{{#Wiki_filter:Issue Date:  01/05/18 1 TABLE OF CONTENTS NRC INSPECTION MANUAL DIRS TABLE OF CONTENTS Table of Contents Current through Change Notice 18-001 issued 01/05/2018 PART CHAPTER 0000 NRC Inspection Manual 1
{{#Wiki_filter:NRC INSPECTION MANUAL                                                         DIRS TABLE OF CONTENTS Table of Contents     Current through Change Notice 18-001 issued 01/05/2018 PART CHAPTER 0000   NRC Inspection Manual1 0040           Preparing, Revising, and Issuing Documents for the NRC Inspection Manual 01/05/18 (18-001) 0100    Program Responsibilities 0102          Oversight and Objectivity of Inspectors and Examiners at Reactor Facilities 04/24/13 (13-012) 0111          Monitoring Activities for the DOE West Valley Demonstration Project 03/04/02 (02-006) 0200    Program Management Reports 0300    Inspection Policy 0301          Coordination of NRC Visits to Commercial Reactor Sites 08/24/01 (01-016) 0302          RESERVED Coordination of Regional Requests For NRR Staff To Conduct Inspection Activities 0305          Operating Reactor Assessment Program 11/17/16 (16-031) 0306          Planning, Tracking and Reporting of the Reactor Oversight Process 12/23/15 (15-032) 0307          Reactor Oversight Process Self-Assessment Program 11/23/15 (15-025) 0307, App A Reactor Oversight Process Self-Assessment Metrics 08/25/17 (17-016) 0307, App B ROP Realignment Process 08/25/17 (17-016) 0307, App C Reactor Oversight Process Self-Assessment Regional Peer Reviews 07/15/16 (16-016) 0308          Reactor Oversight Process (ROP) Basis Document 10/04/17 (17-021) 0308, Att 1    Technical Basis for Performance Indicators 11/08/07 (07-035) 0308, Att 2    Technical Basis for Inspection Program 01/05/18 (18-001) 0308, Att 3    Technical Basis for Significance Determination Process 06/16/16 (16-013) 1 The date and numbers in parentheses to the right of the chapter/inspection procedure title are the issue date and the change notice number under which the title was issued.
0040 Preparing, Revising, and Issuing Documents for the NRC   Inspection Manual 01/05/18 (18-001)  
Issue Date: 01/05/18                              1                          TABLE OF CONTENTS


0100 Program Responsibilities 0102  Oversight and Objectivity of Inspectors and Examiners    at Reactor Facilities 04/24/13 (13-012) 0111  Monitoring Activities for the DOE West Valley  Demonstration Project 03/04/02 (02-006)  
0308, Att 3, App A Technical Basis for At Power Significance Determination 06/19/12 (12-010) 0308, Att 3, App B Technical Basis for Emergency Preparedness Significance Determination Process 12/19/12 (12-029) 0308, Att 3, App C Technical Basis for Occupational Radiation Safety Significance Determination Process 07/28/05 (05-022) 0308, Att 3, App D Technical Basis for Public Radiation Safety Significance Determination Process 07/27/04 (04-020) 0308, Att 3, App E Technical Basis for the Baseline Security Significance Determination Process 07/27/12 (12-016) 0308, Att 3, App F Technical Basis for Fire Protection Significance Determination Process [IMC 0609, Appendix F] At Power Operations 02/28/05 (05-007) 0308, Att 3, App G Technical Basis for Shutdown Operations Significance Determination Process 02/28/05 (05-007) 0308, Att 3, App H Technical Basis for Containment Integrity Significance Determination Process 05/06/04 (04-010) 0308, Att 3, App I Technical Basis for Operator Requalification Human Performance Significance Determination Process 07/28/05 (05-022) 0308, Att 3, App J Technical Basis for Steam Generator Tube Integrity Findings Significance Determination Process 07/06/11 (11-011) 0308, Att 3, App K Technical Basis for Maintenance Risk Assessment and Risk Management SDP 05/19/05 (05-014) 0308 Att 3 App L Technical Basis for the B.5.b Significance Determination Process 03/28/17 (17-008) 0308 Att 3 App M Technical Basis for the Significance Determination Process (SDP)
Using Qualitative Criteria 06/11/14 (14-012) 0308 Att 3 App N RESERVED for Technical Basis for the Spent Fuel Pool Significance Determination Process 0308, Att 4    Technical Basis for Assessment 05/15/17 (17-010) 0308, Att 5    Technical Basis for Enforcement 10/16/06 (06-027) 0308, Att 6    Basis Document for the Security Cornerstone of the Reactor Oversight Process 09/08/09 (09-021) 0309          Reactive Inspection Decision Basis for Reactors 10/28/11 (11-023) 0310          Aspects Within the Cross-Cutting Areas 12/04/14 (14-029) 0312          Technical Assistance for Radiation Safety Inspections at Nuclear Fuel Cycle Facilities and Materials Licensees' Sites 06/06/02 (02-023) 0321          Reserved for Operability Determinations & Functionality Assessments of Conditions Adverse To Quality or Safety 0326          Operability Determinations and Functionality Assessments for Conditions Adverse to Quality or Safety 11/20/17 (17-026) 0330          Guidance for NRC Review of Licensee Draft Documents 07/08/96 (96-015) 0350          Oversight of Operating Reactor Facilities in a Shutdown Condition With Performance Problems 12/15/06 (06-035) 0351          Now IMC 0375 0375          Implementation of the Reactor Oversight Process at Reactor Facilities in an Extended Shutdown Condition for Reasons Not Related to Performance 11/13/15 (15-024)
Issue Date: 01/05/18                            2                        TABLE OF CONTENTS


0200 Program Management Reports
0400  Enforcement Policy 0410          Notices of Enforcement Discretion 03/13/13 (13-009) 0410, App A  Reserved for Design Compliance Enforcement Discretion 0500  Tracking Systems 0600  Documentation of Program Findings 0608          Performance Indicator Program 09/26/12 (12-022) 0609          Significance Determination Process 04/29/15 (15-008) 0609TP        Significance Determination Process 10/28/16 (16-028) 0609.01      Significance and Enforcement Review Panel Process 12/08/16 (16-032) 0609.01TP    Significance and Enforcement Review Panel Process 10/28/16 (16-028) 0609.02      Process for Appealing NRC Characterization of Inspection Findings (SDP Appeal Process) 06/08/11 (11-010) 0609.03      Senior Reactor Analyst (SRA) and Risk Analyst Support Expectations 04/29/15 (15-008) 0609.04      Initial Characterization of Findings 10/07/16 (16-026) 0609.05TP    Inspection Findings Review Board 10/28/16 (16-028) 0609, App A Determining the Significance of Reactor Inspection Findings for At-Power Situations 06/19/12 (12-010) 0609, App B Emergency Preparedness Significance Determination Process 09/22/15 (15-017) 0609, App C Occupational Radiation Safety Significance Determination Process 08/19/08 (08-024) 0609, App D Public Radiation Safety Significance Determination Process 02/12/08 (08-007) 0609, App E Security Significance Determination Process for Power Reactors 10/08/15 (15-019) 0609, App E Part I Baseline Security Significance Determination Process for Power Reactors 09/30/16 (16-024) 0609, App E Part II Force-on-Force Significance Determination Process 01/15/14 (14-001) 0609, App E(P)Part III Construction Fitness-for-Duty Significance Determination Process
                    - Pilot 09/19/12 (12-021) 0609, App E Part IV Cyber Security Significance Determination Process for Power Reactors 08/15/17 (17-014) 0609, App F Fire Protection Significance Determination Process 09/20/13 (13-02) 0609, App F, Att 1 Part 1: Fire Protection SDP Phase 1 Worksheet 09/20/13 (13-022) 0609, App F, Att 2 Degradation Rating Guidance Specific to Various Fire Protection Program Elements 02/28/05 (05-007) 0609, App F, Att 3 Guidance for Identifying Fire Growth and Damage Scenarios 02/28/05 (05-007) 0609, App F, Att 4 Fire Ignition Source Mapping Information: Fire Frequency, Counting Instructions, Applicable Fire Severity Characteristics, and Applicable Manual Fire Suppression Curves 02/28/05 (05-007)
Issue Date: 01/05/18                            3                      TABLE OF CONTENTS


0300 Inspection Policy
0609, App F, Att 5 Characterizing Non-Simple Fire Ignition Sources 02/28/05 (05-007) 0609, App F, Att 6 Guidance for the Identification of Targets and Their Ignition and Damage Criteria 02/28/05 (05-007) 0609, App F, Att 7 Guidance for Fire Growth and Damage Time Analysis 02/28/05 (05-007) 0609, App F, Att 8 Guidance for Fire Non-Suppression Probability Analysis 02/28/05 (05-007) 0609, App G Shutdown Operations Significance Determination Process 05/09/14 (14-011) 0609, App G, Att 1 Shutdown Operations Significance Determination Process Phase 1 Operational Checklists for Both PWRs and BWRs 05/09/14 (14-011) 0609, App G, Att 2 Phase 2 Significance Determination Process Template for PWR during Shutdown 02/28/05 (05-007) 0609, App G, Att 3 Phase 2 Significance Determination Process Template for BWR during Shutdown 02/28/05 (05-007) 0609, App H Containment Integrity Significance Determination Process 05/06/04 (04-010) 0609, App I Operator Requalification Human Performance Significance Determination Process [SDP] 12/06/11 (11-040) 0609, App J Technical Basis for Steam Generator Tube Integrity Findings 07/06/11 (11-011) 0609, App K Maintenance Risk Assessment and Risk Management Significance Determination Process 05/19/05 (05-014) 0609, App L B.5.b Significance Determination Process 12/24/09 (09-032) 0609, App M Significance Determination Process Using Qualitative Criteria 12/22/06 (06-036) 0609 App N RESERVED SDP for ISFSI at Operating Plants 0609 App O Significance Determination Process for Mitigating Strategies and Spent Fuel Pool Instrumentation 10/07/16 (16-026) 0610          Nuclear Material Safety and Safeguards Inspection Reports 05/18/04 (04-014) 0611          Power Reactor Inspection Reports 12/13/17 (17-029)
Effective Date: 01/01/18 0611, Exh 1 Standard Reactor Inspection Report Outline 12/13/17 (17-029)
Effective Date: 01/01/18 0611, Exh 2 Inspection Report Documentation Matrix 12/13/17 (17-029)
Effective Date: 01/01/18 0611, App A Acronyms Used in Inspection Reports 12/13/17 (17-029)
Effective Date: 01/01/18 0611, App C Guidance for Supplemental Inspection Reports 12/13/17 (17-029)
Effective Date: 01/01/18 0611, App D Guidance for Problem Identification and Resolution Inspection Reports 12/13/17 (17-029) Effective Date: 01/01/18 0612          Issue Screening 05/03/17 (17-009) 0612          Power Reactor Inspection Reports 05/06/16 (16-012) 0612, Exh 1 Standard Reactor Inspection Report 02/07/14 (14-005) 0612, Exh 2 Inspection Report Documentation Matrix 09/04/14 (14-020) 0612, Exh 3 Reserved for Sample Reactor Inspection Report (temporarily suspended pending revision) 0612, Exh 4 Inspection Report Cover Letter Templates 07/26/16 (16-018)
Issue Date: 01/05/18                          4                        TABLE OF CONTENTS


0301  Coordination of NRC Visits to Commercial Reactor Sites  08/24/01 (01-016) 0302  RESERVED Coordination of Regional Requests For NRR Staff To Conduct Inspection Activities  0305  Operating Reactor Assessment Program 11/17/16 (16-031)  0306  Planning, Tracking and Reporting of the Reactor Oversight Process 12/23/15 (15-032)  0307  Reactor Oversight Process Self-Assessment Program 11/23/15 (15-025)  0307, App A  Reactor Oversight Process Self-Assessment Metrics 08/25/17 (17-016) 0307, App B ROP Realignment Process 08/25/17 (17-016) 0307, App C Reactor Oversight Process Self-Assessment Regional Peer Reviews    07/15/16 (16-016) 0308  Reactor Oversight Process (ROP) Basis Document 10/04/17 (17-021)  0308, Att 1 Technical Basis for Performance Indicators  11/08/07 (07-035)  0308, Att 2 Technical Basis for Inspection Program 01/05/18 (18-001) 0308, Att 3 Technical Basis for Significance Determination Process 06/16/16 (16-013) 1The date and numbers in parentheses to the right of the chapter/inspection procedure title are the issue date and the change notice number under which the title was issued.
0612, App A Acronyms Used in IMC 0612 12/04/08 (08-034) 0612, App B Issue Screening 09/07/12 (12-020) 0612, App B Issue Screening 12/13/17 (17-029) Effective Date: 01/01/18 0612, App C Documentation Guidance for Supplemental Inspections 10/28/11 (11-024) 0612, App C Exh1 Sample Supplemental Inspection Report for IP 95001 and IP 95002 10/28/11 (11-024) 0612, App D Guidance for Documenting Inspection Procedure 71152, Identification and Resolution of Problems 08/13/13 (13-017) 0612, App E Minor/More-Than-Minor Screening Examples 08/11/09 (09-020) 0612, App G Emergency Planning Cornerstone- Specific Supplemental Guidance for Appendix B Screening Figures 1 and 2 09/09/13 (13-020) 0613            Power Reactor Construction Inspection Reports 02/09/17 (17-003) 0614            Documenting 10 CFR Part 52 Construction Audit Activities 10/03/07 (07-030) 0615            Research and Test Reactor Inspection Reports 06/23/04 (04-018) 0616            Fuel Cycle Safety and Safeguards Inspection Reports 08/15/17 (17-014) 0617            Vendor and Quality Assurance Implementation Inspection Reports 08/15/17 (17-016) 0620            Inspection Documents and Records 09/12/11 (11-015) 0700  Communications with Licensees 0730            Generic Communications Regarding Materials and Fuel Cycle Issues 03/21/08 (08-011) 0800  Feedback - Improving the Regulatory Process 0801            Inspection Program Feedback Process 12/19/16 (16-034) 0802            Reserved for the Part 52 Program 0900  Reporting of Events/Incidents 1000  Regional Office Program Interfaces 1007            Interfacing Activities between Regional Offices of NRC and OSHA 05/06/16 (16-012) 1100  Notifications of Meetings and Conferences 1120            Preliminary Notifications 09/13/13 (13-021) 1200  Inspector Requirements 1201            Conduct of Employees 07/29/16 (16-019)
Issue Date: 01/05/18 2 TABLE OF CONTENTS  0308, Att 3, App A Technical Basis for At Power Significance Determination    06/19/12 (12-010) 0308, Att 3, App B Technical Basis for Emergency Preparedness Significance    Determination Process 12/19/12 (12-029) 0308, Att 3, App C Technical Basis for Occupational Radiation Safety    Significance Determination Process 07/28/05 (05-022) 0308, Att 3, App D Technical Basis for Public Radiation Safety Significance Determination Process 07/27/04 (04-020) 0308, Att 3, App E Technical Basis for the Baseline Security Significance Determination Process 07/27/12 (12-016) 0308, Att 3, App F Technical Basis for Fire Protection Significance Determination Process [IMC 0609, Appendix F] At Power Operations 02/28/05 (05-007) 0308, Att 3, App G Technical Basis for Shutdown Operations Significance    Determination Process 02/28/05 (05-007) 0308, Att 3, App H Technical Basis for Containment Integrity Significance Determination Process 05/06/04 (04-010) 0308, Att 3, App I Technical Basis for Operator Requalification Human Performance Significance Determination Process    07/28/05 (05-022) 0308, Att 3, App J Technical Basis for Steam Generator Tube Integrity Findings Significance Determination Process 07/06/11 (11-011) 0308, Att 3, App K Technical Basis for Maintenance Risk Assessment and Risk    Management SDP 05/19/05 (05-014) 0308 Att 3 App L Technical Basis for the B.5.b Significance Determination Process    03/28/17 (17-008) 0308 Att 3 App M Technical Basis for the Significance Determination Process (SDP) Using Qualitative Criteria 06/11/14 (14-012) 0308 Att 3 App N RESERVED for Technical Basis for the Spent Fuel Pool Significance Determination Process 0308, Att 4 Technical Basis for Assessment 05/15/17 (17-010) 0308, Att 5 Technical Basis for Enforcement 10/16/06 (06-027) 0308, Att 6  Basis Document for the Security Cornerstone of the Reactor Oversight Process 09/08/09 (09-021) 0309 Reactive Inspection Decision Basis for Reactors 10/28/11 (11-023) 0310 Aspects Within the Cross-Cutting Areas 12/04/14 (14-029) 0312 Technical Assistance for Radiation Safety Inspections at Nuclear Fuel Cycle Facilities and Materials Licensees' Sites 06/06/02 (02-023) 0321 Reserved for Operability Determinations & Functionality Assessments of Conditions Adverse To Quality or Safety 0326 Operability Determinations and Functionality Assessments for Conditions Adverse to Quality or Safety 11/20/17 (17-026) 0330 Guidance for NRC Review of Licensee Draft Documents    07/08/96 (96-015) 0350  Oversight of Operating Reactor Facilities in a Shutdown Condition With Performance Problems 12/15/06 (06-035) 0351  Now IMC 0375  0375  Implementation of the Reactor Oversight Process at Reactor Facilities in an Extended Shutdown Condition for Reasons Not Related to Performance 11/13/15 (15-024)
Issue Date: 01/05/18                             5                      TABLE OF CONTENTS
Issue Date: 01/05/18 3 TABLE OF CONTENTS 0400 Enforcement Policy 0410 Notices of Enforcement Discretion  03/13/13 (13-009) 0410, App A Reserved for Design Compliance Enforcement Discretion


0500 Tracking Systems 0600 Documentation of Program Findings 0608 Performance Indicator Program 09/26/12 (12-022)  0609  Significance Determination Process 04/29/15 (15-008)  0609TP Significance Determination Process 10/28/16 (16-028)  0609.01 Significance and Enforcement Review Panel Process 12/08/16 (16-032) 0609.01TP Significance and Enforcement Review Panel Process 10/28/16 (16-028) 0609.02 Process for Appealing NRC Characterization of Inspection Findings (SDP Appeal Process) 06/08/11 (11-010)  0609.03 Senior Reactor Analyst (SRA) and Risk Analyst Support Expectations 04/29/15 (15-008) 0609.04 Initial Characterization of Findings 10/07/16 (16-026) 0609.05TP Inspection Findings Review Board 10/28/16 (16-028) 0609, App A Determining the Significance of Reactor Inspection Findings for At-Power Situations 06/19/12 (12-010)  0609, App B Emergency Preparedness Significance Determination Process    09/22/15 (15-017) 0609, App C Occupational Radiation Safety Significance Determination  Process 08/19/08 (08-024)  0609, App D Public Radiation Safety Significance Determination Process    02/12/08 (08-007)  0609, App E Security Significance Determination Process for Power Reactors 10/08/15 (15-019) 0609, App E  Part I Baseline Security Significance Determination Process for Power Reactors 09/30/16 (16-024) 0609, App E  Part II Force-on-Force Significance Determination Process    01/15/14 (14-001) 0609, App E(P)Part III Construction Fitness-for-Duty Significance Determination Process - Pilot 09/19/12 (12-021) 0609, App E  Part IV Cyber Security Significance Determination Process for Power Reactors 08/15/17 (17-014)  0609, App F Fire Protection Significance Determination Process  09/20/13 (13-02)  0609, App F, Att 1 Part 1:  Fire Protection SDP Phase 1 Worksheet 09/20/13 (13-022) 0609, App F, Att 2 Degradation Rating Guidance Specific to Various Fire Protection Program Elements 02/28/05 (05-007) 0609, App F, Att 3 Guidance for Identifying Fire Growth and Damage Scenarios 02/28/05 (05-007) 0609, App F, Att 4 Fire Ignition Source Mapping Information: Fire Frequency,    Counting Instructions, Applicable Fire Severity Characteristics, and Applicable Manual Fire Suppression Curves 02/28/05 (05-007)
1202          Senior Resident Inspector Site Turnover 10/31/08 (08-031) 1220          Processing of NRC Form 241, "Report of Proposed Activities In Non-Agreement States," Areas of Exclusive Federal Jurisdiction and Offshore Waters, and Inspection of Agreement State Licensees Operating Under 10 CFR 150.20 05/01/03 (03-013) 1220, App I Procedures and Guidelines for Processing NRC Form 241 05/01/03 (03-013) 1220, App II Procedures Letter to be Sent to Licensees with Procedures and Information for Filing NRC Form 241 05/01/03 (03-013) 1220, App III Inspection of Agreement State Licensees 05/01/03 (03-013) 1230          Quality Assurance Program for Radiological Confirmatory Measurements 10/01/83 (83-12) 1232          Collection, Preparation, and Shipment of Independent Measurement Samples 11/18/86 (86-52) 1240          Unescorted Access at Power Reactors 12/01/04 (04-027) 1245          Qualification Program for Operating Reactor Programs 08/24/17 (17-015) 1245, Att 1   General Overview of the Inspector Training and Qualification Program 08/24/17 (17-015) 1245, Att 2   Inspector Competencies 10/31/06 (06-032) 1245, Att 3   General Orientation Topics 10/31/06 (06-032) 1245, App A Basic-Level Training and Qualification Journal 08/24/17 (17-015) 1245, App B General Proficiency-Level Training and Qualification Journal 08/24/17 (17-015) 1245, App C1 Reactor Operations Inspector Technical Proficiency Training and Qualification Journal 12/19/16 (16-034) 1245, App C2 Reactor Engineering Inspector Technical Proficiency Training and Qualification Journal 12/19/16 (16-034) 1245, App C3 Health Physics Inspector Technical Proficiency Training and Qualification Journal 02/20/17 (17-004) 1245, App C4 Reactor Security Inspector Technical Proficiency Qualification Training and Qualification Journal 11/29/13 (13-027) 1245, App C5 Research and Test Reactor Inspector Technical Proficiency Qualification Journal 07/08/09 (09-017) 1245, App C6 Emergency Preparedness Inspector Technical Proficiency Training and Qualification Journal 07/08/09 (09-017) 1245, App C7 Fire Protection Inspector Technical Proficiency Training and Qualification Journal 10/21/15 (15-020) 1245, App C8 Vendor Inspector Technical Proficiency Qualification Journal 12/19/12 (12-029) 1245, App C9 Senior Reactor Analyst Training and Qualification Program 11/24/15 (15-026) 1245, App C10 Operator Licensing (OL) Examiner Technical Proficiency Training and Qualification Journal 10/21/15 (15-020) 1245, App C11 Security Risk Analyst Technical Proficiency Training and Qualification Journal 08/30/13 (13-019) 1245, App C12 Safety Culture Assessor Training and Qualification Journal 05/24/17 (17-011) 1245, App C13 Independent Spent Fuel Storage Installation Security Inspector Technical Proficiency Training and Qualification Journal 08/08/13 (13-016)
Issue Date:  01/05/18 4 TABLE OF CONTENTS  0609, App F, Att 5 Characterizing Non-Simple Fire Ignition Sources 02/28/05 (05-007) 0609, App F, Att 6 Guidance for the Identification of Targets and Their Ignition and Damage Criteria 02/28/05 (05-007) 0609, App F, Att 7 Guidance for Fire Growth and Damage Time Analysis    02/28/05 (05-007) 0609, App F, Att 8 Guidance for Fire Non-Suppression Probability Analysis 02/28/05 (05-007) 0609, App G Shutdown Operations Significance Determination Process 05/09/14 (14-011) 0609, App G, Att 1 Shutdown Operations Significance Determination Process    Phase 1 Operational Checklists for Both PWRs and BWRs 05/09/14 (14-011) 0609, App G, Att 2 Phase 2 Significance Determination Process Template for PWR during Shutdown 02/28/05 (05-007) 0609, App G, Att 3 Phase 2 Significance Determination Process Template for    BWR during Shutdown 02/28/05 (05-007) 0609, App H Containment Integrity Significance Determination Process 05/06/04 (04-010) 0609, App I Operator Requalification Human Performance Significance    Determination Process [SDP] 12/06/11 (11-040) 0609, App J Technical Basis for Steam Generator Tube Integrity Findings 07/06/11 (11-011)  0609, App K Maintenance Risk Assessment and Risk Management Significance Determination Process 05/19/05 (05-014) 0609, App L B.5.b Significance Determination Process 12/24/09 (09-032) 0609, App M Significance Determination Process Using Qualitative Criteria    12/22/06 (06-036) 0609 App N RESERVED SDP for ISFSI at Operating Plants 0609 App O Significance Determination Process for Mitigating Strategies and Spent    Fuel Pool Instrumentation 10/07/16 (16-026) 0610  Nuclear Material Safety and Safeguards Inspection Reports    05/18/04 (04-014) 0611  Power Reactor Inspection Reports 12/13/17 (17-029)
Issue Date: 01/05/18                          6                        TABLE OF CONTENTS
Effective Date:  01/01/18 0611, Exh 1 Standard Reactor Inspection Report Outline 12/13/17 (17-029)
Effective Date:  01/01/18  0611, Exh 2 Inspection Report Documentation Matrix 12/13/17 (17-029)    Effective Date:  01/01/18 0611, App A Acronyms Used in Inspection Reports 12/13/17 (17-029)
Effective Date: 01/01/18 0611, App C Guidance for Supplemental Inspection Reports 12/13/17 (17-029)    Effective Date:  01/01/18  0611, App D Guidance for Problem Identification and Resolution Inspection Reports 12/13/17 (17-029) Effective Date:  01/01/18 0612  Issue Screening 05/03/17 (17-009) 0612  Power Reactor Inspection Reports 05/06/16 (16-012) 0612, Exh 1 Standard Reactor Inspection Report 02/07/14 (14-005)  0612, Exh 2 Inspection Report Documentation Matrix 09/04/14 (14-020) 0612, Exh 3 Reserved for Sample Reactor Inspection Report (temporarily suspended pending revision)  0612, Exh 4 Inspection Report Cover Letter Templates 07/26/16 (16-018)
Issue Date:  01/05/18 5 TABLE OF CONTENTS  0612, App A Acronyms Used in IMC 0612 12/04/08 (08-034) 0612, App B Issue Screening 09/07/12 (12-020) 0612, App B Issue Screening 12/13/17 (17-029) Effective Date:  01/01/18  0612, App C Documentation Guidance for Supplemental Inspections 10/28/11 (11-024) 0612, App C Exh1  Sample Supplemental Inspection Report for IP 95001 and IP 95002 10/28/11 (11-024) 0612, App D Guidance for Documenting Inspection Procedure 71152, "Identification and Resolution of Problems" 08/13/13 (13-017) 0612, App E Minor/More-Than-Minor Screening Examples 08/11/09 (09-020)  0612, App G Emergency Planning Cornerstone- Specific Supplemental Guidance for    Appendix B Screening Figures 1 and 2 09/09/13 (13-020) 0613  Power Reactor Construction Inspection Reports 02/09/17 (17-003) 0614  Documenting 10 CFR Part 52 Construction Audit Activities    10/03/07 (07-030)  0615  Research and Test Reactor Inspection Reports  06/23/04 (04-018)  0616  Fuel Cycle Safety and Safeguards Inspection Reports 08/15/17 (17-014) 0617  Vendor and Quality Assurance Implementation Inspection Reports 08/15/17 (17-016) 0620 Inspection Documents and Records 09/12/11 (11-015)


