{{#Wiki_filter:Clinton Power Station ILT Class 14-1 Exam Date 3116/15 Operating Test 2015-301 I I tem# I UnSat/Editorial I JPM417 Editoria l JPM418 Editorial JPM429 Editoria l JPM247 Ed it orial JPM501 Editorial JPM531 Editor ial JPM534 Editorial JPM537 Editorial
{{#Wiki_filter:ILT 14-1 NRC Exam Submittal Comments Clinton Power Station                                                                                                         Date Received: 2/13115 ILT Class 14-1 Exam Date 3116/15 Operating Test 2015-301 I   Item# I UnSat/Editorial I                         Chief Examiner Comment                                             Facility Action/Response Qperatina Test JPM417    Editorial        Chanoe estimated comoletion time from 15 minutes to 35 minutes.                 Chanoed as requested .
-ILT 14-1 NRC Exam Submittal Comment s Date Received:
JPM418            Editorial
2/13115 Chief Examiner Comment Facility Action/Response Qperatina Test Chanoe estimated comoletion time from 15 minutes to 35 m i nutes. Chanoed as requested.
* Add action to simulator setup instructions to turn the synch scope on, verify Changed as requested.
* Add action to simulator setup instructions to turn the synch scope on, verify Changed as requested.
clockwise rotation and adjust DG speed if necessary, and then turn the synch
clockwise rotation and adjust DG speed if necessary, and then turn the synch scope back off. . Step 8.2.12.6 -add comment that JPM can be terminated when VARS are with in ranae (500-0 KVAR\ and aenerator load is beina raised.
                              . scope back off.
* General note -add steps for evaluato r to annotate performance of the A and Changed as requested.
Step 8.2.12.6 - add comment that JPM can be terminated when VARS are within ranae (500- 0 KVAR\ and aenerator load is beina raised.
JPM429    Editorial
* General note - add steps for evaluator to annotate performance of the A and   Changed as requested.
B FCVs.
B FCVs.
* Step 8.4.2.2. -add cue " If examinee requests to use "d ouble deten t'', authorize use.
* Step 8.4.2.2. - add cue "If examinee requests to use "double detent'',
* Add a comment to step 8.4.2.2. to d i scuss the amount of FCV movement that is reauired to meet the th reshold of a minor reactiv i tv manaoement event.
authorize use.
* Typo on page 7 -step 4.1 -standard third bullet -remove the word "i s" in Changed as requested.
* Add a comment to step 8.4.2.2. to discuss the amount of FCV movement that is reauired to meet the th reshold of a minor reactivitv manaoement event.
front o f MIA.
JPM247    Editorial
* Step 5.8 -add to the cue -If the operator sends an EO to the RCIC Room , cue him/her that there are no abnormalities i n the room and that the RCIC Turbine is rota tina slowlv.
* Typo on page 7 - step 4.1 - standard third bullet - remove the word "is" in   Changed as requested.
* Move S imul ator Setup action #2 to after action to just before action 7 (Fr eeze Changed as requested.
front of MIA.
the s i mu l ator)
* Step 5.8 - add to the cue - If the operator sends an EO to the RCIC Room, cue him/her that there are no abnormalities in the room and that the RCIC Turbine is rotatina slowlv.
* Add remaining TCVs (2, 3, 4) to JPM .
JPM501    Editorial
* Add cues that the plant is stable .
* Move Simulator Setup action #2 to after action to just before action 7 (Freeze Changed as requested.
* Delete instructor stationed  
the simulator)
@ P678 -NRC will orovide P678 cue .
* Add remaining TCVs (2, 3, 4) to JPM.
* Add the first 3 steps (FC031A, 19A & 21A) to the i n iti al conditions.
* Add cues that the plant is stable.
Changed as requested.
* Delete instructor stationed @ P678 - NRC will orovide P678 cue .
JPM531    Editorial
* Add the first 3 steps (FC031A, 19A & 21A) to the initial conditions.         Changed as requested.
* Add 8.3.2.3 to the initial conditions .
* Add 8.3.2.3 to the initial conditions .
* Put a copy of 9000.01 in examinee binders Changed as requested. . Put a copy of the blank data sheet in the exam lnee binders
JPM534    Editorial
* Chanae Estimated Comoletion Time f rom 1 O to 20 minutes .
                              .* Put a copy of 9000.01 in examinee binders Put a copy of the blank data sheet in the examlnee binders
* Remove second sentence from INITIAL CONDITIONS (leaving ONLY, "Th e Inco r porated all 6 changes as requested. plant i s in Mode 1 ")
* Chanae Estimated Comoletion Time from 1Oto 20 minutes.
* Remove the following words from the INI TIATING CUE, " for MS IVs 1621-F022A and 1B21-F022B".
Changed as requested .
* Fix typo -8.1.1.3 shou ld be 8.1.2.3 .
Incorporated all 6 changes as requested .
* Add the fo llowi ng_ to the cue for step 8.1.1.3 -When examinee reoorts that ------.. -****-1B2f.F022B closed fully after the test push b utton was released, acknowledge  
JPM537    Editorial
-*-the report and state, "Take appropr i ate action fo r the va lve closure".
* Remove second sentence from INITIAL CONDITIONS (leaving ONLY, "The plant is in Mode 1")
* On the marked up copy of CPS 9031.10 , delete the N/A'ed steps .
* Remove the following words from the INITIATING CUE, "for MSIVs 1621-F022A and 1B21-F022B".
* Step 8.2.5.2 -Standard -Change to read, "No action required.
* Fix typo - 8.1 .1.3 should be 8.1.2.3 .
Permission rece i ved in th e steo 8.2.5.1 Time Comoress io n cue" Clinton.Power Station ILT Cla ss 14-1 Exam Date 3/1 6/15 Operating Te st 2015-30 1 Item# UnSat/Editorial JPM423 Editori a l JPM532 Editorial JPM535 Un sat JPM536 Editorial JPM538 Ed it orial JPM244 Ed it orial J PM451 Editorial Scenario 1 Ed i tor i al ::;cenano 1 *---eai!Orlal Scenario 1 Ed it or ial Scenar i o 1 Ed i to ri al ILT 14-1 NRC Exam Submittal Comments Chief Examiner Comment . Step 8.3. 1 .1 #1 on page 8 -change the standard to read "E xaminee enters " Open and/or On" in t h e Or i g i na l Condition fie l d of CPS 3512.0 1 F002".
* Add the following_ to the cue for step 8.1 .1.3 - When examinee reoorts that     -*- ----- -..-****-
* Step 8.3.1.1 #2 on page 8-change the standard t o read "Examinee enters "Not Ooen and/or Off" in the Original Cond it ion field of CPS 3512.0 1 F 00 2". . A d d 'Today's date is 1 1/27/14" to t h e ini tial condit i ons block. . JPM Stec 3 Cue -Add " i f requested , prov i de RWP (Attachment
-                                  1B2f.F022B closed fully after the test pushbutton was released, acknowledge the report and state, "Take appropriate action for the valve closure".
: 1)
* On the marked up copy of CPS 9031.10, delete the N/A'ed steps .
* Change the f irst sentence of the init i a l cond ition s block to read , " The plant was operating at rated thermal power wi t h no out of service equ i pment."
* Step 8.2.5.2 - Standard - Change to read, "No action required. Permission received in the steo 8.2.5.1 Time Comoression cue"
* De lete the 2 00 sentence i n the Initial Cond i tions b l ock (NO L COs a r e i n effec t.)
 
