ML17228A797: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17228A797
| number = ML17228A797
| issue date = 08/16/2017
| issue date = 08/16/2017
| title = Braidwood Station, Units 1 and 2 - Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information (Meb)
| title = Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information (Meb)
| author name = Bielby M E
| author name = Bielby M
| author affiliation = NRC/RGN-III/DRS/OB
| author affiliation = NRC/RGN-III/DRS/OB
| addressee name = Hanson B C
| addressee name = Hanson B
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| docket = 05000456, 05000457
| docket = 05000456, 05000457
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 August 16, 2017 Mr. Bryan C. Hanson Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
-4352 August 16, 2017 Mr. Bryan C. Hanson Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555


==SUBJECT:==
==SUBJECT:==
BRAIDWOOD STATION, UNITS 1 AND 2
BRAIDWOOD STATION, UNITS 1 AND 2 - NOTIFICATION OF AN NRC BIENNIAL LICENSED OPERATOR REQUALIFICATION PROGRAM INSPECTION AND REQUEST FOR INFORMATION
- NOTIFICATION OF AN NRC BIENNIAL LICENSED OPERATOR REQUALIFICATION PROGRAM INSPECTION AND REQUEST FOR INFORMATION  


==Dear Mr. Hanson:==
==Dear Mr. Hanson:==
In a telephone conversation on May 30, 2017 , between Mr. Michael Bielby, Senior Operations Engineer, the U.S. Nuclear Regulatory Commission (NRC) lead inspector for this inspection , and Mr. John Taff , Licensed Operator Requalification Training Lead , final arrangements were made for the NRC to inspect the licensed operator requalification program at the Braidwood Station, Units 1 and 2
. The inspection is planned for the week of September 25, 2017, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations and annual operating tests as necessary to support the NRC's inspection program needs. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a request for documents needed for the inspection. 


Please furnish the items listed in the first group of the attached enclosure, needed to support our in-office inspection activities, to the NRC by September 15, 2017
In a telephone conversation on May 30, 2017, between Mr. Michael Bielby, Senior Operations Engineer, the U.S. Nuclear Regulatory Commission (NRC) lead inspector for this inspection, and Mr. John Taff, Licensed Operator Requalification Training Lead, final arrangements were made for the NRC to inspect the licensed operator requalification program at the Braidwood Station, Units 1 and 2. The inspection is planned for the week of September 25, 2017, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.
. Please have the items listed in the second group of the attached enclosure available for the inspectors during the onsite portion of the inspection activities.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations and annual operating tests as necessary to support the NRC's inspection program needs. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a request for documents needed for the inspection.
Mr. Taff has been advised of this request
Please furnish the items listed in the first group of the attached enclosure, needed to support our in-office inspection activities, to the NRC by September 15, 2017. Please have the items listed in the second group of the attached enclosure available for the inspectors during the onsite portion of the inspection activities. Mr. Taff has been advised of this request.
. Thank you for your cooperation in this matter. If there are any questions regarding either the inspection, or the material requested in the enclosure, please contact me at 630
Thank you for your cooperation in this matter. If there are any questions regarding either the inspection, or the material requested in the enclosure, please contact me at 630-829-9762 or via e-mail at Michael.Bielby@NRC.gov.
-829-9762 or via e-mail at Michael.Bielby@NRC.gov
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.
. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150
-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.
B. Hanson      This letter and its enclosure will be available for public inspection and copying at http://www.nrc.gov/reading
-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."
Sincerely, 
/RA Randal Baker Acting for/
Michael E. Bielby, Sr., Senior Operations Engineer Operations Branch Division of Reactor Safety


Docket Nos. 50
B. Hanson                                      This letter and its enclosure will be available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
-456; 50-457 License Nos. NPF
Sincerely,
-72; NPF-77  
                                                /RA Randal Baker Acting for/
Michael E. Bielby, Sr., Senior Operations Engineer Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77


