IR 05000259/2016006: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 5: | Line 5: | ||
| author name = Blamey A | | author name = Blamey A | ||
| author affiliation = NRC/RGN-II/DRP/RPB6 | | author affiliation = NRC/RGN-II/DRP/RPB6 | ||
| addressee name = Shea J | | addressee name = Shea J | ||
| addressee affiliation = Tennessee Valley Authority | | addressee affiliation = Tennessee Valley Authority | ||
| docket = 05000259, 05000260, 05000296 | | docket = 05000259, 05000260, 05000296 | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION rch 1, 2017 | ||
==SUBJECT:== | |||
ANNUAL ASSESSMENT LETTER FOR BROWNS FERRY NUCLEAR PLANT UNITS 1, 2, AND 3 (REPORT 05000259/2016006, 05000260/2016006 AND 05000296/2016006 ) | |||
SUBJECT: ANNUAL ASSESSMENT LETTER FOR BROWNS FERRY NUCLEAR PLANT UNITS 1 , 2, AND 3 (REPORT 05000259/ | |||
==Dear Mr. Shea:== | ==Dear Mr. Shea:== | ||
The NRC has completed its end-of-cycle performance assessment of the Browns Ferry Nuclear Plant, Units 1, 2, and 3, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2016, through December 31, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. | |||
The NRC determined the performance at Browns Ferry Units 1, 2, and 3 during the most recent quarter was within the Licensee Response Column, the highest performance category of the | The NRC determined the performance at Browns Ferry Units 1, 2, and 3 during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). | ||
Therefore, the NRC plans to conduct ROP baseline inspections at your facility. | |||
Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes | The enclosed inspection plan lists the inspections scheduled through December 31, 2018. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. | ||
This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence. | |||
- | |||
Follow-up inspections in accordance with IP 92702 will be accomplished as necessary for the follow | In addition to the ROP baseline inspections at your facility, we also plan on conducting infrequently performed inspections which include: Inspection Procedure (IP) 92702, Follow-up On Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, And Alternative Dispute Resolution Confirmatory Orders. Follow-up inspections in accordance with IP 92702 will be accomplished as necessary for the follow-up to open willful violations and escalated enforcement items. In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts towards compliance with these Orders, and the information gathered will aid staff in development of the ultimate Safety Evaluation for the site. After the NRC staff receives the Final Compliance Letter for the site, the Safety Evaluation will be issued. Then, the NRC staff will confirm, through inspections, the full implementation of the Orders mentioned above by performing Temporary Instruction 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans. | ||
-up to open willful violations and escalated enforcement items. In response to the accident at Fukushima, the Commission issued Order EA | |||
-12-049, | |||
-Design-Basis External Events, | |||
-12-051, | |||
, through inspections | |||
, the full implementation of the Orders mentioned above by performing Temporary Instruction 2515/191, | |||
-Unit Dose Assessment Plans. | |||
Additionally, the NRC will perform Temporary Instruction 2515/192, | Additionally, the NRC will perform Temporary Instruction 2515/192, Inspection of the Licensees Interim Compensatory Measures Associated With the Open Phase Condition Design Vulnerabilities in Electric Power Systems, in the first quarter of 2017. | ||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the | In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