* Change the f i rst bulleted i tem i n the Initia t in g cue block to read , ''T echnical Specification actions are requ i red to be entered , and if t h e event i s reportable, the reportability req ui rements. Delete the second bulleted li ne.
ILT 14-1 NRC Exam Submittal Comments Clinton.Power Station                                                                                                               Date Received: 2/13115 ILT Class 14-1 Exam Date 3/16/15 Operating Test 2015-301 Item#     UnSat/Editorial                             Chief Examiner Comment                                                  Facilit Action/Res onse JPM423      Editorial         . Step 8.3. 1.1 #1 on page 8 - change the standard to read "Examinee enters        Changed as requested .
* JP M step 1 standard -Add ITS 3.6.1.3 A.1 and A.2 t o the list.
                                  "Open and/or On" in the Original Condition field of CPS 3512.01F002".
* Terminating Cues -Cha ng e the term i nating cue to read, " Examinee has evaluated I T S and determined repon lng r equireme nts for inoperablllty of the H i gh Pressure Core Sorav (HPCSl Svstem". Steo 4 Standard -add Channel 3 to the end of the first bu lle ted li ne. Step 1 Standard -soecilv reauirements for I TS 3.6.1.3 Act ion A.1 and A.2
* Step 8.3.1 .1 #2 on page 8- change the standard to read "Examinee enters
* S t ep 8.5.8.3 Standard -change the standard to read, " S i mu l ates placing th e Main Control Switch i n MANUAL 1 and/or Ma nual 2. . S t ep 8.2.2 Cue -Add a cue that flow noise can be heard i f requested by t he exam i nee.
                            ..
* Add alarms that are expected to be In to the i nit i al cond i tions b l ock.
                                  "Not Ooen and/or Off" in the Original Condition field of CPS 3512.01F002".
* Step 8.4.6.1 -Add a cue that describes w h at alarms are in and i f they are expected to reset when steo 8.4.6.1 i s pe rf ormed. Event 4 TDRFP 'A' High Bearing Temperature
JPM532      Editorial              Add 'Today's date is 11/27/14" to the initial conditions block.                   Changed as requested .
-the MDRFP. is started per sect i on 8.1.3 MDRFP Startup and section 8.1.6 Tra n s iti on from a TORFP to a MDRFP but the scena ri o quide onlv references section 6.1.3. -cFC'ommen!
JPM Stec 3 Cue -Add "if requested, provide RWP (Attachment 1)
-sFi OUT d we cna:riae lo soeea i.JDCfiTeT6 lransler lo A l ter computer po i nts CW-BA027 , 28, and 29 to simulator lesson p l an for event #7 to add realism. Event Tr i ggers and Role P l ay -Event #4 -add EO cue (i i d ir ec te d to raise cooling w ate r flow\ -"Flow Is hiah i n the band". Date Received:
JPM535      Unsat
2/13115 Facilit Action/Res onse Changed as requ ested . Cha n ged as re q uested . Cha ng ed as r eq uested . Cha n aed as requested.
* Change the first sentence of the initial conditions block to read, "The plant was    Changed as requested .
Cha n aed as requested.
operating at rated thermal power with no out of service equipment."
Cha n ged as requested.
* Delete the 200 sentence in the Initial Conditions block (NO LCOs are in effect.)
C ha nged as requested.
* Change the first bulleted item in the Initiating cue block to read, ''Technical Specification actions are required to be entered, and if the event is reportable, the reportability requirements. Delete the second bulleted line.
<Cil-* . ...
* JPM step 1 standard - Add ITS 3.6.1.3 A.1 and A.2 to the list.
.. ... Added CPS 3103.01 sec ti on 8.1.6 to the A T C act io ns b l ock. NO r eas 16 ie way lo ao llils=lefl as 1s. Added computer poin t s to the s imu lato r lesso n plan to cause them to ramp up -30&deg;F over 1 O mi nutes. Added EO cue #6 to e vent 4 Clinton Power Station ILT Class 14-1 Exam Date 3/16/1 5 Operating Test 2015-301 Item# I UnSat/Editorial I Scenario 1 Editorial Scenario 1 Ed it orial Scenario 1 Ed i torial Scenario 2 Ed i torial Scenario 2 Editorial Scenario 2 Ed i torial Scenario 2 Editorial Scenar io 2 Editorial Scenario 3 Editorial Scenar io 3 Editorial Scenario 3 Editoria l Scenario 3 Ed i tor i al Scenario 1, Ed i tor i al 2, and 3 *-... ILT 14-1 NRC Exam Submittal Comments Chief Examiner Comment Event T r igge rs and Role Play -Event #4 -add EO cue (if directed to check TDRFP bearina bubbler flow) -"Bubb ler flow is normal." Event Tr igge rs and Role Play -Event #8 -add cue from field concern in g local gas boundary inspect i ons. Event Tr i ggers and Ro l e Play -Event #4 -add EO cue to repo rt no abnorma l ities if requested to check TDAFP 'A' room conditions on the camera. Event 7/8-the actions required to perform "Term i nate and prevent LPCS and L PCI inject ion" are not detai l ed in the scenario guide. Event 7/8 -t he crew may " Anticipate Blowdown" but those actions are not lis ted in the scenario gu i de. The c r itical tasks listing on page 4 of the scenario guide needs to be revised to reflect that EOP-6 does not require a blowdown on high Conta i nment Pressure unless contain.ment p r essure cannot be be low F ig. N. Even t 6 -the actions to terminate HPCS injection are reversed from those contained on the hard card. Event 4 -need to add r i sing trend to the CAD temperature reported from the area operator.
* Terminating Cues - Change the terminating cue to read, "Examinee has evaluated ITS and determined reponlng requirements for inoperablllty of the High Pressure Core Sorav (HPCSl Svstem".
Event 6 -Validation crew swapped the runn i ng SPE b l owers; those actions are not li sted in the Annlicant's Actions or Behavior block of the scenario au i de. Event 8 -Validation c r ew entered ITS 3.4.5 RA B.1 but the ITS reference i s not lis ted in the scena r io au i de. The ITS 3.1.5 pressure lim it value for accumulator pressure is <: 1520 psig. In the scenar i o gu i de f or Event #7, the accumu l ator pressure is reported to be 1540 psig. Chanae the reported pressure to 1510 psig. Event B -Add SRO action to direct RR Loop emergency isolat i on Add MCA Baseline data to PPG 10 i n the simulator setup instr uctio ns. -.. -. Date Received:
JPM536      Editorial        Steo 4 Standard - add Channel 3 to the end of the first bulleted line.                 Chanaed as requested.
2/13/15 Facility Action/Response Added EO cue #7 to event 4 Added EO cue #3 to event 8. Added EO cue #8 to event 4. Added actions required to Termina te and Prevent LPCS and LPC I injection to the BOP Actio n s for Event 7/8 in the Scenar i o 2 sim auide. Added " Anticipate Slowdown" to the ATC and SAO actions block for events 7/8. Mod i fied the PC-7.1 critical tas k listing in the scenario outline to ind i cate that a blowdow n i s not required if containment pressure can be lowered below EOP*6 Figure N after anticipating blowdown. Rev i sed critical task l isting PC-7.1 to state , 'W it hin 1 0 minutes of exceeding Figure N and conta in ment pressure continu i ng to r ise, the SAO will enter EO P*3 Emergency RPV Depressur i zation. If the crew Ant i c ip ates Slowdown using bypass valves , and in do i ng so Conta inme nt Pressure can be reduced I maintained be l ow Fig. N , then this critical task is considered to be met. IPAA\ Swapped actions t o shut 1 E22-F004 and Stop the HPCS oumo in the BOP actions b l ock of event #6. Added trend i nformation to event 4 EO cue 1a. Added open bullet action to the Event 6 BOP actions b l ock. Added ITS 3.4.5 to the SRO Actions block f or event 8. Changed all i nstances of 15 40 psig to 1510 ps i g. Added to ATC & SRO act i ons for event #8. Added to the S i mulator O perator Ini tial Se tup instructions.
JPM538      Editorial        Step 1 Standard - soecilv reauirements for ITS 3.6.1 .3 Action A.1 and A.2             Chanaed as requested.
*-
JPM244      Editorial
Clinton Power Station ILT Class 14-1 Exam Date 3116/15 Operating Test 2015-301 I I tem# I UnSat/Editorial I JPM417 Editoria l JPM418 Editorial JPM429 Editoria l JPM247 Ed it orial JPM501 Editorial JPM531 Editor ial JPM534 Editorial JPM537 Editorial  
* Step 8.5.8.3 Standard - change the standard to read, "Simulates placing th e         Changed as requested.
-ILT 14-1 NRC Exam Submittal Comment s Date Received:
                              . Main Control Switch in MANUAL 1 and/or Manual 2.
2/13115 Chief Examiner Comment Facility Action/Response Qperatina Test Chanoe estimated comoletion time from 15 minutes to 35 m i nutes. Chanoed as requested.
Step 8.2.2 Cue - Add a cue that flow noise can be heard if requested by the examinee.
* Add action to simulator setup instructions to turn the synch scope on, verify Changed as requested.
JPM451      Editorial
clockwise rotation and adjust DG speed if necessary, and then turn the synch scope back off. . Step 8.2.12.6 -add comment that JPM can be terminated when VARS are with in ranae (500-0 KVAR\ and aenerator load is beina raised.
* Add alarms that are expected to be In to the initial conditions block.              Changed as requested.
* General note -add steps for evaluato r to annotate performance of the A and Changed as requested.
* Step 8.4.6. 1 - Add a cue that describes what alarms are in and if they are expected to reset when steo 8.4.6.1 is performed.
                                                                                                              *.~        <Cil-*
                                                                                                                                      .... ... *.~..r::
                                                                                                                                                        "~**''"*              ..
                                                                                                                                                                *.~.*:~~,M:~~ ~
Scenario 1        Editorial  Event 4 TDRFP 'A' High Bearing Temperature - the MDRFP. is started per section        Added CPS 3103.01 section 8.1.6 to the ATC actions 8.1.3 MDRFP Startup and section 8.1.6 Transition from a TORFP to a MDRFP but          block.
the scenario quide onlv references section 6.1.3.
::;cenano 1  *---eai!Orlal  -cFC'ommen! - sFiOUTd we cna:riae lo soeea i.JDCfiTeT6 lransler lo l'VJ[J~              NO reas16ie way lo ao llils=lefl as 1s.
Scenario 1        Editorial  Alter computer points CW-BA027, 28, and 29 to simulator lesson plan for event #7      Added computer points to the simulator lesson plan to to add realism.                                                                        cause them to ramp up - 30&deg;F over 1Ominutes.
Scenario 1        Editorial  Event Triggers and Role Play - Event #4 - add EO cue (ii directed to raise cooling    Added EO cue #6 to event 4 water flow\ - "Flow Is hiah in the band".
 
