Line 3: Line 3:
| issue date = 06/22/2015
| issue date = 06/22/2015
| title = 2015 Davis-Besse Nuclear Power Station Initial License Examination ES-201-1 r9 supp1
| title = 2015 Davis-Besse Nuclear Power Station Initial License Examination ES-201-1 r9 supp1
| author name = Reeser D W
| author name = Reeser D
| author affiliation = NRC/RGN-III/DRS
| author affiliation = NRC/RGN-III/DRS
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000346
| docket = 05000346
| license number =  
| license number =  
| contact person = Reeser D W
| contact person = Reeser D
| package number = ML15217A089
| package number = ML15217A089
| document type = License-Operator, Part 55 Examination Related Material
| document type = License-Operator, Part 55 Examination Related Material
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:ES-201                                  Examination Preparation Checklist                              Form ES-201-1 Facility: Davis-Besse                                                    Date of Examination: June 2015 Developed by: Written - Facility                NRC          // Operating - Facility        NRC Target                                                                                                    Chief Date*                                    Task Description (Reference)                                Examiners Initials
    -180        1. Examination administration date confirmed (C.1.a; C.2.a and b)                  dwr 12/15/2014
    -120        2. NRC examiners and facility contact assigned (C.1.d; C.2.e)                      dwr 2/2/2015
    -120        3. Facility contact briefed on security and other requirements (C.2.c)              dwr 2/2/2015
    -120        4. Corporate notification letter sent (C.2.d)                                      dwr 2/2/2015 N/A        [5. Reference material due (C.1.e; C.3.c; Attachment 3)]                            N/A
{-75}        6. Integrated examination outline(s) due, including Forms ES-201-2, ES-201-3,      dwr 3/6/2015            ES-301-1, ES-301-2, ES-301-5, ES-D-1's, ES-401-1/2, ES-401-3, and ES-401-4, as applicable (C.1.e and f; C.3.d)
{-70}        {7. Examination outline(s) reviewed by NRC and feedback provided to facility        dwr 3/13/2015            licensee (C.2.h; C.3.e)}
{-45}        8. Proposed examinations (including written, walk-through JPMs, and                dwr 4/17/2015            scenarios, as applicable), supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, and ES-401-6, and any Form ES-201-3 updates), and reference materials due (C.1.e, f, g and h; C.3.d)
      -30        9. Preliminary license applications (NRC Form 398's) due (C.1.l; C.2.g;            dwr 5/8/2015            ES-202)
      -14        10. Final license applications due and Form ES-201-4 prepared (C.1.l; C.2.i;        dwr 6/1/2015            ES-202)
      -14        11. Examination approved by NRC supervisor for facility licensee review            dwr 5/15/2015              (C.2.h; C.3.f)
      -14        12. Examinations reviewed with facility licensee (C.1.j; C.2.f and h; C.3.g)        dwr 5/18-22/15
      -7        13. Written examinations and operating tests approved by NRC supervisor            dwr 6/5/2015              (C.2.i; C.3.h)
      -7        14. Final applications reviewed; 1 or 2 (if >10) applications audited to confirm    dwr 6/8/2015              qualifications / eligibility; and examination approval and waiver letters sent (C.2.i; Attachment 5; ES-202, C.2.e; ES-204)
      -7        15. Proctoring/written exam administration guidelines reviewed                      dwr 6/8/2015              with facility licensee (C.3.k)
      -7        16. Approved scenarios, job performance measures, and questions                    dwr 6/8/2015              distributed to NRC examiners (C.3.i)
* Target dates are generally based on facility-prepared examinations and are keyed to the examination date identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.
[Applies only] {Does not apply} to examinations prepared by the NRC.}}

Latest revision as of 07:09, 31 October 2019

2015 Davis-Besse Nuclear Power Station Initial License Examination ES-201-1 r9 supp1
ML15274A233
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/22/2015
From: David Reeser
Division of Reactor Safety III
To:
FirstEnergy Nuclear Operating Co
Reeser D
Shared Package
ML15217A089 List:
References
Download: ML15274A233 (1)


Text

ES-201 Examination Preparation Checklist Form ES-201-1 Facility: Davis-Besse Date of Examination: June 2015 Developed by: Written - Facility NRC // Operating - Facility NRC Target Chief Date* Task Description (Reference) Examiners Initials

-180 1. Examination administration date confirmed (C.1.a; C.2.a and b) dwr 12/15/2014

-120 2. NRC examiners and facility contact assigned (C.1.d; C.2.e) dwr 2/2/2015

-120 3. Facility contact briefed on security and other requirements (C.2.c) dwr 2/2/2015

-120 4. Corporate notification letter sent (C.2.d) dwr 2/2/2015 N/A [5. Reference material due (C.1.e; C.3.c; Attachment 3)] N/A

{-75} 6. Integrated examination outline(s) due, including Forms ES-201-2, ES-201-3, dwr 3/6/2015 ES-301-1, ES-301-2, ES-301-5, ES-D-1's, ES-401-1/2, ES-401-3, and ES-401-4, as applicable (C.1.e and f; C.3.d)

{-70} {7. Examination outline(s) reviewed by NRC and feedback provided to facility dwr 3/13/2015 licensee (C.2.h; C.3.e)}

{-45} 8. Proposed examinations (including written, walk-through JPMs, and dwr 4/17/2015 scenarios, as applicable), supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, and ES-401-6, and any Form ES-201-3 updates), and reference materials due (C.1.e, f, g and h; C.3.d)

-30 9. Preliminary license applications (NRC Form 398's) due (C.1.l; C.2.g; dwr 5/8/2015 ES-202)

-14 10. Final license applications due and Form ES-201-4 prepared (C.1.l; C.2.i; dwr 6/1/2015 ES-202)

-14 11. Examination approved by NRC supervisor for facility licensee review dwr 5/15/2015 (C.2.h; C.3.f)

-14 12. Examinations reviewed with facility licensee (C.1.j; C.2.f and h; C.3.g) dwr 5/18-22/15

-7 13. Written examinations and operating tests approved by NRC supervisor dwr 6/5/2015 (C.2.i; C.3.h)

-7 14. Final applications reviewed; 1 or 2 (if >10) applications audited to confirm dwr 6/8/2015 qualifications / eligibility; and examination approval and waiver letters sent (C.2.i; Attachment 5; ES-202, C.2.e; ES-204)

-7 15. Proctoring/written exam administration guidelines reviewed dwr 6/8/2015 with facility licensee (C.3.k)

-7 16. Approved scenarios, job performance measures, and questions dwr 6/8/2015 distributed to NRC examiners (C.3.i)

  • Target dates are generally based on facility-prepared examinations and are keyed to the examination date identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.

[Applies only] {Does not apply} to examinations prepared by the NRC.