MONTHYEARIR 05000285/20230062023-12-21021 December 2023 NRC Inspection Report 05000285/2023006 IR 05000285/20230052023-11-0202 November 2023 NRC Inspection Room 05000285/2023005 IR 05000285/20230042023-09-13013 September 2023 NRC Inspection Report 05000285/2023-004 IR 05000285/20230032023-07-10010 July 2023 NRC Inspection Report 05000285/2023003 IR 05000285/20230022023-06-0505 June 2023 NRC Inspection Report 05000285/2023002 IR 05000285/20230012023-02-24024 February 2023 NRC Inspection Report 05000285/2023001 IR 05000285/20220062023-01-0505 January 2023 NRC Inspection Report 05000285/2022-006 IR 05000285/20220052022-10-26026 October 2022 NRC Inspection Report 05000285/2022-005 IR 05000285/20220042022-09-14014 September 2022 NRC Inspection Report 05000285/2022004 IR 05000285/20220032022-06-15015 June 2022 NRC Inspection Report 05000285/2022003 IR 05000285/20220022022-04-28028 April 2022 NRC Inspection Report 050-00285/2022-002 IR 05000285/20220012022-02-25025 February 2022 NRC Inspection Report 050-00285/2022-001 IR 05000285/20210042021-11-18018 November 2021 NRC Inspection Report 050-00285/2021-004 IR 05000285/20210032021-08-11011 August 2021 NRC Inspection Report 050-00285/2021-003 (Public) IR 05000285/20210022021-05-0707 May 2021 NRC Inspection Report 05000285/2021002 IR 05000285/20210012021-02-17017 February 2021 NRC Inspection Report 05000285/2021001 IR 07200054/20204012020-10-29029 October 2020 Independent Spent Fuel Storage Installation Physical Security Requirements for Independent Spent Fuel Storage Installations Inspection Report 07200054/2020401 IR 05000285/20200022020-09-22022 September 2020 NRC Inspection Report 05000285/2020002 IR 05000285/20190052020-03-12012 March 2020 Independent Spent Fuel Storage Installation (ISFSI) - NRC Inspection Report 050-00285/2019-005 and 072-00054/2019-001 IR 05000206/20190042020-02-20020 February 2020 Independent Spent Fuel Storage Installation (ISFSI) - NRC Inspection Report 05000206/2019 004; 05000361/2019 007; 05000362/2019 007; and 07200054/2019-002 IR 05000285/20190042019-11-26026 November 2019 Inspection Report 050-00285/2019-004 IR 05000285/20190032019-09-13013 September 2019 NRC Inspection Report 050-00285/2019-003 IR 05000285/20190022019-07-23023 July 2019 NRC Inspection Report 05000285/2019002 IR 05000285/20194042019-07-11011 July 2019 NRC Security Baseline Inspection Report 05000285/2019404 IR 05000285/20194032019-06-0404 June 2019 NRC Security Baseline Inspection Report 05000285/2019403 IR 05000285/20190012019-02-12012 February 2019 NRC Inspection Report 050-00285/2019-001 IR 05000285/20180042018-11-19019 November 2018 Omaha Public Power District; Fort Calhoun Station - NRC Inspection Report 05000285/2018-004 IR 05000285/20180032018-09-27027 September 2018 NRC Inspection Report 05000285/2018003 IR 05000285/20184032018-05-17017 May 2018 NRC Physical Security Inspection Report 05000285/2018403 IR 05000285/20184102018-05-17017 May 2018 NRC Security Baseline Inspection Report 05000285/2018410 IR 05000285/20180012018-04-13013 April 2018 NRC Inspection Report 05000285/2018001 IR 05000285/20174032018-04-10010 April 2018 Cancellation of NRC Inspection Report 05000285/2017403 IR 05000285/20170112018-02-0101 February 2018 NRC Inspection Report 05000285/2017-011 IR 05000285/20170022017-11-0909 November 2017 NRC Inspection Reports 05000285/2017002 Through 05000285/2017007 IR 05000285/20170122017-11-0808 November 2017 NRC Inspection Report 05000285/2017-012 IR 05000285/20160062017-09-18018 September 2017 NRC Inspection Report 05000285/2016006 IR 05000285/20170092017-08-0404 August 2017 NRC Inspection Report 05000285/2017-009 IR 05000285/20174062017-06-26026 June 2017 NRC Security Baseline Inspection Report 05000285/2017406 IR 05000285/20174052017-06-26026 June 2017 NRC Security Inspection Report 05000285/2017405 and NRC Investigation Report 4-2015-030 IR 05000285/20170102017-06-15015 June 2017 Independent Spent Fuel Storage Installation Inspection Report 05000285/2017010 and 07200054/2017001 IR 05000285/20170012017-05-0808 May 2017 NRC Inspection Report 05000285/2017001 and 05000285/2017008 IR 05000285/20160042017-01-18018 January 2017 NRC Integrated Inspection Report 05000285/2016004 IR 05000285/20165012017-01-17017 January 2017 NRC Emergency Preparedness Annual Inspection Report 05000285/2016501 IR 05000285/20160032016-11-0808 November 2016 NRC Integrated Inspection Report Number 05000285/2016003 IR 05000285/20164042016-10-28028 October 2016 