{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Warren Chris Swartz, Jr., President Keweenaw Bay Indian Community 16429 Beartown Rd Baraga, MI 49908
 
Mr. Warren Chris Swartz, Jr., President Keweenaw Bay Indian Community 16429 Beartown Rd Baraga, MI 49908


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT  
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT


==Dear President Swartz:==
==Dear President Swartz:==
Line 27: Line 25:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8(c).
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8(c).
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license)
In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.
As discussed in the draft SEIS, the NRC's recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2;" (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.


A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft supplement and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to: Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
W. Swartz                                  A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft supplement and on our preliminary conclusions.
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.
Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.
Sincerely, /RA/
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
David J. Wrona, Chief Environmental Review and  
Sincerely,
 
                                                /RA/
Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation  
David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341
 
Docket No. 50-341


==Enclosure:==
==Enclosure:==
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56


cc w/encl: Listserv G. Loonsfoot, THPO UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv G. Loonsfoot, THPO


Mr. Levi Carrick, Sr, Chairman Bay Mills Indian Community 12104 West Lakeshore Drive Brimley, MI 49715  
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Levi Carrick, Sr, Chairman Bay Mills Indian Community 12104 West Lakeshore Drive Brimley, MI 49715


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT  
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT


==Dear Chairman Carrick:==
==Dear Chairman Carrick:==
Line 56: Line 50:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license)
In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.
As discussed in the draft SEIS, the NRC's recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2;" (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.
 
A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to: Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC  20555-0001
 
Please note that the public comment period for the draft SEIS ends on December 28, 2015.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
 
Sincerely,  /RA/  David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation


Docket No. 50-341
L. Carrick                                    A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.
Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Sincerely,
                                                  /RA/
David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341


==Enclosure:==
==Enclosure:==


NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv P. Carrick, THPO UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv P. Carrick, THPO


Mr. Al Pedwaydon, Council Chair Grand Traverse Band of Ottawa and Chippewa Indians 2605 N. West Bay Shore Dr.
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Al Pedwaydon, Council Chair Grand Traverse Band of Ottawa and Chippewa Indians 2605 N. West Bay Shore Dr.
Peshawbestown, MI 49682  
Peshawbestown, MI 49682


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT  
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT


==Dear Council Chair Pedwaydon:==
==Dear Council Chair Pedwaydon:==
Line 85: Line 76:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license)
In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.
As discussed in the draft SEIS, the NRC's recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2;" (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.


A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to: Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
A. Pedwaydon                                    A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001  
Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:
 
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Please note that the public comment period for the draft SEIS ends on December 28, 2015.
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Sincerely,
 
                                                /RA/
Sincerely, /RA/ David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation  
David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341
 
Docket No. 50-341  


==Enclosure:==
==Enclosure:==


NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56  
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv


cc w/encl:  Listserv UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015  
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. James Williams, Jr., Tribal Chairman Lac Vieux Desert Band of Lake Superior Chippewa Indians P.O. Box 249 Watersmeet, MI 49969
 
Mr. James Williams, Jr., Tribal Chairman Lac Vieux Desert Band of Lake Superior Chippewa Indians P.O. Box 249
 
Watersmeet, MI 49969  


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT  
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT


==Dear Chairman Williams:==
==Dear Chairman Williams:==
Line 117: Line 101:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license)
In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.
As discussed in the draft SEIS, the NRC's recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2;" (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.
J. Williams, Jr A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to: Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC  20555-0001


Please note that the public comment period for the draft SEIS ends on December 28, 2015.
J. Williams, Jr                                  A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:
Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
 
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.
Sincerely, /RA/ David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation  
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
 
Sincerely,
Docket No. 50-341
                                                /RA/
David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341


==Enclosure:==
==Enclosure:==


NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56  
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv G. Martin, THPO


cc w/encl:  Listserv                  G. Martin, THPO UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015  
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Ms. Regina Gasco-Bentley, Tribal Chairperson Little Traverse Bay Bands of Odawa Indians 7500 Odawa Circle Harbor Springs, MI 49740
 
Ms. Regina Gasco-Bentley, Tribal Chairperson Little Traverse Bay Bands of Odawa Indians 7500 Odawa Circle Harbor Springs, MI 49740  


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT  
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT


==Dear Chairperson Gasco-Bentley:==
==Dear Chairperson Gasco-Bentley:==
Line 146: Line 126:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license)
In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.
As discussed in the draft SEIS, the NRC's recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2;" (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.
R. Gasco-Bentley A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to: Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC  20555-0001


Please note that the public comment period for the draft SEIS ends on December 28, 2015.
R. Gasco-Bentley                                A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:
Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
 
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.
Sincerely, /RA/ David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation  
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
 
Sincerely,
Docket No. 50-341
                                                /RA/
David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341


==Enclosure:==
==Enclosure:==


NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56  
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv
 
cc w/encl: Listserv UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015
 
Mr. John Warren, Chairman


Pokagon Band of Potawatomi Indians 58620 Sink Road Box 180 Dowagiac, MI 49047  
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. John Warren, Chairman Pokagon Band of Potawatomi Indians 58620 Sink Road Box 180 Dowagiac, MI 49047


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT  
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT


==Dear Chairman Warren:==
==Dear Chairman Warren:==
Line 177: Line 151:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license)
In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.
As discussed in the draft SEIS, the NRC's recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2;" (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.


A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to: Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
J. Warren                                        A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001  
Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:
 
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Please note that the public comment period for the draft SEIS ends on December 28, 2015.
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Sincerely,
 
                                                /RA/
Sincerely, /RA/ David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation  
David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341
 
Docket No. 50-341


==Enclosure:==
==Enclosure:==


NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56  
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv M. Winchester, THPO


cc w/encl:  Listserv                  M. Winchester, THPO UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015  
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Aaron A. Payment, Tribal Chairperson Sault Ste. Marie Tribe of Chippewa Indians of Michigan 523 Ashmun St.
 
Sault Ste. Marie, MI 49783
Mr. Aaron A. Payment, Tribal Chairperson Sault Ste. Marie Tribe of Chippewa   Indians of Michigan 523 Ashmun St.  
 
Sault Ste. Marie, MI 49783


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF ENRICO FERMI UNIT 2, FOR PUBLIC COMMENT  
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF ENRICO FERMI UNIT 2, FOR PUBLIC COMMENT


==Dear Tribal Chairperson Payment:==
==Dear Tribal Chairperson Payment:==
Line 209: Line 177:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license)
In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.
As discussed in the draft SEIS, the NRC's recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2;" (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.


A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to: Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
A. Payment                                      A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001  
Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:
 
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Please note that the public comment period for the draft SEIS ends on December 28, 2015.
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Sincerely,
 
                                                /RA/
Sincerely, /RA/ David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation  
David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341
 
Docket No. 50-341


==Enclosure:==
==Enclosure:==


NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56  
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv
 
cc w/encl: Listserv  
 
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015
 
Mr. Kenneth Meshigaud, Tribal Chairperson


Hannahville Indian Community N14911 Hannahville B-1 Rd Wilson MI 49896  
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Kenneth Meshigaud, Tribal Chairperson Hannahville Indian Community N14911 Hannahville B-1 Rd Wilson MI 49896


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT  
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT


==Dear Tribal Chairperson Meshigaud:==
==Dear Tribal Chairperson Meshigaud:==
Line 243: Line 202:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license)
In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.
As discussed in the draft SEIS, the NRC's recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2;" (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.


