{{#Wiki_filter:TQ-AA-150-J020 Revision 00 Page 1 of 8 This replaced TQ
{{#Wiki_filter:TQ-AA-150-J020 Revision 00 Page 1 of 8 This replaced TQ-JA-150-02 Job Performance Measure Limitorque Motor-Operated and Chainwheel Operated Valve Operations Review JPM Number: A-N-1-S Revision Number: 00 Date: 01 / 03 / 2017 Developed By:
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Exam Author                  Date Approved By:
Job Performance Measure Limitorque Motor
Facility Representative          Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
-Operated and Chainwheel Operated Valve Operations Review   JPM Number:
A-N-1-S Revision Number: 00 Date: 01 / 03 / 20 17 


Developed By:
TQ-AA-150-J020 Revision 00 Page 2 of 8 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Exam Author Date  Approved By:
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
Facility Representative Date TQ-AA-150-J020 Revision 00 Page 2 of 8 This replaced TQ
________     1. Task description and number, JPM description and number are identified.
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
________     2. Knowledge and Abilities (K/A) references are included.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.
________     3. Performance location specified. (in-plant, control room, simulator, or other)
________ 2. Knowledge and Abilities (K/A) references are included.
________     4. Initial setup conditions are identified.
________ 3. Performance location specified. (in
________     5. Initiating cue (and terminating cue if required) are properly identified.
-plant, control room, simulator, or other) ________ 4. Initial setup conditions are identified.
________     6. Task standards identified and verified by SME review.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 6. Task standards identified and verified by SME review.
________     8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________     9. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
Procedure OP-AA-103-105 Rev: 5 Procedure                           Rev:
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure                           Rev:
Procedure OP-AA-103-105     Rev: 5 Procedure Rev:   Procedure Rev:   ________ 10. Verify cues both verbal and visual are free of conflict.
________     10. Verify cues both verbal and visual are free of conflict.
________ 11. Verify performance time is accurate
________     11. Verify performance time is accurate
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________     12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
________     13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date       SME / Instructor Date       SME / Instructor Date TQ-AA-150-J020 Revision 00 Page 3 of 8 This replaced TQ
SME / Instructor                               Date SME / Instructor                               Date SME / Instructor                               Date SRRS: 3D.100; There are no retention requirements for this section
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section Revision Record (Summary)
Revision 00 Generated for 2016
-302 NRC Exam


TQ-AA-150-J020 Revision 00 Page 4 of 8 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 3 of 8 This replaced TQ-JA-150-02 Revision Record (Summary)
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section SIMULATOR SETUP INSTRUCTIONS
Revision 00      Generated for 2016-302 NRC Exam SRRS: 3D.100; There are no retention requirements for this section
 
TQ-AA-150-J020 Revision 00 Page 4 of 8 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS
: 1. This is an administrative JPM. No simulator setup is required.
: 1. This is an administrative JPM. No simulator setup is required.
SRRS: 3D.100; There are no retention requirements for this section


TQ-AA-150-J020 Revision 00 Page 5 of 8 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 5 of 8 This replaced TQ-JA-150-02 INITIAL CONDITIONS
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
: 1. Unit 2 is in Mode 5.
: 1. Unit 2 is in Mode 5.
: 2. Unit 2 is in Day 8 of a refueling outage
: 2. Unit 2 is in Day 8 of a refueling outage
Line 57: Line 54:
: 5. MO 2-1501-20A must be torqued via the handwheel.
: 5. MO 2-1501-20A must be torqued via the handwheel.
INITIATING CUE
INITIATING CUE
: 1. Review OP-AA-103-105 Attachment C for accuracy and make corrections as necessary. Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
: 1. Review OP-AA-103-105 Attachment C for accuracy and make corrections as necessary.
Information For Evaluator's Use:
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.100; There are no retention requirements for this section


TQ-AA-150-J020 Revision 00 Page 6 of 8 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 6 of 8 This replaced TQ-JA-150-02 JPM Start Time:
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Comment STEP                   ELEMENT                                 STANDARD             SAT   UNSAT Number
JPM Start Time:
  *01     Determines Maximum                         Determines incorrect value for  ___    ___    ___
STEP ELEMENT STANDARD SAT UNSAT Comment Number *01 Determines Maximum Backseating torque as recorded is incorrect.
Backseating torque as recorded             maximum backseating torque is is incorrect.                              incorrect. Correct value is 1150.1 ft-lbs NOTE:
Determines incorrect value for maximum backseating torque is incorrect. Correct value is 1150.1 ft-lbs ___ ___ ___ NOTE: If the candidate attempts to terminate the review, direct the candidate to make corrections as necessary and complete the attachment. Another SRO will review upon completion.
If the candidate attempts to terminate the review, direct the candidate to make corrections as necessary and complete the attachment. Another SRO will review upon completion.
*02 Determines Stem Factor was incorrectly used in Manu a l backseating handwheel torque limit calculation Determines Stem Factor was used vice Spur Gear Ratio to determine handwheel torque limit. Replaces Stem Factor with Spur Gear Ratio.
  *02     Determines Stem Factor was                 Determines Stem Factor was       ___    ___    ___
___ ___ ___ *03 Determines calculated Maximum Backseating Handwheel Shaft Torque limit is incorrect.
incorrectly used in Manual                used vice Spur Gear Ratio to backseating handwheel torque              determine handwheel torque limit calculation                          limit. Replaces Stem Factor with Spur Gear Ratio.
Determines Maximum Backseating Handwheel Shaft Torque is 154.7 ft
  *03     Determines calculated                     Determines Maximum              ___    ___    ___
-lbs. ___ ___ ___ CUE: Another SRO will review the calculation. JPM complete.
Maximum Backseating                        Backseating Handwheel Shaft Handwheel Shaft Torque limit is           Torque is 154.7 ft-lbs.
incorrect.
CUE:
Another SRO will review the calculation. JPM complete.
JPM Stop Time:
JPM Stop Time:
SRRS: 3D.105 (when utilized for operator initial or continuing training)


TQ-AA-150-J020 Revision 00 Page 7 of 8 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 7 of 8 This replaced TQ-JA-150-02 JPM  
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Emp. ID#: ____________
:   Emp. ID#: ____________
Job Title:   SRO JPM Title: Limitorque Motor-Operated and Chainwheel Operated Valve Operations Review JPM Number: A-N-1-S                                 Revision Number: 00 Task Number and Title: 299L080 Perform the administrative duties for conduct of surveillances, complex, or special procedures K/A Number and Importance: Generic 2.1.23 --/ 4.4 Suggested Testing Environment: Classroom Alternate Path:     Yes       No SRO Only:               Yes         No Time Critical: Yes       No Reference(s): OP-AA-103-105 Revision 05 Actual Testing Environment:             Simulator             Control Room       In-Plant     Other Testing Method:           Simulate             Perform Estimated Time to Complete: 15 minutes                         Actual Time Used:         minutes EVALUATION  
Job Title: SRO JPM Title:
Limitorque Motor
-Operated and Chainwheel Operated Valve Operations Review JPM Number:
A-N-1-S Revision Number:
00 Task Number and Title:
299L080 Perform the administrative duties for conduct of surveillances, complex, or special procedures K/A Number and Importance:
Generic 2.1.23  
--/ 4.4 Suggested Testing Environment:
Classroom Alternate Path:
Yes No SRO Only: Yes  No Time Critical:
Yes No Reference(s):
OP-AA-103-105 Revision 05 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
1 5 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?                   Yes             No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                   Satisfactory   Unsatisfactory Comments:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Name (Print):
Satisfactory Unsatisfactory Comments:                     Evaluator's Name (Print):   Evaluator's Signature
Evaluators Signature:                                                     Date:
:   Date:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
TQ-AA-150-J020 Revision 00 Page 8 of 8 This replaced TQ
 
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
TQ-AA-150-J020 Revision 00 Page 8 of 8 This replaced TQ-JA-150-02 INITIAL CONDITIONS
: 1. Unit 2 is in Mode 5.
: 1. Unit 2 is in Mode 5.
: 2. Unit 2 is in Day 8 of a refueling outage
: 2. Unit 2 is in Day 8 of a refueling outage
Line 117: Line 102:
INITIATING CUE
INITIATING CUE
: 1. Review OP-AA-103-105 Attachment C for accuracy and make corrections as necessary.
: 1. Review OP-AA-103-105 Attachment C for accuracy and make corrections as necessary.
TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ
SRRS: 3D.100; There are no retention requirements for this section
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
 
Job Performance Measure AUTHORIZE A WAIVER OF 10 CFR WORK HOUR LIMITS JPM Number:
TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 Job Performance Measure AUTHORIZE A WAIVER OF 10 CFR WORK HOUR LIMITS JPM Number: A-N-2-S Revision Number: 02 Date: 12 / 28 / 2016 Developed By:
A-N-2-S Revision Number:
Exam Author                  Date Approved By:
0 2  Date: 12 / 2 8 / 20 16 
Facility Representative          Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
 
TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
________    1. Task description and number, JPM description and number are identified.
________    2. Knowledge and Abilities (K/A) references are included.
________    3. Performance location specified. (in-plant, control room, simulator, or other)
________    4. Initial setup conditions are identified.
________    5. Initiating cue (and terminating cue if required) are properly identified.
________    6. Task standards identified and verified by SME review.
________    7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________    8. If an alternate path is used, the task standard contains criteria for successful completion.
________    9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure LS-AA-119                  Rev: 12 Procedure                            Rev:
Procedure                            Rev:
________    10. Verify cues both verbal and visual are free of conflict.
________    11. Verify performance time is accurate
________    12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________    13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                              Date SME / Instructor                              Date SME / Instructor                              Date SRRS: 3D.100; There are no retention requirements for this section


Developed By:
TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ-JA-150-02 Revision Record (Summary)
Exam Author Date  Approved By:
Revision 00 Bank JPM.
Facility Representative Date TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ
Revision 01 Revised for ILT 12-1 (2013-301) NRC Exam.
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Revision 02 Updated for 2016-302 NRC Exam SRRS: 3D.100; There are no retention requirements for this section
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure LS-AA-119  Rev: 12 Procedure Rev:  Procedure Rev:  ________ 10. Verify cues both verbal and visual are free of conflict.
________ 11. Verify performance time is accurate
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date        SME / Instructor Date        SME / Instructor Date TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section Revision Record (Summary)
Revision 00 Bank JPM. Revision 01 Revised for ILT 12-1 (2013-301) NRC Exam
. Revision 02 Updated for 2016
-302 NRC Exam


TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section SIMULATOR SETUP INSTRUCTIONS
: 1. No simulator setup is required. This is an administrative JPM.
: 1. No simulator setup is required. This is an administrative JPM.
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Clean copy of LS
: 1. Clean copy of LS-AA-119.
-AA-119.
SRRS: 3D.100; There are no retention requirements for this section
TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ
 
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS
: 1. You are the Shift Manager.
: 1. You are the Shift Manager.
: 2. Both units are operating at near rated power.
: 2. Both units are operating at near rated power.
: 3. It is Monday 1/23/2017 @ 0600
: 3. It is Monday 1/23/2017 @ 0600
: 4. The on-coming Unit 2 SRO, calls in to report he will not be able to come in for shift 2, due to a sudden illness.
: 4. The on-coming Unit 2 SRO, calls in to report he will not be able to come in for shift 2, due to a sudden illness.
: 5. Another SRO will not be able to come in until 1300. 6. The Unit 3 SRO is already scheduled to work a shift 1 and shift 2 double.
: 5. Another SRO will not be able to come in until 1300.
: 6. The Unit 3 SRO is already scheduled to work a shift 1 and shift 2 double.
: 7. No other Licensed individual is available to fill the Safety Related position.
: 7. No other Licensed individual is available to fill the Safety Related position.
: 8. The Unit 2 SRO working shift 1 is Steve Smith.
: 8. The Unit 2 SRO working shift 1 is Steve Smith.
: 9. Steve is ready and willing to work the overtime and will work until 1300.
: 9. Steve is ready and willing to work the overtime and will work until 1300.
: 10. Steve is NOT fatigued and IS mentally alert.
: 10. Steve is NOT fatigued and IS mentally alert.
: 11. Steve's rolling work hour average for the past 6 weeks is 42.0 hours/week
: 11. Steves rolling work hour average for the past 6 weeks is 42.0 hours/week
: 12. Steve's Employee ID# is: 987654.
: 12. Steves Employee ID# is: 987654.
: 13. Safety-related work WILL be performed by Steve during the shift.
: 13. Safety-related work WILL be performed by Steve during the shift.
: 14. Steve is NOT scheduled to work Tuesday 1/24/2017 through Thursday 1/26/2017.
: 14. Steve is NOT scheduled to work Tuesday 1/24/2017 through Thursday 1/26/2017.
: 15. Steve was on a 7 day vacation prior to the following shifts that count towards 10 CFR 26 Work Hour Limits:
: 15. Steve was on a 7 day vacation prior to the following shifts that count towards 10 CFR 26 Work Hour Limits:
Shift Tue 1/17/17 Wed 1/18/17 Thu 1/19/17 Fri 1/20/17 Sat 1/21/17 Sun 1/22/17 Mon 1/23/17 1    (2300
Tue          Wed          Thu            Fri  Sat        Sun      Mon Shift 1/17/17     1/18/17     1/19/17       1/20/17 1/21/17     1/22/17   1/23/17 1    (2300-0700)       8             8           8             8     8           8         8 2    (0700-1500)       4                         4                   4 3    (1500-2300)
-0700) 8 8 8 8 8 8 8 2    (0700
INITIATING CUE
-1500) 4 4 4   3    (1500
: 1. Complete LS-AA-119, attachment 1, section 1 - Request paperwork for Steve Smith.
-2300)         INITIATING CUE
: 2. The Operations Director will complete sections 2 - 4 of LS-AA-119.
: 1. Complete LS
SRRS: 3D.100; There are no retention requirements for this section
-AA-119, attachment 1, section 1  
 
- Request paperwork for Steve Smith.
TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ-JA-150-02 Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
: 2. The Operations Director will complete sections 2  
Information For Evaluators Use:
- 4 of LS-AA-119.
TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.100; There are no retention requirements for this section


TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ-JA-150-02 JPM Start Time:
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Comment STEP                   ELEMENT                                 STANDARD                 SAT   UNSAT Number NOTE:
JPM Start Time:
Provide the examinee with the supplied copy of LS-AA-119.
STEP ELEMENT STANDARD SAT UNSAT Comment Number NOTE: Provide the examinee with the supplied copy of LS
01     Reviews procedure to determine             Determines that overtime would      ___    ___    ___
-AA-119. 01 Reviews procedure to determine what limits will be exceeded.
what limits will be exceeded.             exceed:
Determines that overtime would exceed: 72 hours in any 7 days.
72 hours in any 7 days.
___ ___ ___ *02 Records Planned Waiver Start.
  *02     Records Planned Waiver Start.             Planned Waiver Start:               ___    ___    ___
Planned Waiver Start:       1/2 3/20 1 7 / 1100 ___ ___ ___ *03 Records Planned Waiver End.
1/23/2017 / 1100
Planned Waiver End:       1/2 3/20 1 7 / 1300 ___ ___ ___ *04 Records Planned Waiver Duration. Planned Waiver Duration:
  *03     Records Planned Waiver End.               Planned Waiver End:                 ___    ___    ___
2 hours ___ ___ ___ *05 Checks the appropriate limit exceeded. > 72 in any 7 days.
1/23/2017 / 1300
c hecked ___ ___ ___ 06 Documents and signs the submitted by block.
  *04     Records Planned Waiver                     Planned Waiver Duration: 2         ___   ___     ___
Submitted by: name, signature, date, and time.
Duration.                                  hours
___ ___ ___ 07 Forwards paperwork to the Operations Director.
  *05     Checks the appropriate limit               > 72 in any 7 days.                 ___   ___     ___
Forwards paperwork to the Operations Director or designee.
exceeded.                                  checked 06     Documents and signs the                   Submitted by: name,                 ___    ___    ___
___ ___ ___ END   JPM Stop Time:
submitted by block.                        signature, date, and time.
07     Forwards paperwork to the                 Forwards paperwork to the           ___    ___    ___
Operations Director.                      Operations Director or designee.
END JPM Stop Time:
SRRS: 3D.105 (when utilized for operator initial or continuing training)


TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ-JA-150-02 JPM  
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Emp. ID#: ____________
:   Emp. ID#: ____________
Job Title:   SRO JPM Title: AUTHORIZE A WAIVER OF 10 CFR WORK HOUR LIMITS JPM Number: A-N-2-S                                 Revision Number: 02 Task Number and Title: 299L057, Perform administrative duties to ensure overtime restrictions are not exceeded.
Job Title:   SRO JPM Title:
K/A Number and Importance: Generic 2.1.5 -- / 3.9 Suggested Testing Environment: Simulator Alternate Path:     Yes       No SRO Only:               Yes         No Time Critical: Yes       No Reference(s): LS-AA-119 Rev. 12 Actual Testing Environment:             Simulator             Control Room       In-Plant    Other Testing Method:           Simulate             Perform Estimated Time to Complete: 14 minutes                         Actual Time Used:         minutes EVALUATION  
AUTHORIZE A WAIVER OF 10 CFR WORK HOUR LIMITS JPM Number:
A-N-2-S Revision Number:
0 2 Task Number and Title:
299L057, Perform administrative duties to ensure overtime restrictions are not exceeded. K/A Number and Importance:
Generic 2.1.5   -- / 3.9 Suggested Testing Environment:
Simulator Alternate Path:
Yes No SRO Only: Yes  No Time Critical:
Yes No Reference(s):
LS-AA-119 Rev. 12 Actual Testing Environment:
Simulator Control Room In-Pla nt  Other Testing Method:
Simulate Perform Estimated Time to Complete:
1 4 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?                   Yes             No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                   Satisfactory   Unsatisfactory Comments:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Name (Print):
Satisfactory Unsatisfactory Comments:                     Evaluator's Name (Print):   Evaluator's Signature
Evaluators Signature:                                                     Date:
:   Date:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ
 
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS
: 1. You are the Shift Manager.
: 1. You are the Shift Manager.
: 2. Both units are operating at near rated power.
: 2. Both units are operating at near rated power.
Line 244: Line 216:
: 9. Steve is ready and willing to work the overtime and will work until 1300.
: 9. Steve is ready and willing to work the overtime and will work until 1300.
: 10. Steve is NOT fatigued and IS mentally alert.
: 10. Steve is NOT fatigued and IS mentally alert.
: 11. Steve's rolling work hour average for the past 6 weeks is 42.0 hours/week
: 11. Steves rolling work hour average for the past 6 weeks is 42.0 hours/week
: 12. Steve's Employee ID# is: 987654.
: 12. Steves Employee ID# is: 987654.
: 13. Safety-related work WILL be performed by Steve during the shift.
: 13. Safety-related work WILL be performed by Steve during the shift.
: 14. Steve is NOT scheduled to work Tuesday 1/24/2017 through Thursday 1/26/2017.
: 14. Steve is NOT scheduled to work Tuesday 1/24/2017 through Thursday 1/26/2017.
: 15. Steve was on a 7 day vacation prior to the following shifts that count towards 10 CFR 26 Work Hour Limits:
: 15. Steve was on a 7 day vacation prior to the following shifts that count towards 10 CFR 26 Work Hour Limits:
Shift Tue 1/17/17 Wed 1/18/17 Thu 1/19/17 Fri 1/20/17 Sat 1/21/17 Sun 1/22/17 Mon 1/23/17 1    (2300
Tue          Wed          Thu            Fri  Sat        Sun      Mon Shift 1/17/17     1/18/17     1/19/17       1/20/17 1/21/17     1/22/17   1/23/17 1    (2300-0700)       8             8           8             8     8           8         8 2    (0700-1500)       4                         4                   4 3    (1500-2300)
-0700) 8 8 8 8 8 8 8 2    (0700
INITIATING CUE
-1500) 4 4 4   3    (1500
: 1. Complete LS-AA-119, attachment 1, section 1 - Request paperwork for Steve Smith.
-2300)         INITIATING CUE
: 2. The Operations Director will complete sections 2 - 4 of LS-AA-119.
: 1. Complete LS
SRRS: 3D.100; There are no retention requirements for this section
-AA-119, attachment 1, section 1  
 
- Request paperwork for Steve Smith.
TQ-AA-150-J020 Revision 00 Page 1 of 8 This replaced TQ-JA-150-02 Job Performance Measure ACOUSTIC MONITOR SURVIELLANCE AND OPERABILITY DETERMINATION JPM Number: A-N-3-S Revision Number: 00 Date: 11 / 30 / 2016 Developed By:
: 2. The Operations Director will complete sections 2  
Exam Author                  Date Approved By:
- 4 of LS-AA-119.
Facility Representative          Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
TQ-AA-150-J020 Revision 00 Page 1 of 8 This replaced TQ
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Job Performance Measure ACOUSTIC MONITOR SURVIEL LANCE AND OPERABILITY DETERMINATION JPM Number:
A-N-3-S Revision Number: 00 Date: 11 / 30 / 20 16 


Developed By:
TQ-AA-150-J020 Revision 00 Page 2 of 8 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Exam Author Date  Approved By:
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
Facility Representative Date TQ-AA-150-J020 Revision 00 Page 2 of 8 This replaced TQ
________     1. Task description and number, JPM description and number are identified.
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
________     2. Knowledge and Abilities (K/A) references are included.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.
________     3. Performance location specified. (in-plant, control room, simulator, or other)
________ 2. Knowledge and Abilities (K/A) references are included.
________     4. Initial setup conditions are identified.
________ 3. Performance location specified. (in
________     5. Initiating cue (and terminating cue if required) are properly identified.
-plant, control room, simulator, or other)
________     6. Task standards identified and verified by SME review.
________ 4. Initial setup conditions are identified.
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________     8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 6. Task standards identified and verified by SME review.
________     9. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
Procedure DOS 0250-06               Rev: 16 Procedure OP-AA-108-115 Rev: 17 Procedure OP-AA-108-115-1002 Rev: 03
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
________     10. Verify cues both verbal and visual are free of conflict.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
________     11. Verify performance time is accurate
Procedure DOS 0250-06 Rev: 16 Procedure OP-AA-108-115 Rev: 17 Procedure OP-AA-108-115-1002   Rev: 03 ________ 10. Verify cues both verbal and visual are free of conflict.
________     12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 11. Verify performance time is accurate
________     13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
SME / Instructor                               Date SME / Instructor                               Date SME / Instructor                               Date SRRS: 3D.100; There are no retention requirements for this section
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date       SME / Instructor Date       SME / Instructor Date TQ-AA-150-J020 Revision 00 Page 3 of 8 This replaced TQ
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section Revision Record (Summary) Revision 00
: Generated for 2016
-302 NRC Exam


TQ-AA-150-J020 Revision 00 Page 4 of 8 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 3 of 8 This replaced TQ-JA-150-02 Revision Record (Summary)
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section SIMULATOR SETUP INSTRUCTIONS
Revision 00:      Generated for 2016-302 NRC Exam SRRS: 3D.100; There are no retention requirements for this section
 
TQ-AA-150-J020 Revision 00 Page 4 of 8 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS
: 1. This is a administrative JPM utilizing simulator procedures. No simulator setup is necessary.
: 1. This is a administrative JPM utilizing simulator procedures. No simulator setup is necessary.
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Mark up a copy of DOS 0250
: 1. Mark up a copy of DOS 0250-06 as required.
-06 as required.
: 2. Ensure access simulator procedures or EDMS/Passport is available.
: 2. Ensure access simulator procedures or EDMS/Passport is available.
SRRS: 3D.100; There are no retention requirements for this section


TQ-AA-150-J020 Revision 00 Page 5 of 8 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 5 of 8 This replaced TQ-JA-150-02 INITIAL CONDITIONS
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
: 1. You are the Unit 2 SRO.
: 1. You are the Unit 2 SRO
: 2. Unit 2 is in Mode 1.
. 2. Unit 2 is in Mode 1.
: 3. DOS 0250-06 has just been completed.
: 3. DOS 0250-06 has just been completed
: 4. The NSO reported that all surveillance requirements were within specifications.
. 4. The NSO reported that all surveillance requirements were within specifications
INITIATING CUE
. INITIATING CUE
: 1. Review DOS 0250-06 for accuracy and completeness.
: 1. Review DOS 0250
: 2. Determine operability of acoustic monitors.
-06 for accuracy and completeness
: 3. Enter Technical Specification and/or TRMs if required.
. 2. Determine operability of acoustic monitors
. 3. Enter Technical Specification and/or TRMs if required.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.100; There are no retention requirements for this section


TQ-AA-150-J020 Revision 00 Page 6 of 8 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 6 of 8 This replaced TQ-JA-150-02 JPM Start Time:
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Comment STEP                   ELEMENT                                 STANDARD                 SAT   UNSAT Number
JPM Start Time:
  *01     Identifies on the data sheet that         Identifies out of spec value.        ___    ___    ___
STEP ELEMENT STANDARD SAT UNSAT Comment Number *01 Identifies on the data sheet that valve 203-4A threshold volt is out of spec. Identifies out of spec value.
valve 203-4A threshold volt is out of spec.
___ ___ ___ *02 Declares Acoustic Monitor Inoperable due to failure to meet acceptance criteria Declares Acoustic Monitor Inoperable
  *02     Declares Acoustic Monitor                  Declares Acoustic Monitor           ___    ___    ___
___ ___ ___ NOTE: Acoustic Monitor failure results in TRM 3.3.b Condition A.1
Inoperable due to failure to               Inoperable meet acceptance criteria NOTE:
*03 Enters TRM 3.3.b Condition A.1 Enters TRM 3.3.b Condition A.1 and determines the channel must be restored to OPERABLE within 30 days. ___ ___ ___ END OF JPM JPM Stop Time:
Acoustic Monitor failure results in TRM 3.3.b Condition A.1
  *03     Enters TRM 3.3.b Condition A.1             Enters TRM 3.3.b Condition A.1       ___    ___    ___
and determines the channel must be restored to OPERABLE within 30 days.
END OF JPM JPM Stop Time:
SRRS: 3D.105 (when utilized for operator initial or continuing training)


TQ-AA-150-J020 Revision 00 Page 7 of 8 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 7 of 8 This replaced TQ-JA-150-02 JPM  
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Emp. ID#: ____________
:   Emp. ID#: ____________
Job Title:   SRO JPM Title: ACOUSTIC MONITOR SURVIELANCE AND OPERABILITY DETERMINATION JPM Number: A-N-3-S                                 Revision Number: 00 Task Number and Title: 299L080 Perform the administrative duties for conduct of surveillance, special, or complex procedures.
Job Title:   SRO JPM Title:
K/A Number and Importance: Generic 2.2.37 --/4.6 Suggested Testing Environment: Classroom Alternate Path:     Yes       No SRO Only:               Yes         No Time Critical: Yes       No Reference(s): DOS 0250-06 Rev. 16, OP-AA-108-115 Rev. 17, OP-AA-108-115-1002 Rev. 03 Actual Testing Environment:             Simulator             Control Room       In-Plant     Other Testing Method:           Simulate             Perform Estimated Time to Complete: 10 minutes                         Actual Time Used:         minutes EVALUATION  
ACOUSTIC MONITOR SURVIELANCE AND OPERABILITY DETERMINATION JPM Number:
A-N-3-S Revision Number:
00 Task Number and Title:
299L080 Perform the administrative duties for conduct of surveillance, special, or complex procedures.
K/A Number and Importance:
Generic 2.2.37     --/4.6 Suggested Testing Environment:
Classroom Alternate Path:
Yes No SRO Only: Yes  No Time Critical:
Yes No Reference(s):
DOS 0250-06 Rev. 16, OP
-AA-108-115 Rev. 17, OP
-AA-108-115-1002 Rev. 03 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
10 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?                   Yes             No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                   Satisfactory   Unsatisfactory Comments:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Name (Print):
Satisfactory Unsatisfactory Comments:                     Evaluator's Name (Print):   Evaluator's Signature
Evaluators Signature:                                                     Date:
:   Date:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
TQ-AA-150-J020 Revision 00 Page 8 of 8 This replaced TQ
 
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
TQ-AA-150-J020 Revision 00 Page 8 of 8 This replaced TQ-JA-150-02 INITIAL CONDITIONS
: 1. You are the Unit 2 SRO
: 1. You are the Unit 2 SRO.
. 2. Unit 2 is in Mode 1.
: 2. Unit 2 is in Mode 1.
: 3. DOS 0250-06 has just been completed
: 3. DOS 0250-06 has just been completed.
. 4. The NSO reported that all surveillance requirements were within specifications
: 4. The NSO reported that all surveillance requirements were within specifications.
. INITIATING CUE
INITIATING CUE
: 1. Review DOS 0250
: 1. Review DOS 0250-06 for accuracy and completeness.
-06 for accuracy and completeness
: 2. Determine operability of acoustic monitors.
. 2. Determine operability of acoustic monitors
: 3. Enter Technical Specification and/or TRMs if required.
. 3. Enter Technical Specification and/or TRMs if required.
SRRS: 3D.100; There are no retention requirements for this section
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
KEY EVALUATOR: The candidate must determine that dose for the task will be 5 5 mrem and determine that only two E Os can receive the dose, necessary to compl ete the task. They are Mike and Tom. See the table below for projected job dose, 24 hour total dose on RWP DR-0-17-00333, and total Annual TEDE dose for each Operator.
KEY EVALUATOR: The candidate must determine that dose for the task will be 55 mrem and determine that only two EOs can receive the dose, necessary to complete the task. They are Mike and Tom. See the table below for projected job dose, 24 hour total dose on RWP DR 17-00333, and total Annual TEDE dose for each Operator.
Calculation:
Calculation:
2 valve s clearance (at RWCU Aux Pump) projected dose = 0.
2 valves clearance (at RWCU Aux Pump) projected dose = 0.50 hr x 40 mr/hr = 20mrem 1 valve clearance (at A RWCU Pump) projected dose = 0.25hr x 140 mr/hr = 35mrem 20 mrem + 35 mrem = 55 mrem projected job dose for clearance order hanging DDE dose Annual TEDE        Projected dose on    Projected Annual TEDE received on RWP Name        DR-0-17-00333 dose as of     RWP DR-0-17-00333       (including all dose from Midnight To Date  for the 24 hour period       last 24 hours) today (50 + 55              (1550 + 105 Alex         50 mrem           1550 mrem         =)           105   =)                    1655 mrem                     mrem (1950 + 60 (5 + 55 =)
50 hr x 40 mr/hr =
Dan           5 mrem           1950 mrem                             =)                   2010 60 mrem mrem (1920 + 55 (0 + 55 Mike           0 mrem           1920 mrem                             =)                   1975
2 0mrem 1 valve clearance (at 'A' RWCU Pump) projected dose = 0.25hr x 140 mr/hr = 35mrem 2 0 mrem + 35 mrem = 5 5 mre m projected job dose for clearance order hanging Name DDE dose received on RWP DR-0-17-00333 today Annual TEDE dose as of Midnight To Date Projected dose on          RWP DR-0-17-00333                   for the 24 hour period Projected Annual TEDE    (including all dose from              last 24 hours)
                                                    =)            55 mrem mrem (47 + 55              (1850 + 102 Sue           47 mrem           1850 mrem         =)            102    =)                   1952 mrem                    mrem (1750 + 63 (8 + 55 Tom             8 mrem           1750 mrem                             =)                   1813
Alex 50 mrem 1550 mrem (50 + 5 5 =)
                                                    =)            63 mrem mrem The bolded values in the table exceed the applicable Company, RWP, or 10CFR limit.
105 mrem (1550 + 105 =)
 
1 655 mrem Dan 5 mrem 1950 mrem (5 + 55 =)
TQ-AA-150-J020 Revision 00 Page 1 of 10 This replaced TQ-JA-150-02 Job Performance Measure Select Personnel for Radiation Work JPM Number: A-N-4-S Revision Number: 02 Date: 12 / 28 / 2016 Developed By:
60 mrem (1950 + 6 0 =)
Exam Author                  Date Approved By:
20 1 0 mrem Mike 0 mrem 1920 mrem (0 + 5 5 =)
Facility Representative          Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
55 mrem (1920 + 5 5 =)
19 7 5 mrem Sue 47 mrem 1850 mrem (47 + 5 5 =)
1 02 mrem (1850 + 1 0 2 =)
19 52 mrem Tom 8 mrem 1750 mrem (8 + 5 5 =)
63 mrem (1750 + 63
=)
1 813 mrem The bolded values in the table exceed the applicable Company, RWP, or 10CFR limit.


