuation D, E, R 2

DB-OP-02508, CTRM Evacuation (JPM 048)

P2 - (064) / Restore EDG to supply 4160 Essential Bus D, E 6 DB-OP-02538, Loss of D2P and DBP (JPM 079)

P3 - (078) / Bypass and isolate the in service air dryers D, E 8 DB-OP-02528, IA Malfunctions (JPM 078)

@ All RO and SRO control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate Path 4-6 /4-6 /2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (EN)gineered safety feature 1 / 1 / > 1 (control room system)

(L)ow-power / Shutdown 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3/ 3 / 2 (randomly selected)

(R)CA 1/1/1 (S)imulator NUREG-1021, R9 Supplement 1 FENOC Facsimile Rev. 1