A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to: Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
K. Meshigaud                                    A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001  
Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:
 
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Please note that the public comment period for the draft SEIS ends on December 28, 2015.
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Sincerely,
 
                                                /RA/
Sincerely, /RA/   David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation  
David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341
 
Docket No. 50-341


==Enclosure:==
==Enclosure:==


NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv  
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv


UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015  
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Dan Green THPO/Chief Planning Officer Nottawaseppi Huron Band of the Potawatomi 1485 Mno-Bmadzewen Way Fulton, MI 49052
 
Mr. Dan Green THPO/Chief Planning Officer Nottawaseppi Huron Band of the Potawatomi 1485 Mno-Bmadzewen Way  
 
Fulton, MI 49052  


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT  
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT


==Dear Mr. Green:==
==Dear Mr. Green:==
Line 275: Line 227:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license)
In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.
As discussed in the draft SEIS, the NRC's recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2;" (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process
 
A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to: Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC  20555-0001
 
Please note that the public comment period for the draft SEIS ends on December 28, 2015.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.


Sincerely, /RA/   David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation  
D. Green                                        A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.
 
Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:
Docket No. 50-341
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Sincerely,
                                                /RA/
David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341


==Enclosure:==
==Enclosure:==


NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv  
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv


UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015  
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Steve Pego, Chief Saginaw Chippewa Indian Tribe of Michigan 7070 E. Broadway Mt. Pleasant, MI 48858
 
Mr. Steve Pego, Chief Saginaw Chippewa Indian Tribe of Michigan 7070 E. Broadway Mt. Pleasant, MI 48858  


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT  
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT


==Dear Chief Pego:==
==Dear Chief Pego:==
Line 305: Line 252:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license)
In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.
As discussed in the draft SEIS, the NRC's recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2;" (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.


A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to: Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
S. Pego                                          A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001  
Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:
 
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Please note that the public comment period for the draft SEIS ends on December 28, 2015.
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Sincerely,
 
                                                /RA/
Sincerely, /RA/   David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation  
David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341
 
Docket No. 50-341


==Enclosure:==
==Enclosure:==


NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv W. Johnson, THPO UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv W. Johnson, THPO


Mr. D.K. Sprague, Tribal Chairman Match-e-be-nash-she-wish Band   of Potawatomi Indians of Michigan 1743 142 nd Avenue P.O. Box 218 Dorr, MI 49323  
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. D.K. Sprague, Tribal Chairman Match-e-be-nash-she-wish Band of Potawatomi Indians of Michigan 1743 142nd Avenue P.O. Box 218 Dorr, MI 49323


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT  
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT


==Dear Tribal Chairman Sprague:==
==Dear Tribal Chairman Sprague:==
Line 333: Line 277:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license)
In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.
As discussed in the draft SEIS, the NRC's recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2;" (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.
D.
A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to: Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC  20555-0001


Please note that the public comment period for the draft SEIS ends on December 28, 2015.
D.K. Sprague                                    A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:
Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
 
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.
Sincerely, /RA/   David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation  
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
 
Sincerely,
Docket No. 50-341
                                                /RA/
David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341


==Enclosure:==
==Enclosure:==


NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv  
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv
 
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015
 
Mr. Larry Romanelli, Ogema


Little River Band of Ottawa Indians 375 River St Manistee, MI 49660  
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Larry Romanelli, Ogema Little River Band of Ottawa Indians 375 River St Manistee, MI 49660


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT  
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT


==Dear Mr. Romanelli:==
==Dear Mr. Romanelli:==
Line 365: Line 302:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license)
In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.
As discussed in the draft SEIS, the NRC's recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2;" (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.
 
A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to: Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC  20555-0001
 
Please note that the public comment period for the draft SEIS ends on December 28, 2015.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.


Sincerely, /RA/   David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation  
L. Romanelli                                      A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.
 
Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:
Docket No. 50-341
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Sincerely,
                                                  /RA/
David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341


==Enclosure:==
==Enclosure:==


NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56  
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv J. Sam II, THPO


cc w/encl:  Listserv                  J. Sam II, THPO
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Harold Gus Frank, Chairman Forest County Potawatomi 5416 Everybodys Rd.
 
P.O. Box 340 Crandon, WI 54520
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015  
 
Mr. Harold "Gus" Frank, Chairman Forest County Potawatomi 5416 Everybody's Rd. P.O. Box 340 Crandon, WI 54520  


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF ENRICO FERMI UNIT 2, FOR PUBLIC COMMENT  
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF ENRICO FERMI UNIT 2, FOR PUBLIC COMMENT


==Dear Chairman Frank:==
==Dear Chairman Frank:==
Line 397: Line 328:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license)
In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.
As discussed in the draft SEIS, the NRC's recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2;" (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.


A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to: Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
H. Frank                                        A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001  
Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:
 
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Please note that the public comment period for the draft SEIS ends on December 28, 2015.
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Sincerely,
 
                                                /RA/
Sincerely, /RA/   David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation  
David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341
 
Docket No. 50-341


==Enclosure:==
==Enclosure:==


NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv M. Cook, THPO UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Ron Sparkman, Chief
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv M. Cook, THPO
 
Shawnee Tribe P.O. Box 189 


29 S Hwy 69A Miami, OK 74355  
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Ron Sparkman, Chief Shawnee Tribe P.O. Box 189 29 S Hwy 69A Miami, OK 74355


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT  
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT


==Dear Chief Sparkman:==
==Dear Chief Sparkman:==
Line 427: Line 353:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license)
In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.
As discussed in the draft SEIS, the NRC's recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2;" (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process
 
A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to: Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC  20555-0001
 
Please note that the public comment period for the draft SEIS ends on December 28, 2015.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.


Sincerely, /RA/   David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation  
R. Sparkman                                      A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.
 
Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:
Docket No. 50-341
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Sincerely,
                                                /RA/
David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341


==Enclosure:==
==Enclosure:==


NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv  
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv


UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015  
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Kerry Holton, President Delaware Nation 3 Mi. N. of Anadarko on Highway 281 Main Office Bldg 100 P.O. Box 825 Anadarko, OK 73005
 
Kerry Holton, President  
 
Delaware Nation 3 Mi. N. of Anadarko on Highway 281 Main Office Bldg 100 P.O. Box 825 Anadarko, OK 73005  


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT  
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT


==Dear President Holton:==
==Dear President Holton:==
Line 459: Line 378:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8(c).
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8(c).
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license)
In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.
As discussed in the draft SEIS, the NRC's recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2;" (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.


A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft supplement and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to: Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
K. Holton                                      A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft supplement and on our preliminary conclusions.
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.
Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.
Sincerely, /RA/
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
David J. Wrona, Chief Environmental Review and  
Sincerely,
 
                                                /RA/
Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation  
David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341
 
Docket No. 50-341


==Enclosure:==
==Enclosure:==
NUREG-1437, Generic Environmental Impact Statement  for License Renewal of Nuclear Plants, Supplement 56
cc w/encl:  Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015


Mr. Billy Friend, Chief
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv


Wyandotte Nation 64700 E. Highway 60 Wyandotte, OK 74370  
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Billy Friend, Chief Wyandotte Nation 64700 E. Highway 60 Wyandotte, OK 74370


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT  
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT


==Dear Chief Friend:==
==Dear Chief Friend:==
Line 492: Line 403:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license)
In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.
As discussed in the draft SEIS, the NRC's recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2;" (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process
 
A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to: Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC  20555-0001
 
Please note that the public comment period for the draft SEIS ends on December 28, 2015.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.