TQ-AA-150-J020 Revision 00 Page 1 of 10 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 2 of 10 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
Job Performance Measure Select Personnel for Radiation Work JPM Number:
________    1. Task description and number, JPM description and number are identified.
A-N-4-S  Revision Number:
________    2. Knowledge and Abilities (K/A) references are included.
0 2  Date: 12 / 2 8 / 20 16 
________    3. Performance location specified. (in-plant, control room, simulator, or other)
________    4. Initial setup conditions are identified.
________    5. Initiating cue (and terminating cue if required) are properly identified.
________    6. Task standards identified and verified by SME review.
________    7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________    8. If an alternate path is used, the task standard contains criteria for successful completion.
________    9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure RP-AA-203                  Rev: 03 Procedure                            Rev:
Procedure                            Rev:
________    10. Verify cues both verbal and visual are free of conflict.
________    11. Verify performance time is accurate
________    12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________    13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                              Date SME / Instructor                              Date SME / Instructor                              Date SRRS: 3D.100; There are no retention requirements for this section


Developed By:
TQ-AA-150-J020 Revision 00 Page 3 of 10 This replaced TQ-JA-150-02 Revision Record (Summary)
Exam Author Date  Approved By:
Revision 02      Updated for 2016-302 NRC Exam SRRS: 3D.100; There are no retention requirements for this section
Facility Representative Date TQ-AA-150-J020 Revision 00 Page 2 of 10 This replaced TQ
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure RP-AA-203  Rev: 03 Procedure Rev:  Procedure Rev:  ________ 10. Verify cues both verbal and visual are free of conflict.
________ 11. Verify performance time is accurate
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date        SME / Instructor Date        SME / Instructor Date TQ-AA-150-J020 Revision 00 Page 3 of 10 This replaced TQ
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section Revision Record (Summary)
Revision 02 Updated for 2016-302 NRC Exam


TQ-AA-150-J020 Revision 00 Page 4 of 10 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 4 of 10 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section SIMULATOR SETUP INSTRUCTIONS
: 1. This is a tabletop JPM utilizing simulator procedures
: 1. This is a tabletop JPM utilizing simulator procedures
: 2. No simulator setup is required.
: 2. No simulator setup is required.
DOCUMENT PERPARATION
DOCUMENT PERPARATION
: 1. Markup a copy of an RWP for the Unit 3 RWCU Pump Room.
: 1. Markup a copy of an RWP for the Unit 3 RWCU Pump Room.
: 2. Markup a survey map for the Unit 3 RWCU Pump Room. 3. Clean copy of RP
: 2. Markup a survey map for the Unit 3 RWCU Pump Room.
-AA-203.
: 3. Clean copy of RP-AA-203.
TQ-AA-150-J020 Revision 00 Page 5 of 10 This replaced TQ
SRRS: 3D.100; There are no retention requirements for this section
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS INITIAL CONDITIONS
 
: 1. You are a Unit Supervisor and will be briefing EOs to perform a Clearance Order First Hang in the Unit 3 RWCU Pump Room under RWP DR-0-17-00333. 2. Five EOs are available this shift.
TQ-AA-150-J020 Revision 00 Page 5 of 10 This replaced TQ-JA-150-02 INITIAL CONDITIONS INITIAL CONDITIONS
None of the five have received dose at any location other than Dresden Station.
: 1. You are a Unit Supervisor and will be briefing EOs to perform a Clearance Order First Hang in the Unit 3 RWCU Pump Room under RWP DR-0-17-00333.
None of the five have received dose since midnight on any RWPs other than DR-0-17-00333. 3. The Radiation Protection Department has provided the attached Survey map, and the following dose history for the five EOs to assist you in your planning:
: 2. Five EOs are available this shift.
Name DDE dose received on         RWP DR-0-17-00333 Today Annual TEDE dose Prior to Shift Alex 5 0 mrem 1550 mrem Dan 5 mrem 1950 mrem Mike 0 mrem 1920 mrem Sue 47 mrem 1850 mrem Tom 8 mrem 1750 mrem 4. The total expected stay time for each EO will be 45 minutes. Based on past job history, it will breakdown as follows:
* None of the five have received dose at any location other than Dresden Station.
30 minutes total in the area near the following two valves: 3-1201-138 RWCU Aux Pump Suction (at RWCU Aux Pump) 3-1201-139 RWCU Aux Pump Discharge (at RWCU Aux Pump) 15 minutes total in the area near the following one valve: 3-1201-128A 'A' RWCU Pump Suction (at 'A' RWCU Pump)
* None of the five have received dose since midnight on any RWPs other than DR-0       00333.
: 3. The Radiation Protection Department has provided the attached Survey map, and the following dose history for the five EOs to assist you in your planning:
Annual TEDE DDE dose received on Name                                                  dose              Prior RWP DR-0-17-00333 Today to Shift Alex                       50 mrem                       1550 mrem Dan                         5 mrem                       1950 mrem Mike                         0 mrem                       1920 mrem Sue                         47 mrem                       1850 mrem Tom                         8 mrem                       1750 mrem
: 4. The total expected stay time for each EO will be 45 minutes. Based on past job history, it will breakdown as follows:
* 30 minutes total in the area near the following two valves:
3-1201-138 RWCU Aux Pump Suction (at RWCU Aux Pump) 3-1201-139 RWCU Aux Pump Discharge (at RWCU Aux Pump)
* 15 minutes total in the area near the following one valve:
3-1201-128A A RWCU Pump Suction (at A RWCU Pump)
INITIATING CUE
INITIATING CUE
: 1. CALCULATE the expected dose for the work in RWCU Pump Room. DETERMINE which  
: 1. CALCULATE the expected dose for the work in RWCU Pump Room. DETERMINE which EO(s) CAN and which EO(s) CAN NOT be assigned to perform the task. Demonstrate SRRS: 3D.100; There are no retention requirements for this section


EO(s) CAN and which EO(s) CAN NOT be assigned to perform the task. Demonstrate TQ-AA-150-J020 Revision 00 Page 6 of 10 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 6 of 10 This replaced TQ-JA-150-02 dose calculation to determine all violations (if any). EXPLAIN the basis for your determination.
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section dose calculation to determine all violations (if any). EXPLAIN the basis for your determination.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.100; There are no retention requirements for this section


TQ-AA-150-J020 Revision 00 Page 7 of 10 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 7 of 10 This replaced TQ-JA-150-02 JPM Start Time:
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Comment STEP                   ELEMENT                                 STANDARD                 SAT   UNSAT Number NOTE:
JPM Start Time:
Provide the examinee with the supplied copy of the RWP and survey map of the RWCU pump room and, if requested, the supplied copy of RP-AA-203.
STEP ELEMENT STANDARD SAT UNSAT Comment Number NOTE: Provide the examinee with the supplied copy of the RWP and survey map of the RWCU pump room and, if requested, the supplied copy of RP
The following steps may be performed in any order.
-AA-203. The following steps may be performed in any order.
01     Reviews Survey Maps to                     Reviews the survey maps and          ___  ___    ___
01 Reviews Survey Maps to determine area dose rates.
determine area dose rates.                 determines area dose rates to be 40 mr/hr for the first group of 2 valves and 140 mr/hr for the remaining valve.
Reviews the survey maps and determines area dose rates to be 40 mr/hr for the first group of 2 valves and 1 40 mr/hr for the remaining valve.
NOTE:
___ ___ ___ NOTE: The following calculations should be made:
The following calculations should be made:
2 valve clearance projected dose = 0.50 hr x 40 mr/hr =
2 valve clearance projected dose = 0.50 hr x 40 mr/hr = 20 mrem 1 valve clearance projected dose = 0.25 hr x 140 mr/hr = 35 mrem Total projected dose for the job = 20 mrem + 35 mrem = 55 mrem 02     Calculates that the projected dose         Determines the EOs will receive 20  ___  ___    ___
20 mrem 1 valve clearance projected dose = 0.25 hr x 140 mr/hr = 35 mrem Total projected dose for the job = 20 mrem + 3 5 mrem = 55 mrem 02 Calculates that the projected dose that will be received for the task is 55 mrem. Determines the EOs will receive 2 0 mrem on the first 2 valves and 35 on the next valve.
that will be received for the task is     mrem on the first 2 valves and 35 55 mrem.                                  on the next valve.
___ ___ ___ *03 Determines that ALEX CAN NOT perform the job because he would exceed the 80 mrem dose alarm on RWP DR-0-17-00333. Alex's total daily dose on RWP DR-0-17-00333 would be 105 mrem. ___ ___ ___ *04 Determines that Dan CAN NOT perform the job because he would exceed the 2000 mrem Exelon Annual limit.
  *03     Determines that ALEX CAN NOT               Alexs total daily dose on RWP      ___  ___    ___
Dan's total Annual dose would be 20 1 0 mrem. ___ ___ ___ *05 Determines that Mike CAN perform the job because no limits will be exceeded. Mike's total RWP daily dose and Annual dose will remain below the limits. ___ ___ ___ *06 Determines that Sue CAN NOT perform the job because she would exceed the 80 mrem dose alarm on RWP DR-0-17-00333. Sue's total daily dose on RWP DR-0-17-00333 would be 1 0 2 mrem. ___ ___ ___
perform the job because he would           DR-0-17-00333 would be 105 exceed the 80 mrem dose alarm              mrem.
TQ-AA-150-J020 Revision 00 Page 8 of 10 This replaced TQ
on RWP DR-0-17-00333.
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
  *04     Determines that Dan CAN NOT               Dans total Annual dose would        ___  ___    ___
STEP ELEMENT STANDARD SAT UNSAT Comment Number *07 Determines that Tom CAN perform the job because no limits will be exceeded. Tom's total RWP daily dose and Annual dose will remain below the limits. ___ ___ ___ END of JPM JPM Stop Time:
perform the job because he would           be 2010 mrem.
exceed the 2000 mrem Exelon Annual limit.
  *05     Determines that Mike CAN perform Mikes total RWP daily dose and                ___  ___    ___
the job because no limits will be Annual dose will remain below the exceeded.                        limits.
  *06     Determines that Sue CAN NOT               Sues total daily dose on RWP DR-    ___  ___    ___
perform the job because she would         0-17-00333 would be 102 mrem.
exceed the 80 mrem dose alarm on RWP DR-0-17-00333.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
 
TQ-AA-150-J020 Revision 00 Page 8 of 10 This replaced TQ-JA-150-02 Comment STEP                   ELEMENT                                 STANDARD               SAT   UNSAT Number
  *07     Determines that Tom CAN perform           Toms total RWP daily dose and      ___  ___    ___
the job because no limits will be         Annual dose will remain below the exceeded.                                  limits.
END of JPM JPM Stop Time:
SRRS: 3D.105 (when utilized for operator initial or continuing training)


TQ-AA-150-J020 Revision 00 Page 9 of 10 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 9 of 10 This replaced TQ-JA-150-02 JPM  
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Emp. ID#: ____________
:   Emp. ID#: ____________
Job Title:   SRO JPM Title: Select Personnel for Radiation Work JPM Number: A-N-4-S                                 Revision Number: 02 Task Number and Title: 29900LK119 Discuss the items to be considered prior to work authorization K/A Number and Importance: Generic 2.3.13 --/3.8 Suggested Testing Environment: Simulator Alternate Path:     Yes       No SRO Only:               Yes         No Time Critical: Yes       No Reference(s): RP-AA-203 Revision 03 Actual Testing Environment:             Simulator             Control Room       In-Plant     Other Testing Method:           Simulate             Perform Estimated Time to Complete: 10 minutes                         Actual Time Used:         minutes EVALUATION  
Job Title:   SRO JPM Title:
Select Personnel for Radiation Work JPM Number:
A-N-4-S Revision Number:
02 Task Number and Title:
29900LK119 Discuss the items to be considered prior to work authorization K/A Number and Importance:
Generic 2.3.13    
--/3.8 Suggested Testing Environment:
Simulator Alternate Path:
Yes No SRO Only: Yes  No Time Critical:
Yes No Reference(s):
RP-AA-203 Revision 03 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete: 10 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?                   Yes             No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                   Satisfactory   Unsatisfactory Comments:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Name (Print):
Satisfactory Unsatisfactory Comments:                     Evaluator's Name (Print):   Evaluator's Signature
Evaluators Signature:                                                     Date:
:   Date:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
TQ-AA-150-J020 Revision 00 Page 10 of 10 This replaced TQ
 
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS INITIAL CONDITIONS
TQ-AA-150-J020 Revision 00 Page 10 of 10 This replaced TQ-JA-150-02 INITIAL CONDITIONS INITIAL CONDITIONS
: 1. You are a Unit Supervisor and will be briefing EOs to perform a Clearance Order First Hang in the Unit 3 RWCU Pump Room under RWP DR-0-17-00333. 2. Five EOs are available this shift.
: 1. You are a Unit Supervisor and will be briefing EOs to perform a Clearance Order First Hang in the Unit 3 RWCU Pump Room under RWP DR-0-17-00333.
None of the five have received dose at any location other than Dresden Station.
: 2. Five EOs are available this shift.
None of the five have received dose since midnight on any RWPs other than DR-0-17-00333. 3. The Radiation Protection Department has provided the attached Survey map, and the following dose history for the five EOs to assist you in your planning:
* None of the five have received dose at any location other than Dresden Station.
Name DDE dose received on         RWP DR-0-17-00333 Today Annual TEDE dose Prior to Shift Alex 5 0 mrem 1550 mrem Dan 5 mrem 1950 mrem Mike 0 mrem 1920 mrem Sue 4 7 mrem 1850 mrem Tom 8 mrem 1750 mrem 4. The total expected stay time for each EO will be 45 minutes. Based on past job history, it will breakdown as follows:
* None of the five have received dose since midnight on any RWPs other than DR-0       00333.
30 minutes total in the area near the following two valves: 3-1201-138 RWCU Aux Pump Suction (at RWCU Aux Pump) 3-1201-139 RWCU Aux Pump Discharge (at RWCU Aux Pump) 15 minutes total in the area near the following one valve: 3-1201-128A 'A' RWCU Pump Suction (at 'A' RWCU Pump)
: 3. The Radiation Protection Department has provided the attached Survey map, and the following dose history for the five EOs to assist you in your planning:
DDE dose received on             Annual TEDE dose Name RWP DR-0-17-00333 Today               Prior to Shift Alex                       50 mrem                     1550 mrem Dan                         5 mrem                     1950 mrem Mike                         0 mrem                     1920 mrem Sue                         47 mrem                     1850 mrem Tom                         8 mrem                     1750 mrem
: 4. The total expected stay time for each EO will be 45 minutes. Based on past job history, it will breakdown as follows:
* 30 minutes total in the area near the following two valves:
3-1201-138 RWCU Aux Pump Suction (at RWCU Aux Pump) 3-1201-139 RWCU Aux Pump Discharge (at RWCU Aux Pump)
* 15 minutes total in the area near the following one valve:
3-1201-128A A RWCU Pump Suction (at A RWCU Pump)
INITIATING CUE
INITIATING CUE
: 1. CALCULATE the expected dose for the work in RWCU Pump Room. DETERMINE which  
: 1. CALCULATE the expected dose for the work in RWCU Pump Room. DETERMINE which EO(s) CAN and which EO(s) CAN NOT be assigned to perform the task. Demonstrate dose calculation to determine all violations (if any). EXPLAIN the basis for your determination.
SRRS: 3D.100; There are no retention requirements for this section


EO(s) CAN and which EO(s) CAN NOT be assigned to perform the task. Demonstrate dose calculation to determine all violations (if any). EXPLAIN the basis for your determination.
TQ-AA-150-J020 Revision 00 Page 1 of 8 This replaced TQ-JA-150-02 Job Performance Measure EAL Declaration JPM Number: A-N-5-S Revision Number: 00 Date: 12 / 28 / 2016 Developed By:
Exam Author                  Date Approved By:
Facility Representative          Date SRRS: 3D.105 (when utilized for operator initial or continuing training)


TQ-AA-150-J020 Revision 00 Page 1 of 8 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 2 of 8 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
Job Performance Measure EAL Declaration JPM Number:
________    1. Task description and number, JPM description and number are identified.
A-N-5-S  Revision Number:
________    2. Knowledge and Abilities (K/A) references are included.
0 0  Date: 12 / 2 8 / 20 16 
________    3. Performance location specified. (in-plant, control room, simulator, or other)
________    4. Initial setup conditions are identified.
________    5. Initiating cue (and terminating cue if required) are properly identified.
________    6. Task standards identified and verified by SME review.
________    7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________    8. If an alternate path is used, the task standard contains criteria for successful completion.
________    9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure EP-AA-1004 Addendum 3                Rev: 05 Procedure                            Rev:
Procedure                            Rev:
________    10. Verify cues both verbal and visual are free of conflict.
________    11. Verify performance time is accurate
________    12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________    13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                              Date SME / Instructor                              Date SME / Instructor                              Date SRRS: 3D.100; There are no retention requirements for this section


Developed By:
TQ-AA-150-J020 Revision 00 Page 3 of 8 This replaced TQ-JA-150-02 Revision Record (Summary)
Exam Author Date  Approved By:
Revision 00:      Generated for 2016-302 NRC Exam SRRS: 3D.100; There are no retention requirements for this section
Facility Representative Date TQ-AA-150-J020 Revision 00 Page 2 of 8 This replaced TQ
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure EP-AA-1004 Addendum 3  Rev: 05 Procedure Rev:  Procedure Rev:  ________ 10. Verify cues both verbal and visual are free of conflict.
________ 11. Verify performance time is accurate
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM. ________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date        SME / Instructor Date        SME / Instructor Date TQ-AA-150-J020 Revision 00 Page 3 of 8 This replaced TQ
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section Revision Record (Summary)
Revision 0 0: Generated for 2016-302 NRC Exam


TQ-AA-150-J020 Revision 00 Page 4 of 8 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 4 of 8 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section SIMULATOR SETUP INSTRUCTIONS
: 1. This is an administrative JPM utilizing the simulator procedures only. No simulator setup is required.
: 1. This is an administrative JPM utilizing the simulator procedures only. No simulator setup is required. 2. Ensure EAL charts are free of markings.
: 2. Ensure EAL charts are free of markings.
SRRS: 3D.100; There are no retention requirements for this section


TQ-AA-150-J020 Revision 00 Page 5 of 8 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 5 of 8 This replaced TQ-JA-150-02 INITIAL CONDITIONS
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
: 1. THIS IS A TIME CRITICAL JPM.
: 1. THIS IS A TIME CRITICAL JPM.
: 2. You are the Unit 2 SRO. 3. Unit 2 is operating at rated power
: 2. You are the Unit 2 SRO.
. 4. There are NO surveillances in progress
: 3. Unit 2 is operating at rated power.
. 5. There are NO RPV level transients in progress.
: 4. There are NO surveillances in progress.
: 6. EO report s a fire with visible flames in the Unit 2 HPCI Aux Oil Pump.
: 5. There are NO RPV level transients in progress.
: 7. The fire is limited to the HPCI Aux Oil Pump. 8. There is NO verifier available.
: 6. EO reports a fire with visible flames in the Unit 2 HPCI Aux Oil Pump.
: 7. The fire is limited to the HPCI Aux Oil Pump.
: 8. There is NO verifier available.
INITIATING CUE
INITIATING CUE
: 1. Determine EAL(s) (ignore discretionary EALs) and complete a NARS form. Give the NARS form to the WEC Supervisor, who will make the state notification.
: 1. Determine EAL(s) (ignore discretionary EALs) and complete a NARS form. Give the NARS form to the WEC Supervisor, who will make the state notification.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.100; There are no retention requirements for this section


TQ-AA-150-J020 Revision 00 Page 6 of 8 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 6 of 8 This replaced TQ-JA-150-02 JPM Start Time:
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Comment STEP                   ELEMENT                                 STANDARD                 SAT   UNSAT Number NOTE:
JPM Start Time:
When student located NARS form provide student with:
STEP ELEMENT STANDARD SAT UNSAT Comment Number NOTE: When student located NARS form provide student with:
* Included color copy of NARS form (gray)
Included color copy of NARS form (gray)
* Screenshot of PPDS
Screenshot of PPDS
  *01     Determines a classification of           Determine highest classification is  ___  ___    ___
*01 Determines a classification of ALERT, due to fire damaging a safety system required by Technical Specifications in the current operating mode.
ALERT, due to fire damaging a             ALERT per EAL MA5. (15 minute safety system required by                 time requirement)
Determine highest classification is ALERT per EAL MA5. (15 minute time requirement)
Technical Specifications in the current operating mode.
___ ___ ___ NOTE: Determines classification start time _______ and stop time _______ .
NOTE:
Determines classification start time _______ and stop time _______ .
(15 minute limit)
(15 minute limit)
*02 Properly fills out NARS form.
  *02         Properly fills out NARS form.         See attached key for the areas that   ___  ___    ___
(NOTE: referenced attached key has been withheld due to proprietary content)
must be filled out correctly (12 minute requirement) Critical items (NOTE: referenced attached key            are HIGHLIGHTED has been withheld due to              NARS form Block 8 either proprietary content)                meters/sec or miles/hr may be annotated. Only one is required.
See attached key for the areas that must be filled out correctly (1 2 minute requirement)
Elevated parameters must be used.
Critical items are HIGHLIGHTED NARS form Block 8 either meters/sec or miles/hr may be annotated. Only one is required. Elevated parameters must be used. ___ ___ ___ NOTE: Fill out NARS form start time (when declaration completed) _______ and stop time ______                 (12 minute limit)
NOTE:
END   JPM Stop Time:
Fill out NARS form start time (when declaration completed) _______ and stop time ______
(12 minute limit)
END JPM Stop Time:
SRRS: 3D.105 (when utilized for operator initial or continuing training)


TQ-AA-150-J020 Revision 00 Page 7 of 8 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 7 of 8 This replaced TQ-JA-150-02 JPM  
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Emp. ID#: ____________
:   Emp. ID#: ____________
Job Title:   SRO JPM Title: EAL Declaration JPM Number: A-N-5-S                                 Revision Number: 00 Task Number and Title: 295L160 Perform the duties of Shift Emergency Director K/A Number and Importance: Generic 2.4.44 --/4.4 Suggested Testing Environment: Simulator Alternate Path:     Yes       No SRO Only:               Yes         No Time Critical: Yes       No Reference(s): EP-AA-1004 Addendum 3 Rev. 05 Actual Testing Environment:             Simulator             Control Room       In-Plant     Other Testing Method:           Simulate             Perform Estimated Time to Complete: 20 minutes                         Actual Time Used:         minutes EVALUATION  
Job Title:   SRO JPM Title:
EAL Declaration JPM Number:
A-N-5-S Revision Number:
00 Task Number and Title:
295L160 Perform the duties of Shift Emergency Director K/A Number and Importance:
Generic 2.4.44    
--/4.4 Suggested Testing Environment:
Simulator Alternate Path:
Yes No SRO Only: Yes  No Time Critical:
Yes No Reference(s):
EP-AA-1004 Addendum 3 Rev. 05 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
20 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?                   Yes             No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                   Satisfactory   Unsatisfactory Comments:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Name (Print):
Satisfactory Unsatisfactory Comments:                     Evaluator's Name (Print):   Evaluator's Signature
Evaluators Signature:                                                     Date:
:   Date:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
TQ-AA-150-J020 Revision 00 Page 8 of 8 This replaced TQ
 
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
TQ-AA-150-J020 Revision 00 Page 8 of 8 This replaced TQ-JA-150-02 INITIAL CONDITIONS
: 1. THIS IS A TIME CRITICAL JPM.
: 1. THIS IS A TIME CRITICAL JPM.
: 2. You are the Unit 2 SRO
: 2. You are the Unit 2 SRO.
. 3. Unit 2 is operating at rated power
: 3. Unit 2 is operating at rated power.
. 4. There are NO surveillances in progress
: 4. There are NO surveillances in progress.
. 5. There are NO RPV level transients in progress.
: 5. There are NO RPV level transients in progress.
: 6. EO reports a fire with visible flames in the Unit 2 HPCI Aux Oil Pump
: 6. EO reports a fire with visible flames in the Unit 2 HPCI Aux Oil Pump.
. 7. The fire is limited to the HPCI Aux Oil Pump
: 7. The fire is limited to the HPCI Aux Oil Pump.
. 8. There is NO verifier available.
: 8. There is NO verifier available.
INITIATING CUE
INITIATING CUE
: 1. Determine EAL(s) (ignore discretionary EALs) and complete a NARS form. Give the NARS form to the WEC Supervisor, who will make the state notification.
: 1. Determine EAL(s) (ignore discretionary EALs) and complete a NARS form. Give the NARS form to the WEC Supervisor, who will make the state notification.
SRRS: 3D.100; There are no retention requirements for this section


TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 Job Performance Measure Insertion of Manual Scram with Failure to Scram (AP)
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM Number: S-N-a Revision Number: 02 Date: 12/ 28 / 2016 Developed By:
Job Performance Measure Insertion of Manual Scram with Failure to Scram (AP)   JPM Number:
Exam Author                  Date Approved By:
S-N-a Revision Number: 02 Date: 12/ 28 / 20 16 
Facility Representative          Date SRRS: 3D.105 (when utilized for operator initial or continuing training)


Developed By:
TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Exam Author Date  Approved By:
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
Facility Representative Date TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ
________     1. Task description and number, JPM description and number are identified.
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
________     2. Knowledge and Abilities (K/A) references are included.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.
________     3. Performance location specified. (in-plant, control room, simulator, or other)
________ 2. Knowledge and Abilities (K/A) references are included.
________     4. Initial setup conditions are identified.
________ 3. Performance location specified. (in
________     5. Initiating cue (and terminating cue if required) are properly identified.
-plant, control room, simulator, or other)
________     6. Task standards identified and verified by SME review.
________ 4. Initial setup conditions are identified.
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________     8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 6. Task standards identified and verified by SME review.
________     9. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
Procedure DGP 02-03                 Rev: 106 Procedure                           Rev:
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
Procedure                           Rev:
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
________     10. Verify cues both verbal and visual are free of conflict.
Procedure DGP 02-03 Rev: 10 6 Procedure Rev:   Procedure Rev:   ________ 10. Verify cues both verbal and visual are free of conflict.
________     11. Verify performance time is accurate
________ 11. Verify performance time is accurate
________     12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________     13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                               Date SME / Instructor                               Date SME / Instructor                               Date SRRS: 3D.100; There are no retention requirements for this section
SME / Instructor Date       SME / Instructor Date       SME / Instructor Date TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section Revision Record (Summary)
Revision 00 Bank JPM Revision 01 JPM revised for ILT 07
-01 CERT Exam Revision 02 JPM revised for 2016-302 NRC Exam


TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ-JA-150-02 Revision Record (Summary)
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section SIMULATOR SETUP INSTRUCTIONS
Revision 00      Bank JPM Revision 01      JPM revised for ILT 07-01 CERT Exam Revision 02      JPM revised for 2016-302 NRC Exam SRRS: 3D.100; There are no retention requirements for this section
: 1. Reset the simulator to IC 50 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. {Delete this NOTE if not applicable.}
 
TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to IC 50 NOTE:     It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. {Delete this NOTE if not applicable.}
: 2. Insert expert command:
: 2. Insert expert command:
imf B12 TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ
imf B12 SRRS: 3D.100; There are no retention requirements for this section
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
 
TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS
: 1. Security has reported a tornado heading towards the 345KV switchyard and it is about to strike the yard.
: 1. Security has reported a tornado heading towards the 345KV switchyard and it is about to strike the yard.
INITIATING CUE
INITIATING CUE
: 1. Unit Supervisor has directed you to insert a manual scram and perform the immediate operator actions of the DGP 02-0 3 hard card.
: 1. Unit Supervisor has directed you to insert a manual scram and perform the immediate operator actions of the DGP 02-03 hard card.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.100; There are no retention requirements for this section
TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ-JA-150-02 JPM Start Time:
Comment STEP                    ELEMENT                                  STANDARD                SAT  UNSAT Number 01      Presses both scram pushbuttons.            Both pushbuttons DEPRESSED.        ___    ___    ___
02      Place reactor mode switch to              Mode switch in SHUTDOWN.            ___    ___    ___
SHUTDOWN.
NOTE:
Rod position can be verified by: Full core display, Computer output, or RWM CRT.
03      Check rods inserted <02.                  VERIFIES all rods not < 02.        ___    ___    ___
BEGIN ALTERNATE PATH
  *04    Collars armed on either ATWS ARI          Collars ARMED.                      ___    ___    ___
S4A & S4C OR S4B & S4D.
  *05    Depress pushbuttons on either              Pushbuttons DEPRESSED.              ___    ___    ___
ATWS ARI S4A & S4C or S4B &
S4D.
NOTE:
Rod position can be verified by any or all of the following:
* Full core display
* Computer output
* RWM CRT.
Rod positions VERIFIED.
06      Check rods inserted <02.                                                      ___    ___    ___
07      Verify Recirc pumps run back to            VERIFIES that both Recirc pumps    ___    ___    ___
minimum.                                  are running down to minimum.
NOTE:
Steps 08 and 09 may be performed, however these actions are not critical.
08      Insert SRMs and IRMs.                      Depresses SRM and IRM drive in      ___    ___    ___
pushbuttons.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ-JA-150-02 Comment STEP                   ELEMENT                                 STANDARD                 SAT   UNSAT Number 09     Control Reactor water level +25 to         VERIFIES that the FWLC is            ___  ___    ___
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
          +35 inches or as directed by the           operating and controlling RPV Unit Supervisor.                          water level.
JPM Start Time:
10     Inform US that all rods are in, ARI       Attention for an Update; All rods   ___  ___    ___
STEP ELEMENT STANDARD SAT UNSAT Comment Number 01 Presses both scram pushbuttons.
was required.                              are in ARI was used, Rx Pressure
Both pushbuttons DEPRESSED.
                                                    & Level are trending as expected.
___ ___ ___ 02 Place reactor mode switch to SHUTDOWN. Mode switch in SHUTDOWN.
End of Update.
___ ___ ___ NOTE: Rod position can be verified by: Full core display, Computer output, or RWM CRT.
CUE:
03 Check rods inserted
Acknowledge report. The JPM is considered complete at this time.
<02. VERIFIES all rods not
END JPM Stop Time:
< 0 2. ___ ___ ___ BEGIN ALTERNATE PATH
SRRS: 3D.105 (when utilized for operator initial or continuing training)
*04 Collars armed on either ATWS ARI S4A & S4C OR S4B & S4D.
Collars ARMED.
___ ___ ___ *05 Depress pushbuttons on either ATWS ARI S4A & S4C or S4B & S4D. Pushbuttons DEPRESSED.
___ ___ ___ NOTE: Rod position can be verified by any or all of the following
:  Full core display Computer output RWM CRT. 06 Check rods inserted
<02. Rod positions VERIFIED. ___ ___ ___ 07 Verify Recirc pumps run back to minimum. VERIFIES that both Recirc pumps are running down to minimum.
___ ___ ___ NOTE: Steps 08 and 09 may be performed, however these actions are not critical.
08 Insert SRMs and IRMs
. Depresses SRM and IRM drive in pushbuttons.
___ ___ ___
TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ
-JA-150-02  SRRS: 3D.105 (when utilized for operator initial or continuing training)
STEP ELEMENT STANDARD SAT UNSAT Comment Number 09 Control Reactor water level +25 to +35 inches or as directed by the Unit Supervisor.
VERIFIES that the FWLC is operating and controlling RPV water level.
___ ___ ___ 10 Inform US that all rods are in, ARI was required.
"Attention for an Update; All rods are in ARI was used, Rx Pressure  
& Level are trending as expected. End of Update."
___ ___ ___ CUE: Acknowledge report. The JPM is considered complete at this time.
END   JPM Stop Time:


TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ-JA-150-02 JPM  
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Emp. ID#: ____________
:   Emp. ID#: ____________
Job Title:   SRO JPM Title: Insertion of Manual Scram with Failure to Scram JPM Number: S-N-a                                   Revision Number: 02 Task Number and Title: 295L068 Insertion of Manual Scram with Failure to Scram (ARI Successful)
Job Title: SRO JPM Title:
K/A Number and Importance: 295037.A1.03 4.1/4.1 Suggested Testing Environment: Simulator Alternate Path:     Yes       No SRO Only:               Yes         No Time Critical: Yes       No Reference(s): DGP 02-03 Revision 106 Actual Testing Environment:             Simulator             Control Room       In-Plant     Other Testing Method:           Simulate             Perform Estimated Time to Complete: 5 minutes                         Actual Time Used:         minutes EVALUATION  
Insertion of Manual Scram with Failure to Scram JPM Number:
S-N-a Revision Number:
02 Task Number and Title:
295L068 Insertion of Manual Scram with Failure to Scram (ARI Successful)
K/A Number and Importance:
295037.A1.03     4.1/4.1 Suggested Testing Environment:
Simulator Alternate Path:
Yes No SRO Only: Yes  No Time Critical:
Yes No Reference(s):
DGP 02-03 Revision 10 6  Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
5 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?                   Yes             No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                   Satisfactory   Unsatisfactory Comments:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Name (Print):
Satisfactory Unsatisfactory Comments:                     Evaluator's Name (Print):   Evaluator's Signature
Evaluators Signature:                                                     Date:
:   Date:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ
 
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS
: 1. Security has reported a tornado heading towards the 345KV switchyard and it is about to strike the yard.
: 1. Security has reported a tornado heading towards the 345KV switchyard and it is about to strike the yard.
INITIATING CUE
INITIATING CUE
: 1. Unit Supervisor has directed you to insert a manual scram and perform the immediate operator actions of the DGP 02-03 hard card.
: 1. Unit Supervisor has directed you to insert a manual scram and perform the immediate operator actions of the DGP 02-03 hard card.
TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ
SRRS: 3D.100; There are no retention requirements for this section
-JA-150-02  SRRS: 3D.105 (when utilized for operator initial or continuing training)
Job Performance Measure Initiate HPCI with Incomplete Group IV Isolation (AP)  JPM Number:
S-N-b  Revision Number: 01  Date: 11/29/2016 


Developed By:
TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 Job Performance Measure Initiate HPCI with Incomplete Group IV Isolation (AP)
Exam Author Date  Approved By:
JPM Number: S-N-b Revision Number: 01 Date: 11/29/2016 Developed By:
Facility Representative Date TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ
Exam Author                  Date Approved By:
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Facility Representative          Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOA 2300-02  Rev:    1 1  Procedure DAN 902(3)
-3 C-7  Rev: 14 Procedure Rev:   ________ 10. Verify cues both verbal and visual are free of conflict.
________ 11. Verify performance time is accurate
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM. ________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date        SME / Instructor Date        SME / Instructor Date TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section Revision Record (Summary)
Revision 0 0: New JPM created for 2016 LORT exam.
Revision 01:
Revised for 2016-302 NRC Exam


TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section SIMULATOR SETUP INSTRUCTIONS
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
________    1. Task description and number, JPM description and number are identified.
________    2. Knowledge and Abilities (K/A) references are included.
________    3. Performance location specified. (in-plant, control room, simulator, or other)
________    4. Initial setup conditions are identified.
________    5. Initiating cue (and terminating cue if required) are properly identified.
________    6. Task standards identified and verified by SME review.
________    7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________    8. If an alternate path is used, the task standard contains criteria for successful completion.
________    9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOA 2300-02                Rev: 11 Procedure DAN 902(3)-3 C-7 Rev: 14 Procedure                            Rev:
________    10. Verify cues both verbal and visual are free of conflict.
________    11. Verify performance time is accurate
________    12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________    13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                              Date SME / Instructor                              Date SME / Instructor                              Date SRRS: 3D.100; There are no retention requirements for this section
 
TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ-JA-150-02 Revision Record (Summary)
Revision 00:      New JPM created for 2016 LORT exam.
Revision 01:      Revised for 2016-302 NRC Exam SRRS: 3D.100; There are no retention requirements for this section
 
TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to 0% power with full pressure (IC 51 used for validation)
: 1. Reset the simulator to 0% power with full pressure (IC 51 used for validation)
: 2. Run CAEP - S-2300-08.cae a. If the CAEP cannot be ran, insert the following Expert Commands:
: 2. Run CAEP - S-2300-08.cae
: a. If the CAEP cannot be ran, insert the following Expert Commands:
: 1) irf rd25pos 0.0
: 1) irf rd25pos 0.0
: 2) imf hp4vlbn 50.0
: 2) imf hp4vlbn 50.0
: 3) trgset 1 "atl140b .gt.
: 3) trgset 1 atl140b .gt. 0.0
0.0" 4) imf ser0086 (1 8) on
: 4) imf ser0086 (1 8) on
: 5) ior hpdcl4 (1 8) close
: 5) ior hpdcl4 (1 8) close
: 6) imf ser0654 (1 60) on
: 6) imf ser0654 (1 60) on
: 7) imf ser0288 (1 120)
: 7) imf ser0288 (1 120)
: 3. Verify 2-0301-25 valve is closed (completed during running the CAEP file)
: 3. Verify 2-0301-25 valve is closed (completed during running the CAEP file)
: 4. Lower FWLC setpoint to  
: 4. Lower FWLC setpoint to -10 and allow RPV level to stabilize at the new level.
-10" and allow RPV level to stabilize at the new level.
: 5. Put computer point C360 up on the Digital Display
: 5. Put computer point C360 up on the Digital Display
: 6. Acknowledge the alarms that are in and press the Reset button to clear any cleared alarms.
: 6. Acknowledge the alarms that are in and press the Reset button to clear any cleared alarms.
: 7. This completes the setup for this JPM DOCUMENT PREPARATION
: 7. This completes the setup for this JPM DOCUMENT PREPARATION Need a clean copy of current revision of DOA 2300-02, HPCI Fast Startup, Attachment B (Hardcard).
SRRS: 3D.100; There are no retention requirements for this section


Need a clean copy of current revision of DOA 2300-02, HPCI Fast Startup, Attachment B (Hardcard).
TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS
 
TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
: 1. You are the Unit 2 NSO.
: 1. You are the Unit 2 NSO.
: 2. A transient has occurred resulting in lowering RPV level.
: 2. A transient has occurred resulting in lowering RPV level.
: 3. NO HPCI initiation signal is present.
: 3. NO HPCI initiation signal is present.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to inject with HPCI to raise RPV level and maintain RPV level between +8" and +48"
: 1. The Unit Supervisor has directed you to inject with HPCI to raise RPV level and maintain RPV level between +8 and +48.
. 2. Hard card use IS authorized.
: 2. Hard card use IS authorized.
: 3. An additional NSO has been tasked with starting HPCI room cooler, SBGT, and Torus Cooling
: 3. An additional NSO has been tasked with starting HPCI room cooler, SBGT, and Torus Cooling.
. 4. Inform the Unit Supervisor when the task is complete
: 4. Inform the Unit Supervisor when the task is complete.
. Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
 
Information For Evaluators Use:
Information For Evaluator's Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.100; There are no retention requirements for this section


TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ-JA-150-02 JPM Start Time:
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Comment STEP                   ELEMENT                                 STANDARD                 SAT   UNSAT Number
JPM Start Time:
: 1. Verity HPCI Aux Oil Pump AND 2-           Verify GREEN lights are lit 2301-14 valve are NOT in PTL
STEP ELEMENT STANDARD SAT UNSAT Comment Number 1. Verity HPCI Aux Oil Pump AND 2-2301-14 valve are NOT in PTL Verify GREEN lights are lit
___    ___    ___
___
   *2. Depress AND hold depressed the             Depress HPCI AUTO INITIATE HPCI AUTO INITIATE pushbutton             pushbutton.
___   ___ *2. Depress AND hold depressed the HPCI AUTO INITIATE pushbutton until the MSC reaches the HSS.
until the MSC reaches the HSS.             Verifies Motor Speed Changer LSS (green light) goes out and HSS (red light) illuminates
Depress HPCI AUTO INITIATE pushbutton.
___   ___    ___
Verifies Motor Speed Changer LSS (green light) goes out and HSS (red light) illuminates
: 3. Verifies RWL is increasing                 Verifies RWL is increasing by looking at Medium or Narrow Range indicators
___     ___    ___ 3. Verifies RWL is increasing Verifies RWL is increasing by looking at Medium or Narrow Range indicators
___   ___    ___
___
BEGIN ALTERNATE PATH (HPCI Auto Isolation alarm occurs 8 seconds after RWL is > 0)
___
: 4. HPCI AUTO ISOL INITIATED                   Recognizes 902-3 C-7 (HPCI alarm comes in                            AUTO ISOL INITIATED) is in alarm
___ BEGIN ALTERNATE PATH (HPCI Auto Isolation alarm occurs 8 seconds after RWL is > 0")
___   ___     ___
: 4. HPCI AUTO ISOL INITIATED alarm comes in Recognizes 902
: 5. Verify Auto Isolation complete             Verifies:
-3 C-7 (HPCI AUTO ISOL INITIATED) is in alarm    ___
* MO 2-2301-35 green light lit
___
* MO 2-2301-36 green light lit Determines
___ 5. Verify Auto Isolation complete Verifies: MO 2-2301-35 green light lit MO 2-2301-36 green light lit Determines MO 2-2301-4 did not close (dual indication)
* MO 2-2301-4 did not close (dual indication)
MO 2-2301-5 did not close (green light still lit)
* MO 2-2301-5 did not close (green light still lit)     ___    ___     ___
___
: 6. Attempts to manually complete the         Attempts to close:
___
incomplete Group IV Isolation
___ 6. Attempts to manually complete the incomplete Group IV Isolation Attempts to close:
* MO 2-2301-4                   ___   ___     ___
MO 2-2301-4 ___ ___ ___ *7. Manually completes the incomplete Group IV Isolation Closes:  MO 2-2301-5   ___ ___ ___
  *7. Manually completes the                     Closes:
TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ
incomplete Group IV Isolation
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
* MO 2-2301-5                     ___   ___     ___
STEP ELEMENT STANDARD SAT UNSAT Comment Number 8. Informs Unit Supervisor Informs Unit Supervisor HPCI Isolation signal received while initiating system MO 2-2301-4 has dual indication MO 2-2301-5 valve did not close Isolation was manually completed by closing the 2
SRRS: 3D.105 (when utilized for operator initial or continuing training)
-2301-5 valve, the 2
 
-2301-4 still has dual indication
TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ-JA-150-02 Comment STEP                   ELEMENT                                 STANDARD                 SAT   UNSAT Number
___         ___         ___ Cue Acknowledge report as the Unit Supervisor END   JPM Stop Time:
: 8. Informs Unit Supervisor                   Informs Unit Supervisor
* HPCI Isolation signal received while initiating system
* MO 2-2301-4 has dual indication
* MO 2-2301-5 valve did not close
* Isolation was manually completed by closing the 2-2301-5 valve, the 2-2301-4 still has dual indication     ___   ___     ___
Cue     Acknowledge report as the Unit Supervisor END JPM Stop Time:
SRRS: 3D.105 (when utilized for operator initial or continuing training)


TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ-JA-150-02 JPM  
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                               Emp. ID#: ____________
:       Emp. ID#: ____________
Job Title:           SRO JPM Title: Initiate HPCI with Incomplete Group IV Isolation JPM Number: S-N-b                                   Revision Number: 01 Task Number and Title: 206L022, Perform a fast startup of the HPCI system K/A Number and Importance: 206000.A3.09                           4.2 / 4.1 Suggested Testing Environment: Simulator Alternate Path:     Yes       No     SRO Only:         Yes         No     Time Critical:   Yes     No Reference(s): DOA 2300-02, Rev 11, DAN 902(3)-3 C-7 Rev. 14 Actual Testing Environment:             Simulator             Control Room         In-Plant       Other Testing Method:           Simulate             Perform Estimated Time to Complete: 10 minutes                         Actual Time Used:             minutes EVALUATION  
Job Title: SRO JPM Title:   Initiate HPCI with Incomplete Group IV Isolation JPM Number
: S-N-b Revision Number
: 0 1 Task Number and Title
: 206L022 , Perform a fast startup of the HPCI system K/A Number and Importance
:   206000.A3.09 4.2 / 4.1 Suggested Testing Environment
:   Simulator Alternate Path
: Yes No SRO Only: Yes No Time Critical
: Yes No Reference(s)
: DOA 2300-02, Rev 11, DAN 902(3)
-3 C-7 Rev. 14 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
1 0  minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?                     Yes             No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory     Unsatisfactory Comments:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Name (Print):
Satisfactory Unsatisfactory Comments:                     Evaluator's Name (Print):   Evaluator's Signature
Evaluators Signature:                                                       Date:
:   Date:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ
 
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS
: 1. You are the Unit 2 NSO.
: 1. You are the Unit 2 NSO.
: 2. A transient has occurred resulting in lowering RPV level.
: 2. A transient has occurred resulting in lowering RPV level.
: 3. NO HPCI initiation signal is present.
: 3. NO HPCI initiation signal is present.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to inject with HPCI to raise RPV level and maintain RPV level between +8" and +48".
: 1. The Unit Supervisor has directed you to inject with HPCI to raise RPV level and maintain RPV level between +8 and +48.
: 2. Hard card use IS authorized.
: 2. Hard card use IS authorized.
: 3. An additional NSO has been tasked with starting HPCI room cooler, SBGT, and Torus Cooling
: 3. An additional NSO has been tasked with starting HPCI room cooler, SBGT, and Torus Cooling.
. 4. Inform the Unit Supervisor when the task is complete
: 4. Inform the Unit Supervisor when the task is complete.
.
SRRS: 3D.100; There are no retention requirements for this section
TQ-AA-150-J020 Revision 00 Page 1 of 10 This replaced TQ
 
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
TQ-AA-150-J020 Revision 00 Page 1 of 10 This replaced TQ-JA-150-02 Job Performance Measure MSIV Closure Scram and Isolation Circuit Functional Test JPM Number: S-N-c Revision Number: 00 Date: 11 / 29 / 2016 Developed By:
Job Performance Measure MSIV Closure Scram and Isolation Circuit Functional Test JPM Number:
Exam Author                  Date Approved By:
S-N-c Revision Number: 00 Date: 11 / 29 / 20 16 
Facility Representative          Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
 
TQ-AA-150-J020 Revision 00 Page 2 of 10 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
________    1. Task description and number, JPM description and number are identified.
________    2. Knowledge and Abilities (K/A) references are included.
________    3. Performance location specified. (in-plant, control room, simulator, or other)
________    4. Initial setup conditions are identified.
________    5. Initiating cue (and terminating cue if required) are properly identified.
________    6. Task standards identified and verified by SME review.
________    7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________    8. If an alternate path is used, the task standard contains criteria for successful completion.
________    9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOS 0500-08                Rev: 45 Procedure                            Rev:
Procedure                            Rev:
________    10. Verify cues both verbal and visual are free of conflict.
________    11. Verify performance time is accurate
________    12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________    13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                              Date SME / Instructor                              Date SME / Instructor                              Date SRRS: 3D.100; There are no retention requirements for this section
 
TQ-AA-150-J020 Revision 00 Page 3 of 10 This replaced TQ-JA-150-02 Revision Record (Summary)
Revision 00:      Developed for 2016-302 NRC Exam SRRS: 3D.100; There are no retention requirements for this section
 
TQ-AA-150-J020 Revision 00 Page 4 of 10 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to IC 50 NOTE:    It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. {Delete this NOTE if not applicable.}
: 2. This completes the setup for this JPM.
SRRS: 3D.100; There are no retention requirements for this section


Developed By:
TQ-AA-150-J020 Revision 00 Page 5 of 10 This replaced TQ-JA-150-02 INITIAL CONDITIONS
Exam Author Date  Approved By:
: 1. Engineering requests that testing the D Main Steam Line Isolation Valves (MSIVs) be performed.
Facility Representative Date TQ-AA-150-J020 Revision 00 Page 2 of 10 This replaced TQ
: 2. Operators are stationed at the 902-15 & 17 panels.
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOS 0500-08  Rev: 4 5 Procedure Rev:  Procedure Rev:  ________ 10. Verify cues both verbal and visual are free of conflict.
________ 11. Verify performance time is accurate
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date        SME / Instructor Date        SME / Instructor Date TQ-AA-150-J020 Revision 00 Page 3 of 10 This replaced TQ
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section Revision Record (Summary)
Revision 00:
Developed for 2016-302 NRC Exam TQ-AA-150-J020 Revision 00 Page 4 of 10 This replaced TQ
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to IC 50  NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. {Delete this NOTE if not applicable.}
: 2. This completes the setup for this JP M.
TQ-AA-150-J020 Revision 00 Page 5 of 10 This replaced TQ
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
: 1. Engineering requests that testing the 'D' Main Steam Line Isolation Valves (MSIVs) be performed.
: 2. Operators are stationed at the 902
-15 & 17 panels.
: 3. Prerequisites have been completed.
: 3. Prerequisites have been completed.
: 4. No compensatory actions are in place for TS 3.3.1.1 5. Test switches SS1 and SS2 are NOT installed.
: 4. No compensatory actions are in place for TS 3.3.1.1
: 5. Test switches SS1 and SS2 are NOT installed.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor directs you to perform DOS 0500
: 1. The Unit Supervisor directs you to perform DOS 0500-08, Main Steam Line Isolation Valve Closure Scram Circuit Functional Test, for the D MSIVs ONLY.
-08, Main Steam Line Isolation Valve Closure Scram Circuit Functional Test, for the  
'D' MSIVs ONLY.
 
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
 
Information For Evaluators Use:
Information For Evaluator's Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.100; There are no retention requirements for this section


TQ-AA-150-J020 Revision 00 Page 6 of 10 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 6 of 10 This replaced TQ-JA-150-02 JPM Start Time:
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
UNSAT  Comment #
JPM Start Time:
PERFORMANCE CHECKLIST                               STANDARDS                 SAT NOTE Examinee MAY validate with assigned operators at the 902-15&17 panels that they are ready.
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment # NOTE Examinee MAY validate with assigned operators at the 902
01       Inform operators at 902-15 & 17       Informs operators at 902-15 &
-15&17 panels that they are ready.
to watch relays 590-102G and          17 to watch relays 590-102G 590-102H.                            and 590-102H.                       _____   _____   _____
01 Inform operators at 902
CUE Acknowledge direction and inform the examinee we are ready.
-15 & 17 to watch relays 590
NOTE If Examinee requests a peer check, respond - a peer check is not available.
-102 G and 590-10 2H. Informs operators at 902
-15 & 17 to watch relays 590-102G and 590-102H. _____     _____   _____
CUE Acknowledge direction and inform the examinee "we are ready".
NOTE If Examinee requests a peer check, respond  
- "a peer check is not available.
Examinee may use flagging to identify components to be manipulated.
Examinee may use flagging to identify components to be manipulated.
   *02 Test MS IV 203-1 D by momentarily placing MSIV TEST AO 2-203-1 D switch to TEST on Panel 902(3)
   *02     Test MSIV 203-1D by                   Momentarily rotates MSIV TEST momentarily placing MSIV TEST         AO 2-203-1D switch to TEST on AO 2-203-1D switch to TEST on         Panel 902-3.
-3 Momentarily rotates MSIV TEST AO 2-203-1 D switch to TEST on Panel 902-3. _____     _____   _____
Panel 902(3)-3                                                            _____   _____   _____
03 Verifies MSIV 1 D slow closes until the dual indication is received, THEN returns to the full open position.
03       Verifies MSIV 1D slow closes         Dual indication is received, until the dual indication is         THEN returns to the full open received, THEN returns to the         position. (CLOSE light OFF, full open position.                  OPEN light ON)                     _____   _____   _____
Dual indication is received, THEN returns to the full open position. (CLOSE light OFF, OPEN light ON)
04       Verify MSIV NOT FULL OPEN             Contacts operator watching relay 590-102G drops out.             relay 590-102G for its operation. _____   _____   _____
_____     _____   _____
05       Verify MSIV NOT FULL OPEN             Contacts operator watching relay 590-102G picks up.             relay 590-102G for its operation. _____   _____   _____
04 Verify MSIV NOT FULL OPEN relay 590-102G drops out. Contacts operator watching relay 590-102G for its operation.
CUE Report that relay 590-102G dropped out with contacts 1-2 AND 3-4 opening, then the relay picked up 06       Verify MSIV NOT FULL OPEN             Contacts operator watching relay 590-102H drops out.             relay 590-102H for its operation. _____   _____   _____
_____     _____   _____
07       Verify MSIV NOT FULL OPEN             Contacts operator watching relay 590-102H picks up.             relay 590-102H for its operation. _____   _____   _____
05 Verify MSIV NOT FULL OPEN relay 590-102G picks up. Contacts operator watching relay 590-102G for its operation.
CUE Report that relay 590-102H dropped out with contacts 1-2 AND 3-4 opening, then the relay picked up 08       On Panel 902(3)-5, annunciator       Verifies on Panel 902-5, 902(3)-5 D-14 does NOT alarm.         annunciator 902-5 D-14 does NOT alarm.
_____     _____   _____
_____   _____   _____
CUE Report that "relay 590
SRRS: 3D.105 (when utilized for operator initial or continuing training)
-102G dropped out with contacts 1-2 AND 3-4 opening, then the relay picked up" 06 Verify MSIV NOT FULL OPEN relay 590-102H drops out. Contacts operator watching relay 590-102H for its operation.
_____     _____   _____
07 Verify MSIV NOT FULL OPEN relay 590-102H picks up. Contacts operator watching relay 590-102H for its operation.
_____     _____   _____
CUE Report that "relay 590-102H dropped out with contacts 1
-2 AND 3-4 opening, then the relay picked up" 08 On Panel 902(3)
-5, annunciator 902(3)-5 D-14 does NOT alarm. Verifies on Panel 902
-5, annunciator 902
-5 D-14 does NOT alarm.
_____     _____   _____


TQ-AA-150-J020 Revision 00 Page 7 of 10 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 7 of 10 This replaced TQ-JA-150-02 UNSAT  Comment #
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
PERFORMANCE CHECKLIST                               STANDARDS               SAT CUE Annunciator 902-5 D-14 did NOT alarm.
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment # CUE Annunciator 902
09     MSIV C NOT FULL OPEN                   Verifies MSIV C NOT FULL computer point W010 does NOT           OPEN computer point W010 indicate TRIP.                         does NOT indicate TRIP.             _____   _____   _____
-5 D-14 did NOT alarm.
CUE Computer point W010 does NOT indicate TRIP.
09 MSIV C NOT FULL OPEN computer point W010 does NOT indicate TRIP.
10     MSIV D NOT FULL OPEN                   Verifies MSIV D NOT FULL computer point W011 does NOT           OPEN computer point W011 indicate TRIP.                          does NOT indicate TRIP.             _____   _____   _____
Verifies MSIV C NOT FULL OPEN computer point W0 10 does NOT indicate TRIP.
_____     _____   _____
CUE Computer point W0 10 does NOT indicate TRIP.
10 MSIV D NOT FULL OPEN computer point W011 does NOT indicate TRIP.
Verifies MSIV D NOT FULL OPEN computer point W011 does NOT indicate TRIP.
_____     _____   _____
CUE Computer point W011 does NOT indicate TRIP.
CUE Computer point W011 does NOT indicate TRIP.
NOTE Examinee MAY inform the operators at the 902
NOTE Examinee MAY inform the operators at the 902-15&17 panels that they are ready.
-15&17 panels that they are ready.
11     Inform operators at 902-15 & 17         Inform operators at 902-15 & 17 to watch relays 590-102G and           to watch relays 590-102G and 590-102H.                              590-102H.                           _____   _____   _____
11 Inform operators at 902
CUE Acknowledge direction and inform the examinee we are ready.
-15 & 17 to watch relays 590-102G and 590-102H. Inform operators at 902
   *12   Test MSIV 203-2D by                     Momentarily rotates MSIV TEST momentarily placing MSIV TEST           AO 2-203-2D switch to TEST on AO 2-203-2D switch to TEST on           Panel 902-3.
-15 & 17 to watch relays 590-102G and 590-102H. _____     _____   _____
Panel 902(3)-3                                                              _____   _____   _____
CUE Acknowledge direction and inform the examinee "we are ready".
13     Verifies MSIV 2D slow closes           Dual indication is received, until the dual indication is           THEN returns to the full open received, THEN returns to the           position. (CLOSE light OFF, full open position.                    OPEN light ON)                     _____   _____   _____
   *12 Test MSIV 203
14     Verify MSIV NOT FULL OPEN               Contacts operator watching relay 590-102G drops out.               relay 590-102G for its operation. _____   _____   _____
-2D by momentarily placing MSIV TEST AO 2-203-2 D switch to TEST on Panel 902(3)
15     Verify MSIV NOT FULL OPEN               Contacts operator watching relay 590-102G picks up.               relay 590-102G for its operation. _____   _____   _____
-3 Momentarily rotates MSIV TEST AO 2-203-2 D switch to TEST on Panel 902-3. _____     _____   _____
CUE Report that relay 590-102G dropped out, then the relay picked up SRRS: 3D.105 (when utilized for operator initial or continuing training)
13 Verifies MSIV 2 D slow closes until the dual indication is received, THEN returns to the full open position.
Dual indication is received, THEN returns to the full open position. (CLOSE light OFF, OPEN light ON)
_____     _____   _____
14 Verify MSIV NOT FULL OPEN relay 590-102G drops out.
Contacts operator watching relay 590-102G for its operation.
_____     _____   _____
15 Verify MSIV NOT FULL OPEN relay 590-102G picks up. Contacts operator watching relay 590-102G for its operation.
_____     _____   _____
CUE Report that "relay 590-102G dropped out, then the relay picked up"


TQ-AA-150-J020 Revision 00 Page 8 of 10 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 8 of 10 This replaced TQ-JA-150-02 UNSAT  Comment #
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
PERFORMANCE CHECKLIST                               STANDARDS               SAT 16     Verify MSIV NOT FULL OPEN               Contacts operator watching relay 590-102H drops out.               relay 590-102H for its operation. _____   _____   _____
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment # 16 Verify MSIV NOT FULL OPEN relay 590-102H drops out.
17     Verify MSIV NOT FULL OPEN               Contacts operator watching relay 590-102H picks up.               relay 590-102H for its operation. _____   _____   _____
Contacts operator watching relay 590-102H for its operation.
CUE Report that relay 590-102H dropped out, then the relay picked up 18     On Panel 902(3)-5, ALL white           Verifies on Panel 902-5, SCRAM SCRAM SOLENOID GROUPS                  SOLENOID GROUP lights are lights are lit.                        illuminated: A1, A2, A3, A4, B1, B2, B3, B4.                         _____   _____   _____
_____     _____   _____
17 Verify MSIV NOT FULL OPEN relay 590-102H picks up. Contacts operator watching relay 590-102H for its operation.
_____     _____   _____
CUE Report that "relay 590-102H dropped out, then the relay picked up" 18 On Panel 902(3)
-5, ALL white SCRAM SOLENOID GROUPS lights are lit.
Verifies on Panel 902
-5, SCRAM SOLENOID GROUP lights are illuminated: A1, A2, A3, A4, B1, B2, B3, B4.
_____     _____   _____
END OF JPM JPM Stop Time:
END OF JPM JPM Stop Time:
SRRS: 3D.105 (when utilized for operator initial or continuing training)


TQ-AA-150-J020 Revision 00 Page 9 of 10 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 9 of 10 This replaced TQ-JA-150-02 JPM  
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Emp. ID#: ____________
:   Emp. ID#: ____________
Job Title:     SRO JPM Title: MSIV Closure Scram and Isolation Circuit Functional Test JPM Number: S-N-c                                   Revision Number: 00 Task Number and Title: 239000LP012 / Perform a MSIV closure scram and isolation circuit functional test in accordance with DOS 0500-08 K/A Number and Importance: 239001.A4.01 4.2/4.0 Suggested Testing Environment: Simulator Alternate Path:     Yes       No SRO Only:               Yes         No Time Critical: Yes       No Reference(s): DOS 0500-08 Rev. 45 Actual Testing Environment:             Simulator             Control Room       In-Plant     Other Testing Method:           Simulate             Perform Estimated Time to Complete: 15 minutes                         Actual Time Used:         minutes EVALUATION  
Job Title: SRO JPM Title:
MSIV Closure Scram and Isolation Circuit Functional Test JPM Number:
S-N-c Revision Number:
00 Task Number and Title:
239 000LP012 / Perform a MSIV closure scram and isolation circuit functional test in accordance with DOS 0500
-08 K/A Number and Importance:
239001.A4.01   4.2/4.0 Suggested Testing Environment:
Simulator Alternate Path:
Yes No SRO Only: Yes  No Time Critical:
Yes No Reference(s):
DOS 0500-08 Rev. 45 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
1 5 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?                   Yes             No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                   Satisfactory   Unsatisfactory Comments:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Name (Print):
Satisfactory Unsatisfactory Comments:                     Evaluator's Name (Print):   Evaluator's Signature
Evaluators Signature:                                                     Date:
:   Date:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
TQ-AA-150-J020 Revision 00 Page 10 of 10 This replaced TQ
 
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
TQ-AA-150-J020 Revision 00 Page 10 of 10 This replaced TQ-JA-150-02 INITIAL CONDITIONS
: 1. Engineering requests that testing the 'D' Main Steam Line Isolation Valves (MSIVs) be performed.
: 1. Engineering requests that testing the D Main Steam Line Isolation Valves (MSIVs) be performed.
: 2. Operators are stationed at the 902
: 2. Operators are stationed at the 902-15 & 17 panels.
-15 & 17 panels.
: 3. Prerequisites have been completed.
: 3. Prerequisites have been completed.
: 4. No compensatory actions are in place for TS 3.3.1.1
: 4. No compensatory actions are in place for TS 3.3.1.1
: 5. Test switches SS1 and SS2 are NOT installed.
: 5. Test switches SS1 and SS2 are NOT installed.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor directs you to perform DOS 0500
: 1. The Unit Supervisor directs you to perform DOS 0500-08, Main Steam Line Isolation Valve Closure Scram Circuit Functional Test, for the D MSIVs ONLY.
-08, Main Steam Line Isolation Valve Closure Scram Circuit Functional Test, for the  
SRRS: 3D.100; There are no retention requirements for this section
'D' MSIVs ONLY.


TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 Job Performance Measure Initiate IC with System Isolation Failure (AP)
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM Number: S-N-d Revision Number: 00 Date: 11 / 30 / 2016 Developed By:
Job Performance Measure Initiate IC with System Isolation Failure (AP)   JPM Number:
Exam Author                  Date Approved By:
S-N-d Revision Number:
Facility Representative          Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
0 0  Date: 11 / 30 / 20 16 


Developed By:
TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Exam Author Date  Approved By:
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
Facility Representative Date TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ
________     1. Task description and number, JPM description and number are identified.
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
________     2. Knowledge and Abilities (K/A) references are included.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.
________     3. Performance location specified. (in-plant, control room, simulator, or other)
________ 2. Knowledge and Abilities (K/A) references are included.
________     4. Initial setup conditions are identified.
________ 3. Performance location specified. (in
________     5. Initiating cue (and terminating cue if required) are properly identified.
-plant, control room, simulator, or other)
________     6. Task standards identified and verified by SME review.
________ 4. Initial setup conditions are identified.
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________     8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 6. Task standards identified and verified by SME review.
________     9. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
Procedure DOP 1300-03               Rev: 38 Procedure DAN 902(3)-3 H-2 Rev: 21 Procedure                           Rev:
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
________     10. Verify cues both verbal and visual are free of conflict.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
________     11. Verify performance time is accurate
Procedure DOP 1300-03 Rev: 38 Procedure DAN 902(3)
________     12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
-3 H-2 Rev: 21 Procedure Rev:   ________ 10. Verify cues both verbal and visual are free of conflict.
________     13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
________ 11. Verify performance time is accurate
SME / Instructor                               Date SME / Instructor                               Date SME / Instructor                               Date SRRS: 3D.100; There are no retention requirements for this section
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
 
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ-JA-150-02 Revision Record (Summary)
SME / Instructor Date       SME / Instructor Date       SME / Instructor Date TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ
Revision 00:      Generated for 2016-302 NRC Exam SRRS: 3D.100; There are no retention requirements for this section
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section Revision Record (Summary)
 
Revision 0 0: Generated for 2016-302 NRC Exam TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to IC 50 NOTE:     It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. {Delete this NOTE if not applicable.}
: 1. Reset the simulator to IC 50 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. {Delete this NOTE if not applicable.}
: 2. Insert Expert Commands:
: 2. Insert Expert Commands:
# Incomplete Group V Isolation imf cigp5ap
      # Incomplete Group V Isolation imf cigp5ap
  # Causes a spurious Group V Isolation by taking out 125 VDC 2B
      # Causes a spurious Group V Isolation by taking out 125 VDC 2B-1 trgset 1 ".not. hwiclcl3" imf t61 (1 20)
-1 trgset 1 ".not. hwiclcl3" imf t61 (1 20)
: 3. This completes the setup for this JPM.
: 3. This completes the setup for this JPM.
SRRS: 3D.100; There are no retention requirements for this section


TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
: 1. You are the Unit 2 NSO.
: 1. You are the Unit 2 NSO.
: 2. A transient occurred resulting in the loss of bypass valves.
: 2. A transient occurred resulting in the loss of bypass valves.
: 3. The Unit Supervisor has directed a RPV pressure band of 800  
: 3. The Unit Supervisor has directed a RPV pressure band of 800 - 1060 psig.
- 1060 psig. 4. No Isolation Condenser auto
: 4. No Isolation Condenser auto-initiation signal has been received.
-initiation signal has been received.
: 5. Hard Card use has been authorized.
: 5. Hard Card use has been authorized
INITIATING CUE
. INITIATING CUE
: 1. The Unit Supervisor has directed you to initiate the Isolation Condenser and lower RPV pressure between 800 and 850 psig.
: 1. The Unit Supervisor has directed you to initiate the Isolation Condenser and lower RPV pressure between 800 and 850 psig. 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
 
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
***NOTE: Simulator conditions do not match plant conditions as specified in initial conditions. Main Turbine bypass valves are open in simulator setup. This does not effect the performance of the JPM****
***NOTE: Simulator conditions do not match plant conditions as specified in initial conditions.
Main Turbine bypass valves are open in simulator setup. This does not effect the performance of the JPM****
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.100; There are no retention requirements for this section
TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ-JA-150-02 JPM Start Time:
Comment STEP                    ELEMENT                                  STANDARD                  SAT  UNSAT Number NOTE:
When the candidate locates the DOP 1300-03 Hard Card located on the 902-3 panel, hand the candidate the included copy of the Hard Card.
01      Close AO 2-1301-17 and 2-1301-            Place control switch for AO 2-        ___  ___    ___
20 valves.                                1301-17 and 2-1301-20 valves in the closed direction. Observe GREEN lights (Open) extinguish and RED lights (Closed) illuminate.
02      Rotate RX INLET ISOL VLV                  Rotates RX INLET ISOL VLV            ___  ___    ___
HAND/RESET switch to HAND                  HAND/RESET switch on 902-3 and release.                              panel to HAND and releases.
  *03    Open MO 2-1301-3 RX INLET                  Places control switch for MO 2-      ___  ___    ___
ISOL valve to lower RPV                    1301-3 valve in the open pressure.                                  position. Observes GREEN (closed) light extinguish and RED (open) light illuminate.
BEGIN ALTERNATE PATH NOTE:
If candidate attempts to address annunciators beyond the 902-3 Panel inform them: Another NSO will address the annunciators beyond the 902-3 Panel.
04      Determines PCIS Group V                    Annunciator 902-3 H-2, ISOL          ___  ___    ___
isolation signal has been                  CONDR LINE BREAK (GROUP received.                                  5 ISOL) is illuminated.
  *05    Determines MO 2-1301-1 failed              Places control switch for MO 2-      ___  ___    ___
to close                                  1301-1 to close. Verifies RED (closed) light illuminates and GREEN (open) light extinguishes.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ-JA-150-02 Comment STEP                   ELEMENT                                 STANDARD               SAT   UNSAT Number
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
  *06    Determines MO 2-1301-4 failed             Places control switch for MO 2-     ___   ___     ___
JPM Start Time:
to close                                   1301-4 to close. Verifies RED (closed) light illuminates and GREEN (open) light extinguishes.
STEP ELEMENT STANDARD SAT UNSAT Comment Number NOTE: When the candidate locates the DOP 1300
07     Verifies PCIS Group V isolation           Verifies the following valves       ___  ___    ___
-03 Hard Card located on the 902
completed                                  closed:
-3 panel, hand the candidate the included copy of the Hard Card.
AO 2-1301-17 (Red light lit)
01 Close AO 2-1301-17 and 2-1301-20 valves.
Place control switch for AO 2
-1301-17 and 2-1301-20 valves in the closed direction. Observe GREEN lights (Open) extinguish and RED lights (Closed) illuminate
. ___ ___ ___ 02 Rotate RX INLET ISOL VLV HAND/RESET switch to HAND and release
. Rotates RX INLET ISOL VLV HAND/RESET switch on 902
-3 panel to HAND and releases.
___ ___ ___ *03 Open MO 2-1301-3 RX INLET ISOL valve to lower RPV pressure. Places control switch for MO 2
-
1301-3 valve in the open position. Observes GREEN (closed) light extinguish and RED (open) light illuminate.
___ ___ ___ BEGIN ALTERNATE PATH NOTE: If candidate attempts to address annunciators beyond the 902
-3 Panel inform them: Another NSO will address the annunciators beyond the 902
-3 Panel. 04 Determines PCIS Group V isolation signal has been received. Annunciator 902
-3 H-2, ISOL CONDR LINE BREAK (GROUP 5 ISOL) is illuminated.
___ ___ ___ *05 Determines MO 2
-1301-1 failed to close  Places control switch for MO 2
-
1301-1 to close. Verifies RED (closed) light illuminates and GREEN (open) light extinguishes.
___ ___ ___
TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ
-JA-150-02  SRRS: 3D.105 (when utilized for operator initial or continuing training)
STEP ELEMENT STANDARD SAT UNSAT Comment Number *06 Determines MO 2
-1301-4 failed to close Places control switch for MO 2
-1301-4 to close. Verifies RED (closed) light illuminates and GREEN (open) light extinguishes.
___ ___ ___ 07 Verifies PCIS Group V isolation completed Verifies the following valves closed: AO 2-1301-17 (Red light lit)
AO 2-1301-20 (Red light lit)
AO 2-1301-20 (Red light lit)
MO 2-1301-2 (Red light lit)
MO 2-1301-2 (Red light lit)
MO 2-1301-3 (Green light lit)
MO 2-1301-3 (Green light lit) 08     Informs Unit Supervisor                   Informs Unit Supervisor PCIS       ___  ___    ___
___ ___ ___ 08 Informs Unit Supervisor Informs Unit Supervisor PCIS signal failed to complete isolation of Isolation Condenser. Manual action was taken to complete the isolation.
signal failed to complete isolation of Isolation Condenser.
___ ___ ___ END OF JPM   JPM Stop Time:
Manual action was taken to complete the isolation.
END OF JPM JPM Stop Time:
SRRS: 3D.105 (when utilized for operator initial or continuing training)


TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ-JA-150-02 JPM  
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Emp. ID#: ____________
:   Emp. ID#: ____________
Job Title:     SRO JPM Title: Initiate IC with System Isolation Failure JPM Number: S-N-d                                   Revision Number: 00 Task Number and Title: 20700LP003 Given plant conditions which result in an automatic initiation of the IC, secure the IC with the initiation signal still present per DOP 1300-02.
Job Title:   SRO JPM Title:
K/A Number and Importance: 207000.A4.A4.01 3.1/3.0 Suggested Testing Environment: Simulator Alternate Path:       Yes     No SRO Only:               Yes         No Time Critical: Yes       No Reference(s): DOP 1300-03 Rev. 38, DAN 902(3)-3 H-2 Rev. 21 Actual Testing Environment:             Simulator             Control Room       In-Plant     Other Testing Method:           Simulate           Perform Estimated Time to Complete: 9 minutes                         Actual Time Used:         minutes EVALUATION  
Initiate IC with System Isolation Failure JPM Number:
S-N-d Revision Number:
00 Task Number and Title:
20700LP003 Given plant conditions which result in an automatic initiation of the IC, secure the IC with the initiation signal still present per DOP 1300
-02. K/A Number and Importance:
207000.A4.A4.01     3.1/3.0 Suggested Testing Environment:
Simulator Alternate Path:
Yes No SRO Only: Yes  No Time Critical:
Yes No Reference(s):
DOP 1300-03 Rev. 38, DAN 902(3)
-3 H-2 Rev. 21 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
9 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?                   Yes             No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                   Satisfactory   Unsatisfactory Comments:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Name (Print):
Satisfactory Unsatisfactory Comments:                     Evaluator's Name (Print):   Evaluator's Signature
Evaluators Signature:                                                     Date:
:   Date:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ
 
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS
: 1. You are the Unit 2 NSO.
: 1. You are the Unit 2 NSO.
: 2. A transient occurred resulting in the loss of bypass valves.
: 2. A transient occurred resulting in the loss of bypass valves.
: 3. The Unit Supervisor has directed a RPV pressure band of 800  
: 3. The Unit Supervisor has directed a RPV pressure band of 800 - 1060 psig.
- 1060 psig. 4. No Isolation Condenser auto
: 4. No Isolation Condenser auto-initiation signal has been received.
-initiation signal has been received.
: 5. Hard Card use has been authorized.
: 5. Hard Card use has been authorized.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to initiate the Isolation Condenser and lower RPV pressure between 800 and 850 psig.
: 1. The Unit Supervisor has directed you to initiate the Isolation Condenser and lower RPV pressure between 800 and 850 psig.
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
SRRS: 3D.100; There are no retention requirements for this section


TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 Job Performance Measure CONTAINMENT - VENT THE TORUS WITH LEVEL LESS THAN 30 FEET -
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
(AP)
Job Performance Measure CONTAINMENT  
JPM Number: S-N-e Revision Number: 07 Date: 11 / 29 / 2016 Developed By:
- VENT THE TORUS WITH LEVEL LESS THAN 30 FEET  
Exam Author                  Date Approved By:
- (AP) JPM Number:
Facility Representative          Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-e Revision Number:
0 7  Date: 11 / 2 9 / 20 1 6 


Developed By:
TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Exam Author Date  Approved By:
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
Facility Representative Date TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ
________     1. Task description and number, JPM description and number are identified.
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
________     2. Knowledge and Abilities (K/A) references are included.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.
________     3. Performance location specified. (in-plant, control room, simulator, or other)
________ 2. Knowledge and Abilities (K/A) references are included.
________     4. Initial setup conditions are identified.
________ 3. Performance location specified. (in
________     5. Initiating cue (and terminating cue if required) are properly identified.
-plant, control room, simulator, or other)
________     6. Task standards identified and verified by SME review.
________ 4. Initial setup conditions are identified.
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________     8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 6. Task standards identified and verified by SME review.
________     9. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
Procedure DEOP 0500-04               Rev: 17 Procedure                           Rev:
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
Procedure                           Rev:
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
________     10. Verify cues both verbal and visual are free of conflict.
Procedure D EOP 0500-04 Rev: 17 Procedure Rev:   Procedure Rev:   ________ 10. Verify cues both verbal and visual are free of conflict.
________     11. Verify performance time is accurate
________ 11. Verify performance time is accurate
________     12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________     13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                               Date SME / Instructor                               Date SME / Instructor                               Date SRRS: 3D.100; There are no retention requirements for this section
SME / Instructor Date       SME / Instructor Date       SME / Instructor Date TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section Revision Record (Summary)
Revision 0 4 Bank JPM. Revision 0 5 Revised for 2010 NRC exam.
Revision 0 6 Revised for 201 4 NRC exam. Revision 07 Revised for 2016
-302 NRC Exam.


TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ-JA-150-02 Revision Record (Summary)
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section SIMULATOR SETUP INSTRUCTIONS
Revision 04 Bank JPM.
: 1. Reset the simulator to an IC with the mode switch NOT in run, so that the proper alarms and interlocks will work
Revision 05 Revised for 2010 NRC exam.
. IC 51 used for validation.
Revision 06 Revised for 2014 NRC exam.
Revision 07 Revised for 2016-302 NRC Exam.
SRRS: 3D.100; There are no retention requirements for this section
 
TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to an IC with the mode switch NOT in run, so that the proper alarms and interlocks will work. IC 51 used for validation.
: 2. Ensure Torus water level is <30 feet.
: 2. Ensure Torus water level is <30 feet.
: 3. Insert following Malfunctions and/or Remotes.
: 3. Insert following Malfunctions and/or Remotes.
IMF CIGP2I (Spurious Group II Isolation)
* IMF CIGP2I (Spurious Group II Isolation)
IOR PCDOP61 OFF (prevents the 1601
* IOR PCDOP61 OFF (prevents the 1601-61 valve from opening)
-61 valve from opening)
* Adjusts Torus Level indications to ~20 feet.
Adjusts Torus Level indications to ~20 feet.
ior atl10 25.0 ior pcltr10a 20 ior pcltr10b 20
ior atl10 25.0 ior pcltr10a 20 ior pcltr10b 20 ior pcptr103 58.0 (Adjusts Torus Bottom Pressure to 58.0 psig)
* ior pcptr103 58.0 (Adjusts Torus Bottom Pressure to 58.0 psig)
Pulls ECCS Initiation Logic fuses so when Drywell pressure is forced high, NO ECCS starts.
* Pulls ECCS Initiation Logic fuses so when Drywell pressure is forced high, NO ECCS starts.
irf lp1aaf1f pulled irf lp701af pulled irf lp1aaf2f pulled irf lp701bf pulled irf csalgoff pulled irf csblgoff pulled irf hp2a1f1 pulled irf hp2b1f1 pulled Adjusts Drywell & Torus pressures to 50.0 psig.
irf lp1aaf1f pulled irf lp701af pulled irf lp1aaf2f pulled irf lp701bf pulled irf csalgoff pulled irf csblgoff pulled irf hp2a1f1 pulled irf hp2b1f1 pulled
* Adjusts Drywell & Torus pressures to 50.0 psig.
ior pcp8524 50.0 ior pcpdw102 50.0 ior pcp85401 5.0l ior pcptr1 5.0
ior pcp8524 50.0 ior pcpdw102 50.0 ior pcp85401 5.0l ior pcptr1 5.0
: 4. Verify the SBGT system operating and verify flow ~4000 scfm.
: 4. Verify the SBGT system operating and verify flow ~4000 scfm.
: 5. Place CRM ISOL switch to ISOLATE  
: 5. Place CRM ISOL switch to ISOLATE - wait 10 seconds then verify a C/R Booster Fan is running.
- wait 10 seconds then verify a C/R Booster Fan is running.
: 6. Cover DW pressure indications on 902-3 and 902-5 panel.
: 6. Cover DW pressure indications on 902
DOCUMENT PREPARATION Markup a copy of DEOP 0500-04, Containment Venting.
-3 and 902-5 panel. DOCUMENT PREPARATION Markup a copy of DEOP 0 500-04 , Containment Venting
SRRS: 3D.100; There are no retention requirements for this section
.
 
TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
: 1. You are the Aux 2 NSO.
: 1. You are the Aux 2 NSO. 2. A break inside the Unit 2 Primary Containment has occurred.
: 2. A break inside the Unit 2 Primary Containment has occurred.
: 3. Torus bottom pressure is about to exceed the P CP limit in DEOP 0200-01. 4. Torus water level is 20 feet. 5. Control Room ventilation has been isolated.
: 3. Torus bottom pressure is about to exceed the PCP limit in DEOP 0200-01.
: 4. Torus water level is 20 feet.
: 5. Control Room ventilation has been isolated.
: 6. Reactor Building and Turbine Building have been evacuated.
: 6. Reactor Building and Turbine Building have been evacuated.
: 7. The Instrument Bus and ESS Bus are energized.
: 7. The Instrument Bus and ESS Bus are energized.
Line 1,225: Line 1,061:
: 9. The N2 System is in its normal lineup.
: 9. The N2 System is in its normal lineup.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to vent the Unit 2 Primary Containment in accordance with DEOP 0500-04 , to control Primary Containment pressure.
: 1. The Unit Supervisor has directed you to vent the Unit 2 Primary Containment in accordance with DEOP 0500-04, to control Primary Containment pressure.
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
. Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.100; There are no retention requirements for this section


TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ-JA-150-02 JPM Start Time:
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Comment STEP                   ELEMENT                                 STANDARD                 SAT   UNSAT Number NOTE:
JPM Start Time:
Provide examinee the marked up copy of DEOP 0500-04.
STEP ELEMENT STANDARD SAT UNSAT Comment Number NOTE: Provide examinee the marked up copy of DEOP 0500
Annunciator 902-3 A-15, Pri Cnmt Vent/Sample Isol Bypass, will be received during this JPM.
-04. Annunciator 902
01     Verify SBGT is operating and flow         Verifies 2/3A SBGT train             ___  ___    ___
-3 A-15, Pri Cnmt Vent/Sample Isol Bypass, will be received during this JPM.
is ~ 4000 scfm.                            FI 7540-13 is reading ~4000 scfm.
01 Verify SBGT is operating and flow is ~ 4000 scfm.
02     Verify Reactor Mode switch NOT             Verifies Reactor Mode switch NOT     ___  ___    ___
Verifies 2/3A SBGT train FI 7540-13 is reading ~4000 scfm.
in RUN.                                    in RUN.
___ ___ ___ 02 Verify Reactor Mode switch NOT in RUN. Verifies Reactor Mode switch NOT in RUN. ___ ___ ___ *03 Place VENT ISOL SIGNAL BYPASS switch on 902
  *03     Place VENT ISOL SIGNAL                     Momentarily places Bypass switch    ___  ___    ___
-5 panel to TORUS. Momentarily places Bypass switch to Torus Position.
BYPASS switch on 902-5 panel to           to Torus Position.
___ ___ ___ NOTE: The AO 2-1601-61, TORUS 2
TORUS.
-INCH VENT VLV, will NOT open. 04 Open AO 2-1601-61, TORUS 2
NOTE:
-INCH VENT VLV. Places AO 2
The AO 2-1601-61, TORUS 2-INCH VENT VLV, will NOT open.
-1601-61 control switch to OPEN position and determines that the valve will not open. ___ ___ ___ NOTE: IF candidate states that the 2
04     Open AO 2-1601-61, TORUS 2-               Places AO 2-1601-61 control         ___  ___    ___
-1601-61 valve will not open, direct him/her to complete the task.
INCH VENT VLV.                            switch to OPEN position and determines that the valve will not open.
NOTE:
IF candidate states that the 2-1601-61 valve will not open, direct him/her to complete the task.
BEGIN ALTERNATE PATH
BEGIN ALTERNATE PATH
*05 Place VENT ISOL SIGNAL BYPASS switch on 902
  *05     Place VENT ISOL SIGNAL                     Momentarily places Vent Isol        ___  ___    ___
-5 panel to DRYWELL. Momentarily places Vent Isol Signal Bypass switch to Drywell position. ___ ___ ___ CUE: If examinee reads TORUS BOTTOM PRESS PI 2
BYPASS switch on 902-5 panel to           Signal Bypass switch to Drywell DRYWELL.                                  position.
-1640-103,                                                         inform him/her that the meter displays 58 psig and is trending UP slowly.
CUE:
*06 Open AO 2-1601-62, DW 2-INCH Vent.
If examinee reads TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter displays 58 psig and is trending UP slowly.
Red Open light illuminated.
  *06     Open AO 2-1601-62, DW                     Red Open light illuminated.         ___   ___     ___
___ ___ ___ *07 Open AO 2-1601-63, VENT TO SBGT. Red Open light illuminated.
2-INCH Vent.
___ ___ ___
  *07     Open AO 2-1601-63, VENT TO                 Red Open light illuminated.         ___   ___     ___
TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ
SBGT.
-JA-150-02  SRRS: 3D.105 (when utilized for operator initial or continuing training)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
STEP ELEMENT STANDARD SAT UNSAT Comment Number 08 Determine if SBGT flow is adequate to control and maintain Torus Bottom pressure below the Primary Containment Pressure Limit. Containment pressure stable or decreasing.
___ ___ ___ CUE: DW pressure is being controlled and maintained below the Primary Containment Pressure Limit.
If examinee asks reading on TORUS BOTTOM PRESS PI 2
-1640-103,                                                      inform him/her that the meter has decreased to 53 psig (5 psig less than original report).
09 Informs Unit Supervisor task is complete. Examinee notifies the Unit Supervisor.
___ ___ ___ CUE: Acknowledge report of task completion.
END  JPM Stop Time:


TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ-JA-150-02 Comment STEP                    ELEMENT                                  STANDARD                SAT  UNSAT Number 08      Determine if SBGT flow is                  Containment pressure stable or adequate to control and maintain          decreasing.
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Torus Bottom pressure below the                                              ___    ___    ___
JPM  
Primary Containment Pressure Limit.
CUE:
DW pressure is being controlled and maintained below the Primary Containment Pressure Limit.
If examinee asks reading on TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter has decreased to 53 psig (5 psig less than original report).
09      Informs Unit Supervisor task is            Examinee notifies the Unit
___    ___    ___
complete.                                  Supervisor.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
 
TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ-JA-150-02 JPM  


==SUMMARY==
==SUMMARY==


Operator's Name:   Emp. ID#: ____________
Operators Name:                                                 Emp. ID#: ____________
Job Title:   SRO JPM Title:
Job Title:   SRO JPM Title: CONTAINMENT - VENT THE TORUS WITH LEVEL LESS THAN 30 FEET JPM Number: S-N-e                                   Revision Number: 07 Task Number and Title: 295L099, Vent the primary containment to SBGT to stay below the Primary Containment Pressure Limit.
CONTAINMENT  
K/A Number and Importance: 295024.A1.14 3.4/3.5 Suggested Testing Environment: Simulator Alternate Path:     Yes       No SRO Only:               Yes         No Time Critical: Yes       No Reference(s): DEOP 0500-04 Rev. 17 Actual Testing Environment:             Simulator             Control Room       In-Plant     Other Testing Method:           Simulate             Perform Estimated Time to Complete: 17 minutes                         Actual Time Used:         minutes EVALUATION  
- VENT THE TORUS WITH LEVEL LESS THAN 30 FEET JPM Number:
S-N-e Revision Number:
0 7 Task Number and Title:
295L099, Vent the primary containment to SBGT to stay below the Primary Containment Pressure Limit.
K/A Number and Importance:
295024.A1.14     3.4/3.5 Suggested Testing Environment:
Simulator Alternate Path:
Yes No SRO Only: Yes  No Time Critical:
Yes No Reference(s):
DEOP 0500-04 Rev. 17 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
17 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?                   Yes             No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                   Satisfactory   Unsatisfactory Comments:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Name (Print):
Satisfactory Unsatisfactory Comments:                     Evaluator's Name (Print):   Evaluator's Signature
Evaluators Signature:                                                     Date:
:   Date:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ
 
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS
: 1. You are the Aux 2 NSO. 2. A break inside the Unit 2 Primary Containment has occurred.
: 1. You are the Aux 2 NSO.
: 3. Torus bottom pressure is about to exceed the P CP limit in DEOP 200
: 2. A break inside the Unit 2 Primary Containment has occurred.
-01. 4. Torus water level is 20 feet. 5. Control Room ventilation has been isolated.
: 3. Torus bottom pressure is about to exceed the PCP limit in DEOP 200-01.
: 4. Torus water level is 20 feet.
: 5. Control Room ventilation has been isolated.
: 6. Reactor Building and Turbine Building have been evacuated.
: 6. Reactor Building and Turbine Building have been evacuated.
: 7. The Instrument Bus and ESS Bus are energized.
: 7. The Instrument Bus and ESS Bus are energized.
Line 1,308: Line 1,140:
: 9. The N2 System is in its normal lineup.
: 9. The N2 System is in its normal lineup.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to vent the Unit 2 Primary Containment in accordance with DEOP 500
: 1. The Unit Supervisor has directed you to vent the Unit 2 Primary Containment in accordance with DEOP 500-04, to control Primary Containment pressure.
-04 , to control Primary Containment pressure.
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
SRRS: 3D.100; There are no retention requirements for this section
TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 Job Performance Measure RWM - PLACE A CONTROL ROD O.O.S JPM Number: S-N-f Revision Number: 02 Date: 11 / 29 / 2016 Developed By:
Exam Author                  Date Approved By:
Facility Representative          Date SRRS: 3D.105 (when utilized for operator initial or continuing training)


TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
Job Performance Measure RWM - PLACE A CONTROL ROD O.O.S JPM Number:
________    1. Task description and number, JPM description and number are identified.
S-N-f  Revision Number: 02  Date: 11 / 29 / 20 16 
________    2. Knowledge and Abilities (K/A) references are included.
________    3. Performance location specified. (in-plant, control room, simulator, or other)
________    4. Initial setup conditions are identified.
________    5. Initiating cue (and terminating cue if required) are properly identified.
________    6. Task standards identified and verified by SME review.
________    7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________    8. If an alternate path is used, the task standard contains criteria for successful completion.
________    9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOP 0400-02                Rev: 28 Procedure                            Rev:
Procedure                            Rev:
________    10. Verify cues both verbal and visual are free of conflict.
________    11. Verify performance time is accurate
________    12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________    13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                              Date SME / Instructor                              Date SME / Instructor                              Date SRRS: 3D.100; There are no retention requirements for this section


Developed By:
TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ-JA-150-02 Revision Record (Summary)
Exam Author Date  Approved By:
Revision 02:      Updated for 2016-302 NRC Exam.
Facility Representative Date TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ
SRRS: 3D.100; There are no retention requirements for this section
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOP 0400-02  Rev: 28 Procedure Rev:  Procedure Rev:  ________ 10. Verify cues both verbal and visual are free of conflict.
________ 11. Verify performance time is accurate
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date        SME / Instructor Date        SME / Instructor Date TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section Revision Record (Summary)
Revision 02:
Updated for 2016-302 NRC Exam.


TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to IC 50 NOTE:     It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. {Delete this NOTE if not applicable.}
: 1. Reset the simulator to IC 50 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. {Delete this NOTE if not applicable.}
: 2. Re- Initialize the RWM to ensure no rods are OOS
: 2. Re- Initialize the RWM to ensure no rods are OOS
: 3. Insert the following remote function (this remote disarms CRD H
: 3. Insert the following remote function (this remote disarms CRD H-08):
-08): IRF RODH08DA disarm
* IRF RODH08DA disarm
: 4. This completes the setup for this JPM.
: 4. This completes the setup for this JPM.
SRRS: 3D.100; There are no retention requirements for this section


TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
: 1. You are the Unit 2 NSO.
: 1. You are the Unit 2 NSO.
: 2. Control Rod H-08 was discovered uncoupled, 15 minutes ago
: 2. Control Rod H-08 was discovered uncoupled, 15 minutes ago.
. 3. All attempts to couple the rod have been unsuccessful.
: 3. All attempts to couple the rod have been unsuccessful.
: 4. The Control rod was then inserted to position 00, then electrically disarmed.
: 4. The Control rod was then inserted to position 00, then electrically disarmed.
: 5. QNE has been notified.
: 5. QNE has been notified.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to take rod H-08 out of service on the Rod Worth Minimizer per DOP 0400
: 1. The Unit Supervisor has directed you to take rod H-08 out of service on the Rod Worth Minimizer per DOP 0400-02.
-02. 2. Another NSO will complete DOA 0300
: 2. Another NSO will complete DOA 0300-05 actions and logging requirements once control rod H-08 is OOS.
-05 actions and logging requirements once control rod H-08 is OOS. 3. Notify the Unit Supervisor when complete.
: 3. Notify the Unit Supervisor when complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.100; There are no retention requirements for this section
TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ-JA-150-02 JPM Start Time:
Comment STEP                    ELEMENT                                  STANDARD                SAT  UNSAT Number NOTE:
Provide Examinee a copy of DOP 0400-02.
    *01  Touches the area marked                    SECONDARY FUNCTION SECONDARY FUNCTION.                        selected.                          ___    ___    ___
    *02  Selects H-08 on the rod select            CRD H-08 selected and matrix                                    illuminated on rod select matrix. ___    ___    ___
    *03  Selects control rod H-08 on the            Control Rod H-08 outlined with RWM touch screen.                          blue box and shown on screen as SELECTED.                          ___    ___    ___
04    Verifies CRD H-08 is enclosed in a        CRD H-08 is outlined with a blue blue box.                                  box and shown as selected on the screen.                            ___    ___    ___
    *05  Selects the ROD OUT OF                    Message ROD H-08 placed out SERVICE command.                          of service is displayed.          ___    ___    ___
06    Verify insert and withdraw block is        H-08 Rod position numerals are applied to CRD H-08.                      blue. Withdraw and insert block inserted for H-08.                  ___    ___    ___
07    Selects the RETURN TO                      RWM returns to the Main Display.
PRIMARY command.                                                              ___    ___    ___
NOTE:
Performer may verify the rod OOS by any of the following:
* The RWM Main Display for H-08 indicates 00 and is blue in color.
* Select rod to ensure rod in and out blocks are applied. Rod indication is backlit in blue color.
* Review status screen to verify H-08 is listed as OOS.
08    Determines no actions are                  Determines CRD H-08 is at required per G.4.h                        required position and no actions are required.                      ___    ___    ___
SRRS: 3D.105 (when utilized for operator initial or continuing training)


TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ-JA-150-02 Comment STEP                   ELEMENT                                 STANDARD               SAT   UNSAT Number 09     Verifies Control rod block has been Deselects and reselects control applied                            rod H-08. Verifies Rod is indicated in light blue and rod blocks are applied.                                 ___   ___     ___
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
CUE:
JPM Start Time:
If the candidate attempts to update the Control Rod Sequence Package (CRSP), inform them Another NSO will update the CRSP.
STEP ELEMENT STANDARD SAT UNSAT Comment Number NOTE: Provide Examinee a copy of DOP 0400
10     Informs Unit Supervisor task is           Examinee notifies the Unit complete.                                  Supervisor.                       ___   ___     ___
-02. *01 Touches the area marked SECONDARY FUNCTION.
CUE:
SECONDARY FUNCTION selected. ___ ___ ___ *02 Selects H-08 on the rod select matrix CRD H-08 selected and illuminated on rod select matrix.
Respond as Unit Supervisor and/or QNE when examinee informs you they have completed the task JPM Stop Time:
___ ___ ___ *03 Selects control rod H
SRRS: 3D.105 (when utilized for operator initial or continuing training)
-0 8 on the RWM touch screen.
Control Rod H
-0 8 outlined with blue box and shown on screen as SELECTED. ___ ___ ___ 04 Verifies CRD H
-08 is enclosed in a blue box. CRD H-08 is outlined with a blue box and shown as selected on the screen. ___ ___ ___ *05 Selects the ROD OUT OF SERVICE command. Message "ROD H
-08 placed out of service" is displayed.
___ ___ ___ 06 Verify insert and withdraw block is applied to CRD H
-08. H-0 8 Rod position numerals are blue. Withdraw and insert block inserted for H
-0 8. ___ ___ ___ 07 Selects the RETURN TO PRIMARY command.
RWM returns to the Main Display.
___ ___ ___ NOTE: Performer may verify the rod OOS by any of the following:
The RWM Main Display for H
-0 8 indicates 00 and is blue in color.
Select rod to ensure rod in and out blocks are applied. Rod indication is backlit in blue color.
Review status screen to verify H
-0 8 is listed as OOS.
08 Determines no actions are required per G.4.h Determines CRD H
-08 is at required position and no actions are required.
___ ___ ___
TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ
-JA-150-02  SRRS: 3D.105 (when utilized for operator initial or continuing training)
STEP ELEMENT STANDARD SAT UNSAT Comment Number 09 Verifies Control rod block has been applied Deselects and reselects control rod H-08. Verifies Rod is indicated in light blue and rod blocks are applied. ___ ___ ___ CUE: If the candidate attempts to update the Control Rod Sequence Package (CRSP), inform them "Another NSO will update the CRSP".
10 Informs Unit Supervisor task is complete. Examinee notifies the Unit Supervisor.
___ ___ ___ CUE: Respond as Unit Supervisor and/or QNE when examinee informs you they have completed the task JPM Stop Time:


TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ-JA-150-02 JPM  
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Emp. ID#: ____________
:   Emp. ID#: ____________
Job Title:   SRO JPM Title: RWM - Place a Control Rod O.O.S JPM Number: S-N-f             Revision Number: 02 Task Number and Title: 20106LP005.B.3 / From the Functions available from the Primary Display Screen, operate the RWM in the optional modes settings listed below, IAW DOP 0400-02: Given the Secondary Functions Display, initiate the following functions: Rod Out of Service.
Job Title: SRO   JPM Title:
K/A Number and Importance: 201006.A2.05 3.1/3.5 Suggested Testing Environment: Simulator Alternate Path:     Yes       No SRO Only:               Yes         No Time Critical: Yes       No Reference(s): DOP 0400-02 Rev. 28 Actual Testing Environment:             Simulator             Control Room       In-Plant     Other Testing Method:           Simulate             Perform Estimated Time to Complete: 15 minutes                         Actual Time Used:         minutes EVALUATION  
RWM - Place a Control Rod O.O.S JPM Number:
S-N-f   Revision Number:
02 Task Number and Title:
20106LP005.B.3 / From the Functions available from the Primary Display Screen, operate the RWM in the "optional modes" settings listed below, IAW DOP 0400-02: Given the Secondary Functions Display, initiate the following functions: Rod Out of Service. K/A Number and Importance:
201006.A2.05     3.1/3.5 Suggested Testing Environment:
Simulator Alternate Path:
Yes No SRO Only: Yes  No Time Critical:
Yes No Reference(s):
DOP 0400-02 Rev. 28 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
1 5 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?                   Yes             No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                   Satisfactory   Unsatisfactory Comments:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Name (Print):
Satisfactory Unsatisfactory Comments:                   Evaluator's Name (Print):   Evaluator's Signature
Evaluators Signature:                                                     Date:
:   Date:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ
 
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS
: 1. You are the Unit 2 NSO.
: 1. You are the Unit 2 NSO.
: 2. Control Rod H-08 was discovered uncoupled
: 2. Control Rod H-08 was discovered uncoupled, 15 minutes ago.
, 15 minutes ago
: 3. All attempts to couple the rod have been unsuccessful.
. 3. All attempts to couple the rod have been unsuccessful.
: 4. The Control rod was then inserted to position 00, then electrically disarmed.
: 4. The Control rod was then inserted to position 00, then electrically disarmed.
: 5. QNE has been notified.
: 5. QNE has been notified.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to take rod H-08 out of service on the Rod Worth Minimizer per DOP 0400
: 1. The Unit Supervisor has directed you to take rod H-08 out of service on the Rod Worth Minimizer per DOP 0400-02.
-02. 2. Another NSO will complete DOA 0300
: 2. Another NSO will complete DOA 0300-05 actions and logging requirements once control rod H-08 is OOS.
-05 actions and logging requirements once control rod H-08 is OOS. 3. Notify the Unit Supervisor when complete.
: 3. Notify the Unit Supervisor when complete.
SRRS: 3D.100; There are no retention requirements for this section


TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 Job Performance Measure CREV - SECURE A AHU AND STARTUP B AHU AND RCU JPM Number: S-N-g Revision Number: 02 Date: 02/03/17 Developed By:
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Exam Author                  Date Approved By:
Job Performance Measure CREV - SECURE "A" AHU AND STARTUP "B" AHU AND R CU  JPM Number:
Facility Representative          Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-g Revision Number:
0 2  Date: 0 2/03/17  


Developed By:
Exam Author Date  Approved By:
Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
________ 2. Knowledge and Abilities (K/A) references are included.
________     1. Task description and number, JPM description and number are identified.
________ 3. Performance location specified. (in
________     2. Knowledge and Abilities (K/A) references are included.
-plant, control room, simulator, or other)
________     3. Performance location specified. (in-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________     4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________     5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________     6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
________     8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
________     9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOP 5750-05       Rev: 67 Procedure Rev:   Procedure Rev:   ________ 10. Verify cues both verbal and visual are free of conflict.
Procedure DOP 5750-05                   Rev: 67 Procedure                               Rev:
________ 11. Verify performance time is accurate
Procedure                               Rev:
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________     10. Verify cues both verbal and visual are free of conflict.
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
________     11. Verify performance time is accurate
SME / Instructor Date       SME / Instructor Date       SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
________     12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________     13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                             Date SME / Instructor                             Date SME / Instructor                             Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
 
Revision Record (Summary)
Revision Record (Summary)
Revision 00 New JPM. Revision 01
Revision 00 New JPM.
: Revised JPM ILT 14
Revision 01: Revised JPM ILT 14-1 NRC Exam.
-1 NRC Exam.
Revision 02: Updated for 2016-302 NRC Exam.
Revision 02:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Updated for 2016
-302 NRC Exam.