ILT 14-1 NRC Exam Submittal Comments Clinton Power Station                                                                                                                  Date Received: 2/13/15 ILT Class 14-1 Exam Date 3/16/1 5 Operating Test 2015-301 Item#     I UnSat/Editorial I                           Chief Examiner Comment                                                Facility Action/Response Scenario 1       Editorial       Event Triggers and Role Play - Event #4 - add EO cue (if directed to check          Added EO cue #7 to event 4 TDRFP bearina bubbler flow) - "Bubbler flow is normal."
Scenario 1      Editorial       Event Triggers and Role Play - Event #8 - add cue from field concerning local gas  Added EO cue #3 to event 8.
boundary inspections.
Scenario 1      Editorial      Event Triggers and Role Play - Event #4 - add EO cue to report no abnormalities if  Added EO cue #8 to event 4.
requested to check TDAFP 'A' room conditions on the camera.
Scenario 2      Editorial      Event 7/8- the actions required to perform "Terminate and prevent LPCS and         Added actions required to Terminate and Prevent LPCS LPCI injection" are not detailed in the scenario guide.                             and LPCI injection to the BOP Actions for Event 7/8 in the Scenario 2 sim auide.
Scenario 2      Editorial      Event 7/8 - the crew may "Anticipate Blowdown" but those actions are not listed in Added "Anticipate Slowdown" to the ATC and SAO the scenario guide.                                                                 actions block for events 7/8. Modified the PC-7.1 critical task listing in the scenario outline to indicate that a blowdown is not required if containment pressure can be lowered below EOP*6 Figure N after anticipating blowdown.
Scenario 2      Editorial      The critical tasks listing on page 4 of the scenario guide needs to be revised to  Revised critical task listing PC-7.1 to state, 'W ithin 10 reflect that EOP-6 does not require a blowdown on high Containment Pressure        minutes of exceeding Figure N and containment unless contain.ment pressure cannot be low~red below Fig. N.                       pressure continuing to rise, the SAO will enter EOP*3 Emergency RPV Depressurization. If the crew Anticipates Slowdown using bypass valves, and in doing so Containment Pressure can be reduced I maintained below Fig. N, then this critical task is considered to be met. IPAA\
Scenario 2      Editorial        Event 6 - the actions to terminate HPCS injection are reversed from those          Swapped actions to shut 1E22-F004 and Stop the HPCS contained on the hard card.                                                         oumo in the BOP actions block of event #6.
Scenario 2       Editorial        Event 4 - need to add rising trend to the CAD temperature reported from the area  Added trend information to event 4 EO cue 1a.
operator.
Scenario 3      Editorial        Event 6 - Validation crew swapped the running SPE blowers; those actions are not  Added open bullet action to the Event 6 BOP actions listed in the Annlicant's Actions or Behavior block of the scenario auide.         block.
Scenario 3      Editorial        Event 8 - Validation c rew entered ITS 3.4.5 RA B.1 but the ITS reference is not  Added ITS 3.4.5 to the SRO Actions block for event 8.
listed in the scenario auide.
Scenario 3      Editorial      The ITS 3.1.5 pressure limit value for accumulator pressure is <: 1520 psig. In the Changed all instances of 1540 psig to 1510 psig.
scenario guide for Event #7, the accumulator pressure is reported to be 1540 psig.
Chanae the reported pressure to 1510 psig.
Scenario 3      Editorial        Event B - Add SRO action to direct RR Loop emergency isolation                    Added to ATC & SRO actions for event #8.
Scenario 1,      Editorial        Add MCA Baseline data to PPG 10 in the simulator setup instructions.              Added to the Simulator Operator Initial Setup 2, and 3                                                                                                            instructions.
            *-            .. .                               -            ..                   -.                                                                 *-
 
