| | issue date = 09/13/2016 | | | issue date = 09/13/2016 |
| | title = Requalification Program Inspection - Nine Mile Point Nuclear Station, Unit 1 | | | title = Requalification Program Inspection - Nine Mile Point Nuclear Station, Unit 1 |
| | author name = Jackson D E | | | author name = Jackson D |
| | author affiliation = NRC/RGN-I/DRS/OB | | | author affiliation = NRC/RGN-I/DRS/OB |
| | addressee name = Hanson B C | | | addressee name = Hanson B |
| | addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear | | | addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear |
| | docket = 05000220 | | | docket = 05000220 |
Line 15: |
Line 15: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:P.Orphano UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406 | | {{#Wiki_filter:P.Orphano UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 September 13, 2016 Mr. Bryan C. Hanson Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 |
| -2713 September 13, 2016 Mr. Bryan C. Hanson Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| REQUALIFICATION PROGRAM INSPECTION | | REQUALIFICATION PROGRAM INSPECTION - NINE MILE POINT NUCLEAR STATION, UNIT 1 |
| - NINE MILE POINT NUCLEAR STATION, UNIT 1 | |
|
| |
|
| ==Dear Mr. Hanson:== | | ==Dear Mr. Hanson:== |
| In a telephone conversation on September 6, 2016, Mr. M. Alexander, Requalification Program Administrator, and Mr.
| |
| T. Fish, Senior Operations Engineer, made arrangements for the U. S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the Nine Mile Point, Unit 1 facility. The inspection is planned for the week of October 24 , 201 6, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.
| |
|
| |
|
| In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish: (1) an index or summary of condition reports written in the past two years in which licensed operator errors were determined to be the root or contributing cause; (2) an index or summary of condition reports written in the past two years on simulator performance problems; (3) an index or summary of simulator performance test results in the past two years; and (4) the examination schedule, sample plan, and operating test scheduled for the week of the inspection to the NRC by October 10, 2016. Mr. Alexander has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection. | | In a telephone conversation on September 6, 2016, Mr. M. Alexander, Requalification Program Administrator, and Mr. T. Fish, Senior Operations Engineer, made arrangements for the U. S. |
| This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150 | | Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the Nine Mile Point, Unit 1 facility. The inspection is planned for the week of October 24, 2016, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. |
| -0018. The public reporting burden for this collection of information is estimated to average four hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T | | In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish: (1) an index or summary of condition reports written in the past two years in which licensed operator errors were determined to be the root or contributing cause; (2) an index or summary of condition reports written in the past two years on simulator performance problems; (3) an index or summary of simulator performance test results in the past two years; and (4) the examination schedule, sample plan, and operating test scheduled for the week of the inspection to the NRC by October 10, 2016. Mr. Alexander has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection. |
| -5 F52), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555 | | This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018. |
| -0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB | | The public reporting burden for this collection of information is estimated to average four hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. |
| -10202, (3150 | | Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503. |
| -0018), Office of Management and Budget, Washington, D.C. 20503. | |
|
| |
|
| B. Hanson The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available NPF 69 electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading | | B. Hanson The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available NPF 69 electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room). |
| -rm/adams.html (The Public Electronic Reading Room). | | Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Fish at (610) 337-5369. |
| | Sincerely, |
| | /RA/ |
| | Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-220 License No. NPF-63 |
|
| |
|
| Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Fish at (610) 337
| | ML16258A101 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRS/OB RI/DRS/OB NAME TFish/DEJ DEJackson DATE 9/13/16 9/13/16}} |
| -5369. Sincerely,
| |
| /RA/ Donald E. Jackson, Chief Operations Branch Division of Reactor Safety
| |
| | |
| Docket No.