-rm/adams.html (the Public Electronic Reading Room). | |||
Please contact me at (404) 997 | Please contact me at (404) 997-4415 with any questions you may have regarding this letter. | ||
- | |||
Sincerely, | Sincerely, | ||
/RA/ Alan Blamey, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.: | /RA/ | ||
50-259, 50-260, 50-296 License Nos.: | Alan Blamey, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-259, 50-260, 50-296 License Nos.: DPR-33, DPR-52, DPR-68 Enclosure: | ||
DPR-33, DPR-52, DPR-68 Enclosure: | Browns Ferry Inspection/Activity Plan (03/01/2017 - 12/31/2018) | ||
Browns Ferry Inspection/Activity Plan (03/01/ | cc Distribution via ListServ SUBJECT: ANNUAL ASSESSMENT LETTER FOR BROWNS FERRY NUCLEAR PLANT UNITS 1, 2, AND 3 (REPORT 05000259/2016006, 05000260/2016006 AND 05000296/2016006 March 1, 2017 DISTRIBUTION: | ||
cc Distribution via ListServ SUBJECT: ANNUAL ASSESSMENT LETTER FOR BROWNS FERRY NUCLEAR PLANT UNITS 1, 2, AND 3 (REPORT 05000259/2016006, 05000260/2016006 AND 05000296/2016006 March 1, 2017 DISTRIBUTION: M. Kowal, RII S. Price, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMBrownsFerryResource ROPassessment Resource | M. Kowal, RII S. Price, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMBrownsFerryResource ROPassessment Resource ROPreports Resource Institute of Nuclear Power Operations (INPO) | ||
ADAMS Accession Number: ML17060A159 OFFICE RII:DRP RII:DRP NAME JSeat ABlamey DATE 2/22/2017 2/22/2017 Official Agency Record | |||
Page 1 of 2 Browns Ferry 02/28/2017 06:43:46 Inspection / Activity Plan Report 22 03/01/2017 - 12/31/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site TI192 - TI 192 INSPECTION 3 1, 2, 3 01/01/2017 03/31/2017 IP 2515/192 Inspection of the Licensees Interim Compensatory Measures Associated with the Open Phase Condition ISI - UNIT 2 IN-SERVICE INSPECTION 1 2 03/13/2017 03/17/2017 IP 7111108G Inservice Inspection Activities - BWR OL EXAM - INITIAL LICENSE EXAM PREP 3 1 03/13/2017 03/17/2017 V23490 BROWNS FERRY/APRIL 2017 INITIAL EXAM AT POWER FACILITIES RP - RP OCCUPATIONAL INSPECTION WEEK 1 3 1, 2, 3 03/13/2017 03/17/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2, 3 03/13/2017 03/17/2017 IP 71124.02 Occupational ALARA Planning and Controls 1, 2, 3 03/13/2017 03/17/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2, 3 03/13/2017 03/17/2017 IP 71124.04 Occupational Dose Assessment 1, 2, 3 03/13/2017 03/17/2017 IP 71124.05 Radiation Monitoring Instrumentation 1, 2, 3 03/13/2017 03/17/2017 IP 71151 Performance Indicator Verification RP - RP OCCUPATIONAL INSPECTION WEEK 2 2 1, 2, 3 03/27/2017 03/31/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2, 3 03/27/2017 03/31/2017 IP 71124.02 Occupational ALARA Planning and Controls 1, 2, 3 03/27/2017 03/31/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2, 3 03/27/2017 03/31/2017 IP 71124.04 Occupational Dose Assessment 1, 2, 3 03/27/2017 03/31/2017 IP 71124.05 Radiation Monitoring Instrumentation 1, 2, 3 03/27/2017 03/31/2017 IP 71151 Performance Indicator Verification OL EXAM - INITIAL LICENSE EXAM 3 1 04/10/2017 04/21/2017 V23490 BROWNS FERRY/APRIL 2017 INITIAL EXAM AT POWER FACILITIES EP - EP EXERCISE 6 1, 2, 3 06/26/2017 06/30/2017 IP 7111401 Exercise Evaluation 1, 2, 3 06/26/2017 06/30/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2, 3 06/26/2017 06/30/2017 IP 7111408 Exercise Evaluation - Scenario Review 1, 2, 3 06/26/2017 06/30/2017 IP 71151 Performance Indicator Verification HS - TRIENNIAL HEAT SINK PERFORMANCE 1 1, 2, 3 07/24/2017 07/28/2017 IP 7111107T Heat Sink Performance MODS - PLANT MODIFICATIONS INSPECTION 4 1, 2, 3 12/04/2017 12/08/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications EPU - EROSION AND FLOW ACC COROSION PROGRAMS 1 1, 2, 3 01/22/2018 01/26/2018 IP 49001 Inspection Of Erosion-Corrosion/Flow-Accelerated-Corrosion Monitoring Programs This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. Enclosure | |||