ILT 14-1 NRC Exam Submittal Comments Clinton Power Station                                                                                                        Date Received: 2/13115 ILT Class 14-1 Exam Date 3116/15 Operating Test 2015-301 I   Item# I UnSat/Editorial I                         Chief Examiner Comment                                            Facility Action/Response Qperatina Test JPM417     Editorial         Chanoe estimated comoletion time from 15 minutes to 35 minutes.                  Chanoed as requested .
JPM418            Editorial
* Add action to simulator setup instructions to turn the synch scope on, verify  Changed as requested.
clockwise rotation and adjust DG speed if necessary, and then turn the synch
                              . scope back off.
Step 8.2.12.6 - add comment that JPM can be terminated when VARS are within ranae (500- 0 KVAR\ and aenerator load is beina raised.
JPM429    Editorial
* General note - add steps for evaluator to annotate performance of the A and   Changed as requested.
B FCVs.
B FCVs.
* Step 8.4.2.2. -add cue " If examinee requests to use "d ouble deten t'', authorize use.
* Step 8.4.2.2. - add cue "If examinee requests to use "double detent'',
* Add a comment to step 8.4.2.2. to d i scuss the amount of FCV movement that is reauired to meet the th reshold of a minor reactiv i tv manaoement event.
authorize use.
* Typo on page 7 -step 4.1 -standard third bullet -remove the word "i s" in Changed as requested.
* Add a comment to step 8.4.2.2. to discuss the amount of FCV movement that is reauired to meet the th reshold of a minor reactivitv manaoement event.
front o f MIA.
JPM247    Editorial
* Step 5.8 -add to the cue -If the operator sends an EO to the RCIC Room , cue him/her that there are no abnormalities i n the room and that the RCIC Turbine is rota tina slowlv.
* Typo on page 7 - step 4.1 - standard third bullet - remove the word "is" in   Changed as requested.
* Move S imul ator Setup action #2 to after action to just before action 7 (Fr eeze Changed as requested.
front of MIA.
the s i mu l ator)
* Step 5.8 - add to the cue - If the operator sends an EO to the RCIC Room, cue him/her that there are no abnormalities in the room and that the RCIC Turbine is rotatina slowlv.
* Add remaining TCVs (2, 3, 4) to JPM .
JPM501    Editorial
* Add cues that the plant is stable .
* Move Simulator Setup action #2 to after action to just before action 7 (Freeze Changed as requested.
* Delete instructor stationed  
the simulator)
@ P678 -NRC will orovide P678 cue .
* Add remaining TCVs (2, 3, 4) to JPM.
* Add the first 3 steps (FC031A, 19A & 21A) to the i n iti al conditions.
* Add cues that the plant is stable.
Changed as requested.
* Delete instructor stationed @ P678 - NRC will orovide P678 cue .
JPM531    Editorial
* Add the first 3 steps (FC031A, 19A & 21A) to the initial conditions.         Changed as requested.
* Add 8.3.2.3 to the initial conditions .
* Add 8.3.2.3 to the initial conditions .
* Put a copy of 9000.01 in examinee binders Changed as requested. . Put a copy of the blank data sheet in the exam lnee binders
JPM534    Editorial
* Chanae Estimated Comoletion Time f rom 1 O to 20 minutes .
                              .* Put a copy of 9000.01 in examinee binders Put a copy of the blank data sheet in the examlnee binders
* Remove second sentence from INITIAL CONDITIONS (leaving ONLY, "Th e Inco r porated all 6 changes as requested. plant i s in Mode 1 ")
* Chanae Estimated Comoletion Time from 1Oto 20 minutes.
* Remove the following words from the INI TIATING CUE, " for MS IVs 1621-F022A and 1B21-F022B".
Changed as requested .
* Fix typo -8.1.1.3 shou ld be 8.1.2.3 .
Incorporated all 6 changes as requested .
* Add the fo llowi ng_ to the cue for step 8.1.1.3 -When examinee reoorts that ------.. -****-1B2f.F022B closed fully after the test push b utton was released, acknowledge  
JPM537    Editorial
-*-the report and state, "Take appropr i ate action fo r the va lve closure".
* Remove second sentence from INITIAL CONDITIONS (leaving ONLY, "The plant is in Mode 1")
* On the marked up copy of CPS 9031.10 , delete the N/A'ed steps .
* Remove the following words from the INITIATING CUE, "for MSIVs 1621-F022A and 1B21-F022B".
* Step 8.2.5.2 -Standard -Change to read, "No action required.
* Fix typo - 8.1 .1.3 should be 8.1.2.3 .
Permission rece i ved in th e steo 8.2.5.1 Time Comoress io n cue" Clinton.Power Station ILT Cla ss 14-1 Exam Date 3/1 6/15 Operating Te st 2015-30 1 Item# UnSat/Editorial JPM423 Editori a l JPM532 Editorial JPM535 Un sat JPM536 Editorial JPM538 Ed it orial JPM244 Ed it orial J PM451 Editorial Scenario 1 Ed i tor i al ::;cenano 1 *---eai!Orlal Scenario 1 Ed it or ial Scenar i o 1 Ed i to ri al ILT 14-1 NRC Exam Submittal Comments Chief Examiner Comment . Step 8.3. 1 .1 #1 on page 8 -change the standard to read "E xaminee enters " Open and/or On" in t h e Or i g i na l Condition fie l d of CPS 3512.0 1 F002".
* Add the following_ to the cue for step 8.1 .1.3 - When examinee reoorts that     -*- ----- -..-****-
* Step 8.3.1.1 #2 on page 8-change the standard t o read "Examinee enters "Not Ooen and/or Off" in the Original Cond it ion field of CPS 3512.0 1 F 00 2". . A d d 'Today's date is 1 1/27/14" to t h e ini tial condit i ons block. . JPM Stec 3 Cue -Add " i f requested , prov i de RWP (Attachment
-                                  1B2f.F022B closed fully after the test pushbutton was released, acknowledge the report and state, "Take appropriate action for the valve closure".
: 1)
* On the marked up copy of CPS 9031.10, delete the N/A'ed steps .
* Change the f irst sentence of the init i a l cond ition s block to read , " The plant was operating at rated thermal power wi t h no out of service equ i pment."
* Step 8.2.5.2 - Standard - Change to read, "No action required. Permission received in the steo 8.2.5.1 Time Comoression cue"
* De lete the 2 00 sentence i n the Initial Cond i tions b l ock (NO L COs a r e i n effec t.)
 