| |
| 50-220 License No. NPF
| |
| -63
| |
| | |
| ML16258A101 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRS/OB RI/DRS/OB NAME TFish/DEJ DEJackson DATE 9/13/16 9/13/16}} | |
|
---|
Category:Letter
MONTHYEARNMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station IR 05000410/20243012023-12-14014 December 2023 Initial Operator Licensing Examination Report 05000410/2024301 ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 NMP1L3564, Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23291A4642023-12-0707 December 2023 Issuance of Amendment No. 251 Regarding the Adoption of Title 10 the Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of SSC for Nuclear Power Plants ML23289A0122023-12-0606 December 2023 Issuance of Amendment No. 250 Regarding the Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b NMP1L3563, Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-12-0404 December 2023 Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) IR 05000220/20234022023-11-28028 November 2023 Security Baseline Inspection Report 05000220/2023402 and 05000410/2023402 NMP1L3557, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000220/20234202023-11-0101 November 2023 Security Baseline Inspection Report 05000220/2023420 and 05000410/2023420 ML23305A0052023-11-0101 November 2023 Operator Licensing Examination Approval IR 05000220/20230032023-10-25025 October 2023 Integrated Inspection Report 05000220/2023003 and 05000410/2023003 IR 05000220/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000220/2023501 and 05000410/2023501 IR 05000220/20230112023-10-16016 October 2023 Comprehensive Engineering Team Inspection Report 05000220/2023011 and 05000410/2023011 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans NMP1L3554, Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases2023-10-0606 October 2023 Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases C IR 05000220/20233032023-09-20020 September 2023 Retake Operator Licensing Examination Report 05000220/2023303 ML23250A0822023-09-19019 September 2023 Regulatory Audit Summary Regarding LARs to Adopt TSTF-505, Rev. 2, and 10 CFR 50.69 ML23257A1732023-09-14014 September 2023 Requalification Program Inspection IR 05000220/20230052023-08-31031 August 2023 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2023005 and 05000410/2023005) RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs NMP2L2851, Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations2023-08-25025 August 2023 Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration NMP1L3534, License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2023-08-18018 August 2023 License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML23220A0262023-08-0808 August 2023 Licensed Operator Positive Fitness-for-Duty Test IR 05000220/20234012023-08-0808 August 2023 Cyber Security Inspection Report 05000220/2023401 and 05000410/2023401 (Cover Letter Only) NMP1L3545, Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems .2023-08-0404 August 2023 Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems . RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor IR 05000220/20230022023-08-0101 August 2023 Integrated Inspection Report 05000220/2023002 and 05000410/2023002 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 NMP1L3544, Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations2023-07-14014 July 2023 Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations ML23186A1642023-07-0606 July 2023 Operator Licensing Retake Examination Approval NMP2L2846, Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications2023-07-0505 July 2023 Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications ML23192A0622023-06-30030 June 2023 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance, Report No. 10CFR21-0136, Rev. 0 IR 05000220/20230102023-06-29029 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000220/2023010 and 05000410/2023010 ML23131A4242023-06-23023 June 2023 Issuance of Amendment No. 249 Regarding the Revision to Technical Specification 3.3.1 to Adopt Technical Specifications Task Force Traveler TSTF-568 RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3539, Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-06-0909 June 2023 Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling IR 05000410/20233022023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000410/2023302 2024-02-01
[Table view] Category:License-Operator
MONTHYEARML24002B0852024-01-0202 January 2024 FY24 NMP2 Final QA Forms ML23347A0632023-12-13013 December 2023 NMP1 Retake FY23 Examination Files ML23257A1732023-09-14014 September 2023 Requalification Program Inspection ML23220A0262023-08-0808 August 2023 Licensed Operator Positive Fitness-for-Duty Test ML23186A1642023-07-0606 July 2023 Operator Licensing Retake Examination Approval RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23135A1562023-05-15015 May 2023 Final Qa/Related Forms IR 05000410/20233022023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000410/2023302 ML23123A0582023-05-0303 May 2023 Final Qa/Related Forms ML23109A0332023-04-19019 April 2023 Senior Reactor and Reactor Operator Initial License Examinations RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21258A3552021-09-16016 September 2021 Requalification Program Inspection ML21137A1602021-05-17017 May 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21137A2402021-05-17017 May 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21137A1692021-05-17017 May 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21133A1472021-05-13013 May 2021 Final Qa/Related Forms (Folder 1) ML21133A2422021-05-13013 May 2021 Handouts to Applicants (Folder 3) ML21131A1892021-05-11011 May 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21123A1892021-05-0303 May 2021 Draft Written Examination (Folder 2) ML21123A1982021-05-0303 May 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21123A2242021-04-19019 April 2021 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21123A2412021-04-19019 April 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21034A4742021-02-0303 February 2021 Handouts to Applicants (Folder 3) ML21034A4762021-02-0303 February 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21033A7962021-02-0202 February 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21033A5382021-02-0202 February 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21032A3232021-02-0101 February 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21032A2812021-02-0101 February 2021 Final Qa/Related Forms (Folder 1) ML21027A2592021-01-27027 January 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML21008A3542021-01-0808 January 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21008A3322021-01-0808 January 2021 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20350B7852020-12-11011 December 2020 Modified Question Source Information (Post 2020 Audit) (Folder 3) ML20120A5582020-04-30030 April 2020 Senior Reactor and Reactor Operator Initial License Examinations ML20105A1762020-04-15015 