0700 Communications with Licensees
1245, App C14 Cyber Security Inspector Technical Proficiency Training and Qualification Journal 08/03/15 (15-014) 1245, App C15 Construction Inspector Technical Proficiency Training and Qualification Journal 08/15/17 (17-014) 1245 App C16 RESERVED for RTR training qual 1245, App D1 Maintaining Qualifications 08/24/17 (17-015) 1245, App D2 Inservice Inspection Advanced-Level Training 10/21/15 (15-020) 1245, App D3 Fire Protection Advanced-Level Training 12/19/12 (12-029) 1245, App D4 Advanced Electrical Inspector Technical Proficiency Training and Qualification Journal 12/29/11 (11-044) 1246          Formal Qualification Programs in the Nuclear Material Safety and Safeguards Program Area 10/26/11 (11-022) 1246, App A Training Activities 10/26/11 (11-022) 1246, App B1 Training Requirements and Qualification Journal for Spent Fuel Storage and Transportation Reviewer 10/26/11 (11-022) 1246, App B2 Training Requirements and Qualification Journal for Spent Fuel Storage and Transportation Inspector 10/26/11 (11-022) 1246, App B3 Training Requirements and Qualification Journal for Independent Spent Fuel Storage Installation Inspector 11/07/11 (11-028) 1246, App B4 Independent Spent Fuel Storage Installation Security Inspector Technical Proficiency Training and Qualification Journal 08/08/13 (13-016) 1246, App C1 Training Requirements and Qualification Journal for Fuel Cycle License Reviewer 10/26/11 (11-022) 1246, App C2 Training Requirements and Qualification Journal for Fuel Cycle Project Manager 10/26/11 (11-022) 1246, App C3 Training Requirements and Qualification Journal for Material Control and Accounting License Reviewer 10/26/11 (11-022) 1246, App C4 Training Requirements and Qualification Journal for Fuel Cycle Safeguards Physical Security Inspector 10/26/11 (11-022) 1246, App C5 Training Requirements and Qualification Journal for International Safeguards Analysts, Nuclear Materials Management and Safeguards System (NMMSS) Analysts, and Import/Export Analysts 06/27/16 (16-014) 1246, App D1 Training Requirements and Qualification Journal for High Level Waste Repository License Technical Reviewer 10/26/11 (11-022) 1246, App D2 Training Requirements and Qualification Journal for High Level Waste Repository Inspector 10/26/11 (11-022) 1247          Qualification Program for Fuel Facility Inspectors in the Nuclear Material Safety and Safeguards Program Area 10/28/14 (14-026) 1247, App A Basic-Level Training and Certification Journal Fuel Facility Inspector 06/27/14 (14-014) 1247, App B General Proficiency-Level Training and Qualification Journal 06/11/14 (14-012) 1247, App C1 Fuel Facility Operations Inspector Technical Proficiency Training and Qualification Journal 06/11/14 (14-012) 1247, App C2 Fuel Facility Health Physics Inspector Technical Proficiency Training and Qualification Journal 06/20/2014 (14-013) 1247, App C3 Fuel Facility Emergency Preparedness Inspector Technical Proficiency Training and Qualification Journal 06/11/14 (14-012) 1247, App C5 Fuel Facility Material Control & Accounting Inspector Technical Proficiency Training and Qualification Journal 06/11/14 (14-012)
Issue Date: 01/05/18                          7                        TABLE OF CONTENTS


0730  Generic Communications Regarding Materials and Fuel Cycle Issues 03/21/08 (08-011)  
1247, App C6 Fuel Facility Nuclear Criticality Safety Inspector Technical Proficiency Training and Qualification Journal 06/11/14 (14-012) 1247, App D RESERVED for Advanced and Specialized Training Courses and Qualification Programs 1247, App D1 Fuel Facility Information Security Inspector Specialized Qualification Program Training and Qualification Journal 10/28/14 (14-026) 1248          Formal Qualification Programs for Federal and State Materials and Environmental Management Programs 04/19/13 (13-011) 1248, App A Materials Health Physics License Review Qualification Journal 04/19/13 (13-011) 1248, App B Materials Health Physics Inspector Qualification Journal 04/19/13 (13-011) 1248, App C Training Requirements and Qualification Journal for Materials Exempt Distribution License Reviewer 04/19/13 (13-011) 1248, App D Training Requirements and Qualification Journal for Byproduct Material Sealed Source and Device Reviewer 04/19/13 (13-011) 1248, App E Training Requirements and Qualification Journal for Division of Waste Management Inspector and License Reviewer 04/19/13 (13-011) 1248, App F Training Requirements and Qualification Journal for Decommissioning Inspectors 10/07/16 (16-026) 1248, App G Training Requirements and Qualification Journal for Decommissioning Project Managers and Technical Reviewers 01/13/16 (16-002) 1248, App H Training Requirements and Qualification Journal for Uranium Recovery Inspector 04/19/13 (13-011) 1248, App I Training Requirements and Qualification Journal for Uranium Recovery Project Manager/Technical Reviewer 04/19/13 (13-011) 1248 App J RESERVED 1248 App K Low-Level Waste Project Manager Qualification Journal 06/27/16 (16-014) 1248 App L Performance Assessment Technical Reviewer Qualification Journal 06/27/16 (16-014) 1300  Incident Response 1301          Response to Non-Emergency Incidents Involving Radioactive Material 10/20/00 (00-022) 1302          Action Levels for Radiation Exposures and Contamination Associated with Materials Events Involving Members of the Public 07/14/05 (05-019) 1303          Requesting Emergency Acceptance of Radioactive Material by the U.S.
Department of Energy 11/29/07 (07-037) 1304          Reserved for Independent Split Sampling Program for Residual Radioactivity 1330          Response to Transportation Accidents Involving Radioactive Materials 10/06/04 (04-025) 1360          Use of Physician and Scientific Consultants in the Medical Consultant Program 11/02/06 (06-033) 1400  Reserved Issue Date: 01/05/18                          8                        TABLE OF CONTENTS


0800 Feedback - Improving the Regulatory Process 0801   Inspection Program Feedback Process 12/19/16 (16-034) 0802  Reserved for the Part 52 Program  
1415          State Contracts for Environmental Monitoring 06/28/91 (91-009) 1500  Reserved 1600  Emergency Preparedness 1601          Communication Protocol for Assessing Offsite Emergency Preparedness Following a Natural Disaster 08/27/13 (13-018) 1700  Reserved 1800  Reserved 1900  Reserved 2000  Reserved 2100  Reserved 2200   Nuclear Security and Incident Response 2200 Security Inspection Program for Construction 09/07/12 (12-020) 2200, App A Security Construction Inspection Program 09/07/12 (12-020) 2201 Security Inspection Program for Commercial Nuclear Power Reactors 09/22/15 (15-017) 2201, App A Security Baseline Inspection Program 11/09/16 (16-029) 2201, App B Supplemental Inspection Program 09/22/15 (15-017) 2201, App C Generic, Special, and Infrequent Inspections 09/22/15 (15-017) 2201, App D Facility Status Reviews for Security and Safeguards Inspection Program 09/22/15 (15-017) 2201/003      Reserved for Fitness for Duty Part 26 Subpart K 2201/004      Inspection of Implementation of Interim Cyber Security Milestones 1-7 12/22/14 (14-031) 2201/005      Inspection of TVA WB1, Implementation of the Cyber Security Program Required by 10 CFR 73.54 and 10 CFR 73.55 07/03/14 (14-015) 2202          Security Inspection Program for Decommissioning Reactors 08/27/14 (14-019) 2202, App A Security Core Inspection Program 08/27/14 (14-019) 2202, App B Security Discretionary Inspection Program 10/06/14 (14-023) 2300  High Level Waste Issue Date: 01/05/18                          9                      TABLE OF CONTENTS


0900 Reporting of Events/Incidents 1000 Regional Office Program Interfaces 1007  Interfacing Activities between Regional Offices of NRC and OSHA 05/06/16 (16-012)
2300          Yucca Mountain Inspection Program License Application Review Period 09/11/08 (08-026) 2400  Low Level Waste Program 2401          Near-Surface Low-Level Radioactive Waste Disposal Facility Inspection Program 11/27/01 (01-028) 2410          Conduct of Observation Audits 07/12/00 (00-012) 2500  Reactor Inspection Program 2500          Reactor Inspection Program 11/06/86 (reactivated 09-020) 2501          Construction Inspection Program: Early Site Permit (ESP) 06/06/13 (13-013) 2502          Construction Inspection Program: Pre-Combined License (Pre-COL) Phase 12/13/10 (10-026) 2503          Construction Inspection Program: Inspections of Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) 07/05/12 (12-012) 2504          Construction Inspection Program: Inspections of Construction and Operational Programs 10/24/12 (12-025) 2505          Periodic Assessment of Construction Inspection Program Results 01/06/17 (17-001) 2506          Construction Reactor Oversight Process General Guidance and Basis Document 02/20/17 (17-004) 2507          Construction Inspection Program: Vendor Inspections 10/03/13 (13-024) 2508          Construction Inspection Program: Design Certification 09/06/16 (16-022) 2512          Light Water Reactor Inspection Program - Construction Phase 12/17/86 (reactivated 07-032) 2512 App I    Light Water Reactor Inspection Program - Construction Phase -
Procedure List 10/16/07 (07-032) 2513 Light Water Reactor Inspection Program - Preoperational Testing and Operational Preparedness Phase 08/05/08 (Reactivated 08-023) 2513, App A Light Water Reactor - Preoperational Testing Phase 08/05/08 (reactivated 08-023) 2513, App B Light Water Reactor - Operational Preparedness Phase 08/05/08 (reactivated 08-023) 2515          Light Water Inspection Program - Operations Phase 03/28/17 (17-008) 2515, App A Risk-Informed Baseline Inspection Program 03/08/13 (13-008) 2515, App B Supplemental Inspection Program 12/18/15 (15-031) 2515, App C Special and Infrequently Performed Inspections 06/24/15 (15-012) 2515, App D Plant Status 10/03/17 (17-020) 2515, App E Inspection Program Modifications during a Pandemic 01/26/07 (07-004) 2515, App F Reactor Construction Activities near Operating Unit(s) 06/02/11 (11-009) 2515, App G Baseline Inspection Guidance for Power Reactors Preparing for Transition to Decommissioning Phase 02/01/16 (16-004)
Issue Date: 01/05/18                          10                      TABLE OF CONTENTS


1100 Notifications of Meetings and Conferences
2515/176      Emergency Diesel Generator Technical Specification Surveillance Requirements Regarding Endurance and Margin Testing 05/16/08 08-015 2515/179      Verification of Licensee Responses To NRC Requirement Rev. 1        for Inventories of Materials Tracked in the National Source Tracking System Pursuant to Title 10, Code of Federal Regulations, Part 20.2207 (10 CFR 20.2207) 05/27/10 (10-014) 2515/190      Inspection of Licensees Proposed Interim Actions as a Result of the Near-Term Task Force Recommendation 2.1 - Flooding Evaluation 09/04/15 (15-016) 2515/191      Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans 12/23/15 (15-032) 2515/192      Inspection of The Licensees Interim Corrective Actions Associated With Interim Enforcement Policy for the Open Phase Condition (OPC) Design Vulnerabilities In Electric Power Systems 11/09/16 (16-029) 2515/193      Inspection of the Implementation of Order EA-13-109, Order Modifying Licensees with Regard to Reliable Hardened Containment Vents Capable of Operation under Severe Accident Conditions, 10/10/17 (17-022) 2515/194      Inspection of the Licensees Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerabilities in Electric Power Systems (NRC Bulletin 2012-01) 10/31/17 (17-024) 2516          Policy and Guidance for the License Renewal Inspection Programs 08/13/13 (13-017) 2518          Reserved for Construction Inspection Program: Advanced Reactors, Pre Construction Permit (CP) 2519          Construction Significance Determination Process 12/06/17 (17-028) 2522          Construction Reactor Oversight Process Self-Assessment Program 07/28/14 (14-017) 2522, App A  Construction Reactor Oversight Process Self-Assessment Metrics 10/03/17 (17-021) 2523          NRC Application of the Reactor Operating Experience Program in NRC Oversight Processes 06/19/13 (13-014) 2530          Integrated Design Inspection Program 04/24/85 (reactivated 10-006) 2535          Design Verification Programs 03/24/89 (reactivated 10-006) 2545          Research and Test Reactor Inspection Program 06/23/04 (04-018) 2550          Non-Power Protection Facilities (NPUFs) Licensed Under 10 CFR Part 50: Construction Inspection Program (CIP) 12/14/15 (15-029) 2561          Decommissioning Power Reactor Inspection Program 04/14/03 (03-012) 2600  Fuel Cycle Facility Inspection Program 2600          Fuel Cycle Facility Operational Safety and Safeguards Inspection Program 12/20/17 (17-030) 2600, App A Guidance for Conducting Fuel Cycle Inspections 12/20/17 (17-030) 2600, App B NRC Core Inspection Requirements, Tables 1 and 2 09/24/15 (15-018) 2600, App C Fuel Cycle Resident Inspection Program 09/24/15 (15-018) 2600, App D Fuel Cycle Facility Inspection Planning 09/24/15 (15-018)
Issue Date: 01/05/18                            11                      TABLE OF CONTENTS


1120  Preliminary Notifications 09/13/13 (13-021)  
2600/016      Inspection of Activities Associated with NRC Generic Letter 2015-01 11/09/16 (16-029) 2601          Reactive Inspection Decision Making Process for Fuel Facilities 09/20/16 (16-023) 2602          Decommissioning Oversight and Inspection Program for Fuel Cycle Facilities and Materials Licensees 07/29/08 (08-021) 2603          Reserved for Fuel Cycle Facility Construction Inspection Program Assessment 2604          Licensee Performance Review 09/20/16 (16-023) 2606          Assessment of the Change in Risk Resulting From a Violation at a Fuel Cycle Facility 04/01/16 (16-010) 2606, E-2      Evaluation Based on Specific Licensee ISAs 09/26/12 (12-022) 2620          On-Site Construction Reviews of Remedial Action at Inactive Uranium Mill Tailing Sites (Title I, Uranium Mill Tailings Radiation Control Act) 10/05/01 (01-020) 2630          Mixed Oxide Fuel Fabrication Facility Construction Inspection Program 09/20/16 (16-023) 2635          Reserved for Uranium Enrichment Facility Construction and Pre-Operational Readiness Review Inspection Programs 2641          In-Situ Leach Facilities Inspection Program 08/25/00 (00-014) 2681          Physical Protection and Transport of SNM and Irradiated Fuel Inspections of Fuel Facilities 10/27/17 (17-023) 2681/009      Inspection Guidance and Requirements for Physical Protection of the Transfer, Loading and Shipment of Irradiated Special Nuclear Material from General Atomics Facility, San Diego, California to U.S. Department of Energy, Idaho National Laboratory, Scoville, Idaho 08/12/10 (10-017) 2682          Technical Assistance for Safeguards MC&A Inspections at Fuel Facilities 06/18/84 (84-18) 2683          MC&A Safeguards Inspection of Fuel Facilities 05/09/14 (14-011) 2690          Inspection Program for Dry Storage of Spent Reactor Fuel at Independent Spent Fuel Storage Installations and for 10 CFR Part 71 Transportation Packagings 03/09/12 (12-004) 2694          Fuel Cycle Facility Construction and Pre-operational Readiness Review Inspection Programs 0830/17 (17-017) 2696          Louisiana Energy Services Gas Centrifuge Facility Construction and Pre-Operational Readiness Review Inspection Programs 10/19/06 (06-028) 2700  Licensee Contractor and Vendor Inspection Program 2800  Materials Inspection Program 2800          Materials Inspection Program 09/12/17 (17-018) 2800/030      Verification of the Status of Devices Authorized For Use Under a General License 05/30/00 (00-011) 2800/032      Follow-up - Materials Safeguard Advisory 10/31/01 (01-023) 2800/036      Inspection of Manufacturing and Distribution Licensees 09/13/04 (04-024) 2800/037      Safety Procedures for Panoramic Irradiators Rev 1 07/14/05 (05-019)
Issue Date: 01/05/18                            12                        TABLE OF CONTENTS


1200 Inspector Requirements
2800/038      Inspection of the Implementation of Increased Controls for Licensees Authorized to Possess Risk Significant Radioactive Material 03/30/06 (06-008) 2800/039      Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in the National Source Tracking System Pursuant to Title 10 Code of Federal Regulations, Part 20.2207 (10 CFR 20.2207) 04/09/09 (09-011) 2800/040      Material Control and Accounting at Nuclear Power Plants and Wet Storage Sites 03/07/11 (11-002) 2800/041      10 CFR Part 37 Materials Security Review at Facilities with a Title 10 Code of Federal Regulations Part 73 Physical Protection Program 07/01/15 (15-013) 2800/043      Inspection of Facilities Potentially Contaminated with Discrete Radium-226 Sources 01/06/17 (17-001) 2801          Uranium Mill 11e.(2) Byproduct Material Disposal Site and Facility Inspection Program 08/25/00 (00-014) 2810          Master Materials License Oversight and Inspection Program 10/11/12 (12-023) 2815          Construction and Preoperational Inspection of Panoramic, Wet-Source-Storage Gamma Irradiators 03/27/01 (01-010) 2882          Transfer of NRC License Files to Agreement State(s) 12/03/01 (01-029) 2900  Performance Appraisal Program 2901          Team Inspections 08/24/01 (01-016) 2920          Construction Appraisal Team Inspection Program 03/29/85 (85-11) 3000  Management Meetings 30050        Construction Permit Corporate Management Meeting 04/01/80 (reactivated 07-034) 30703        Management Meetings - Entrance and Exit Interviews 01/01/82 (reactivated 08-008) 30800        Initial Management Meeting - Materials Licensees 10/01/76 (76-26) 3100  Reserved 3200  Reserved 3300  Reserved 3400  Reserved Issue Date: 01/05/18                          13                      TABLE OF CONTENTS


1201  Conduct of Employees 07/29/16 (16-019)
3500  Quality Assurance 35002        Early Site Permit Pre-Docketing Quality Assurance Controls Meeting 05/29/03 (03-018) 35004        Pre-Docketing Early Site Permit Quality Assurance Controls Inspection 05/29/03 (03-018) 35006        Post-Docketing Early Site Permit Quality Assurance Controls Inspection 05/29/03 (03-018) 35007        Quality Assurance Program Implementation During Construction and Pre-Construction Activities 12/08/16 (16-032) 35012        Early Site Permit Quality Assurance Controls Assessment and Conclusion 05/29/03 (03-018) 35017        Quality Assurance Implementation Inspection 07/29/08 (08-021) 35023        Reserved for Design Reliability Assurance Program 35031        Reserved for Design Certification Pre-Meeting 35032        Reserved for Pre-Docketing Design Certification Quality Assurance Controls Inspection 35033        Reserved for Post-Docketing Design Certification Quality Assurance Controls Inspection 35034        Design Certification Testing Inspection 01/27/10 (10-003) 35060        Licensee Management of QA Activities 04/01/83 (reactivated 07-032) 35061        In-Depth QA Inspection of Performance 11/19/85 (reactivated 07-034) 35065        Procurement, Receiving, and Storage 04/01/83 (Reactivated 07-032) 35101        QA Program Implementation Inspection for Operational Programs 07/08/16 (16-015) 35301        Preoperational Testing - Quality Assurance 08/06/03 (03-028) 35701        Quality Assurance Program Review 09/17/01 (01-017) 35710        Reserved for Quality Assurance Inspection of Digital Computer Software 35750        QA Program Measuring and Test Equipment 04/14/92 (reactivated 08-032) 35960        QA Program Evaluation of Engineering Organization 10/01/82 (reactivated 07-034) 35962        Reserved for Part 52 QA Program Evaluation of Engineering Service Organization 3600  Organization and Administration 36100        Inspection of 10 CFR Parts 21 and 50.55(e) Programs for Reporting Defects and Noncompliance 02/13/12 (12-002) 36100.01      Inspection of 10 CFR Part 21 and Programs for Reporting Defects and Noncompliance During Construction 02/13/12 (12-002) 36301        Operational Staffing 07/01/77 (reactivated 08-032) 36302        Part 52. Operational Staffing 08/19/08 (08-024) 36801        Organization, Management, and Cost Controls at Permanently Shutdown Reactors 08/11/97 (97-012)
Issue Date:  01/05/18 6 TABLE OF CONTENTS  1202  Senior Resident Inspector Site Turnover 10/31/08 (08-031)  1220  Processing of NRC Form 241, "Report of Proposed Activities In Non-Agreement States," Areas of Exclusive Federal Jurisdiction and Offshore Waters, and Inspection of Agreement State Licensees Operating Under 10 CFR 150.20 05/01/03 (03-013) 1220, App I Procedures and Guidelines for Processing NRC Form 241 05/01/03 (03-013) 1220, App II Procedures Letter to be Sent to Licensees with Procedures and Information for Filing NRC Form 241 05/01/03 (03-013)  1220, App III  Inspection of Agreement State Licensees 05/01/03 (03-013) 1230  Quality Assurance Program for Radiological Confirmatory  Measurements 10/01/83 (83-12)  1232  Collection, Preparation, and Shipment of Independent  Measurement Samples 11/18/86 (86-52)  1240  Unescorted Access at Power Reactors 12/01/04 (04-027) 1245  Qualification Program for Operat ing Reactor Programs 08/24/17 (17-015) 1245, Att 1 General Overview of the Inspector Training and Qualification Program 08/24/17 (17-015) 1245, Att 2 Inspector Competencies 10/31/06 (06-032) 1245, Att 3 General Orientation Topics 10/31/06 (06-032)  1245, App A Basic-Level Training and Qualification Journal 08/24/17 (17-015) 1245, App B General Proficiency-Level Training and Qualification Journal 08/24/17 (17-015) 1245, App C1 Reactor Operations Inspector Technical Proficiency Training and Qualification Journal 12/19/16 (16-034)  1245, App C2 Reactor Engineering Inspector Technical Proficiency Training    and Qualification Journal 12/19/16 (16-034) 1245, App C3 Health Physics Inspector Technical Proficiency Training and Qualification Journal 02/20/17 (17-004) 1245, App C4 Reactor Security Inspector Technical Proficiency Qualification    Training and Qualification Journal 11/29/13 (13-027)  1245, App C5 Research and Test Reactor Inspector Technical Proficiency Qualification Journal 07/08/09 (09-017) 1245, App C6 Emergency Preparedness Inspector Technical Proficiency Training and Qualification Journal 07/08/09 (09-017) 1245, App C7 Fire Protection Inspector Technical Proficiency Training and Qualification Journal 10/21/15 (15-020)  1245, App C8 Vendor Inspector Technical Proficiency Qualification Journal 12/19/12 (12-029) 1245, App C9 Senior Reactor Analyst Training and Qualification Program 11/24/15 (15-026)  1245, App C10 Operator Licensing (OL) Examiner Technical Proficiency    Training and Qualification Journal 10/21/15 (15-020) 1245, App C11 Security Risk Analyst Technical Proficiency Training and Qualification Journal 08/30/13 (13-019)  1245, App C12 Safety Culture Assessor Training and Qualification Journal  05/24/17 (17-011) 1245, App C13 Independent Spent Fuel Storage Installation Security Inspector Technical Proficiency Training and Qualification Journal      08/08/13 (13-016)
Issue Date: 01/05/18                         14                      TABLE OF CONTENTS
Issue Date:  01/05/18 7 TABLE OF CONTENTS  1245, App C14 Cyber Security Inspector Technical Proficiency Training and Qualification        Journal 08/03/15 (15-014) 1245, App C15 Construction Inspector Technical Proficiency Training and Qualification Journal 08/15/17 (17-014) 1245 App C16  RESERVED for RTR training qual  1245, App D1  Maintaining Qualifications 08/24/17 (17-015) 1245, App D2  Inservice Inspection Advanced-Level Training 10/21/15 (15-020) 1245, App D3  Fire Protection Advanced-Level Training 12/19/12 (12-029) 1245, App D4  Advanced Electrical Inspector Technical Proficiency Training and Qualification Journal 12/29/11 (11-044) 1246  Formal Qualification Programs in the Nuclear Material Safety and Safeguards Program Area 10/26/11 (11-022) 1246, App A Training Activities 10/26/11 (11-022) 1246, App B1 Training Requirements and Qualification Journal for Spent Fuel Storage and Transportation Reviewer 10/26/11 (11-022)  1246, App B2 Training Requirements and Qualification Journal for Spent Fuel Storage and Transportation Inspector 10/26/11 (11-022) 1246, App B3 Training Requirements and Qualification Journal for Independent Spent Fuel Storage Installation Inspector 11/07/11 (11-028)  1246, App B4 Independent Spent Fuel Storage Installation Security Inspector Technical Proficiency Training and Qualification Journal 08/08/13 (13-016)  1246, App C1 Training Requirements and Qualification Journal for Fuel Cycle License Reviewer 10/26/11 (11-022) 1246, App C2 Training Requirements and Qualification Journal for Fuel Cycle Project Manager 10/26/11 (11-022)  1246, App C3 Training Requirements and Qualification Journal for Material Control and Accounting License Reviewer 10/26/11 (11-022) 1246, App C4 Training Requirements and Qualification Journal for Fuel Cycle Safeguards Physical Security Inspector 10/26/11 (11-022)   1246, App C5 Training Requirements and Qualification Journal for International Safeguards Analysts, Nuclear Materials Management and Safeguards System (NMMSS) Analysts, and Import/Export Analysts    06/27/16 (16-014) 1246, App D1 Training Requirements and Qualification Journal for High Level Waste Repository License Technical Reviewer 10/26/11 (11-022)  1246, App D2 Training Requirements and Qualification Journal for High Level Waste Repository Inspector 10/26/11 (11-022)  1247  Qualification Program for Fuel Facility Inspectors in the Nuclear Material Safety and Safeguards Program Area 10/28/14 (14-026) 1247, App A  Basic-Level Training and Certification Journal Fuel Facility Inspector 06/27/14 (14-014) 1247, App B  General Proficiency-Level Training and Qualification Journal 06/11/14 (14-012) 1247, App C1  Fuel Facility Operations Inspector Technical Proficiency Training and Qualification Journal 06/11/14 (14-012) 1247, App C2  Fuel Facility Health Physics Inspector Technical Proficiency Training and Qualification Journal 06/20/2014 (14-013) 1247, App C3  Fuel Facility Emergency Preparedness Inspector Technical Proficiency Training and Qualification Journal 06/11/14 (14-012) 1247, App C5  Fuel Facility Material Control & Accounting Inspector Technical Proficiency Training and Qualification Journal 06/11/14 (14-012)
Issue Date: 01/05/18 8 TABLE OF CONTENTS 1247, App C6 Fuel Facility Nuclear Criticality Safety Inspector Technical Proficiency Training and Qualification Journal 06/11/14 (14-012) 1247, App D RESERVED for Advanced and Specialized Training Courses and Qualification Programs 1247, App D1 Fuel Facility Information Security Inspector Specialized Qualification Program Training and Qualification Journal 10/28/14 (14-026) 1248 Formal Qualification Programs for Federal and State Materials and Environmental Management Programs 04/19/13 (13-011) 1248, App A Materials Health Physics License Review Qualification Journal  04/19/13 (13-011) 1248, App B Materials Health Physics Inspector Qualification Journal 04/19/13 (13-011) 1248, App C Training Requirements and Qualification Journal for Materials Exempt Distribution License Reviewer 04/19/13 (13-011) 1248, App D Training Requirements and Qualification Journal for Byproduct Material Sealed Source and Device Reviewer 04/19/13 (13-011) 1248, App E Training Requirements and Qualification Journal for Division of Waste Management Inspector and License Reviewer 04/19/13 (13-011) 1248, App F Training Requirements and Qualification Journal for Decommissioning Inspectors 10/07/16 (16-026) 1248, App G Training Requirements and Qualification Journal for Decommissioning Project Managers and Technical Reviewers 01/13/16 (16-002) 1248, App H Training Requirements and Qualification Journal for Uranium Recovery Inspector 04/19/13 (13-011) 1248, App I Training Requirements and Qualification Journal for Uranium Recovery Project Manager/Technical Reviewer 04/19/13 (13-011) 1248 App J RESERVED 1248 App K Low-Level Waste Project Manager Qualification Journal 06/27/16 (16-014) 1248 App L Performance Assessment Technical Reviewer Qualification Journal  06/27/16 (16-014)


