Line 3: Line 3:
| issue date = 04/28/2016
| issue date = 04/28/2016
| title = Notification of Evaluations of Changes, Tests, and Experiments, and Permanent Plant Modifications Inspection (05000285/2016007) and Request for Information
| title = Notification of Evaluations of Changes, Tests, and Experiments, and Permanent Plant Modifications Inspection (05000285/2016007) and Request for Information
| author name = Farnholtz T R
| author name = Farnholtz T
| author affiliation = NRC/RGN-IV/DRS/EB-1
| author affiliation = NRC/RGN-IV/DRS/EB-1
| addressee name = Marik S M
| addressee name = Marik S
| addressee affiliation = Omaha Public Power District
| addressee affiliation = Omaha Public Power District
| docket = 05000285
| docket = 05000285
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:April 28, 2016  
{{#Wiki_filter:April 28, 2016
 
Mr. Shane M. Marik, Vice President
Mr. Shane M. Marik, Vice President
  and Chief Nuclear Officer
  and Chief Nuclear Officer Omaha Public Power District  
Omaha Public Power District
Fort Calhoun Station
P.O. Box 550
Fort Calhoun, NE 68023-0550
SUBJECT: FORT CALHOUN STATION - NOTIFICATION OF EVALUATIONS OF CHANGES,
              TESTS, AND EXPERIMENTS, AND PERMANENT PLANT MODIFICATIONS
              INSPECTION (05000285/2016007) AND REQUEST FOR INFORMATION
Dear Mr. Marik:
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC)
staff will conduct the baseline inspection of changes, tests, experiments, and permanent plant
modifications at your Fort Calhoun Station from July 25 through July 29 and August 8 through
August 12, 2016. The inspection will consist of three reactor inspectors from the NRCs Region
IV office for two weeks. The inspection will be conducted in accordance with NRC Inspection
Procedure 71111.17T, Evaluations of Changes, Tests, and Experiments and Permanent Plant
Modifications.
Experience has shown that this inspection is resource intensive for both the NRC inspectors
and your staff. In order to minimize the impact to your on-site resources and to ensure a
productive inspection, we have enclosed a request for documents needed for this inspection.
Please note that the documents are requested to be provided by July 18, 2016. Upon review of
these documents, the inspectors will select additional documentation for review upon arrival. It
is important that all of these documents are up-to-date and complete in order to minimize the
number of additional documents requested during the preparation and/or the on-site portions of
the inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Corey Cameron of your licensing
organization. If there are any questions about this inspection or the material requested, please
contact the lead inspector, Robert Latta, by telephone at 817-200-1532 or by e-mail at
Robert.Latta@nrc.gov.
This letter does not contain new or amended information collection requirements subject to
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, control
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.


Fort Calhoun Station 
S. Marik                                    -2-
P.O. Box 550
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRC's document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
                                                Sincerely,
                                                /RA/
                                                Thomas R. Farnholtz, Chief
                                                Engineering Branch 1
                                                Division of Reactor Safety
Docket No. 50-285
License No. DPR-40
Enclosure:
Request for Information
cc: Electronic Distribution


Fort Calhoun, NE  68023-0550
SUBJECT: FORT CALHOUN STATION - NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND PERMANENT PLANT MODIFICATIONS


INSPECTION (05000285/2016007) AND REQUEST FOR INFORMATION  
ML16119A486
Dear Mr. Marik:
  SUNSI Review            ADAMS            Publicly Available      Non-Sensitive  Keyword:
By: RLatta                  Yes  No      Non-Publicly Available  Sensitive      NRC-002
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC)  
OFFICE        R4:SRI/EB1  R4:C/EB1
staff will conduct the baseline inspection of changes, tests, experiments, and permanent plant modifications at your Fort Calhoun Station from July 25 through July 29 and August 8 through August 12, 2016. The inspection will consist of three reactor inspectors from the NRC's Region IV office for two weeks. The inspection will be conducted in accordance with NRC Inspection
NAME          RLatta      TFarnholtz
Procedure 71111.17T, "Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications.
SIGNATURE /RA/            /RA/
DATE          4/27/16      4/28/16
                                     