Page 2 of 2 Browns Ferry 02/28/2017 06:43:46 Inspection / Activity Plan Report 22 03/01/2017 - 12/31/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EPU - EROSION AND FLOW ACC COROSION PROGRAMS 1 1, 2, 3 01/22/2018 01/26/2018 IP 71004 Power Uprate PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 1, 2, 3 01/22/2018 01/26/2018 IP 71152B Problem Identification and Resolution 1, 2, 3 02/05/2018 02/09/2018 IP 71152B Problem Identification and Resolution RP - RAD HAZARDS AND TRANSPORTATION 2 1, 2, 3 03/05/2018 03/09/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2, 3 03/05/2018 03/09/2018 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation ISI - UNIT 3 IN-SERVICE INSPECTION 1 3 03/12/2018 03/16/2018 IP 7111108G Inservice Inspection Activities - BWR DBAI - DESIGN BASES ASSURANCE INSPECTION (TEAM) 6 1, 2, 3 04/09/2018 04/13/2018 IP 7111121M Component Design Bases Inspection (Teams) | |||
-12/31/2018 | 1, 2, 3 04/30/2018 05/04/2018 IP 7111121M Component Design Bases Inspection (Teams) | ||
1, 2, 3 05/14/2018 05/18/2018 IP 7111121M Component Design Bases Inspection (Teams) | |||
EP - EP PROGRAM INSPECTION 3 1, 2, 3 04/16/2018 04/20/2018 IP 7111402 Alert and Notification System Testing 1, 2, 3 04/16/2018 04/20/2018 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2, 3 04/16/2018 04/20/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2, 3 04/16/2018 04/20/2018 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2, 3 04/16/2018 04/20/2018 IP 71151 Performance Indicator Verification OL EXAM - INITIAL LICENSE EXAM PREP 3 1 06/18/2018 06/22/2018 V23515 BROWNS FERRY / JULY 2018 INITIAL EXAM AT POWER FACILITES RP - RP PUBLIC INSPECTION 2 1, 2, 3 06/18/2018 06/22/2018 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2, 3 06/18/2018 06/22/2018 IP 71124.07 Radiological Environmental Monitoring Program 1, 2, 3 06/18/2018 06/22/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2, 3 06/18/2018 06/22/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences OL EXAM - INITIAL LICENSE EXAM 3 1 07/16/2018 08/03/2018 V23515 BROWNS FERRY / JULY 2018 INITIAL EXAM AT POWER FACILITES OL RQ - REQUAL INSPECTION 2 1, 2, 3 09/10/2018 09/14/2018 IP 7111111B Licensed Operator Requalification Program ISI - UNIT 1 IN-SERVICE INSPECTION 1 1 10/22/2018 10/26/2018 IP 7111108G Inservice Inspection Activities - BWR This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
}} | }} |
Latest revision as of 06:13, 30 October 2019
ML17060A159 | |
Person / Time | |
---|---|
Site: | Browns Ferry |
Issue date: | 03/01/2017 |
From: | Alan Blamey Reactor Projects Region 2 Branch 6 |
To: | James Shea Tennessee Valley Authority |
References | |
IR 2016006 | |
Download: ML17060A159 (5) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION rch 1, 2017
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR BROWNS FERRY NUCLEAR PLANT UNITS 1, 2, AND 3 (REPORT 05000259/2016006, 05000260/2016006 AND 05000296/2016006 )
Dear Mr. Shea:
The NRC has completed its end-of-cycle performance assessment of the Browns Ferry Nuclear Plant, Units 1, 2, and 3, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2016, through December 31, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.
