ML15252A443: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:F IGURE 1  
{{#Wiki_filter:NYS000566 Submitted: September 9, 2015 FIGURE 1 BEe (1)
 
(3)  (2) 1.0
F igure 1: Comparison of Limit Line (LL) and Best Estimate (BE) p redictions, with embrittlement (BE e) and without embrittlement (BE ne). Note: (1) BE ne predicts possible failure at end of life (EOL). (2) BE e predicts failure (CUF en = 1.0) before end of life.
                                          +
(3) BE e predicts possible failure well before end of life.
BEne Limit Line (LL)
BE ne 10 17 F L UENCE (n/cm 2) CUF en Li mit Line (LL)
                                            -
Be st Estimate (BE)
CUFen          Best Estimate (BE) 1017                                    FLUENCE (n/cm2)
(3) BE e 1.0 (2) (1)  - E OL (PE O) T IME}}
EOL (PEO)        TIME Figure 1: Comparison of Limit Line (LL) and Best Estimate (BE) predictions, with embrittlement (BEe) and without embrittlement (BEne).
Note:
(1) BEne predicts possible failure at end of life (EOL).
(2) BEe predicts failure (CUFen = 1.0) before end of life.
(3) BEe predicts possible failure well before end of life.}}

Revision as of 06:51, 31 October 2019

NYS000566 - Figure 1 for Supplemental Reply Testimony of Dr. Richard T. Lahey
ML15252A443
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 09/09/2015
From:
State of NY, Office of the Attorney General
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 28270, ASLBP 07-858-03-LR-BD01, 50-247-LR, 50-286-LR
Download: ML15252A443 (1)


Text

NYS000566 Submitted: September 9, 2015 FIGURE 1 BEe (1)

(3) (2) 1.0

+

BEne Limit Line (LL)

-

CUFen Best Estimate (BE) 1017 FLUENCE (n/cm2)

EOL (PEO) TIME Figure 1: Comparison of Limit Line (LL) and Best Estimate (BE) predictions, with embrittlement (BEe) and without embrittlement (BEne).

Note:

(1) BEne predicts possible failure at end of life (EOL).

(2) BEe predicts failure (CUFen = 1.0) before end of life.

(3) BEe predicts possible failure well before end of life.