SRRS: 3D.105 (when utilized for operator initial or continuing training)
SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to any IC. (IC 50 used for validation)
: 1. Reset the simulator to any IC. (IC 50 used for validation)
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
NOTE:     It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Ensure "A" AHU operating.
: 2. Ensure A AHU operating.
: 3. Insert following Malfunctions and/or Remotes:
: 3. Insert following Malfunctions and/or Remotes:
None. 4. Setup the following Triggers:
* None.
None. DOCUMENT PREPARATION Clean copy of DOP 5750
: 4. Setup the following Triggers:
-05, Control Room Ventilation and Air Conditioning System.
* None.
DOCUMENT PREPARATION Clean copy of DOP 5750-05, Control Room Ventilation and Air Conditioning System.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


SRRS: 3D.105 (when utilized for operator initial or continuing training)
INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. The Control Room Vent "A" AHU needs to be removed from service for maintenance.
: 2. The Control Room Vent A AHU needs to be removed from service for maintenance.
: 3. There has NOT been any painting done anywhere in the plant within the last 14 days.
: 3. There has NOT been any painting done anywhere in the plant within the last 14 days.
: 4. There has NOT been any propane
: 4. There has NOT been any propane-powered equipment operated anywhere in the plant within the last 14 days.
-powered equipment operated anywhere in the plant within the last 14 days.
: 5. The U2/3 CONTROL ROOM REFRIG CONDENSING UNIT crankcase heaters have been operating for the past 7 days.
: 5. The U2/3 CONTROL ROOM REFRIG CONDENSING UNIT crankcase heaters have been operating for the past 7 days.
: 6. The CRM HVAC REFRIG COMPR B crankcase heater has been operating for the past 7 days. 7. RCU Cooling Water has been lined up.
: 6. The CRM HVAC REFRIG COMPR B crankcase heater has been operating for the past 7 days.
: 7. RCU Cooling Water has been lined up.
: 8. Operation in ISOLATION mode is NOT desired.
: 8. Operation in ISOLATION mode is NOT desired.
: 9. No smoke detectors require resetting on the 2223
: 9. No smoke detectors require resetting on the 2223-35 panel.
-35 panel. 10. Heating Steam is not available.
: 10. Heating Steam is not available.
: 11. Operation of an AFU is not required.
: 11. Operation of an AFU is not required.
: 12. Another NSO will perform all log entries.
: 12. Another NSO will perform all log entries.
: 13. An EO is stationed in the field.
: 13. An EO is stationed in the field.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to secure the "A" AHU and startup the "B" AHU and RCU per DOP 5750
: 1. The Unit Supervisor has directed you to secure the A AHU and startup the B AHU and RCU per DOP 5750-05 Step G.1.
-05 Step G.1. 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue
The timeclock starts when the candidate acknowledges the initiating cue SRRS: 3D.105 (when utilized for operator initial or continuing training)


JPM Start Time:
Comment STEP                    ELEMENT                                  STANDARD                  SAT  UNSAT Number NOTE:
Provide the Examinee with the supplied copy of DOP 5750-05.
NOTE:
Train B AHU will automatically start when Train A AHU is secured.
CUE:
If asked as EO in the field, the Train B RCU oil level is in the sightglass.
  *1. Secure Train A AHU using control          BLUE ON light OFF and GREEN          ___    ___    ___
switch, 2/3A TRAIN CRM AIR                OFF light lit.
HANDLING UNIT.
  *2. Secure Train A Return Fan using            BLUE ON light OFF and GREEN          ___    ___    ___
control switch, CRM RETURN                OFF light lit.
FAN.
: 3. Place Train B AHU control switch,          Control Switch RED target visible. ___    ___    ___
CRM AIR HANDLING UNIT B, in Auto After Start.
: 4. Monitor PI 2/3-5740-36, CRM TO            Observes a positive pressure is E TURB DP, to assure a positive            being maintained.                    ___ ___
pressure is being maintained in the
___
Control Room.
: 5. Monitors the RCU compressor                Directs the EO, in the field, to suction pressure.                          report the RCU compressor            ___    ___    ___
suction pressure.
CUE:
RCU suction pressure is 75 psig.
: 6. Monitors the RCU compressor                Directs the EO, in the field, to    ___    ___    ___
discharge pressure.                        report the RCU compressor discharge pressure.
CUE:
RCU discharge pressure is 230 psig.
: 7. Monitors the RCU compressor oil            Directs the EO, in the field, to    ___    ___    ___
pressure, (40 to 60 psig above            report the RCU compressor oil suction pressure).                        pressure.
CUE:
RCU compressor oil pressure is 125 psig.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM Start Tim e:  STEP ELEMENT STANDARD SAT UNSAT Comment Number NOTE: Provide the Examinee with the supplied copy of DOP 5750-05. NOTE: Train B AHU will automatically start when Train A AHU is secured.
CUE: If asked as EO in the field, the Train B RCU oil level is in the sightglass.
*1. Secure Train A AHU using control switch, 2/3A TRAIN CRM AIR HANDLING UNIT
. BLUE ON light OFF and GREEN OFF light lit.
___ ___ ___ *2. Secure Train A Return Fan using control switch, CRM RETURN FAN. BLUE ON light OFF and GREEN OFF light lit.
___ ___ ___ 3. Place Train B AHU control switch, CRM AIR HANDLING UNIT B, in Auto After Start
. Control Switch RED target visible.
___ ___ ___ 4. Monitor PI 2/3
-5740-36, CRM TO E TURB DP, to assure a positive pressure is being maintained in the Control Room
. Observes a positive pressure is being maintained.
___ ___ ___ 5. Monitors the RCU compressor suction pressure
. Directs the EO, in the field, to report the RCU compressor suction pressure. ___ ___ ___ CUE: RCU suction pressure is 75 psig.
: 6. Monitors the RCU compressor discharge pressure
. Directs the EO, in the field, to report the RCU compressor discharge pressure. ___ ___ ___ CUE: RCU discharge pressure is 230 psig.
: 7. Monitors the RCU compressor oil pressure, (40 to 60 psig above suction pressure
). Directs the EO, in the field, to report the RCU compressor oil pressure. ___ ___ ___ CUE: RCU compressor oil pressure is 125 psig.


Comment STEP                    ELEMENT                                  STANDARD              SAT  UNSAT Number
: 8. States intention to monitor the            Communicates need to monitor oil  ___  ___    ___
RCU compressor oil level AFTER            pressure AFTER three hours of three hours of operation.                  operation.
CUE:
Acknowledge report.
: 9. Informs Unit Supervisor that task is      Examinee notifies the Unit        ___  ___    ___
complete.                                  Supervisor.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
STEP ELEMENT STANDARD SAT UNSAT Comment Number 8. States intention to monitor the RCU compressor oil level AFTER three hours of operation.
Communicates need to monitor oil pressure AFTER three hours of operation.
___ ___ ___ CUE: Acknowledge report.
: 9. Informs Unit Supervisor that task is complete. Examinee notifies the Unit Supervisor.
___ ___ ___ CUE: Acknowledge report of task completion.
END    JPM Stop Time:


SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM  
JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Emp. ID#: ____________
:   Emp. ID#: ____________
Job Title:   SRO JPM Title: CREV - SECURE A AHU AND STARTUP B AHU AND RCU JPM Number: S-N-g                                   Revision Number: 02 Task Number and Title: 288LN003-14, Discuss the major steps involved in performing Control Room HVAC AFU and RCU test.
Job Title:   SRO JPM Title:
K/A Number and Importance: 290003.A4.01 3.2 / 3.2 Suggested Testing Environment: Simulator Alternate Path:     Yes       No SRO Only:               Yes         No Time Critical: Yes       No Reference(s): DOP 5750-05, rev 63 Actual Testing Environment:             Simulator             Control Room       In-Plant     Other Testing Method:           Simulate             Perform Estimated Time to Complete: 12 minutes                         Actual Time Used:         minutes EVALUATION  
CREV - SECURE "A" AHU AND STARTUP "B" AHU AND R CU JPM Number:
S-N-g Revision Number:
0 2 Task Number and Title:
288LN003-14, Discuss the major steps involved in performing Control Room HVAC AFU and RCU test.
K/A Number and Importance:
290003.A4.01     3.2 / 3.2 Suggested Testing Environment:
Simulator Alternate Path:
Yes No SRO Only: Yes  No Time Critical:
Yes No Reference(s):
DOP 5750-05, rev 63 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
12 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?                   Yes             No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                   Satisfactory   Unsatisfactory Comments:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Name (Print):
Satisfactory Unsatisfactory Comments:                     Evaluator's Name (Print):   Evaluator's Signature
Evaluators Signature:                                                     Date:
:   Date:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
 
INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. The Control Room Vent "A" AHU needs to be removed from service for maintenance.
: 2. The Control Room Vent A AHU needs to be removed from service for maintenance.
: 3. There has NOT been any painting done anywhere in the plant within the last 14 days.
: 3. There has NOT been any painting done anywhere in the plant within the last 14 days.
: 4. There has NOT been any propane
: 4. There has NOT been any propane-powered equipment operated anywhere in the plant within the last 14 days.
-powered equipment operated anywhere in the plant within the last 14 days.
: 5. The U2/3 CONTROL ROOM REFRIG CONDENSING UNIT crankcase heaters have been operating for the past 7 days.
: 5. The U2/3 CONTROL ROOM REFRIG CONDENSING UNIT crankcase heaters have been operating for the past 7 days.
: 6. The CRM HVAC REFRIG COMPR B crankcase heater has been operating for the past 7 days. 7. RCU Cooling Water has been lined up.
: 6. The CRM HVAC REFRIG COMPR B crankcase heater has been operating for the past 7 days.
: 7. RCU Cooling Water has been lined up.
: 8. Operation in ISOLATION mode is NOT desired.
: 8. Operation in ISOLATION mode is NOT desired.
: 9. No smoke detectors require resetting on the 2223
: 9. No smoke detectors require resetting on the 2223-35 panel.
-35 panel. 10. Heating Steam is not available.
: 10. Heating Steam is not available.
: 11. Operation of an AFU is not required.
: 11. Operation of an AFU is not required.
: 12. Another NSO will perform all log entries.
: 12. Another NSO will perform all log entries.
: 13. An EO is stationed in the field.
: 13. An EO is stationed in the field.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to secure the "A" AHU and startup the "B" AHU and RCU per DOP 5750
: 1. The Unit Supervisor has directed you to secure the A AHU and startup the B AHU and RCU per DOP 5750-05 Step G.1.
-05 Step G.1.
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
SRRS: 3D.100; There are no retention requirements for this section


TQ-AA-150-J020 Revision 00 Page 1 of 10 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 1 of 10 This replaced TQ-JA-150-02 Job Performance Measure Respond to failure of Unit 2 24 / 48 VDC power supply (AP)
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM Number: S-N-i Revision Number: 08 Date: 01/04/17 Developed By:
Job Performance Measure
Exam Author                  Date Approved By:
Facility Representative          Date SRRS: 3D.105 (when utilized for operator initial or continuing training)


Respond to failure of Unit 2 24 / 48 VDC power supply (AP)
TQ-AA-150-J020 Revision 00 Page 2 of 10 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
JPM Number:
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
S-N-i  Revision Number: 08  Date: 01/04/1 7 
________    1. Task description and number, JPM description and number are identified.
________    2. Knowledge and Abilities (K/A) references are included.
________    3. Performance location specified. (in-plant, control room, simulator, or other)
________    4. Initial setup conditions are identified.
________    5. Initiating cue (and terminating cue if required) are properly identified.
________    6. Task standards identified and verified by SME review.
________    7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________    8. If an alternate path is used, the task standard contains criteria for successful completion.
________    9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOA 6900-01                Rev: 19 Procedure                            Rev:
Procedure                            Rev:
________    10. Verify cues both verbal and visual are free of conflict.
________    11. Verify performance time is accurate
________    12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________    13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                              Date SME / Instructor                              Date SME / Instructor                              Date SRRS: 3D.100; There are no retention requirements for this section


Developed By:
TQ-AA-150-J020 Revision 00 Page 3 of 10 This replaced TQ-JA-150-02 Revision Record (Summary)
Exam Author Date  Approved By:
Revision 04:     Updated for 2006 LORT exam Revision 05:     Updated for 2009 LORT exam Revision 06:     Updated for 2012 LORT exam Revision 07:     Updated for 2016 LORT exam and new JPM format Revision 08:     Updated for 2016-302 NRC Exam SRRS: 3D.100; There are no retention requirements for this section
Facility Representative Date TQ-AA-150-J020 Revision 00 Page 2 of 10 This replaced TQ
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOA 6900-01  Rev:    1 9  Procedure Rev:  Procedure Rev:  ________ 10. Verify cues both verbal and visual are free of conflict.
________ 11. Verify performance time is accurate
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date        SME / Instructor Date        SME / Instructor Date TQ-AA-150-J020 Revision 00 Page 3 of 10 This replaced TQ
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section Revision Record (Summary)
Revision 0 4: Updated for 200 6 LORT exam Revision 05
: Updated for 2009 LORT exam Revision 06
: Updated for 2012 LORT exam Revision 07
: Updated for 2016 LORT exam and new JPM format Revision 08:
Updated for 2016
-302 NRC Exam


TQ-AA-150-J020 Revision 00 Page 4 of 10 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 4 of 10 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS N/A: In-Plant JPM DOCUMENT PREPARATION Need a clean copy of current revision of DOA 6900-01, Failure of Unit 2(3) 24 48 Vdc Power Supply SRRS: 3D.100; There are no retention requirements for this section
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section SIMULATOR SETUP INSTRUCTIONS N/A: In-Plant JPM   DOCUMENT PREPARATION Need a clean copy of current revision of DOA 6900-01, Failure of Unit 2(3) 24 48 Vdc Power Supply


TQ-AA-150-J020 Revision 00 Page 5 of 10 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 5 of 10 This replaced TQ-JA-150-02 INITIAL CONDITIONS Unit 2 is operating at 780 MWe when the following annunciators alarm:
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS Unit 2 is operating at 780 MWe when the following annunciators alarm:
: 1. SRM Downscale.
: 1. SRM Downscale.
: 2. IRM Downscale.
: 2. IRM Downscale.
: 3. Channel B Reactor Scram
: 3. Channel B Reactor Scram.
. 4. IRM channel B HI
: 4. IRM channel B HI-HI / Inop.
-HI / Inop.
: 5. 48/24 V Neutron Monitor B Supply Voltage Hi/Lo.
: 5. 48/24 V Neutron Monitor B Supply Voltage Hi/Lo.
: 6. 250 / 125 / 48/24 Volt Battery Undervoltage.
: 6. 250 / 125 / 48/24 Volt Battery Undervoltage.
Line 1,635: Line 1,438:
INITIATING CUE
INITIATING CUE
: 1. An extra EO is available to assist as necessary for monitoring.
: 1. An extra EO is available to assist as necessary for monitoring.
: 2. The Unit Supervisor has directed you to perform DOA 6900
: 2. The Unit Supervisor has directed you to perform DOA 6900-01.
-01. 3. Inform the Unit Supervisor when the task is complete
: 3. Inform the Unit Supervisor when the task is complete.
. Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.100; There are no retention requirements for this section


TQ-AA-150-J020 Revision 00 Page 6 of 10 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 6 of 10 This replaced TQ-JA-150-02 JPM Start Time:
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Comment STEP                   ELEMENT                                 STANDARD                   SAT   UNSAT Number
JPM Start Time:
: 1. Proceeds to the Unit 2 Battery             LOCATES Unit 2 Battery Room Room.                                      and performs an evaluation of the 24/48 VDC equipment.                 ___   ___     ___
STEP ELEMENT STANDARD SAT UNSAT Comment Number 1. Proceeds to the Unit 2 Battery Room. LOCATES Unit 2 Battery Room and performs an evaluation of the 24/48 VDC equipment.
Cue     As the Examine checks equipment, provide the following cues:
___   ___   ___ Cue As the Examine checks equipment, provide the following cues:
Battery Charger Indications:
Battery Charger Indications:
2A+
2A+         2A-       2B+           2B-25 V         25 V         25 V           25 V 7 amps       5 amps       0 amps         0 amps ALL circuit breakers at the Battery Chargers are closed.
2A-           2B+
The local low current light is lit on the face of the 2B+ and 2B- chargers Batteries Batteries appear normal.
2B-   25 V             25 V 25 V 25 V   7 amps         5 amps 0 amps 0 amps ALL circuit breakers at the Battery Chargers are closed.
The local low current light is lit on the face of the 2B+ and 2B
- chargers Batteries Batteries appear normal.
Bus 2B BOTH DC Voltmeters are indicating zero (0) volts.
Bus 2B BOTH DC Voltmeters are indicating zero (0) volts.
BOTH Undervoltage relay targets are indicating RED targets.
BOTH Undervoltage relay targets are indicating RED targets.
Distribution Panel 2B (Give this indication when the panel is opened)
Distribution Panel 2B (Give this indication when the panel is opened)
Main (lower section) Breaker #
Main (lower section) Breaker #4 (48/24 VDC TO 2B DISTRIBUTION BREAKERS) is in the mid-position.
4 (48/24 VDC TO 2B DISTRIBUTION BREAKERS) is in the mid-position. 2. Notify Unit Supervisor.
: 2. Notify Unit Supervisor.                   Notifies Unit Supervisor of conditions found.                     ___   ___     ___
Notifies Unit Supervisor of conditions found.
: 3. IF 24/48 VDC System voltage is             Operator might contact the Unit low (below 25 VDC OR a battery             Supervisor as this step directs charger has failed, THEN restore           DOP 6900-03 to restore a charger.
___ ___ ___ 3. IF 24/48 VDC System voltage is low (below 25 VDC OR a battery charger has failed, THEN restore the battery charger to operation per DOP 6900
the battery charger to operation per DOP 6900-03, 24/48 VDC Electrical System.                                                               ___   ___    ___
-03, 24/48 VDC Electrical System.
Cue     Acknowledge as U2 Unit Supervisor. Operator should perform actions the DOA as directed in the initial cue. As Unit Supervisor respond - Another operator will be assigned DOP 6900-03.
Operator might contact the Unit Supervisor as this step directs DOP 6900-03 to restore a charger.
: 4. Isolate any failed loads if possible.     Will not be able to identify any failed loads.                         ___   ___     ___
___
: 5. Attempt to RESET AND close any             There are no tripped breakers in tripped load breaker (8 breaker           the upper section upper section)                                                                  ___   ___     ___
___    ___ Cue Acknowledge as U2 Unit Supervisor. Operator should perform actions the DOA as directed in the initial cue. As Unit Supervisor respond  
Cue     Breakers are in the condition seen. (If there are open/tripped breakers in section cue the operator that all upper breakers are closed.)
- "Another operator will be assigned DOP 6900
SRRS: 3D.105 (when utilized for operator initial or continuing training)
-03." 4. Isolate any failed loads if possible.
Will not be able to identify any failed loads.
___ ___ ___ 5. Attempt to RESET AND close any tripped load breaker (8 breaker upper section)
There are no tripped breakers in the upper section
___   ___   ___ Cue Breakers are in the condition seen. (If there are open/tripped breakers in section cue the operator that all upper breakers are closed.)


TQ-AA-150-J020 Revision 00 Page 7 of 10 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 7 of 10 This replaced TQ-JA-150-02 Comment STEP                   ELEMENT                                 STANDARD                   SAT   UNSAT Number
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
  *6. Attempt to RESET AND close any             Finds Breaker #4 tripped. Takes tripped supply breaker (4 breaker          Main (lower) breaker #4 (48/24 lower section)                            VDC TO 2B DISTRIBUTION BREAKERS) to Open and then back to Close.                       ___    ___     ___
STEP ELEMENT STANDARD SAT UNSAT Comment Number *6. Attempt to RESET AND close any tripped supply breaker (4 breaker lower section)
Cue     Main (lower) breaker #4 re-tripped instantly.
Finds Breaker #
4 tripped. Takes Main (lower) breaker #
4 (48/24 VDC TO 2B DISTRIBUTION BREAKERS) to Open and then back to Close.
___    ___   ___ Cue Main (lower) breaker #
4 re-tripped instantly.
BEGIN ALTERNATE PATH
BEGIN ALTERNATE PATH
*7. In the applicable Distribution Panel (upper) section, open all breakers (1 through 8)
  *7. In the applicable Distribution Panel       Opens / verifies open all breakers (upper) section, open all breakers         in the upper section.
Opens / verifies open all breakers in the upper section.
(1 through 8)
___
___   ___    ___
___
Note     Breakers 2, 3, 5, 6, and 8 are labeled as SPARES and are already open. Breaker 7 is closed.
___ Note Breakers 2, 3, 5, 6, and 8 are labeled as SPARES and are already open.
Cue     Indicate breakers #1, 4 and 7 are OPEN, as the examinee opens each.
Breaker 7 is closed.
  *8     In the Main Panel (lower) section          Places Main Panel (lower) section (lower four breakers), reset any           breaker #4 to Open and then tripped breakers.                          Close.
Cue Indicate breakers #1 , 4 and 7 are OPEN, as the examinee opens each.
*8 In the Main Panel (lower) section (lower four breakers), reset any tripped breakers.
IF the breaker trips again, THEN notify the Unit Supervisor of a faulted panel.
IF the breaker trips again, THEN notify the Unit Supervisor of a faulted panel.
Places Main Panel (lower) section breaker #4 to Open and then Close.      ___     ___     ___ Cue Main (lower) breaker #4 is closed.
___   ___     ___
Note The breakers can be closed in any order and the examinee will stop when upper breaker #4 is closed. Cue If requested as the extra EO, report, "I will stand by the battery charger ammeters.
Cue     Main (lower) breaker #4 is closed.
*9. Close applicable load breakers one at a time to return required loads to service AND determine which load causes the overload.
Note     The breakers can be closed in any order and the examinee will stop when upper breaker #4 is closed.
Closes upper breakers one at a time to determine faulted circuit.
Cue     If requested as the extra EO, report, I will stand by the battery charger ammeters.
___
  *9. Close applicable load breakers            Closes upper breakers one at a one at a time to return required           time to determine faulted circuit.
___
loads to service AND determine
___ Cue Bkr 1 Indicate breaker closed as examinee closes breaker. If asked, ampmeter shows a few amps.
___    ___    ___
Bkr 4 Main Supply breaker #
which load causes the overload.
4 (48/24 VDC TO 2 B DISTRIBUTION BREAKERS) tripped when upper breaker #4 (Panel 902
Cue     Bkr 1 Indicate breaker closed as examinee closes breaker. If asked, ampmeter shows a few amps.
-10 RBCCW RAD MONITOR) was closed. Amps momentarily pegged full scale. Cue Unit Supervisor will take care of documenting issue per OP
Bkr 4 Main Supply breaker #4 (48/24 VDC TO 2B DISTRIBUTION BREAKERS) tripped when upper breaker #4 (Panel 902-10 RBCCW RAD MONITOR) was closed. Amps momentarily pegged full scale.
-DR-108-101-1001.
Cue     Unit Supervisor will take care of documenting issue per OP-DR-108-101-1001.
TQ-AA-150-J020 Revision 00 Page 8 of 10 This replaced TQ
SRRS: 3D.105 (when utilized for operator initial or continuing training)
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
 
STEP ELEMENT STANDARD SAT UNSAT Comment Number 10. IF a breaker trips after a load is restored, THEN notify the Unit Supervisor of the failed load.
TQ-AA-150-J020 Revision 00 Page 8 of 10 This replaced TQ-JA-150-02 Comment STEP                   ELEMENT                                 STANDARD                 SAT   UNSAT Number
Notifies the Unit Supervisor that fault is on upper load breaker #4.
: 10. IF a breaker trips after a load is         Notifies the Unit Supervisor that restored, THEN notify the Unit             fault is on upper load breaker #4.
___
Supervisor of the failed load.
___
___   ___    ___
___ Cue Repeat back the status of the 24/48 VDC battery system.
Cue     Repeat back the status of the 24/48 VDC battery system.
As Unit Supervisor  
As Unit Supervisor - Leave all breakers in their present position. Electrical Maintenance will be contacted for further troubleshooting.
- "Leave all breakers in their present position. Electrical Maintenance will be contacted for further troubleshooting."
END JPM Stop Time:
END   JPM Stop Time:
SRRS: 3D.105 (when utilized for operator initial or continuing training)


TQ-AA-150-J020 Revision 00 Page 9 of 10 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 9 of 10 This replaced TQ-JA-150-02 JPM  
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                               Emp. ID#: ____________
:       Emp. ID#: ____________
Job Title:   SRO JPM Title: Respond to failure of Unit 2 24 / 48 VDC power supply JPM Number: S-N-i                                   Revision Number: 08 Task Number and Title: 263L003, Respond to failure of Unit 2(3) 24/48 VDC power supply K/A Number and Importance: 295004.AA1.01                           3.3 / 3.4 Suggested Testing Environment: Plant Alternate Path:     Yes       No     SRO Only:         Yes         No     Time Critical:   Yes     No Reference(s): DOA 6900-01, Rev 19 Actual Testing Environment:             Simulator             Control Room         In-Plant     Other Testing Method:           Simulate             Perform Estimated Time to Complete: 12 minutes                         Actual Time Used:             minutes EVALUATION  
Job Title: SRO JPM Title:   Respond to failure of Unit 2 24 / 48 VDC power supply JPM Number
: S-N-i Revision Number
: 08 Task Number and Title
: 263L003, Respond to failure of Unit 2(3) 24/48 VDC power supply K/A Number and Importance
:   295004.AA1.01 3.3 / 3.4 Suggested Testing Environment
:   Plant Alternate Path
: Yes No SRO Only: Yes No Time Critical
: Yes No Reference(s)
: DOA 6900-01, Rev 19 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
1 2  minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?                     Yes             No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory     Unsatisfactory Comments:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Name (Print):
Satisfactory Unsatisfactory Comments:                     Evaluator's Name (Print):   Evaluator's Signature
Evaluators Signature:                                                       Date:
:   Date:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
TQ-AA-150-J020 Revision 00 Page 10 of 10 This replaced TQ
 
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS Unit 2 is operating at 780 MWe when the following annunciators alarm:
TQ-AA-150-J020 Revision 00 Page 10 of 10 This replaced TQ-JA-150-02 INITIAL CONDITIONS Unit 2 is operating at 780 MWe when the following annunciators alarm:
: 1. SRM Downscale.
: 1. SRM Downscale.
: 2. IRM Downscale.
: 2. IRM Downscale.
: 3. Channel B Reactor Scram
: 3. Channel B Reactor Scram.
. 4. IRM channel B HI
: 4. IRM channel B HI-HI / Inop.
-HI / Inop.
: 5. 48/24 V Neutron Monitor B Supply Voltage Hi/Lo.
: 5. 48/24 V Neutron Monitor B Supply Voltage Hi/Lo.
: 6. 250 / 125 / 48/24 Volt Battery Undervoltage.
: 6. 250 / 125 / 48/24 Volt Battery Undervoltage.
Line 1,756: Line 1,528:
INITIATING CUE
INITIATING CUE
: 1. An extra EO is available to assist as necessary for monitoring.
: 1. An extra EO is available to assist as necessary for monitoring.
: 2. The Unit Supervisor has directed you to perform DOA 6900
: 2. The Unit Supervisor has directed you to perform DOA 6900-01.
-01. 3. Inform the Unit Supervisor when the task is complete
: 3. Inform the Unit Supervisor when the task is complete.
.
SRRS: 3D.100; There are no retention requirements for this section
TQ-AA-150-J020 Revision 00 Page 1 of 10 This replaced TQ
-JA-150-02  SRRS: 3D.105 (when utilized for operator initial or continuing training)
Job Performance Measure Bypass the Unit 2 HPCI Group 4 Isolations JPM Number:
S-N-j  Revision Number:
0 8  Date: 01/04/1 7 


Developed By:
TQ-AA-150-J020 Revision 00 Page 1 of 10 This replaced TQ-JA-150-02 Job Performance Measure Bypass the Unit 2 HPCI Group 4 Isolations JPM Number: S-N-j Revision Number: 08 Date: 01/04/17 Developed By:
Exam Author Date  Approved By:
Exam Author                  Date Approved By:
Facility Representative Date TQ-AA-150-J020 Revision 00 Page 2 of 10 This replaced TQ
Facility Representative          Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section  JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). ________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DEOP 0500-02  Rev:   17 Procedure Rev:  Procedure Rev:   ________ 10. Verify cues both verbal and visual are free of conflict.
________ 11. Verify performance time is accurate
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date       SME / Instructor Date        SME / Instructor Date TQ-AA-150-J020 Revision 00 Page 3 of 10 This replaced TQ
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section  Revision Record (Summary)
Revision 04: Updated for the 2007 LORT exam Revision 05:
Updated for the 2010 LORT exam Revision 06:
Updated for the 2013 LORT exam Revision 07: Updated for 2016 LORT Exam and new JPM format Revision 08:
Updated for 2016
-302 NRC Exam