Letter to Shane M. Marik from Thomas R. Farnholtz, dated April 28, 2016
SUBJECT: FORT CALHOUN STATION - NOTIFICATION OF EVALUATIONS OF CHANGES,
              TESTS, AND EXPERIMENTS, AND PERMANENT PLANT MODIFICATIONS
              INSPECTION (05000285/2016007) AND REQUEST FOR INFORMATION
Electronic distribution by RIV:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Max.Schneider@nrc.gov)
Resident Inspector (Steven.Janicki@nrc.gov)
FCS Administrative Assistant (Dawn.Yancey@nrc.gov)
Branch Chief, DRP/D (Jeffrey.Josey@nrc.gov)
Project Engineer, DRP/D (Jan.Tice@nrc.gov)
Project Engineer, DRP/D (Jim.Melfi@nrc.gov)
RIV Public Affairs Officer (Victor.Dricks@nrc.gov)
NRR Project Manager (Fred.Lyon@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
OEWEB Resource@nrc.gov
OEWEB Resource (Sue.Bogle@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)


                                      Request for Information
Experience has shown that this
  Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications
inspection is resource intens
                                              Inspection
ive for both the NRC inspectors and your staff.  In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection.
                                        Fort Calhoun Station
Please note that the documents are requested to  
Inspection Report:              05000285/2016007
be provided by July 18, 2016. Upon review of these documents, the inspectors will select additional documentation for review upon arrival. It
Inspection Dates:              On-site - July 25-29 and August 8-12, 2016
is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection.  
Inspection Procedure:          IP 71111.17T, Evaluations of Changes, Tests, and Experiments
                                and Permanent Plant Modifications
We have discussed the schedule for these inspection activities with your staff and understand
Lead Inspector:                Robert Latta, Senior Reactor Inspector
that our regulatory contact for this inspection will be Corey Cameron of your licensing
Information Requested for the In-Office Preparation Week
organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Robert Latta, by telephone at 817-200-1532 or by e-mail at
The following information should be sent to the Region IV office in hard copy or electronic
Robert.Latta@nrc.gov.
format (preferred) by July 18, 2016, to the attention of Robert Latta. We request that you
categorize the documents in your response with the numbered list below. If only hard copies of
the requested documents are available or if the electronic format is too large, please inform the
lead inspector and provide the documents on the first day of the on-site inspection. Also, the
inspectors will select specific items from the information requested below and request from your
staff additional documents needed during the on-site inspection weeks. We ask that the specific
items requested be available and ready for review on the first day of inspection. If you have any
questions regarding this information request, please contact the lead inspector as soon as
possible.
    1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.
    2. A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) of fully
        implemented changes, tests, and experiments performed since the last triennial
        modification inspection that did not result in an evaluation.
    3. A list with descriptions of all 10 CFR 50.59 evaluations of fully implemented changes,
        tests, and experiments performed since the last triennial modification inspection that did
        not result in an application for a license amendment.
    4. A list with descriptions of all corrective action documents related to 10 CFR 50.59
        screenings and evaluations since the last triennial modification inspection.
    5. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations,
        including qualification dates.
    6. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or
        evaluations, including qualification dates.
                                              -1-                                Enclosure


    7. Procedure(s) for implementing permanent plant modifications.
This letter does not contain new or amended information collection requirements subject to
    8. A list with descriptions of all permanent plant modifications fully implemented since the
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information
        last triennial modification inspection.
collection requirements were approved by the Office of Management and Budget, control number 3150-0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the
    9. A list with descriptions of all corrective action documents related to permanent plant
requesting document displays a currently valid Office of Management and Budget control
        modifications fully implemented since the last triennial modification inspection.
number. 
    10. Current revisions of the Technical Specifications and Bases and the Updated Final
S. Marik - 2 -
        Safety Analysis Report.
  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
    11. A copy of the most recent audits/self-assessments performed of the 10 CFR 50.59 and
enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). 
        permanent plant modification programs.
Sincerely,  /RA/  Thomas R. Farnholtz, Chief Engineering Branch 1
    12. A copy of the most recent submittal of the report containing a brief description of any
Division of Reactor Safety
        changes, tests, and experiments, including a summary of the evaluation of each,
        required by 10 CFR 50.59(d)(2).
    13. A list of systems and system designators and a set of one-line (i.e., simplified) system
Docket No. 50-285 License No. DPR-40
        diagrams.
 