==Enclosure:==
==Enclosure:==


Requested Information to Support Licensed Operator Requalification Program a nd    Licensed Operator Performance Inspection (I P 71111.11) cc: Distribution via LISTSERV B. Hanson     Letter to Bryan Hanson from Michael Bielby, Sr.
Requested Information to Support Licensed Operator Requalification Program and Licensed Operator Performance Inspection (IP 71111.11) cc: Distribution via LISTSERV
dated August 16, 2017  
 
B. Hanson                                   Letter to Bryan Hanson from Michael Bielby, Sr. dated August 16, 2017


==SUBJECT:==
==SUBJECT:==
BRAIDWOOD STATION, UNITS 1 AND 2  
BRAIDWOOD STATION, UNITS 1 AND 2 - NOTIFICATION OF AN NRC BIENNIAL LICENSED OPERATOR REQUALIFICATION PROGRAM INSPECTION AND REQUEST FOR INFORMATION DISTRIBUTION:
- NOTIFICATION OF AN NRC BIENNIAL LICENSED OPERATOR REQUALIFICATION PROGRAM INSPECTION AND REQUEST FOR INFORMATION DISTRIBUTION
Jeremy Bowen RidsNrrDorlLpl3 RidsNrrPMBraidwood Resource RidsNrrDirsIrib Resource Cynthia Pederson James Trapp Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Nancy Salgado, NRR Colleen Schmidt, DRS ADAMS Accession Number: ML17228A797 OFFICE     RIII                 RIII             RIII             RIII NAME       RBaker for MBielby:jw DATE       08/16/17 OFFICIAL RECORD COPY
: Jeremy Bowen RidsNrrDorlLpl3 RidsNrrPMBraidwood Resource RidsNrrDirsIrib Resource Cynthia Pederson James Trapp Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Nancy Salgado, NRR Colleen Schmidt, DRS
 
ADAMS Accession Number: ML17228A797 OFFICE RIII RIII RIII RIII NAME RBaker for MBielby:jw DATE 08/16/17   OFFICIAL RECORD COPY