TQ-AA-150-J020 Revision 00 Page 4 of 10 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 2 of 10 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section SIMULATOR SETUP INSTRUCTIONS N/A:   In-Plant JPM Note: Need a clean copy of current revision of DEOP 0500
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
-02, Bypassing Interlocks and Isolations, to provide to examinee.
________    1. Task description and number, JPM description and number are identified.
________    2. Knowledge and Abilities (K/A) references are included.
________    3. Performance location specified. (in-plant, control room, simulator, or other)
________    4. Initial setup conditions are identified.
________    5. Initiating cue (and terminating cue if required) are properly identified.
________    6. Task standards identified and verified by SME review.
________    7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________    8. If an alternate path is used, the task standard contains criteria for successful completion.
________    9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DEOP 0500-02 Rev: 17 Procedure                            Rev:
Procedure                            Rev:
________    10. Verify cues both verbal and visual are free of conflict.
________    11. Verify performance time is accurate
________    12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________    13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                              Date SME / Instructor                              Date SME / Instructor                              Date SRRS: 3D.100; There are no retention requirements for this section
 
TQ-AA-150-J020 Revision 00 Page 3 of 10 This replaced TQ-JA-150-02 Revision Record (Summary)
Revision 04:      Updated for the 2007 LORT exam Revision 05:      Updated for the 2010 LORT exam Revision 06:      Updated for the 2013 LORT exam Revision 07:      Updated for 2016 LORT Exam and new JPM format Revision 08:      Updated for 2016-302 NRC Exam SRRS: 3D.100; There are no retention requirements for this section
 
TQ-AA-150-J020 Revision 00 Page 4 of 10 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS N/A: In-Plant JPM Note: Need a clean copy of current revision of DEOP 0500-02, Bypassing Interlocks and Isolations, to provide to examinee.
A laser pointer is useful but not required for this JPM.
A laser pointer is useful but not required for this JPM.
SRRS: 3D.100; There are no retention requirements for this section


TQ-AA-150-J020 Revision 00 Page 5 of 10 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 5 of 10 This replaced TQ-JA-150-02 INITIAL CONDITIONS
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section  INITIAL CONDITIONS
: 1. A transient has occurred which requires Alternate Emergency Depressurization of the Unit 2 RPV
: 1. A transient has occurred which requires Alternate Emergency Depressurization of the Unit 2 RPV 2. A Group 4 Isolation is present.
: 2. A Group 4 Isolation is present.
: 3. The Reactor Building is evacuated.
: 3. The Reactor Building is evacuated.
: 4. NO HPCI initiation signal is present.
: 4. NO HPCI initiation signal is present.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to bypass the Unit 2 HPCI Group 4 isolations in accordance with DEOP 500-02. 2. Notify the Unit Supervisor upon completion of the task.
: 1. The Unit Supervisor has directed you to bypass the Unit 2 HPCI Group 4 isolations in accordance with DEOP 500-02.
: 2. Notify the Unit Supervisor upon completion of the task.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps. Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
* Denotes critical steps.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.100; There are no retention requirements for this section


TQ-AA-150-J020 Revision 00 Page 6 of 10 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 6 of 10 This replaced TQ-JA-150-02 JPM Start Time:
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Comment STEP                   ELEMENT                                 STANDARD               SAT   UNSAT Number
JPM Start Time:
: 1. Locate procedure step G.10.               Locates Step G.10.                 ___   ___     ___
STEP ELEMENT STANDARD SAT UNSAT Comment Number 1. Locate procedure step G.10.
Note     The DEOP Equipment Storage Cabinet key must be obtained from the Unit Supervisor.
Locates Step G.10.
___ ___ ___ Note The DEOP Equipment Storage Cabinet key must be obtained from the Unit Supervisor.
Do NOT allow examinee to remove the Equipment Box from the DEOP Equipment Storage Cabinet.
Do NOT allow examinee to remove the Equipment Box from the DEOP Equipment Storage Cabinet.
Lock cabinet and return DEOP key to Unit Supervisor PRIOR to leaving the Control Room.
Lock cabinet and return DEOP key to Unit Supervisor PRIOR to leaving the Control Room.
: 2. Obtains appropriate Equipment Box from the Control Room DEOP Equipment Storage Cabinet.
: 2. Obtains appropriate Equipment             Locates Equipment Box DEOP Box from the Control Room DEOP             500-2 Bypassing Interlocks &
Locates Equipment Box DEOP 500-2 Bypassing Interlocks & Isolations Step G.10: HPCI Group 4 Isolation and identifies the following equipment.
Equipment Storage Cabinet.                Isolations Step G.10: HPCI Group 4 Isolation and identifies the following equipment.
Electrical Tape.
* Electrical Tape.
Standard Straight Screwdriver.
* Standard Straight Screwdriver.
Split Blade Screwdriver.
* Split Blade Screwdriver.
Insulated Gloves.
* Insulated Gloves.               ___  ___    ___
Cue      DEOP Equipment Box you have identified is in your hand.
Note    DS key is required for entry into the AEER.
: 3. Proceeds to 902-39 panel (HPCI            Locates the 902-39 panel.
RELAYS ESS II).
___  ___    ___
Note    Location of the correct terminal board inside the cabinet is shown in a placard attached to the outside of the cabinet door on the correct side.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


___
TQ-AA-150-J020 Revision 00 Page 7 of 10 This replaced TQ-JA-150-02 Comment STEP                    ELEMENT                                  STANDARD                SAT  UNSAT Number
___
  *4. Lift and tape lead in panel 902-39,        Lifts and tapes leads in panel relay 2330-125B, device AE,                902-39, relay 2330-125B, device terminal point 13.                        AE, terminal point 13 (back left terminal).
* Puts on insulated gloves.
* Locates relay 2330-125B.
* Locates terminal point 13.
* Loosens terminal point 13 screw with standard screwdriver.
* Uses split screwdriver to remove screw.
* Tapes loose wire with electricians tape.            ___    ___    ___
Cue      The lead on back left terminal, 902-39 Panel, relay 2330-125B, device AE, terminal point 13 is lifted and taped.
  *5. Lift and tape lead in panel 902-39,        Lifts and tapes leads in panel relay 2330-126, device BW,                902-39, relay 2330-126, device terminal point 13.                        BW, terminal point 13 (two leads on back left terminal).
* Using insulated gloves.
* Locates relay 2330-126.
* Locates terminal point 13.
* Loosens terminal point 13 screw with standard screwdriver.
* Uses split screwdriver to remove screw.
* Tapes loose wires with electricians tape.            ___    ___     ___
Cue      The two leads on 902-39 Panel, relay 2330-126, device BW, terminal point 13, are lifted and taped.
: 6. Proceed to 902-33 panel.                  Locates 902-33 panel in AEER.      ___    ___     ___
SRRS: 3D.105 (when utilized for operator initial or continuing training)


___ Cue DEOP Equipment Box you have identified is in your hand.
TQ-AA-150-J020 Revision 00 Page 8 of 10 This replaced TQ-JA-150-02 Comment STEP                   ELEMENT                                 STANDARD                 SAT   UNSAT Number
Note DS key is required for entry into the AEER.
  *7. Lift and tape lead in panel 902-33,       Lifts and tapes lead in panel relay 2330-125A, device DL,               902-33, relay 2330-125A, device terminal point 13.                         DL, terminal point 13 (back left terminal.
: 3. Proceeds to 902
* Using insulated gloves.
-39 panel (HPCI RELAYS ESS II).
* Locates relay 2330-125A.
Locates the 902
* Locates terminal point 13.
-39 panel. ___  ___  ___ Note Location of the correct terminal board inside the cabinet is shown in a placard attached to the outside of the cabinet door on the correct side.
* Loosens terminal point 13 screw with standard screwdriver.
 
* Uses split screwdriver to remove screw.
TQ-AA-150-J020 Revision 00 Page 7 of 10 This replaced TQ
* Tapes loose wire with electricians tape.             ___    ___     ___
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
CUE     The lead on back left terminal of 902-33 Panel relay 2330-125A device DL terminal point 13 is lifted and taped.
STEP ELEMENT STANDARD SAT UNSAT Comment Number *4. Lift and tape lead in panel 902
: 8. Notify Unit 2 Unit Supervisor upon         Notifies Unit 2 Unit Supervisor completion of bypassing the HPCI           upon completion of this task.
-39, relay 2330
Group 4 Isolation per DEOP 500-02.                                                                       ___   ___     ___
-125B, device AE, terminal point 13.
CUE     Acknowledge report of task completion.
Lifts and tapes leads in panel 902-39, relay 2330
END JPM Stop Time:
-125B, device AE, terminal point 13 (back left terminal).
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Puts on insulated gloves.
Locates relay 2330
-125B. Locates terminal point 13.
Loosens terminal point 13 screw with standard screwdriver.
Uses split screwdriver to remove screw.
Tapes loose wire with electrician's tape.
 
___
___
___ Cue The lead on back left terminal, 902
-39 Panel, relay 2330
-125B, device AE, terminal point 13 is lifted and taped.
*5. Lift and tape lead in panel 902
-39, relay 2330
-126, device BW, terminal point 13. Lifts and tapes leads in panel 902-39, relay 2330
-126, device BW, terminal point 13 (two leads on back left terminal).
Using insulated gloves.
Locates relay 2330
-126. Locates terminal point 13.
Loosens terminal point 13 screw with standard screwdriver. Uses split screwdriver to remove screw.
Tapes loose wires with electrician's tape.
 
___          ___          ___ Cue The two leads on 902
-39 Panel, relay 2330
-126, device BW, terminal point 13, are lifted and taped. 6. Proceed to 902-33 panel. Locates 902
-33 panel in AEER.
___ ___ ___
TQ-AA-150-J020 Revision 00 Page 8 of 10 This replaced TQ
-JA-150-02  SRRS: 3D.105 (when utilized for operator initial or continuing training)
STEP ELEMENT STANDARD SAT UNSAT Comment Number *7. Lift and tape lead in panel 902
-33, relay 2330
-125A, device DL, terminal point 13.
Lifts and tapes lead in panel 902-33, relay 2330
-125A, device DL, terminal point 13 (back left terminal. Using insulated gloves.
Locates relay 2330
-125A. Locates terminal point 13.
Loosens terminal point 13 screw with standard screwdriver.
Uses split screwdriver to remove screw.
Tapes loose wire with electrician's tape.
 
___
___
___ CUE The lead on back left terminal of 902
-33 Panel relay 2330
-125A device DL terminal point 13 is lifted and taped.
: 8. Notify Unit 2 Unit Supervisor upon completion of bypassing the HPCI Group 4 Isolation per DEOP 500-02. Notifies Unit 2 Unit Supervisor upon completion of this task.
___
___   ___ CUE Acknowledge report of task completion.
END   JPM Stop Time:


TQ-AA-150-J020 Revision 00 Page 9 of 10 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 9 of 10 This replaced TQ-JA-150-02 JPM  
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                               Emp. ID#: ____________
:       Emp. ID#: ____________
Job Title:         SRO JPM Title: Bypass the Unit 2 HPCI Group 4 Isolations JPM Number: S-N-j                                   Revision Number: 08 Task Number and Title: 295L081, Bypass the Unit 2 HPCI Group 4 Isolations K/A Number and Importance: 206000A2.10                             4.0 / 4.1 Suggested Testing Environment: Plant Alternate Path:     Yes       No     SRO Only:         Yes         No     Time Critical:   Yes     No Reference(s): DEOP 0500-02, Revision 17 Actual Testing Environment:             Simulator             Control Room         In-Plant     Other Testing Method:           Simulate             Perform Estimated Time to Complete: 15 minutes                         Actual Time Used:             minutes EVALUATION  
Job Title: SRO     JPM Title:   Bypass the Unit 2 HPCI Group 4 Isolations JPM Number
: S-N-j Revision Number
: 0 8 Task Number and Title
: 295L081, Bypass the Unit 2 HPCI Group 4 Isolations K/A Number and Importance
:   206000A2.10 4.0 / 4.1 Suggested Testing Environment
:   Plant Alternate Path
: Yes No SRO Only: Yes No Time Critical
: Yes No Reference(s)
: DEOP 0500-02, Revision 1 7  Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
1 5  minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?                     Yes             No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory     Unsatisfactory Comments:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Name (Print):
Satisfactory Unsatisfactory Comments:                     Evaluator's Name (Print):   Evaluator's Signature
Evaluators Signature:                                                       Date:
:   Date:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
TQ-AA-150-J020 Revision 00 Page 10 of 10 This replaced TQ
 
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
TQ-AA-150-J020 Revision 00 Page 10 of 10 This replaced TQ-JA-150-02 INITIAL CONDITIONS
: 1. A transient has occurred which requires Alternate Emergency Depressurization of the Unit 2 RPV 2. A Group 4 Isolation is present.
: 1. A transient has occurred which requires Alternate Emergency Depressurization of the Unit 2 RPV
: 3. The Reactor Building is evacuated. 4. NO HPCI initiation signal is present.
: 2. A Group 4 Isolation is present.
: 3. The Reactor Building is evacuated.
: 4. NO HPCI initiation signal is present.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to bypass the Unit 2 HPCI Group 4 isolations in accordance with DEOP 500
: 1. The Unit Supervisor has directed you to bypass the Unit 2 HPCI Group 4 isolations in accordance with DEOP 500-02.
-02. 2. Notify the Unit Supervisor upon completion of the task.
: 2. Notify the Unit Supervisor upon completion of the task.
SRRS: 3D.100; There are no retention requirements for this section


TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 Job Performance Measure Seal Purge Isolation on Unit 3 JPM Number: S-N-k Revision Number: 15 Date: 01 / 04 / 2017 Developed By:
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Exam Author                  Date Approved By:
Job Performance Measure Seal Purge Isolation on Unit 3 JPM Number:
Facility Representative          Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-k Revision Number: 15 Date: 0 1 / 04 / 20 1 7 


Developed By:
TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Exam Author Date  Approved By:
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
Facility Representative Date TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ
________     1. Task description and number, JPM description and number are identified.
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
________     2. Knowledge and Abilities (K/A) references are included.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.
________     3. Performance location specified. (in-plant, control room, simulator, or other)
________ 2. Knowledge and Abilities (K/A) references are included.
________     4. Initial setup conditions are identified.
________ 3. Performance location specified. (in
________     5. Initiating cue (and terminating cue if required) are properly identified.
-plant, control room, simulator, or other)
________     6. Task standards identified and verified by SME review.
________ 4. Initial setup conditions are identified.
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________     8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 6. Task standards identified and verified by SME review.
________     9. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
Procedure DOP 0202-11               Rev: 33 Procedure                           Rev:
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
Procedure                           Rev:
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
________     10. Verify cues both verbal and visual are free of conflict.
Procedure DOP 0202-11 Rev: 33 Procedure Rev:   Procedure Rev:   ________ 10. Verify cues both verbal and visual are free of conflict.
________     11. Verify performance time is accurate
________ 11. Verify performance time is accurate
________     12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________     13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                               Date SME / Instructor                               Date SME / Instructor                               Date SRRS: 3D.100; There are no retention requirements for this section
SME / Instructor Date       SME / Instructor Date       SME / Instructor Date TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section Revision Record (Summary)
Revision 11 Revised for 2006 LORT Requal exam Revision 12 Revised for 2009 LORT Requal exam Revision 13 Revised for 2012 LORT Requal exam Revision 14 Revised for 2015 LORT Requal exam Revision 15 Updated for 2016
-302 NRC Exam


TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ-JA-150-02 Revision Record (Summary)
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section SIMULATOR SETUP INSTRUCTIONS
Revision 11 Revised for 2006 LORT Requal exam Revision 12 Revised for 2009 LORT Requal exam Revision 13 Revised for 2012 LORT Requal exam Revision 14 Revised for 2015 LORT Requal exam Revision 15 Updated for 2016-302 NRC Exam SRRS: 3D.100; There are no retention requirements for this section
: 1. No simulator setup is required. This is an in
-plant JPM.


TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
: 1. No simulator setup is required. This is an in-plant JPM.
SRRS: 3D.100; There are no retention requirements for this section
 
TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS
: 1. Unit 3 is in a Refuel Outage.
: 1. Unit 3 is in a Refuel Outage.
: 2. Both Recirc Pumps are off.
: 2. Both Recirc Pumps are off.
: 3. Both pumps will be shutdown for an extended period for seal replacement.
: 3. Both pumps will be shutdown for an extended period for seal replacement.
INITIATING CUE
INITIATING CUE
: 1. The Unit 3 Unit Supervisor has directed you to perform the infield actions to shutdown the Unit 3 Seal Purge System to the Recirculation Pumps in accordance with DOP 0202
: 1. The Unit 3 Unit Supervisor has directed you to perform the infield actions to shutdown the Unit 3 Seal Purge System to the Recirculation Pumps in accordance with DOP 0202-11 steps G.2.a through G.2.c..
-11 steps G.2.a through G.2.c.
: 2. Notify the Unit Supervisor upon completion.
. 2. Notify the Unit Supervisor upon completion.
 
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.100; There are no retention requirements for this section


TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ-JA-150-02 JPM Start Time:
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Comment STEP                   ELEMENT                                 STANDARD               SAT   UNSAT Number 01     Proceed to Step G.2.a of DOP               LOCATES step G.2.a                 ___   ___     ___
JPM Start Time:
0202-11.
STEP ELEMENT STANDARD SAT UNSAT Comment Number 01 Proceed to Step G.2.a of DOP 0202-11. LOCATES step G.2.a
For 3 A Recirc Pump, close the                                                 ___  ___    ___
___ ___ ___ For 3 A Recirc Pump, close the following valves:
following valves:
___ ___ ___ *0 2 3-0399-510, 3 A RECIRC PMP SEAL PURGE ISOL VLV.
  *02    3-0399-510, 3 A RECIRC PMP                 Rotates 3-0399-510 CW until         ___  ___    ___
Rotates 3-0399-510 CW until stem stops moving inward.
SEAL PURGE ISOL VLV.                      stem stops moving inward.
___ ___ ___ NOTE Operating the preceding valve requires a ladder and RP survey.
NOTE Operating the preceding valve requires a ladder and RP survey.
CUE Conditions are as described.
CUE     Conditions are as described.
*03 3-0399-512, 3 A RECIRC PMP SEAL PURGE ISOL VLV Rotates 3-0399-512 CW until stem stops moving inward.
  *03     3-0399-512, 3 A RECIRC PMP               Rotates 3-0399-512 CW until         ___  ___    ___
___ ___ ___ CUE Conditions are as described.
stem stops moving inward.
For 3 B Recirc Pump, close the following valves:
SEAL PURGE ISOL VLV CUE     Conditions are as described.
___ ___ ___ *0 4 3-0399-509, 3 B RECIRC PMP SEAL PURGE ISOL VLV.
For 3 B Recirc Pump, close the                                                 ___  ___    ___
Rotates 3-0399-509 CW until stem stops moving inward.
following valves:
___ ___ ___ CUE Conditions are as described.
  *04    3-0399-509, 3 B RECIRC PMP                 Rotates 3-0399-509 CW until         ___  ___    ___
SEAL PURGE ISOL VLV.                      stem stops moving inward.
CUE     Conditions are as described.
NOTE Operating the preceding valve requires a ladder and RP survey.
NOTE Operating the preceding valve requires a ladder and RP survey.
*0 5 3-0399-513, 3 B RECIRC PMP SEAL PURGE ISOL VLV Rotates 3-0399-513 CW until stem stops moving inward.
  *05    3-0399-513, 3 B RECIRC PMP                 Rotates 3-0399-513 CW until         ___  ___    ___
___ ___ ___ CUE Conditions are as described.
SEAL PURGE ISOL VLV                        stem stops moving inward.
0 6 Notify Unit Supervisor that the seal purge system is shutdown.
CUE     Conditions are as described.
Notifies Unit Supervisor that the seal purge system is shutdown.
06      Notify Unit Supervisor that the           Notifies Unit Supervisor that the  ___  ___    ___
___ ___ ___ CUE Respond as US.
seal purge system is shutdown.             seal purge system is shutdown.
END TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ
CUE     Respond as US.
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
END SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM Stop Time:
 
TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ-JA-150-02 JPM Stop Time:
SRRS: 3D.105 (when utilized for operator initial or continuing training)


TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ-JA-150-02 JPM  
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Emp. ID#: ____________
:   Emp. ID#: ____________
Job Title:   SRO JPM Title: Seal Purge Isolation on Unit 3 JPM Number: S-N-k                                   Revision Number: 15 Task Number and Title: 202LN001.14d: Seal Purge System Isolation K/A Number and Importance: 202001K4.04                   3.0/3.1 Suggested Testing Environment: In-Plant Alternate Path:     Yes       No SRO Only:               Yes         No Time Critical:   Yes     No Reference(s): DOP 0202-11 Rev. 33 Actual Testing Environment:             Simulator             Control Room       In-Plant     Other Testing Method:           Simulate             Perform Estimated Time to Complete: 15 minutes                         Actual Time Used:         minutes EVALUATION  
Job Title:   SRO JPM Title:
Seal Purge Isolation on Unit 3 JPM Number:
S-N-k Revision Number:
15 Task Number and Title:
202LN001.14d: Seal Purge System Isolation K/A Number and Importance:
202001K4.04 3.0/3.1 Suggested Testing Environment:
In-Plant Alternate Path:
Yes No SRO Only: Yes  No Time Critical:
Yes No Reference(s):
DOP 0202-11 Rev. 33 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
1 5 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?                   Yes             No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                   Satisfactory     Unsatisfactory Comments:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Name (Print):
Satisfactory Unsatisfactory Comments:                     Evaluator's Name (Print):   Evaluator's Signature
Evaluators Signature:                                                     Date:
:   Date:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ
 
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS
TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS
: 1. Unit 3 is in a Refuel Outage.
: 1. Unit 3 is in a Refuel Outage.
: 2. Both Recirc Pumps are off
: 2. Both Recirc Pumps are off.
. 3. Both pumps will be shutdown for an extended period for seal replacement.
: 3. Both pumps will be shutdown for an extended period for seal replacement.
INITIATING CUE
INITIATING CUE
: 1. The Unit 3 Unit Supervisor has directed you to perform the infield actions to shutdown the Unit 3 Seal Purge System to the Recirculation Pumps in accordance with DOP 0202
: 1. The Unit 3 Unit Supervisor has directed you to perform the infield actions to shutdown the Unit 3 Seal Purge System to the Recirculation Pumps in accordance with DOP 0202-11 steps G.2.a through G.2.c.
-11 steps G.2.a through G.2.c. 2. Notify the Unit Supervisor upon completion.}}
: 2. Notify the Unit Supervisor upon completion.
SRRS: 3D.100; There are no retention requirements for this section}}

Revision as of 03:53, 30 October 2019

2017 Dresden Nuclear Power Station Initial License Reexamination Administered JPMs
ML17128A150
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 03/06/2017
From:
NRC/RGN-III
To:
Exelon Generation Co
Shared Package
ML17110A111 List:
References
TQ-AA-150-J020
Download: ML17128A150 (137)


Text

TQ-AA-150-J020 Revision 00 Page 1 of 8 This replaced TQ-JA-150-02 Job Performance Measure Limitorque Motor-Operated and Chainwheel Operated Valve Operations Review JPM Number: A-N-1-S Revision Number: 00 Date: 01 / 03 / 2017 Developed By:

Exam Author Date Approved By:

Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 2 of 8 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure OP-AA-103-105 Rev: 5 Procedure Rev:

Procedure Rev:

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 3 of 8 This replaced TQ-JA-150-02 Revision Record (Summary)

Revision 00 Generated for 2016-302 NRC Exam SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 4 of 8 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS

1. This is an administrative JPM. No simulator setup is required.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 5 of 8 This replaced TQ-JA-150-02 INITIAL CONDITIONS

1. Unit 2 is in Mode 5.
2. Unit 2 is in Day 8 of a refueling outage
3. MO 2-1501-20A is required to be manually backseated to isolate leakage.
4. Engineering has performed the initial calculations and recorded data required to determine maximum backseating handwheel shaft torque limit.
5. MO 2-1501-20A must be torqued via the handwheel.

INITIATING CUE

1. Review OP-AA-103-105 Attachment C for accuracy and make corrections as necessary.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 6 of 8 This replaced TQ-JA-150-02 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number

  • 01 Determines Maximum Determines incorrect value for ___ ___ ___

Backseating torque as recorded maximum backseating torque is is incorrect. incorrect. Correct value is 1150.1 ft-lbs NOTE:

If the candidate attempts to terminate the review, direct the candidate to make corrections as necessary and complete the attachment. Another SRO will review upon completion.

  • 02 Determines Stem Factor was Determines Stem Factor was ___ ___ ___

incorrectly used in Manual used vice Spur Gear Ratio to backseating handwheel torque determine handwheel torque limit calculation limit. Replaces Stem Factor with Spur Gear Ratio.

  • 03 Determines calculated Determines Maximum ___ ___ ___

Maximum Backseating Backseating Handwheel Shaft Handwheel Shaft Torque limit is Torque is 154.7 ft-lbs.

incorrect.

CUE:

Another SRO will review the calculation. JPM complete.

JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 7 of 8 This replaced TQ-JA-150-02 JPM

SUMMARY

Operators Name: Emp. ID#: ____________

Job Title: SRO JPM Title: Limitorque Motor-Operated and Chainwheel Operated Valve Operations Review JPM Number: A-N-1-S Revision Number: 00 Task Number and Title: 299L080 Perform the administrative duties for conduct of surveillances, complex, or special procedures K/A Number and Importance: Generic 2.1.23 --/ 4.4 Suggested Testing Environment: Classroom Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): OP-AA-103-105 Revision 05 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 8 of 8 This replaced TQ-JA-150-02 INITIAL CONDITIONS

1. Unit 2 is in Mode 5.
2. Unit 2 is in Day 8 of a refueling outage
3. MO 2-1501-20A is required to be manually backseated to isolate leakage.
4. Engineering has performed the initial calculations and recorded data required to determine maximum backseating handwheel shaft torque limit.
5. MO 2-1501-20A must be torqued via the handwheel.

INITIATING CUE

1. Review OP-AA-103-105 Attachment C for accuracy and make corrections as necessary.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 Job Performance Measure AUTHORIZE A WAIVER OF 10 CFR WORK HOUR LIMITS JPM Number: A-N-2-S Revision Number: 02 Date: 12 / 28 / 2016 Developed By:

Exam Author Date Approved By:

Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure LS-AA-119 Rev: 12 Procedure Rev:

Procedure Rev:

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ-JA-150-02 Revision Record (Summary)

Revision 00 Bank JPM.

Revision 01 Revised for ILT 12-1 (2013-301) NRC Exam.

Revision 02 Updated for 2016-302 NRC Exam SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS

1. No simulator setup is required. This is an administrative JPM.

DOCUMENT PREPARATION

1. Clean copy of LS-AA-119.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS

1. You are the Shift Manager.
2. Both units are operating at near rated power.
3. It is Monday 1/23/2017 @ 0600
4. The on-coming Unit 2 SRO, calls in to report he will not be able to come in for shift 2, due to a sudden illness.
5. Another SRO will not be able to come in until 1300.
6. The Unit 3 SRO is already scheduled to work a shift 1 and shift 2 double.
7. No other Licensed individual is available to fill the Safety Related position.
8. The Unit 2 SRO working shift 1 is Steve Smith.
9. Steve is ready and willing to work the overtime and will work until 1300.
10. Steve is NOT fatigued and IS mentally alert.
11. Steves rolling work hour average for the past 6 weeks is 42.0 hour0 days <br />0 hours <br />0 weeks <br />0 months <br />s/week
12. Steves Employee ID# is: 987654.
13. Safety-related work WILL be performed by Steve during the shift.
14. Steve is NOT scheduled to work Tuesday 1/24/2017 through Thursday 1/26/2017.
15. Steve was on a 7 day vacation prior to the following shifts that count towards 10 CFR 26 Work Hour Limits:

Tue Wed Thu Fri Sat Sun Mon Shift 1/17/17 1/18/17 1/19/17 1/20/17 1/21/17 1/22/17 1/23/17 1 (2300-0700) 8 8 8 8 8 8 8 2 (0700-1500) 4 4 4 3 (1500-2300)

INITIATING CUE

1. Complete LS-AA-119, attachment 1, section 1 - Request paperwork for Steve Smith.
2. The Operations Director will complete sections 2 - 4 of LS-AA-119.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ-JA-150-02 Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ-JA-150-02 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number NOTE:

Provide the examinee with the supplied copy of LS-AA-119.

01 Reviews procedure to determine Determines that overtime would ___ ___ ___

what limits will be exceeded. exceed:

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in any 7 days.

  • 02 Records Planned Waiver Start. Planned Waiver Start: ___ ___ ___

1/23/2017 / 1100

  • 03 Records Planned Waiver End. Planned Waiver End: ___ ___ ___

1/23/2017 / 1300

  • 04 Records Planned Waiver Planned Waiver Duration: 2 ___ ___ ___

Duration. hours

  • 05 Checks the appropriate limit > 72 in any 7 days. ___ ___ ___

exceeded. checked 06 Documents and signs the Submitted by: name, ___ ___ ___

submitted by block. signature, date, and time.

07 Forwards paperwork to the Forwards paperwork to the ___ ___ ___

Operations Director. Operations Director or designee.

END JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ-JA-150-02 JPM

SUMMARY

Operators Name: Emp. ID#: ____________

Job Title: SRO JPM Title: AUTHORIZE A WAIVER OF 10 CFR WORK HOUR LIMITS JPM Number: A-N-2-S Revision Number: 02 Task Number and Title: 299L057, Perform administrative duties to ensure overtime restrictions are not exceeded.

K/A Number and Importance: Generic 2.1.5 -- / 3.9 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): LS-AA-119 Rev. 12 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 14 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS

1. You are the Shift Manager.
2. Both units are operating at near rated power.
3. It is Monday 1/23/2017 @ 0600
4. The on-coming Unit 2 SRO, calls in to report he will not be able to come in for shift 2, due to a sudden illness.
5. Another SRO will not be able to come in until 1300.
6. The Unit 3 SRO is already scheduled to work a shift 1 and shift 2 double.
7. No other Licensed individual is available to fill the Safety Related position.
8. The Unit 2 SRO working shift 1 is Steve Smith.
9. Steve is ready and willing to work the overtime and will work until 1300.
10. Steve is NOT fatigued and IS mentally alert.
11. Steves rolling work hour average for the past 6 weeks is 42.0 hour0 days <br />0 hours <br />0 weeks <br />0 months <br />s/week
12. Steves Employee ID# is: 987654.
13. Safety-related work WILL be performed by Steve during the shift.
14. Steve is NOT scheduled to work Tuesday 1/24/2017 through Thursday 1/26/2017.
15. Steve was on a 7 day vacation prior to the following shifts that count towards 10 CFR 26 Work Hour Limits:

Tue Wed Thu Fri Sat Sun Mon Shift 1/17/17 1/18/17 1/19/17 1/20/17 1/21/17 1/22/17 1/23/17 1 (2300-0700) 8 8 8 8 8 8 8 2 (0700-1500) 4 4 4 3 (1500-2300)

INITIATING CUE

1. Complete LS-AA-119, attachment 1, section 1 - Request paperwork for Steve Smith.
2. The Operations Director will complete sections 2 - 4 of LS-AA-119.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 1 of 8 This replaced TQ-JA-150-02 Job Performance Measure ACOUSTIC MONITOR SURVIELLANCE AND OPERABILITY DETERMINATION JPM Number: A-N-3-S Revision Number: 00 Date: 11 / 30 / 2016 Developed By:

Exam Author Date Approved By:

Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 2 of 8 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure DOS 0250-06 Rev: 16 Procedure OP-AA-108-115 Rev: 17 Procedure OP-AA-108-115-1002 Rev: 03

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 3 of 8 This replaced TQ-JA-150-02 Revision Record (Summary)

Revision 00: Generated for 2016-302 NRC Exam SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 4 of 8 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS

1. This is a administrative JPM utilizing simulator procedures. No simulator setup is necessary.

DOCUMENT PREPARATION

1. Mark up a copy of DOS 0250-06 as required.
2. Ensure access simulator procedures or EDMS/Passport is available.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 5 of 8 This replaced TQ-JA-150-02 INITIAL CONDITIONS

1. You are the Unit 2 SRO.
2. Unit 2 is in Mode 1.
3. DOS 0250-06 has just been completed.
4. The NSO reported that all surveillance requirements were within specifications.