April 2020 March 4, 2020, NRC Generic Fundamentals Examination Results for Nine Mile Point Nuclear Station, Unit 1 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML20055E0092020-01-15015 January 2020 Final Q/A Related Form - Form ES-401-6 (Folder 1) ML20055D8832020-01-15015 January 2020 Final Qa/Related Forms (Folder 1) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19337A5342019-11-29029 November 2019 Operator Licensing Examination Approval ML20055E0172019-10-28028 October 2019 Nile Mile Point Unit 2 - Draft Written Examination (Folder 2) ML20055E0152019-10-28028 October 2019 Draft Written Examination and Operating Test Outlines (Folder 2) ML20055E0122019-10-28028 October 2019 NRC Comments on Draft Licensee-Developed Operating Test ML19289D0132019-10-15015 October 2019 September 4, 2019, NRC Generic Fundamentals Examination Results for Nine Mile Point Nuclear Station, Unit 1 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML20055E0132019-10-15015 October 2019 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) NMP1L3288, Fitness-for-Duty Response to Request for Information2019-07-0101 July 2019 Fitness-for-Duty Response to Request for Information ML19154A5672019-06-0303 June 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19151A8132019-05-31031 May 2019 Licensed Operator Positive Fitness-For-Duty Test 2024-01-02
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24002B0852024-01-0202 January 2024 FY24 NMP2 Final QA Forms ML23347A0632023-12-13013 December 2023 NMP1 Retake FY23 Examination Files ML23186A1642023-07-0606 July 2023 Operator Licensing Retake Examination Approval RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23135A1562023-05-15015 May 2023 Final Qa/Related Forms IR 05000410/20233022023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000410/2023302 ML23123A0582023-05-0303 May 2023 Final Qa/Related Forms ML23109A0332023-04-19019 April 2023 Senior Reactor and Reactor Operator Initial License Examinations RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21137A1692021-05-17017 May 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21137A2402021-05-17017 May 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21137A1602021-05-17017 May 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21133A2422021-05-13013 May 2021 Handouts to Applicants (Folder 3) ML21133A1472021-05-13013 May 2021 Final Qa/Related Forms (Folder 1) ML21131A1892021-05-11011 May 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21123A1982021-05-0303 May 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21123A1892021-05-0303 May 2021 Draft Written Examination (Folder 2) ML21123A2412021-04-19019 April 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21123A2242021-04-19019 April 2021 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21034A4762021-02-0303 February 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21034A4742021-02-0303 February 2021 Handouts to Applicants (Folder 3) ML21033A7962021-02-0202 February 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21033A5382021-02-0202 February 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21032A2812021-02-0101 February 2021 Final Qa/Related Forms (Folder 1) ML21032A3232021-02-0101 February 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21027A2592021-01-27027 January 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML21008A3322021-01-0808 January 2021 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21008A3542021-01-0808 January 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML20350B7852020-12-11011 December 2020 Modified Question Source Information (Post 2020 Audit) (Folder 3) ML20120A5582020-04-30030 April 2020 Senior Reactor and Reactor Operator Initial License Examinations ML20105A1762020-04-15015 April 2020 March 4, 2020, NRC Generic Fundamentals Examination Results for Nine Mile Point Nuclear Station, Unit 1 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML20055D8832020-01-15015 January 2020 Final Qa/Related Forms (Folder 1) ML20055E0092020-01-15015 January 2020 Final Q/A Related Form - Form ES-401-6 (Folder 1) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19337A5342019-11-29029 November 2019 Operator Licensing Examination Approval ML20055E0172019-10-28028 October 2019 Nile Mile Point Unit 2 - Draft Written Examination (Folder 2) ML20055E0152019-10-28028 October 2019 Draft Written Examination and Operating Test Outlines (Folder 2) ML20055E0122019-10-28028 October 2019 NRC Comments on Draft Licensee-Developed Operating Test ML20055E0132019-10-15015 October 2019 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML19151A8132019-05-31031 May 2019 Licensed Operator Positive Fitness-For-Duty Test RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML20055E0202019-04-22022 April 2019 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML18333A0182018-11-25025 November 2018 Initial Operator Licensing Operating Test Approval ML18088A7262018-05-21021 May 2018 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML18117A2102018-04-26026 April 2018 Senior Reactor and Reactor Operator Initial License Examinations RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations 2024-01-02
[Table view] |
Text
P.Orphano UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 September 13, 2016 Mr. Bryan C. Hanson Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION - NINE MILE POINT NUCLEAR STATION, UNIT 1
Dear Mr. Hanson:
In a telephone conversation on September 6, 2016, Mr. M. Alexander, Requalification Program Administrator, and Mr. T. Fish, Senior Operations Engineer, made arrangements for the U. S.
Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the Nine Mile Point, Unit 1 facility. The inspection is planned for the week of October 24, 2016, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.
In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish: (1) an index or summary of condition reports written in the past two years in which licensed operator errors were determined to be the root or contributing cause; (2) an index or summary of condition reports written in the past two years on simulator performance problems; (3) an index or summary of simulator performance test results in the past two years; and (4) the examination schedule, sample plan, and operating test scheduled for the week of the inspection to the NRC by October 10, 2016. Mr. Alexander has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018.
The public reporting burden for this collection of information is estimated to average four hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S.
Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503.
B. Hanson The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available NPF 69 electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Fish at (610) 337-5369.
Sincerely,
/RA/
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-220 License No. NPF-63
ML16258A101 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRS/OB RI/DRS/OB NAME TFish/DEJ DEJackson DATE 9/13/16 9/13/16