ML15281A177: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 10/16/2015 | | issue date = 10/16/2015 | ||
| title = Notice of Availability of the Final Environmental Impact Statement for the Construction Permit for the Proposed Shine Medical Radioisotope Production Facility | | title = Notice of Availability of the Final Environmental Impact Statement for the Construction Permit for the Proposed Shine Medical Radioisotope Production Facility | ||
| author name = Wrona D | | author name = Wrona D | ||
| author affiliation = NRC/NRR/DLR | | author affiliation = NRC/NRR/DLR | ||
| addressee name = Nelson R | | addressee name = Nelson R | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Mr. Reid Nelson, Director Office of Federal Agency Programs Advisory Council on Historic Preservation 401 F Street NW, Suite 308 Washington, DC 20001-2637 | ||
October 16, 2015 | |||
Mr. Reid Nelson, Director Office of Federal Agency Programs Advisory Council on Historic Preservation 401 F Street NW, Suite 308 Washington, DC | |||
==SUBJECT:== | ==SUBJECT:== | ||
NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY | NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY | ||
==Dear Mr. Nelson:== | ==Dear Mr. Nelson:== | ||
The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, | The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS. | ||
In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings. | In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings. | ||
R. Nelson If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov. | |||
Sincerely, | |||
Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation | /RA/ | ||
David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608 | |||
Docket No. 50-608 | |||
==Enclosure:== | ==Enclosure:== | ||
As stated cc w/encls: Distribution List | As stated cc w/encls: Distribution List | ||
ML15281A235 (Package) ML15281A177 (Letter) | ML15281A235 (Package) ML15281A177 (Letter) | ||
ML15288A046 (Final EIS) | |||
*concurred via email RERB Technical BC:RERB:DLR OFFICE LA:DLR PM:RERB:DLR Staff Member NAME IBetts MMoser RHoffman DWrona DATE 10/ 13 /15 10/ 13 /15 10/ 14 /15 10/ 16 /15 | |||
==SUBJECT:== | ==SUBJECT:== | ||
NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY | NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY DISTRIBUTION: | ||
E-MAIL: | |||
DISTRIBUTION: | PUBLIC Public DHowe SLynch JLynch SHarwell RTR r/f MAdams CWeber CFrazier MConley RidsNrrDpr MMoser DBarss LLondon JWeil RidsNrrDprPrta AAdams ASapountzis MYoung VHuckabay RidsNrrDprPrtb LTran DSeymour TZaki DWrona RidsOgcRp Resource RHoffman RidsAcrsAcnw_MailCTR Resource HARD COPY: | ||
E-MAIL: PUBLIC Public | Laura Bub Environmental Analysis and Review Specialist State of Wisconsin Department of Natural Resources 3911 Fish Hatchery Road Fitchburg, WI 53711 Jim Costedio Licensing Manager SHINE Medical Technologies, Inc. | ||
2555 Industrial Drive Monona, WI 53713 Randy Howell National Nuclear Security Administration, NA-212 U.S. Department of Energy 1000 Independence Ave SW Washington, DC 20585 | |||
HARD COPY: | |||
Laura Bub Environmental Analysis and Review | |||
Mr. Reid Nelson, Director Office of Federal Agency Programs Advisory Council on Historic Preservation 401 F Street NW, Suite 308 Washington, DC | UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Mr. Reid Nelson, Director Office of Federal Agency Programs Advisory Council on Historic Preservation 401 F Street NW, Suite 308 Washington, DC 20001-2637 | ||
==SUBJECT:== | ==SUBJECT:== | ||
NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY | NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY | ||
==Dear Mr. Nelson:== | ==Dear Mr. Nelson:== | ||
The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, | The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS. | ||
In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings. | In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings. | ||
R. Nelson If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov. | |||
Sincerely, | |||
Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation | /RA/ | ||
David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608 | |||
Docket No. 50-608 | |||
==Enclosure:== | ==Enclosure:== | ||
As stated cc w/encls: Distribution List | As stated cc w/encls: Distribution List | ||
ML15281A235 (Package) ML15281A177 (Letter) | ML15281A235 (Package) ML15281A177 (Letter) | ||
ML15288A046 (Final EIS) | |||
*concurred via email RERB Technical BC:RERB:DLR OFFICE LA:DLR PM:RERB:DLR Staff Member NAME IBetts MMoser RHoffman DWrona DATE 10/ 13 /15 10/ 13 /15 10/ 14 /15 10/ 16 /15 | |||
