{{#Wiki_filter:ES-301 Operating Test Quality Checklist Form ES-301-3 Facility: Duane Arnold Energy Center Date of Examination
{{#Wiki_filter:ES-301                                           Operating Test Quality Checklist                                   Form ES-301-3 Facility: Duane Arnold Energy Center                                                     Date of Examination: 4/6/ 15 - 4/17/15 Operatin Test Number: 2015301 Initials
: 4/6/15 -4/17/15 Operatin Test Number: 201530 1 1. General Criteria a. b. There is no day-to-day repetit io n between this and other operating tests to be administe r ed durin this examination. d. Overlap with the written examination and between different parts of the operating test i s within acce table limits. e. It appears that the operating test will differentiate between c ompetent and less-than-competent a licants at the desi nated license level. 2. Walk-Thr ough Criteria a. Each JPM includes th e following, as applicable
: 1. General Criteria a     b. c#
: b. i niti al conditions ini ti ating cues refer e nces and tools, includ in g associated pro cedu r es reasonable and validated time limit s (average time allowed for complet ion) and specific designation if deemed to be time-c r itical by the facility licensee operationally importa nt specific performance crite ria that include: de t a il ed expected ac tions with exact c riteria and nomenclature system response and o t her examiner cues s tatement s describing important ob serva tions to be made by the applicant cr iteria for successful co mpletion of the task identification of critical steps and their associated performance standards restrictions on the seq u ence of s te s , if ap pli cable Ensu r e that any changes from the previously approved systems and admi nistr ative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptanc e c riteria (e.g., item distribution , bank use, repetition from the last 2 NRC examinations) specified on those forms and Form ES-201-2. 3. Simulator Criteria T he a s s oci a ted s imulator op e r a ting tests (sce n a r io se ts) h a v e b een r e vi e w e d in a cc o rd a n ce with Fo rm ES-30 1-4 a nd a c o is a tt ac hed. Pri n t e d N a m e I Signatur e Jes-s-e..
a.
L. Se'.:.l""o""r  
: b.           There is no day-to-day repetition between this and other operating tests to be administered durin this examination.
/cJ.<,f-'-:
: d.           Overlap with the written examination and between different parts of the operating test is within acce table limits.
: a. Author b. F ac ility R e vi e w e r (*) c. NR C C hi e f Ex a m i n er(#) d. N OTE:
: e.           It appears that the operating test will differentiate between competent and less-than-competent a licants at the desi nated license level.
* The fac il ity s i gna t ure is n ot ap p l i cab l e for NRG-developed tests. # Inde p e n den t N RC revie w e r i n i t ia l ite m s in Co lu mn " c"; c h ief examiner concurrence required. Initials a b. Dat e c#}}
: 2. Walk-Through Criteria
: a.           Each JPM includes the following, as applicable:
initial conditions initiating cues references and tools, including associated procedures reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time-critical by the facility licensee operationally important specific performance criteria that include:
detailed expected actions with exact criteria and nomenclature system response and other examiner cues statements describing important observations to be made by the applicant criteria for successful completion of the task identification of critical steps and their associated performance standards restrictions on the sequence of ste s, if applicable
: b.          Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last 2 NRC examinations) specified on those forms and Form ES-201-2.
: 3. Simulator Criteria The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-301-4 and a co is attached.
                                                ~            Printed Name I Signature                                    Date
: a. Author                                    Jes-s-e.. L. Se'.:.l""o""r /cJ.<,f-'-:
: b. Facility Reviewer(*)
: c. NRC Chief Examiner(#)
d.
NOTE:
* The facility signature is not applicable for NRG-developed tests.
              #   Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.}}

Latest revision as of 08:08, 31 October 2019

2015 Duane Arnold Energy Center Initial License Examination Form 301-3
ML15244A279
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 08/20/2015
From:
NRC/RGN-III
To:
NextEra Energy Duane Arnold
Zoia, C D
Shared Package
ML15118A364 List:
References
Download: ML15244A279 (1)


Text

ES-301 Operating Test Quality Checklist Form ES-301-3 Facility: Duane Arnold Energy Center Date of Examination: 4/6/ 15 - 4/17/15 Operatin Test Number: 2015301 Initials

1. General Criteria a b. c#

a.

b. There is no day-to-day repetition between this and other operating tests to be administered durin this examination.
d. Overlap with the written examination and between different parts of the operating test is within acce table limits.
e. It appears that the operating test will differentiate between competent and less-than-competent a licants at the desi nated license level.
2. Walk-Through Criteria
a. Each JPM includes the following, as applicable:

initial conditions initiating cues references and tools, including associated procedures reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time-critical by the facility licensee operationally important specific performance criteria that include:

detailed expected actions with exact criteria and nomenclature system response and other examiner cues statements describing important observations to be made by the applicant criteria for successful completion of the task identification of critical steps and their associated performance standards restrictions on the sequence of ste s, if applicable

b. Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last 2 NRC examinations) specified on those forms and Form ES-201-2.
3. Simulator Criteria The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-301-4 and a co is attached.

~ Printed Name I Signature Date

a. Author Jes-s-e.. L. Se'.:.l""o""r /cJ.<,f-'-:
b. Facility Reviewer(*)
c. NRC Chief Examiner(#)

d.

NOTE:

  • The facility signature is not applicable for NRG-developed tests.
  1. Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.