Enclosure REQUESTED INFORMATION TO SUPPORT LICENSED OPERATOR REQUALIFICATION PROGRAM AND LICENSED OPERATOR PERFORMANCE INSPECTION (IP 71111.11)
REQUESTED INFORMATION TO SUPPORT LICENSED OPERATOR REQUALIFICATION PROGRAM AND LICENSED OPERATOR PERFORMANCE INSPECTION (IP 71111.11)
Please provide the following information on a CD/DVD , if possible
Please provide the following information on a CD/DVD, if possible, by September 15, 2017.
, by September 1 5, 2017. 1. One complete version of a biennial requalification written examination administered during the training cycle.
: 1. One complete version of a biennial requalification written examination administered during the training cycle.
: 2. Ten (10) job performance measures (JPMs) and four (4) simulator scenarios associated with an annual requalification operating test required by Title 10 of the Code of Federal Regulations 55.59(a)(2). The JPMs and scenarios to be reviewed should include those that will be observed during the onsite portion of this inspection, with any remaining JPMs and scenarios reviewed selected from other weeks within the same training cycle.
: 2. Ten (10) job performance measures (JPMs) and four (4) simulator scenarios associated with an annual requalification operating test required by Title 10 of the Code of Federal Regulations 55.59(a)(2). The JPMs and scenarios to be reviewed should include those that will be observed during the onsite portion of this inspection, with any remaining JPMs and scenarios reviewed selected from other weeks within the same training cycle.
: 3. Complete versions of the reference materials used to develop and administer the written examination and operating test.
: 3. Complete versions of the reference materials used to develop and administer the written examination and operating test. (Refer to NUREG-1021, ES-201 Attachment 3, Reference Material Guidelines for Initial Licensing Examinations.)
  (Refer to NUREG
-1021, ES-201 Attachment 3, Reference Material Guidelines for Initial Licensing Examinations.)
: 4. Spreadsheets and/or test outlines which show the usage of written examination questions, JPMs, and simulator scenarios.
: 4. Spreadsheets and/or test outlines which show the usage of written examination questions, JPMs, and simulator scenarios.
: 5. A list (or lists) of licensee-identified issues associated with licensed operator errors or other licensed operator performance problems which have occurred in the actual plant/main control room since the last biennial requalification program, their associated corrective actions, and if these issues were incorporated into requalification training. (These issues are likely documented in condition/problem identification reports, licensee-conducted audits and assessments, and in industry operating experience reports, etc.)
: 5. A list (or lists) of licensee-identified issues associated with licensed operator errors or other licensed operator performance problems which have occurred in the actual plant/main control room since the last biennial requalification program, their associated corrective actions, and if these issues were incorporated into requalification training.
(These issues are likely documented in condition/problem identification reports, licensee-conducted audits and assessments, and in industry operating experience reports, etc.)
: 6. Facility licensee procedures for licensed operator requalification training and examination, including examination security procedures.
: 6. Facility licensee procedures for licensed operator requalification training and examination, including examination security procedures.
: 7. A schedule of the licensee's examination activities during the on
: 7. A schedule of the licensees examination activities during the on-site inspection week.
-site inspection week.
Please have the following information available for U.S. Nuclear Regulatory Commission (NRC) review on September 25, 2017.
Please have the following information available for U.S. Nuclear Regulatory Commission (NRC) review on September 25, 2017
: 1. Licensed operator pass/fail statistics for any NRC-required requalification examination that has been completed (see Table 03.02-1, Examination Results).
. 1. Licensed operator pass/fail statistics for any NRC
: 2. An overall schedule of the facility licensees requalification program since the last biennial inspection (cycle weeks, training topics, etc.).
-required requalification examination that has been completed (see Table 03.02-1, Examination Results).
: 3. A list and descriptions of any examination security problems since the last biennial inspection (likely documented in training department condition/problem identification reports).
: 2. An overall schedule of the facility licensee's requalification program since the last biennial inspection (cycle weeks, training topics, etc.).
: 4. Records for licensed operator requalification training attendance, licensed operator performance in requalification, licensed operator remedial training, individual licensed operator medical records, and records for maintaining an active license and license re-activation.
: 3. A list and descriptions of any examination security problems since the last biennial inspection (likely documented in training department condition/problem identification reports). 4. Records for licensed operator requalification training attendance, licensed operator performance in requalification, licensed operator remedial training, individual licensed operator medical records, and records for maintaining an active license and license re-activation.
: 5. Simulator testing, maintenance, modification, and performance records.
: 5. Simulator testing, maintenance, modification, and performance records. Simulator corrective action records, including lists of open/closed simulator deficiencies
Simulator corrective action records, including lists of open/closed simulator deficiencies, and corrective actions taken.
, and corrective actions taken.}}
Enclosure}}

Latest revision as of 21:09, 29 October 2019

Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information (Meb)
ML17228A797
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 08/16/2017
From: Bielby M
Operations Branch III
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
Download: ML17228A797 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 August 16, 2017 Mr. Bryan C. Hanson Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

BRAIDWOOD STATION, UNITS 1 AND 2 - NOTIFICATION OF AN NRC BIENNIAL LICENSED OPERATOR REQUALIFICATION PROGRAM INSPECTION AND REQUEST FOR INFORMATION

Dear Mr. Hanson:

In a telephone conversation on May 30, 2017, between Mr. Michael Bielby, Senior Operations Engineer, the U.S. Nuclear Regulatory Commission (NRC) lead inspector for this inspection, and Mr. John Taff, Licensed Operator Requalification Training Lead, final arrangements were made for the NRC to inspect the licensed operator requalification program at the Braidwood Station, Units 1 and 2. The inspection is planned for the week of September 25, 2017, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations and annual operating tests as necessary to support the NRC's inspection program needs. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a request for documents needed for the inspection.