Sincerely, /RA/   David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation  
B. Friend                                        A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.
 
Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:
Docket No. 50-341
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Sincerely,
                                                /RA/
David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341


==Enclosure:==
==Enclosure:==


NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv


Ms. Ethel E. Cook, Chief Ottawa Tribe of Oklahoma 13 South Highway 69A Miami, OK 74354  
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Ms. Ethel E. Cook, Chief Ottawa Tribe of Oklahoma 13 South Highway 69A Miami, OK 74354


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT  
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT


==Dear Chief Cook:==
==Dear Chief Cook:==
Line 520: Line 428:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license)
In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.
As discussed in the draft SEIS, the NRC's recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2;" (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.


A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to: Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
E. Cook                                          A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001  
Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:
 
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Please note that the public comment period for the draft SEIS ends on December 28, 2015.
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Sincerely,
 
                                                /RA/
Sincerely, /RA/   David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation  
David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341
 
Docket No. 50-341


==Enclosure:==
==Enclosure:==


NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv


ML15293A421 (Pkg), ML15293A442 (Ltr)
ML15293A421 (Pkg), ML15293A442 (Ltr)
OFFICE LA:DLR:RPB2 PM:DLR:RPB2RERB Technical Staff Member BC:DLR:RERB NAME IBetts EKeegan RHoffman DWrona DATE 10/2/15 11/02/15 11/03/15 11/03/15
OFFICE       LA:DLR:RPB2 PM:DLR:RPB2 RERB Technical Staff Member                     BC:DLR:RERB NAME         IBetts           EKeegan           RHoffman                           DWrona DATE         10/2/15         11/02/15           11/03/15                           11/03/15


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF ENRICO FERMI UNIT 2, FOR PUBLIC COMMENT Identical letters have been sent to:
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF ENRICO FERMI UNIT 2, FOR PUBLIC COMMENT Identical letters have been sent to:
Warren Chris Swartz, Jr
Warren Chris Swartz, Jr., President, Keweenaw Bay Indian Community Levi Carrick, Sr, Chairman, Bay Mills Indian Community Al Pedwaydon, Council Chair, Grand Traverse Band of Ottawa and Chippewa Indians James Williams Jr., Tribal Chairman, Lac Vieux Desert Band of Lake Superior Chippewa Indians Regina Gasco-Bentley, Tribal Chairperson, Little Traverse Bay Bands of Odawa Indians John Warren, Chairman, Pokagon Band of Potawatomi Indians Aaron A. Payment, Tribal Chairperson, Sault Ste. Marie Tribe of Chippewa Indians of Michigan Kenneth Meshigaud, Tribal Chairperson, Hannahville Indian Community Dan Green, THPO/Chief Planning Officer, Nottawaseppi Huron Band of the Potawatomi Steve Pego, Chief, Saginaw Chippewa Indian Tribe of Michigan D. K. Sprague, Tribal Chairman, Match-e-be-nash-she-wish Band of Potawatomi Indians of Michigan Larry Romanelli, Ogema, Little River Band of Ottawa Indians Harold Gus Frank, Chairman, Forest County Potawatomi Ron Sparkman, Chief, Shawnee Tribe Kerry Holton, President, Delaware Nation Billy Friend, Chief, Wyandotte Nation Ethel E. Cook, Chief, Ottawa Tribe of Oklahoma DISTRIBUTION:
., President, Keweenaw Bay Indian Community Levi Carrick, Sr, Chairman, Bay Mills Indian Community Al Pedwaydon, Council Chair, Grand Trav erse Band of Ottawa and Chippewa Indians James Williams Jr., Tribal Chairman, Lac Vieux Desert Band of Lake Superior Chippewa  
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRsrg Resource RidsNrrPMFermi Resource RidsOpaMail RidsOgcMailCenter
-------------------
EKeegan DWrona RHoffman


Indians Regina Gasco-Bentley, Tribal Chairperson, Little Traverse Bay Bands of Odawa Indians John Warren, Chairman, Pokagon Band of Potawatomi Indians Aaron A. Payment, Tribal Chairperson, Sault Ste. Marie Tribe of Chippewa Indians of Michigan Kenneth Meshigaud, Tribal Chairperson, Hannahville Indian Community Dan Green, THPO/Chief Planning Officer, Nottawaseppi Huron Band of the Potawatomi Steve Pego, Chief, Saginaw Chippewa Indian Tribe of Michigan D. K. Sprague, Tribal Chairman, Match-e-be-nash-she-wish Band of Potawatomi Indians of Michigan Larry Romanelli, Ogema, Little River Band of Ottawa Indians Harold "Gus" Frank, Chairman, Forest County Potawatomi
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Warren Chris Swartz, Jr., President Keweenaw Bay Indian Community 16429 Beartown Rd Baraga, MI 49908
 
Ron Sparkman, Chief, Shawnee Tribe Kerry Holton, President, Delaware Nation Billy Friend, Chief, Wyandotte Nation
 
Ethel E. Cook, Chief, Ottawa Tribe of Oklahoma DISTRIBUTION
: PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRsrg Resource RidsNrrPMFermi Resource RidsOpaMail RidsOgcMailCenter
-------------------
 
EKeegan DWrona RHoffman UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015  
 
Mr. Warren Chris Swartz, Jr., President Keweenaw Bay Indian Community 16429 Beartown Rd Baraga, MI 49908


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT  
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT


==Dear President Swartz:==
==Dear President Swartz:==
Line 566: Line 463:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8(c).
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8(c).
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license)
In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.
As discussed in the draft SEIS, the NRC's recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2;" (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.


A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft supplement and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to: Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
W. Swartz                                  A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft supplement and on our preliminary conclusions.
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.
Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.
Sincerely, /RA/
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
David J. Wrona, Chief Environmental Review and  
Sincerely,
 
                                                /RA/
Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation  
David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341
 
Docket No. 50-341


==Enclosure:==
==Enclosure:==
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56


cc w/encl: Listserv G. Loonsfoot, THPO UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv G. Loonsfoot, THPO


Mr. Levi Carrick, Sr, Chairman Bay Mills Indian Community 12104 West Lakeshore Drive Brimley, MI 49715  
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Levi Carrick, Sr, Chairman Bay Mills Indian Community 12104 West Lakeshore Drive Brimley, MI 49715


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT  
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT


==Dear Chairman Carrick:==
==Dear Chairman Carrick:==
Line 595: Line 488:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license)
In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.
As discussed in the draft SEIS, the NRC's recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2;" (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.


A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to: Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
L. Carrick                                    A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001  
Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:
 
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Please note that the public comment period for the draft SEIS ends on December 28, 2015.
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Sincerely,
 
                                                  /RA/
Sincerely, /RA/   David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation  
David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341
 
Docket No. 50-341


==Enclosure:==
==Enclosure:==


NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv P. Carrick, THPO UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv P. Carrick, THPO


Mr. Al Pedwaydon, Council Chair Grand Traverse Band of Ottawa and Chippewa Indians 2605 N. West Bay Shore Dr.
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Al Pedwaydon, Council Chair Grand Traverse Band of Ottawa and Chippewa Indians 2605 N. West Bay Shore Dr.
Peshawbestown, MI 49682  
Peshawbestown, MI 49682


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT  
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT


==Dear Council Chair Pedwaydon:==
==Dear Council Chair Pedwaydon:==
Line 624: Line 514:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license)
In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.
As discussed in the draft SEIS, the NRC's recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2;" (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.


