MONTHYEARML24260A2152024-09-16016 September 2024 Confirmation of Initial License Examination ML24179A1752024-06-27027 June 2024 Form 5.1-1 Post Examination Check Sheet ML24179A1742024-06-11011 June 2024 Form 2.1-1 Examination Preparation Checklist ML24179A1732024-06-11011 June 2024 Form 1.3-1 - Exam Security Agreement ML24179A1722024-06-0707 June 2024 2024-301 Post Exam SVP Letter ML24120A2032024-04-29029 April 2024 Operator Licensing Exam Approval - Dresden Nuclear Power Station, May 2024 ML24179A2152024-04-25025 April 2024 Form 3.4-1 Events and Evolutions Checklist ML24179A2142024-04-25025 April 2024 Form 2.3-1 Examination Outline Quality Checklist ML24179A2242024-04-23023 April 2024 Form 2.3-2 - Operating Test Quality Checklist ML24179A2252024-04-22022 April 2024 Form 2.3-4 - Written Examination Quality Checklist ML24179A2232024-02-12012 February 2024 ILT 23-1 (2024-301) SVP Letter - 24-007 ILT Exam Submittal ML24179A2122023-11-0808 November 2023 ILT 23-1 (2024-301) Exam Outline Submittal SVP Letter 23-0036 ML23285A2342023-10-13013 October 2023 Confirmation of Initial License Examination RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23160A1712023-06-0909 June 2023 Form 5.1-1 Post Examination Check Sheet ML23160A1672023-05-18018 May 2023 Form 1.3-1 Post Examination Security Agreement ML23160A1702023-05-18018 May 2023 Form 2.1-1 Examination Prep Checklist SVPLTR 23-0019, ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1)2023-05-0101 May 2023 ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1) ML23087A0482023-03-28028 March 2023 Operator Licensing Examination Approval - Dresden Nuclear Power Station, April 2023 ML23160A1832023-03-16016 March 2023 3.4-1 Events and Evolutions Checklist ML23160A1802023-03-16016 March 2023 2.3-1 Examination Outline Quality Checklist SVPLTR 23-0002, 2.3-4 - Written Examination Quality Checklist2023-03-16016 March 2023 2.3-4 - Written Examination Quality Checklist ML23160A0542023-03-16016 March 2023 2.3-2 - Operating Test Quality Checklist ML23160A1782023-03-0606 March 2023 ILT Exam Outline Submittal Letter ML23160A0522023-01-25025 January 2023 ILT Exam Submittal Letter RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000237/20213022021-12-29029 December 2021 NRC Initial License Examination Report 05000237/2021302; 05000249/2021302 ML22195A1552021-12-0303 December 2021 Nov 2021 Ile ES-401-9 Written Exam Review Worksheet - Final ML22195A1422021-12-0303 December 2021 Nov 2021 Ile ES-301-7 Operating Test Review Worksheet - Final ML22195A1522021-12-0303 December 2021 Nov 2021 Ile ES-401-4 - Record of Rejected KAs-Final ML22195A1342021-12-0303 December 2021 Nov 2021 Ile ES-403-1-Written Exam Grading Quality Checklist-Signed ML22195A1312021-12-0303 December 2021 Nov 2021 Ile ES-201-3 - Exam Security Agreement ML22195A1272021-12-0303 December 2021 Nov 2021 Ile ES-201-1 Exam Prep Checklist ML22195A1702021-12-0303 December 2021 Nov 2021 Ile Outline Submittal Review Comments ML22195A1352021-11-15015 November 2021 Nov 2021 Ile Post-Exam Package Submittal Letter 11/15/2021 ML22195A1872021-11-0808 November 2021 Nov 2021 Ile Administered Simulator and Inplant JPMs-FINAL ML22195A1932021-11-0808 November 2021 Nov 2021 Ile Administered RO and SRO List of Reference Handouts-FINAL ML22195A1882021-11-0808 November 2021 Nov 2021 Ile As-administered Simulator Scenarios-FINAL ML22195A1792021-11-0808 November 2021 Nov 2021 Ile Administered RO and SRO Admin JPMs-FINAL ML22195A1912021-11-0808 November 2021 Nov 2021 Ile Administered Written Exam-FINAL ML21287A0442021-10-18018 October 2021 Operator Licensing Examination Approval ML22195A2522021-09-19019 September 2021 Nov 2021 Ile Proposed RO and SRO Written Exam ML22195A2312021-09-19019 September 2021 Nov 2021 Ile Es 401-6 Written Exam Quality Checklist-Signed ML22195A2282021-09-19019 September 2021 Nov 2021 Ile Es 301-6 Competencies Checklist ML22195A2262021-09-19019 September 2021 Nov 2021 Ile Es 301-4 Simulator Scenario Quality Checklist-Signed ML22195A2222021-09-19019 September 2021 Nov 2021 Ile Es 301-3 Operating Test Quality Checklist-Signed ML22195A2462021-09-19019 September 2021 Nov 2021 Ile Proposed Simulator and Inplant JPMs ML22195A2482021-09-19019 September 2021 Nov 2021 Ile Proposed Simulator Scenarios ML22195A2422021-09-19019 September 2021 Nov 2021 Ile Proposed RO and SRO Admin JPMs ML22195A2372021-09-0707 September 2021 Nov 2021 Ile Written Exam Submittal Letter 09-07-2021 2024-09-16