INITIATING CUE

1. Review DOS 0250-06 for accuracy and completeness.
2. Determine operability of acoustic monitors.
3. Enter Technical Specification and/or TRMs if required.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 6 of 8 This replaced TQ-JA-150-02 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number

  • 01 Identifies on the data sheet that Identifies out of spec value. ___ ___ ___

valve 203-4A threshold volt is out of spec.

  • 02 Declares Acoustic Monitor Declares Acoustic Monitor ___ ___ ___

Inoperable due to failure to Inoperable meet acceptance criteria NOTE:

Acoustic Monitor failure results in TRM 3.3.b Condition A.1

  • 03 Enters TRM 3.3.b Condition A.1 Enters TRM 3.3.b Condition A.1 ___ ___ ___

and determines the channel must be restored to OPERABLE within 30 days.

END OF JPM JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 7 of 8 This replaced TQ-JA-150-02 JPM

SUMMARY

Operators Name: Emp. ID#: ____________

Job Title: SRO JPM Title: ACOUSTIC MONITOR SURVIELANCE AND OPERABILITY DETERMINATION JPM Number: A-N-3-S Revision Number: 00 Task Number and Title: 299L080 Perform the administrative duties for conduct of surveillance, special, or complex procedures.

K/A Number and Importance: Generic 2.2.37 --/4.6 Suggested Testing Environment: Classroom Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DOS 0250-06 Rev. 16, OP-AA-108-115 Rev. 17, OP-AA-108-115-1002 Rev. 03 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 10 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 8 of 8 This replaced TQ-JA-150-02 INITIAL CONDITIONS

1. You are the Unit 2 SRO.
2. Unit 2 is in Mode 1.
3. DOS 0250-06 has just been completed.
4. The NSO reported that all surveillance requirements were within specifications.

INITIATING CUE

1. Review DOS 0250-06 for accuracy and completeness.
2. Determine operability of acoustic monitors.
3. Enter Technical Specification and/or TRMs if required.

SRRS: 3D.100; There are no retention requirements for this section

Job Performance Measure (JPM)

KEY EVALUATOR: The candidate must determine that dose for the task will be 55 mrem and determine that only two EOs can receive the dose, necessary to complete the task. They are Mike and Tom. See the table below for projected job dose, 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> total dose on RWP DR 17-00333, and total Annual TEDE dose for each Operator.

Calculation:

2 valves clearance (at RWCU Aux Pump) projected dose = 0.50 hr x 40 mr/hr = 20mrem 1 valve clearance (at A RWCU Pump) projected dose = 0.25hr x 140 mr/hr = 35mrem 20 mrem + 35 mrem = 55 mrem projected job dose for clearance order hanging DDE dose Annual TEDE Projected dose on Projected Annual TEDE received on RWP Name DR-0-17-00333 dose as of RWP DR-0-17-00333 (including all dose from Midnight To Date for the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />) today (50 + 55 (1550 + 105 Alex 50 mrem 1550 mrem =) 105 =) 1655 mrem mrem (1950 + 60 (5 + 55 =)

Dan 5 mrem 1950 mrem =) 2010 60 mrem mrem (1920 + 55 (0 + 55 Mike 0 mrem 1920 mrem =) 1975

=) 55 mrem mrem (47 + 55 (1850 + 102 Sue 47 mrem 1850 mrem =) 102 =) 1952 mrem mrem (1750 + 63 (8 + 55 Tom 8 mrem 1750 mrem =) 1813

=) 63 mrem mrem The bolded values in the table exceed the applicable Company, RWP, or 10CFR limit.

TQ-AA-150-J020 Revision 00 Page 1 of 10 This replaced TQ-JA-150-02 Job Performance Measure Select Personnel for Radiation Work JPM Number: A-N-4-S Revision Number: 02 Date: 12 / 28 / 2016 Developed By:

Exam Author Date Approved By:

Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 2 of 10 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure RP-AA-203 Rev: 03 Procedure Rev:

Procedure Rev:

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 3 of 10 This replaced TQ-JA-150-02 Revision Record (Summary)

Revision 02 Updated for 2016-302 NRC Exam SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 4 of 10 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures
2. No simulator setup is required.

DOCUMENT PERPARATION

1. Markup a copy of an RWP for the Unit 3 RWCU Pump Room.
2. Markup a survey map for the Unit 3 RWCU Pump Room.
3. Clean copy of RP-AA-203.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 5 of 10 This replaced TQ-JA-150-02 INITIAL CONDITIONS INITIAL CONDITIONS

1. You are a Unit Supervisor and will be briefing EOs to perform a Clearance Order First Hang in the Unit 3 RWCU Pump Room under RWP DR-0-17-00333.
2. Five EOs are available this shift.
  • None of the five have received dose at any location other than Dresden Station.
  • None of the five have received dose since midnight on any RWPs other than DR-0 00333.
3. The Radiation Protection Department has provided the attached Survey map, and the following dose history for the five EOs to assist you in your planning:

Annual TEDE DDE dose received on Name dose Prior RWP DR-0-17-00333 Today to Shift Alex 50 mrem 1550 mrem Dan 5 mrem 1950 mrem Mike 0 mrem 1920 mrem Sue 47 mrem 1850 mrem Tom 8 mrem 1750 mrem

4. The total expected stay time for each EO will be 45 minutes. Based on past job history, it will breakdown as follows:
  • 30 minutes total in the area near the following two valves:

3-1201-138 RWCU Aux Pump Suction (at RWCU Aux Pump) 3-1201-139 RWCU Aux Pump Discharge (at RWCU Aux Pump)

  • 15 minutes total in the area near the following one valve:

3-1201-128A A RWCU Pump Suction (at A RWCU Pump)

INITIATING CUE

1. CALCULATE the expected dose for the work in RWCU Pump Room. DETERMINE which EO(s) CAN and which EO(s) CAN NOT be assigned to perform the task. Demonstrate SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 6 of 10 This replaced TQ-JA-150-02 dose calculation to determine all violations (if any). EXPLAIN the basis for your determination.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 7 of 10 This replaced TQ-JA-150-02 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number NOTE:

Provide the examinee with the supplied copy of the RWP and survey map of the RWCU pump room and, if requested, the supplied copy of RP-AA-203.

The following steps may be performed in any order.

01 Reviews Survey Maps to Reviews the survey maps and ___ ___ ___

determine area dose rates. determines area dose rates to be 40 mr/hr for the first group of 2 valves and 140 mr/hr for the remaining valve.

NOTE:

The following calculations should be made:

2 valve clearance projected dose = 0.50 hr x 40 mr/hr = 20 mrem 1 valve clearance projected dose = 0.25 hr x 140 mr/hr = 35 mrem Total projected dose for the job = 20 mrem + 35 mrem = 55 mrem 02 Calculates that the projected dose Determines the EOs will receive 20 ___ ___ ___

that will be received for the task is mrem on the first 2 valves and 35 55 mrem. on the next valve.

  • 03 Determines that ALEX CAN NOT Alexs total daily dose on RWP ___ ___ ___

perform the job because he would DR-0-17-00333 would be 105 exceed the 80 mrem dose alarm mrem.

on RWP DR-0-17-00333.

  • 04 Determines that Dan CAN NOT Dans total Annual dose would ___ ___ ___

perform the job because he would be 2010 mrem.

exceed the 2000 mrem Exelon Annual limit.

  • 05 Determines that Mike CAN perform Mikes total RWP daily dose and ___ ___ ___

the job because no limits will be Annual dose will remain below the exceeded. limits.

  • 06 Determines that Sue CAN NOT Sues total daily dose on RWP DR- ___ ___ ___

perform the job because she would 0-17-00333 would be 102 mrem.

exceed the 80 mrem dose alarm on RWP DR-0-17-00333.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 8 of 10 This replaced TQ-JA-150-02 Comment STEP ELEMENT STANDARD SAT UNSAT Number

  • 07 Determines that Tom CAN perform Toms total RWP daily dose and ___ ___ ___

the job because no limits will be Annual dose will remain below the exceeded. limits.

END of JPM JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 9 of 10 This replaced TQ-JA-150-02 JPM

SUMMARY

Operators Name: Emp. ID#: ____________

Job Title: SRO JPM Title: Select Personnel for Radiation Work JPM Number: A-N-4-S Revision Number: 02 Task Number and Title: 29900LK119 Discuss the items to be considered prior to work authorization K/A Number and Importance: Generic 2.3.13 --/3.8 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): RP-AA-203 Revision 03 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 10 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 10 of 10 This replaced TQ-JA-150-02 INITIAL CONDITIONS INITIAL CONDITIONS

1. You are a Unit Supervisor and will be briefing EOs to perform a Clearance Order First Hang in the Unit 3 RWCU Pump Room under RWP DR-0-17-00333.
2. Five EOs are available this shift.
  • None of the five have received dose at any location other than Dresden Station.
  • None of the five have received dose since midnight on any RWPs other than DR-0 00333.
3. The Radiation Protection Department has provided the attached Survey map, and the following dose history for the five EOs to assist you in your planning:

DDE dose received on Annual TEDE dose Name RWP DR-0-17-00333 Today Prior to Shift Alex 50 mrem 1550 mrem Dan 5 mrem 1950 mrem Mike 0 mrem 1920 mrem Sue 47 mrem 1850 mrem Tom 8 mrem 1750 mrem

4. The total expected stay time for each EO will be 45 minutes. Based on past job history, it will breakdown as follows:
  • 30 minutes total in the area near the following two valves:

3-1201-138 RWCU Aux Pump Suction (at RWCU Aux Pump) 3-1201-139 RWCU Aux Pump Discharge (at RWCU Aux Pump)

  • 15 minutes total in the area near the following one valve:

3-1201-128A A RWCU Pump Suction (at A RWCU Pump)

INITIATING CUE

1. CALCULATE the expected dose for the work in RWCU Pump Room. DETERMINE which EO(s) CAN and which EO(s) CAN NOT be assigned to perform the task. Demonstrate dose calculation to determine all violations (if any). EXPLAIN the basis for your determination.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 1 of 8 This replaced TQ-JA-150-02 Job Performance Measure EAL Declaration JPM Number: A-N-5-S Revision Number: 00 Date: 12 / 28 / 2016 Developed By:

Exam Author Date Approved By:

Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 2 of 8 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure EP-AA-1004 Addendum 3 Rev: 05 Procedure Rev:

Procedure Rev:

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 3 of 8 This replaced TQ-JA-150-02 Revision Record (Summary)

Revision 00: Generated for 2016-302 NRC Exam SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 4 of 8 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS

1. This is an administrative JPM utilizing the simulator procedures only. No simulator setup is required.
2. Ensure EAL charts are free of markings.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 5 of 8 This replaced TQ-JA-150-02 INITIAL CONDITIONS

1. THIS IS A TIME CRITICAL JPM.
2. You are the Unit 2 SRO.
3. Unit 2 is operating at rated power.
4. There are NO surveillances in progress.
5. There are NO RPV level transients in progress.
6. EO reports a fire with visible flames in the Unit 2 HPCI Aux Oil Pump.
7. The fire is limited to the HPCI Aux Oil Pump.
8. There is NO verifier available.

INITIATING CUE

1. Determine EAL(s) (ignore discretionary EALs) and complete a NARS form. Give the NARS form to the WEC Supervisor, who will make the state notification.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 6 of 8 This replaced TQ-JA-150-02 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number NOTE:

When student located NARS form provide student with:

  • Included color copy of NARS form (gray)
  • Screenshot of PPDS
  • 01 Determines a classification of Determine highest classification is ___ ___ ___

ALERT, due to fire damaging a ALERT per EAL MA5. (15 minute safety system required by time requirement)

Technical Specifications in the current operating mode.

NOTE:

Determines classification start time _______ and stop time _______ .

(15 minute limit)

  • 02 Properly fills out NARS form. See attached key for the areas that ___ ___ ___

must be filled out correctly (12 minute requirement) Critical items (NOTE: referenced attached key are HIGHLIGHTED has been withheld due to NARS form Block 8 either proprietary content) meters/sec or miles/hr may be annotated. Only one is required.

Elevated parameters must be used.

NOTE:

Fill out NARS form start time (when declaration completed) _______ and stop time ______

(12 minute limit)

END JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 7 of 8 This replaced TQ-JA-150-02 JPM

SUMMARY

Operators Name: Emp. ID#: ____________

Job Title: SRO JPM Title: EAL Declaration JPM Number: A-N-5-S Revision Number: 00 Task Number and Title: 295L160 Perform the duties of Shift Emergency Director K/A Number and Importance: Generic 2.4.44 --/4.4 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): EP-AA-1004 Addendum 3 Rev. 05 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 20 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 8 of 8 This replaced TQ-JA-150-02 INITIAL CONDITIONS

1. THIS IS A TIME CRITICAL JPM.
2. You are the Unit 2 SRO.
3. Unit 2 is operating at rated power.
4. There are NO surveillances in progress.
5. There are NO RPV level transients in progress.
6. EO reports a fire with visible flames in the Unit 2 HPCI Aux Oil Pump.
7. The fire is limited to the HPCI Aux Oil Pump.
8. There is NO verifier available.

INITIATING CUE

1. Determine EAL(s) (ignore discretionary EALs) and complete a NARS form. Give the NARS form to the WEC Supervisor, who will make the state notification.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 Job Performance Measure Insertion of Manual Scram with Failure to Scram (AP)

JPM Number: S-N-a Revision Number: 02 Date: 12/ 28 / 2016 Developed By:

Exam Author Date Approved By:

Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure DGP 02-03 Rev: 106 Procedure Rev:

Procedure Rev:

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ-JA-150-02 Revision Record (Summary)

Revision 00 Bank JPM Revision 01 JPM revised for ILT 07-01 CERT Exam Revision 02 JPM revised for 2016-302 NRC Exam SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC 50 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. {Delete this NOTE if not applicable.}
2. Insert expert command:

imf B12 SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS

1. Security has reported a tornado heading towards the 345KV switchyard and it is about to strike the yard.

INITIATING CUE

1. Unit Supervisor has directed you to insert a manual scram and perform the immediate operator actions of the DGP 02-03 hard card.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ-JA-150-02 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number 01 Presses both scram pushbuttons. Both pushbuttons DEPRESSED. ___ ___ ___

02 Place reactor mode switch to Mode switch in SHUTDOWN. ___ ___ ___

SHUTDOWN.

NOTE:

Rod position can be verified by: Full core display, Computer output, or RWM CRT.

03 Check rods inserted <02. VERIFIES all rods not < 02. ___ ___ ___

BEGIN ALTERNATE PATH

  • 04 Collars armed on either ATWS ARI Collars ARMED. ___ ___ ___

S4A & S4C OR S4B & S4D.

  • 05 Depress pushbuttons on either Pushbuttons DEPRESSED. ___ ___ ___

ATWS ARI S4A & S4C or S4B &

S4D.

NOTE:

Rod position can be verified by any or all of the following:

  • Full core display
  • Computer output

Rod positions VERIFIED.

06 Check rods inserted <02. ___ ___ ___

07 Verify Recirc pumps run back to VERIFIES that both Recirc pumps ___ ___ ___

minimum. are running down to minimum.

NOTE:

Steps 08 and 09 may be performed, however these actions are not critical.

08 Insert SRMs and IRMs. Depresses SRM and IRM drive in ___ ___ ___

pushbuttons.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ-JA-150-02 Comment STEP ELEMENT STANDARD SAT UNSAT Number 09 Control Reactor water level +25 to VERIFIES that the FWLC is ___ ___ ___

+35 inches or as directed by the operating and controlling RPV Unit Supervisor. water level.

10 Inform US that all rods are in, ARI Attention for an Update; All rods ___ ___ ___

was required. are in ARI was used, Rx Pressure

& Level are trending as expected.

End of Update.

CUE:

Acknowledge report. The JPM is considered complete at this time.

END JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ-JA-150-02 JPM

SUMMARY

Operators Name: Emp. ID#: ____________

Job Title: SRO JPM Title: Insertion of Manual Scram with Failure to Scram JPM Number: S-N-a Revision Number: 02 Task Number and Title: 295L068 Insertion of Manual Scram with Failure to Scram (ARI Successful)

K/A Number and Importance: 295037.A1.03 4.1/4.1 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DGP 02-03 Revision 106 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 5 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS

1. Security has reported a tornado heading towards the 345KV switchyard and it is about to strike the yard.

INITIATING CUE

1. Unit Supervisor has directed you to insert a manual scram and perform the immediate operator actions of the DGP 02-03 hard card.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 Job Performance Measure Initiate HPCI with Incomplete Group IV Isolation (AP)

JPM Number: S-N-b Revision Number: 01 Date: 11/29/2016 Developed By:

Exam Author Date Approved By:

Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure DOA 2300-02 Rev: 11 Procedure DAN 902(3)-3 C-7 Rev: 14 Procedure Rev:

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ-JA-150-02 Revision Record (Summary)

Revision 00: New JPM created for 2016 LORT exam.

Revision 01: Revised for 2016-302 NRC Exam SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to 0% power with full pressure (IC 51 used for validation)
2. Run CAEP - S-2300-08.cae
a. If the CAEP cannot be ran, insert the following Expert Commands:
1) irf rd25pos 0.0
2) imf hp4vlbn 50.0
3) trgset 1 atl140b .gt. 0.0
4) imf ser0086 (1 8) on
5) ior hpdcl4 (1 8) close
6) imf ser0654 (1 60) on
7) imf ser0288 (1 120)
3. Verify 2-0301-25 valve is closed (completed during running the CAEP file)
4. Lower FWLC setpoint to -10 and allow RPV level to stabilize at the new level.
5. Put computer point C360 up on the Digital Display
6. Acknowledge the alarms that are in and press the Reset button to clear any cleared alarms.
7. This completes the setup for this JPM DOCUMENT PREPARATION Need a clean copy of current revision of DOA 2300-02, HPCI Fast Startup, Attachment B (Hardcard).

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS

1. You are the Unit 2 NSO.
2. A transient has occurred resulting in lowering RPV level.
3. NO HPCI initiation signal is present.

INITIATING CUE

1. The Unit Supervisor has directed you to inject with HPCI to raise RPV level and maintain RPV level between +8 and +48.
2. Hard card use IS authorized.
3. An additional NSO has been tasked with starting HPCI room cooler, SBGT, and Torus Cooling.
4. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ-JA-150-02 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number

1. Verity HPCI Aux Oil Pump AND 2- Verify GREEN lights are lit 2301-14 valve are NOT in PTL

___ ___ ___

  • 2. Depress AND hold depressed the Depress HPCI AUTO INITIATE HPCI AUTO INITIATE pushbutton pushbutton.

until the MSC reaches the HSS. Verifies Motor Speed Changer LSS (green light) goes out and HSS (red light) illuminates

___ ___ ___

3. Verifies RWL is increasing Verifies RWL is increasing by looking at Medium or Narrow Range indicators

___ ___ ___

BEGIN ALTERNATE PATH (HPCI Auto Isolation alarm occurs 8 seconds after RWL is > 0)

4. HPCI AUTO ISOL INITIATED Recognizes 902-3 C-7 (HPCI alarm comes in AUTO ISOL INITIATED) is in alarm

___ ___ ___

5. Verify Auto Isolation complete Verifies:
  • MO 2-2301-35 green light lit
  • MO 2-2301-36 green light lit Determines
  • MO 2-2301-4 did not close (dual indication)
  • MO 2-2301-5 did not close (green light still lit) ___ ___ ___
6. Attempts to manually complete the Attempts to close:

incomplete Group IV Isolation

  • MO 2-2301-4 ___ ___ ___
  • 7. Manually completes the Closes:

incomplete Group IV Isolation

  • MO 2-2301-5 ___ ___ ___

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ-JA-150-02 Comment STEP ELEMENT STANDARD SAT UNSAT Number

8. Informs Unit Supervisor Informs Unit Supervisor
  • HPCI Isolation signal received while initiating system
  • MO 2-2301-4 has dual indication
  • MO 2-2301-5 valve did not close
  • Isolation was manually completed by closing the 2-2301-5 valve, the 2-2301-4 still has dual indication ___ ___ ___

Cue Acknowledge report as the Unit Supervisor END JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ-JA-150-02 JPM

SUMMARY

Operators Name: Emp. ID#: ____________

Job Title: SRO JPM Title: Initiate HPCI with Incomplete Group IV Isolation JPM Number: S-N-b Revision Number: 01 Task Number and Title: 206L022, Perform a fast startup of the HPCI system K/A Number and Importance: 206000.A3.09 4.2 / 4.1 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DOA 2300-02, Rev 11, DAN 902(3)-3 C-7 Rev. 14 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 10 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS

1. You are the Unit 2 NSO.
2. A transient has occurred resulting in lowering RPV level.
3. NO HPCI initiation signal is present.

INITIATING CUE

1. The Unit Supervisor has directed you to inject with HPCI to raise RPV level and maintain RPV level between +8 and +48.
2. Hard card use IS authorized.
3. An additional NSO has been tasked with starting HPCI room cooler, SBGT, and Torus Cooling.
4. Inform the Unit Supervisor when the task is complete.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 1 of 10 This replaced TQ-JA-150-02 Job Performance Measure MSIV Closure Scram and Isolation Circuit Functional Test JPM Number: S-N-c Revision Number: 00 Date: 11 / 29 / 2016 Developed By:

Exam Author Date Approved By:

Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 2 of 10 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure DOS 0500-08 Rev: 45 Procedure Rev:

Procedure Rev:

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 3 of 10 This replaced TQ-JA-150-02 Revision Record (Summary)

Revision 00: Developed for 2016-302 NRC Exam SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 4 of 10 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC 50 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. {Delete this NOTE if not applicable.}
2. This completes the setup for this JPM.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 5 of 10 This replaced TQ-JA-150-02 INITIAL CONDITIONS

1. Engineering requests that testing the D Main Steam Line Isolation Valves (MSIVs) be performed.
2. Operators are stationed at the 902-15 & 17 panels.
3. Prerequisites have been completed.
4. No compensatory actions are in place for TS 3.3.1.1
5. Test switches SS1 and SS2 are NOT installed.

INITIATING CUE

1. The Unit Supervisor directs you to perform DOS 0500-08, Main Steam Line Isolation Valve Closure Scram Circuit Functional Test, for the D MSIVs ONLY.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 6 of 10 This replaced TQ-JA-150-02 JPM Start Time:

UNSAT Comment #

PERFORMANCE CHECKLIST STANDARDS SAT NOTE Examinee MAY validate with assigned operators at the 902-15&17 panels that they are ready.

01 Inform operators at 902-15 & 17 Informs operators at 902-15 &

to watch relays 590-102G and 17 to watch relays 590-102G 590-102H. and 590-102H. _____ _____ _____

CUE Acknowledge direction and inform the examinee we are ready.

NOTE If Examinee requests a peer check, respond - a peer check is not available.

Examinee may use flagging to identify components to be manipulated.

  • 02 Test MSIV 203-1D by Momentarily rotates MSIV TEST momentarily placing MSIV TEST AO 2-203-1D switch to TEST on AO 2-203-1D switch to TEST on Panel 902-3.

Panel 902(3)-3 _____ _____ _____

03 Verifies MSIV 1D slow closes Dual indication is received, until the dual indication is THEN returns to the full open received, THEN returns to the position. (CLOSE light OFF, full open position. OPEN light ON) _____ _____ _____

04 Verify MSIV NOT FULL OPEN Contacts operator watching relay 590-102G drops out. relay 590-102G for its operation. _____ _____ _____

05 Verify MSIV NOT FULL OPEN Contacts operator watching relay 590-102G picks up. relay 590-102G for its operation. _____ _____ _____

CUE Report that relay 590-102G dropped out with contacts 1-2 AND 3-4 opening, then the relay picked up 06 Verify MSIV NOT FULL OPEN Contacts operator watching relay 590-102H drops out. relay 590-102H for its operation. _____ _____ _____

07 Verify MSIV NOT FULL OPEN Contacts operator watching relay 590-102H picks up. relay 590-102H for its operation. _____ _____ _____

CUE Report that relay 590-102H dropped out with contacts 1-2 AND 3-4 opening, then the relay picked up 08 On Panel 902(3)-5, annunciator Verifies on Panel 902-5, 902(3)-5 D-14 does NOT alarm. annunciator 902-5 D-14 does NOT alarm.

_____ _____ _____

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 7 of 10 This replaced TQ-JA-150-02 UNSAT Comment #

PERFORMANCE CHECKLIST STANDARDS SAT CUE Annunciator 902-5 D-14 did NOT alarm.

09 MSIV C NOT FULL OPEN Verifies MSIV C NOT FULL computer point W010 does NOT OPEN computer point W010 indicate TRIP. does NOT indicate TRIP. _____ _____ _____

CUE Computer point W010 does NOT indicate TRIP.

10 MSIV D NOT FULL OPEN Verifies MSIV D NOT FULL computer point W011 does NOT OPEN computer point W011 indicate TRIP. does NOT indicate TRIP. _____ _____ _____

CUE Computer point W011 does NOT indicate TRIP.

NOTE Examinee MAY inform the operators at the 902-15&17 panels that they are ready.

11 Inform operators at 902-15 & 17 Inform operators at 902-15 & 17 to watch relays 590-102G and to watch relays 590-102G and 590-102H. 590-102H. _____ _____ _____

CUE Acknowledge direction and inform the examinee we are ready.

  • 12 Test MSIV 203-2D by Momentarily rotates MSIV TEST momentarily placing MSIV TEST AO 2-203-2D switch to TEST on AO 2-203-2D switch to TEST on Panel 902-3.

Panel 902(3)-3 _____ _____ _____

13 Verifies MSIV 2D slow closes Dual indication is received, until the dual indication is THEN returns to the full open received, THEN returns to the position. (CLOSE light OFF, full open position. OPEN light ON) _____ _____ _____

14 Verify MSIV NOT FULL OPEN Contacts operator watching relay 590-102G drops out. relay 590-102G for its operation. _____ _____ _____

15 Verify MSIV NOT FULL OPEN Contacts operator watching relay 590-102G picks up. relay 590-102G for its operation. _____ _____ _____

CUE Report that relay 590-102G dropped out, then the relay picked up SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 8 of 10 This replaced TQ-JA-150-02 UNSAT Comment #

PERFORMANCE CHECKLIST STANDARDS SAT 16 Verify MSIV NOT FULL OPEN Contacts operator watching relay 590-102H drops out. relay 590-102H for its operation. _____ _____ _____

17 Verify MSIV NOT FULL OPEN Contacts operator watching relay 590-102H picks up. relay 590-102H for its operation. _____ _____ _____

CUE Report that relay 590-102H dropped out, then the relay picked up 18 On Panel 902(3)-5, ALL white Verifies on Panel 902-5, SCRAM SCRAM SOLENOID GROUPS SOLENOID GROUP lights are lights are lit. illuminated: A1, A2, A3, A4, B1, B2, B3, B4. _____ _____ _____

END OF JPM JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 9 of 10 This replaced TQ-JA-150-02 JPM

SUMMARY

Operators Name: Emp. ID#: ____________

Job Title: SRO JPM Title: MSIV Closure Scram and Isolation Circuit Functional Test JPM Number: S-N-c Revision Number: 00 Task Number and Title: 239000LP012 / Perform a MSIV closure scram and isolation circuit functional test in accordance with DOS 0500-08 K/A Number and Importance: 239001.A4.01 4.2/4.0 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DOS 0500-08 Rev. 45 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 10 of 10 This replaced TQ-JA-150-02 INITIAL CONDITIONS

1. Engineering requests that testing the D Main Steam Line Isolation Valves (MSIVs) be performed.
2. Operators are stationed at the 902-15 & 17 panels.
3. Prerequisites have been completed.
4. No compensatory actions are in place for TS 3.3.1.1
5. Test switches SS1 and SS2 are NOT installed.

INITIATING CUE

1. The Unit Supervisor directs you to perform DOS 0500-08, Main Steam Line Isolation Valve Closure Scram Circuit Functional Test, for the D MSIVs ONLY.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 Job Performance Measure Initiate IC with System Isolation Failure (AP)

JPM Number: S-N-d Revision Number: 00 Date: 11 / 30 / 2016 Developed By:

Exam Author Date Approved By:

Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure DOP 1300-03 Rev: 38 Procedure DAN 902(3)-3 H-2 Rev: 21 Procedure Rev:

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ-JA-150-02 Revision Record (Summary)

Revision 00: Generated for 2016-302 NRC Exam SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC 50 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. {Delete this NOTE if not applicable.}
2. Insert Expert Commands:
  1. Incomplete Group V Isolation imf cigp5ap
  1. Causes a spurious Group V Isolation by taking out 125 VDC 2B-1 trgset 1 ".not. hwiclcl3" imf t61 (1 20)
3. This completes the setup for this JPM.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS

1. You are the Unit 2 NSO.
2. A transient occurred resulting in the loss of bypass valves.
3. The Unit Supervisor has directed a RPV pressure band of 800 - 1060 psig.
4. No Isolation Condenser auto-initiation signal has been received.
5. Hard Card use has been authorized.

INITIATING CUE

1. The Unit Supervisor has directed you to initiate the Isolation Condenser and lower RPV pressure between 800 and 850 psig.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

      • NOTE: Simulator conditions do not match plant conditions as specified in initial conditions.

Main Turbine bypass valves are open in simulator setup. This does not effect the performance of the JPM****

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ-JA-150-02 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number NOTE:

When the candidate locates the DOP 1300-03 Hard Card located on the 902-3 panel, hand the candidate the included copy of the Hard Card.

01 Close AO 2-1301-17 and 2-1301- Place control switch for AO 2- ___ ___ ___

20 valves. 1301-17 and 2-1301-20 valves in the closed direction. Observe GREEN lights (Open) extinguish and RED lights (Closed) illuminate.

02 Rotate RX INLET ISOL VLV Rotates RX INLET ISOL VLV ___ ___ ___

HAND/RESET switch to HAND HAND/RESET switch on 902-3 and release. panel to HAND and releases.

  • 03 Open MO 2-1301-3 RX INLET Places control switch for MO 2- ___ ___ ___

ISOL valve to lower RPV 1301-3 valve in the open pressure. position. Observes GREEN (closed) light extinguish and RED (open) light illuminate.

BEGIN ALTERNATE PATH NOTE:

If candidate attempts to address annunciators beyond the 902-3 Panel inform them: Another NSO will address the annunciators beyond the 902-3 Panel.

04 Determines PCIS Group V Annunciator 902-3 H-2, ISOL ___ ___ ___

isolation signal has been CONDR LINE BREAK (GROUP received. 5 ISOL) is illuminated.

  • 05 Determines MO 2-1301-1 failed Places control switch for MO 2- ___ ___ ___

to close 1301-1 to close. Verifies RED (closed) light illuminates and GREEN (open) light extinguishes.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ-JA-150-02 Comment STEP ELEMENT STANDARD SAT UNSAT Number

  • 06 Determines MO 2-1301-4 failed Places control switch for MO 2- ___ ___ ___

to close 1301-4 to close. Verifies RED (closed) light illuminates and GREEN (open) light extinguishes.

07 Verifies PCIS Group V isolation Verifies the following valves ___ ___ ___

completed closed:

AO 2-1301-17 (Red light lit)

AO 2-1301-20 (Red light lit)

MO 2-1301-2 (Red light lit)

MO 2-1301-3 (Green light lit) 08 Informs Unit Supervisor Informs Unit Supervisor PCIS ___ ___ ___

signal failed to complete isolation of Isolation Condenser.

Manual action was taken to complete the isolation.

END OF JPM JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ-JA-150-02 JPM

SUMMARY

Operators Name: Emp. ID#: ____________

Job Title: SRO JPM Title: Initiate IC with System Isolation Failure JPM Number: S-N-d Revision Number: 00 Task Number and Title: 20700LP003 Given plant conditions which result in an automatic initiation of the IC, secure the IC with the initiation signal still present per DOP 1300-02.