Note: Descriptions should be brief but of sufficient detail to ensure that inspectors can
determine the safety and/or risk significance of the screenings, evaluations, and modifications.
Enclosure: 
Note: For this inspection, permanent plant modifications include permanent plant changes,
 
design changes, set point changes, procedure changes, equivalency evaluations, suitability
Request for Information
analyses, calculations, and commercial grade dedications.
 
Inspector Contact Information:
cc:  Electronic Distribution 
Robert Latta                     Jonathan Braisted               Samuel Graves
S. Marik - 2 -
Senior Reactor Inspector         Reactor Inspector               Senior Reactor Inspector
  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
817-200-1532                     817-200-1194                     817-200-8385
enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). 
Robert.Latta@nrc.gov             Jonathan.Braisted@nrc.gov       Samual.Graves@nrc.gov
Sincerely,  /RA/  Thomas R. Farnholtz, Chief Engineering Branch 1
Mailing Address:
Division of Reactor Safety
U.S. NRC, Region IV
Attn: Robert Latta
1600 East Lamar Blvd.
Docket No. 50-285 License No. DPR-40
Arlington, TX 76011-4125
 
                                              -2-
Enclosure: 
 
Request for Information
 
cc:  Electronic Distribution
 
Distribution
: See next page
ADAMS ACCESSION NUMB
ER:  ML16119A486  SUNSI Review By:  RLatta
ADAMS  Yes    No  Publicly Available  Non-Publicly Available  Non-Sensitive  Sensitive Keyword: NRC-002 OFFICE R4:SRI/EB1 R4:C/EB1      NAME RLatta TFarnholtz      SIGNATURE /RA/ /RA/      DATE 4/27/16 4/28/16      OFFICIAL RECORD COPY
 
  Letter to Shane M. Marik from Thomas R. Farnholtz, dated April 28, 2016
SUBJECT: FORT CALHOUN STATION - NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND PERMANENT PLANT MODIFICATIONS
INSPECTION (05000285/2016007) AND REQUEST FOR INFORMATION
Electronic distribution by RIV:
Regional Administrator (Marc.Dapas@nrc.gov) Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)  Senior Resident Inspector (Max.Schneider@nrc.gov) Resident Inspector (Steven.Janicki@nrc.gov)
FCS Administrative Assistant (Dawn.Yancey@nrc.gov)
Branch Chief, DRP/D (Jeffrey.Josey@nrc.gov)
Project Engineer, DRP/D (Jan.Tice@nrc.gov) Project Engineer, DRP/D (Jim.Melfi@nrc.gov) RIV Public Affairs Officer (Victor.Dricks@nrc.gov)
NRR Project Manager (Fred.Lyon@nrc.gov)
 
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov) Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
OEWEB Resource@nrc.gov
OEWEB Resource (Sue.Bogle@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov) RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
 
ACES (R4Enforcement.Resource@nrc.gov)
 
  - 1 - Enclosure
Request for Information
Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications
Inspection Fort Calhoun Station
 
Inspection Report:  05000285/2016007
 
Inspection Dates:  On-site - July 25-29 and August 8-12, 2016
Inspection Procedure: IP 71111.17T, "Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications"
Lead Inspector:  Robert Latta, Senior Reactor Inspector
Information Requested for the In-Office Preparation Week
 
The following information should be sent to the Region IV office in hard copy or electronic
format (preferred) by July 18, 2016, to the attention of Robert Latta.  We request that you categorize the documents in your response with the numbered list below.  If only hard copies of
the requested documents are available or if the electronic format is too large, please inform the
lead inspector and provide the documents on the first day of the on-site inspection.  Also, the
inspectors will select specific items from the information requested below and request from your staff additional documents needed during the on-site inspection weeks.  We ask that the specific items requested be available and ready for review on the first day of inspection.  If you have any questions regarding this information request, please contact the lead inspector as soon as
 
possible.
 