1300 Incident Response
3700  Design, Design Changes, Modifications 37002        Construction Refurbishment Process - Watts Bar Unit 2 02/05/10 (10-005) 37051        Verification of As-Builts 12/04/87 (reactivated 07-032) 37055        Onsite Design Activities 04/01/83 (reactivated 07-032) 37060        Inspections under the 10CFR Part 50.69 Special Program 09/14/11 (11-016) 37301        Comparison of As-Built Plant to FSAR Description 03/14/14 (14-008) 37700        Design Changes, and Modifications 09/17/01 (01-017) 37801        Safety Reviews, Design Changes, and Modifications at Permanently Shutdown Reactors 08/11/97 (97-012) 37803        Reserved 37804        Aircraft Impact Assessment Inspection 02/09/12 (12-001) 37805        Engineering Design Verification Inspections 04/25/11 (11-007) 3800  Procurement 3900  Records 39701        Records Program 09/17/01 (01-017) 4000  Review and Audit 40001        Resolution of Employee Concerns 06/03/97 (97-006) 40002        Inspections to Review Allegations 06/28/02 (02-024) 40100        Independent Safety Culture Assessment Follow-up 04/09/15 (15-005) 40505        Reserved for Effectiveness of Process to Identify, Resolve, and Prevent Construction Problems 40600        Licensee Program for Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Management 07/28/14 (14-017) 40801        Self-Assessment, Auditing, and Corrective Action at Permanently Shutdown Reactors 08/11/97 (97-012) 4100  Training 41301        Pre-Licensing Review of Training and Qualification Programs 02/18/87 (reactivated 08-032) 41500        Training and Qualification Effectiveness 06/13/95 (95-007) 41501        Review of Training and Qualification Programs 04/27/16 (16-011) 41502        Nuclear Power Plant Simulation Facilities 10/16/12 (12-024)
Issue Date: 01/05/18                            15                      TABLE OF CONTENTS


1301  Response to Non-Emergency Incid ents Involving Radioactive Material 10/20/00 (00-022) 1302  Action Levels for Radiation Exposures and Contamination  Associated with Materials Events Involving Members of the Public
4200  Procedures 42001        Emergency Operating Procedures 06/28/91 (91-009) 42051        Fire Prevention and Protection 10/01/77 (reactivated 08-004) 42401        Part 52, Plant Procedures10/27/10 (10-022) 42453        Part 52, Operating Procedures Inspection 08/19/08 (08-024) 42454        Part 52, Emergency Operating Procedures 09/09/13 (13-020) 42700        Plant Procedures 11/15/95 (95-015) 4300  Vendor Procedures 43002        Routine Inspections of Nuclear Vendors 01/27/17 (17-002) 43003        Reactive Inspections of Nuclear Vendors 12/14/15 (15-029) 43004        Inspection of Commercial-Grade Dedication Programs 01/27/17 (17-002) 43005        NRC Oversight of Third-Party Organizations Implementing Quality Assurance Requirements 10/08/15 (15-019) 43006        Inspection of the Implementation of Mitigation Strategies Orders Regarding the Use of National Response Centers 09/30/16 (16-025) 4400  Reserved 4500  Geotechnical/Foundation 45051        Geotechnical/Foundation Activities Procedure Review 05/29/03 (03-018) 45051.A      Geotechnical/Foundation Activities Procedure Review 03/23/84 (reactivated 08-004) 45052        Review of Geotechnical and Site Characterization Activities 10/03/07 (07-030) 45053        Geotechnical/Foundation Activities Work Observation 03/23/84 (reactivated 07-034) 45055        Geotechnical/Foundation Activities Record Review 03/23/84 (reactivated 07-034) 4600  Structural Concrete 46051        Structural Concrete Procedure Review 07/01/83 (reactivated 07-034) 46053        Structural Concrete Work Observation 07/01/83 (reactivated 07-034) 46055        Structural Concrete Record Review 07/01/83 (reactivated 07-034) 46061        Structural Masonry Construction 12/17/86 (reactivated 07-034) 46071        Concrete Expansion Anchors 12/17/86 (reactivated 07-034) 4700  Containment (Post-Tensioning)
Issue Date: 01/05/18                        16                        TABLE OF CONTENTS


07/14/05 (05-019) 1303  Requesting Emergency Acceptance of Radioactive Material by the U.S. Department of Energy 11/29/07 (07-037) 1304  Reserved for Independent Split Sampling Program for Residual Radioactivity  1330  Response to Transportation Accidents Involving Radioactive Materials 10/06/04 (04-025) 1360  Use of Physician and Scientific Consultants in the Medical    Consultant Program 11/02/06 (06-033)  
4800  Structural Steel and Supports 48051          Structural Steel and Supports Procedure Review 12/17/86 (reactivated 07-032) 48053          Structural Steel and Supports Work Observation 12/17/86 (reactivated 07-032) 48055          Structural Steel and Supports Record Review 07/01/83 (reactivated 07-032) 4900  Piping 49001          Inspection of Erosion/Corrosion Monitoring Programs 12/11/98 (98-019) 49051          Reactor Coolant Pressure Boundary Piping QA Review 08/16/82 (reactivated 07-032) 49053          Reactor Coolant Pressure Boundary Piping - Work Observation 11/19/85 (reactivated 07-032) 49055          Reactor Coolant Pressure Boundary Piping Record Review 08/16/82 (reactivated 07-034) 49061          Safety-Related Piping 10/01/82 (reactivated 07-034) 49063          Piping - Work Observation 11/19/85 (reactivated 07-034) 49065          Safety-Related Piping-Records Review 10/01/82 (reactivated 07-034) 5000  Mechanical Components and Equipment 50001          Steam Generator Replacement Inspection 09/12/17 (17-018) 50002          Steam Generators 12/31/96 (96-024) 50003          Pressurizer Replacement Inspection 09/12/17 (17-018) 50051          Reactor Vessels and Internals QA Review 08/16/82 (reactivated 07-034) 50053          Reactor Vessel and Internals Work Observation 08/16/82 (reactivated 07-034) 50054          Reactor Vessel Material Surveillance Program 12/04/08 (08-034) 50055          Reactor Vessel and Internals Record Review 08/16/82 (reactivated 07-034) 50054          Reserved for Reactor Vessel Material Surveillance Program 50071          (Safety-Related Components - Procedure Review 04/01/83 (reactivated 07-034) 50073          Mechanical Components - Work Observation 11/19/85 (reactivated 07-034) 50075          Safety Related Components - Records Review 04/01/83 (reactivated 07-034) 50090          Pipe Support and Restraint Systems 08/06/03 (03-028) 50095          Spent Fuel Storage Racks 03/14/94 (reactivated 07-034) 50100          Heating, Ventilating, and Air Conditioning Systems 08/06/03 (03-028)
Issue Date: 01/05/18                          17                      TABLE OF CONTENTS


1400 Reserved Issue Date: 01/05/18 9 TABLE OF CONTENTS 1415  State Contracts for Environmental Monitoring 06/28/91 (91-009)
5100  Electrical Components and Systems 51051        Electrical Components and Systems - Procedure Review 03/30/84 (reactivated 07-034) 51053        Electrical Components and systems - Work Observation 08/06/03 (03-028) 51055        Electrical Components and Systems - Record Review 08/06/03 (03-028) 51061        Electrical Cable - Procedure Review 08/06/03 (03-028) 51063        Electric Cable - Work Observation 11/19/85 (reactivated 07-034) 51065        Electric Cable - Record Review 03/30/84 (reactivated 07-034) 51080        Part 52, Environmental Qualifications (EQ) Program for Electrical and Mechanical Equipment 06/26/17 (17-013) 5200  Instrumentation Systems and Components 52003        Digital Instrumentation and Control Modification Inspection 10/31/08 (08-031) 52051        Instrument Components and Systems - Procedure Review 03/30/84 (reactivated 07-034) 52053        Instrument Components and Systems - Work Observation 03/30/84 (reactivated 07-034) 52055        Instrument Components and Systems - Record Review 03/30/84 (reactivated 07-034) 5300  Containment Penetrations 53051        Containment Penetrations (Mechanical) Procedure Review 01/27/84 (reactivated 07-034) 53053        Containment Penetrations (Mechanical) Work Observation 01/27/84 (reactivated 07-034) 53055        Containment Penetrations (Mechanical) Record Review 01/17/84 (reactivated 07-034) 5400  Cleanliness 5500  Welding 55050        Nuclear Welding General Inspection Procedure 06/20/83 (83-06) 55093        Reactor Vessels Internals (Welding) Observation of Welding and Associated Activities 07/01/7 (reactivated 07-034) 55100        Structural Welding General Inspection Procedure 06/20/83 (83-06) 55150        Weld Verification Checklist 06/20/83 (reactivated 07-034) 5600  Calibration 56700        Calibration 03/23/05 (05-008)
Issue Date: 01/05/18                         18                        TABLE OF CONTENTS


1500 Reserved  
5700  Nondestructive Examination, Destructive Examination and Fabrication Testing 57050          Visual Testing Examination 03/09/99 (99-003) 57060          Liquid Penetrant Testing Examination 03/09/99 (99-003) 57070          Magnetic Particle Testing Examination 03/09/99 (99-003) 57080          Ultrasonic Testing Examination 03/09/99 (99-003) 57090          Nondestructive Examination Procedure Radiographic Examination Procedure Review/Work Observation/Record Review 06/14/93 (93-005) 5800  Special Processes 5900  Reserve Shutdown System 6000  Fuel Fabrication, Handling and Storage 60501          Fuel Receipt and Storage 04/30/75 (reactivated 08-032) 60705          Preparation for Refueling 07/27/95 (95-009) 60710          Refueling Activities 07/27/95 (95-009) 60715          Spent Fuel Safety at Operating Reactors 10/30/15 (15-022) 60801          Spent Fuel Pool Safety at Permanently Shutdown Reactors 08/11/97 (16-001) 60845          Operation of Intra-Unit Fuel Transfer Canister and Cask System 04/26/12 (12-007) 60851          Design Control of ISFSI Components 01/16/08 (08-003) 60852          ISFSI Component Fabrication by Outside Fabricators 01/16/08 (08-003) 60853          On-Site Fabrication of Components and Construction of an ISFSI 01/16/08 (08-003) 60854          Preoperational Testing of an Independent Spent Fuel Storage Installation 01/16/08 (08-003) 60854.1        Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 09/05/06 (06-022) 60855          Operation of an Independent Spent Fuel Storage Installation 01/16/08 (08-003) 60855.1        Operation of an Independent Spent Fuel Storage Installation at Operating Plants 09/05/06 (06-022) 60856          Review of 10 CFR 72.212(b) Evaluations 03/05/08 (08-010) 60856.1        Review of 10 CFR 72.212(b) Evaluations at Operating Plants 02/02/04 (04-003) 60857          Review of 10 CFR 72.48 Evaluations 10/24/07 (07-033) 60858          Away-From-Reactor ISFSI Inspection Guidance 05/03/07 (07-015) 60859          Reserved for Welding Verification Checklist for Transportation and ISFSI Components 60860          Reserved for Nondestructive Examination Procedure Visual Examination Procedure Review/Work Observation/Record Review of Transportation and ISFSI Components Issue Date: 01/05/18                            19                        TABLE OF CONTENTS


1600 Emergency Preparedness 1601  Communication Protocol for A ssessing Offsite Emergency Preparedness Following a Natural Disaster 08/27/13 (13-018)  
60861        Reserved for Nondestructive Examination Procedure Liquid Penetrant Examination Procedure Review/Work Observation/Record Review of Transportation ISFSI Components 60862        Reserved for Nondestructive Examination Procedure Magnetic Particle Examination Procedure Review/Work Observation/Record Review of Transportation ISFSI Components 60863        Reserved for Nondestructive Examination Procedure Ultrasonic Examination Procedure Review/Work Observation/Record Review 60864        Reserved for Nondestructive Examination Procedure Radiographic Examination Procedure Review/Work Observation/Record Review of Transportation and ISFSI Components 6100  Surveillance 61705        Calibration of Nuclear Instrumentation Systems 05/12/86 (86-25) 61706        Core Thermal Power Evaluation 07/14/86 (86-36) 61707        Determination of Reactor Shutdown Margin 10/11/85 (85-31) 61708        Isothermal and Moderator Temperature Coefficient Determinations 10/11/85 (85-31) 61709        Total Power Coefficient of Reactivity at Pressurized Water Reactors 07/14/86 (86-36) 61710        Control Rod Worth Measurements (PWR) 10/11/85 (85-31) 61715        Verification of Containment Integrity 12/23/86 (86-60) 61720        Containment Local Leak Rate Testing 10/03/85 (85-30) 61726        Surveillance Observations 06/24/98 (98-010) 61728        Independent Measurement of RCS Leak Rates for a PWR 01/01/84 (84-02) 6200  Maintenance 62002        Inspection of Structures, Passive Components, and Civil Engineering Features at Nuclear Power Plants 12/31/96 (96-024) 62003        Inspection of Steel and Concrete Containments at Nuclear Power Plants 06/11/97 (97-008) 62706        Maintenance Rule 12/13/00 (00-028) 62708        Motor-Operated Valve Capability 10/23/13 (13-026) 62709        Configuration Risk Assessment and Risk Management Process 12/28/00 (00-029) 62710        Power-Operated Gate Valve Pressure Locking and Thermal Binding 04/30/10 (10-013) 62711        Reserved for Operational Reliability Assurance Process 62712        Part 52, Maintenance Rule 08/13/13 (13-017) 62801        Maintenance and Surveillance at Permanently Shutdown Reactors 08/11/97 (97-012)
Issue Date: 01/05/18                          20                        TABLE OF CONTENTS


1700 Reserved  
6300    Construction Testing 63050          Containment Structural Integrity Test 07/01/83 (reactivated 07-034) 6400  Fire Prevention/Protection 64051          Procedures - Fire Prevention/Protection 07/01/79 (reactivated 07-034) 64053          Fire Loop Installation 07/01/79 (reactivated 07-034) 64102          Reserved for Part 52 Post fire Safe Shutdown, Emergency Lighting and Oil Collection Capabilities 64704          Fire Protection Program 06/24/98 (98-010) 64705          Part 52, Fire Protection Operational Program 10/03/07 (07-030) 6500  10 CFR Part 52 ITAAC Inspections 65001          Inspections of Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Related Work 08/13/13 (13-017) 65001.01      Inspection of ITAAC-Related Foundations & Buildings 04/18/14 (14-010) 65001.02      Inspection of ITAAC-Related Installation of Structural Concrete 11/22/11 (11-037) 65001.03      Inspection of ITAAC-Related Installation of Piping 08/19/08 (08-024) 65001.04      Inspection of ITAAC-Related Installation of Pipe Supports and Restraints 08/13/14 (14-018) 65001.05      Inspection of ITAAC-Related Installation of Reactor Pressure Vessel and Internals 08/19/08 (08/19/08) 65001.06      Inspection of ITAAC-Related Installation o Mechanical Components 01/27/15 (15-001) 65001.07      Inspection of ITAAC-Related Installation of Valves 07/29/08 (08-021) 65001.08      Inspection of ITAAC-Related Installation of Electric Components and Systems 08/19/08 (08-024) 65001.09      Inspection of ITAAC-Related Installation of Electric and Fiber Optic Cable 08/05/09 (09-019) 65001.10      Inspection of ITAAC-Related Installation of Instrument Components and Systems 10/20/08 (08-029) 65001.11      Construction Inspection Program Inspection of ITAAC-Related Containment Integrity and Containment Penetration 08/19/08 (08-024) 65001.12      Inspection of ITAAC-Related Installation of Heating, Ventilating, and Air Conditioning Systems 07/29/08 (08-021) 65001.13      Inspection of ITAAC-Related Installation of Load Handling Equipment and Fuel Racks 08/05/09 (09-019) 65001.14      Inspection of ITAAC-Related Installation of Complex Systems with Multiple Components 06/24/15 (15-012) 65001.15      Inspection of ITAAC-Related Installation of Fire Protection Equipment 07/01/08 (08-019) 65001.16      Inspection of ITAAC-Related Engineering 06/20/14 (14-013) 65001.17      Inspection of ITAAC-Related Security Structures, Systems, and Components 09/30/16 (16-025) 65001.18      Inspection of Emergency Planning ITAAC 10/30/08 (08-030)
Issue Date: 01/05/18                            21                      TABLE OF CONTENTS


1800 Reserved  
65001.19      Inspection of Installation of ITAAC-Related Radiation Monitoring Components and Systems 10/20/08 (08-029) 65001.20      Inspection of Safety-Related Piping Design Acceptance Criteria (DAC)-
Related ITAAC 06/02/11 (11-009) 65001.21      Inspection of Pipe Rupture Hazard Analysis Design Acceptance Criteria (DAC) - Related ITAAC 11/07/11 (11-029) 65001.22      Inspection of Digital Instrumentation and Control (DI&C) System/Software Design Acceptance Criteria (DAC) - Related ITAAC 12/19/11 (11-041) 65001.23      Inspection of Human Factors Engineering Integrated System Validation ITAAC 12/22/14 (14-031) 65001.23, App A Inspection Guide for AP1000 Human Factors Engineering Integrated System Validation 12/22/14 (14-031) 65001.A      ITAAC Attributes for As-Built Inspection 09/25/13 (13-023) 65001.B      Inspection of the ITAAC-Related Welding Program 09/25/13 (13-023) 65001.C      Inspection of the ITAAC-Related Construction Test Program 04/18/14 (14-010) 65001.D      Inspection of the ITAAC-Related Operational Testing Program 05/09/14 (14-011) 65001.E      Inspection of the ITAAC-Related Qualification Program 06/20/14 (14-013) 65001.F      Inspection of the ITAAC-Related Design and Fabrication Requirements 09/20/13 (13-022) 65051        Low-Level Radioactive Waste Storage Facilities 06/13/86 (reactivated 07-034) 6600  Reserved 6700  Reserved 6800  Reserved 6900  Non-Power Reactor Inspection 69001        Class II Research and Test Reactors 02/03/04 (04-004) 69002        Class III Research and Test Reactors 02/03/04 (04-004) 69003        Class I Research and Test Reactor Operator Licenses, Requalification, and Medical Examinations 02/03/04 (04-004) 69004        Class I Research and Test Reactor Effluent and Environmental Monitoring 02/03/047 (04-004) 69005        Class I Research and Test Reactor Experiments 02/03/04 (04-004) 69006        Class I Research and Test Reactors Organization and Operations and Maintenance Activities 02/03/04 (04-004) 69007        Class I Research and Test Reactor Review and Audit and Design Change Functions 02/03/04 (04-004) 69008        Class I Research and Test Reactor Procedures 02/03/04 (04-004)
Issue Date: 01/05/18                            22                      TABLE OF CONTENTS


1900 Reserved
69009        Class I Research and Test Reactor Fuel Movement 02/03/04 (04-004) 69010        Class I Research and Test Reactor Surveillance 02/03/04 (04-004) 69011        Class I Research and Test Reactor Emergency Preparedness 02/03/04 (04-004) 69012        Class I Research and Test Reactors Radiation Protection 02/03/04 (04-004) 69013        Research and Test Reactor Decommissioning 02/03/04 (04-004) 69020        Inspections of Safety-Related Items (and Services) During Construction of Non-Power Production and Utilization Facilities 12/14/15 (15-029) 69021        Inspections of Quality Assurance Program Implementation During Construction of Non-Power Production and Utilization Facilities 09/12/17 (17-018) 69022        Inspections of Operational Readiness During Construction of Non-Power Production and Utilization Facilities 12/14/15 (15-029) 7000  Preoperational Testing 70300        Preoperational Test Procedure Test Review 10/01/83 (reactivated 08-032) 70301        Overall Preoperational Test Program Review Requirements 10/01/83 (reactivated 08-032) 70302        Preoperational Test Program Implementation 10/01/83 (reactivated 08-032) 70304        Engineered Safety Features Test - Preoperational Test Procedure Review 08/06/03 (03-028) 70305        Reactor Protection System Test Preoperational Test Procedure Review Preoperational Testing Procedure Verification 01/01/79 (reactivated 08-032) 70306        Loss of Offsite Power Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003) 70307        Containment Integrated Leak Rate Test - Procedure Review 03/07/86 (86-13) 70308        Preoperational Hot Functional Testing - PWR Procedure Review) 10/01/83 (reactivated 08-032) 70311        Preoperational Testing Procedure Verification 10/01/83 (reactivated 08-032) 70312        Preoperational Test Witnessing 10/01/83 (reactivated 08-032) 70313        Containment Integrated Leak Rate Test 11/12/85 (85-36) 70314        HFT Witnessing 10/01/81 (reactivated 08-032) 70315        Engineered Safety Features Test Preoperational Test Witnessing) 01/01/79 (reactivated 08-032) 70316        Loss of Offsite Power Test Preoperational Test Witnessing 01/01/79 (reactivated 08-032) 70317        Reactor Protection System Test Preoperational Test Witnessing 01/01/79 (reactivated 08-032) 70323        Containment Leak Rate Test Results Evaluation 10/03/85 (85-30) 70324        Preoperational Test Results Evaluation - Integrated Hot Functional Test 04/01/77 (reactivated 08-032)
Issue Date: 01/05/18                          23                        TABLE OF CONTENTS


2000 Reserved
70325        Preoperational Test Results Evaluation - Reactor Protection System 01/01/79 (reactivated 08-032) 70326        Preoperational Test Results Evaluation - Loss of Offsite Power 01/01/79 (reactivated 08-032) 70329        Preoperational Test Result Evaluation Verification 10/01/83 (reactivated 08-032) 70331        Vibration Test- Preoperational Test Procedure Review 01/01/79 (reactivated 09-003) 70332        Control Rod System Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003) 70333        Chemical Control System Test - Preoperation Test Procedure Review 01/01/79 (reactivated 09-003) 70334        Engineered Safety Features Act. System Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003) 70335        Safety and Relief Valve Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003) 70336        Residual / Decay Heat Removal System Test - Preoperational Test Review 01/01/79 (reactivated 09-003) 70337        Main Stream Isolation Valve Test - Preoperational Test Procedure Review) 01/01/79 (reactivated 09-003) 70338        Auxilliary Feedwater System Test -Preoperational Test Procedure Review 01/01/79 (reactivated 09-003) 70339        Component Cooling Water System Test - Preoperational; Test Procedure Review 01/01/79 (reactivated 09-003) 70340        D.C. Power System Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003) 70341        Emergency/Standby Power Supply System Test - Preoperational Teat Procedure Review 01/01/79 (reactivated 09-003) 70342        Containment Combustable Gas Control System Test -
Preoperational Test Procedure Review 01/01/79 (reactivated 09-003) 70344        Containment Isolation Vales Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003) 70345        Containment Heat/Cool/Vent. System Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003) 70346        Aux. Bldg. Heat /Cool/Vent. System Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003) 70347        Pressurizer and Level Control System Test- Preoperational Test Procedure Review 01/01/79 (reactivated 09-003) 70348        Main Feedwater Control System Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003) 70349        Reactor Coolant Leak Detection System Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003) 70350        Loose Parts Monitoring System Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003) 70351        Integrated Reactor Control System Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003) 70352        Remote Reactor Shutdown Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003)
Issue Date: 01/05/18                        24                        TABLE OF CONTENTS


2100 Reserved  
70353        Cranes, Hoists and Lifting Equipment Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003) 70354        Nuclear Instrumentation System Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003) 70355        Compressed Gas System Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003) 70362        Reactor Coolant System Hydrostatic Test Procedure Review 10/01/83 (reactivated 08-032) 70367        Inspection of Pre-operational Test Program 01/15/14 (14-001) 70368        Part 52 Containment Leak Rate Testing (Programmatic) 06/26/17 (17-013) 70369        Reserved for Part 52 Containment Leak Rate Testing 70370        Testing Piping Support and Restraint Systems 03/07/86 (86-13) 70371        Reserved for Part 52 Testing of Pipe Support and Restraint System 70400        Preoperational Test Results Evaluation 10/01/83 (reactivated 08-032) 70431        Vibration Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70432        Control Rod System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70433        Chemical Control System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70434        Engineered Safety Features Act. System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70435        Safety and Relief Valves Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70436        Residual / Decay Heat Removal System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70437        Main Stream Isolation Valve Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70438        Auxiliary Feedwater System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70439        Component Cooling Water System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70440        D.C. Power System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70441        Emergency / Standby Power Supply System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70442        Containment Combustible Gas Control System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70443        Containment Spray System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70444        Containment Isolation Valve Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70445        Containment Heat/Cool/Vent. System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70446        Auxiliary Bldg. Heat/Cool/Vent. System Test - Preoperational Test Witnessing 01/22/09 (09-003) 70447        Pressurizer and Level Control System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003)
Issue Date: 01/05/18                          25                      TABLE OF CONTENTS


2200 Nuclear Security and Incident Response 2200 Security Inspection Program for Construction 09/07/12 (12-020) 2200, App A Security Construction Inspection Program 09/07/12 (12-020) 2201 Security Inspection Program for Commercial Nuclear Power Reactors 09/22/15 (15-017) 2201, App A Security Baseline Inspection Program 11/09/16 (16-029) 2201, App B Supplemental Inspection Program 09/22/15 (15-017) 2201, App C Generic, Special, and Infrequent Inspections 09/22/15 (15-017) 2201, App D Facility Status Reviews for Security and Safeguards Inspection Program 09/22/15 (15-017) 2201/003 Reserved for Fitness for Duty Part 26 Subpart K 2201/004 Inspection of Implementation of Interim Cyber Security Milestones 1-7    12/22/14 (14-031) 2201/005 Inspection of TVA WB1, Implementation of the Cyber Security Program Required by 10 CFR 73.54 and 10 CFR 73.55 07/03/14 (14-015) 2202  Security Inspection Program for Decommissioning Reactors 08/27/14 (14-019) 2202, App A Security Core Inspection Program 08/27/14 (14-019) 2202, App B Security Discretionary Inspection Program 10/06/14 (14-023)  
70448          Main Feedwater Control System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70449          Reactor Coolant Leak Detection System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70450          Loose Parts Monitoring System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70451          Integrated Reactor Control System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70452          Remote Reactor Shutdown Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70453          Cranes, Hoists and Lifting Equipment Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70454          Nuclear Instrumentation System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70455          Compressed Gas System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70462          Reactor Coolant System Hydrostatic Test - Test Witnessing 08/13/14 14-018 70562          Reactor Coolant System Hydrostatic Test Results Evaluation 08/13/14 14-018 70701          Reserved 70702          Inspection of Preoperational Test Performance 12/06/17 (17-028) 7100  Operations (License & TS Requirements) 71002          License Renewal Inspection 11/23/11 (11-038) 71003          Post-Approval Site Inspection for License Renewal 07/08/16 (16-015) 71004          Power Uprate 05/15/17 (17-010) 71007          Reactor Vessel Head Replacement Inspection 10/03/17 (17-020) 71013          Site Inspections at Plants with Timely Renewal Applications 09/25/13 (13-023) 71111          Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity 10/28/11 (11-025) 71111.01      Adverse Weather Protection 11/28/17 (17-027) 71111.04      Equipment Alignment 09/24/14 (14-022) 71111.05AQ Fire Protection (Annual / Quarterly) 09/30/10 (10-020) 71111.05T      Fire Protection (Triennial) 01/31/13 (13-004) 71111.05XT Fire Protection - NFPA 805 (Triennial) 01/31/13 (13-004) 71111.06      Flood Protection Measures 11/25/15 (15-027) 71111.07       Heat Sink Performance 12/08/16 (16-032) 71111.08      In-service Inspection Activities 12/21/16 (16-035) 71111.11      Licensed Operator Requalification Program 09/24/14 (14-022) 71111.12      Maintenance Effectiveness 02/03/16 (16-005) 71111.13      Maintenance Risk Assessments and Emergent Work Control 12/20/17 (17-030) 71111.15      Operability Determinations and Functionality Assessments 12/21/16 (16-035) 71111.17T      Evaluations of Changes, Tests, and Experiments 12/08/16 (16-032)
Issue Date: 01/05/18                            26                      TABLE OF CONTENTS