==SUBJECT:== | ==SUBJECT:== | ||
NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY | NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY DISTRIBUTION: | ||
E-MAIL: | |||
DISTRIBUTION: | PUBLIC Public DHowe SLynch JLynch SHarwell RTR r/f MAdams CWeber CFrazier MConley RidsNrrDpr MMoser DBarss LLondon JWeil RidsNrrDprPrta AAdams ASapountzis MYoung VHuckabay RidsNrrDprPrtb LTran DSeymour TZaki DWrona RidsOgcRp Resource RHoffman RidsAcrsAcnw_MailCTR Resource HARD COPY: | ||
E-MAIL: PUBLIC Public | Laura Bub Environmental Analysis and Review Specialist State of Wisconsin Department of Natural Resources 3911 Fish Hatchery Road Fitchburg, WI 53711 Jim Costedio Licensing Manager SHINE Medical Technologies, Inc. | ||
2555 Industrial Drive Monona, WI 53713 Randy Howell National Nuclear Security Administration, NA-212 U.S. Department of Energy 1000 Independence Ave SW Washington, DC 20585}} | |||
HARD COPY: | |||
Laura Bub Environmental Analysis and Review |
Latest revision as of 05:51, 31 October 2019
ML15281A177 | |
Person / Time | |
---|---|
Site: | SHINE Medical Technologies |
Issue date: | 10/16/2015 |
From: | David Wrona Division of License Renewal |
To: | Nelson R US Advisory Council On Historic Preservation |
Hoffman R,NRR/DLR,415-1107 | |
References | |
DLR-15-0464 | |
Download: ML15281A177 (4) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Mr. Reid Nelson, Director Office of Federal Agency Programs Advisory Council on Historic Preservation 401 F Street NW, Suite 308 Washington, DC 20001-2637
SUBJECT:
NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY
Dear Mr. Nelson:
The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.
In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.
R. Nelson If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Sincerely,
/RA/
David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608
Enclosure:
As stated cc w/encls: Distribution List
ML15281A235 (Package) ML15281A177 (Letter)
ML15288A046 (Final EIS)
- concurred via email RERB Technical BC:RERB:DLR OFFICE LA:DLR PM:RERB:DLR Staff Member NAME IBetts MMoser RHoffman DWrona DATE 10/ 13 /15 10/ 13 /15 10/ 14 /15 10/ 16 /15
SUBJECT:
NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY DISTRIBUTION:
E-MAIL:
PUBLIC Public DHowe SLynch JLynch SHarwell RTR r/f MAdams CWeber CFrazier MConley RidsNrrDpr MMoser DBarss LLondon JWeil RidsNrrDprPrta AAdams ASapountzis MYoung VHuckabay RidsNrrDprPrtb LTran DSeymour TZaki DWrona RidsOgcRp Resource RHoffman RidsAcrsAcnw_MailCTR Resource HARD COPY:
Laura Bub Environmental Analysis and Review Specialist State of Wisconsin Department of Natural Resources 3911 Fish Hatchery Road Fitchburg, WI 53711 Jim Costedio Licensing Manager SHINE Medical Technologies, Inc.
2555 Industrial Drive Monona, WI 53713 Randy Howell National Nuclear Security Administration, NA-212 U.S. Department of Energy 1000 Independence Ave SW Washington, DC 20585
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Mr. Reid Nelson, Director Office of Federal Agency Programs Advisory Council on Historic Preservation 401 F Street NW, Suite 308 Washington, DC 20001-2637
SUBJECT:
NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY
Dear Mr. Nelson:
The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.
In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.
R. Nelson If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Sincerely,
/RA/
David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608
Enclosure:
As stated cc w/encls: Distribution List
ML15281A235 (Package) ML15281A177 (Letter)
ML15288A046 (Final EIS)
- concurred via email RERB Technical BC:RERB:DLR OFFICE LA:DLR PM:RERB:DLR Staff Member NAME IBetts MMoser RHoffman DWrona DATE 10/ 13 /15 10/ 13 /15 10/ 14 /15 10/ 16 /15
SUBJECT:
NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY DISTRIBUTION:
E-MAIL:
PUBLIC Public DHowe SLynch JLynch SHarwell RTR r/f MAdams CWeber CFrazier MConley RidsNrrDpr MMoser DBarss LLondon JWeil RidsNrrDprPrta AAdams ASapountzis MYoung VHuckabay RidsNrrDprPrtb LTran DSeymour TZaki DWrona RidsOgcRp Resource RHoffman RidsAcrsAcnw_MailCTR Resource HARD COPY:
Laura Bub Environmental Analysis and Review Specialist State of Wisconsin Department of Natural Resources 3911 Fish Hatchery Road Fitchburg, WI 53711 Jim Costedio Licensing Manager SHINE Medical Technologies, Inc.
2555 Industrial Drive Monona, WI 53713 Randy Howell National Nuclear Security Administration, NA-212 U.S. Department of Energy 1000 Independence Ave SW Washington, DC 20585