February 28, 2024

Jim Barstow, Vice President

Nuclear Regulatory Affairs & Support Services

Tennessee Valley Authority

1101 Market Street, LP 4A-C

Chattanooga, TN 37402-2801

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR BROWNS FERRY NUCLEAR PLANT,

UNITS 1, 2 AND 3 - REPORT 05000259/2023006, 05000260/2023006 AND

05000296/2023006

Dear Jim Barstow:

The NRC has completed its end-of-cycle performance assessment of Browns Ferry Nuclear

Plant, Units 1, 2 and 3, reviewing performance indicators (PIs), inspection results, and

enforcement actions from January 1, 2023, through December 31, 2023. This letter informs you

of the NRCs assessment of your facility during this period and its plans for future inspections at

your facility. The NRC concluded that overall performance at your facility preserved public

health and safety. The baseline inspection program was completed at your facility as defined in

Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations

Phase.

The NRC determined the performance at Browns Ferry Nuclear Plant, Units 1, 2, and 3, during

the most recent quarter was within the Licensee Response Column, the highest performance

category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection

findings had very low safety significance (i.e., Green), and all PIs were within the expected

range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your

facility.

Browns Ferry Nuclear Plant, Unit 1, was in the Regulatory Response Column, the second

highest performance category of the NRCs ROP Action Matrix for the first three quarters of

Calendar Year (CY) 2023 for Unit 1 High Pressure Core Cooling (HPCI) inoperable in July 2022.

The 95001 Supplemental Inspection report 05000259/2023040 was completed on September

21 and issued on November 2, 2023 (ML23305A350). Based on the results of this inspection

and our Action Matrix assessment, the NRC has determined that Browns Ferry Nuclear Plant,

Unit 1 would be transitioned to the Licensee Response Column (Column 1) of the Action Matrix

as of September 21, 2023.

The enclosed inspection plan lists the inspections scheduled through December 31, 2025.

The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and

personnel availability issues. Routine inspections performed by resident inspectors are not

included in the inspection plan. The inspections listed during the last twelve months of the

J. Barstow

2

inspection plan are tentative and may be revised. The NRC will contact you as soon as possible

to discuss changes to the inspection plan should circumstances warrant any changes.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs

Rules of Practice, a copy of this letter will be available electronically for public inspection in the

NRC Public Document Room or from the Publicly Available Records (PARS) component of

NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Louis McKown at (404) 997-4545 with any questions you may have regarding

this letter.

Sincerely,

Mark E. Franke, Director

Division of Reactor Projects

Docket Nos. 05000259, 05000260, 05000296

License Nos. DPR-33, DPR-52, DPR-68

Enclosure:

Browns Ferry Inspection/Activity Plan

(03/01/2024- 12/31/2025)

cc:

Distribution via ListServ

Signed by Franke, Mark

on 02/28/24

ML24052A147

Site Inspection Activity Plan

Prepared on 1/22/2024 11:10:33 AM

1 of

36

07200052 - Browns Ferry (ISFSI)

