ML17037C782: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17037C782
| number = ML17037C782
| issue date = 02/06/2017
| issue date = 02/06/2017
| title = Nine Mile Point, Unit 2 - Table 7.2-1 Process Pipelines Penetrating Primary Containment 1 of 6
| title = Table 7.2-1 Process Pipelines Penetrating Primary Containment 1 of 6
| author name =  
| author name =  
| author affiliation = Niagara Mohawk Power Corp
| author affiliation = Niagara Mohawk Power Corp
Line 13: Line 13:
| page count = 1
| page count = 1
}}
}}
=Text=
{{#Wiki_filter:NMPNS-2 TABLE  7.2-1 PROCESS  P~PE4XNES  E      T  G  MA  CO~~
(Numbers in parentheses are keyed to notes on following pages; signal codes are listed  on  following pages)
Valve Location Number Approximate Valves                      Relative to          Valve and/or of    Pipe Size,  Per                          Primary              Operator        Power to            Power  to          Isolation    Closing          Normal 1 t*>    ~ne s              ~ine          Qrru          Containment            ~>>>  (6      ~n~,6)              ~+e5,6)                          ~1m''7    11, 12) ~tstu  (9> 10)  remarks Main steam  line                  28                      A              Inside              Globe          Air/A-c            Air/Spring          B,C,D>P,E,H,R 3-10 sec          Open              Note 1 A              Outside            AO globe        Air/A-c            Air/Spring                        3-10 sec          Open              Note 1 Main steam  line                                          A              Inside              MO gate        A-c                A-c                B>C>D>P>E>H  Standard          Closed            Note 9 drain                                                    A              Outside            MO gate        D-c                D-c                B,C,D>P>E>H  Stsndarcl        Closed            Note 9 From  reactor feedwster                                    A              Inside              Check                              Process            Reverse flow                    Open A              Outside            AO check                            Note 3              Reverse flow                    Open              Note  3 A              Outsicle            MO              A-c                A-c                RM            Standard          Open Reactor water sample                                                      Ins ide            AO              A-c/Air            Spring              B>C >D>P>E>H  Standard          Closed            Note 9 Outside            AO              A-c/Air            Spring                            Standard          Closed            Note 9 Control rod                                                A              Ins ide            Check                              process            Reverse flow                    Opens on        )
hydraulic return                                          A              Outside            Check                              Process            Reverse flow                    rod movement  )
and closed    ) Note 4 Control rod              183                                              Outside            SO valve        A-c                Spring              Note  4                        all  other    )
drive outlet                                                                                                                                                                          times          )
                                                                                                                                                                                                      )
Control rod              18'                                              Outszde            SO valve                            Spring              Note  4                                        )
drive inlet RHR  shutdown                      10                                    Inside              AO check        Note 3              Note 3              Note 3                          Closed            Note 9 cooling injection                                                        Outside            MO              A-c                A-c                A,F, lvl      Standard          Closed            Note 9 RHR  shutdown                                              A              Inside            MO              A-c                A-c                A>F>U, t>)    Stsndarcl        Closed            Note 9 cooling suction from                                      A              Outs'de            MO              D-c                D-c                A,F>U,M      Standard          Closed            Note 9 recirculation  system RHR  - LPCI to                      10                    A              Inside            AO check        Note 3              Not,e 3            Note 3                          Closed            Note 3 reactor                                                  A              Outside            MO              A-c                A-c                RM            Standard          Closed RHR  Reactor head                                                        Inside            MO              A-c                A-c                A>F,U        Standard.        Closed.          Note 9 spray                                                                    Outside            MO              D-c                D-c                A>F,U        Standard          Closed            Note 9 lof6}}

Latest revision as of 07:57, 30 October 2019

Table 7.2-1 Process Pipelines Penetrating Primary Containment 1 of 6
ML17037C782
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 02/06/2017
From:
Niagara Mohawk Power Corp
To:
Office of Nuclear Reactor Regulation
References
Download: ML17037C782 (1)


Text

NMPNS-2 TABLE 7.2-1 PROCESS P~PE4XNES E T G MA CO~~

(Numbers in parentheses are keyed to notes on following pages; signal codes are listed on following pages)

Valve Location Number Approximate Valves Relative to Valve and/or of Pipe Size, Per Primary Operator Power to Power to Isolation Closing Normal 1 t*> ~ne s ~ine Qrru Containment ~>>> (6 ~n~,6) ~+e5,6) ~1m7 11, 12) ~tstu (9> 10) remarks Main steam line 28 A Inside Globe Air/A-c Air/Spring B,C,D>P,E,H,R 3-10 sec Open Note 1 A Outside AO globe Air/A-c Air/Spring 3-10 sec Open Note 1 Main steam line A Inside MO gate A-c A-c B>C>D>P>E>H Standard Closed Note 9 drain A Outside MO gate D-c D-c B,C,D>P>E>H Stsndarcl Closed Note 9 From reactor feedwster A Inside Check Process Reverse flow Open A Outside AO check Note 3 Reverse flow Open Note 3 A Outsicle MO A-c A-c RM Standard Open Reactor water sample Ins ide AO A-c/Air Spring B>C >D>P>E>H Standard Closed Note 9 Outside AO A-c/Air Spring Standard Closed Note 9 Control rod A Ins ide Check process Reverse flow Opens on )

hydraulic return A Outside Check Process Reverse flow rod movement )

and closed ) Note 4 Control rod 183 Outside SO valve A-c Spring Note 4 all other )

drive outlet times )

)

Control rod 18' Outszde SO valve Spring Note 4 )

drive inlet RHR shutdown 10 Inside AO check Note 3 Note 3 Note 3 Closed Note 9 cooling injection Outside MO A-c A-c A,F, lvl Standard Closed Note 9 RHR shutdown A Inside MO A-c A-c A>F>U, t>) Stsndarcl Closed Note 9 cooling suction from A Outs'de MO D-c D-c A,F>U,M Standard Closed Note 9 recirculation system RHR - LPCI to 10 A Inside AO check Note 3 Not,e 3 Note 3 Closed Note 3 reactor A Outside MO A-c A-c RM Standard Closed RHR Reactor head Inside MO A-c A-c A>F,U Standard. Closed. Note 9 spray Outside MO D-c D-c A>F,U Standard Closed Note 9 lof6