A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to: Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
A. Pedwaydon                                    A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001  
Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:
 
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Please note that the public comment period for the draft SEIS ends on December 28, 2015.
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Sincerely,
 
                                                /RA/
Sincerely, /RA/ David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation  
David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341
 
Docket No. 50-341  


==Enclosure:==
==Enclosure:==


NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56  
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv
 
cc w/encl: Listserv UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015
 
Mr. James Williams, Jr., Tribal Chairman Lac Vieux Desert Band of Lake Superior Chippewa Indians P.O. Box 249 


Watersmeet, MI 49969  
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. James Williams, Jr., Tribal Chairman Lac Vieux Desert Band of Lake Superior Chippewa Indians P.O. Box 249 Watersmeet, MI 49969


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT  
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT


==Dear Chairman Williams:==
==Dear Chairman Williams:==
Line 656: Line 539:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license)
In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.
As discussed in the draft SEIS, the NRC's recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2;" (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.
J. Williams, Jr A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to: Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC  20555-0001


Please note that the public comment period for the draft SEIS ends on December 28, 2015.
J. Williams, Jr                                  A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:
Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
 
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.
Sincerely, /RA/ David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation  
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
 
Sincerely,
Docket No. 50-341
                                                /RA/
David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341


==Enclosure:==
==Enclosure:==


NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56  
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv G. Martin, THPO


cc w/encl:  Listserv                  G. Martin, THPO UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015  
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Ms. Regina Gasco-Bentley, Tribal Chairperson Little Traverse Bay Bands of Odawa Indians 7500 Odawa Circle Harbor Springs, MI 49740
 
Ms. Regina Gasco-Bentley, Tribal Chairperson Little Traverse Bay Bands of Odawa Indians 7500 Odawa Circle Harbor Springs, MI 49740  


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT  
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT


==Dear Chairperson Gasco-Bentley:==
==Dear Chairperson Gasco-Bentley:==
Line 685: Line 564:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license)
In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.
As discussed in the draft SEIS, the NRC's recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2;" (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.
R. Gasco-Bentley A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to: Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC  20555-0001


Please note that the public comment period for the draft SEIS ends on December 28, 2015.
R. Gasco-Bentley                                A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:
Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
 
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.
Sincerely, /RA/ David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation  
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
 
Sincerely,
Docket No. 50-341
                                                /RA/
David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341


==Enclosure:==
==Enclosure:==


NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56  
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv
 
cc w/encl: Listserv UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015
 
Mr. John Warren, Chairman


Pokagon Band of Potawatomi Indians 58620 Sink Road Box 180 Dowagiac, MI 49047  
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. John Warren, Chairman Pokagon Band of Potawatomi Indians 58620 Sink Road Box 180 Dowagiac, MI 49047


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT  
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT


==Dear Chairman Warren:==
==Dear Chairman Warren:==
Line 716: Line 589:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license)
In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.
As discussed in the draft SEIS, the NRC's recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2;" (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process
 
A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to: Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC  20555-0001
 
Please note that the public comment period for the draft SEIS ends on December 28, 2015.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.


Sincerely, /RA/ David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation  
J. Warren                                        A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.
 
Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:
Docket No. 50-341
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Sincerely,
                                                /RA/
David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341


==Enclosure:==
==Enclosure:==


NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56  
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv M. Winchester, THPO


cc w/encl:  Listserv                  M. Winchester, THPO UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015  
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Aaron A. Payment, Tribal Chairperson Sault Ste. Marie Tribe of Chippewa Indians of Michigan 523 Ashmun St.
 
Sault Ste. Marie, MI 49783
Mr. Aaron A. Payment, Tribal Chairperson Sault Ste. Marie Tribe of Chippewa   Indians of Michigan 523 Ashmun St.  
 
Sault Ste. Marie, MI 49783


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF ENRICO FERMI UNIT 2, FOR PUBLIC COMMENT  
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF ENRICO FERMI UNIT 2, FOR PUBLIC COMMENT


==Dear Tribal Chairperson Payment:==
==Dear Tribal Chairperson Payment:==
Line 748: Line 615:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license)
In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.
As discussed in the draft SEIS, the NRC's recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2;" (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.


A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to: Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
A. Payment                                      A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001  
Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:
 
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Please note that the public comment period for the draft SEIS ends on December 28, 2015.
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Sincerely,
 
                                                /RA/
Sincerely, /RA/ David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation  
David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341
 
Docket No. 50-341


==Enclosure:==
==Enclosure:==


NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56  
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv
 
cc w/encl: Listserv  
 
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015
 
Mr. Kenneth Meshigaud, Tribal Chairperson


Hannahville Indian Community N14911 Hannahville B-1 Rd Wilson MI 49896  
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Kenneth Meshigaud, Tribal Chairperson Hannahville Indian Community N14911 Hannahville B-1 Rd Wilson MI 49896


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT  
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT


==Dear Tribal Chairperson Meshigaud:==
==Dear Tribal Chairperson Meshigaud:==
Line 782: Line 640:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license)
In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.
As discussed in the draft SEIS, the NRC's recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2;" (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.


A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to: Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
K. Meshigaud                                    A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001  
Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:
 
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Please note that the public comment period for the draft SEIS ends on December 28, 2015.
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Sincerely,
 
                                                /RA/
Sincerely, /RA/   David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation  
David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341
 
Docket No. 50-341


==Enclosure:==
==Enclosure:==


NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv  
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv


UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015  
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Dan Green THPO/Chief Planning Officer Nottawaseppi Huron Band of the Potawatomi 1485 Mno-Bmadzewen Way Fulton, MI 49052
 
Mr. Dan Green THPO/Chief Planning Officer Nottawaseppi Huron Band of the Potawatomi 1485 Mno-Bmadzewen Way  
 
Fulton, MI 49052  


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT  
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT


==Dear Mr. Green:==
==Dear Mr. Green:==
Line 814: Line 665:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license)
In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.
As discussed in the draft SEIS, the NRC's recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2;" (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.
 
A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to: Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC  20555-0001
 
Please note that the public comment period for the draft SEIS ends on December 28, 2015.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
 
Sincerely,  /RA/  David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation


Docket No. 50-341
D. Green                                        A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.
Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Sincerely,
                                                /RA/
David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341


==Enclosure:==
==Enclosure:==


NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv  
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv
 
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015


Mr. Steve Pego, Chief Saginaw Chippewa Indian Tribe of Michigan 7070 E. Broadway Mt. Pleasant, MI 48858  
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Steve Pego, Chief Saginaw Chippewa Indian Tribe of Michigan 7070 E. Broadway Mt. Pleasant, MI 48858


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT  
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT


==Dear Chief Pego:==
==Dear Chief Pego:==
Line 844: Line 690:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license)
In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.
As discussed in the draft SEIS, the NRC's recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2;" (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.