Please furnish the items listed in the first group of the attached enclosure, needed to support our in-office inspection activities, to the NRC by September 15, 2017. Please have the items listed in the second group of the attached enclosure available for the inspectors during the onsite portion of the inspection activities. Mr. Taff has been advised of this request.

Thank you for your cooperation in this matter. If there are any questions regarding either the inspection, or the material requested in the enclosure, please contact me at 630-829-9762 or via e-mail at Michael.Bielby@NRC.gov.

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.

B. Hanson This letter and its enclosure will be available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA Randal Baker Acting for/

Michael E. Bielby, Sr., Senior Operations Engineer Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77

Enclosure:

Requested Information to Support Licensed Operator Requalification Program and Licensed Operator Performance Inspection (IP 71111.11) cc: Distribution via LISTSERV

B. Hanson Letter to Bryan Hanson from Michael Bielby, Sr. dated August 16, 2017

SUBJECT:

BRAIDWOOD STATION, UNITS 1 AND 2 - NOTIFICATION OF AN NRC BIENNIAL LICENSED OPERATOR REQUALIFICATION PROGRAM INSPECTION AND REQUEST FOR INFORMATION DISTRIBUTION:

Jeremy Bowen RidsNrrDorlLpl3 RidsNrrPMBraidwood Resource RidsNrrDirsIrib Resource Cynthia Pederson James Trapp Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Nancy Salgado, NRR Colleen Schmidt, DRS ADAMS Accession Number: ML17228A797 OFFICE RIII RIII RIII RIII NAME RBaker for MBielby:jw DATE 08/16/17 OFFICIAL RECORD COPY

REQUESTED INFORMATION TO SUPPORT LICENSED OPERATOR REQUALIFICATION PROGRAM AND LICENSED OPERATOR PERFORMANCE INSPECTION (IP 71111.11)

Please provide the following information on a CD/DVD, if possible, by September 15, 2017.

1. One complete version of a biennial requalification written examination administered during the training cycle.
2. Ten (10) job performance measures (JPMs) and four (4) simulator scenarios associated with an annual requalification operating test required by Title 10 of the Code of Federal Regulations 55.59(a)(2). The JPMs and scenarios to be reviewed should include those that will be observed during the onsite portion of this inspection, with any remaining JPMs and scenarios reviewed selected from other weeks within the same training cycle.
3. Complete versions of the reference materials used to develop and administer the written examination and operating test. (Refer to NUREG-1021, ES-201 Attachment 3, Reference Material Guidelines for Initial Licensing Examinations.)
4. Spreadsheets and/or test outlines which show the usage of written examination questions, JPMs, and simulator scenarios.
5. A list (or lists) of licensee-identified issues associated with licensed operator errors or other licensed operator performance problems which have occurred in the actual plant/main control room since the last biennial requalification program, their associated corrective actions, and if these issues were incorporated into requalification training.

(These issues are likely documented in condition/problem identification reports, licensee-conducted audits and assessments, and in industry operating experience reports, etc.)

6. Facility licensee procedures for licensed operator requalification training and examination, including examination security procedures.
7. A schedule of the licensees examination activities during the on-site inspection week.

Please have the following information available for U.S. Nuclear Regulatory Commission (NRC) review on September 25, 2017.

1. Licensed operator pass/fail statistics for any NRC-required requalification examination that has been completed (see Table 03.02-1, Examination Results).
2. An overall schedule of the facility licensees requalification program since the last biennial inspection (cycle weeks, training topics, etc.).
3. A list and descriptions of any examination security problems since the last biennial inspection (likely documented in training department condition/problem identification reports).
4. Records for licensed operator requalification training attendance, licensed operator performance in requalification, licensed operator remedial training, individual licensed operator medical records, and records for maintaining an active license and license re-activation.
5. Simulator testing, maintenance, modification, and performance records.

Simulator corrective action records, including lists of open/closed simulator deficiencies, and corrective actions taken.

Enclosure