* Change the f i rst bulleted i tem i n the Initia t in g cue block to read , ''T echnical Specification actions are requ i red to be entered , and if t h e event i s reportable, the reportability req ui rements. Delete the second bulleted li ne.
ILT 14-1 NRC Exam Submittal Comments Clinton.Power Station                                                                                                               Date Received: 2/13115 ILT Class 14-1 Exam Date 3/16/15 Operating Test 2015-301 Item#     UnSat/Editorial                             Chief Examiner Comment                                                  Facilit Action/Res onse JPM423      Editorial         . Step 8.3. 1.1 #1 on page 8 - change the standard to read "Examinee enters        Changed as requested .
* JP M step 1 standard -Add ITS 3.6.1.3 A.1 and A.2 t o the list.
                                  "Open and/or On" in the Original Condition field of CPS 3512.01F002".
* Terminating Cues -Cha ng e the term i nating cue to read, " Examinee has evaluated I T S and determined repon lng r equireme nts for inoperablllty of the H i gh Pressure Core Sorav (HPCSl Svstem". Steo 4 Standard -add Channel 3 to the end of the first bu lle ted li ne. Step 1 Standard -soecilv reauirements for I TS 3.6.1.3 Act ion A.1 and A.2
* Step 8.3.1 .1 #2 on page 8- change the standard to read "Examinee enters
* S t ep 8.5.8.3 Standard -change the standard to read, " S i mu l ates placing th e Main Control Switch i n MANUAL 1 and/or Ma nual 2. . S t ep 8.2.2 Cue -Add a cue that flow noise can be heard i f requested by t he exam i nee.
                            ..
* Add alarms that are expected to be In to the i nit i al cond i tions b l ock.
                                  "Not Ooen and/or Off" in the Original Condition field of CPS 3512.01F002".
* Step 8.4.6.1 -Add a cue that describes w h at alarms are in and i f they are expected to reset when steo 8.4.6.1 i s pe rf ormed. Event 4 TDRFP 'A' High Bearing Temperature
JPM532      Editorial              Add 'Today's date is 11/27/14" to the initial conditions block.                  Changed as requested .
-the MDRFP. is started per sect i on 8.1.3 MDRFP Startup and section 8.1.6 Tra n s iti on from a TORFP to a MDRFP but the scena ri o quide onlv references section 6.1.3. -cFC'ommen!
JPM Stec 3 Cue -Add "if requested, provide RWP (Attachment 1)
-sFi OUT d we cna:riae lo soeea i.JDCfiTeT6 lransler lo A l ter computer po i nts CW-BA027 , 28, and 29 to simulator lesson p l an for event #7 to add realism. Event Tr i ggers and Role P l ay -Event #4 -add EO cue (i i d ir ec te d to raise cooling w ate r flow\ -"Flow Is hiah i n the band". Date Received:
JPM535      Unsat
2/13115 Facilit Action/Res onse Changed as requ ested . Cha n ged as re q uested . Cha ng ed as r eq uested . Cha n aed as requested.
* Change the first sentence of the initial conditions block to read, "The plant was   Changed as requested .
Cha n aed as requested.
operating at rated thermal power with no out of service equipment."
Cha n ged as requested.
* Delete the 200 sentence in the Initial Conditions block (NO LCOs are in effect.)
C ha nged as requested.
* Change the first bulleted item in the Initiating cue block to read, ''Technical Specification actions are required to be entered, and if the event is reportable, the reportability requirements. Delete the second bulleted line.
<Cil-* . ...
* JPM step 1 standard - Add ITS 3.6.1.3 A.1 and A.2 to the list.
.. ... Added CPS 3103.01 sec ti on 8.1.6 to the A T C act io ns b l ock. NO r eas 16 ie way lo ao llils=lefl as 1s. Added computer poin t s to the s imu lato r lesso n plan to cause them to ramp up -30&deg;F over 1 O mi nutes. Added EO cue #6 to e vent 4 Clinton Power Station ILT Class 14-1 Exam Date 3/16/1 5 Operating Test 2015-301 Item# I UnSat/Editorial I Scenario 1 Editorial Scenario 1 Ed it orial Scenario 1 Ed i torial Scenario 2 Ed i torial Scenario 2 Editorial Scenario 2 Ed i torial Scenario 2 Editorial Scenar io 2 Editorial Scenario 3 Editorial Scenar io 3 Editorial Scenario 3 Editoria l Scenario 3 Ed i tor i al Scenario 1, Ed i tor i al 2, and 3 *-... ILT 14-1 NRC Exam Submittal Comments Chief Examiner Comment Event T r igge rs and Role Play -Event #4 -add EO cue (if directed to check TDRFP bearina bubbler flow) -"Bubb ler flow is normal." Event Tr igge rs and Role Play -Event #8 -add cue from field concern in g local gas boundary inspect i ons. Event Tr i ggers and Ro l e Play -Event #4 -add EO cue to repo rt no abnorma l ities if requested to check TDAFP 'A' room conditions on the camera. Event 7/8-the actions required to perform "Term i nate and prevent LPCS and L PCI inject ion" are not detai l ed in the scenario guide. Event 7/8 -t he crew may " Anticipate Blowdown" but those actions are not lis ted in the scenario gu i de. The c r itical tasks listing on page 4 of the scenario guide needs to be revised to reflect that EOP-6 does not require a blowdown on high Conta i nment Pressure unless contain.ment p r essure cannot be be low F ig. N. Even t 6 -the actions to terminate HPCS injection are reversed from those contained on the hard card. Event 4 -need to add r i sing trend to the CAD temperature reported from the area operator.
* Terminating Cues - Change the terminating cue to read, "Examinee has evaluated ITS and determined reponlng requirements for inoperablllty of the High Pressure Core Sorav (HPCSl Svstem".
Event 6 -Validation crew swapped the runn i ng SPE b l owers; those actions are not li sted in the Annlicant's Actions or Behavior block of the scenario au i de. Event 8 -Validation c r ew entered ITS 3.4.5 RA B.1 but the ITS reference i s not lis ted in the scena r io au i de. The ITS 3.1.5 pressure lim it value for accumulator pressure is <: 1520 psig. In the scenar i o gu i de f or Event #7, the accumu l ator pressure is reported to be 1540 psig. Chanae the reported pressure to 1510 psig. Event B -Add SRO action to direct RR Loop emergency isolat i on Add MCA Baseline data to PPG 10 i n the simulator setup instr uctio ns. -.. -. Date Received:
JPM536      Editorial        Steo 4 Standard - add Channel 3 to the end of the first bulleted line.                 Chanaed as requested.
2/13/15 Facility Action/Response Added EO cue #7 to event 4 Added EO cue #3 to event 8. Added EO cue #8 to event 4. Added actions required to Termina te and Prevent LPCS and LPC I injection to the BOP Actio n s for Event 7/8 in the Scenar i o 2 sim auide. Added " Anticipate Slowdown" to the ATC and SAO actions block for events 7/8. Mod i fied the PC-7.1 critical tas k listing in the scenario outline to ind i cate that a blowdow n i s not required if containment pressure can be lowered below EOP*6 Figure N after anticipating blowdown. Rev i sed critical task l isting PC-7.1 to state , 'W it hin 1 0 minutes of exceeding Figure N and conta in ment pressure continu i ng to r ise, the SAO will enter EO P*3 Emergency RPV Depressur i zation. If the crew Ant i c ip ates Slowdown using bypass valves , and in do i ng so Conta inme nt Pressure can be reduced I maintained be l ow Fig. N , then this critical task is considered to be met. IPAA\ Swapped actions t o shut 1 E22-F004 and Stop the HPCS oumo in the BOP actions b l ock of event #6. Added trend i nformation to event 4 EO cue 1a. Added open bullet action to the Event 6 BOP actions b l ock. Added ITS 3.4.5 to the SRO Actions block f or event 8. Changed all i nstances of 15 40 psig to 1510 ps i g. Added to ATC & SRO act i ons for event #8. Added to the S i mulator O perator Ini tial Se tup instructions.
JPM538      Editorial        Step 1 Standard - soecilv reauirements for ITS 3.6.1 .3 Action A.1 and A.2             Chanaed as requested.
*-}}
JPM244      Editorial
* Step 8.5.8.3 Standard - change the standard to read, "Simulates placing th e         Changed as requested.
                              . Main Control Switch in MANUAL 1 and/or Manual 2.
Step 8.2.2 Cue - Add a cue that flow noise can be heard if requested by the examinee.
JPM451      Editorial
* Add alarms that are expected to be In to the initial conditions block.              Changed as requested.
* Step 8.4.6. 1 - Add a cue that describes what alarms are in and if they are expected to reset when steo 8.4.6.1 is performed.
                                                                                                              *.~        <Cil-*
                                                                                                                                      .... ... *.~..r::
                                                                                                                                                        "~**''"*              ..
                                                                                                                                                                *.~.*:~~,M:~~ ~
Scenario 1        Editorial  Event 4 TDRFP 'A' High Bearing Temperature - the MDRFP. is started per section        Added CPS 3103.01 section 8.1.6 to the ATC actions 8.1.3 MDRFP Startup and section 8.1.6 Transition from a TORFP to a MDRFP but          block.
the scenario quide onlv references section 6.1.3.
::;cenano 1  *---eai!Orlal  -cFC'ommen! - sFiOUTd we cna:riae lo soeea i.JDCfiTeT6 lransler lo l'VJ[J~              NO reas16ie way lo ao llils=lefl as 1s.
Scenario 1        Editorial  Alter computer points CW-BA027, 28, and 29 to simulator lesson plan for event #7      Added computer points to the simulator lesson plan to to add realism.                                                                        cause them to ramp up - 30&deg;F over 1Ominutes.
Scenario 1       Editorial  Event Triggers and Role Play - Event #4 - add EO cue (ii directed to raise cooling    Added EO cue #6 to event 4 water flow\ - "Flow Is hiah in the band".
 