A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to: Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
S. Pego                                          A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001  
Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:
 
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Please note that the public comment period for the draft SEIS ends on December 28, 2015.
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Sincerely,
 
                                                /RA/
Sincerely, /RA/   David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation  
David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341
 
Docket No. 50-341


==Enclosure:==
==Enclosure:==


NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv W. Johnson, THPO UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv W. Johnson, THPO


Mr. D.K. Sprague, Tribal Chairman Match-e-be-nash-she-wish Band   of Potawatomi Indians of Michigan 1743 142 nd Avenue P.O. Box 218 Dorr, MI 49323  
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. D.K. Sprague, Tribal Chairman Match-e-be-nash-she-wish Band of Potawatomi Indians of Michigan 1743 142nd Avenue P.O. Box 218 Dorr, MI 49323


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT  
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT


==Dear Tribal Chairman Sprague:==
==Dear Tribal Chairman Sprague:==
Line 872: Line 715:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license)
In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.
As discussed in the draft SEIS, the NRC's recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2;" (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.
D.
A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to: Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC  20555-0001


Please note that the public comment period for the draft SEIS ends on December 28, 2015.
D.K. Sprague                                    A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:
Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
 
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.
Sincerely, /RA/   David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation  
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
 
Sincerely,
Docket No. 50-341
                                                /RA/
David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341


==Enclosure:==
==Enclosure:==


NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv  
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv
 
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015
 
Mr. Larry Romanelli, Ogema


Little River Band of Ottawa Indians 375 River St Manistee, MI 49660  
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Larry Romanelli, Ogema Little River Band of Ottawa Indians 375 River St Manistee, MI 49660


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT  
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT


==Dear Mr. Romanelli:==
==Dear Mr. Romanelli:==
Line 904: Line 740:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license)
In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.
As discussed in the draft SEIS, the NRC's recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2;" (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.
 
A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to: Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC  20555-0001
 
Please note that the public comment period for the draft SEIS ends on December 28, 2015.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.


Sincerely, /RA/   David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation  
L. Romanelli                                      A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.
 
Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:
Docket No. 50-341
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Sincerely,
                                                  /RA/
David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341


==Enclosure:==
==Enclosure:==


NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56  
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv J. Sam II, THPO


cc w/encl:  Listserv                  J. Sam II, THPO
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Harold Gus Frank, Chairman Forest County Potawatomi 5416 Everybodys Rd.
 
P.O. Box 340 Crandon, WI 54520
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015  
 
Mr. Harold "Gus" Frank, Chairman Forest County Potawatomi 5416 Everybody's Rd. P.O. Box 340 Crandon, WI 54520  


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF ENRICO FERMI UNIT 2, FOR PUBLIC COMMENT  
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF ENRICO FERMI UNIT 2, FOR PUBLIC COMMENT


==Dear Chairman Frank:==
==Dear Chairman Frank:==
Line 936: Line 766:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license)
In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.
As discussed in the draft SEIS, the NRC's recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2;" (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.


A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to: Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
H. Frank                                        A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001  
Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:
 
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Please note that the public comment period for the draft SEIS ends on December 28, 2015.
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Sincerely,
 
                                                /RA/
Sincerely, /RA/   David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation  
David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341
 
Docket No. 50-341


==Enclosure:==
==Enclosure:==


NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv M. Cook, THPO UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Ron Sparkman, Chief
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv M. Cook, THPO
 
Shawnee Tribe P.O. Box 189 


29 S Hwy 69A Miami, OK 74355  
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Ron Sparkman, Chief Shawnee Tribe P.O. Box 189 29 S Hwy 69A Miami, OK 74355


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT  
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT


==Dear Chief Sparkman:==
==Dear Chief Sparkman:==
Line 966: Line 791:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license)
In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.
As discussed in the draft SEIS, the NRC's recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2;" (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process
 
A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to: Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC  20555-0001
 
Please note that the public comment period for the draft SEIS ends on December 28, 2015.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.


Sincerely, /RA/   David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation  
R. Sparkman                                      A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.
 
Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:
Docket No. 50-341
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Sincerely,
                                                /RA/
David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341


==Enclosure:==
==Enclosure:==


NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv  
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv


UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015  
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Kerry Holton, President Delaware Nation 3 Mi. N. of Anadarko on Highway 281 Main Office Bldg 100 P.O. Box 825 Anadarko, OK 73005
 
Kerry Holton, President  
 
Delaware Nation 3 Mi. N. of Anadarko on Highway 281 Main Office Bldg 100 P.O. Box 825 Anadarko, OK 73005  


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT  
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT


==Dear President Holton:==
==Dear President Holton:==
Line 998: Line 816:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8(c).
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8(c).
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license)
In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.
As discussed in the draft SEIS, the NRC's recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2;" (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.


A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft supplement and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to: Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
K. Holton                                      A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft supplement and on our preliminary conclusions.
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.
Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.
Sincerely, /RA/
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
David J. Wrona, Chief Environmental Review and  
Sincerely,
 
                                                /RA/
Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation  
David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341
 
Docket No. 50-341


==Enclosure:==
==Enclosure:==
NUREG-1437, Generic Environmental Impact Statement  for License Renewal of Nuclear Plants, Supplement 56
cc w/encl:  Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015


Mr. Billy Friend, Chief
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv


Wyandotte Nation 64700 E. Highway 60 Wyandotte, OK 74370  
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Billy Friend, Chief Wyandotte Nation 64700 E. Highway 60 Wyandotte, OK 74370


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT  
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT


==Dear Chief Friend:==
==Dear Chief Friend:==
Line 1,031: Line 841:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license)
In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.
As discussed in the draft SEIS, the NRC's recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2;" (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process
 
A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to: Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC  20555-0001
 
Please note that the public comment period for the draft SEIS ends on December 28, 2015.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.


Sincerely, /RA/   David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation  
B. Friend                                        A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.
 
Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:
Docket No. 50-341
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Sincerely,
                                                /RA/
David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341


==Enclosure:==
==Enclosure:==


NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv


Ms. Ethel E. Cook, Chief Ottawa Tribe of Oklahoma 13 South Highway 69A Miami, OK 74354  
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Ms. Ethel E. Cook, Chief Ottawa Tribe of Oklahoma 13 South Highway 69A Miami, OK 74354


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT  
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT


==Dear Chief Cook:==
==Dear Chief Cook:==
Line 1,059: Line 866:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.
In the context of NEPA, the NRC's preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license)
In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.
. The justification for these conclusions is explained in the draft SEIS.
As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.
As discussed in the draft SEIS, the NRC's recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2;" (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRC's environmental review; and (5) consideration of public comments received during the scoping process.


A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions. Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to: Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
E. Cook                                          A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001  
Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:
 
Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)
Please note that the public comment period for the draft SEIS ends on December 28, 2015.
Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S.
A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Sincerely,
 
                                                /RA/
Sincerely, /RA/   David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation  
David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341
 
Docket No. 50-341


==Enclosure:==
==Enclosure:==


NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv
NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv


ML15293A421 (Pkg), ML15293A442 (Ltr)
ML15293A421 (Pkg), ML15293A442 (Ltr)
OFFICE LA:DLR:RPB2 PM:DLR:RPB2RERB Technical Staff Member BC:DLR:RERB NAME IBetts EKeegan RHoffman DWrona DATE 10/2/15 11/02/15 11/03/15 11/03/15
OFFICE       LA:DLR:RPB2 PM:DLR:RPB2 RERB Technical Staff Member                     BC:DLR:RERB NAME         IBetts           EKeegan           RHoffman                           DWrona DATE         10/2/15         11/02/15           11/03/15                           11/03/15