2300 High Level Waste Issue Date:  01/05/18 10 TABLE OF CONTENTS 2300  Yucca Mountain Inspection Program License Application Review Period 09/11/08 (08-026)  
71111.18      Plant Modifications 11/17/16 (16-031) 71111.19      Post Maintenance Testing 09/24/14 (14-022) 71111.20      Refueling and Other Outage Activities 11/28/17 (17-027) 71111.21M    Component Design Bases Inspection (Teams) 12/08/16 (16-032) 71111.21N    Component Design Bases Inspection (Programs) 12/08/16 (16-032) 71111.22      Surveillance Testing 06/15/15 (15-011) 71113        Reserved for Review of License Renewal Commitments for Plants in Timely Renewal 71114        Reactor Safety-Emergency Preparedness 05/29/12 (12-008) 71114.01      Exercise Evaluation 07/21/16 (16-017) 71114.02      Alert and Notification System Evaluation 07/21/16 (16-017) 71114.03      Emergency Response Organization Staffing and Augmentation System 07/21/16 (16-017) 71114.04      Emergency Action Level and Emergency Plan Changes 07/21/16 (16-017) 71114.05      Maintenance of Emergency Preparedness 07/21/16 (16-017))
71114.06      Drill Evaluation 07/21/16 (16-017) 71114.07      Exercise Evaluation-Hostile Action (HA) Event 07/21/16 (16-017) 71114.08      Exercise Evaluation-Scenario Review 07/21/16 (16-017) 71124        Radiation Safety - Public and Occupational 12/21/17 (17-031) 71124.01      Radiological Hazard Assessment and Exposure Controls 12/21/17 (17-031) 71124.02      Occupational ALARA Planning and Controls 12/21/17 (17-031) 71124.03      In-Plant Airborne Radioactivity Control and Mitigation 12/21/17 (17-031) 71124.04      Occupational Dose Assessment 12/21/17 (17-031) 71124.05      Radiation Monitoring Instrumentation 04/01/16 (17-031) 71124.06      Radioactive Gaseous and Liquid Effluent Treatment 12/21/17 (17-031) 71124.07      Public Radiation Safety 12/21/17 (17-031) 71124.08      Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 12/21/17 (17-031) 71130        Security 04/20/15 (15-006) 71130.01     Access Authorization 09/30/16 (16-024) 71130.02      Access Control 09/30/16 (16-024) 71130.03      Contingency Response - Force-On-Force Testing 12/22/16 (16-035) 71130.04      Equipment Performance, Testing and Maintenance 09/30/16 (16-024) 71130.05     Protective Strategy Evaluation 09/30/16 (16-024) 71130.06      Protection of Safeguards Information 09/30/16 (16-024) 71130.07      Security Training 09/30/16 (16-024) 71130.08      Fitness for Duty Program 09/30/16 (16-024) 71130.10P    Cyber Security 05/15/17 (17-010) 71130.11     Material Control & Accounting (MC&A) 12/10/08 (08-035) 71130.12      Reserved for Physical Protection of Shipments of Irradiated Fuel 71130.13      Reserved for Security Inspections Conducted by Resident Inspectors 71130.14      Review of Power Reactor Target Sets 09/12/17 (17-018) 71150        Discrepant or Unreported Performance Indicator Data 01/04/07 (07-001) 71151        Performance Indicator Verification 05/03/17 (17-009) 71152        Problem Identification and Resolution 02/26/15 (15-003) 71153        Follow-up of Events and Notices of Enforcement Discretion 12/17/15 (15-030)
Issue Date: 01/05/18                          27                        TABLE OF CONTENTS


2400 Low Level Waste Program  
71302          Preoperational Test Program Implementation Verification 10/01/83 (reactivated 08-032) 71303          Part 52, Technical Specifications Review 10/20/08 (08-029) 71714          Cold Weather Preparations 09/17/01 (01-017) 71715          Sustained Control Room and Plant Observation 04/14/92 (92-004) 71801          Decommissioning Performance and Status Review at Permanently Shutdown Reactors 08/11/97 (97-012) 71841          Human Performance 12/12/00 (00-027) 7200  Startup Testing 72303          Startup Testing for ABWR: Test Procedure Review, Test Witnessing, and Test Results Evaluation 09/05/06 (06-021) 72304          Startup Testing for AP 1000: Test Procedure Review, Test Witnessing, and Test Results Evaluation 09/05/06 (06-021) 72401          Part 52, Inspection of Startup Test Program 06/24/14 (14-014) 72501          Reserved for Part 52 Initial Fuel Load Procedure Review 72525          Reserved for Part 52 Initial Fuel Load Witnessing 7300  In-service Inspection 73052          In-service Inspection - Review of Procedures 01/14/86 (86-03) 73053          Pre-service Inspection - Observation of Work and Work Activities 01/01/79 (reactivated 07-034) 73054          Part 52, Pre-service and In-service Inspection - Review of Program 05/03/17 (17-009) 73055          Pre-service Inspection Data Review and Evaluation 01/01/79 (reactivated 07-034) 73753          In-service Inspection 06/24/98 (98-010) 73754          Part 52 - Preservice Inspection - Non-Destructive Examination 12/12/13 (13-028) 73755          In-service Inspection - Data Review and Evaluation 10/27/10 (10-022) 73756          In-service Testing of Pumps and Valves 07/27/95 (95-009) 73757          Part 52 In-service Inspection - Data Review and Evaluation 02/07/14 (14-005) 73758          Part 52, Functional Design and Qualification, and Preservice and Inservice Testing Programs for Pumps, Valves and Dynamic Restraints 04/19/13 (13-011) 7400  Reserved 7500  Reserved 7600  Reserved Issue Date: 01/05/18                          28                      TABLE OF CONTENTS


2401  Near-Surface Low-Level Radioactive Waste Disposal Facility Inspection Program 11/27/01 (01-028) 2410  Conduct of Observation Audits 07/12/00 (00-012)  
7700  Reserved 7800  High Level Waste 78010        10 CFR Part 21 Program 09/11/08 (08-026) 7900  Water Chemistry 79501        LWR Water Chemistry Control and Chemical Analysis - Audits 02/24/89 (reactivated 08-032) 79502        Plant Systems Affecting Plant Water Chemistry 12/31/91 (reactivated 08-032) 79503        Reserved for Part 52 LWR Water Chem. Control & Chem. Analysis (Pre-Op and Supp) 79504        Reserved for Part 52 Plant systems Affecting Plant Water Chem.
79702        Control and monitoring of Radiological Source Term 04/17/00 (00-006) 8000  Environmental Protection 80211        Reserved for Part 52 Environmental Protection - Initial & Periodic Inspection 80521        Radiological Environmental Monitoring (Preoperational and Supplemental) 01/01/84 (reactivated 08-032) 80522        Part 52, Radiological Environmental Monitoring Program (REMP) 07/01/08 (08-019) 80600        Reserved for Independent Assessment of Site Radiological Conditions 80721        Radiological Environmental Monitoring 09/17/01(01-017) 8100  Physical Security 81000        Security 08/27/13 (13-018) 81000.01     Access Authorization 09/07/12 (12-020) 81000.02      Access Control 09/07/12 (12-020) 81000.03      Performance Evaluation Program 09/07/12 (12-020) 81000.04      Equipment Performance, Testing and Maintenance 09/07/12 (12-020) 81000.05      Protective Strategy Evaluation 01/03/13 (13-001) 81000.07      Security Training 09/07/12 (12-020) 81000.08      Fitness for Duty Operational Program 09/07/12 (12-020) 81000.09      Cyber Security Inspection for Construction 09/30/16 (16-025) 81000.10      Security Organization, Management Effectiveness, Program Reviews and Audits 09/07/12 (12-020) 81000.11      Material Control and Accounting 09/07/12 (12-020) 81000.14      Review of New Reactor Target Sets 12/19/13 (13-029) 81018        Physical Security Plan and Implementing Procedures 05/24/07 (07-17) 81019        Reserved for Part 52 Security Plan & Implementing Procedures 81020        Management Effectiveness - Security Program 06/13/07 (07-019) 81021        Reserved for Part 52 Management Effectiveness Issue Date: 01/05/18                          29                      TABLE OF CONTENTS


2500 Reactor Inspection Program 2500  Reactor Inspection Program 11/06/86 (reactivated 09-020) 2501  Construction Inspection Program:  Early Site Permit (ESP)    06/06/13 (13-013) 2502  Construction Inspection Program: Pre-Combined License (Pre-   COL) Phase 12/13/10 (10-026) 2503  Construction Inspection Program:  Inspections of Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) 07/05/12 (12-012) 2504  Construction Inspection Program:  Inspections of Construction and Operational Programs 10/24/12 (12-025) 2505  Periodic Assessment of Construction Inspection Program Results 01/06/17 (17-001) 2506  Construction Reactor Oversight Process General Guidance and Basis Document 02/20/17 (17-004) 2507  Construction Inspection Program:  Vendor Inspections 10/03/13 (13-024) 2508  Construction Inspection Program:  Design Certification 09/06/16 (16-022) 2512  Light Water Reactor Inspection Program - Construction Phase 12/17/86 (reactivated 07-032) 2512 App I Light Water Reactor Inspection Program - Construction Phase - Procedure List 10/16/07 (07-032)   2513 Light Water Reactor Inspection Program - Preoperational Testing and Operational Preparedness Phase 08/05/08 (Reactivated 08-023)   2513, App A Light Water Reactor - Preoperational Testing Phase 08/05/08 (reactivated 08-023) 2513, App B  Light Water Reactor - Operational Preparedness Phase 08/05/08 (reactivated 08-023)  2515  Light Water Inspection Program - Operations Phase 03/28/17 (17-008) 2515, App A Risk-Informed Baseline Inspection Program 03/08/13 (13-008) 2515, App B Supplemental Inspection Program 12/18/15 (15-031) 2515, App C Special and Infrequently Performed Inspections 06/24/15 (15-012) 2515, App D Plant Status 10/03/17 (17-020) 2515, App E Inspection Program Modifications during a Pandemic 01/26/07 (07-004) 2515, App F Reactor Construction Activities near Operating Unit(s) 06/02/11 (11-009) 2515, App G Baseline Inspection Guidance for Power Reactors Preparing for Transition to Decommissioning Phase 02/01/16 (16-004)
81023        Reserved for Part 52 Security Organization 81022        Security Organization 06/13/07 (07-019) 81034        Security Program Audit 09/10/07 (07-027) 81035        Reserved for Part 52 Security Audit Program 81038        Records and Reports 09/10/07 (07-027) 81039        Reserved for Part 52 Records & Reports 81042        Testing and Maintenance 04/12/07 (07-013) 81043        Reserved for Part 52 Testing & Maintenance 81046        Locks, Keys, and Combinations 09/10/07 (07-027) 81047        Reserved for Part 52 Locks, Keys & Combinations 81052        Physical Barriers - Protected Areas 09/10/07 (07-027) 81053        Reserved for Part 52 Physical Barriers - Protected Areas 81054        Physical Barriers - Vital Areas, Material Access Areas, and Controlled Access Areas 09/10/07 (07-027) 81055        Reserved for Part 52 Physical Barriers - Vital Areas, Material Access Areas & Controlled Access Areas 81058        Security System Power Supply 09/10/07 (07-027) 81059        Reserved for Part 52 Security System Power Supply 81062        Lighting 09/10/07 (07-027) 81063        Reserved for Part 52 Lighting 81064        Compensatory Measures 09/10/07 (07-027) 81065        Reserved for Part 52 Compensatory Measures 81066        Assessment Aids 09/10/07 (07-027) 81067        Reserved for Part 52 Assessment Aides 81070        Access Control - Personnel 12/22/08 (08-037) 81071        Reserved for Part 52 Access Control - Personnel 81072        Access Control (Power Reactor) - Packages 05/09/84 (84-15) 81073        Access Control (Fuel Facility) - Packages, Material, and Strategic Special Nuclear Material (SSNM) 08/05/09 (09-019) 81074        Access Control - Vehicles 12/22/08 (08-037) 81075        Reserved for Part 52 Access Control - (Power Reactors) - Packages 81076        Reserved for Part 52 Access Control - Vehicles 81078        Detection Aids - Protected Areas 11/23/09 (09-028) 81079        Reserved for Part 52 Detection Aids - Protected Areas 81080        Detection Aids - MAA and CAA 12/22/08 (08-037) 81081        Reserved for Part 52 Detection Aids - VA, MAA, & CAA 81084        Alarm Stations 09/10/07 (07-027) 81085        Reserved for Part 52 Alarm Stations 81088        Communications 09/10/07 (07-027) 81089        Reserved for Part 52 Communications 81120        Inspection Requirements and Guidance for Additional Security Measures for the Physical Protection in Transit for Radioactive Material Quantities of Concern 04/01/10 (10-010)
Issue Date: 01/05/18 11 TABLE OF CONTENTS 2515/176 Emergency Diesel Generator Technical Specification Surveillance Requirements Regarding Endurance and Margin Testing 05/16/08 08-015  2515/179 Verification of Licensee Responses To NRC Requirement  Rev. 1 for Inventories of Materials Tracked in the National Source Tracking System Pursuant to Title 10, Code of Federal Regulations, Part 20.2207
(Note this IP contains safeguards material) 81200        Security 08/27/14 (14-019) 81200.01      Access Authorization for Decommissioning Nuclear Power Reactors 10/21/14 (14-025) 81200.02      Access Control for Decommissioning Nuclear Power Reactors 08/27/14 (14-019) 81200.03      Reserved for Decommissioning Force-on-Force Testing Issue Date: 01/05/18                           30                        TABLE OF CONTENTS


(10 CFR 20.2207) 05/27/10 (10-014) 2515/190 Inspection of Licensee's Proposed Interim Actions as a Result of the Near-Term Task Force Recommendation 2.1 - Flooding Evaluation  09/04/15 (15-016) 2515/191 Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans  12/23/15 (15-032) 2515/192 Inspection of The Licensee's Interim Corrective Actions Associated With Interim Enforcement Policy for the Open Phase Condition (OPC) Design Vulnerabilities In Electric Power Systems 11/09/16 (16-029) 2515/193 Inspection of the Implementation of Order EA-13-109, "Order Modifying Licensees with Regard to Reliable Hardened Containment Vents Capable of Operation under Severe Accident Conditions," 10/10/17 (17-022) 2515/194 Inspection of the Licensees' Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerabilities in Electric Power Systems (NRC Bulletin 2012-01) 10/31/17 (17-024) 2516 Policy and Guidance for the License Renewal Inspection Programs 08/13/13 (13-017) 2518  Reserved for Construction Inspection Program: Advanced Reactors, Pre Construction Permit (CP) 2519  Construction Significance Determination Process 12/06/17 (17-028) 2522 Construction Reactor Oversight Process Self-Assessment Program 07/28/14 (14-017) 2522, App A Construction Reactor Oversight Process Self-Assessment Metrics  10/03/17 (17-021) 2523  NRC Application of the Reactor Operating Experience Program in NRC Oversight Processes 06/19/13 (13-014) 2530  Integrated Design Inspection Program 04/24/85 (reactivated 10-006) 2535 Design Verification Programs 03/24/89 (reactivated 10-006) 2545 Research and Test Reactor Inspection Program 06/23/04 (04-018) 2550 Non-Power Protection Facilities (NPUFs) Licensed Under 10 CFR Part 50:  Construction Inspection Program (CIP) 12/14/15 (15-029) 2561 Decommissioning Power Reactor Inspection Program 04/14/03 (03-012)  
81200.04      Equipment Performance, Testing, and Maintenance for Decommissioning Nuclear Power Reactors 08/27/14 (14-019) 81200.05      Protective Strategy Evaluation and Performance Evaluation Program for Decommissioning Nuclear Power Reactors 10/21/14 (14-025) 81200.06      Protection of Safeguards Information for Decommissioning Nuclear Power Reactors 08/27/14 (14-019) 81200.07      Security Training for Decommissioning Nuclear Power Reactor 10/21/14 (14-025) 81200.08      Reserved for Decommissioning Fitness for Duty Program 81200.10      Reserved for Decommissioning Cyber Security 81200.11      Reserved for Decommissioning Material Control and Accounting 81200.14      Review of Decommissioning Target Sets 01/15/14 (14-001) 81310        Physical Protection of Shipments of Irradiated Fuel 12/22/08 (08-037) 81311        Physical Security Requirements for Independent Spent Fuel Storage Installations 08/25/17 (17-016) 81335        Physical Protection of Shipments of Special Nuclear Material of Moderate Strategic Significance (SNM-MSS) 12/02/09 (09-029) 81340        Physical Protection of Shipments of Special Nuclear Material of Low Strategic Significance (SNM-LSS) 11/23/09 (09-028) 81360        General Requirements for Physical Protection of Formula Quantities of Special Nuclear Material in Transit 12/02/09 (09-029) 81365        Records, Reports, and Planning for Physical Protection of Formula Quantities of Special Nuclear Material in Transit 11/23/09 (09-028) 81370        Specific Requirements for Physical Protection of Formula Quantities of Special Nuclear Materials in Transit 12/22/08 (08-037) 81402        Reports of Safeguards Events 11/23/09 (09-028) 81411        Physical Protection for Reactors with Formula Quantities of Special Nuclear Material 11/04/85 (85-34) 81421        Fixed Site Physical Protection of Special Nuclear Material of Moderate Strategic Significance 11/23/09 (09-028) 81431        Fixed Site Physical Protection of Special Nuclear Material of Low Strategic Significance 10/24/12 (12-025) 81501        Personnel Training and Qualification - General Requirements 12/02/09 (09-029) 81502        Fitness for Duty Program 12/22/08 (08-037) 81503        Reserved for Part 52 Personnel Training and Qualification - Gen.
Requirements 81504        Fitness for Duty Program for Construction 10/15/09 (09-024) 81601        Safeguards Contingency Plan - Implementation Review 12/22/08 (08-037) 81602        Reserved for Part 52 Safeguards Contingency Plan - Implementation Review 81700        RESERVED for Materials Security 81700.01      Category I Fuel Cycle Facility Strategic Special Nuclear Material Security Controls 05/15/17 (17-010) 81700.02      Category I Fuel Cycle Facility Access Control Measures 05/15/17 (17-010)
Issue Date: 01/05/18                          31                        TABLE OF CONTENTS


2600 Fuel Cycle Facility Inspection Program  
81700.04      Category I Fuel Cycle Facility Security Equipment Performance, Testing and Maintenance 05/15/17 (17-010) 81700.05      Category I Fuel Cycle Facility Physical Protection Program and Protective Strategy 05/15/17 (17-010) 81700.06      Licensee Conducted Force-on-Force Exercises at Category I Fuel Cycle Facilities 10/27/17 (17-023) 81700.07      Category I Fuel Cycle Facility Security Training 05/15/17 (17-010) 81700.08      Category I Fuel Cycle Facility Fitness-for-Duty Programs 05/15/17 (17-010) 81700.09      Security Measures for Licensed Facilities 10/26/15 (15-021) 81700.10      Protection of Safeguards Information at Category I Fuel Cycle Facilities 05/15/17 (17-010) 81700.11      Annual Observation of Licensee Conducted Force-on-Force Exercises at Category I Fuel Cycle Facilities 10/27/17 (17-023) 81810        Protection of Safeguards Information 09/10/07 (07-027) 81811        Protection of Safeguards Information By Design Certification Applicants and Vendors 09/06/16 (16-022) 81815        Authorization for Access to National Security Information (NSI) and Restricted Data (RD) 06/27/14 (14-014) 81820        Physical Protection Facility Approval and Safeguarding of National Security Information (NSI) and Restricted Data (RD) 06/27/14 (14-014) 8200  Emergency Planning 82001        Evaluation of Emergency Preparedness 05/22/00 (00-010) 82002        Part 52, Emergency Preparedness Program 14/28/14 (14-026) 82002.01      Facilities and Equipment 11/08/11 (11-030) 82002.02      Procedure Quality 11/08/11 (11-030) 82002.03      Review of Exercise Objectives and Exercise Scenario for Power Reactors 11/08/11 (11-030) 82002.04      Emergency Preparedness Exercises 11/08/11 (11-030) 82002.05      Emergency Response Organization On-Shift Staffing and Augmentation Drills 11/08/11 (11-030) 82002.06      Emergency Response Organization, Dose Assessment Drills 11/08/11 (11-030) 82002.07      Operational Status of the Emergency Preparedness Program 11/08/11 (11-030) 82002.08      RESERVED for Inspection Of Site Specific Implementation Of 10 Cfr 50.54(HH)(2) Phase 1, 2, And 3 Mitigating Strategies For Nuclear Power Plants Referencing The Ap1000 Certified Design 82201        Emergency Detection and Classification 03/23/05 (05-008) 82202        Protective Action Decision Making 03/23/05 (05-008) 82301        Evaluation of Exercises for Power Plants 04/24/13 (13-012) 82302        Review of Exercise Objectives and Scenarios for Power Reactors 04/24/13 (13-012) 82401        Decommissioning Emergency Preparedness Scenario Review and Exercise Evaluation 09/04/14 (14-020) 82501        Decommissioning Emergency Preparedness Program Evaluation 09/04/14 (14-020)
Issue Date: 01/05/18                          32                          TABLE OF CONTENTS


2600   Fuel Cycle Facility Operational Safety and Safeguards Inspection Program 12/20/17 (17-030) 2600, App A Guidance for Conducting Fuel Cycle Inspections 12/20/17 (17-030) 2600, App B NRC Core Inspection Requirements, Tables 1 and 2 09/24/15 (15-018) 2600, App C Fuel Cycle Resident Inspection Program 09/24/15 (15-018) 2600, App D  Fuel Cycle Facility Inspection Planning 09/24/15 (15-018)
82701        Operational Status of the Emergency Preparedness Program 04/24/13 (13-012) 8300   Radiation Protection 83100        Occupational Exposure During SAFSTOR and DECON 12/30/91 (91-022) 83311        Reserved for Part 52, Radiation Protection During Construction 83501        Significant Uncontrolled Radiation Exposures 04/17/00 (00-006) 83502.01      Radioactive Gaseous and Liquid Treatment and Monitoring Systems 04/17/00 (00-006) 83502.02      Radioactive Material Process and Transportation 04/17/00 (00-006) 83502.03      Radiological Environmental Monitoring Program and Radioactive Material Control Program 04/17/00 (00-006) 83522        Radiation Protection, Plant Chemistry, Radwaste, and Environmental:
Issue Date: 01/05/18 12 TABLE OF CONTENTS  2600/016 Inspection of Activities Associated with NRC Generic Letter 2015-01   11/09/16 (16-029) 2601  Reactive Inspection Decision Making Process for Fuel Facilities  09/20/16 (16-023) 2602  Decommissioning Oversight and Inspection Program for Fuel    Cycle Facilities and Materials Licensees 07/29/08 (08-021) 2603  Reserved for Fuel Cycle Facility Construction Inspection Program Assessment  2604  Licensee Performance Review 09/20/16 (16-023) 2606  Assessment of the Change in Risk Resulting From a Violation at a Fuel Cycle Facility 04/01/16 (16-010) 2606, E-2 Evaluation Based on Specific Licensee ISAs 09/26/12 (12-022) 2620  On-Site Construction Reviews of Remedial Action at Inactive Uranium Mill Tailing Sites (Title I, Uranium Mill Tailings Radiation Control Act)    10/05/01 (01-020) 2630  Mixed Oxide Fuel Fabrication Facility Construction Inspection Program 09/20/16 (16-023) 2635    Reserved for Uranium Enrichment Facility Construction and Pre-Operational Readiness Review Inspection Programs  2641  In-Situ Leach Facilities Inspection Program 08/25/00 (00-014) 2681  Physical Protection and Transport of SNM and Irradiated Fuel Inspections of Fuel Facilities 10/27/17 (17-023) 2681/009 Inspection Guidance and Requirements for Physical Protection of the Transfer, Loading and Shipment of Irradiated Special Nuclear Material from General Atomics Facility, San Diego, California to U.S. Department of Energy, Idaho National Laboratory, Scoville, Idaho 08/12/10 (10-017) 2682  Technical Assistance for Safeguards MC&A Inspections at Fuel Facilities 06/18/84 (84-18) 2683  MC&A Safeguards Inspection of Fuel Facilities 05/09/14 (14-011) 2690  Inspection Program for Dry Storage of Spent Reactor Fuel at Independent Spent Fuel Storage Installations and for 10 CFR Part 71 Transportation Packagings 03/09/12 (12-004) 2694  Fuel Cycle Facility Construction and Pre-operational Readiness Review Inspection Programs 0830/17 (17-017) 2696  Louisiana Energy Services Gas Centrifuge Facility Construction and Pre-Operational Readiness Review Inspection Programs 10/19/06 (06-028)  
Organization and Management Controls 12/31/91 (reactivated 08-032) 83523        Radiation Protection, Plant Chemistry, Radwaste, Transportation and Environmental: Training and Qualifications 01/01/84 (reactivated 08-032) 83524        External Occupational Exposure Control and Personal Dosimetry (Preoperational and Supplemental) 01/01/84 (reactivated 08-032) 83525        Internal Exposure Control and Assessment (Preoperational and Supplemental) 01/01/84 (reactivated 08-032) 83526        Control of Radioactive Materials and Contamination, Surveys, and Monitoring (Preoperational and Supplemental) 01/01/84    (reactivated 08-032) 83527        Facilities and Equipment (Preoperational and Supplemental) 01/01/84 (reactivated 08-032) 83529        Reserved for Part 52 Radiation Protection - Startup 83531        Part 52 Life Cycle Minimization of Contamination and Groundwater Protection Program 12/21/16 (16-035) 83532        Reserved for Part 52 Radiation Protection, Plant Chemistry, and Radwaste Training 83533        Part 52 External Occupational Exposure Control and Personal Dosimetry 10/27/10 (10-022) 83534        Part 52, Internal Exposure Control and Assessment 10/27/10 (10-022) 83535        Part 52, Control of Radioactive Materials and Contamination, Surveys, and Monitoring 10/27/10 (10-022) 83536        Part 52 Facilities and Equipment 10/27/10 (10-022) 83537        Part 52 Maintaining Occupational Exposures ALARA 10/27/10 (10-022) 83722        Radiation Protection, Plant Chemistry, and Radwaste: Organization and Management Controls (Minimum/Basic) 09/17/01 (01-017) 83723        General Employee, Radiation Safety, Plant Chemistry, Radwaste, and Transportation Training 12/16/03 (03-041) 83724        External Occupational Exposure Control and Personal Dosimetry 04/17/00 (00-006) 83725        Internal Exposure Control and Assessment 04/17/00 (00-006) 83726        Control of Radioactive Materials and Contamination, Surveys and Monitoring 11/13/14 (14-027) 83727        Facilities and Equipment (Basic) 09/17/01 (01-017) 83728        Maintaining Occupational Exposures ALARA 04/17/00 (00-006) 83729        Occupational Exposure during Extended Outages 12/31/91 (91-021) 83746        Offsite Dose Calculation Manual (ODCM) 07/29/08 (08-021)
Issue Date: 01/05/18                          33                      TABLE OF CONTENTS