03/01/2024 - 12/31/2025

AGING MANAGEMENT OF AN ISFSI

2

Unit

Start

End

Activity

CAC

Title

Staff Count

6/16/2025 6/20/2025

IP

60859

INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

LICENSE RENEWAL INSPECTION

Site Inspection Activity Plan

Prepared on 1/22/2024 11:10:33 AM

2 of

36

Browns Ferry

03/01/2024 - 12/31/2025

SECURITY BASELINE INSPECTION

3

1,2,3

3/25/2024

3/28/2024

IP 71130.02

000734

Access Control

1,2,3

3/25/2024

3/28/2024

IP 71130.04

000736

Equipment Performance, Testing, and Maintenance

1,2,3

3/25/2024

3/28/2024

IP 71130.07

000739

Security Training

1,2,3

3/25/2024

3/28/2024

IP 71130.09

001656

Security Plan Changes

1,2,3

3/25/2024

3/28/2024

IP 71151

001338

Performance Indicator Verification

EMERGENCY PREPAREDNESS PROGRAM INSPECTION

2

1,2,3

4/8/2024

4/12/2024

IP 71114.02

000717

Alert and Notification System Testing

1,2,3

4/8/2024

4/12/2024

IP 71114.03

000718

Emergency Response Organization Staffing and Augmentation System

1,2,3

4/8/2024

4/12/2024

IP 71114.04

000719

Emergency Action Level and Emergency Plan Changes

1,2,3

4/8/2024

4/12/2024

IP 71114.05

000720

Maintenance of Emergency Preparedness

1,2,3

4/8/2024

4/12/2024

IP 71151

001397

Performance Indicator Verification

TARGET SET INSPECTION

2

1,2,3

4/29/2024 5/3/2024

IP 71130.14

000743

Review of Power Reactor Target Sets

BROWNS FERRY INITIAL LICENSE EXAM

5

1,2,3

4/14/2024 4/20/2024

OV

000956

FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1,2,3

5/19/2024 6/1/2024

EXAD

000500

FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

SECURITY BASELINE INSPECTION

3

1,2,3

7/8/2024

7/11/2024

IP 71130.05

000737

Protective Strategy Evaluation

RP PUBLIC RAD SAFETY BASELINE INSPECTION

2

1,2,3

7/29/2024

8/2/2024

IP 71124.06

000730

Radioactive Gaseous and Liquid Effluent Treatment

1,2,3

7/29/2024

8/2/2024

IP 71124.07

000731

Radiological Environmental Monitoring Program

1,2,3

7/29/2024

8/2/2024

IP 71124.08

000732

Radioactive Solid Waste Processing & Radioactive Material Handling,

Storage, & Transportation

1,2,3

7/29/2024

8/2/2024

IP 71151

000746

Performance Indicator Verification

CYBER SECURITY INSPECTION

4

1,2,3

7/29/2024 8/2/2024

IP 71130.10

000741

Cybersecurity

FOCUSED ENGINEERING INSPECTION (AGE-RELATED)

3

1,2,3

8/12/2024 8/16/2024

IP 71111.21N.04

001832

Age-Related Degradation

1,2,3

8/26/2024 8/30/2024

IP 71111.21N.04

001832

Age-Related Degradation

UNIT 1 IN-SERVICE INSPECTION

1

1

9/9/2024

9/13/2024

IP 71111.08G

000701

Inservice Inspection Activities (BWR)

PROBLEM IDENTIFICATION AND RESOLUTION

4

1,2,3

10/21/2024 10/25/2024

IP 71152B

000747

Problem Identification and Resolution

Unit

Start

End

Activity

CAC

Title

Staff Count

Site Inspection Activity Plan

Prepared on 1/22/2024 11:10:33 AM

3 of

36

BROWNS FERRY REQUAL INSPECTION

2

1,2,3

11/4/2024 11/8/2024

IP 71111.11B

000704

Licensed Operator Requalification Program and Licensed Operator

Performance

RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION

3

1,2,3

3/3/2025

3/7/2025

IP 71124.01

000725

Radiological Hazard Assessment and Exposure Controls

1,2,3

3/3/2025

3/7/2025

IP 71124.03

000727

In-Plant Airborne Radioactivity Control and Mitigation

1,2,3

3/3/2025

3/7/2025

IP 71124.04

000728

Occupational Dose Assessment

1,2,3

3/3/2025

3/7/2025

IP 71124.05

000729

Radiation Monitoring Instrumentation

1,2,3

3/3/2025

3/7/2025

IP 71151

000746

Performance Indicator Verification

1,2,3

3/17/2025

3/21/2025

IP 71124.01

000725

Radiological Hazard Assessment and Exposure Controls

1,2,3

3/17/2025

3/21/2025

IP 71124.03

000727

In-Plant Airborne Radioactivity Control and Mitigation

1,2,3

3/17/2025

3/21/2025

IP 71124.04

000728

Occupational Dose Assessment

1,2,3

3/17/2025

3/21/2025

IP 71124.05

000729

Radiation Monitoring Instrumentation

1,2,3

3/17/2025

3/21/2025

IP 71151

000746

Performance Indicator Verification

SECURITY BASELINE INSPECTION

1

1,2,3

3/3/2025

3/6/2025

IP 71130.02

000734

Access Control

1,2,3

3/3/2025

3/6/2025

IP 71130.09

001656

Security Plan Changes

1,2,3

3/3/2025

3/6/2025

IP 71151

001338

Performance Indicator Verification

FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - BFN

5

1,2,3

4/28/2025 5/2/2025

IP 71130.03

000735

Contingency Response - Force-On-Force Testing

1,2,3

5/19/2025 5/23/2025

IP 71130.03

000735

Contingency Response - Force-On-Force Testing

BROWNS FERRY INITIAL EXAM

4

1,2,3

4/6/2025

4/12/2025

OV

000956

FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1,2,3

5/11/2025 5/24/2025

EXAD

000500

FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

AGING MANAGEMENT OF AN ISFSI

2

1,2,3

6/16/2025 6/20/2025

IP 60859

INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI) LICENSE

RENEWAL INSPECTION

EMERGENCY PREPAREDNESS EXERCISE INSPECTION

5

1,2,3

6/23/2025

6/27/2025

IP 71114.01

000716

Exercise Evaluation

1,2,3

6/23/2025

6/27/2025

IP 71114.04

000719

Emergency Action Level and Emergency Plan Changes

1,2,3

6/23/2025

6/27/2025

IP 71151

001397

Performance Indicator Verification

COMPREHENSIVE ENGINEERING TEAM INSPECTION (CETI)

7

1,2,3

12/1/2025 12/5/2025

IP 71111.21M

000713

Comprehensive Engineering Team Inspection

1,2,3

12/15/2025 12/19/2025

IP 71111.21M

000713

Comprehensive Engineering Team Inspection

1,2,3

11/4/2024 11/8/2024

IP 71152B

000747

Problem Identification and Resolution

UNIT 2 IN-SERVICE

INSPECTION

1

2

3/3/2025

3/7/2025

IP 71111.08G

000701