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF ENRICO FERMI UNIT 2, FOR PUBLIC COMMENT Identical letters have been sent to:
NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF ENRICO FERMI UNIT 2, FOR PUBLIC COMMENT Identical letters have been sent to:
Warren Chris Swartz, Jr
Warren Chris Swartz, Jr., President, Keweenaw Bay Indian Community Levi Carrick, Sr, Chairman, Bay Mills Indian Community Al Pedwaydon, Council Chair, Grand Traverse Band of Ottawa and Chippewa Indians James Williams Jr., Tribal Chairman, Lac Vieux Desert Band of Lake Superior Chippewa Indians Regina Gasco-Bentley, Tribal Chairperson, Little Traverse Bay Bands of Odawa Indians John Warren, Chairman, Pokagon Band of Potawatomi Indians Aaron A. Payment, Tribal Chairperson, Sault Ste. Marie Tribe of Chippewa Indians of Michigan Kenneth Meshigaud, Tribal Chairperson, Hannahville Indian Community Dan Green, THPO/Chief Planning Officer, Nottawaseppi Huron Band of the Potawatomi Steve Pego, Chief, Saginaw Chippewa Indian Tribe of Michigan D. K. Sprague, Tribal Chairman, Match-e-be-nash-she-wish Band of Potawatomi Indians of Michigan Larry Romanelli, Ogema, Little River Band of Ottawa Indians Harold Gus Frank, Chairman, Forest County Potawatomi Ron Sparkman, Chief, Shawnee Tribe Kerry Holton, President, Delaware Nation Billy Friend, Chief, Wyandotte Nation Ethel E. Cook, Chief, Ottawa Tribe of Oklahoma DISTRIBUTION:
., President, Keweenaw Bay Indian Community Levi Carrick, Sr, Chairman, Bay Mills Indian Community Al Pedwaydon, Council Chair, Grand Trav erse Band of Ottawa and Chippewa Indians James Williams Jr., Tribal Chairman, Lac Vieux Desert Band of Lake Superior Chippewa  
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRsrg Resource RidsNrrPMFermi Resource RidsOpaMail RidsOgcMailCenter
 
-------------------
Indians Regina Gasco-Bentley, Tribal Chairperson, Little Traverse Bay Bands of Odawa Indians John Warren, Chairman, Pokagon Band of Potawatomi Indians Aaron A. Payment, Tribal Chairperson, Sault Ste. Marie Tribe of Chippewa Indians of Michigan Kenneth Meshigaud, Tribal Chairperson, Hannahville Indian Community Dan Green, THPO/Chief Planning Officer, Nottawaseppi Huron Band of the Potawatomi Steve Pego, Chief, Saginaw Chippewa Indian Tribe of Michigan D. K. Sprague, Tribal Chairman, Match-e-be-nash-she-wish Band of Potawatomi Indians of Michigan Larry Romanelli, Ogema, Little River Band of Ottawa Indians Harold "Gus" Frank, Chairman, Forest County Potawatomi  
 
Ron Sparkman, Chief, Shawnee Tribe Kerry Holton, President, Delaware Nation Billy Friend, Chief, Wyandotte Nation  
 
Ethel E. Cook, Chief, Ottawa Tribe of Oklahoma DISTRIBUTION
: PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRsrg Resource RidsNrrPMFermi Resource RidsOpaMail RidsOgcMailCenter  
-------------------  
 
EKeegan DWrona RHoffman}}
EKeegan DWrona RHoffman}}

Revision as of 06:30, 31 October 2019

Tribal Dseis Letters
ML15293A442
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 11/03/2015
From: David Wrona
Division of License Renewal
To: Carrick L, Cook E, Frank H, Friend B, Green D, Holton K, Meshigaud K, Payment A, Pedwaydon A, Romanelli L, Sparkman R, Sprague D, Swartz W, Warren J, Williams J
Bay Mills Indian Community, Delaware Nation, Forest County Potawatomi Tribal Community, Grand Traverse Band of Ottawa & Chippewa Indians, Hannahville Indian Community, Keweenaw Bay Indian Community, Lac Vieux Desert Band of Lake Superior Chippewa, Little River Band of Ottawa Indians, Little Traverse Bay Bands of Odawa Indians, Match-E-Be-Nash-She-Wish Band of Potawatomi Indians of Michigan, Nottawaseppi Huron Pottawatomi, Ottawa Tribe of Oklahoma, Pokagon Band of Potawatomi Indians, Saginaw Chippewa Indian Tribe of Michigan, Saulte Ste. Marie Tribe of Chippewa Indians of Michigan, Shawnee Tribe, Sultzer Pumps (US), Wyandotte Nation
Hoffman Robert 415-1107
Shared Package
ML15293A421 List:
References
Download: ML15293A442 (36)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Warren Chris Swartz, Jr., President Keweenaw Bay Indian Community 16429 Beartown Rd Baraga, MI 49908

SUBJECT:

NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT

Dear President Swartz:

The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.

As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8(c).

In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.

As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.

W. Swartz A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft supplement and on our preliminary conclusions.

Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:

Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)

Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.

A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv G. Loonsfoot, THPO

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Levi Carrick, Sr, Chairman Bay Mills Indian Community 12104 West Lakeshore Drive Brimley, MI 49715

SUBJECT:

NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT

Dear Chairman Carrick:

The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.

As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.

In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.

As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.

L. Carrick A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.

Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:

Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)

Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.

A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv P. Carrick, THPO

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Al Pedwaydon, Council Chair Grand Traverse Band of Ottawa and Chippewa Indians 2605 N. West Bay Shore Dr.

Peshawbestown, MI 49682

SUBJECT:

NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT

Dear Council Chair Pedwaydon:

The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.

As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.

In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.

As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.

A. Pedwaydon A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.

Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:

Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)

Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.

A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. James Williams, Jr., Tribal Chairman Lac Vieux Desert Band of Lake Superior Chippewa Indians P.O. Box 249 Watersmeet, MI 49969

SUBJECT:

NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT

Dear Chairman Williams:

The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.

As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.

In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.

As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.

J. Williams, Jr A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.

Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:

Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)

Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.

A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv G. Martin, THPO

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Ms. Regina Gasco-Bentley, Tribal Chairperson Little Traverse Bay Bands of Odawa Indians 7500 Odawa Circle Harbor Springs, MI 49740

SUBJECT:

NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT

Dear Chairperson Gasco-Bentley:

The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.

As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.

In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.

As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.

R. Gasco-Bentley A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.

Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:

Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)

Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.

A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. John Warren, Chairman Pokagon Band of Potawatomi Indians 58620 Sink Road Box 180 Dowagiac, MI 49047

SUBJECT:

NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT

Dear Chairman Warren:

The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.

As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.

In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.

As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.

J. Warren A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.

Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:

Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)

Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.

A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv M. Winchester, THPO

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Aaron A. Payment, Tribal Chairperson Sault Ste. Marie Tribe of Chippewa Indians of Michigan 523 Ashmun St.

Sault Ste. Marie, MI 49783

SUBJECT:

NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF ENRICO FERMI UNIT 2, FOR PUBLIC COMMENT

Dear Tribal Chairperson Payment:

The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.

As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.

In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.

As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.

A. Payment A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.

Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:

Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)

Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.

A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Kenneth Meshigaud, Tribal Chairperson Hannahville Indian Community N14911 Hannahville B-1 Rd Wilson MI 49896

SUBJECT:

NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT

Dear Tribal Chairperson Meshigaud:

The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.

As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.

In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.

As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.

K. Meshigaud A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.

Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:

Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)

Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.

A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Dan Green THPO/Chief Planning Officer Nottawaseppi Huron Band of the Potawatomi 1485 Mno-Bmadzewen Way Fulton, MI 49052

SUBJECT:

NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT

Dear Mr. Green:

The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.