ILT 14-1 NRC Exam Submittal Comments Clinton Power Station                                                                                                                  Date Received: 2/13/15 ILT Class 14-1 Exam Date 3/16/1 5 Operating Test 2015-301 Item#     I UnSat/Editorial I                           Chief Examiner Comment                                                Facility Action/Response Scenario 1       Editorial       Event Triggers and Role Play - Event #4 - add EO cue (if directed to check          Added EO cue #7 to event 4 TDRFP bearina bubbler flow) - "Bubbler flow is normal."
Scenario 1      Editorial       Event Triggers and Role Play - Event #8 - add cue from field concerning local gas  Added EO cue #3 to event 8.
boundary inspections.
Scenario 1       Editorial      Event Triggers and Role Play - Event #4 - add EO cue to report no abnormalities if Added EO cue #8 to event 4.
requested to check TDAFP 'A' room conditions on the camera.
Scenario 2      Editorial      Event 7/8- the actions required to perform "Terminate and prevent LPCS and          Added actions required to Terminate and Prevent LPCS LPCI injection" are not detailed in the scenario guide.                             and LPCI injection to the BOP Actions for Event 7/8 in the Scenario 2 sim auide.
Scenario 2      Editorial      Event 7/8 - the crew may "Anticipate Blowdown" but those actions are not listed in  Added "Anticipate Slowdown" to the ATC and SAO the scenario guide.                                                                 actions block for events 7/8. Modified the PC-7.1 critical task listing in the scenario outline to indicate that a blowdown is not required if containment pressure can be lowered below EOP*6 Figure N after anticipating blowdown.
Scenario 2      Editorial      The critical tasks listing on page 4 of the scenario guide needs to be revised to   Revised critical task listing PC-7.1 to state, 'W ithin 10 reflect that EOP-6 does not require a blowdown on high Containment Pressure         minutes of exceeding Figure N and containment unless contain.ment pressure cannot be low~red below Fig. N.                       pressure continuing to rise, the SAO will enter EOP*3 Emergency RPV Depressurization. If the crew Anticipates Slowdown using bypass valves, and in doing so Containment Pressure can be reduced I maintained below Fig. N, then this critical task is considered to be met. IPAA\
Scenario 2      Editorial        Event 6 - the actions to terminate HPCS injection are reversed from those          Swapped actions to shut 1E22-F004 and Stop the HPCS contained on the hard card.                                                         oumo in the BOP actions block of event #6.
Scenario 2      Editorial        Event 4 - need to add rising trend to the CAD temperature reported from the area  Added trend information to event 4 EO cue 1a.
operator.
Scenario 3      Editorial        Event 6 - Validation crew swapped the running SPE blowers; those actions are not  Added open bullet action to the Event 6 BOP actions listed in the Annlicant's Actions or Behavior block of the scenario auide.          block.
Scenario 3      Editorial        Event 8 - Validation c rew entered ITS 3.4.5 RA B.1 but the ITS reference is not  Added ITS 3.4.5 to the SRO Actions block for event 8.
listed in the scenario auide.
Scenario 3      Editorial      The ITS 3.1.5 pressure limit value for accumulator pressure is <: 1520 psig. In the Changed all instances of 1540 psig to 1510 psig.
scenario guide for Event #7, the accumulator pressure is reported to be 1540 psig.
Chanae the reported pressure to 1510 psig.
Scenario 3      Editorial        Event B - Add SRO action to direct RR Loop emergency isolation                    Added to ATC & SRO actions for event #8.
Scenario 1,      Editorial        Add MCA Baseline data to PPG 10 in the simulator setup instructions.              Added to the Simulator Operator Initial Setup 2, and 3                                                                                                             instructions.
            *-             .. .                               -            ..                   -.                                                                 *-}}

Revision as of 04:46, 31 October 2019

2015 Clinton Power Station Initial License Examination Submittal Comments
ML15314A105
Person / Time
Site: Clinton Constellation icon.png
Issue date: 11/10/2015
From:
Division of Reactor Safety III
To:
Zoia, C D
Shared Package
ML15124A054 List:
References
Download: ML15314A105 (3)


Text

ILT 14-1 NRC Exam Submittal Comments Clinton Power Station Date Received: 2/13115 ILT Class 14-1 Exam Date 3116/15 Operating Test 2015-301 I Item# I UnSat/Editorial I Chief Examiner Comment Facility Action/Response Qperatina Test JPM417 Editorial Chanoe estimated comoletion time from 15 minutes to 35 minutes. Chanoed as requested .

JPM418 Editorial

  • Add action to simulator setup instructions to turn the synch scope on, verify Changed as requested.

clockwise rotation and adjust DG speed if necessary, and then turn the synch

. scope back off.

Step 8.2.12.6 - add comment that JPM can be terminated when VARS are within ranae (500- 0 KVAR\ and aenerator load is beina raised.

JPM429 Editorial

  • General note - add steps for evaluator to annotate performance of the A and Changed as requested.

B FCVs.

  • Step 8.4.2.2. - add cue "If examinee requests to use "double detent,

authorize use.

  • Add a comment to step 8.4.2.2. to discuss the amount of FCV movement that is reauired to meet the th reshold of a minor reactivitv manaoement event.

JPM247 Editorial

  • Typo on page 7 - step 4.1 - standard third bullet - remove the word "is" in Changed as requested.

front of MIA.

  • Step 5.8 - add to the cue - If the operator sends an EO to the RCIC Room, cue him/her that there are no abnormalities in the room and that the RCIC Turbine is rotatina slowlv.

JPM501 Editorial

  • Move Simulator Setup action #2 to after action to just before action 7 (Freeze Changed as requested.

the simulator)

  • Add remaining TCVs (2, 3, 4) to JPM.
  • Add cues that the plant is stable.
  • Delete instructor stationed @ P678 - NRC will orovide P678 cue .

JPM531 Editorial

  • Add the first 3 steps (FC031A, 19A & 21A) to the initial conditions. Changed as requested.
  • Add 8.3.2.3 to the initial conditions .

JPM534 Editorial

.* Put a copy of 9000.01 in examinee binders Put a copy of the blank data sheet in the examlnee binders

  • Chanae Estimated Comoletion Time from 1Oto 20 minutes.

Changed as requested .

Incorporated all 6 changes as requested .

JPM537 Editorial

  • Remove second sentence from INITIAL CONDITIONS (leaving ONLY, "The plant is in Mode 1")
  • Remove the following words from the INITIATING CUE, "for MSIVs 1621-F022A and 1B21-F022B".
  • Fix typo - 8.1 .1.3 should be 8.1.2.3 .
  • Add the following_ to the cue for step 8.1 .1.3 - When examinee reoorts that -*- ----- -..-****-

- 1B2f.F022B closed fully after the test pushbutton was released, acknowledge the report and state, "Take appropriate action for the valve closure".

  • On the marked up copy of CPS 9031.10, delete the N/A'ed steps .
  • Step 8.2.5.2 - Standard - Change to read, "No action required. Permission received in the steo 8.2.5.1 Time Comoression cue"

ILT 14-1 NRC Exam Submittal Comments Clinton.Power Station Date Received: 2/13115 ILT Class 14-1 Exam Date 3/16/15 Operating Test 2015-301 Item# UnSat/Editorial Chief Examiner Comment Facilit Action/Res onse JPM423 Editorial . Step 8.3. 1.1 #1 on page 8 - change the standard to read "Examinee enters Changed as requested .

"Open and/or On" in the Original Condition field of CPS 3512.01F002".

  • Step 8.3.1 .1 #2 on page 8- change the standard to read "Examinee enters

..

"Not Ooen and/or Off" in the Original Condition field of CPS 3512.01F002".

JPM532 Editorial Add 'Today's date is 11/27/14" to the initial conditions block. Changed as requested .

JPM Stec 3 Cue -Add "if requested, provide RWP (Attachment 1)

JPM535 Unsat

  • Change the first sentence of the initial conditions block to read, "The plant was Changed as requested .

operating at rated thermal power with no out of service equipment."

  • Delete the 200 sentence in the Initial Conditions block (NO LCOs are in effect.)
  • Change the first bulleted item in the Initiating cue block to read, Technical Specification actions are required to be entered, and if the event is reportable, the reportability requirements. Delete the second bulleted line.
  • JPM step 1 standard - Add ITS 3.6.1.3 A.1 and A.2 to the list.
  • Terminating Cues - Change the terminating cue to read, "Examinee has evaluated ITS and determined reponlng requirements for inoperablllty of the High Pressure Core Sorav (HPCSl Svstem".