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24260A2152024-09-16016 September 2024 Confirmation of Initial License Examination ML24179A1752024-06-27027 June 2024 Form 5.1-1 Post Examination Check Sheet ML24179A1732024-06-11011 June 2024 Form 1.3-1 - Exam Security Agreement ML24179A1742024-06-11011 June 2024 Form 2.1-1 Examination Preparation Checklist ML24179A1722024-06-0707 June 2024 2024-301 Post Exam SVP Letter ML24120A2032024-04-29029 April 2024 Operator Licensing Exam Approval - Dresden Nuclear Power Station, May 2024 ML24179A2142024-04-25025 April 2024 Form 2.3-1 Examination Outline Quality Checklist ML24179A2152024-04-25025 April 2024 Form 3.4-1 Events and Evolutions Checklist ML24179A2242024-04-23023 April 2024 Form 2.3-2 - Operating Test Quality Checklist ML24179A2252024-04-22022 April 2024 Form 2.3-4 - Written Examination Quality Checklist ML24179A2232024-02-12012 February 2024 ILT 23-1 (2024-301) SVP Letter - 24-007 ILT Exam Submittal ML24179A2122023-11-0808 November 2023 ILT 23-1 (2024-301) Exam Outline Submittal SVP Letter 23-0036 ML23285A2342023-10-13013 October 2023 Confirmation of Initial License Examination RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23160A1712023-06-0909 June 2023 Form 5.1-1 Post Examination Check Sheet ML23160A1672023-05-18018 May 2023 Form 1.3-1 Post Examination Security Agreement ML23160A1702023-05-18018 May 2023 Form 2.1-1 Examination Prep Checklist SVPLTR 23-0019, ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1)2023-05-0101 May 2023 ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1) ML23087A0482023-03-28028 March 2023 Operator Licensing Examination Approval - Dresden Nuclear Power Station, April 2023 ML23160A1832023-03-16016 March 2023 3.4-1 Events and Evolutions Checklist ML23160A1802023-03-16016 March 2023 2.3-1 Examination Outline Quality Checklist SVPLTR 23-0002, 2.3-4 - Written Examination Quality Checklist2023-03-16016 March 2023 2.3-4 - Written Examination Quality Checklist ML23160A0542023-03-16016 March 2023 2.3-2 - Operating Test Quality Checklist ML23160A1782023-03-0606 March 2023 ILT Exam Outline Submittal Letter ML23160A0522023-01-25025 January 2023 ILT Exam Submittal Letter RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000237/20213022021-12-29029 December 2021 NRC Initial License Examination Report 05000237/2021302; 05000249/2021302 ML22195A1422021-12-0303 December 2021 Nov 2021 Ile ES-301-7 Operating Test Review Worksheet - Final ML22195A1272021-12-0303 December 2021 Nov 2021 Ile ES-201-1 Exam Prep Checklist ML22195A1552021-12-0303 December 2021 Nov 2021 Ile ES-401-9 Written Exam Review Worksheet - Final ML22195A1342021-12-0303 December 2021 Nov 2021 Ile ES-403-1-Written Exam Grading Quality Checklist-Signed ML22195A1312021-12-0303 December 2021 Nov 2021 Ile ES-201-3 - Exam Security Agreement ML22195A1702021-12-0303 December 2021 Nov 2021 Ile Outline Submittal Review Comments ML22195A1522021-12-0303 December 2021 Nov 2021 Ile ES-401-4 - Record of Rejected KAs-Final ML22195A1352021-11-15015 November 2021 Nov 2021 Ile Post-Exam Package Submittal Letter 11/15/2021 ML22195A1792021-11-0808 November 2021 Nov 2021 Ile Administered RO and SRO Admin JPMs-FINAL ML22195A1912021-11-0808 November 2021 Nov 2021 Ile Administered Written Exam-FINAL ML22195A1932021-11-0808 