The NRC determined the performance at Browns Ferry Units 1, 2, and 3 during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green).
Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31, 2018. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.
In addition to the ROP baseline inspections at your facility, we also plan on conducting infrequently performed inspections which include: Inspection Procedure (IP) 92702, Follow-up On Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, And Alternative Dispute Resolution Confirmatory Orders. Follow-up inspections in accordance with IP 92702 will be accomplished as necessary for the follow-up to open willful violations and escalated enforcement items. In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts towards compliance with these Orders, and the information gathered will aid staff in development of the ultimate Safety Evaluation for the site. After the NRC staff receives the Final Compliance Letter for the site, the Safety Evaluation will be issued. Then, the NRC staff will confirm, through inspections, the full implementation of the Orders mentioned above by performing Temporary Instruction 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.
Additionally, the NRC will perform Temporary Instruction 2515/192, Inspection of the Licensees Interim Compensatory Measures Associated With the Open Phase Condition Design Vulnerabilities in Electric Power Systems, in the first quarter of 2017.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (404) 997-4415 with any questions you may have regarding this letter.
Sincerely,
/RA/
Alan Blamey, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-259, 50-260, 50-296 License Nos.: DPR-33, DPR-52, DPR-68 Enclosure:
Browns Ferry Inspection/Activity Plan (03/01/2017 - 12/31/2018)
cc Distribution via ListServ SUBJECT: ANNUAL ASSESSMENT LETTER FOR BROWNS FERRY NUCLEAR PLANT UNITS 1, 2, AND 3 (REPORT 05000259/2016006, 05000260/2016006 AND 05000296/2016006 March 1, 2017 DISTRIBUTION:
M. Kowal, RII S. Price, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMBrownsFerryResource ROPassessment Resource ROPreports Resource Institute of Nuclear Power Operations (INPO)
ADAMS Accession Number: ML17060A159 OFFICE RII:DRP RII:DRP NAME JSeat ABlamey DATE 2/22/2017 2/22/2017 Official Agency Record
Page 1 of 2 Browns Ferry 02/28/2017 06:43:46 Inspection / Activity Plan Report 22 03/01/2017 - 12/31/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site TI192 - TI 192 INSPECTION 3 1, 2, 3 01/01/2017 03/31/2017 IP 2515/192 Inspection of the Licensees Interim Compensatory Measures Associated with the Open Phase Condition ISI - UNIT 2 IN-SERVICE INSPECTION 1 2 03/13/2017 03/17/2017 IP 7111108G Inservice Inspection Activities - BWR OL EXAM - INITIAL LICENSE EXAM PREP 3 1 03/13/2017 03/17/2017 V23490 BROWNS FERRY/APRIL 2017 INITIAL EXAM AT POWER FACILITIES RP - RP OCCUPATIONAL INSPECTION WEEK 1 3 1, 2, 3 03/13/2017 03/17/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2, 3 03/13/2017 03/17/2017 IP 71124.02 Occupational ALARA Planning and Controls 1, 2, 3 03/13/2017 03/17/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2, 3 03/13/2017 03/17/2017 IP 71124.04 Occupational Dose Assessment 1, 2, 3 03/13/2017 03/17/2017 IP 71124.05 Radiation Monitoring Instrumentation 1, 2, 3 03/13/2017 03/17/2017 IP 71151 Performance Indicator Verification RP - RP OCCUPATIONAL INSPECTION WEEK 2 2 1, 2, 3 03/27/2017 03/31/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2, 3 03/27/2017 03/31/2017 IP 71124.02 Occupational ALARA Planning and Controls 