As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.

In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.

As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.

D. Green A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.

Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:

Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)

Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.

A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Steve Pego, Chief Saginaw Chippewa Indian Tribe of Michigan 7070 E. Broadway Mt. Pleasant, MI 48858

SUBJECT:

NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT

Dear Chief Pego:

The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.

As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.

In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.

As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.

S. Pego A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.

Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:

Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)

Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.

A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv W. Johnson, THPO

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. D.K. Sprague, Tribal Chairman Match-e-be-nash-she-wish Band of Potawatomi Indians of Michigan 1743 142nd Avenue P.O. Box 218 Dorr, MI 49323

SUBJECT:

NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT

Dear Tribal Chairman Sprague:

The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.

As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.

In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.

As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.

D.K. Sprague A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.

Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:

Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)

Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.

A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Larry Romanelli, Ogema Little River Band of Ottawa Indians 375 River St Manistee, MI 49660

SUBJECT:

NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT

Dear Mr. Romanelli:

The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.

As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.

In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.

As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.

L. Romanelli A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.

Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:

Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)

Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.

A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv J. Sam II, THPO

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Harold Gus Frank, Chairman Forest County Potawatomi 5416 Everybodys Rd.

P.O. Box 340 Crandon, WI 54520

SUBJECT:

NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF ENRICO FERMI UNIT 2, FOR PUBLIC COMMENT

Dear Chairman Frank:

The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.

As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.

In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.

As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.

H. Frank A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.

Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:

Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)

Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.

A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv M. Cook, THPO

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Ron Sparkman, Chief Shawnee Tribe P.O. Box 189 29 S Hwy 69A Miami, OK 74355

SUBJECT:

NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT

Dear Chief Sparkman:

The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.

As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.

In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.

As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.

R. Sparkman A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.

Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:

Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)

Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.

A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Kerry Holton, President Delaware Nation 3 Mi. N. of Anadarko on Highway 281 Main Office Bldg 100 P.O. Box 825 Anadarko, OK 73005

SUBJECT:

NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT

Dear President Holton:

The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.

As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8(c).

In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.

As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.

K. Holton A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft supplement and on our preliminary conclusions.

Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:

Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)

Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.

A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Billy Friend, Chief Wyandotte Nation 64700 E. Highway 60 Wyandotte, OK 74370

SUBJECT:

NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT

Dear Chief Friend:

The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.

As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.

In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.

As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.

B. Friend A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.

Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:

Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)

Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.

A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Ms. Ethel E. Cook, Chief Ottawa Tribe of Oklahoma 13 South Highway 69A Miami, OK 74354

SUBJECT:

NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT

Dear Chief Cook:

The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.

As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.

In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.

As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.

E. Cook A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.

Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:

Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)

Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.

A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv

ML15293A421 (Pkg), ML15293A442 (Ltr)

OFFICE LA:DLR:RPB2 PM:DLR:RPB2 RERB Technical Staff Member BC:DLR:RERB NAME IBetts EKeegan RHoffman DWrona DATE 10/2/15 11/02/15 11/03/15 11/03/15

SUBJECT:

NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF ENRICO FERMI UNIT 2, FOR PUBLIC COMMENT Identical letters have been sent to:

Warren Chris Swartz, Jr., President, Keweenaw Bay Indian Community Levi Carrick, Sr, Chairman, Bay Mills Indian Community Al Pedwaydon, Council Chair, Grand Traverse Band of Ottawa and Chippewa Indians James Williams Jr., Tribal Chairman, Lac Vieux Desert Band of Lake Superior Chippewa Indians Regina Gasco-Bentley, Tribal Chairperson, Little Traverse Bay Bands of Odawa Indians John Warren, Chairman, Pokagon Band of Potawatomi Indians Aaron A. Payment, Tribal Chairperson, Sault Ste. Marie Tribe of Chippewa Indians of Michigan Kenneth Meshigaud, Tribal Chairperson, Hannahville Indian Community Dan Green, THPO/Chief Planning Officer, Nottawaseppi Huron Band of the Potawatomi Steve Pego, Chief, Saginaw Chippewa Indian Tribe of Michigan D. K. Sprague, Tribal Chairman, Match-e-be-nash-she-wish Band of Potawatomi Indians of Michigan Larry Romanelli, Ogema, Little River Band of Ottawa Indians Harold Gus Frank, Chairman, Forest County Potawatomi Ron Sparkman, Chief, Shawnee Tribe Kerry Holton, President, Delaware Nation Billy Friend, Chief, Wyandotte Nation Ethel E. Cook, Chief, Ottawa Tribe of Oklahoma DISTRIBUTION:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRsrg Resource RidsNrrPMFermi Resource RidsOpaMail RidsOgcMailCenter


EKeegan DWrona RHoffman

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Warren Chris Swartz, Jr., President Keweenaw Bay Indian Community 16429 Beartown Rd Baraga, MI 49908

SUBJECT:

NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT

Dear President Swartz:

The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.

As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8(c).

In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.

As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.

W. Swartz A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft supplement and on our preliminary conclusions.

Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:

Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)

Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.

A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv G. Loonsfoot, THPO

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Levi Carrick, Sr, Chairman Bay Mills Indian Community 12104 West Lakeshore Drive Brimley, MI 49715

SUBJECT:

NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT

Dear Chairman Carrick:

The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.

As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.

In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.

As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.

L. Carrick A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.

Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:

Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)

Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.

A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv P. Carrick, THPO

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Al Pedwaydon, Council Chair Grand Traverse Band of Ottawa and Chippewa Indians 2605 N. West Bay Shore Dr.

Peshawbestown, MI 49682

SUBJECT:

NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT

Dear Council Chair Pedwaydon:

The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.

As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.

In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.

As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.

A. Pedwaydon A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.

Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:

Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)

Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.

A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. James Williams, Jr., Tribal Chairman Lac Vieux Desert Band of Lake Superior Chippewa Indians P.O. Box 249 Watersmeet, MI 49969

SUBJECT:

NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT

Dear Chairman Williams:

The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.

As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.

In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.

As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.

J. Williams, Jr A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.

Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:

Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)

Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.

A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv G. Martin, THPO

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Ms. Regina Gasco-Bentley, Tribal Chairperson Little Traverse Bay Bands of Odawa Indians 7500 Odawa Circle Harbor Springs, MI 49740

SUBJECT:

NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT

Dear Chairperson Gasco-Bentley:

The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.

As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.

In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.

As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.

R. Gasco-Bentley A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.

Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:

Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)

Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.

A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. John Warren, Chairman Pokagon Band of Potawatomi Indians 58620 Sink Road Box 180 Dowagiac, MI 49047

SUBJECT:

NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT

Dear Chairman Warren:

The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.

As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.

In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.

As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.

J. Warren A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.

Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:

Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)

Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.

A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv M. Winchester, THPO

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Aaron A. Payment, Tribal Chairperson Sault Ste. Marie Tribe of Chippewa Indians of Michigan 523 Ashmun St.

Sault Ste. Marie, MI 49783

SUBJECT:

NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF ENRICO FERMI UNIT 2, FOR PUBLIC COMMENT

Dear Tribal Chairperson Payment:

The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.

As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.

In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.

As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.

A. Payment A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.

Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:

Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)

Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.

A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Kenneth Meshigaud, Tribal Chairperson Hannahville Indian Community N14911 Hannahville B-1 Rd Wilson MI 49896

SUBJECT:

NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT

Dear Tribal Chairperson Meshigaud:

The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.

As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.

In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.

As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.

K. Meshigaud A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.

Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:

Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)

Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.