1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.
2. A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) of fully implemented changes, tests, and experiments performed since the last triennial modification inspection that did not result in an evaluation. 
3. A list with descriptions of all 10 CFR 50.59 evaluations of fully implemented changes, tests, and experiments performed since the last triennial modification inspection that did
not result in an application for a license amendment. 
4. A list with descriptions of all corrective action documents related to 10 CFR 50.59 screenings and evaluations since the last triennial modification inspection. 
5. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations, including qualification dates.
6. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or evaluations, including qualification dates.
 
  - 2 - 7. Procedure(s) for implementing permanent plant modifications.  
8. A list with descriptions of all permanent plant modifications fully implemented since the last triennial modification inspection.
9. A list with descriptions of all corrective action documents related to permanent plant modifications fully implemented since the last triennial modification inspection.
10. Current revisions of the Technical Specifications and Bases and the Updated Final Safety Analysis Report.  
 
11. A copy of the most recent audits/self-assessments performed of the 10 CFR 50.59 and permanent plant modification programs.  
12. A copy of the most recent submittal of the report containing a brief description of any changes, tests, and experiments, including a summary of the evaluation of each,  
required by 10 CFR 50.59(d)(2).  
13. A list of systems and system designators and a set of one-line (i.e., simplified) system  
diagrams.  
Note: Descriptions should be brief but of sufficient detail to ensure that inspectors can  
determine the safety and/or risk significance of the screenings, evaluations, and modifications.  
 
Note: For this inspection, permanent plant modifications include permanent plant changes, design changes, set point changes, procedure changes, equivalency evaluations, suitability  
analyses, calculations, and commercial grade dedications.  
 
Inspector Contact Information:  
Robert Latta Jonathan Braisted Samuel Graves  
Senior Reactor Inspector Reactor Inspector Senior Reactor Inspector  
817-200-1532 817-200-1194 817-200-8385  
Robert.Latta@nrc.gov Jonathan.Braisted@nrc.gov Samual.Graves@nrc.gov  
 
Mailing Address:  
 
U.S. NRC, Region IV  
Attn: Robert Latta 1600 East Lamar Blvd.  
Arlington, TX 76011-4125
}}
}}

Latest revision as of 21:06, 30 October 2019

Notification of Evaluations of Changes, Tests, and Experiments, and Permanent Plant Modifications Inspection (05000285/2016007) and Request for Information
ML16119A486
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 04/28/2016
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Marik S
Omaha Public Power District
References
IR 2016007
Download: ML16119A486 (6)


See also: IR 05000285/2016007

Text

April 28, 2016

Mr. Shane M. Marik, Vice President

and Chief Nuclear Officer

Omaha Public Power District

Fort Calhoun Station

P.O. Box 550

Fort Calhoun, NE 68023-0550

SUBJECT: FORT CALHOUN STATION - NOTIFICATION OF EVALUATIONS OF CHANGES,

TESTS, AND EXPERIMENTS, AND PERMANENT PLANT MODIFICATIONS

INSPECTION (05000285/2016007) AND REQUEST FOR INFORMATION

Dear Mr. Marik:

The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC)

staff will conduct the baseline inspection of changes, tests, experiments, and permanent plant

modifications at your Fort Calhoun Station from July 25 through July 29 and August 8 through

August 12, 2016. The inspection will consist of three reactor inspectors from the NRCs Region

IV office for two weeks. The inspection will be conducted in accordance with NRC Inspection

Procedure 71111.17T, Evaluations of Changes, Tests, and Experiments and Permanent Plant

Modifications.

Experience has shown that this inspection is resource intensive for both the NRC inspectors

and your staff. In order to minimize the impact to your on-site resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection.

Please note that the documents are requested to be provided by July 18, 2016. Upon review of

these documents, the inspectors will select additional documentation for review upon arrival. It

is important that all of these documents are up-to-date and complete in order to minimize the

number of additional documents requested during the preparation and/or the on-site portions of

the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Corey Cameron of your licensing

organization. If there are any questions about this inspection or the material requested, please

contact the lead inspector, Robert Latta, by telephone at 817-200-1532 or by e-mail at

Robert.Latta@nrc.gov.

