ML17297B812: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:TORREY PINES TECHNOLOGY P.O.Box 81608 San Diego, California 92138 Telephone:
{{#Wiki_filter:TORREY PINES TECHNOLOGY P.O. Box 81608 San Diego, California 92138 Telephone: (714I 455-2654 A DIVISION OF GENERAL ATOMIC COMPANY TPT: 197:WAS:82 November 19, 1982 Mr. Harold R. Denton, Director Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555
(714I 455-2654 A DIVISION OF GENERAL ATOMIC COMPANY TPT: 197:WAS:82 November 19, 1982 Mr.Harold R.Denton, Director Nuclear Reactor Regulation U.S.Nuclear Regulatory Commission Washington, D.C.20555  


==Subject:==
==Subject:==
Docket Nos.50-528/529/530, Palo Verde Nuclear Generating Station, Xndependent Design Verification File: 82-003-002
Docket Nos. 50-528/529/530,     Palo Verde Nuclear Generating Station, Xndependent Design Verification File: 82-003-002


==Dear Mr.Denton:==
==Dear Mr. Denton:==
Under separate cover, we are sending you a submittal letter from Arizona Public Service Company, and we are enclosing with this letter 50 copies of our final report on the Independent Quality Assurance Evaluation of Palo Verde Nuclear Gener ating Station (PVNGS)Units 1, 2 and 3.The report consists of three volumes as follows: Volume 1 Executive Summary Volume 2 Program Results Volume 3 Potential Finding Reports (Books 1 and 2)At this time we are also sending, for the first time, copies of the report to Arizona Public Service Company.Based on the results of our evaluation, we see no reason to prohibit the issuance of a full power operating license for PVNGS Units 1, 2 and 3.We will be pleased to meet with you and your staff to discuss our evaluation and the results.S cerely, Project Manager cc: w/o enclosures K.L.Turley E.E.Van Brunt, Jr G.L.Wessman w/enclosures L.Bernabei D.Sternberg 8211290142 821119 PDR ADOCK 05000528''A'DR re~=~~ae 0 0>>s VOC1 0 li 400 ff 0 er~ee~~r AEE~0'A 0 I.-~l 0~-I~4 r I y I fl I=~~0~~re r~0~0 0~~E.0 0~A%~0}}
 
Under separate       cover, we are sending you a submittal letter from Arizona Public Service Company, and we are enclosing with this letter 50 copies of our final report on the Independent Quality Assurance Evaluation of Palo Verde Nuclear Gener ating Station (PVNGS) Units 1, 2 and 3.                 The report consists of three volumes as follows:
Volume 1     Executive Summary Volume 2     Program Results Volume 3     Potential Finding Reports (Books     1   and 2)
At this time we are also sending, for the           first   time, copies of the report to Arizona Public Service Company.
Based on the       results of our evaluation,     we see   no reason   to prohibit the issuance of a       full power   operating license for   PVNGS   Units 1, 2 and 3.
We   will be   pleased to meet with you and your     staff to   discuss our evaluation and the     results.
S   cerely, Project Manager cc:     w/o enclosures K. L. Turley E. E. Van   Brunt, Jr G. L. Wessman w/enclosures L. Bernabei D. Sternberg
''A'DR 8211290142 821119 PDR ADOCK 05000528
 
re   ~ =           ~ ~ ae 0
0>> s VOC1 0
0       er                         ~   ee li                                                            ~   ~
400 ff r AEE ~ 0'A 0 I. -
                                                          ~l                     4 0
I
                                                  ~-                         r~ I I
fl                         I=
                                                                                              ~ ~
y 0
                ~ ~ re r ~
0
~ 0 0 ~   ~ E.                                                       ~  A 0 0
                                                                %~
0}}

Latest revision as of 11:27, 29 October 2019

Forwards,Under Separate Cover, Independent QA Evaluation of Palo Verde Nuclear Generating Station Units 1,2 & 3, Vols 1,2 & 3.No Reason Seen to Prohibit Issuance of Full Power OL for Units 1,2 & 3
ML17297B812
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 11/19/1982
From: Simon W
TORREY PINES TECHNOLOGY
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML17297B811 List:
References
TPT:197:WAS:82, NUDOCS 8211290142
Download: ML17297B812 (2)


Text

TORREY PINES TECHNOLOGY P.O. Box 81608 San Diego, California 92138 Telephone: (714I 455-2654 A DIVISION OF GENERAL ATOMIC COMPANY TPT: 197:WAS:82 November 19, 1982 Mr. Harold R. Denton, Director Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Docket Nos. 50-528/529/530, Palo Verde Nuclear Generating Station, Xndependent Design Verification File: 82-003-002

Dear Mr. Denton:

Under separate cover, we are sending you a submittal letter from Arizona Public Service Company, and we are enclosing with this letter 50 copies of our final report on the Independent Quality Assurance Evaluation of Palo Verde Nuclear Gener ating Station (PVNGS) Units 1, 2 and 3. The report consists of three volumes as follows:

Volume 1 Executive Summary Volume 2 Program Results Volume 3 Potential Finding Reports (Books 1 and 2)

At this time we are also sending, for the first time, copies of the report to Arizona Public Service Company.

Based on the results of our evaluation, we see no reason to prohibit the issuance of a full power operating license for PVNGS Units 1, 2 and 3.

We will be pleased to meet with you and your staff to discuss our evaluation and the results.

S cerely, Project Manager cc: w/o enclosures K. L. Turley E. E. Van Brunt, Jr G. L. Wessman w/enclosures L. Bernabei D. Sternberg

A'DR 8211290142 821119 PDR ADOCK 05000528

re ~ = ~ ~ ae 0

0>> s VOC1 0

0 er ~ ee li ~ ~

400 ff r AEE ~ 0'A 0 I. -

~l 4 0

I

~- r~ I I

fl I=

~ ~

y 0

~ ~ re r ~

0

~ 0 0 ~ ~ E. ~ A 0 0

%~

0