JPM536 Editorial Steo 4 Standard - add Channel 3 to the end of the first bulleted line. Chanaed as requested.

JPM538 Editorial Step 1 Standard - soecilv reauirements for ITS 3.6.1 .3 Action A.1 and A.2 Chanaed as requested.

JPM244 Editorial

  • Step 8.5.8.3 Standard - change the standard to read, "Simulates placing th e Changed as requested.

. Main Control Switch in MANUAL 1 and/or Manual 2.

Step 8.2.2 Cue - Add a cue that flow noise can be heard if requested by the examinee.

JPM451 Editorial

  • Add alarms that are expected to be In to the initial conditions block. Changed as requested.
  • Step 8.4.6. 1 - Add a cue that describes what alarms are in and if they are expected to reset when steo 8.4.6.1 is performed.
  • .~ <Cil-*

.... ... *.~..r::

"~**"* ..

  • .~.*:~~,M:~~ ~

Scenario 1 Editorial Event 4 TDRFP 'A' High Bearing Temperature - the MDRFP. is started per section Added CPS 3103.01 section 8.1.6 to the ATC actions 8.1.3 MDRFP Startup and section 8.1.6 Transition from a TORFP to a MDRFP but block.

the scenario quide onlv references section 6.1.3.

cenano 1 *---eai!Orlal -cFC'ommen! - sFiOUTd we cna
riae lo soeea i.JDCfiTeT6 lransler lo l'VJ[J~ NO reas16ie way lo ao llils=lefl as 1s.

Scenario 1 Editorial Alter computer points CW-BA027, 28, and 29 to simulator lesson plan for event #7 Added computer points to the simulator lesson plan to to add realism. cause them to ramp up - 30°F over 1Ominutes.

Scenario 1 Editorial Event Triggers and Role Play - Event #4 - add EO cue (ii directed to raise cooling Added EO cue #6 to event 4 water flow\ - "Flow Is hiah in the band".

ILT 14-1 NRC Exam Submittal Comments Clinton Power Station Date Received: 2/13/15 ILT Class 14-1 Exam Date 3/16/1 5 Operating Test 2015-301 Item# I UnSat/Editorial I Chief Examiner Comment Facility Action/Response Scenario 1 Editorial Event Triggers and Role Play - Event #4 - add EO cue (if directed to check Added EO cue #7 to event 4 TDRFP bearina bubbler flow) - "Bubbler flow is normal."

Scenario 1 Editorial Event Triggers and Role Play - Event #8 - add cue from field concerning local gas Added EO cue #3 to event 8.

boundary inspections.

Scenario 1 Editorial Event Triggers and Role Play - Event #4 - add EO cue to report no abnormalities if Added EO cue #8 to event 4.

requested to check TDAFP 'A' room conditions on the camera.

Scenario 2 Editorial Event 7/8- the actions required to perform "Terminate and prevent LPCS and Added actions required to Terminate and Prevent LPCS LPCI injection" are not detailed in the scenario guide. and LPCI injection to the BOP Actions for Event 7/8 in the Scenario 2 sim auide.

Scenario 2 Editorial Event 7/8 - the crew may "Anticipate Blowdown" but those actions are not listed in Added "Anticipate Slowdown" to the ATC and SAO the scenario guide. actions block for events 7/8. Modified the PC-7.1 critical task listing in the scenario outline to indicate that a blowdown is not required if containment pressure can be lowered below EOP*6 Figure N after anticipating blowdown.

Scenario 2 Editorial The critical tasks listing on page 4 of the scenario guide needs to be revised to Revised critical task listing PC-7.1 to state, 'W ithin 10 reflect that EOP-6 does not require a blowdown on high Containment Pressure minutes of exceeding Figure N and containment unless contain.ment pressure cannot be low~red below Fig. N. pressure continuing to rise, the SAO will enter EOP*3 Emergency RPV Depressurization. If the crew Anticipates Slowdown using bypass valves, and in doing so Containment Pressure can be reduced I maintained below Fig. N, then this critical task is considered to be met. IPAA\

Scenario 2 Editorial Event 6 - the actions to terminate HPCS injection are reversed from those Swapped actions to shut 1E22-F004 and Stop the HPCS contained on the hard card. oumo in the BOP actions block of event #6.

Scenario 2 Editorial Event 4 - need to add rising trend to the CAD temperature reported from the area Added trend information to event 4 EO cue 1a.

operator.

Scenario 3 Editorial Event 6 - Validation crew swapped the running SPE blowers; those actions are not Added open bullet action to the Event 6 BOP actions listed in the Annlicant's Actions or Behavior block of the scenario auide. block.

Scenario 3 Editorial Event 8 - Validation c rew entered ITS 3.4.5 RA B.1 but the ITS reference is not Added ITS 3.4.5 to the SRO Actions block for event 8.

listed in the scenario auide.

Scenario 3 Editorial The ITS 3.1.5 pressure limit value for accumulator pressure is <: 1520 psig. In the Changed all instances of 1540 psig to 1510 psig.

scenario guide for Event #7, the accumulator pressure is reported to be 1540 psig.

Chanae the reported pressure to 1510 psig.

Scenario 3 Editorial Event B - Add SRO action to direct RR Loop emergency isolation Added to ATC & SRO actions for event #8.

Scenario 1, Editorial Add MCA Baseline data to PPG 10 in the simulator setup instructions. Added to the Simulator Operator Initial Setup 2, and 3 instructions.

  • - .. . - .. -. *-

ILT 14-1 NRC Exam Submittal Comments Clinton Power Station Date Received: 2/13115 ILT Class 14-1 Exam Date 3116/15 Operating Test 2015-301 I Item# I UnSat/Editorial I Chief Examiner Comment Facility Action/Response Qperatina Test JPM417 Editorial Chanoe estimated comoletion time from 15 minutes to 35 minutes. Chanoed as requested .

JPM418 Editorial

  • Add action to simulator setup instructions to turn the synch scope on, verify Changed as requested.

clockwise rotation and adjust DG speed if necessary, and then turn the synch

. scope back off.

Step 8.2.12.6 - add comment that JPM can be terminated when VARS are within ranae (500- 0 KVAR\ and aenerator load is beina raised.

JPM429 Editorial

  • General note - add steps for evaluator to annotate performance of the A and Changed as requested.

B FCVs.

  • Step 8.4.2.2. - add cue "If examinee requests to use "double detent,

authorize use.

  • Add a comment to step 8.4.2.2. to discuss the amount of FCV movement that is reauired to meet the th reshold of a minor reactivitv manaoement event.

JPM247 Editorial

  • Typo on page 7 - step 4.1 - standard third bullet - remove the word "is" in Changed as requested.

front of MIA.

  • Step 5.8 - add to the cue - If the operator sends an EO to the RCIC Room, cue him/her that there are no abnormalities in the room and that the RCIC Turbine is rotatina slowlv.

JPM501 Editorial

  • Move Simulator Setup action #2 to after action to just before action 7 (Freeze Changed as requested.

the simulator)

  • Add remaining TCVs (2, 3, 4) to JPM.
  • Add cues that the plant is stable.
  • Delete instructor stationed @ P678 - NRC will orovide P678 cue .

JPM531 Editorial

  • Add the first 3 steps (FC031A, 19A & 21A) to the initial conditions. Changed as requested.
  • Add 8.3.2.3 to the initial conditions .

JPM534 Editorial

.* Put a copy of 9000.01 in examinee binders Put a copy of the blank data sheet in the examlnee binders

  • Chanae Estimated Comoletion Time from 1Oto 20 minutes.