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, control

number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

S. Marik -2-

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Docket No. 50-285

License No. DPR-40

Enclosure:

Request for Information

cc: Electronic Distribution

ML16119A486

SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: RLatta Yes No Non-Publicly Available Sensitive NRC-002

OFFICE R4:SRI/EB1 R4:C/EB1

NAME RLatta TFarnholtz

SIGNATURE /RA/ /RA/

DATE 4/27/16 4/28/16

Letter to Shane M. Marik from Thomas R. Farnholtz, dated April 28, 2016

SUBJECT: FORT CALHOUN STATION - NOTIFICATION OF EVALUATIONS OF CHANGES,

TESTS, AND EXPERIMENTS, AND PERMANENT PLANT MODIFICATIONS

INSPECTION (05000285/2016007) AND REQUEST FOR INFORMATION

Electronic distribution by RIV:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Max.Schneider@nrc.gov)

Resident Inspector (Steven.Janicki@nrc.gov)

FCS Administrative Assistant (Dawn.Yancey@nrc.gov)

Branch Chief, DRP/D (Jeffrey.Josey@nrc.gov)

Project Engineer, DRP/D (Jan.Tice@nrc.gov)

Project Engineer, DRP/D (Jim.Melfi@nrc.gov)

RIV Public Affairs Officer (Victor.Dricks@nrc.gov)

NRR Project Manager (Fred.Lyon@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

OEWEB Resource@nrc.gov

OEWEB Resource (Sue.Bogle@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Request for Information

Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications

Inspection

Fort Calhoun Station

Inspection Report: 05000285/2016007

Inspection Dates: On-site - July 25-29 and August 8-12, 2016

Inspection Procedure: IP 71111.17T, Evaluations of Changes, Tests, and Experiments

and Permanent Plant Modifications

Lead Inspector: Robert Latta, Senior Reactor Inspector

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or electronic

format (preferred) by July 18, 2016, to the attention of Robert Latta. We request that you

categorize the documents in your response with the numbered list below. If only hard copies of

the requested documents are available or if the electronic format is too large, please inform the

lead inspector and provide the documents on the first day of the on-site inspection. Also, the

inspectors will select specific items from the information requested below and request from your

staff additional documents needed during the on-site inspection weeks. We ask that the specific

items requested be available and ready for review on the first day of inspection. If you have any

questions regarding this information request, please contact the lead inspector as soon as

possible.

1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.

2. A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) of fully

implemented changes, tests, and experiments performed since the last triennial

modification inspection that did not result in an evaluation.

3. A list with descriptions of all 10 CFR 50.59 evaluations of fully implemented changes,

tests, and experiments performed since the last triennial modification inspection that did

not result in an application for a license amendment.

4. A list with descriptions of all corrective action documents related to 10 CFR 50.59

screenings and evaluations since the last triennial modification inspection.

5. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations,

including qualification dates.

6. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or

evaluations, including qualification dates.

-1- Enclosure

7. Procedure(s) for implementing permanent plant modifications.

8. A list with descriptions of all permanent plant modifications fully implemented since the

last triennial modification inspection.

9. A list with descriptions of all corrective action documents related to permanent plant

modifications fully implemented since the last triennial modification inspection.

10. Current revisions of the Technical Specifications and Bases and the Updated Final

Safety Analysis Report.

11. A copy of the most recent audits/self-assessments performed of the 10 CFR 50.59 and

permanent plant modification programs.

12. A copy of the most recent submittal of the report containing a brief description of any

changes, tests, and experiments, including a summary of the evaluation of each,

required by 10 CFR 50.59(d)(2).

13. A list of systems and system designators and a set of one-line (i.e., simplified) system

diagrams.

Note: Descriptions should be brief but of sufficient detail to ensure that inspectors can

determine the safety and/or risk significance of the screenings, evaluations, and modifications.

Note: For this inspection, permanent plant modifications include permanent plant changes,

design changes, set point changes, procedure changes, equivalency evaluations, suitability

analyses, calculations, and commercial grade dedications.

Inspector Contact Information:

Robert Latta Jonathan Braisted Samuel Graves

Senior Reactor Inspector Reactor Inspector Senior Reactor Inspector

817-200-1532 817-200-1194 817-200-8385

Robert.Latta@nrc.gov Jonathan.Braisted@nrc.gov Samual.Graves@nrc.gov

Mailing Address:

U.S. NRC, Region IV

Attn: Robert Latta

1600 East Lamar Blvd.

Arlington, TX 76011-4125

-2-