2700 Licensee Contractor and Vendor Inspection Program
83750        Occupational Radiation Exposure 06/06/02 (02-023) 83801        Inspection of Remedial and Final Surveys at Permanently Shutdown Reactors 07/26/16 (16-018) 83822        Radiation Protection 09/07/00 (00-016) 83890        Closeout Inspection and Survey 05/01/03 (03-013) 8400  Radioactive Waste Management 84100        Special Nuclear Material Inspections At Near Surface Low-Level Waste Disposal Facilities In Agreement States 11/27/01 (01-028) 84101        Radioactive Waste Management 12/30/91 (91-022) 84522        Solid Wastes (Preoperational and Supplemental) 01/01/84 (reactivated 08-032) 84523        Liquids and Liquid Wastes (Preoperational and Supplemental) 01/01/84 (reactivated 08-032) 84524        Gaseous Waste System (Preoperational and Supplemental) 01/01/84 (reactivated 08-032) 84525        Quality Assurance and Confirmatory Measurements for In-Plant Radiochemical Analysis (Preoperational and Supplemental) 5/23/85 (reactivated 08-032) 84526        Reserved for Part 52 Radwaste - Startup 84527        Part 52, Solid Waste Management System 07/01/08 (08-019) 84528        Part 52 Liquid Waste Management Program 10/19/16 (16-027) 84529        Part 52, Gaseous Waste Management Program 10/19/16 (16-027) 84750        Radioactive Waste Treatment, and Effluent and Environmental Monitoring 03/15/94 (94-006) 84850        Radioactive Waste Management - Inspection of Waste Generator Requirements of 10 CFR 20 and 10 CFR 61 12/22/08 (08-037) 84900        Low-Level Radioactive Waste Storage 12/22/08 (08-037)
(Preoperational and Supplemental) 8500      Material Control and Accountability 85102        Material Control and Accounting - Reactors 03/29/85 (85-10) 85103        RESERVED for Material Control and Accounting - Decommissioning Power Reactors 85200        MC&A for Licensees Possessing Less Than or Equal to One Effective Kilogram of SNM 04/10/85 (85-15) 85203        Management Structure and Controls 08/10/16 (16-020) 85205        Facility Operations and Internal Controls 08/10/16 (16-020) 85207        Measurement Systems 01/17/86 (86-04) 85209        Measurement Control and Statistics 04/10/85 (85-15) 85211        Physical Inventory 01/17/86 (86-04) 85303        Material Control and Accounting Management Structure and Personnel Training and Qualification 08/10/16 (16-020) 85305        Item Monitoring 11/15/16 (16-030) 85307        Process Monitoring 11/15/16 (16-030) 85309        Measurement Systems and Control 10/20/10 (10-021)
Issue Date: 01/05/18                          34                      TABLE OF CONTENTS


2800 Materials Inspection Program 2800  Materials Inspection Program 09/12/17 (17-018) 2800/030 Verification of the Status of Devices Authorized For Use Under a General License 05/30/00 (00-011) 2800/032 Follow-up - Materials Safeguard Advisory 10/31/01 (01-023) 2800/036 Inspection of Manufacturing and Distribution Licensees    09/13/04 (04-024) 2800/037 Safety Procedures for Panoramic Irradiators Rev 1 07/14/05 (05-019)
85311          Physical Inventory Program 11/15/10 (10-023) 85313          Alarm Resolution Program 11/15/16 (16-030) 85315          Internal Control 12/21/2010 (10-027) 85401          Management Structure 11/15/16 (16-030) 85402          Measurement Program 10/20/10 (10-021) 85403          Measurement Control Program 10/20/10 (10-021) 85404          Physical Inventory Program for Low Enriched Uranium Fuel Facilities 11/15/10 (10-023) 85405          Item Control 09/09/10 (10-019) 85406          Resolution Program for Low Enriched Uranium Fuel Facilities 11/15/10 (10-023) 85407          Assessment Program 11/29/10 (10-024) 85408          Recordkeeping 11/29/10 (10-024) 85420          Inspection of IAEA Safeguards for Inspectors at Power Reactors 06/22/88 (88-07) 85501          Physical Inventory Program for Uranium Enrichment Facilities 11/15/10 (10-023) 85502          Detection Program for Uranium Enrichment Facilities 12/21/10 (10-027) 85503          Resolution Program for Uranium Enrichment Facilities 11/15/10 (10-023) 8600 Spent Fuel and Other Radioactive Material Packaging and Shipping 86001          Design, Fabrication, Testing, and Maintenance of Transportation Packagings 01/16/08 (08-003) 86730          Transportation of Radioactive Materials (49 CFR Parts 100-179 and 10 CFR Part 71) 04/17/00 (00-006) 86740          Inspection of Transportation Activities 10/30/08 (08-030) 86750          Solid Radioactive Waste Management and Transportation of Radioactive Materials 03/15/94 (94-006) 8700  Materials Safety Inspection 87102          Maintaining Effluents from Materials Facilities As Low As Is Reasonably Achievable (ALRA) 04/04/00 (00-005) 87103          Inspection of Material Licensees Involved in an Incident or Bankruptcy Filing 11/03/00 (00-023) 87104          Decommissioning Inspection Procedure for Materials Licensees 07/29/02 (02-029) 87121          Industrial Radiography Programs 12/17/14 (14-030) 87122          Irradiator Programs 12/31/02 (02-047) 87123          Well Logging Programs 11/25/03 (03-037) 87124          Fixed and Portable Gauge Programs 11/25/03 (03-037) 87125          Materials Processor/Manufacturer Programs 09/28/05 (05-027) 87126          Industrial/Academic/Research Programs 09/28/05 (05-027) 87127          Radiopharmacy Programs 07/01/08 (08-018) 87128          Manufacturing and Distribution of Exempt Products 01/27/17 (17-002) 87129          Master Materials Program 09/15/03 (03-034)
Issue Date:  01/05/18 13 TABLE OF CONTENTS  2800/038 Inspection of the Implementation of Increased Controls for Licensees Authorized to Possess Risk Significant Radioactive Material 03/30/06    (06-008) 2800/039 Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in the National Source Tracking System Pursuant to Title 10 Code of Federal Regulations, Part 20.2207 (10 CFR 20.2207)  
Issue Date: 01/05/18                            35                        TABLE OF CONTENTS


04/09/09 (09-011) 2800/040 Material Control and Accounting at Nuclear Power Plants and Wet Storage Sites 03/07/11 (11-002) 2800/041 10 CFR Part 37 Materials Security Review at Facilities with a Title 10 Code of Federal Regulations Part 73 Physical Protection Program 07/01/15 (15-013) 2800/043 Inspection of Facilities Potentially Contaminated with Discrete Radium-226 Sources 01/06/17 (17-001) 2801  Uranium Mill 11e.(2) Byproduct Material Disposal Site and Facility Inspection Program 08/25/00 (00-014) 2810  Master Materials License Oversight and Inspection Program 10/11/12 (12-023) 2815  Construction and Preoperational Inspection of Panoramic,    Wet-Source-Storage Gamma Irradiators 03/27/01 (01-010) 2882  Transfer of NRC License Files to Agreement State(s) 12/03/01 (01-029)  
87130          Nuclear Medicine Programs, Written Directive Not Required 10/24/02 (02-041) 87131          Nuclear Medicine Programs, Written Directive Required 08/24/11 (11-014) 87132          Brachytherapy Programs 02/26/15 (15-003) 87133          Medical Gamma Sterotactic Radiosurgery and Teletherapy Programs 08/24/11 (11-014) 87134          Medical Broad-Scope Programs 08/24/11 (11-014) 87135          Panoramic and Underwater Irradiator Security Program 10/30/08 (08-030) 87136          Manufacturing and Distribution (M&D) Security Program 10/30/08 (08-030) 87137          10 CFR Part 37 Materials Security Programs 04/03/14 (14-009) 87138          RESERVED for 10 CFR Part 37, Physical Protection Of Category 1 And Category 2 Quantities Of Radioactive Material At Facilities With A 10 CFR Part 73 Physical Protection Program 87250          Locating Missing Materials Licensees 10/29/01 (01-022) 87654          Uranium Mill, In-Situ Uranium Recovery, and 11e.(2) Byproduct Material Site Decommissioning Inspection 03/19/02 (02-010) 8800  Fuel Facility Inspection 88001          On-Site Construction 04/15/94 (94-011) 88003          Reactive Inspection for Events at Fuel Cycle Facilities 03/16/15 (15-004) 88004          Reserved for Adverse Weather Protection 88005          Management Organization and Controls 09/05/06 (06-020) 88010          Training 02/07/14 (14-005) 88015          Nuclear Criticality Safety 08/11/15 (15-0215) 88020          Operational Safety 01/23/14 (14-003) 88025          Maintenance and Surveillance Testing 01/23/14 (14-003) 88030          Radiation Protection 03/06/14 (14-007) 88035          Radioactive Waste Management 02/07/14 (14-005) 88045          Effluent Control and Environmental Protection 02/07/14 (14-005) 88050          Emergency Preparedness 03/06/14 (14-007) 88051          Evaluation of Exercises and Drills 03/06/14 (14-007) 88054          Fire Protection (Triennial) 03/06/14 (14-007) 88055          Fire Protection (Annual) 01/23/14 (14-003) 88070          Plant Modification 09/20/16 (16-023) 88071          Configuration Management Program 03/06/14 (14-007) 88075          Event Follow-up 03/16/15 (15-004) 88100          Plant Operations 12/30/96 (96-026) 88101          Configuration Control 12/30/96 (96-026) 88102          Surveillance Observations 12/30/96 (96-026) 88103          Maintenance Observations 12/30/96 (96-026) 88104          Decommissioning Inspection Procedure for Fuel Cycle Facilities 07/03/02 (02-026) 88106          Quality Assurance: Program Development and Implementation (Pre-licensing and Construction) 02/07/07 (07-006) 88107          Quality Assurance: Design and Documentation Control (Pre-licensing and Construction) 05/18/05 (05-013)
Issue Date: 01/05/18                            36                        TABLE OF CONTENTS


2900 Performance Appraisal Program 2901  Team Inspections 08/24/01 (01-016)   2920  Construction Appraisal Team Inspection Program 03/29/85 (85-11)  
88108        Quality Assurance: Control of Materials, Equipment, and Services (Pre-licensing and Construction) 02/07/07 (07-006) 88109        Quality Assurance: Inspection, Test Control, and Control of Measuring and Test Equipment (Pre-licensing and Construction) 06/20/07 (07-020) 88110        Quality Assurance: Problem Identification, Resolution and Corrective Action 05/18/05 (05-013) 88111        10 CFR, Part 21, Inspection-Facility Construction 02/07/07 (07-006) 88112        Reserved for Software Validation 88113        Control of the Electronic Management of Data 02/07/07 (07-006) 88114        Quality Affecting Item Procurement (10 CFR Part 21) and Commercial Grade Item Dedication Process [Reactive] 10/25/06 (06-030) 88115        Supplier/Vendor Inspection (Construction Phase) 10/25/06 (06-030) 88117        Facility Changes (License Application) and Change Process (10 CFR 70.72) (Pre-Licensing and Construction) 09/20/16 (16-023) 88120        Reserved Draft Construction and Operational Readiness Inspections for the Internal Isotopes Uranium Deconversion Facility 88121        Reserved Draft Operational Readiness Reviews for Uranium Deconversion Facilities 88130        Resident Inspection Program for On-Site Construction Activities at the Mixed Oxide Fuel Fabrication Facility 03/02/16 (16-009) 88131        Geotechnical/Foundation Activities 10/25/06 (06-030) 88132        Structural Concrete Activities 10/25/06 (06-030) 88133        Structural Steel and Supports Activities 7/25/07 (07-023) 88134        Quality Assurance: Piping Relied on for Safety 05/18/05 (05-013) 88135        Resident Inspection Program for Category I Fuel Cycle Facilities 02/07/14 (14-005) 88135.02      Resident Inspection Program Plant Status Activities 05/21/15 (15-010) 88135.04      ISA Implementation 01/31/14 (14-004) 88135.05      Fire Protection 01/31/14 (14-004) 88135.17      Permanent Plant Modifications 01/31/14 (14-004) 88135.19      Post Maintenance Testing 01/31/14 (14-004) 88135.22      Surveillance Testing 01/31/14 (14-004) 88136        Mechanical Components 7/25/07 (07-023) 88137        Electric Cable 04/01/10 (10-010) 88138        Electrical Components and Systems 08/08/07 (07-024) 88139        Ventilation and Confinement Systems 08/08/07 (07-024) 88140        Instrumentation and Controls Systems 04/01/10 (10-010) 88141        Fire Prevention and Protection 08/08/07 (07-024) 88142        Underground Fire Water Loop and Equipment Installation 08/08/07 (07-024) 88143        Pipe Supports and Restraints 7/25/07 (07-023) 88150        Reserved for Training and Qualification of Plant Personnel 88151        Reserved for Facility Changes and Change Process (10 CFR70.72) 88152        Reserved for Physical Protection Equipment and Barriers 88153        Reserved for Material Control and Accounting 88154        Reserved for Fire Safety and Protection Systems 88155        Reserved for Functional Verifications of IROFS 88156        Reserved for Integrated Safety Analysis Implementation 88157        Reserved for Waste Management Equipment and Systems 88158        Reserved for Environmental Protection - Initial and Periodic Inspections 88159        Reserved for Process Enclosures and Vessels Issue Date: 01/05/18                          37                      TABLE OF CONTENTS


3000 Management Meetings
88160          Reserved for Utilities and Bulk Chemicals 88161          Corrective Action Program (CAP) Implementation at Fuel Cycle Facilities 07/28/14 (14-017) 8900  Fuel Facility and Materials Special Program 89001          In-Situ Leach (ISL) Facilities 09/02/97 (97-013) 9000  Reportable Matters and Report Reviews 90001          Construction Regulatory Response Column Inspections 10/27/10 (10-022) 90002          Construction Degraded Performance Column Inspections 10/28/14 (14-026) 90003          Construction Multiple/Repetitive Degraded Cornerstone Column Inspection 10/28/14 (14-026) 90502          Reserved for Part 52 Reportable Matters - Test Program 90700          Feedback of Operational Experience Information at Operating Power Reactors 03/23/05 (05-008) 90712          In-office Review of Written Reports of Non-routine Events at Power Reactor Facilities 12/31/98 (98-020) 90713          In Office Review of Periodic and Special Reports 09/17/01 (01-017) 90714          Non-routine Reporting Program 09/17/01 (01-017) 9100  Title 10 Requirements 9200  Planned Non-Routine Activities 92050          Review of Quality Assurance for Extended Construction Delay 04/04/00 (00-005) 92700          Onsite Follow-up of Written Reports of Non-routine Events at Power Reactor Facilities 12/31/98 (98-020) 92701          Follow-up 03/13/07 (07-010) 92702          Follow-up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, and Alternative Dispute Resolution Confirmatory Orders 01/10/08 (08-001) 92703          Follow-up of Confirmatory Action Letters 05/13/09 (09-012) 92709          Licensee Strike Contingency Plans 03/14/14 (14-008) 92711          Continued Implementation of Strike Plans During an Extended Strike 03/14/14 (14-008) 92712          Resumption of Normal Operations After a Strike 03/14/14 (14-008) 92714          Reserved for Part 52 Follow-up 92717          IE Bulletins for Information and IE Information Notice Followup 09/25/85 (reactivated 10-020) 92720          Corrective Action 09/28/98 (reactivated 07-034)
Issue Date: 01/05/18                            38                      TABLE OF CONTENTS


30050  Construction Permit Corporate Management Meeting 04/01/80 (reactivated 07-034)     30703  Management Meetings - Entrance and Exit Interviews 01/01/82 (reactivated 08-008)   30800  Initial Management Meeting - Materials Licensees 10/01/76 (76-26)  
92721          Reserved for Part 52 Follow-up on Corrective Actions for Violations and Deviations 92722          Follow up Inspection for Any Severity Level I or II Traditional Enforcement Violation or for Two or More Severity Level III Traditional Enforcement Violations in a 12-Month Period 08/11/09 (09-020) 92723          Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area is a 12-Month Period 08/11/09 (09-020) 92901          Follow-up - Plant Operations 09/17/01 (01-017) 92902          Follow-up - Maintenance 09/17/01 (01-017) 92903          Follow-up - Engineering 09/17/01 (01-017) 92904          Follow-up - Plant Support 09/17/01 (01-017) 9300  Non-Routine Activities 93002          Managing Fatigue 11/09/09 (09-026) 93100          Safety-Conscious Work Environment Issue of Concern Follow-up 04/09/15 (15-005) 93702          Prompt Onsite Response to Events at Operating Power Reactors 09/17/01 (01-017) 93800          Augmented Inspection Team 11/15/17 (17-025) 93801          Safety System Functional Inspection (SSFI) 07/25/96 (96-016) 93802          Operational Safety Team Inspection (OSTI) 11/27/89 (89-015) 93803          Safety Systems Outage Modifications Inspection 04/27/89 (89-008) 93804          Risk-Based Operational Safety and Performance Inspection 01/15/92 (92-001) 93805          Maintenance Program 08/06/93 (93-070) 93806          Operational Readiness Assessment Team Inspections 09/29/98 (98-015) 93807          Systems Based Instrumentation and Control Inspection 01/29/93 (93-001) 93810          Service Water System Operational Performance Inspection (SWSOPI) 09/14/98 (98-013) 93811          Electrical Distribution System Functional Inspection (EDSFI) 02/03/99 (99-002) 93812          Special Inspection 11/15/17 (17-025) 93813          Reserved for Part 52 Operational Readiness Assessment Team Inspection 93814          Independent Design Verification Program 11/15/10 (10-023) 93815          Part 52, Operational Programs Implementation Inspection 12/23/11 (11-043) 9400  Technical Activities of an Administrative Nature 94300          Status of Plant Readiness for an Operating Licensee 02/14/86 (Reactivated 07-034) 94301          Reserved for Part 52 Status of 10 CFR 52 Plant Readiness for Fuel Load Issue Date: 01/05/18                            39                        TABLE OF CONTENTS


3100 Reserved
9500  Strategic Determination Actions 95001          Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area 08/24/16 (16-021) 95002          Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area 02/09/11 (11-001) 95003          Supplemental Inspection for Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple Yellow Inputs or One Red Input 12/18/15 (15-031) 95003.01      Emergency Preparedness 01/15/09 (09-002) 95003.02      Guidance for Conducting an Independent NRC Safety Culture Assessment) 04/03/14 (14-009) 9600  Materials Safety and Security 96001          NRC Force-on-Force Inspections at Category 1 Fuel Cycle Facilities 12/22/14 (12-031) 9700  Reserved 9800  Reserved 9900  Guidance2 9900          Technical Guidance 05/12/86 (86-26)
 
PART GUIDANCE Technical Guidance ASME Section III      American Society of Mechanical Engineers ASME Boiler and Pressure Vessel Code, Section III 06/16/89 (89-011)
3200 Reserved
ASME Section III      American Society of Mechanical Engineers ASME Boiler and & XI Pressure Vessel Code, Section III & XI 11/12/96 (96-022)
 
ASME Section XI      American Society of Mechanical Engineers ASME Boiler and Pressure Vessel Code, Section XI 12/08/86 (86-54) 2
3300 Reserved
[XXXX.XX] attached to each document in Part 9900, is the file name for that document.
 
Issue Date: 01/05/18                          40                            TABLE OF CONTENTS
3400 Reserved Issue Date:  01/05/18 14 TABLE OF CONTENTS 3500 Quality Assurance 35002  Early Site Permit Pre-Docketing Quality Assurance Controls    Meeting 05/29/03 (03-018) 35004  Pre-Docketing Early Site Permit Quality Assurance Controls Inspection 05/29/03 (03-018) 35006  Post-Docketing Early Site Permit Quality Assurance Controls Inspection 05/29/03 (03-018) 35007  Quality Assurance Program Implementation During Construction and Pre-Construction Activities 12/08/16 (16-032) 35012  Early Site Permit Quality Assurance Controls Assessment and Conclusion 05/29/03 (03-018) 35017  Quality Assurance Implementation Inspection 07/29/08 (08-021) 35023  Reserved for Design Reliability Assurance Program  35031  Reserved for Design Certification Pre-Meeting  35032  Reserved for Pre-Docketing Design Certification Quality Assurance Controls Inspection  35033  Reserved for Post-Docketing Design Certification Quality Assurance Controls Inspection  35034  Design Certification Testing Inspection 01/27/10 (10-003) 35060 Licensee Management of QA Activities 04/01/83 (reactivated 07-032) 35061 In-Depth QA Inspection of Performance 11/19/85 (reactivated 07-034) 35065 Procurement, Receiving, and Storage 04/01/83 (Reactivated 07-032) 35101 QA Program Implementation Inspection for Operational Programs 07/08/16 (16-015) 35301 Preoperational Testing - Quality Assurance 08/06/03 (03-028)  35701  Quality Assurance Program Review 09/17/01 (01-017) 35710  Reserved for Quality Assurance In spection of Digital Computer Software  35750  QA Program Measuring and Test Equipment 04/14/92 (reactivated 08-032)  35960  QA Program Evaluation of Engineering Organization 10/01/82 (reactivated 07-034) 35962 Reserved for Part 52 QA Program Evaluation of Engineering Service Organization
 
3600 Organization and Administration 36100  Inspection of 10 CFR Parts 21 and 50.55(e) Programs for Reporting Defects and Noncompliance 02/13/12 (12-002) 36100.01 Inspection of 10 CFR Part 21 and Programs for Reporting Defects and Noncompliance During Construction 02/13/12 (12-002) 36301 Operational Staffing 07/01/77 (reactivated 08-032) 36302 Part 52. Operational Staffing 08/19/08 (08-024)  36801  Organization, Management, and Cost Controls at Permanently Shutdown Reactors 08/11/97 (97-012)
Issue Date:  01/05/18 15 TABLE OF CONTENTS 3700 Design, Design Changes, Modifications 37002 Construction Refurbishment Process - Watts Bar Unit 2 02/05/10 (10-005) 37051 Verification of As-Builts 12/04/87 (reactivated 07-032)  37055  Onsite Design Activities 04/01/83 (reactivated 07-032) 37060 Inspections under the 10CFR Part 50.69 Special Program 09/14/11 (11-016) 37301 Comparison of As-Built Plant to FSAR Description 03/14/14 (14-008)  37700  Design Changes, and Modifications 09/17/01 (01-017)  37801  Safety Reviews, Design Changes, and Modifications at    Permanently Shutdown Reactors 08/11/97 (97-012) 37803  Reserved 37804  Aircraft Impact Assessment Inspection 02/09/12 (12-001) 37805  Engineering Design Verification Inspections 04/25/11 (11-007)
 
3800 Procurement
 
3900 Records 39701  Records Program 09/17/01 (01-017)
 
4000 Review and Audit
 
40001  Resolution of Employee Concerns 06/03/97 (97-006) 40002  Inspections to Review Allegations 06/28/02 (02-024) 40100  Independent Safety Culture Assessment Follow-up 04/09/15 (15-005) 40505 Reserved for Effectiveness of Process to Identify, Resolve, and Prevent Construction Problems  40600 Licensee Program for Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Management 07/28/14 (14-017) 40801  Self-Assessment, Auditing, and Corrective Action at Permanently Shutdown Reactors 08/11/97 (97-012)
 
4100 Training
 
41301  Pre-Licensing Review of Training and Qualification Programs 02/18/87 (reactivated 08-032)  41500  Training and Qualification Effectiveness 06/13/95 (95-007)  41501  Review of Training and Qualification Programs 04/27/16 (16-011) 41502  Nuclear Power Plant Simulation Facilities 10/16/12 (12-024)
Issue Date:  01/05/18 16 TABLE OF CONTENTS 4200 Procedures 42001  Emergency Operating Procedures 06/28/91 (91-009)  42051 Fire Prevention and Protection 10/01/77 (reactivated 08-004)  42401  Part 52, Plant Procedures10/27/10 (10-022) 42453 Part 52, Operating Procedures Inspection 08/19/08 (08-024)  42454  Part 52, Emergency Operating Procedures 09/09/13 (13-020) 42700  Plant Procedures 11/15/95 (95-015) 
 
4300 Vendor Procedures
 
43002  Routine Inspections of Nuclear Vendors 01/27/17 (17-002) 43003  Reactive Inspections of Nuclear Vendors 12/14/15 (15-029) 43004  Inspection of Commercial-Grade Dedication Programs 01/27/17 (17-002)  43005  NRC Oversight of Third-Party Organizations Implementing Quality Assurance Requirements 10/08/15 (15-019)  43006  Inspection of the Implementation of Mitigation Strategies Orders Regarding the Use of National Response Centers 09/30/16 (16-025)
 
4400 Reserved
 
4500 Geotechnical/Foundation
 
45051  Geotechnical/Foundation Activities Procedure Review 05/29/03 (03-018) 45051.A Geotechnical/Foundation Activities Procedure Review 03/23/84 (reactivated 08-004)  45052  Review of Geotechnical and Site Characterization Activities    10/03/07 (07-030)  45053  Geotechnical/Foundation Activities Work Observation 03/23/84 (reactivated 07-034)  45055  Geotechnical/Foundation Activities Record Review 03/23/84 (reactivated 07-034)
 
4600 Structural Concrete
 
46051  Structural Concrete Procedure Review 07/01/83 (reactivated 07-034) 46053 Structural Concrete Work Observation 07/01/83 (reactivated 07-034)      46055  Structural Concrete Record Review 07/01/83 (reactivated 07-034)  46061  Structural Masonry Construction 12/17/86 (reactivated 07-034) 46071  Concrete Expansion Anchors 12/17/86 (reactivated 07-034)
 
4700 Containment (Post-Tensioning)
 
Issue Date:  01/05/18 17 TABLE OF CONTENTS 4800 Structural Steel and Supports 48051  Structural Steel and Supports Procedure Review 12/17/86    (reactivated 07-032)  48053  Structural Steel and Supports Work Observation 12/17/86 (reactivated 07-032) 48055  Structural Steel and Supports Record Review 07/01/83 (reactivated 07-032)
 
4900 Piping 49001  Inspection of Erosion/Corrosion Monitoring Programs    12/11/98 (98-019)  49051  Reactor Coolant Pressure Boundary Piping QA Review 08/16/82 (reactivated 07-032)  49053  Reactor Coolant Pressure Boundary Piping - Work Observation 11/19/85 (reactivated 07-032) 49055  Reactor Coolant Pressure Boundary Piping Record Review 08/16/82 (reactivated 07-034)  49061 Safety-Related Piping 10/01/82 (reactivated 07-034)  49063  Piping - Work Observation 11/19/85 (reactivated 07-034) 49065  Safety-Related Piping-Records Review 10/01/82 (reactivated 07-034) 
 
5000 Mechanical Components and Equipment 50001  Steam Generator Replacement Inspection 09/12/17 (17-018)  50002  Steam Generators 12/31/96 (96-024)  50003  Pressurizer Replacement Inspection 09/12/17 (17-018)  50051  Reactor Vessels and Internals QA Review 08/16/82 (reactivated 07-034) 50053  Reactor Vessel and Internals Work Observation 08/16/82 (reactivated 07-034) 50054  Reactor Vessel Material Surveillance Program 12/04/08 (08-034) 50055  Reactor Vessel and Internals Record Review 08/16/82      (reactivated 07-034)  50054  Reserved for Reactor Vessel Material Surveillance Program 50071  (Safety-Related Components - Procedure Review 04/01/83 (reactivated 07-034) 50073 Mechanical Components - Work Observation 11/19/85  (reactivated 07-034)    50075  Safety Related Components - Records Review 04/01/83 (reactivated 07-034) 50090  Pipe Support and Restraint Systems 08/06/03 (03-028) 50095 Spent Fuel Storage Racks 03/14/94 (reactivated 07-034) 50100 Heating, Ventilating, and Air Conditioning Systems 08/06/03 (03-028)
 