A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Dan Green THPO/Chief Planning Officer Nottawaseppi Huron Band of the Potawatomi 1485 Mno-Bmadzewen Way Fulton, MI 49052

SUBJECT:

NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT

Dear Mr. Green:

The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.

As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.

In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.

As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.

D. Green A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.

Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:

Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)

Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.

A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Steve Pego, Chief Saginaw Chippewa Indian Tribe of Michigan 7070 E. Broadway Mt. Pleasant, MI 48858

SUBJECT:

NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT

Dear Chief Pego:

The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.

As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.

In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.

As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.

S. Pego A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.

Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:

Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)

Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.

A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv W. Johnson, THPO

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. D.K. Sprague, Tribal Chairman Match-e-be-nash-she-wish Band of Potawatomi Indians of Michigan 1743 142nd Avenue P.O. Box 218 Dorr, MI 49323

SUBJECT:

NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT

Dear Tribal Chairman Sprague:

The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.

As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.

In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.

As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.

D.K. Sprague A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.

Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:

Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)

Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.

A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Larry Romanelli, Ogema Little River Band of Ottawa Indians 375 River St Manistee, MI 49660

SUBJECT:

NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT

Dear Mr. Romanelli:

The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.

As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.

In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.

As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.

L. Romanelli A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.

Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:

Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)

Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.

A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv J. Sam II, THPO

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Harold Gus Frank, Chairman Forest County Potawatomi 5416 Everybodys Rd.

P.O. Box 340 Crandon, WI 54520

SUBJECT:

NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF ENRICO FERMI UNIT 2, FOR PUBLIC COMMENT

Dear Chairman Frank:

The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.

As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.

In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.

As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.

H. Frank A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.

Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:

Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)

Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.

A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv M. Cook, THPO

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Ron Sparkman, Chief Shawnee Tribe P.O. Box 189 29 S Hwy 69A Miami, OK 74355

SUBJECT:

NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT

Dear Chief Sparkman:

The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.

As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.

In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.

As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.

R. Sparkman A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.

Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:

Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)

Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.

A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Kerry Holton, President Delaware Nation 3 Mi. N. of Anadarko on Highway 281 Main Office Bldg 100 P.O. Box 825 Anadarko, OK 73005

SUBJECT:

NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT

Dear President Holton:

The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.

As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8(c).

In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.

As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.

K. Holton A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8(c), we are requesting your comments on the draft supplement and on our preliminary conclusions.

Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:

Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)

Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.

A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Mr. Billy Friend, Chief Wyandotte Nation 64700 E. Highway 60 Wyandotte, OK 74370

SUBJECT:

NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT

Dear Chief Friend:

The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.

As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.

In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.

As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.

B. Friend A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.

Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:

Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)

Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.

A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 2015 Ms. Ethel E. Cook, Chief Ottawa Tribe of Oklahoma 13 South Highway 69A Miami, OK 74354

SUBJECT:

NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF FERMI UNIT 2, FOR PUBLIC COMMENT

Dear Chief Cook:

The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review of the effects of renewing the operating license for Fermi 2. Fermi 2 is located in Monroe County, Michigan, approximately 30 miles southwest of Detroit, Michigan, and 7 miles from the United States-Canada border. Fermi 2 is operated by DTE Electric Company (DTE). As part of its review, the NRC has completed a draft Supplemental Environmental Impact Statement (SEIS) for the license renewal of Fermi 2. This letter is to inform you and members of your tribe that the draft SEIS for the license renewal of Fermi 2 is available for public comment. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological, and cultural properties from continued plant operation associated with license renewal.

As stated in our letter to your tribe dated July 8, 2014, the NRC is conducting Section 106 consultations in compliance with the National Historic Preservation Act (NHPA) through the requirements of the National Environmental Policy Act (NEPA), as outlined in 36 CFR 800.8©.

In the context of NEPA, the NRCs preliminary determination is that any impact from continued power plant operations and maintenance activities during the license renewal term on historical and archaeological resources located in the area of potential effect would be small. Under the provisions of NHPA, the NRC determined that no historic properties would be affected by this undertaking (the renewal of the Fermi 2 operating license). The justification for these conclusions is explained in the draft SEIS.

As discussed in the draft SEIS, the NRCs recommendation is that the adverse environmental impacts of license renewal for Fermi 2 are not so great that preserving the option of license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on (1) the analysis and findings in NUREG 1437, Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, Revision 2; (2) the environmental report submitted by DTE; (3) consultation with Federal, State, Tribal and local agencies; (4) the NRCs environmental review; and (5) consideration of public comments received during the scoping process.

E. Cook A copy of the draft SEIS with these conclusions is enclosed. Pursuant to 36 CFR 800.8©, we are requesting your comments on the draft supplement and on our preliminary conclusions.

Electronic comments on the draft SEIS may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC-2014-0109. Written comments should be submitted by mail to:

Cindy Bladey, Chief Rules, Announcements, and Directives Branch (RADB)

Office of Administration, Mail Stop: OWFN-12-H08 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Please note that the public comment period for the draft SEIS ends on December 28, 2015.

A public meeting to discuss the findings of the draft SEIS will be held on Wednesday, December 2, 2015, at the Monroe County Community College, La-Z-Boy Center, 1555 South Raisinville Road, Monroe, Michigan 48161. The meeting will convene at 7:00 p.m. and will continue until 9:00 p.m., as necessary. A notice will be published shortly providing more details about this meeting. A separate Notice of Availability of the draft SEIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56 cc w/encl: Listserv

ML15293A421 (Pkg), ML15293A442 (Ltr)

OFFICE LA:DLR:RPB2 PM:DLR:RPB2 RERB Technical Staff Member BC:DLR:RERB NAME IBetts EKeegan RHoffman DWrona DATE 10/2/15 11/02/15 11/03/15 11/03/15

SUBJECT:

NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF ENRICO FERMI UNIT 2, FOR PUBLIC COMMENT Identical letters have been sent to:

Warren Chris Swartz, Jr., President, Keweenaw Bay Indian Community Levi Carrick, Sr, Chairman, Bay Mills Indian Community Al Pedwaydon, Council Chair, Grand Traverse Band of Ottawa and Chippewa Indians James Williams Jr., Tribal Chairman, Lac Vieux Desert Band of Lake Superior Chippewa Indians Regina Gasco-Bentley, Tribal Chairperson, Little Traverse Bay Bands of Odawa Indians John Warren, Chairman, Pokagon Band of Potawatomi Indians Aaron A. Payment, Tribal Chairperson, Sault Ste. Marie Tribe of Chippewa Indians of Michigan Kenneth Meshigaud, Tribal Chairperson, Hannahville Indian Community Dan Green, THPO/Chief Planning Officer, Nottawaseppi Huron Band of the Potawatomi Steve Pego, Chief, Saginaw Chippewa Indian Tribe of Michigan D. K. Sprague, Tribal Chairman, Match-e-be-nash-she-wish Band of Potawatomi Indians of Michigan Larry Romanelli, Ogema, Little River Band of Ottawa Indians Harold Gus Frank, Chairman, Forest County Potawatomi Ron Sparkman, Chief, Shawnee Tribe Kerry Holton, President, Delaware Nation Billy Friend, Chief, Wyandotte Nation Ethel E. Cook, Chief, Ottawa Tribe of Oklahoma DISTRIBUTION:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRsrg Resource RidsNrrPMFermi Resource RidsOpaMail RidsOgcMailCenter


EKeegan DWrona RHoffman