November 2021 Nov 2021 Ile Administered RO and SRO List of Reference Handouts-FINAL ML22195A1872021-11-0808 November 2021 Nov 2021 Ile Administered Simulator and Inplant JPMs-FINAL ML22195A1882021-11-0808 November 2021 Nov 2021 Ile As-administered Simulator Scenarios-FINAL ML21287A0442021-10-18018 October 2021 Operator Licensing Examination Approval ML22195A2222021-09-19019 September 2021 Nov 2021 Ile Es 301-3 Operating Test Quality Checklist-Signed ML22195A2522021-09-19019 September 2021 Nov 2021 Ile Proposed RO and SRO Written Exam ML22195A2262021-09-19019 September 2021 Nov 2021 Ile Es 301-4 Simulator Scenario Quality Checklist-Signed ML22195A2312021-09-19019 September 2021 Nov 2021 Ile Es 401-6 Written Exam Quality Checklist-Signed ML22195A2462021-09-19019 September 2021 Nov 2021 Ile Proposed Simulator and Inplant JPMs ML22195A2482021-09-19019 September 2021 Nov 2021 Ile Proposed Simulator Scenarios ML22195A2282021-09-19019 September 2021 Nov 2021 Ile Es 301-6 Competencies Checklist ML22195A2422021-09-19019 September 2021 Nov 2021 Ile Proposed RO and SRO Admin JPMs ML22195A2372021-09-0707 September 2021 Nov 2021 Ile Written Exam Submittal Letter 09-07-2021 2024-09-16
[Table view] |
Text
Dresden Retake Exam 2016-302 Review Comments
NRC: This JPM involves performing immediate actions per a hard card. The content appears to be all scram choreography actions. Are these task steps all part of scram immediate actions? NUREG-1021 Appendix C section B.3 says JPMs should not solely test immediate action steps and should include testing additional steps or items that are not from memory.
- Facility: not all actions are immediate actions or steps from memory; ARI initiation and subsequent actions are performed using a hard card procedure.
o JPM b (S-N-b):
NRC: Applicant handout materials do not include a copy of DAN 902 902-3 C-7 for the alternate path.
- Facility: will include a copy.
o NRC: Comment incorporated.
o JPM c (S-N-c):
NRC: The conditional note and cues provided as a contingency in the event that other examinees are in proximity should be removed. Since a single examiner will be conducting this reexamination, multiple examinees will not be performing different JPMs on the simulator floor at the same time.
- Facility: will remove cues.
o NRC: Comment incorporated.
o JPM d (S-N-d):
NRC: JPM cover sheet is missing AP (alternate path) in the title.
o NRC: Comment incorporated.
o JPM e (S-N-e):
NRC: Include in the initiating cue that precautions and limitation have been verified in order to be consistent with the marked-up handout that the applicant will receive.
- Facility: recommended leaving initiating cue as is, as it ensures that applicant must make an initial decision concerning the correct procedural step to begin with.
o NRC: Resolution is acceptable.
o JPM f (S-N-f):
NRC: The performance steps of the task standard contain numbering errors; there are two step 05s and what appears to be step 06 is unlabeled with a step number.
- Facility: will fix numbering.
o NRC: Comment incorporated.
Dresden Retake Exam 2016-302 Review Comments NRC: The initial plant conditions say that rod H-08 has been inserted to position
- 00. The un-numbered performance step in the task standard states Verify ONLY withdraw block is applied to CRD H-08. DOP 0400-02, step G.4.f.1, says to verify that if IF the Rod is at 00, THEN insert and withdraw blocks are applied. Correct the task standard or explain why it is correct as currently written.
- Facility: will verify accuracy of JPM step and revise if needed.
o NRC: Comment incorporated.
NRC: It is likely that based upon the initiating cue provided, an applicant would also complete steps G.4.h through G.4.j before informing an evaluator that they had finished their assigned task. Corresponding performance steps and, if needed cues, should be included in the task standard for these.