Issue Date:  01/05/18 18 TABLE OF CONTENTS 5100 Electrical Components and Systems 51051  Electrical Components and Systems - Procedure Review 03/30/84 (reactivated 07-034)    51053  Electrical Components and systems - Work Observation 08/06/03 (03-028) 51055  Electrical Components and Systems - Record Review 08/06/03 (03-028) 51061  Electrical Cable - Procedure Review 08/06/03 (03-028) 51063  Electric Cable - Work Observation 11/19/85 (reactivated 07-034)  51065  Electric Cable - Record Review 03/30/84 (reactivated 07-034)  51080  Part 52, Environmental Qualifications (EQ) Program for Electrical and Mechanical Equipment 06/26/17 (17-013)
 
5200 Instrumentation Systems and Components
 
52003  Digital Instrumentation and Control Modification Inspection 10/31/08 (08-031) 52051  Instrument Components and Systems - Procedure Review 03/30/84 (reactivated 07-034)  52053  Instrument Components and Systems - Work Observation 03/30/84 (reactivated 07-034)  52055  Instrument Components and Systems - Record Review 03/30/84 (reactivated 07-034)
 
5300 Containment Penetrations 53051  Containment Penetrations (Mechanical) Procedure Review 01/27/84 (reactivated 07-034)  53053  Containment Penetrations (Mechanical) Work Observation 01/27/84 (reactivated 07-034)  53055  Containment Penetrations (Mechanical) Record Review 01/17/84 (reactivated 07-034)
 
5400 Cleanliness
 
5500 Welding 55050 Nuclear Welding General Inspection Procedure 06/20/83 (83-06) 55093 Reactor Vessels Internals (Welding) Observation of Welding and Associated Activities 07/01/7 (reactivated 07-034) 55100 Structural Welding General Inspection Procedure 06/20/83 (83-06) 55150 Weld Verification Checklist 06/20/83 (reactivated 07-034)
 
5600 Calibration 56700  Calibration 03/23/05 (05-008)
 
Issue Date:  01/05/18 19 TABLE OF CONTENTS 5700 Nondestructive Examination, Destructive Examination and Fabrication Testing 57050  Visual Testing Examination 03/09/99 (99-003)  57060  Liquid Penetrant Testing Examination 03/09/99 (99-003) 57070  Magnetic Particle Testing Examination 03/09/99 (99-003) 57080  Ultrasonic Testing Examination 03/09/99 (99-003) 57090  Nondestructive Examination Procedure Radiographic  Examination Procedure Review/Work Observation/Record  Review 06/14/93 (93-005) 5800 Special Processes
 
5900 Reserve Shutdown System
 
6000 Fuel Fabrication, Handling and Storage 60501  Fuel Receipt and Storage 04/30/75 (reactivated 08-032)  60705  Preparation for Refueling 07/27/95 (95-009) 60710  Refueling Activities 07/27/95 (95-009) 60715  Spent Fuel Safety at Operating Reactors 10/30/15 (15-022) 60801  Spent Fuel Pool Safety at Permanently Shutdown Reactors 08/11/97 (16-001)  60845  Operation of Intra-Unit Fuel Transfer Canister and Cask System    04/26/12 (12-007) 60851  Design Control of ISFSI Components 01/16/08 (08-003) 60852  ISFSI Component Fabrication by Outside Fabricators 01/16/08 (08-003) 60853  On-Site Fabrication of Components and Construction of an    ISFSI 01/16/08 (08-003)  60854  Preoperational Testing of an Independent Spent Fuel Storage Installation 01/16/08 (08-003) 60854.1 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 09/05/06 (06-022) 60855  Operation of an Independent Spent Fuel Storage Installation    01/16/08 (08-003)  60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 09/05/06 (06-022) 60856  Review of 10 CFR 72.212(b) Evaluations 03/05/08 (08-010) 60856.1 Review of 10 CFR 72.212(b) Evaluations at Operating Plants    02/02/04 (04-003)  60857  Review of 10 CFR 72.48 Evaluations 10/24/07 (07-033) 60858  Away-From-Reactor ISFSI Inspection Guidance 05/03/07 (07-015) 60859  Reserved for Welding Verification Checklist for Transportation and ISFSI Components  60860  Reserved for Nondestructive Examination Procedure Visual Examination Procedure Review/Work Observation/Record Review of Transportation and ISFSI Components Issue Date:  01/05/18 20 TABLE OF CONTENTS  60861  Reserved for Nondestructive Examination Procedure Liquid Penetrant    Examination Procedure Review/Work Observation/Record Review of Transportation ISFSI Components  60862  Reserved for Nondestructive Examination Procedure Magnetic Particle Examination Procedure Review/Work Observation/Record Review of Transportation ISFSI Components  60863  Reserved for Nondestructive Examination Procedure Ultrasonic Examination Procedure Review/Work Observation/Record Review  60864  Reserved for Nondestructive Examination Procedure Radiographic Examination Procedure Review/Work Observation/Record Review of Transportation and ISFSI Components
 
6100 Surveillance
 
61705  Calibration of Nuclear Instrumentation Systems 05/12/86 (86-25) 61706  Core Thermal Power Evaluation 07/14/86 (86-36) 61707  Determination of Reactor Shutdown Margin 10/11/85 (85-31) 61708  Isothermal and Moderator Temperature Coefficient    Determinations 10/11/85 (85-31)  61709  Total Power Coefficient of Reactivity at Pressurized Water Reactors 07/14/86 (86-36) 61710  Control Rod Worth Measurements (PWR) 10/11/85 (85-31) 61715  Verification of Containment Integrity 12/23/86 (86-60) 61720  Containment Local Leak Rate Testing 10/03/85 (85-30)  61726  Surveillance Observations 06/24/98 (98-010)  61728  Independent Measurement of RCS Leak Rates for a PWR 01/01/84 (84-02)
 
6200 Maintenance 62002  Inspection of Structures, Passive Components, and Civil Engineering Features at Nuclear Power Plants 12/31/96 (96-024) 62003  Inspection of Steel and Concrete Containments at Nuclear Power Plants 06/11/97 (97-008)  62706  Maintenance Rule 12/13/00 (00-028)  62708  Motor-Operated Valve Capability 10/23/13 (13-026) 62709  Configuration Risk Assessment and Risk Management Process 12/28/00 (00-029) 62710  Power-Operated Gate Valve Pressure Locking and Thermal Binding 04/30/10 (10-013)  62711  Reserved for Operational Reliability Assurance Process 62712  Part 52, Maintenance Rule 08/13/13 (13-017)
 
62801  Maintenance and Surveillance at Permanently Shutdown Reactors 08/11/97 (97-012)
 
Issue Date:  01/05/18 21 TABLE OF CONTENTS 6300 Construction Testing 63050  Containment Structural Integrity Test 07/01/83 (reactivated 07-034) 
 
6400 Fire Prevention/Protection
 
64051  Procedures - Fire Prevention/Protection 07/01/79 (reactivated 07-034)  64053 Fire Loop Installation 07/01/79 (reactivated 07-034)  64102  Reserved for Part 52 Post fire Safe Shutdown, Emergency Lighting and Oil Collection Capabilities  64704  Fire Protection Program 06/24/98 (98-010) 64705  Part 52, Fire Protection Operational Program 10/03/07 (07-030)
 
6500 10 CFR Part 52 ITAAC Inspections
 
65001  Inspections of Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Related Work 08/13/13 (13-017)  65001.01 Inspection of ITAAC-Related Foundations & Buildings 04/18/14 (14-010) 65001.02 Inspection of ITAAC-Related Installation of Structural Concrete 11/22/11 (11-037) 65001.03 Inspection of ITAAC-Related Installation of Piping 08/19/08 (08-024) 65001.04 Inspection of ITAAC-Related Installation of Pipe Supports and Restraints 08/13/14 (14-018)  65001.05 Inspection of ITAAC-Related Installation of Reactor Pressure Vessel and Internals 08/19/08 (08/19/08)  65001.06 Inspection of ITAAC-Related Installation o Mechanical Components 01/27/15 (15-001)  65001.07 Inspection of ITAAC-Related Installation of Valves 07/29/08 (08-021)  65001.08 Inspection of ITAAC-Related Installation of Electric Components and Systems 08/19/08 (08-024)  65001.09 Inspection of ITAAC-Related Installation of Electric and Fiber Optic Cable 08/05/09 (09-019)  65001.10 Inspection of ITAAC-Related Installation of Instrument Components and Systems 10/20/08 (08-029)  65001.11 Construction Inspection Program Inspection of ITAAC-Related Containment Integrity and Containment Penetration 08/19/08 (08-024)  65001.12 Inspection of ITAAC-Related Installation of Heating, Ventilating, and Air Conditioning Systems 07/29/08 (08-021)  65001.13 Inspection of ITAAC-Related Installation of Load Handling Equipment and Fuel Racks 08/05/09 (09-019)  65001.14 Inspection of ITAAC-Related Installation of Complex Systems with Multiple Components 06/24/15 (15-012)  65001.15 Inspection of ITAAC-Related Installation of Fire Protection Equipment 07/01/08 (08-019)  65001.16 Inspection of ITAAC-Related Engineering 06/20/14 (14-013)  65001.17 Inspection of ITAAC-Related Security Structures, Systems, and Components 09/30/16 (16-025)  65001.18 Inspection of Emergency Planning ITAAC 10/30/08 (08-030)
Issue Date:  01/05/18 22 TABLE OF CONTENTS  65001.19 Inspection of Installation of ITAAC-Related Radiation Monitoring Components and Systems 10/20/08 (08-029) 65001.20 Inspection of Safety-Related Piping Design Acceptance Criteria (DAC)-
Related ITAAC 06/02/11 (11-009) 65001.21 Inspection of Pipe Rupture Hazard Analysis Design Acceptance Criteria (DAC) - Related ITAAC 11/07/11 (11-029) 65001.22 Inspection of Digital Instrumentation and Control (DI&C) System/Software Design Acceptance Criteria (DAC) - Related ITAAC 12/19/11 (11-041) 65001.23 Inspection of Human Factors Engineering Integrated System Validation  ITAAC 12/22/14 (14-031) 65001.23, App A  Inspection Guide for AP1000 Human Factors Engineering Integrated System Validation 12/22/14 (14-031)  65001.A ITAAC Attributes for As-Built Inspection 09/25/13 (13-023) 65001.B Inspection of the ITAAC-Related Welding Program 09/25/13 (13-023) 65001.C Inspection of the ITAAC-Related Construction Test Program 04/18/14 (14-010) 65001.D  Inspection of the ITAAC-Related Operational Testing Program 05/09/14 (14-011) 65001.E Inspection of the ITAAC-Related Qualification Program 06/20/14 (14-013) 65001.F Inspection of the ITAAC-Related Design and Fabrication Requirements 09/20/13 (13-022)  65051 Low-Level Radioactive Waste Storage Facilities 06/13/86 (reactivated 07-034)
 
6600 Reserved
 
6700 Reserved 6800 Reserved
 
6900 Non-Power Reactor Inspection 69001  Class II Research and Test Reactors 02/03/04 (04-004)  69002  Class III Research and Test Reactors 02/03/04 (04-004) 69003  Class I Research and Test Reactor Operator Licenses, Requalification, and Medical Examinations 02/03/04 (04-004) 69004  Class I Research and Test Reactor Effluent and Environmental    Monitoring 02/03/047 (04-004)  69005  Class I Research and Test Reactor Experiments 02/03/04 (04-004) 69006  Class I Research and Test Reactors Organization and Operations and Maintenance Activities 02/03/04 (04-004) 69007  Class I Research and Test Reactor Review and Audit and Design Change Functions 02/03/04 (04-004)  69008  Class I Research and Test Reactor Procedures 02/03/04 (04-004)
Issue Date:  01/05/18 23 TABLE OF CONTENTS  69009  Class I Research and Test Reactor Fuel Movement    02/03/04 (04-004) 69010  Class I Research and Test Reactor Surveillance 02/03/04 (04-004)  69011  Class I Research and Test Reactor Emergency Preparedness    02/03/04 (04-004) 69012  Class I Research and Test Reactors Radiation Protection 02/03/04 (04-004) 69013  Research and Test Reactor Decommissioning 02/03/04 (04-004) 69020  Inspections of Safety-Related Items (and Services) During Construction of Non-Power Production and Utilization Facilities 12/14/15 (15-029) 69021 Inspections of Quality Assurance Program Implementation During Construction of Non-Power Production and Utilization Facilities  09/12/17 (17-018)  69022  Inspections of Operational Readiness During Construction of Non-Power Production and Utilization Facilities 12/14/15 (15-029)
 
7000 Preoperational Testing 70300  Preoperational Test Procedure Test Review 10/01/83    (reactivated 08-032) 70301  Overall Preoperational Test Program Review Requirements 10/01/83 (reactivated 08-032)  70302  Preoperational Test Program Implementation 10/01/83 (reactivated 08-032)  70304  Engineered Safety Features Test - Preoperational Test Procedure    Review 08/06/03 (03-028) 70305  Reactor Protection System Test Preoperational Test Procedure Review Preoperational Testing Procedure Verification 01/01/79    (reactivated 08-032) 70306  Loss of Offsite Power Test - Preoperational Test    Procedure Review 01/01/79 (reactivated 09-003) 70307  Containment Integrated Leak Rate Test - Procedure  Review 03/07/86 (86-13)  70308  Preoperational Hot Functional Testing - PWR Procedure Review) 10/01/83 (reactivated 08-032)  70311  Preoperational Testing Procedure Verification 10/01/83    (reactivated 08-032) 70312  Preoperational Test Witnessing 10/01/83 (reactivated 08-032) 70313  Containment Integrated Leak Rate Test 11/12/85 (85-36) 70314  HFT Witnessing 10/01/81 (reactivated 08-032)  70315  Engineered Safety Features Test Preoperational Test Witnessing) 01/01/79 (reactivated 08-032)  70316  Loss of Offsite Power Test Preoperational Test Witnessing 01/01/79 (reactivated 08-032)  70317  Reactor Protection System Test Preoperational Test Witnessing 01/01/79 (reactivated 08-032)  70323  Containment Leak Rate Test Results Evaluation 10/03/85 (85-30)  70324  Preoperational Test Results Evaluation - Integrated Hot Functional Test 04/01/77 (reactivated 08-032)
Issue Date:  01/05/18 24 TABLE OF CONTENTS  70325  Preoperational Test Results Evaluation - Reactor Protection System 01/01/79 (reactivated 08-032)  70326  Preoperational Test Results Evaluation - Loss of Offsite Power 01/01/79 (reactivated 08-032)  70329  Preoperational Test Result Evaluation Verification 10/01/83 (reactivated 08-032) 70331  Vibration Test- Preoperational Test Procedure Review 01/01/79 (reactivated 09-003)  70332  Control Rod System Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003)  70333  Chemical Control System Test - Preoperation Test Procedure Review 01/01/79 (reactivated 09-003)  70334  Engineered Safety Features Act. System Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003)  70335  Safety and Relief Valve Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003)  70336  Residual / Decay Heat Removal System Test - Preoperational Test Review 01/01/79 (reactivated 09-003)  70337  Main Stream Isolation Valve Test - Preoperational Test Procedure Review) 01/01/79 (reactivated 09-003)  70338  Auxilliary Feedwater System Test -Preoperational Test Procedure Review 01/01/79 (reactivated 09-003)  70339  Component Cooling Water System Test - Preoperational; Test Procedure Review 01/01/79 (reactivated 09-003)  70340  D.C. Power System Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003)  70341  Emergency/Standby Power Supply System Test - Preoperational Teat Procedure Review 01/01/79 (reactivated 09-003)  70342  Containment Combustable Gas Control System Test -Preoperational Test Procedure Review 01/01/79 (reactivated 09-003)  70344  Containment Isolation Vales Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003)  70345  Containment Heat/Cool/Vent. System Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003)  70346  Aux. Bldg. Heat /Cool/Vent. System Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003)  70347  Pressurizer and Level Control System Test- Preoperational Test Procedure Review 01/01/79 (reactivated 09-003)  70348  Main Feedwater Control System Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003)  70349  Reactor Coolant Leak Detection System Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003)  70350  Loose Parts Monitoring System Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003)  70351  Integrated Reactor Control System Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003)  70352  Remote Reactor Shutdown Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003)
Issue Date:  01/05/18 25 TABLE OF CONTENTS  70353  Cranes, Hoists and Lifting Equipment Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003)  70354  Nuclear Instrumentation System Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003)  70355  Compressed Gas System Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003)  70362  Reactor Coolant System Hydrostatic Test Procedure Review 10/01/83 (reactivated 08-032) 70367  Inspection of Pre-operational Test Program 01/15/14 (14-001) 70368  Part 52 Containment Leak Rate Testing (Programmatic)    06/26/17 (17-013) 70369  Reserved for Part 52 Containment Leak Rate Testing  70370  Testing Piping Support and Restraint Systems 03/07/86 (86-13) 70371  Reserved for Part 52 Testing of Pipe Support and Restraint System  70400  Preoperational Test Results Evaluation 10/01/83    (reactivated 08-032) 70431  Vibration Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70432  Control Rod System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003)  70433  Chemical Control System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003)  70434  Engineered Safety Features Act. System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003)  70435  Safety and Relief Valves Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003)  70436  Residual / Decay Heat Removal System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003)  70437  Main Stream Isolation Valve Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003)  70438  Auxiliary Feedwater System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003)  70439  Component Cooling Water System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003)  70440  D.C. Power System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003)  70441  Emergency / Standby Power Supply System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003)  70442  Containment Combustible Gas Control System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003)  70443  Containment Spray System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003)  70444  Containment Isolation Valve Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003)  70445  Containment Heat/Cool/Vent. System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003)  70446  Auxiliary Bldg. Heat/Cool/Vent. System Test - Preoperational Test Witnessing 01/22/09 (09-003)  70447  Pressurizer and Level Control System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003)
Issue Date:  01/05/18 26 TABLE OF CONTENTS  70448  Main Feedwater Control System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003)  70449  Reactor Coolant Leak Detection System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003)  70450  Loose Parts Monitoring System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003)  70451  Integrated Reactor Control System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003)  70452  Remote Reactor Shutdown Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003)  70453  Cranes, Hoists and Lifting Equipment Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003)  70454  Nuclear Instrumentation System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003)  70455  Compressed Gas System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003)  70462  Reactor Coolant System Hydrostatic Test - Test Witnessing 08/13/14    14-018 70562  Reactor Coolant System Hydrostatic Test Results Evaluation 08/13/14    14-018  70701  Reserved 70702  Inspection of Preoperational Test Performance 12/06/17 (17-028)
 
7100 Operations (License & TS Requirements)
 
71002  License Renewal Inspection 11/23/11 (11-038) 71003  Post-Approval Site Inspection for License Renewal  07/08/16 (16-015) 71004  Power Uprate 05/15/17 (17-010) 71007  Reactor Vessel Head Replacement Inspection 10/03/17 (17-020) 71013 Site Inspections at Plants with Timely Renewal Applications  09/25/13 (13-023)  71111  Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity 10/28/11 (11-025) 71111.01 Adverse Weather Protection 11/28/17 (17-027)  71111.04 Equipment Alignment 09/24/14 (14-022)  71111.05AQ Fire Protection (Annual / Quarterly) 09/30/10 (10-020)  71111.05T Fire Protection (Triennial) 01/31/13 (13-004) 71111.05XT Fire Protection - NFPA 805 (Triennial) 01/31/13 (13-004) 71111.06 Flood Protection Measures 11/25/15 (15-027) 71111.07 Heat Sink Performance 12/08/16 (16-032)  71111.08 In-service Inspection Activities 12/21/16 (16-035)  71111.11 Licensed Operator Requalification Program 09/24/14 (14-022) 71111.12 Maintenance Effectiveness 02/03/16 (16-005)  71111.13 Maintenance Risk Assessments and Emergent Work Control 12/20/17 (17-030) 71111.15 Operability Determinations and Functionality Assessments    12/21/16 (16-035)  71111.17T Evaluations of Changes, Tests, and Experiments 12/08/16 (16-032)
Issue Date:  01/05/18 27 TABLE OF CONTENTS  71111.18 Plant Modifications 11/17/16 (16-031)  71111.19 Post Maintenance Testing 09/24/14 (14-022) 71111.20 Refueling and Other Outage Activities 11/28/17 (17-027) 71111.21M Component Design Bases Inspection (Teams) 12/08/16 (16-032) 71111.21N Component Design Bases Inspection (Programs) 12/08/16 (16-032)  71111.22 Surveillance Testing 06/15/15 (15-011) 71113 Reserved for Review of License Renewal Commitments for Plants in Timely Renewal    71114  Reactor Safety-Emergency Preparedness 05/29/12 (12-008)  71114.01 Exercise Evaluation 07/21/16 (16-017)  71114.02 Alert and Notification System Evaluation 07/21/16 (16-017) 71114.03 Emergency Response Organization Staffing and Augmentation System 07/21/16 (16-017) 71114.04 Emergency Action Level and Emergency Plan Changes    07/21/16 (16-017)  71114.05 Maintenance of Emergency Preparedness 07/21/16 (16-017))
71114.06 Drill Evaluation 07/21/16 (16-017) 71114.07 Exercise Evaluation-Hostile Action (HA) Event 07/21/16 (16-017) 71114.08 Exercise Evaluation-Scenario Review 07/21/16 (16-017)  71124  Radiation Safety - Public and Occupational 12/21/17 (17-031)  71124.01  Radiological Hazard Assessment and Exposure Controls 12/21/17 (17-031) 71124.02  Occupational ALARA Planning and Controls 12/21/17 (17-031) 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 12/21/17 (17-031) 71124.04  Occupational Dose Assessment 12/21/17 (17-031)  71124.05  Radiation Monitoring Instrumentation 04/01/16 (17-031)  71124.06  Radioactive Gaseous and Liquid Effluent Treatment 12/21/17 (17-031) 71124.07  Public Radiation Safety 12/21/17 (17-031) 71124.08  Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 12/21/17 (17-031)  71130  Security 04/20/15 (15-006)  71130.01 Access Authorization 09/30/16 (16-024) 71130.02 Access Control 09/30/16 (16-024) 71130.03 Contingency Response - Force-On-Force Testing 12/22/16 (16-035) 71130.04 Equipment Performance, Testing and Maintenance 09/30/16 (16-024) 71130.05 Protective Strategy Evaluation 09/30/16 (16-024)  71130.06 Protection of Safeguards Information 09/30/16 (16-024)  71130.07 Security Training 09/30/16 (16-024) 71130.08 Fitness for Duty Program 09/30/16 (16-024) 71130.10P Cyber Security 05/15/17 (17-010) 71130.11 Material Control & Accounting (MC&A) 12/10/08 (08-035)  71130.12 Reserved for Physical Protection of Shipments of Irradiated Fuel  71130.13 Reserved for Security Inspections Conducted by Resident Inspectors 71130.14 Review of Power Reactor Target Sets 09/12/17 (17-018) 71150  Discrepant or Unreported Performance Indicator Data 01/04/07 (07-001) 71151  Performance Indicator Verification 05/03/17 (17-009) 71152  Problem Identification and Resolution 02/26/15 (15-003)  71153  Follow-up of Events and Notices of Enforcement Discretion    12/17/15 (15-030)
Issue Date:  01/05/18 28 TABLE OF CONTENTS  71302  Preoperational Test Program Implementation Verification 10/01/83 (reactivated 08-032)  71303  Part 52, Technical Specifications Review 10/20/08 (08-029)  71714  Cold Weather Preparations 09/17/01 (01-017)  71715  Sustained Control Room and Plant Observation 04/14/92 (92-004) 71801  Decommissioning Performance and Status Review at Permanently Shutdown Reactors 08/11/97 (97-012) 71841  Human Performance 12/12/00 (00-027)
 
7200 Startup Testing
 
72303  Startup Testing for ABWR: Test Procedure Review, Test Witnessing, and Test Results Evaluation 09/05/06 (06-021)  72304  Startup Testing for AP 1000: Test Procedure Review, Test Witnessing, and Test Results Evaluation 09/05/06 (06-021)  72401  Part 52, Inspection of Startup Test Program 06/24/14 (14-014) 72501  Reserved for Part 52 Initial Fuel Load Procedure Review 72525  Reserved for Part 52 Initial Fuel Load Witnessing 
 
7300 In-service Inspection 73052  In-service Inspection - Review of Procedures 01/14/86 (86-03) 73053  Pre-service Inspection - Observation of Work and Work Activities 01/01/79 (reactivated 07-034)    73054  Part 52, Pre-service and In-service Inspection - Review of Program 05/03/17 (17-009)  73055  Pre-service Inspection Data Review and Evaluation 01/01/79 (reactivated 07-034)  73753  In-service Inspection 06/24/98 (98-010)  73754  Part 52 - Preservice Inspection - Non-Destructive Examination 12/12/13 (13-028) 73755  In-service Inspection - Data Review and Evaluation 10/27/10 (10-022) 73756  In-service Testing of Pumps and Valves 07/27/95 (95-009) 73757  Part 52 In-service Inspection - Data Review and Evaluation    02/07/14 (14-005)  73758  Part 52, Functional Design and Qualification, and Preservice and Inservice Testing Programs for Pumps, Valves and Dynamic Restraints    04/19/13 (13-011)
 
7400 Reserved
 
7500 Reserved 7600 Reserved
 
Issue Date:  01/05/18 29 TABLE OF CONTENTS 7700 Reserved 7800 High Level Waste 78010  10 CFR Part 21 Program 09/11/08 (08-026)
 
7900 Water Chemistry 79501  LWR Water Chemistry Control and Chemical Analysis - Audits 02/24/89 (reactivated 08-032)  79502  Plant Systems Affecting Plant Water Chemistry 12/31/91 (reactivated 08-032) 79503  Reserved for Part 52 LWR Water Chem. Control & Chem. Analysis (Pre-Op and Supp)  79504  Reserved for Part 52 Plant systems Affecting Plant Water Chem. 79702  Control and monitoring of Radiological Source Term 04/17/00 (00-006)
 
8000 Environmental Protection 80211  Reserved for Part 52 Environmental Protection - Initial & Periodic Inspection  80521  Radiological Environmental Monitoring (Preoperational and Supplemental) 01/01/84 (reactivated 08-032)  80522  Part 52, Radiological Environmental Monitoring Program (REMP) 07/01/08 (08-019)  80600  Reserved for Independent Assessment of Site Radiological Conditions 80721  Radiological Environmental Monitoring 09/17/01(01-017) 
 