NRC Security Baseline Inspection Report 05000285/2016404 IR 05000285/20160082016-09-22022 September 2016 NRC Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications Baseline Inspection Report 05000285/2016008 IR 05000285/20160052016-09-12012 September 2016 Errata for Mid-Cycle Assessment Letter for Fort Calhoun Station (Report 05000285/2016005) IR 05000285/20164012016-08-31031 August 2016 Non-Public Security Inspection Plan for Calhoun Station (NRC Physical Security Inspection Report Number 05000285/2016401) ML16237A0382016-08-31031 August 2016 Mid-Cycle Assessment Letter for Fort Calhoun Station (Report 05000285/2016005) IR 05000285/20160022016-08-0505 August 2016 NRC Integrated Inspection Report 05000285/2016002, April 1, 2016 Through June 30, 2016 2023-09-13
[Table view] Category:Letter
MONTHYEARML24019A1672024-01-31031 January 2024 Issuance of Amendment to Renewed Facility License to Add License Condition to Include License Termination Plan Requirements IR 05000285/20230062023-12-21021 December 2023 NRC Inspection Report 05000285/2023006 LIC-23-0007, Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements Request for Additional Information2023-12-0606 December 2023 Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements Request for Additional Information IR 05000285/20230052023-11-0202 November 2023 NRC Inspection Room 05000285/2023005 ML23276A0042023-09-28028 September 2023 U.S. EPA Response Letter to NRC Letter on Consultation and Finality on Decommissioning and Decontamination of Contaminated Sites MOU - Fort Calhoun Station, Unit 1 (License No. DPR-40, Docket No. 50-285) IR 05000285/20230042023-09-13013 September 2023 NRC Inspection Report 05000285/2023-004 LIC-23-0005, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 20232023-08-24024 August 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 ML23234A2412023-08-18018 August 2023 Email - Letter to M Porath Re Ft Calhoun Unit 1 LTP EA Section 7 Informal Consultation Request ML23234A2392023-08-18018 August 2023 Letter to B Harisis Re Ft Calhoun Unit 1 LTP EA State of Nebraska Comment Request.Pdf IR 05000285/20230032023-07-10010 July 2023 NRC Inspection Report 05000285/2023003 ML23082A2202023-06-26026 June 2023 Consultation on the Decommissioning of the Fort Calhoun Station Unit 1 Pressurized Water Reactor in Fort Calhoun, Nebraska ML23151A0032023-06-0505 June 2023 Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 IR 05000285/20230022023-06-0505 June 2023 NRC Inspection Report 05000285/2023002 LIC-23-0004, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2023-04-20020 April 2023 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-23-0003, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2023-03-15015 March 2023 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-23-0001, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information2023-02-27027 February 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information IR 05000285/20230012023-02-24024 February 2023 NRC Inspection Report 05000285/2023001 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities LIC-23-0002, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2023-02-20020 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report ML23020A0462023-01-19019 January 2023 Threatened and Endangered Species List: Nebraska Ecological Services Field Office IR 05000285/20220062023-01-0505 January 2023 NRC Inspection Report 05000285/2022-006 ML22357A0662022-12-30030 December 2022 Technical RAI Submittal Letter on License Amendment Request for Approval of License Termination Plan IR 05000285/20220052022-10-26026 October 2022 NRC Inspection Report 05000285/2022-005 ML22276A1052022-09-30030 September 2022 Conclusion of Consultation Under Section 106 NHPA for Ft. Calhoun Station LTP ML22258A2732022-09-29029 September 2022 Letter to John Swigart, Shpo; Re., Conclusion of Consultation Under Section 106 Hnpa Fort Calhoun Station Unit 1 ML22265A0262022-09-26026 September 2022 U.S. Nuclear Regulatory Commission'S Analysis of Omaha Public Power District'S Decommissioning Status Report (License No. DPR-40, Docket No. 50-285) IR 05000285/20220042022-09-14014 September 2022 NRC Inspection Report 05000285/2022004 ML22138A1252022-08-0303 August 2022 Letter to Mr. Timothy Rhodd, Chairperson, Iowa Tribe of Kansas and Nebraska, Re., Ft Calhoun LTP Section 106 ML22138A1262022-08-0303 August 2022 Letter to Roger Trudell, Chairman, Santee Sioux Nation, Nebraska, Re., Ft