K/A Number and Importance: 207000.A4.A4.01 3.1/3.0 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DOP 1300-03 Rev. 38, DAN 902(3)-3 H-2 Rev. 21 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 9 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS

1. You are the Unit 2 NSO.
2. A transient occurred resulting in the loss of bypass valves.
3. The Unit Supervisor has directed a RPV pressure band of 800 - 1060 psig.
4. No Isolation Condenser auto-initiation signal has been received.
5. Hard Card use has been authorized.

INITIATING CUE

1. The Unit Supervisor has directed you to initiate the Isolation Condenser and lower RPV pressure between 800 and 850 psig.
2. Inform the Unit Supervisor when the task is complete.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 Job Performance Measure CONTAINMENT - VENT THE TORUS WITH LEVEL LESS THAN 30 FEET -

(AP)

JPM Number: S-N-e Revision Number: 07 Date: 11 / 29 / 2016 Developed By:

Exam Author Date Approved By:

Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure DEOP 0500-04 Rev: 17 Procedure Rev:

Procedure Rev:

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ-JA-150-02 Revision Record (Summary)

Revision 04 Bank JPM.

Revision 05 Revised for 2010 NRC exam.

Revision 06 Revised for 2014 NRC exam.

Revision 07 Revised for 2016-302 NRC Exam.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to an IC with the mode switch NOT in run, so that the proper alarms and interlocks will work. IC 51 used for validation.
2. Ensure Torus water level is <30 feet.
3. Insert following Malfunctions and/or Remotes.
  • IMF CIGP2I (Spurious Group II Isolation)
  • IOR PCDOP61 OFF (prevents the 1601-61 valve from opening)
  • Adjusts Torus Level indications to ~20 feet.

ior atl10 25.0 ior pcltr10a 20 ior pcltr10b 20

  • ior pcptr103 58.0 (Adjusts Torus Bottom Pressure to 58.0 psig)
  • Pulls ECCS Initiation Logic fuses so when Drywell pressure is forced high, NO ECCS starts.

irf lp1aaf1f pulled irf lp701af pulled irf lp1aaf2f pulled irf lp701bf pulled irf csalgoff pulled irf csblgoff pulled irf hp2a1f1 pulled irf hp2b1f1 pulled

  • Adjusts Drywell & Torus pressures to 50.0 psig.

ior pcp8524 50.0 ior pcpdw102 50.0 ior pcp85401 5.0l ior pcptr1 5.0

4. Verify the SBGT system operating and verify flow ~4000 scfm.
5. Place CRM ISOL switch to ISOLATE - wait 10 seconds then verify a C/R Booster Fan is running.
6. Cover DW pressure indications on 902-3 and 902-5 panel.

DOCUMENT PREPARATION Markup a copy of DEOP 0500-04, Containment Venting.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS

1. You are the Aux 2 NSO.
2. A break inside the Unit 2 Primary Containment has occurred.
3. Torus bottom pressure is about to exceed the PCP limit in DEOP 0200-01.
4. Torus water level is 20 feet.
5. Control Room ventilation has been isolated.
6. Reactor Building and Turbine Building have been evacuated.
7. The Instrument Bus and ESS Bus are energized.
8. The Instrument Air System is available.
9. The N2 System is in its normal lineup.

INITIATING CUE

1. The Unit Supervisor has directed you to vent the Unit 2 Primary Containment in accordance with DEOP 0500-04, to control Primary Containment pressure.
2. Inform the Unit Supervisor when the task is complete.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ-JA-150-02 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number NOTE:

Provide examinee the marked up copy of DEOP 0500-04.

Annunciator 902-3 A-15, Pri Cnmt Vent/Sample Isol Bypass, will be received during this JPM.

01 Verify SBGT is operating and flow Verifies 2/3A SBGT train ___ ___ ___

is ~ 4000 scfm. FI 7540-13 is reading ~4000 scfm.

02 Verify Reactor Mode switch NOT Verifies Reactor Mode switch NOT ___ ___ ___

in RUN. in RUN.

  • 03 Place VENT ISOL SIGNAL Momentarily places Bypass switch ___ ___ ___

BYPASS switch on 902-5 panel to to Torus Position.

TORUS.

NOTE:

The AO 2-1601-61, TORUS 2-INCH VENT VLV, will NOT open.

04 Open AO 2-1601-61, TORUS 2- Places AO 2-1601-61 control ___ ___ ___

INCH VENT VLV. switch to OPEN position and determines that the valve will not open.

NOTE:

IF candidate states that the 2-1601-61 valve will not open, direct him/her to complete the task.

BEGIN ALTERNATE PATH

  • 05 Place VENT ISOL SIGNAL Momentarily places Vent Isol ___ ___ ___

BYPASS switch on 902-5 panel to Signal Bypass switch to Drywell DRYWELL. position.

CUE:

If examinee reads TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter displays 58 psig and is trending UP slowly.

  • 06 Open AO 2-1601-62, DW Red Open light illuminated. ___ ___ ___

2-INCH Vent.

  • 07 Open AO 2-1601-63, VENT TO Red Open light illuminated. ___ ___ ___

SBGT.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ-JA-150-02 Comment STEP ELEMENT STANDARD SAT UNSAT Number 08 Determine if SBGT flow is Containment pressure stable or adequate to control and maintain decreasing.

Torus Bottom pressure below the ___ ___ ___

Primary Containment Pressure Limit.

CUE:

DW pressure is being controlled and maintained below the Primary Containment Pressure Limit.

If examinee asks reading on TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter has decreased to 53 psig (5 psig less than original report).

09 Informs Unit Supervisor task is Examinee notifies the Unit

___ ___ ___

complete. Supervisor.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ-JA-150-02 JPM

SUMMARY

Operators Name: Emp. ID#: ____________

Job Title: SRO JPM Title: CONTAINMENT - VENT THE TORUS WITH LEVEL LESS THAN 30 FEET JPM Number: S-N-e Revision Number: 07 Task Number and Title: 295L099, Vent the primary containment to SBGT to stay below the Primary Containment Pressure Limit.

K/A Number and Importance: 295024.A1.14 3.4/3.5 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DEOP 0500-04 Rev. 17 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 17 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS

1. You are the Aux 2 NSO.
2. A break inside the Unit 2 Primary Containment has occurred.
3. Torus bottom pressure is about to exceed the PCP limit in DEOP 200-01.
4. Torus water level is 20 feet.
5. Control Room ventilation has been isolated.
6. Reactor Building and Turbine Building have been evacuated.
7. The Instrument Bus and ESS Bus are energized.
8. The Instrument Air System is available.
9. The N2 System is in its normal lineup.

INITIATING CUE

1. The Unit Supervisor has directed you to vent the Unit 2 Primary Containment in accordance with DEOP 500-04, to control Primary Containment pressure.
2. Inform the Unit Supervisor when the task is complete.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 Job Performance Measure RWM - PLACE A CONTROL ROD O.O.S JPM Number: S-N-f Revision Number: 02 Date: 11 / 29 / 2016 Developed By:

Exam Author Date Approved By:

Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure DOP 0400-02 Rev: 28 Procedure Rev:

Procedure Rev:

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ-JA-150-02 Revision Record (Summary)

Revision 02: Updated for 2016-302 NRC Exam.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC 50 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. {Delete this NOTE if not applicable.}
2. Re- Initialize the RWM to ensure no rods are OOS
3. Insert the following remote function (this remote disarms CRD H-08):
  • IRF RODH08DA disarm
4. This completes the setup for this JPM.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS

1. You are the Unit 2 NSO.
2. Control Rod H-08 was discovered uncoupled, 15 minutes ago.
3. All attempts to couple the rod have been unsuccessful.
4. The Control rod was then inserted to position 00, then electrically disarmed.
5. QNE has been notified.

INITIATING CUE

1. The Unit Supervisor has directed you to take rod H-08 out of service on the Rod Worth Minimizer per DOP 0400-02.
2. Another NSO will complete DOA 0300-05 actions and logging requirements once control rod H-08 is OOS.
3. Notify the Unit Supervisor when complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ-JA-150-02 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number NOTE:

Provide Examinee a copy of DOP 0400-02.

  • 01 Touches the area marked SECONDARY FUNCTION SECONDARY FUNCTION. selected. ___ ___ ___
  • 02 Selects H-08 on the rod select CRD H-08 selected and matrix illuminated on rod select matrix. ___ ___ ___
  • 03 Selects control rod H-08 on the Control Rod H-08 outlined with RWM touch screen. blue box and shown on screen as SELECTED. ___ ___ ___

04 Verifies CRD H-08 is enclosed in a CRD H-08 is outlined with a blue blue box. box and shown as selected on the screen. ___ ___ ___

  • 05 Selects the ROD OUT OF Message ROD H-08 placed out SERVICE command. of service is displayed. ___ ___ ___

06 Verify insert and withdraw block is H-08 Rod position numerals are applied to CRD H-08. blue. Withdraw and insert block inserted for H-08. ___ ___ ___

07 Selects the RETURN TO RWM returns to the Main Display.

PRIMARY command. ___ ___ ___

NOTE:

Performer may verify the rod OOS by any of the following:

  • The RWM Main Display for H-08 indicates 00 and is blue in color.
  • Select rod to ensure rod in and out blocks are applied. Rod indication is backlit in blue color.
  • Review status screen to verify H-08 is listed as OOS.

08 Determines no actions are Determines CRD H-08 is at required per G.4.h required position and no actions are required. ___ ___ ___

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ-JA-150-02 Comment STEP ELEMENT STANDARD SAT UNSAT Number 09 Verifies Control rod block has been Deselects and reselects control applied rod H-08. Verifies Rod is indicated in light blue and rod blocks are applied. ___ ___ ___

CUE:

If the candidate attempts to update the Control Rod Sequence Package (CRSP), inform them Another NSO will update the CRSP.

10 Informs Unit Supervisor task is Examinee notifies the Unit complete. Supervisor. ___ ___ ___

CUE:

Respond as Unit Supervisor and/or QNE when examinee informs you they have completed the task JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ-JA-150-02 JPM

SUMMARY

Operators Name: Emp. ID#: ____________

Job Title: SRO JPM Title: RWM - Place a Control Rod O.O.S JPM Number: S-N-f Revision Number: 02 Task Number and Title: 20106LP005.B.3 / From the Functions available from the Primary Display Screen, operate the RWM in the optional modes settings listed below, IAW DOP 0400-02: Given the Secondary Functions Display, initiate the following functions: Rod Out of Service.

K/A Number and Importance: 201006.A2.05 3.1/3.5 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DOP 0400-02 Rev. 28 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS

1. You are the Unit 2 NSO.
2. Control Rod H-08 was discovered uncoupled, 15 minutes ago.
3. All attempts to couple the rod have been unsuccessful.
4. The Control rod was then inserted to position 00, then electrically disarmed.
5. QNE has been notified.

INITIATING CUE

1. The Unit Supervisor has directed you to take rod H-08 out of service on the Rod Worth Minimizer per DOP 0400-02.
2. Another NSO will complete DOA 0300-05 actions and logging requirements once control rod H-08 is OOS.
3. Notify the Unit Supervisor when complete.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 Job Performance Measure CREV - SECURE A AHU AND STARTUP B AHU AND RCU JPM Number: S-N-g Revision Number: 02 Date: 02/03/17 Developed By:

Exam Author Date Approved By:

Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure DOP 5750-05 Rev: 67 Procedure Rev:

Procedure Rev:

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

Revision Record (Summary)

Revision 00 New JPM.

Revision 01: Revised JPM ILT 14-1 NRC Exam.

Revision 02: Updated for 2016-302 NRC Exam.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to any IC. (IC 50 used for validation)

NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Ensure A AHU operating.
3. Insert following Malfunctions and/or Remotes:
  • None.
4. Setup the following Triggers:
  • None.

DOCUMENT PREPARATION Clean copy of DOP 5750-05, Control Room Ventilation and Air Conditioning System.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. The Control Room Vent A AHU needs to be removed from service for maintenance.
3. There has NOT been any painting done anywhere in the plant within the last 14 days.
4. There has NOT been any propane-powered equipment operated anywhere in the plant within the last 14 days.
5. The U2/3 CONTROL ROOM REFRIG CONDENSING UNIT crankcase heaters have been operating for the past 7 days.
6. The CRM HVAC REFRIG COMPR B crankcase heater has been operating for the past 7 days.
7. RCU Cooling Water has been lined up.
8. Operation in ISOLATION mode is NOT desired.
9. No smoke detectors require resetting on the 2223-35 panel.
10. Heating Steam is not available.
11. Operation of an AFU is not required.
12. Another NSO will perform all log entries.
13. An EO is stationed in the field.

INITIATING CUE

1. The Unit Supervisor has directed you to secure the A AHU and startup the B AHU and RCU per DOP 5750-05 Step G.1.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue SRRS: 3D.105 (when utilized for operator initial or continuing training)

JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number NOTE:

Provide the Examinee with the supplied copy of DOP 5750-05.

NOTE:

Train B AHU will automatically start when Train A AHU is secured.

CUE:

If asked as EO in the field, the Train B RCU oil level is in the sightglass.

  • 1. Secure Train A AHU using control BLUE ON light OFF and GREEN ___ ___ ___

switch, 2/3A TRAIN CRM AIR OFF light lit.

HANDLING UNIT.

  • 2. Secure Train A Return Fan using BLUE ON light OFF and GREEN ___ ___ ___

control switch, CRM RETURN OFF light lit.

FAN.

3. Place Train B AHU control switch, Control Switch RED target visible. ___ ___ ___

CRM AIR HANDLING UNIT B, in Auto After Start.

4. Monitor PI 2/3-5740-36, CRM TO Observes a positive pressure is E TURB DP, to assure a positive being maintained. ___ ___

pressure is being maintained in the

___

Control Room.

5. Monitors the RCU compressor Directs the EO, in the field, to suction pressure. report the RCU compressor ___ ___ ___

suction pressure.

CUE:

RCU suction pressure is 75 psig.

6. Monitors the RCU compressor Directs the EO, in the field, to ___ ___ ___

discharge pressure. report the RCU compressor discharge pressure.

CUE:

RCU discharge pressure is 230 psig.

7. Monitors the RCU compressor oil Directs the EO, in the field, to ___ ___ ___

pressure, (40 to 60 psig above report the RCU compressor oil suction pressure). pressure.

CUE:

RCU compressor oil pressure is 125 psig.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Comment STEP ELEMENT STANDARD SAT UNSAT Number

8. States intention to monitor the Communicates need to monitor oil ___ ___ ___

RCU compressor oil level AFTER pressure AFTER three hours of three hours of operation. operation.

CUE:

Acknowledge report.

9. Informs Unit Supervisor that task is Examinee notifies the Unit ___ ___ ___

complete. Supervisor.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

JPM

SUMMARY

Operators Name: Emp. ID#: ____________

Job Title: SRO JPM Title: CREV - SECURE A AHU AND STARTUP B AHU AND RCU JPM Number: S-N-g Revision Number: 02 Task Number and Title: 288LN003-14, Discuss the major steps involved in performing Control Room HVAC AFU and RCU test.

K/A Number and Importance: 290003.A4.01 3.2 / 3.2 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DOP 5750-05, rev 63 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 12 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. The Control Room Vent A AHU needs to be removed from service for maintenance.
3. There has NOT been any painting done anywhere in the plant within the last 14 days.
4. There has NOT been any propane-powered equipment operated anywhere in the plant within the last 14 days.
5. The U2/3 CONTROL ROOM REFRIG CONDENSING UNIT crankcase heaters have been operating for the past 7 days.
6. The CRM HVAC REFRIG COMPR B crankcase heater has been operating for the past 7 days.
7. RCU Cooling Water has been lined up.
8. Operation in ISOLATION mode is NOT desired.
9. No smoke detectors require resetting on the 2223-35 panel.
10. Heating Steam is not available.
11. Operation of an AFU is not required.
12. Another NSO will perform all log entries.
13. An EO is stationed in the field.

INITIATING CUE

1. The Unit Supervisor has directed you to secure the A AHU and startup the B AHU and RCU per DOP 5750-05 Step G.1.
2. Inform the Unit Supervisor when the task is complete.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 1 of 10 This replaced TQ-JA-150-02 Job Performance Measure Respond to failure of Unit 2 24 / 48 VDC power supply (AP)

JPM Number: S-N-i Revision Number: 08 Date: 01/04/17 Developed By:

Exam Author Date Approved By:

Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 2 of 10 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure DOA 6900-01 Rev: 19 Procedure Rev:

Procedure Rev:

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 3 of 10 This replaced TQ-JA-150-02 Revision Record (Summary)

Revision 04: Updated for 2006 LORT exam Revision 05: Updated for 2009 LORT exam Revision 06: Updated for 2012 LORT exam Revision 07: Updated for 2016 LORT exam and new JPM format Revision 08: Updated for 2016-302 NRC Exam SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 4 of 10 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS N/A: In-Plant JPM DOCUMENT PREPARATION Need a clean copy of current revision of DOA 6900-01, Failure of Unit 2(3) 24 48 Vdc Power Supply SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 5 of 10 This replaced TQ-JA-150-02 INITIAL CONDITIONS Unit 2 is operating at 780 MWe when the following annunciators alarm:

1. SRM Downscale.
2. IRM Downscale.
3. Channel B Reactor Scram.
4. IRM channel B HI-HI / Inop.
5. 48/24 V Neutron Monitor B Supply Voltage Hi/Lo.
6. 250 / 125 / 48/24 Volt Battery Undervoltage.
7. 48/24 V Battery 2A or 2B Feed Breaker Open.
8. Channel A/B Instrument Volume Level High.

INITIATING CUE

1. An extra EO is available to assist as necessary for monitoring.
2. The Unit Supervisor has directed you to perform DOA 6900-01.
3. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 6 of 10 This replaced TQ-JA-150-02 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number

1. Proceeds to the Unit 2 Battery LOCATES Unit 2 Battery Room Room. and performs an evaluation of the 24/48 VDC equipment. ___ ___ ___

Cue As the Examine checks equipment, provide the following cues:

Battery Charger Indications:

2A+ 2A- 2B+ 2B-25 V 25 V 25 V 25 V 7 amps 5 amps 0 amps 0 amps ALL circuit breakers at the Battery Chargers are closed.

The local low current light is lit on the face of the 2B+ and 2B- chargers Batteries Batteries appear normal.

Bus 2B BOTH DC Voltmeters are indicating zero (0) volts.

BOTH Undervoltage relay targets are indicating RED targets.

Distribution Panel 2B (Give this indication when the panel is opened)

Main (lower section) Breaker #4 (48/24 VDC TO 2B DISTRIBUTION BREAKERS) is in the mid-position.

2. Notify Unit Supervisor. Notifies Unit Supervisor of conditions found. ___ ___ ___
3. IF 24/48 VDC System voltage is Operator might contact the Unit low (below 25 VDC OR a battery Supervisor as this step directs charger has failed, THEN restore DOP 6900-03 to restore a charger.

the battery charger to operation per DOP 6900-03, 24/48 VDC Electrical System. ___ ___ ___

Cue Acknowledge as U2 Unit Supervisor. Operator should perform actions the DOA as directed in the initial cue. As Unit Supervisor respond - Another operator will be assigned DOP 6900-03.

4. Isolate any failed loads if possible. Will not be able to identify any failed loads. ___ ___ ___
5. Attempt to RESET AND close any There are no tripped breakers in tripped load breaker (8 breaker the upper section upper section) ___ ___ ___

Cue Breakers are in the condition seen. (If there are open/tripped breakers in section cue the operator that all upper breakers are closed.)

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 7 of 10 This replaced TQ-JA-150-02 Comment STEP ELEMENT STANDARD SAT UNSAT Number

  • 6. Attempt to RESET AND close any Finds Breaker #4 tripped. Takes tripped supply breaker (4 breaker Main (lower) breaker #4 (48/24 lower section) VDC TO 2B DISTRIBUTION BREAKERS) to Open and then back to Close. ___ ___ ___

Cue Main (lower) breaker #4 re-tripped instantly.

BEGIN ALTERNATE PATH

  • 7. In the applicable Distribution Panel Opens / verifies open all breakers (upper) section, open all breakers in the upper section.

(1 through 8)

___ ___ ___

Note Breakers 2, 3, 5, 6, and 8 are labeled as SPARES and are already open. Breaker 7 is closed.

Cue Indicate breakers #1, 4 and 7 are OPEN, as the examinee opens each.

  • 8 In the Main Panel (lower) section Places Main Panel (lower) section (lower four breakers), reset any breaker #4 to Open and then tripped breakers. Close.

IF the breaker trips again, THEN notify the Unit Supervisor of a faulted panel.

___ ___ ___

Cue Main (lower) breaker #4 is closed.

Note The breakers can be closed in any order and the examinee will stop when upper breaker #4 is closed.

Cue If requested as the extra EO, report, I will stand by the battery charger ammeters.

  • 9. Close applicable load breakers Closes upper breakers one at a one at a time to return required time to determine faulted circuit.

loads to service AND determine

___ ___ ___

which load causes the overload.

Cue Bkr 1 Indicate breaker closed as examinee closes breaker. If asked, ampmeter shows a few amps.

Bkr 4 Main Supply breaker #4 (48/24 VDC TO 2B DISTRIBUTION BREAKERS) tripped when upper breaker #4 (Panel 902-10 RBCCW RAD MONITOR) was closed. Amps momentarily pegged full scale.

Cue Unit Supervisor will take care of documenting issue per OP-DR-108-101-1001.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 8 of 10 This replaced TQ-JA-150-02 Comment STEP ELEMENT STANDARD SAT UNSAT Number

10. IF a breaker trips after a load is Notifies the Unit Supervisor that restored, THEN notify the Unit fault is on upper load breaker #4.

Supervisor of the failed load.

___ ___ ___

Cue Repeat back the status of the 24/48 VDC battery system.

As Unit Supervisor - Leave all breakers in their present position. Electrical Maintenance will be contacted for further troubleshooting.

END JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 9 of 10 This replaced TQ-JA-150-02 JPM

SUMMARY

Operators Name: Emp. ID#: ____________

Job Title: SRO JPM Title: Respond to failure of Unit 2 24 / 48 VDC power supply JPM Number: S-N-i Revision Number: 08 Task Number and Title: 263L003, Respond to failure of Unit 2(3) 24/48 VDC power supply K/A Number and Importance: 295004.AA1.01 3.3 / 3.4 Suggested Testing Environment: Plant Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DOA 6900-01, Rev 19 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 12 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 10 of 10 This replaced TQ-JA-150-02 INITIAL CONDITIONS Unit 2 is operating at 780 MWe when the following annunciators alarm:

1. SRM Downscale.
2. IRM Downscale.
3. Channel B Reactor Scram.
4. IRM channel B HI-HI / Inop.
5. 48/24 V Neutron Monitor B Supply Voltage Hi/Lo.
6. 250 / 125 / 48/24 Volt Battery Undervoltage.
7. 48/24 V Battery 2A or 2B Feed Breaker Open.
8. Channel A/B Instrument Volume Level High.

INITIATING CUE

1. An extra EO is available to assist as necessary for monitoring.
2. The Unit Supervisor has directed you to perform DOA 6900-01.
3. Inform the Unit Supervisor when the task is complete.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 1 of 10 This replaced TQ-JA-150-02 Job Performance Measure Bypass the Unit 2 HPCI Group 4 Isolations JPM Number: S-N-j Revision Number: 08 Date: 01/04/17 Developed By:

Exam Author Date Approved By:

Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 2 of 10 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure DEOP 0500-02 Rev: 17 Procedure Rev:

Procedure Rev:

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 3 of 10 This replaced TQ-JA-150-02 Revision Record (Summary)

Revision 04: Updated for the 2007 LORT exam Revision 05: Updated for the 2010 LORT exam Revision 06: Updated for the 2013 LORT exam Revision 07: Updated for 2016 LORT Exam and new JPM format Revision 08: Updated for 2016-302 NRC Exam SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 4 of 10 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS N/A: In-Plant JPM Note: Need a clean copy of current revision of DEOP 0500-02, Bypassing Interlocks and Isolations, to provide to examinee.

A laser pointer is useful but not required for this JPM.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 5 of 10 This replaced TQ-JA-150-02 INITIAL CONDITIONS

1. A transient has occurred which requires Alternate Emergency Depressurization of the Unit 2 RPV
2. A Group 4 Isolation is present.
3. The Reactor Building is evacuated.
4. NO HPCI initiation signal is present.

INITIATING CUE

1. The Unit Supervisor has directed you to bypass the Unit 2 HPCI Group 4 isolations in accordance with DEOP 500-02.
2. Notify the Unit Supervisor upon completion of the task.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 6 of 10 This replaced TQ-JA-150-02 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number

1. Locate procedure step G.10. Locates Step G.10. ___ ___ ___

Note The DEOP Equipment Storage Cabinet key must be obtained from the Unit Supervisor.

Do NOT allow examinee to remove the Equipment Box from the DEOP Equipment Storage Cabinet.

Lock cabinet and return DEOP key to Unit Supervisor PRIOR to leaving the Control Room.

2. Obtains appropriate Equipment Locates Equipment Box DEOP Box from the Control Room DEOP 500-2 Bypassing Interlocks &

Equipment Storage Cabinet. Isolations Step G.10: HPCI Group 4 Isolation and identifies the following equipment.

  • Electrical Tape.
  • Standard Straight Screwdriver.
  • Split Blade Screwdriver.
  • Insulated Gloves. ___ ___ ___

Cue DEOP Equipment Box you have identified is in your hand.

Note DS key is required for entry into the AEER.

3. Proceeds to 902-39 panel (HPCI Locates the 902-39 panel.

RELAYS ESS II).

___ ___ ___

Note Location of the correct terminal board inside the cabinet is shown in a placard attached to the outside of the cabinet door on the correct side.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 7 of 10 This replaced TQ-JA-150-02 Comment STEP ELEMENT STANDARD SAT UNSAT Number

  • 4. Lift and tape lead in panel 902-39, Lifts and tapes leads in panel relay 2330-125B, device AE, 902-39, relay 2330-125B, device terminal point 13. AE, terminal point 13 (back left terminal).
  • Puts on insulated gloves.
  • Locates relay 2330-125B.
  • Locates terminal point 13.
  • Loosens terminal point 13 screw with standard screwdriver.
  • Uses split screwdriver to remove screw.
  • Tapes loose wire with electricians tape. ___ ___ ___

Cue The lead on back left terminal, 902-39 Panel, relay 2330-125B, device AE, terminal point 13 is lifted and taped.

  • 5. Lift and tape lead in panel 902-39, Lifts and tapes leads in panel relay 2330-126, device BW, 902-39, relay 2330-126, device terminal point 13. BW, terminal point 13 (two leads on back left terminal).
  • Using insulated gloves.
  • Locates relay 2330-126.
  • Locates terminal point 13.
  • Loosens terminal point 13 screw with standard screwdriver.
  • Uses split screwdriver to remove screw.
  • Tapes loose wires with electricians tape. ___ ___ ___

Cue The two leads on 902-39 Panel, relay 2330-126, device BW, terminal point 13, are lifted and taped.

6. Proceed to 902-33 panel. Locates 902-33 panel in AEER. ___ ___ ___

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 8 of 10 This replaced TQ-JA-150-02 Comment STEP ELEMENT STANDARD SAT UNSAT Number

  • 7. Lift and tape lead in panel 902-33, Lifts and tapes lead in panel relay 2330-125A, device DL, 902-33, relay 2330-125A, device terminal point 13. DL, terminal point 13 (back left terminal.
  • Using insulated gloves.
  • Locates relay 2330-125A.
  • Locates terminal point 13.
  • Loosens terminal point 13 screw with standard screwdriver.
  • Uses split screwdriver to remove screw.
  • Tapes loose wire with electricians tape. ___ ___ ___

CUE The lead on back left terminal of 902-33 Panel relay 2330-125A device DL terminal point 13 is lifted and taped.

8. Notify Unit 2 Unit Supervisor upon Notifies Unit 2 Unit Supervisor completion of bypassing the HPCI upon completion of this task.

Group 4 Isolation per DEOP 500-02. ___ ___ ___

CUE Acknowledge report of task completion.

END JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 9 of 10 This replaced TQ-JA-150-02 JPM

SUMMARY

Operators Name: Emp. ID#: ____________

Job Title: SRO JPM Title: Bypass the Unit 2 HPCI Group 4 Isolations JPM Number: S-N-j Revision Number: 08 Task Number and Title: 295L081, Bypass the Unit 2 HPCI Group 4 Isolations K/A Number and Importance: 206000A2.10 4.0 / 4.1 Suggested Testing Environment: Plant Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DEOP 0500-02, Revision 17 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 10 of 10 This replaced TQ-JA-150-02 INITIAL CONDITIONS

1. A transient has occurred which requires Alternate Emergency Depressurization of the Unit 2 RPV
2. A Group 4 Isolation is present.
3. The Reactor Building is evacuated.
4. NO HPCI initiation signal is present.

INITIATING CUE

1. The Unit Supervisor has directed you to bypass the Unit 2 HPCI Group 4 isolations in accordance with DEOP 500-02.
2. Notify the Unit Supervisor upon completion of the task.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 Job Performance Measure Seal Purge Isolation on Unit 3 JPM Number: S-N-k Revision Number: 15 Date: 01 / 04 / 2017 Developed By:

Exam Author Date Approved By:

Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure DOP 0202-11 Rev: 33 Procedure Rev:

Procedure Rev:

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ-JA-150-02 Revision Record (Summary)

Revision 11 Revised for 2006 LORT Requal exam Revision 12 Revised for 2009 LORT Requal exam Revision 13 Revised for 2012 LORT Requal exam Revision 14 Revised for 2015 LORT Requal exam Revision 15 Updated for 2016-302 NRC Exam SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS

1. No simulator setup is required. This is an in-plant JPM.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS

1. Unit 3 is in a Refuel Outage.
2. Both Recirc Pumps are off.
3. Both pumps will be shutdown for an extended period for seal replacement.

INITIATING CUE

1. The Unit 3 Unit Supervisor has directed you to perform the infield actions to shutdown the Unit 3 Seal Purge System to the Recirculation Pumps in accordance with DOP 0202-11 steps G.2.a through G.2.c..
2. Notify the Unit Supervisor upon completion.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ-JA-150-02 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number 01 Proceed to Step G.2.a of DOP LOCATES step G.2.a ___ ___ ___

0202-11.

For 3 A Recirc Pump, close the ___ ___ ___

following valves:

  • 02 3-0399-510, 3 A RECIRC PMP Rotates 3-0399-510 CW until ___ ___ ___

SEAL PURGE ISOL VLV. stem stops moving inward.

NOTE Operating the preceding valve requires a ladder and RP survey.

CUE Conditions are as described.

  • 03 3-0399-512, 3 A RECIRC PMP Rotates 3-0399-512 CW until ___ ___ ___

stem stops moving inward.

SEAL PURGE ISOL VLV CUE Conditions are as described.

For 3 B Recirc Pump, close the ___ ___ ___

following valves:

  • 04 3-0399-509, 3 B RECIRC PMP Rotates 3-0399-509 CW until ___ ___ ___

SEAL PURGE ISOL VLV. stem stops moving inward.

CUE Conditions are as described.

NOTE Operating the preceding valve requires a ladder and RP survey.

  • 05 3-0399-513, 3 B RECIRC PMP Rotates 3-0399-513 CW until ___ ___ ___

SEAL PURGE ISOL VLV stem stops moving inward.

CUE Conditions are as described.

06 Notify Unit Supervisor that the Notifies Unit Supervisor that the ___ ___ ___

seal purge system is shutdown. seal purge system is shutdown.

CUE Respond as US.

END SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ-JA-150-02 JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ-JA-150-02 JPM

SUMMARY

Operators Name: Emp. ID#: ____________

Job Title: SRO JPM Title: Seal Purge Isolation on Unit 3 JPM Number: S-N-k Revision Number: 15 Task Number and Title: 202LN001.14d: Seal Purge System Isolation K/A Number and Importance: 202001K4.04 3.0/3.1 Suggested Testing Environment: In-Plant Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DOP 0202-11 Rev. 33 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS

1. Unit 3 is in a Refuel Outage.
2. Both Recirc Pumps are off.
3. Both pumps will be shutdown for an extended period for seal replacement.

INITIATING CUE

1. The Unit 3 Unit Supervisor has directed you to perform the infield actions to shutdown the Unit 3 Seal Purge System to the Recirculation Pumps in accordance with DOP 0202-11 steps G.2.a through G.2.c.
2. Notify the Unit Supervisor upon completion.

SRRS: 3D.100; There are no retention requirements for this section