8100 Physical Security 81000 Security 08/27/13 (13-018) 81000.01 Access Authorization 09/07/12 (12-020) 81000.02 Access Control 09/07/12 (12-020) 81000.03 Performance Evaluation Program 09/07/12 (12-020) 81000.04 Equipment Performance, Testing and Maintenance 09/07/12 (12-020) 81000.05 Protective Strategy Evaluation 01/03/13 (13-001) 81000.07 Security Training 09/07/12 (12-020) 81000.08 Fitness for Duty Operational Program 09/07/12 (12-020) 81000.09 Cyber Security Inspection for Construction 09/30/16 (16-025) 81000.10 Security Organization, Management Effectiveness, Program Reviews and Audits 09/07/12 (12-020) 81000.11 Material Control and Accounting 09/07/12 (12-020) 81000.14 Review of New Reactor Target Sets 12/19/13 (13-029)  81018  Physical Security Plan and Implementing Procedures    05/24/07 (07-17)  81019  Reserved for Part 52 Security Plan & Implementing Procedures  81020 Management Effectiveness - Security Program 06/13/07 (07-019) 81021  Reserved for Part 52 Management Effectiveness Issue Date:  01/05/18 30 TABLE OF CONTENTS  81023  Reserved for Part 52 Security Organization  81022  Security Organization 06/13/07 (07-019) 81034  Security Program Audit 09/10/07 (07-027) 81035  Reserved for Part 52 Security Audit Program 81038  Records and Reports 09/10/07 (07-027) 81039  Reserved for Part 52 Records & Reports 81042  Testing and Maintenance 04/12/07 (07-013)  81043  Reserved for Part 52 Testing & Maintenance  81046  Locks, Keys, and Combinations 09/10/07 (07-027) 81047  Reserved for Part 52 Locks, Keys & Combinations 81052  Physical Barriers - Protected Areas 09/10/07 (07-027) 81053  Reserved for Part 52 Physical Barriers - Protected Areas  81054  Physical Barriers - Vital Areas, Material Access Areas, and  Controlled Access Areas 09/10/07 (07-027) 81055  Reserved for Part 52 Physical Barriers - Vital Areas, Material Access Areas & Controlled Access Areas 81058  Security System Power Supply 09/10/07 (07-027) 81059  Reserved for Part 52 Security System Power Supply 81062  Lighting 09/10/07 (07-027)  81063  Reserved for Part 52 Lighting 81064  Compensatory Measures 09/10/07 (07-027) 81065  Reserved for Part 52 Compensatory Measures 81066  Assessment Aids 09/10/07 (07-027) 81067  Reserved for Part 52 Assessment Aides 81070  Access Control - Personnel 12/22/08 (08-037) 81071  Reserved for Part 52 Access Control - Personnel 81072  Access Control (Power Reactor) - Packages 05/09/84 (84-15)  81073  Access Control (Fuel Facility) - Packages, Material, and    Strategic Special Nuclear Material (SSNM) 08/05/09 (09-019)  81074  Access Control - Vehicles 12/22/08 (08-037)  81075  Reserved for Part 52 Access Control - (Power Reactors) - Packages  81076  Reserved for Part 52 Access Control - Vehicles 81078  Detection Aids - Protected Areas 11/23/09 (09-028) 81079  Reserved for Part 52 Detection Aids - Protected Areas 81080  Detection Aids - MAA and CAA 12/22/08 (08-037) 81081  Reserved for Part 52 Detection Aids - VA, MAA, & CAA 81084  Alarm Stations 09/10/07 (07-027) 81085  Reserved for Part 52 Alarm Stations 81088  Communications 09/10/07 (07-027) 81089  Reserved for Part 52 Communications  81120  Inspection Requirements and Guidance for Additional Security Measures for the Physical Protection in Transit for Radioactive Material Quantities of Concern 04/01/10 (10-010)    (Note this IP contains safeguards material) 81200  Security 08/27/14 (14-019) 81200.01 Access Authorization for Decommissioning Nuclear Power Reactors 10/21/14 (14-025)  81200.02 Access Control for Decommissioning Nuclear Power Reactors    08/27/14 (14-019) 81200.03 Reserved for Decommissioning Force-on-Force Testing Issue Date:  01/05/18 31 TABLE OF CONTENTS 81200.04 Equipment Performance, Testing, and Maintenance for Decommissioning  Nuclear Power Reactors 08/27/14 (14-019)  81200.05 Protective Strategy Evaluation and Performance Evaluation Program for Decommissioning Nuclear Power Reactors 10/21/14 (14-025)  81200.06 Protection of Safeguards Information for Decommissioning Nuclear Power Reactors 08/27/14 (14-019)  81200.07 Security Training for Decommissioning Nuclear Power Reactor 10/21/14 (14-025) 81200.08 Reserved for Decommissioning Fitness for Duty Program  81200.10 Reserved for Decommissioning Cyber Security  81200.11 Reserved for Decommissioning Material Control and Accounting 81200.14 Review of Decommissioning Target Sets 01/15/14 (14-001) 81310  Physical Protection of Shipments of Irradiated Fuel    12/22/08 (08-037) 81311  Physical Security Requirements for Independent Spent Fuel Storage Installations 08/25/17 (17-016) 81335  Physical Protection of Shipments of Special Nuclear Material of Moderate Strategic Significance (SNM-MSS) 12/02/09 (09-029)  81340  Physical Protection of Shipments of Special Nuclear Material of Low Strategic Significance (SNM-LSS) 11/23/09 (09-028)  81360  General Requirements for Physical Protection of Formula  Quantities of Special Nuclear Material in Transit 12/02/09 (09-029)  81365  Records, Reports, and Planning for Physical Protection of Formula Quantities of Special Nuclear Material in Transit 11/23/09 (09-028) 81370  Specific Requirements for Physical Protection of  Formula Quantities of Special Nuclear Materials in  Transit 12/22/08 (08-037)  81402  Reports of Safeguards Events 11/23/09 (09-028) 81411  Physical Protection for Reactors with Formula Quantities of Special Nuclear Material 11/04/85 (85-34)  81421  Fixed Site Physical Protection of Special Nuclear Material of Moderate Strategic Significance 11/23/09 (09-028)  81431  Fixed Site Physical Protection of Special Nuclear  Material of Low Strategic Significance 10/24/12 (12-025) 81501  Personnel Training and Qualification - General Requirements    12/02/09 (09-029)  81502  Fitness for Duty Program 12/22/08 (08-037)  81503  Reserved for Part 52 Personnel Training and Qualification - Gen. Requirements  81504  Fitness for Duty Program for Construction 10/15/09 (09-024)
 
81601  Safeguards Contingency Plan - Implementation Review    12/22/08 (08-037) 81602  Reserved for Part 52 Safeguards Contingency Plan - Implementation Review  81700  RESERVED for Materials Security 81700.01 Category I Fuel Cycle Facility Strategic Special Nuclear Material Security    Controls 05/15/17 (17-010)  81700.02 Category I Fuel Cycle Facility Access Control Measures 05/15/17 (17-010)
Issue Date:  01/05/18 32 TABLE OF CONTENTS  81700.04 Category I Fuel Cycle Facility Security Equipment Performance, Testing    and Maintenance 05/15/17 (17-010) 81700.05 Category I Fuel Cycle Facility Physical Protection Program and Protective    Strategy 05/15/17 (17-010)  81700.06 Licensee Conducted Force-on-Force Exercises at Category I Fuel Cycle Facilities 10/27/17 (17-023) 81700.07 Category I Fuel Cycle Facility Security Training 05/15/17 (17-010) 81700.08 Category I Fuel Cycle Facility Fitness-for-Duty Programs 05/15/17 (17-010)  81700.09 Security Measures for Licensed Facilities 10/26/15 (15-021) 81700.10 Protection of Safeguards Information at Category I Fuel Cycle Facilities 05/15/17 (17-010) 81700.11 Annual Observation of Licensee Conducted Force-on-Force Exercises at Category I Fuel Cycle Facilities 10/27/17 (17-023) 81810  Protection of Safeguards Information 09/10/07 (07-027) 81811  Protection of Safeguards Information By Design Certification Applicants and Vendors 09/06/16 (16-022) 81815  Authorization for Access to National Security Information    (NSI) and Restricted Data (RD) 06/27/14 (14-014)  81820  Physical Protection Facility Approval and Safeguarding  of National Security Information (NSI) and Restricted Data (RD) 06/27/14 (14-014)
 
8200 Emergency Planning
 
82001  Evaluation of Emergency Preparedness 05/22/00 (00-010) 82002  Part 52, Emergency Preparedness Program 14/28/14 (14-026) 82002.01 Facilities and Equipment 11/08/11 (11-030) 82002.02 Procedure Quality 11/08/11 (11-030)  82002.03 Review of Exercise Objectives and Exercise Scenario for Power Reactors    11/08/11 (11-030) 82002.04 Emergency Preparedness Exercises 11/08/11 (11-030) 82002.05 Emergency Response Organization On-Shift Staffing and Augmentation Drills 11/08/11 (11-030) 82002.06 Emergency Response Organization, Dose Assessment Drills 11/08/11 (11-030)  82002.07 Operational Status of the Emergency Preparedness Program 11/08/11 (11-030) 82002.08 RESERVED for Inspection Of Site Specific Implementation Of 10 Cfr 50.54(HH)(2) Phase 1, 2, And 3 Mitigating Strategies For Nuclear Power Plants Referencing The Ap1000 Certified Design  82201  Emergency Detection and Classification 03/23/05 (05-008)  82202  Protective Action Decision Making 03/23/05 (05-008) 82301  Evaluation of Exercises for Power Plants 04/24/13 (13-012) 82302  Review of Exercise Objectives and Scenarios for Power Reactors 04/24/13 (13-012) 82401 Decommissioning Emergency Preparedness Scenario Review and Exercise Evaluation 09/04/14 (14-020) 82501 Decommissioning Emergency Preparedness Program Evaluation  09/04/14 (14-020)
Issue Date:  01/05/18 33 TABLE OF CONTENTS 82701  Operational Status of the Emergency Preparedness Program    04/24/13 (13-012) 8300 Radiation Protection
 
83100  Occupational Exposure During SAFSTOR and DECON 12/30/91 (91-022) 83311  Reserved for Part 52, Radiation Protection During Construction 83501  Significant Uncontrolled Radiation Exposures 04/17/00 (00-006) 83502.01 Radioactive Gaseous and Liquid Treatment and Monitoring    Systems 04/17/00 (00-006)  83502.02 Radioactive Material Process and Transportation 04/17/00 (00-006) 83502.03 Radiological Environmental Monitoring Program and Radioactive Material Control Program 04/17/00 (00-006) 83522  Radiation Protection, Plant Chemistry, Radwaste, and Environmental:    Organization and Management Controls 12/31/91 (reactivated 08-032)  83523  Radiation Protection, Plant Chemistry, Radwaste, Transportation and Environmental:  Training and Qualifications 01/01/84 (reactivated 08-032)  83524  External Occupational Exposure Control and Personal Dosimetry (Preoperational and Supplemental) 01/01/84 (reactivated 08-032)  83525  Internal Exposure Control and Assessment (Preoperational and Supplemental) 01/01/84 (reactivated 08-032)  83526  Control of Radioactive Materials and Contamination, Surveys, and Monitoring (Preoperational and Supplemental) 01/01/84  (reactivated
 
08-032)  83527  Facilities and Equipment (Preoperational and Supplemental) 01/01/84 (reactivated 08-032)  83529  Reserved for Part 52 Radiation Protection - Startup 83531 Part 52 Life Cycle Minimization of Contamination and Groundwater Protection Program 12/21/16 (16-035)  83532  Reserved for Part 52 Radiation Protection, Plant Chemistry, and Radwaste Training  83533  Part 52 External Occupational Exposure Control and Personal Dosimetry 10/27/10 (10-022)  83534  Part 52, Internal Exposure Control and Assessment 10/27/10 (10-022) 83535  Part 52, Control of Radioactive Materials and Contamination, Surveys, and Monitoring 10/27/10 (10-022)  83536  Part 52 Facilities and Equipment 10/27/10 (10-022)  83537  Part 52 Maintaining Occupational Exposures ALARA 10/27/10 (10-022) 83722  Radiation Protection, Plant Chemistry, and Radwaste:  Organization and Management Controls (Minimum/Basic) 09/17/01 (01-017)  83723  General Employee, Radiation Safety, Plant Chemistry,    Radwaste, and Transportation Training 12/16/03 (03-041) 83724  External Occupational Exposure Control and Personal Dosimetry 04/17/00 (00-006)  83725  Internal Exposure Control and Assessment 04/17/00 (00-006) 83726  Control of Radioactive Materials and Contamination, Surveys and Monitoring 11/13/14 (14-027)  83727  Facilities and Equipment (Basic) 09/17/01 (01-017)  83728  Maintaining Occupational Exposures ALARA 04/17/00 (00-006) 83729  Occupational Exposure during Extended Outages 12/31/91 (91-021) 83746  Offsite Dose Calculation Manual (ODCM) 07/29/08 (08-021)
Issue Date:  01/05/18 34 TABLE OF CONTENTS  83750  Occupational Radiation Exposure 06/06/02 (02-023)
 
83801  Inspection of Remedial and Final Surveys at Permanently    Shutdown Reactors 07/26/16 (16-018)  83822  Radiation Protection 09/07/00 (00-016) 83890  Closeout Inspection and Survey 05/01/03 (03-013)
 
8400 Radioactive Waste Management
 
84100  Special Nuclear Material Inspections At Near Surface Low-Level Waste Disposal Facilities In Agreement States 11/27/01 (01-028) 84101  Radioactive Waste Management 12/30/91 (91-022)  84522  Solid Wastes (Preoperational and Supplemental)    01/01/84 (reactivated 08-032)  84523  Liquids and Liquid Wastes (Preoperational and Supplemental) 01/01/84 (reactivated 08-032) 84524  Gaseous Waste System (Preoperational and Supplemental) 01/01/84 (reactivated 08-032)  84525  Quality Assurance and Confirmatory Measurements for In-Plant Radiochemical Analysis (Preoperational and Supplemental)    5/23/85 (reactivated 08-032) 84526  Reserved for Part 52 Radwaste - Startup 84527  Part 52, Solid Waste Management System 07/01/08 (08-019) 84528 Part 52 Liquid Waste Management Program 10/19/16 (16-027) 84529 Part 52, Gaseous Waste Management Program 10/19/16 (16-027) 84750  Radioactive Waste Treatment, and Effluent and Environmental    Monitoring 03/15/94 (94-006) 84850 Radioactive Waste Management - Inspection of Waste Generator Requirements of 10 CFR 20 and 10 CFR 61 12/22/08 (08-037)  84900  Low-Level Radioactive Waste Storage 12/22/08 (08-037)    (Preoperational and Supplemental)
 
8500 Material Control and Accountability 85102 Material Control and Accounting - Reactors 03/29/85 (85-10) 85103  RESERVED for Material Control and Accounting - Decommissioning Power Reactors 85200  MC&A for Licensees Possessing Less Than or Equal to One Effective Kilogram of SNM 04/10/85 (85-15)  85203  Management Structure and Controls 08/10/16 (16-020)  85205  Facility Operations and Internal Controls 08/10/16 (16-020) 85207 Measurement Systems 01/17/86 (86-04) 85209  Measurement Control and Statistics 04/10/85 (85-15)  85211  Physical Inventory 01/17/86 (86-04) 85303  Material Control and Accounting Management Structure and Personnel Training and Qualification 08/10/16 (16-020)  85305  Item Monitoring 11/15/16 (16-030) 85307  Process Monitoring 11/15/16 (16-030) 85309  Measurement Systems and Control 10/20/10 (10-021)
Issue Date:  01/05/18 35 TABLE OF CONTENTS  85311  Physical Inventory Program 11/15/10 (10-023)  85313  Alarm Resolution Program 11/15/16 (16-030) 85315  Internal Control 12/21/2010 (10-027)  85401  Management Structure 11/15/16 (16-030)  85402  Measurement Program 10/20/10 (10-021) 85403  Measurement Control Program 10/20/10 (10-021) 85404  Physical Inventory Program for Low Enriched Uranium Fuel Facilities 11/15/10 (10-023)  85405  Item Control 09/09/10 (10-019)  85406  Resolution Program for Low Enriched Uranium Fuel Facilities    11/15/10 (10-023) 85407  Assessment Program 11/29/10 (10-024) 85408 Recordkeeping 11/29/10 (10-024) 85420  Inspection of IAEA Safeguards for Inspectors at Power  Reactors 06/22/88 (88-07)  85501  Physical Inventory Program for Uranium Enrichment Facilities 11/15/10 (10-023) 85502  Detection Program for Uranium Enrichment Facilities 12/21/10 (10-027) 85503  Resolution Program for Uranium Enrichment Facilities    11/15/10 (10-023)
 
8600 Spent Fuel and Other Radioactive Material Packaging and Shipping
 
86001  Design, Fabrication, Testing, and Maintenance of    Transportation Packagings 01/16/08 (08-003)  86730  Transportation of Radioactive Materials (49 CFR Parts 100-179 and 10 CFR Part 71) 04/17/00 (00-006) 86740  Inspection of Transportation Activities 10/30/08 (08-030) 86750  Solid Radioactive Waste Management and Transportation  of Radioactive Materials 03/15/94 (94-006)
 
8700 Materials Safety Inspection
 
87102  Maintaining Effluents from Materials Facilities As Low As Is Reasonably Achievable (ALRA) 04/04/00 (00-005)  87103  Inspection of Material Licensees Involved in an Incident or Bankruptcy Filing 11/03/00 (00-023) 87104  Decommissioning Inspection Procedure for Materials Licensees 07/29/02 (02-029)  87121  Industrial Radiography Programs 12/17/14 (14-030)  87122  Irradiator Programs 12/31/02 (02-047)
 
87123  Well Logging Programs 11/25/03 (03-037) 87124  Fixed and Portable Gauge Programs 11/25/03 (03-037) 87125  Materials Processor/Manufacturer Programs 09/28/05 (05-027)  87126  Industrial/Academic/Research Programs 09/28/05 (05-027)  87127  Radiopharmacy Programs 07/01/08 (08-018) 87128  Manufacturing and Distribution of Exempt Products 01/27/17 (17-002) 87129  Master Materials Program 09/15/03 (03-034)
Issue Date:  01/05/18 36 TABLE OF CONTENTS  87130  Nuclear Medicine Programs, Written Directive Not Required    10/24/02 (02-041) 87131  Nuclear Medicine Programs, Written Directive Required    08/24/11 (11-014)  87132  Brachytherapy Programs 02/26/15 (15-003) 87133  Medical Gamma Sterotactic Radiosurgery and Teletherapy Programs 08/24/11 (11-014) 87134  Medical Broad-Scope Programs 08/24/11 (11-014) 87135  Panoramic and Underwater Irradiator Security Program 10/30/08 (08-030) 87136 Manufacturing and Distribution (M&D) Security Program 10/30/08 (08-030)  87137  10 CFR Part 37 Materials Security Programs 04/03/14 (14-009) 87138  RESERVED for 10 CFR Part 37, "Physical Protection Of Category 1 And    Category 2 Quantities Of Radioactive Material At Facilities With A 10 CFR    Part 73 Physical Protection Program  87250  Locating Missing Materials Licensees 10/29/01 (01-022) 87654  Uranium Mill, In-Situ Uranium Recovery, and 11e.(2) Byproduct Material Site Decommissioning Inspection 03/19/02 (02-010)
 
8800 Fuel Facility Inspection
 
88001  On-Site Construction 04/15/94 (94-011) 88003  Reactive Inspection for Events at Fuel Cycle Facilities 03/16/15 (15-004)  88004  Reserved for Adverse Weather Protection 88005  Management Organization and Controls 09/05/06 (06-020)  88010  Training 02/07/14 (14-005) 88015  Nuclear Criticality Safety 08/11/15 (15-0215) 88020  Operational Safety 01/23/14 (14-003)  88025  Maintenance and Surveillance Testing 01/23/14 (14-003)  88030  Radiation Protection 03/06/14 (14-007) 88035  Radioactive Waste Management 02/07/14 (14-005) 88045  Effluent Control and Environmental Protection 02/07/14 (14-005) 88050  Emergency Preparedness 03/06/14 (14-007) 88051  Evaluation of Exercises and Drills 03/06/14 (14-007)  88054  Fire Protection (Triennial) 03/06/14 (14-007)  88055  Fire Protection (Annual) 01/23/14 (14-003) 88070  Plant Modification 09/20/16 (16-023) 88071  Configuration Management Program 03/06/14 (14-007) 88075  Event Follow-up 03/16/15 (15-004)  88100  Plant Operations 12/30/96 (96-026)  88101  Configuration Control 12/30/96 (96-026) 88102  Surveillance Observations 12/30/96 (96-026) 88103  Maintenance Observations 12/30/96 (96-026) 88104  Decommissioning Inspection Procedure for Fuel Cycle Facilities 07/03/02 (02-026)  88106  Quality Assurance:  Program Development and Implementation    (Pre-licensing and Construction) 02/07/07 (07-006) 88107  Quality Assurance: Design and Documentation Control (Pre-licensing and Construction) 05/18/05 (05-013)
Issue Date:  01/05/18 37 TABLE OF CONTENTS  88108  Quality Assurance:  Control of Materials, Equipment, and Services    (Pre-licensing and Construction) 02/07/07 (07-006) 88109  Quality Assurance:  Inspection, Test Control, and Control of Measuring and Test Equipment (Pre-licensing and Construction) 06/20/07 (07-020)  88110  Quality Assurance:  Problem Identification, Resolution and Corrective Action 05/18/05 (05-013)  88111  10 CFR, Part 21, Inspection-Facility Construction 02/07/07 (07-006) 88112  Reserved for Software Validation 88113  Control of the Electronic Management of Data 02/07/07 (07-006)  88114  Quality Affecting Item Procurement (10 CFR Part 21) and Commercial Grade Item Dedication Process [Reactive]  10/25/06 (06-030)  88115  Supplier/Vendor Inspection (Construction Phase) 10/25/06 (06-030) 88117  Facility Changes (License Application) and Change Process (10 CFR 70.72) (Pre-Licensing and Construction) 09/20/16 (16-023)  88120  Reserved Draft Construction and Operational Readiness Inspections for the Internal Isotopes Uranium Deconversion Facility  88121  Reserved Draft Operational Readiness Reviews for Uranium Deconversion Facilities  88130  Resident Inspection Program for On-Site Construction Activities at the Mixed Oxide Fuel Fabrication Facility 03/02/16 (16-009)  88131  Geotechnical/Foundation Activities 10/25/06 (06-030) 88132  Structural Concrete Activities 10/25/06 (06-030) 88133  Structural Steel and Supports Activities 7/25/07 (07-023) 88134  Quality Assurance:  Piping Relied on for Safety 05/18/05 (05-013) 88135  Resident Inspection Program for Category I Fuel Cycle Facilities    02/07/14 (14-005)  88135.02 Resident Inspection Program Plant Status Activities 05/21/15 (15-010) 88135.04 ISA Implementation 01/31/14 (14-004) 88135.05 Fire Protection 01/31/14 (14-004) 88135.17 Permanent Plant Modifications 01/31/14 (14-004)  88135.19 Post Maintenance Testing 01/31/14 (14-004)  88135.22 Surveillance Testing 01/31/14 (14-004) 88136  Mechanical Components 7/25/07 (07-023) 88137  Electric Cable 04/01/10 (10-010) 88138  Electrical Components and Systems 08/08/07 (07-024) 88139  Ventilation and Confinement Systems 08/08/07 (07-024)  88140  Instrumentation and Controls Systems 04/01/10 (10-010)  88141  Fire Prevention and Protection 08/08/07 (07-024) 88142 Underground Fire Water Loop and Equipment Installation 08/08/07 (07-024)  88143  Pipe Supports and Restraints 7/25/07 (07-023)  88150  Reserved for Training and Qualification of Plant Personnel 88151 Reserved for Facility Changes and Change Process (10 CFR70.72)  88152  Reserved for Physical Protection Equipment and Barriers 88153  Reserved for Material Control and Accounting 88154 Reserved for Fire Safety and Protection Systems 88155 Reserved for Functional Verifications of IROFS 88156  Reserved for Integrated Safety Analysis Implementation 88157  Reserved for Waste Management Equipment and Systems 88158 Reserved for Environmental Protection - Initial and Periodic Inspections 88159  Reserved for Process Enclosures and Vessels Issue Date:  01/05/18 38 TABLE OF CONTENTS 88160  Reserved for Utilities and Bulk Chemicals
 
88161 Corrective Action Program (CAP) Implementation at Fuel Cycle Facilities  07/28/14 (14-017)
 
8900 Fuel Facility and Materials Special Program 89001 In-Situ Leach (ISL) Facilities 09/02/97 (97-013)
 
9000 Reportable Matters and Report Reviews
 
90001  Construction Regulatory Response Column Inspections 10/27/10    (10-022) 90002 Construction Degraded Performance Column Inspections 10/28/14 (14-026) 90003 Construction Multiple/Repetitive Degraded Cornerstone Column Inspection 10/28/14 (14-026) 90502 Reserved for Part 52 Reportable Matters - Test Program 90700 Feedback of Operational Experience Information at Operating Power Reactors 03/23/05 (05-008) 90712 In-office Review of Written Reports of Non-routine Events at Power Reactor Facilities 12/31/98 (98-020) 90713 In Office Review of Periodic and Special Reports 09/17/01 (01-017) 90714 Non-routine Reporting Program 09/17/01 (01-017)
 
9100 Title 10 Requirements 9200 Planned Non-Routine Activities
 
92050  Review of Quality Assurance for Extended Construction Delay 04/04/00 (00-005) 92700  Onsite Follow-up of Written Reports of Non-routine Events  at Power Reactor Facilities 12/31/98 (98-020)  92701  Follow-up 03/13/07 (07-010) 92702  Follow-up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, and Alternative Dispute Resolution Confirmatory Orders 01/10/08 (08-001)  92703  Follow-up of Confirmatory Action Letters 05/13/09 (09-012)  92709  Licensee Strike Contingency Plans 03/14/14 (14-008)
 
92711  Continued Implementation of Strike Plans During an Extended    Strike 03/14/14 (14-008) 92712  Resumption of Normal Operations After a Strike 03/14/14 (14-008) 92714  Reserved for Part 52 Follow-up 92717  IE Bulletins for Information and IE Information Notice Followup 09/25/85 (reactivated 10-020) 92720  Corrective Action 09/28/98 (reactivated 07-034)
Issue Date:  01/05/18 39 TABLE OF CONTENTS  92721  Reserved for Part 52 Follow-up on Corrective Actions for Violations and Deviations  92722  Follow up Inspection for Any Severity Level I or II Traditional Enforcement Violation or for Two or More Severity Level III Traditional Enforcement Violations in a 12-Month Period 08/11/09 (09-020)  92723  Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area is a 12-Month Period    08/11/09 (09-020) 92901  Follow-up - Plant Operations 09/17/01 (01-017)  92902  Follow-up - Maintenance 09/17/01 (01-017)  92903  Follow-up - Engineering 09/17/01 (01-017) 92904  Follow-up - Plant Support 09/17/01 (01-017)
 
9300 Non-Routine Activities 93002  Managing Fatigue 11/09/09 (09-026) 93100  Safety-Conscious Work Environment Issue of Concern Follow-up 04/09/15 (15-005)  93702  Prompt Onsite Response to Events at Operating Power  Reactors 09/17/01 (01-017) 93800 Augmented Inspection Team 11/15/17 (17-025) 93801 Safety System Functional Inspection (SSFI) 07/25/96 (96-016)  93802  Operational Safety Team Inspection (OSTI)  11/27/89 (89-015) 93803  Safety Systems Outage Modifications Inspection 04/27/89 (89-008)  93804  Risk-Based Operational Safety and Performance Inspection    01/15/92 (92-001) 93805  Maintenance Program 08/06/93 (93-070) 93806  Operational Readiness Assessment Team Inspections 09/29/98 (98-015) 93807  Systems Based Instrumentation and Control Inspection 01/29/93 (93-001)  93810  Service Water System Operational Performance Inspection    (SWSOPI)  09/14/98 (98-013) 93811  Electrical Distribution System Functional Inspection (EDSFI)    02/03/99 (99-002) 93812 Special Inspection 11/15/17 (17-025)  93813  Reserved for Part 52 Operational Readiness Assessment Team Inspection  93814  Independent Design Verification Program 11/15/10 (10-023) 93815  Part 52, Operational Programs Implementation Inspection 12/23/11 (11-043)
 
9400 Technical Activities of an Administrative Nature
 
94300  Status of Plant Readiness for an Operating Licensee 02/14/86    (Reactivated 07-034)  94301  Reserved for Part 52 Status of 10 CFR 52 Plant Readiness for Fuel Load
 
Issue Date:  01/05/18 40 TABLE OF CONTENTS
 
9500 Strategic Determination Actions 
 
95001  Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area 08/24/16 (16-021)  95002  Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area 02/09/11 (11-001)  95003  Supplemental Inspection for Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple Yellow Inputs or    One Red Input 12/18/15 (15-031) 95003.01 Emergency Preparedness 01/15/09 (09-002) 95003.02 Guidance for Conducting an Independent NRC Safety Culture Assessment) 04/03/14 (14-009)
 