Calhoun LTP Section 106 ML22101A1092022-08-0303 August 2022 Letter to Mr. Durell Cooper, Chairman, Apache Tribe of Oklahoma; Re., Ft Calhoun LTP Section 106 ML22138A1242022-08-0303 August 2022 Letter to Mr. Reggie Wassana, Governor, Cheyenne and Arapaho Tribes, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22138A1292022-08-0303 August 2022 Letter to Tiauna Carnes, Chairperson, Sac and Fox Nation of Missouri in Kansas, Re., Ft Calhoun LTP Section 106 ML22138A1212022-08-0303 August 2022 Letter to Mr. Edgar Kent, Chairman, Iowa Tribe of Oklahoma, Re., Ft Calhoun LTP Section 106 ML22138A1282022-08-0303 August 2022 Letter to Victoria Kitcheyan, Chairwoman, Winnebago Tribe of Nebraska, Re., Ft Calhoun LTP Section 106 ML22138A1232022-08-0303 August 2022 Letter to Mr. Leander Merrick, Chairperson, Omaha Tribe of Nebraska, Re., Ft Calhoun LTP Section 106 ML22138A1222022-08-0303 August 2022 Letter to Mr. John Shotton, Chairman, Otoe-Missouria Tribe of Indians, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22138A1272022-08-0303 August 2022 Letter to Vern Jefferson, Chairman, Sac and Fox Tribe of the Mississippi in Iowa, Re., Ft Calhoun LTP Section 106 ML22214A0922022-08-0303 August 2022 Letter to Stacy Laravie, Thpo, Ponca Tribe of Nebraska, Re., Ft Calhoun LTP Section 106 ML22138A1302022-08-0303 August 2022 Letter to Justin Wood, Principal Chief, Sac and Fox Nation, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22159A2152022-06-28028 June 2022 Letter Forwarding FRN on Public Meeting and Request for Comment on License Termination Plan LIC-22-0010, Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information2022-06-15015 June 2022 Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information IR 05000285/20220032022-06-15015 June 2022 NRC Inspection Report 05000285/2022003 ML22119A2472022-05-0303 May 2022 Review of Amendment Request to Add a LC to Include LTP Requirements, RAI for Environmental Review IR 05000285/20220022022-04-28028 April 2022 NRC Inspection Report 050-00285/2022-002 LIC-22-0005, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2022-04-20020 April 2022 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-22-0009, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2022-03-30030 March 2022 Annual Decommissioning Funding / Irradiated Fuel Management Status Report 2024-01-31
[Table view] |
See also: IR 05000285/2016007
Text
April 28, 2016
Mr. Shane M. Marik, Vice President
and Chief Nuclear Officer
Omaha Public Power District
Fort Calhoun Station
P.O. Box 550
Fort Calhoun, NE 68023-0550
SUBJECT: FORT CALHOUN STATION - NOTIFICATION OF EVALUATIONS OF CHANGES,
TESTS, AND EXPERIMENTS, AND PERMANENT PLANT MODIFICATIONS
INSPECTION (05000285/2016007) AND REQUEST FOR INFORMATION
Dear Mr. Marik:
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC)
staff will conduct the baseline inspection of changes, tests, experiments, and permanent plant
modifications at your Fort Calhoun Station from July 25 through July 29 and August 8 through
August 12, 2016. The inspection will consist of three reactor inspectors from the NRCs Region
IV office for two weeks. The inspection will be conducted in accordance with NRC Inspection
Procedure 71111.17T, Evaluations of Changes, Tests, and Experiments and Permanent Plant
Modifications.
Experience has shown that this inspection is resource intensive for both the NRC inspectors
and your staff. In order to minimize the impact to your on-site resources and to ensure a
productive inspection, we have enclosed a request for documents needed for this inspection.
Please note that the documents are requested to be provided by July 18, 2016. Upon review of
these documents, the inspectors will select additional documentation for review upon arrival. It
is important that all of these documents are up-to-date and complete in order to minimize the
number of additional documents requested during the preparation and/or the on-site portions of
the inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Corey Cameron of your licensing
organization. If there are any questions about this inspection or the material requested, please
contact the lead inspector, Robert Latta, by telephone at 817-200-1532 or by e-mail at
Robert.Latta@nrc.gov.
This letter does not contain new or amended information collection requirements subject to
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, control
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.