- Facility: will add additional steps to the task standard as requested.
o NRC: Comment incorporated.
o JPM g (S-N-g):
NRC: This JPM is listed as being associated with K/A 400000 (Component Cooling Water System) A4.01 (Ability to manually operate and / or monitor in the control room: CCW indications and control); this is used to satisfy safety function 8 on the outline (Plant Service Systems).
- NRC: Per the BWR K/A catalog, Safety Function 8 includes the following systems:
o Fire Protection System (286000) o Fuel Handling (234000) o Instrument Air System (300000) o Component Cooling Water System (400000)
NRC: Based upon review of the JPM, the applicant appears to be operating components that are associated with circulating water, versus component cooling water. Please explain how this JPM is associated with the listed K/A and safety function. (Note NUREG-1021 ES-301, sections D.4.a and D.4.b discusses JPM system selections based upon safety functions.)
- Facility: will replace JPM with one related to a system that is associated with the safety function.
o NRC: Replacement JPM meets outline safety function and is acceptable.
NRC: The cue that follows performance step 1 of the task standard says to provide an indication that Main (lower section) Breaker #4 (48/24 VDC TO 2B DISTRIBUTION BREAKERS) in Distribution Panel 2B is tripped. Performance step 6 of the task standard says that the applicant will find tripped and attempt to reclose Main (lower) breaker #4 (48/24 VDC TO 2A DISTRIBUTION BREAKERS).
Dresden Retake Exam 2016-302 Review Comments The cue that follows performance step 9 of the task standard says to provide an indication that Main Supply breaker #4 (48/24 VDC TO 2B DISTRIBUTION BREAKERS) tripped. Explain this apparent discrepancy and correct it if needed.
- Facility: will review and correct if needed.
o NRC: Comment incorporated.
NRC: The cue that follows performance step 9 of the task standard says to provide an indication following the closure of Bkr 1 that the breaker shows a few amps. Is this intended to instead be a simulated reading from the battery charger ammeters as the cue preceding the step suggests? Correct the cue if this is an error.
- Facility: will correct error.
o NRC: Comment incorporated.
o JPM j (S-N-j):
NRC: If the facility has a laser pointer available, please provide one as an aid for this JPM (used to indicate wire and terminal locations without having to break the plane of the open cabinet door.
- Facility: will provide if available.
o NRC: During validation, determination was made that use of a laser pointer would not be desirable.
o JPM k (S-N-k):
NRC: Two of the valves whose operation is simulated require RP surveys. Is the intent of the JPM to have the applicant identify the valves and discuss their operation from a distance sufficient that an RP survey is not required during the conduct of the JPM?
- Facility: intent is just to simulate from the ground; information is provided in JPM so that examiner is aware of requirements that applicant should describe when discussing the simulated operations.
NRC: Performance step 2 contains a typo; Manual is misspelled.
o NRC: Comment incorporated.
o SRO CO2 (A-N-2-S):
NRC: Divide initial condition #15 into multiple sentences for clarity. The current sentence structure could be confusing.
- Facility: will reword for clarity.
o NRC: Comment incorporated.
o SRO EC (A-N-3-S): no comments.
o SRO RC (A-N-4-S):
NRC: In performance step 4, would the total annual dose be 2005 mrem (1950 +
- 55) versus 2010 mrem?
Dresden Retake Exam 2016-302 Review Comments
- Facility: value is correct, there is an additional 5 mrem that must be accounted for in the JPM.
o SRO EP (A-N-5-S):
NRC: Add the following cue to the initiating cue on page 5 of the JPM as well as on the student handout (page 8): THIS JPM IS TIME CRITICAL.
- Facility: will include as requested.
o NRC: Comment incorporated.
NRC: It is requested that the facility indicate which information entered on the NARS form is part of the critical task, as opposed to any information entered which is not part of the critical task. For example, are the utility message number, state message number, additional information field, and approval signature part of the critical step? (These items do not appear to be related to the NEI 99-02 items that are related to the accuracy of a notification.) It is requested that the information that is part of the critical task be designated by annotating it on the key (such as by bolding) or by listing it in the performance standard step.
- Facility: fairly certain that all information entered on the key should be part of the critical task, however will research the question further and update steps as needed. Will update task standard and key to make all entered information that is associated with the critical task in bolded lettering.
o NRC: Comment incorporated.