Changed as requested .

Incorporated all 6 changes as requested .

JPM537 Editorial

  • Remove second sentence from INITIAL CONDITIONS (leaving ONLY, "The plant is in Mode 1")
  • Remove the following words from the INITIATING CUE, "for MSIVs 1621-F022A and 1B21-F022B".
  • Fix typo - 8.1 .1.3 should be 8.1.2.3 .
  • Add the following_ to the cue for step 8.1 .1.3 - When examinee reoorts that -*- ----- -..-****-

- 1B2f.F022B closed fully after the test pushbutton was released, acknowledge the report and state, "Take appropriate action for the valve closure".

  • On the marked up copy of CPS 9031.10, delete the N/A'ed steps .
  • Step 8.2.5.2 - Standard - Change to read, "No action required. Permission received in the steo 8.2.5.1 Time Comoression cue"

ILT 14-1 NRC Exam Submittal Comments Clinton.Power Station Date Received: 2/13115 ILT Class 14-1 Exam Date 3/16/15 Operating Test 2015-301 Item# UnSat/Editorial Chief Examiner Comment Facilit Action/Res onse JPM423 Editorial . Step 8.3. 1.1 #1 on page 8 - change the standard to read "Examinee enters Changed as requested .

"Open and/or On" in the Original Condition field of CPS 3512.01F002".

  • Step 8.3.1 .1 #2 on page 8- change the standard to read "Examinee enters

..

"Not Ooen and/or Off" in the Original Condition field of CPS 3512.01F002".

JPM532 Editorial Add 'Today's date is 11/27/14" to the initial conditions block. Changed as requested .

JPM Stec 3 Cue -Add "if requested, provide RWP (Attachment 1)

JPM535 Unsat

  • Change the first sentence of the initial conditions block to read, "The plant was Changed as requested .

operating at rated thermal power with no out of service equipment."

  • Delete the 200 sentence in the Initial Conditions block (NO LCOs are in effect.)
  • Change the first bulleted item in the Initiating cue block to read, Technical Specification actions are required to be entered, and if the event is reportable, the reportability requirements. Delete the second bulleted line.
  • JPM step 1 standard - Add ITS 3.6.1.3 A.1 and A.2 to the list.
  • Terminating Cues - Change the terminating cue to read, "Examinee has evaluated ITS and determined reponlng requirements for inoperablllty of the High Pressure Core Sorav (HPCSl Svstem".

JPM536 Editorial Steo 4 Standard - add Channel 3 to the end of the first bulleted line. Chanaed as requested.

JPM538 Editorial Step 1 Standard - soecilv reauirements for ITS 3.6.1 .3 Action A.1 and A.2 Chanaed as requested.

JPM244 Editorial

  • Step 8.5.8.3 Standard - change the standard to read, "Simulates placing th e Changed as requested.

. Main Control Switch in MANUAL 1 and/or Manual 2.

Step 8.2.2 Cue - Add a cue that flow noise can be heard if requested by the examinee.

JPM451 Editorial

  • Add alarms that are expected to be In to the initial conditions block. Changed as requested.
  • Step 8.4.6. 1 - Add a cue that describes what alarms are in and if they are expected to reset when steo 8.4.6.1 is performed.
  • .~ <Cil-*

.... ... *.~..r::

"~**"* ..

  • .~.*:~~,M:~~ ~

Scenario 1 Editorial Event 4 TDRFP 'A' High Bearing Temperature - the MDRFP. is started per section Added CPS 3103.01 section 8.1.6 to the ATC actions 8.1.3 MDRFP Startup and section 8.1.6 Transition from a TORFP to a MDRFP but block.

the scenario quide onlv references section 6.1.3.

cenano 1 *---eai!Orlal -cFC'ommen! - sFiOUTd we cna
riae lo soeea i.JDCfiTeT6 lransler lo l'VJ[J~ NO reas16ie way lo ao llils=lefl as 1s.

Scenario 1 Editorial Alter computer points CW-BA027, 28, and 29 to simulator lesson plan for event #7 Added computer points to the simulator lesson plan to to add realism. cause them to ramp up - 30°F over 1Ominutes.

Scenario 1 Editorial Event Triggers and Role Play - Event #4 - add EO cue (ii directed to raise cooling Added EO cue #6 to event 4 water flow\ - "Flow Is hiah in the band".

ILT 14-1 NRC Exam Submittal Comments Clinton Power Station Date Received: 2/13/15 ILT Class 14-1 Exam Date 3/16/1 5 Operating Test 2015-301 Item# I UnSat/Editorial I Chief Examiner Comment Facility Action/Response Scenario 1 Editorial Event Triggers and Role Play - Event #4 - add EO cue (if directed to check Added EO cue #7 to event 4 TDRFP bearina bubbler flow) - "Bubbler flow is normal."

Scenario 1 Editorial Event Triggers and Role Play - Event #8 - add cue from field concerning local gas Added EO cue #3 to event 8.

boundary inspections.

Scenario 1 Editorial Event Triggers and Role Play - Event #4 - add EO cue to report no abnormalities if Added EO cue #8 to event 4.

requested to check TDAFP 'A' room conditions on the camera.

Scenario 2 Editorial Event 7/8- the actions required to perform "Terminate and prevent LPCS and Added actions required to Terminate and Prevent LPCS LPCI injection" are not detailed in the scenario guide. and LPCI injection to the BOP Actions for Event 7/8 in the Scenario 2 sim auide.

Scenario 2 Editorial Event 7/8 - the crew may "Anticipate Blowdown" but those actions are not listed in Added "Anticipate Slowdown" to the ATC and SAO the scenario guide. actions block for events 7/8. Modified the PC-7.1 critical task listing in the scenario outline to indicate that a blowdown is not required if containment pressure can be lowered below EOP*6 Figure N after anticipating blowdown.

Scenario 2 Editorial The critical tasks listing on page 4 of the scenario guide needs to be revised to Revised critical task listing PC-7.1 to state, 'W ithin 10 reflect that EOP-6 does not require a blowdown on high Containment Pressure minutes of exceeding Figure N and containment unless contain.ment pressure cannot be low~red below Fig. N. pressure continuing to rise, the SAO will enter EOP*3 Emergency RPV Depressurization. If the crew Anticipates Slowdown using bypass valves, and in doing so Containment Pressure can be reduced I maintained below Fig. N, then this critical task is considered to be met. IPAA\

Scenario 2 Editorial Event 6 - the actions to terminate HPCS injection are reversed from those Swapped actions to shut 1E22-F004 and Stop the HPCS contained on the hard card. oumo in the BOP actions block of event #6.

Scenario 2 Editorial Event 4 - need to add rising trend to the CAD temperature reported from the area Added trend information to event 4 EO cue 1a.

operator.

Scenario 3 Editorial Event 6 - Validation crew swapped the running SPE blowers; those actions are not Added open bullet action to the Event 6 BOP actions listed in the Annlicant's Actions or Behavior block of the scenario auide. block.

Scenario 3 Editorial Event 8 - Validation c rew entered ITS 3.4.5 RA B.1 but the ITS reference is not Added ITS 3.4.5 to the SRO Actions block for event 8.

listed in the scenario auide.

Scenario 3 Editorial The ITS 3.1.5 pressure limit value for accumulator pressure is <: 1520 psig. In the Changed all instances of 1540 psig to 1510 psig.

scenario guide for Event #7, the accumulator pressure is reported to be 1540 psig.

Chanae the reported pressure to 1510 psig.

Scenario 3 Editorial Event B - Add SRO action to direct RR Loop emergency isolation Added to ATC & SRO actions for event #8.

Scenario 1, Editorial Add MCA Baseline data to PPG 10 in the simulator setup instructions. Added to the Simulator Operator Initial Setup 2, and 3 instructions.

  • - .. . - .. -. *-