S. Marik -2-
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRC's document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Thomas R. Farnholtz, Chief
Engineering Branch 1
Division of Reactor Safety
Docket No. 50-285
License No. DPR-40
Enclosure:
Request for Information
cc: Electronic Distribution
ML16119A486
SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:
By: RLatta Yes No Non-Publicly Available Sensitive NRC-002
OFFICE R4:SRI/EB1 R4:C/EB1
NAME RLatta TFarnholtz
SIGNATURE /RA/ /RA/
DATE 4/27/16 4/28/16
Letter to Shane M. Marik from Thomas R. Farnholtz, dated April 28, 2016
SUBJECT: FORT CALHOUN STATION - NOTIFICATION OF EVALUATIONS OF CHANGES,
TESTS, AND EXPERIMENTS, AND PERMANENT PLANT MODIFICATIONS
INSPECTION (05000285/2016007) AND REQUEST FOR INFORMATION
Electronic distribution by RIV:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Max.Schneider@nrc.gov)
Resident Inspector (Steven.Janicki@nrc.gov)
FCS Administrative Assistant (Dawn.Yancey@nrc.gov)
Branch Chief, DRP/D (Jeffrey.Josey@nrc.gov)
Project Engineer, DRP/D (Jan.Tice@nrc.gov)
Project Engineer, DRP/D (Jim.Melfi@nrc.gov)
RIV Public Affairs Officer (Victor.Dricks@nrc.gov)
NRR Project Manager (Fred.Lyon@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
OEWEB Resource@nrc.gov
OEWEB Resource (Sue.Bogle@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Request for Information
Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications
Inspection
Fort Calhoun Station
Inspection Report: 05000285/2016007
Inspection Dates: On-site - July 25-29 and August 8-12, 2016
Inspection Procedure: IP 71111.17T, Evaluations of Changes, Tests, and Experiments
and Permanent Plant Modifications
Lead Inspector: Robert Latta, Senior Reactor Inspector
Information Requested for the In-Office Preparation Week
The following information should be sent to the Region IV office in hard copy or electronic
format (preferred) by July 18, 2016, to the attention of Robert Latta. We request that you
categorize the documents in your response with the numbered list below. If only hard copies of
the requested documents are available or if the electronic format is too large, please inform the
lead inspector and provide the documents on the first day of the on-site inspection. Also, the
inspectors will select specific items from the information requested below and request from your
staff additional documents needed during the on-site inspection weeks. We ask that the specific
items requested be available and ready for review on the first day of inspection. If you have any
questions regarding this information request, please contact the lead inspector as soon as
possible.
1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.
2. A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) of fully
implemented changes, tests, and experiments performed since the last triennial
modification inspection that did not result in an evaluation.
3. A list with descriptions of all 10 CFR 50.59 evaluations of fully implemented changes,
tests, and experiments performed since the last triennial modification inspection that did
not result in an application for a license amendment.
4. A list with descriptions of all corrective action documents related to 10 CFR 50.59
screenings and evaluations since the last triennial modification inspection.
5. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations,
including qualification dates.
6. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or
evaluations, including qualification dates.
-1- Enclosure
7. Procedure(s) for implementing permanent plant modifications.
8. A list with descriptions of all permanent plant modifications fully implemented since the
last triennial modification inspection.
9. A list with descriptions of all corrective action documents related to permanent plant
modifications fully implemented since the last triennial modification inspection.
10. Current revisions of the Technical Specifications and Bases and the Updated Final
Safety Analysis Report.
11. A copy of the most recent audits/self-assessments performed of the 10 CFR 50.59 and
permanent plant modification programs.
12. A copy of the most recent submittal of the report containing a brief description of any
changes, tests, and experiments, including a summary of the evaluation of each,
required by 10 CFR 50.59(d)(2).
13. A list of systems and system designators and a set of one-line (i.e., simplified) system
diagrams.
Note: Descriptions should be brief but of sufficient detail to ensure that inspectors can
determine the safety and/or risk significance of the screenings, evaluations, and modifications.
Note: For this inspection, permanent plant modifications include permanent plant changes,
design changes, set point changes, procedure changes, equivalency evaluations, suitability
analyses, calculations, and commercial grade dedications.
Inspector Contact Information:
Robert Latta Jonathan Braisted Samuel Graves
Senior Reactor Inspector Reactor Inspector Senior Reactor Inspector
817-200-1532 817-200-1194 817-200-8385
Robert.Latta@nrc.gov Jonathan.Braisted@nrc.gov Samual.Graves@nrc.gov
Mailing Address:
U.S. NRC, Region IV
Attn: Robert Latta
1600 East Lamar Blvd.
Arlington, TX 76011-4125
-2-