1, 2, 3 03/27/2017 03/31/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2, 3 03/27/2017 03/31/2017 IP 71124.04 Occupational Dose Assessment 1, 2, 3 03/27/2017 03/31/2017 IP 71124.05 Radiation Monitoring Instrumentation 1, 2, 3 03/27/2017 03/31/2017 IP 71151 Performance Indicator Verification OL EXAM - INITIAL LICENSE EXAM 3 1 04/10/2017 04/21/2017 V23490 BROWNS FERRY/APRIL 2017 INITIAL EXAM AT POWER FACILITIES EP - EP EXERCISE 6 1, 2, 3 06/26/2017 06/30/2017 IP 7111401 Exercise Evaluation 1, 2, 3 06/26/2017 06/30/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2, 3 06/26/2017 06/30/2017 IP 7111408 Exercise Evaluation - Scenario Review 1, 2, 3 06/26/2017 06/30/2017 IP 71151 Performance Indicator Verification HS - TRIENNIAL HEAT SINK PERFORMANCE 1 1, 2, 3 07/24/2017 07/28/2017 IP 7111107T Heat Sink Performance MODS - PLANT MODIFICATIONS INSPECTION 4 1, 2, 3 12/04/2017 12/08/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications EPU - EROSION AND FLOW ACC COROSION PROGRAMS 1 1, 2, 3 01/22/2018 01/26/2018 IP 49001 Inspection Of Erosion-Corrosion/Flow-Accelerated-Corrosion Monitoring Programs This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures. Enclosure
Page 2 of 2 Browns Ferry 02/28/2017 06:43:46 Inspection / Activity Plan Report 22 03/01/2017 - 12/31/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EPU - EROSION AND FLOW ACC COROSION PROGRAMS 1 1, 2, 3 01/22/2018 01/26/2018 IP 71004 Power Uprate PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 1, 2, 3 01/22/2018 01/26/2018 IP 71152B Problem Identification and Resolution 1, 2, 3 02/05/2018 02/09/2018 IP 71152B Problem Identification and Resolution RP - RAD HAZARDS AND TRANSPORTATION 2 1, 2, 3 03/05/2018 03/09/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2, 3 03/05/2018 03/09/2018 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation ISI - UNIT 3 IN-SERVICE INSPECTION 1 3 03/12/2018 03/16/2018 IP 7111108G Inservice Inspection Activities - BWR DBAI - DESIGN BASES ASSURANCE INSPECTION (TEAM) 6 1, 2, 3 04/09/2018 04/13/2018 IP 7111121M Component Design Bases Inspection (Teams)
1, 2, 3 04/30/2018 05/04/2018 IP 7111121M Component Design Bases Inspection (Teams)
1, 2, 3 05/14/2018 05/18/2018 IP 7111121M Component Design Bases Inspection (Teams)
EP - EP PROGRAM INSPECTION 3 1, 2, 3 04/16/2018 04/20/2018 IP 7111402 Alert and Notification System Testing 1, 2, 3 04/16/2018 04/20/2018 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2, 3 04/16/2018 04/20/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2, 3 04/16/2018 04/20/2018 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2, 3 04/16/2018 04/20/2018 IP 71151 Performance Indicator Verification OL EXAM - INITIAL LICENSE EXAM PREP 3 1 06/18/2018 06/22/2018 V23515 BROWNS FERRY / JULY 2018 INITIAL EXAM AT POWER FACILITES RP - RP PUBLIC INSPECTION 2 1, 2, 3 06/18/2018 06/22/2018 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2, 3 06/18/2018 06/22/2018 IP 71124.07 Radiological Environmental Monitoring Program 1, 2, 3 06/18/2018 06/22/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2, 3 06/18/2018 06/22/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences OL EXAM - INITIAL LICENSE EXAM 3 1 07/16/2018 08/03/2018 V23515 BROWNS FERRY / JULY 2018 INITIAL EXAM AT POWER FACILITES OL RQ - REQUAL INSPECTION 2 1, 2, 3 09/10/2018 09/14/2018 IP 7111111B Licensed Operator Requalification Program ISI - UNIT 1 IN-SERVICE INSPECTION 1 1 10/22/2018 10/26/2018 IP 7111108G Inservice Inspection Activities - BWR This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.