9600 Materials Safety and Security
 
96001  NRC Force-on-Force Inspections at Category 1 Fuel Cycle Facilities 12/22/14 (12-031)
 
9700 Reserved
 
9800 Reserved
 
9900 Guidance 2
9900  Technical Guidance 05/12/86 (86-26) 
 
PART  GUIDANCE Technical Guidance
 
ASME Section III  American Society of Mechanical Engineers ASME Boiler and Pressure Vessel Code, Section III 06/16/89 (89-011)
 
ASME Section III American Society of Mechanical Engineers ASME Boiler and & XI Pressure Vessel Code, Section III & XI 11/12/96 (96-022)
 
ASME Section XI American Society of Mechanical Engineers ASME Boiler and    Pressure Vessel Code, Section XI 12/08/86 (86-54)
 
2 [XXXX.XX] attached to each document in Part 9900, is the file name for that document.
Issue Date:  01/05/18 41 TABLE OF CONTENTS ASME Section XI American Society of Mechanical Engineers ASME, Section XI    05/12/86 (86-26)
 
STS Sec 1.0  Operability 05/12/86 (86-26)
 
STS Sec 1.0  Definitions 12/08/86 (86-54)
 
STS Sec 3.0  Acceptable Measurement Tolerances for Technical  Specification Limits 10/01/78 (78-35)
STS Sec 3/4.6.4  Containment and Drywell Isolation Valves 06/09/88 (88-06)
 
STS Sec 3.7.5  Ultimate Heat Sink 11/25/88 (88-17)
 
STS Sec 3/4.8.1  TDI Diesel Generator Air Roll Tests 06/09/88 (88-06)
 
STS Sec 4.2.8.X.X Surveillance Requirements - 125-Volt Battery Bank 10/01/79 (79-22)
 
STS Sec 4.5.1  Standard Technical Specifications (BWR) 05/12/86 (86-26)
 
STS Sec 4.8.1.1.2 Surveillance Testing of Diesel Generator Lockout Feature 05/12/86 (86-26)
 
STS    Surveillance Sections - Locked or Otherwise Secured    Components 10/01/77 (77-25)
 
STS Interp  Licensee Technical Specification Interpretations 02/03/97 (97-001)
 
Maintenance
 
Voluntary Entry into Limiting Conditions for Operation Action Statements to Perform Preventive Maintenance 01/17/02 (02-001)


ASME Section XI      American Society of Mechanical Engineers ASME, Section XI 05/12/86 (86-26)
STS Sec 1.0          Operability 05/12/86 (86-26)
STS Sec 1.0          Definitions 12/08/86 (86-54)
STS Sec 3.0          Acceptable Measurement Tolerances for Technical Specification Limits 10/01/78 (78-35)
STS Sec 3/4.6.4      Containment and Drywell Isolation Valves 06/09/88 (88-06)
STS Sec 3.7.5        Ultimate Heat Sink 11/25/88 (88-17)
STS Sec 3/4.8.1      TDI Diesel Generator Air Roll Tests 06/09/88 (88-06)
STS Sec 4.2.8.X.X    Surveillance Requirements - 125-Volt Battery Bank 10/01/79 (79-22)
STS Sec 4.5.1        Standard Technical Specifications (BWR) 05/12/86 (86-26)
STS Sec 4.8.1.1.2    Surveillance Testing of Diesel Generator Lockout Feature 05/12/86 (86-26)
STS                  Surveillance Sections - Locked or Otherwise Secured Components 10/01/77 (77-25)
STS Interp          Licensee Technical Specification Interpretations 02/03/97 (97-001)
Maintenance Voluntary Entry into Limiting Conditions for Operation Action Statements to Perform Preventive Maintenance 01/17/02 (02-001)
Assessing On-Line Leak Sealing of ASME Code Class 1 & 2 07/15/97 (97-011)
Assessing On-Line Leak Sealing of ASME Code Class 1 & 2 07/15/97 (97-011)
Filled Organic Coatings Used in Maintenance of Safety Related   Equipment 10/11/94 (94-018)  
Filled Organic Coatings Used in Maintenance of Safety Related Equipment 10/11/94 (94-018)
 
Preconditioning of Structures, Systems, and Components (SSCs)
Preconditioning of Structures, Systems, and Components (SSCs) Before Determining Operability 09/28/98 (98-014) [PRECOND.TG]  
Before Determining Operability 09/28/98 (98-014) [PRECOND.TG]
 
Mechanical Freeze Plugs 06/14/93 (93-005)
Mechanical  
Steam Generator Plugs and Sleeving Repairs 08/01/94 (94-014)
 
Freeze Plugs 06/14/93 (93-005)
Steam Generator Plugs and Sleeving Repairs 08/01/94 (94-014)  
 
Steam Generator Tube-to-Secondary Leakage 09/09/03 (03-033)
Steam Generator Tube-to-Secondary Leakage 09/09/03 (03-033)
Issue Date: 01/05/18 42 TABLE OF CONTENTS   [TG_Mech SGTUBELKG.wpd]
Issue Date: 01/05/18                         41                        TABLE OF CONTENTS
 
Ice Condenser System Inspections 06/06/05 (05-015)
 
Operations


Notice of Enforcement Discretion for Gaseous Diffusion Plants 05/03/99 (99-008) [NOEDGAS.TG]
[TG_Mech SGTUBELKG.wpd]
Ice Condenser System Inspections 06/06/05 (05-015)
Operations Notice of Enforcement Discretion for Gaseous Diffusion Plants 05/03/99 (99-008) [NOEDGAS.TG]
Operation - Safety and Compliance 09/11/07 (07-028)
Operation - Safety and Compliance 09/11/07 (07-028)
[TG 9900 SAFETY]  
[TG 9900 SAFETY]
 
PART 10 CFR GUIDANCE 10                   Title 10 of the Code of Federal Regulations 12/08/86 (86-54) 10 CFR71 and 49 CFR171-178       Transportation of Radioactive Material 12/01/04 (04-027) 50.55(e)             Construction Deficiency Reporting 01/31/89 (89-002) 50.55a               Codes and Standards 02/22/73 (73-9) 50.59               10 CFR 50.59, Changes, Tests, and Experiments 03/13/01 (01-008) [50_59.CFR]
PART 10 CFR GUIDANCE 10   Title 10 of the Code of Federal Regulations 12/08/86 (86-54)  
Part 50, App A       Definition of Leak-Before-Break Analysis 09/26/96 (96-020)
 
Part 50             Appendix J, Containment Integrated Leak Rate Testing 12/08/86 (86-54) 70.51               Material Balance, Inventory, and Records Requirements 12/19/74 (74-11) 70.52               Report of Accidental Criticality or Loss of Special Nuclear Material 11/15/74 (74-010)
10 CFR71 and   49 CFR171-178 Transportation of Radioactive Material 12/01/04 (04-027)  
Interpretations END Issue Date: 01/05/18                          42                        TABLE OF CONTENTS}}
 
50.55(e) Construction Deficiency Reporting 01/31/89 (89-002)  
 
50.55a   Codes and Standards 02/22/73 (73-9) 50.59   10 CFR 50.59, Changes, Tests, and Experiments 03/13/01 (01-008) [50_59.CFR]  
 
Part 50, App A Definition of Leak-Before-Break Analysis 09/26/96 (96-020)
Part 50   Appendix J, Containment Integrated Leak Rate Testing 12/08/86 (86-54) 70.51   Material Balance, Inventory, and Records Requirements   12/19/74 (74-11) 70.52   Report of Accidental Criticality or Loss of Special Nuclear Material 11/15/74 (74-010)  
 
Interpretations  
 
END}}

Revision as of 07:17, 22 October 2019

Table of Contents for Inspection Manual Change Notice 18-001
ML18004A014
Person / Time
Issue date: 01/05/2018
From: Bridget Curran
NRC/NRR/DIRS/IRGB
To:
Curran B
Shared Package
ML18004A011 List:
References
CN 18-001
Download: ML18004A014 (42)


Text

NRC INSPECTION MANUAL DIRS TABLE OF CONTENTS Table of Contents Current through Change Notice 18-001 issued 01/05/2018 PART CHAPTER 0000 NRC Inspection Manual1 0040 Preparing, Revising, and Issuing Documents for the NRC Inspection Manual 01/05/18 (18-001) 0100 Program Responsibilities 0102 Oversight and Objectivity of Inspectors and Examiners at Reactor Facilities 04/24/13 (13-012) 0111 Monitoring Activities for the DOE West Valley Demonstration Project 03/04/02 (02-006) 0200 Program Management Reports 0300 Inspection Policy 0301 Coordination of NRC Visits to Commercial Reactor Sites 08/24/01 (01-016) 0302 RESERVED Coordination of Regional Requests For NRR Staff To Conduct Inspection Activities 0305 Operating Reactor Assessment Program 11/17/16 (16-031) 0306 Planning, Tracking and Reporting of the Reactor Oversight Process 12/23/15 (15-032) 0307 Reactor Oversight Process Self-Assessment Program 11/23/15 (15-025) 0307, App A Reactor Oversight Process Self-Assessment Metrics 08/25/17 (17-016) 0307, App B ROP Realignment Process 08/25/17 (17-016) 0307, App C Reactor Oversight Process Self-Assessment Regional Peer Reviews 07/15/16 (16-016) 0308 Reactor Oversight Process (ROP) Basis Document 10/04/17 (17-021) 0308, Att 1 Technical Basis for Performance Indicators 11/08/07 (07-035) 0308, Att 2 Technical Basis for Inspection Program 01/05/18 (18-001) 0308, Att 3 Technical Basis for Significance Determination Process 06/16/16 (16-013) 1 The date and numbers in parentheses to the right of the chapter/inspection procedure title are the issue date and the change notice number under which the title was issued.

Issue Date: 01/05/18 1 TABLE OF CONTENTS

0308, Att 3, App A Technical Basis for At Power Significance Determination 06/19/12 (12-010) 0308, Att 3, App B Technical Basis for Emergency Preparedness Significance Determination Process 12/19/12 (12-029) 0308, Att 3, App C Technical Basis for Occupational Radiation Safety Significance Determination Process 07/28/05 (05-022) 0308, Att 3, App D Technical Basis for Public Radiation Safety Significance Determination Process 07/27/04 (04-020) 0308, Att 3, App E Technical Basis for the Baseline Security Significance Determination Process 07/27/12 (12-016) 0308, Att 3, App F Technical Basis for Fire Protection Significance Determination Process [IMC 0609, Appendix F] At Power Operations 02/28/05 (05-007) 0308, Att 3, App G Technical Basis for Shutdown Operations Significance Determination Process 02/28/05 (05-007) 0308, Att 3, App H Technical Basis for Containment Integrity Significance Determination Process 05/06/04 (04-010) 0308, Att 3, App I Technical Basis for Operator Requalification Human Performance Significance Determination Process 07/28/05 (05-022) 0308, Att 3, App J Technical Basis for Steam Generator Tube Integrity Findings Significance Determination Process 07/06/11 (11-011) 0308, Att 3, App K Technical Basis for Maintenance Risk Assessment and Risk Management SDP 05/19/05 (05-014) 0308 Att 3 App L Technical Basis for the B.5.b Significance Determination Process 03/28/17 (17-008) 0308 Att 3 App M Technical Basis for the Significance Determination Process (SDP)

Using Qualitative Criteria 06/11/14 (14-012) 0308 Att 3 App N RESERVED for Technical Basis for the Spent Fuel Pool Significance Determination Process 0308, Att 4 Technical Basis for Assessment 05/15/17 (17-010) 0308, Att 5 Technical Basis for Enforcement 10/16/06 (06-027) 0308, Att 6 Basis Document for the Security Cornerstone of the Reactor Oversight Process 09/08/09 (09-021) 0309 Reactive Inspection Decision Basis for Reactors 10/28/11 (11-023) 0310 Aspects Within the Cross-Cutting Areas 12/04/14 (14-029) 0312 Technical Assistance for Radiation Safety Inspections at Nuclear Fuel Cycle Facilities and Materials Licensees' Sites 06/06/02 (02-023) 0321 Reserved for Operability Determinations & Functionality Assessments of Conditions Adverse To Quality or Safety 0326 Operability Determinations and Functionality Assessments for Conditions Adverse to Quality or Safety 11/20/17 (17-026) 0330 Guidance for NRC Review of Licensee Draft Documents 07/08/96 (96-015) 0350 Oversight of Operating Reactor Facilities in a Shutdown Condition With Performance Problems 12/15/06 (06-035) 0351 Now IMC 0375 0375 Implementation of the Reactor Oversight Process at Reactor Facilities in an Extended Shutdown Condition for Reasons Not Related to Performance 11/13/15 (15-024)

Issue Date: 01/05/18 2 TABLE OF CONTENTS

0400 Enforcement Policy 0410 Notices of Enforcement Discretion 03/13/13 (13-009) 0410, App A Reserved for Design Compliance Enforcement Discretion 0500 Tracking Systems 0600 Documentation of Program Findings 0608 Performance Indicator Program 09/26/12 (12-022) 0609 Significance Determination Process 04/29/15 (15-008) 0609TP Significance Determination Process 10/28/16 (16-028) 0609.01 Significance and Enforcement Review Panel Process 12/08/16 (16-032) 0609.01TP Significance and Enforcement Review Panel Process 10/28/16 (16-028) 0609.02 Process for Appealing NRC Characterization of Inspection Findings (SDP Appeal Process) 06/08/11 (11-010) 0609.03 Senior Reactor Analyst (SRA) and Risk Analyst Support Expectations 04/29/15 (15-008) 0609.04 Initial Characterization of Findings 10/07/16 (16-026) 0609.05TP Inspection Findings Review Board 10/28/16 (16-028) 0609, App A Determining the Significance of Reactor Inspection Findings for At-Power Situations 06/19/12 (12-010) 0609, App B Emergency Preparedness Significance Determination Process 09/22/15 (15-017) 0609, App C Occupational Radiation Safety Significance Determination Process 08/19/08 (08-024) 0609, App D Public Radiation Safety Significance Determination Process 02/12/08 (08-007) 0609, App E Security Significance Determination Process for Power Reactors 10/08/15 (15-019) 0609, App E Part I Baseline Security Significance Determination Process for Power Reactors 09/30/16 (16-024) 0609, App E Part II Force-on-Force Significance Determination Process 01/15/14 (14-001) 0609, App E(P)Part III Construction Fitness-for-Duty Significance Determination Process

- Pilot 09/19/12 (12-021) 0609, App E Part IV Cyber Security Significance Determination Process for Power Reactors 08/15/17 (17-014) 0609, App F Fire Protection Significance Determination Process 09/20/13 (13-02) 0609, App F, Att 1 Part 1: Fire Protection SDP Phase 1 Worksheet 09/20/13 (13-022) 0609, App F, Att 2 Degradation Rating Guidance Specific to Various Fire Protection Program Elements 02/28/05 (05-007) 0609, App F, Att 3 Guidance for Identifying Fire Growth and Damage Scenarios 02/28/05 (05-007) 0609, App F, Att 4 Fire Ignition Source Mapping Information: Fire Frequency, Counting Instructions, Applicable Fire Severity Characteristics, and Applicable Manual Fire Suppression Curves 02/28/05 (05-007)

Issue Date: 01/05/18 3 TABLE OF CONTENTS

0609, App F, Att 5 Characterizing Non-Simple Fire Ignition Sources 02/28/05 (05-007) 0609, App F, Att 6 Guidance for the Identification of Targets and Their Ignition and Damage Criteria 02/28/05 (05-007) 0609, App F, Att 7 Guidance for Fire Growth and Damage Time Analysis 02/28/05 (05-007) 0609, App F, Att 8 Guidance for Fire Non-Suppression Probability Analysis 02/28/05 (05-007) 0609, App G Shutdown Operations Significance Determination Process 05/09/14 (14-011) 0609, App G, Att 1 Shutdown Operations Significance Determination Process Phase 1 Operational Checklists for Both PWRs and BWRs 05/09/14 (14-011) 0609, App G, Att 2 Phase 2 Significance Determination Process Template for PWR during Shutdown 02/28/05 (05-007) 0609, App G, Att 3 Phase 2 Significance Determination Process Template for BWR during Shutdown 02/28/05 (05-007) 0609, App H Containment Integrity Significance Determination Process 05/06/04 (04-010) 0609, App I Operator Requalification Human Performance Significance Determination Process [SDP] 12/06/11 (11-040) 0609, App J Technical Basis for Steam Generator Tube Integrity Findings 07/06/11 (11-011) 0609, App K Maintenance Risk Assessment and Risk Management Significance Determination Process 05/19/05 (05-014) 0609, App L B.5.b Significance Determination Process 12/24/09 (09-032) 0609, App M Significance Determination Process Using Qualitative Criteria 12/22/06 (06-036) 0609 App N RESERVED SDP for ISFSI at Operating Plants 0609 App O Significance Determination Process for Mitigating Strategies and Spent Fuel Pool Instrumentation 10/07/16 (16-026) 0610 Nuclear Material Safety and Safeguards Inspection Reports 05/18/04 (04-014) 0611 Power Reactor Inspection Reports 12/13/17 (17-029)

Effective Date: 01/01/18 0611, Exh 1 Standard Reactor Inspection Report Outline 12/13/17 (17-029)

Effective Date: 01/01/18 0611, Exh 2 Inspection Report Documentation Matrix 12/13/17 (17-029)

Effective Date: 01/01/18 0611, App A Acronyms Used in Inspection Reports 12/13/17 (17-029)

Effective Date: 01/01/18 0611, App C Guidance for Supplemental Inspection Reports 12/13/17 (17-029)

Effective Date: 01/01/18 0611, App D Guidance for Problem Identification and Resolution Inspection Reports 12/13/17 (17-029) Effective Date: 01/01/18 0612 Issue Screening 05/03/17 (17-009) 0612 Power Reactor Inspection Reports 05/06/16 (16-012) 0612, Exh 1 Standard Reactor Inspection Report 02/07/14 (14-005) 0612, Exh 2 Inspection Report Documentation Matrix 09/04/14 (14-020) 0612, Exh 3 Reserved for Sample Reactor Inspection Report (temporarily suspended pending revision) 0612, Exh 4 Inspection Report Cover Letter Templates 07/26/16 (16-018)

Issue Date: 01/05/18 4 TABLE OF CONTENTS

0612, App A Acronyms Used in IMC 0612 12/04/08 (08-034) 0612, App B Issue Screening 09/07/12 (12-020) 0612, App B Issue Screening 12/13/17 (17-029) Effective Date: 01/01/18 0612, App C Documentation Guidance for Supplemental Inspections 10/28/11 (11-024) 0612, App C Exh1 Sample Supplemental Inspection Report for IP 95001 and IP 95002 10/28/11 (11-024) 0612, App D Guidance for Documenting Inspection Procedure 71152, Identification and Resolution of Problems 08/13/13 (13-017) 0612, App E Minor/More-Than-Minor Screening Examples 08/11/09 (09-020) 0612, App G Emergency Planning Cornerstone- Specific Supplemental Guidance for Appendix B Screening Figures 1 and 2 09/09/13 (13-020) 0613 Power Reactor Construction Inspection Reports 02/09/17 (17-003) 0614 Documenting 10 CFR Part 52 Construction Audit Activities 10/03/07 (07-030) 0615 Research and Test Reactor Inspection Reports 06/23/04 (04-018) 0616 Fuel Cycle Safety and Safeguards Inspection Reports 08/15/17 (17-014) 0617 Vendor and Quality Assurance Implementation Inspection Reports 08/15/17 (17-016) 0620 Inspection Documents and Records 09/12/11 (11-015) 0700 Communications with Licensees 0730 Generic Communications Regarding Materials and Fuel Cycle Issues 03/21/08 (08-011) 0800 Feedback - Improving the Regulatory Process 0801 Inspection Program Feedback Process 12/19/16 (16-034) 0802 Reserved for the Part 52 Program 0900 Reporting of Events/Incidents 1000 Regional Office Program Interfaces 1007 Interfacing Activities between Regional Offices of NRC and OSHA 05/06/16 (16-012) 1100 Notifications of Meetings and Conferences 1120 Preliminary Notifications 09/13/13 (13-021) 1200 Inspector Requirements 1201 Conduct of Employees 07/29/16 (16-019)

Issue Date: 01/05/18 5 TABLE OF CONTENTS

1202 Senior Resident Inspector Site Turnover 10/31/08 (08-031) 1220 Processing of NRC Form 241, "Report of Proposed Activities In Non-Agreement States," Areas of Exclusive Federal Jurisdiction and Offshore Waters, and Inspection of Agreement State Licensees Operating Under 10 CFR 150.20 05/01/03 (03-013) 1220, App I Procedures and Guidelines for Processing NRC Form 241 05/01/03 (03-013) 1220, App II Procedures Letter to be Sent to Licensees with Procedures and Information for Filing NRC Form 241 05/01/03 (03-013) 1220, App III Inspection of Agreement State Licensees 05/01/03 (03-013) 1230 Quality Assurance Program for Radiological Confirmatory Measurements 10/01/83 (83-12) 1232 Collection, Preparation, and Shipment of Independent Measurement Samples 11/18/86 (86-52) 1240 Unescorted Access at Power Reactors 12/01/04 (04-027) 1245 Qualification Program for Operating Reactor Programs 08/24/17 (17-015) 1245, Att 1 General Overview of the Inspector Training and Qualification Program 08/24/17 (17-015) 1245, Att 2 Inspector Competencies 10/31/06 (06-032) 1245, Att 3 General Orientation Topics 10/31/06 (06-032) 1245, App A Basic-Level Training and Qualification Journal 08/24/17 (17-015) 1245, App B General Proficiency-Level Training and Qualification Journal 08/24/17 (17-015) 1245, App C1 Reactor Operations Inspector Technical Proficiency Training and Qualification Journal 12/19/16 (16-034) 1245, App C2 Reactor Engineering Inspector Technical Proficiency Training and Qualification Journal 12/19/16 (16-034) 1245, App C3 Health Physics Inspector Technical Proficiency Training and Qualification Journal 02/20/17 (17-004) 1245, App C4 Reactor Security Inspector Technical Proficiency Qualification Training and Qualification Journal 11/29/13 (13-027) 1245, App C5 Research and Test Reactor Inspector Technical Proficiency Qualification Journal 07/08/09 (09-017) 1245, App C6 Emergency Preparedness Inspector Technical Proficiency Training and Qualification Journal 07/08/09 (09-017) 1245, App C7 Fire Protection Inspector Technical Proficiency Training and Qualification Journal 10/21/15 (15-020) 1245, App C8 Vendor Inspector Technical Proficiency Qualification Journal 12/19/12 (12-029) 1245, App C9 Senior Reactor Analyst Training and Qualification Program 11/24/15 (15-026) 1245, App C10 Operator Licensing (OL) Examiner Technical Proficiency Training and Qualification Journal 10/21/15 (15-020) 1245, App C11 Security Risk Analyst Technical Proficiency Training and Qualification Journal 08/30/13 (13-019) 1245, App C12 Safety Culture Assessor Training and Qualification Journal 05/24/17 (17-011) 1245, App C13 Independent Spent Fuel Storage Installation Security Inspector Technical Proficiency Training and Qualification Journal 08/08/13 (13-016)

Issue Date: 01/05/18 6 TABLE OF CONTENTS

1245, App C14 Cyber Security Inspector Technical Proficiency Training and Qualification Journal 08/03/15 (15-014) 1245, App C15 Construction Inspector Technical Proficiency Training and Qualification Journal 08/15/17 (17-014) 1245 App C16 RESERVED for RTR training qual 1245, App D1 Maintaining Qualifications 08/24/17 (17-015) 1245, App D2 Inservice Inspection Advanced-Level Training 10/21/15 (15-020) 1245, App D3 Fire Protection Advanced-Level Training 12/19/12 (12-029) 1245, App D4 Advanced Electrical Inspector Technical Proficiency Training and Qualification Journal 12/29/11 (11-044) 1246 Formal Qualification Programs in the Nuclear Material Safety and Safeguards Program Area 10/26/11 (11-022) 1246, App A Training Activities 10/26/11 (11-022) 1246, App B1 Training Requirements and Qualification Journal for Spent Fuel Storage and Transportation Reviewer 10/26/11 (11-022) 1246, App B2 Training Requirements and Qualification Journal for Spent Fuel Storage and Transportation Inspector 10/26/11 (11-022) 1246, App B3 Training Requirements and Qualification Journal for Independent Spent Fuel Storage Installation Inspector 11/07/11 (11-028) 1246, App B4 Independent Spent Fuel Storage Installation Security Inspector Technical Proficiency Training and Qualification Journal 08/08/13 (13-016) 1246, App C1 Training Requirements and Qualification Journal for Fuel Cycle License Reviewer 10/26/11 (11-022) 1246, App C2 Training Requirements and Qualification Journal for Fuel Cycle Project Manager 10/26/11 (11-022) 1246, App C3 Training Requirements and Qualification Journal for Material Control and Accounting License Reviewer 10/26/11 (11-022) 1246, App C4 Training Requirements and Qualification Journal for Fuel Cycle Safeguards Physical Security Inspector 10/26/11 (11-022) 1246, App C5 Training Requirements and Qualification Journal for International Safeguards Analysts, Nuclear Materials Management and Safeguards System (NMMSS) Analysts, and Import/Export Analysts 06/27/16 (16-014) 1246, App D1 Training Requirements and Qualification Journal for High Level Waste Repository License Technical Reviewer 10/26/11 (11-022) 1246, App D2 Training Requirements and Qualification Journal for High Level Waste Repository Inspector 10/26/11 (11-022) 1247 Qualification Program for Fuel Facility Inspectors in the Nuclear Material Safety and Safeguards Program Area 10/28/14 (14-026) 1247, App A Basic-Level Training and Certification Journal Fuel Facility Inspector 06/27/14 (14-014) 1247, App B General Proficiency-Level Training and Qualification Journal 06/11/14 (14-012) 1247, App C1 Fuel Facility Operations Inspector Technical Proficiency Training and Qualification Journal 06/11/14 (14-012) 1247, App C2 Fuel Facility Health Physics Inspector Technical Proficiency Training and Qualification Journal 06/20/2014 (14-013) 1247, App C3 Fuel Facility Emergency Preparedness Inspector Technical Proficiency Training and Qualification Journal 06/11/14 (14-012) 1247, App C5 Fuel Facility Material Control & Accounting Inspector Technical Proficiency Training and Qualification Journal 06/11/14 (14-012)

Issue Date: 01/05/18 7 TABLE OF CONTENTS

1247, App C6 Fuel Facility Nuclear Criticality Safety Inspector Technical Proficiency Training and Qualification Journal 06/11/14 (14-012) 1247, App D RESERVED for Advanced and Specialized Training Courses and Qualification Programs 1247, App D1 Fuel Facility Information Security Inspector Specialized Qualification Program Training and Qualification Journal 10/28/14 (14-026) 1248 Formal Qualification Programs for Federal and State Materials and Environmental Management Programs 04/19/13 (13-011) 1248, App A Materials Health Physics License Review Qualification Journal 04/19/13 (13-011) 1248, App B Materials Health Physics Inspector Qualification Journal 04/19/13 (13-011) 1248, App C Training Requirements and Qualification Journal for Materials Exempt Distribution License Reviewer 04/19/13 (13-011) 1248, App D Training Requirements and Qualification Journal for Byproduct Material Sealed Source and Device Reviewer 04/19/13 (13-011) 1248, App E Training Requirements and Qualification Journal for Division of Waste Management Inspector and License Reviewer 04/19/13 (13-011) 1248, App F Training Requirements and Qualification Journal for Decommissioning Inspectors 10/07/16 (16-026) 1248, App G Training Requirements and Qualification Journal for Decommissioning Project Managers and Technical Reviewers 01/13/16 (16-002) 1248, App H Training Requirements and Qualification Journal for Uranium Recovery Inspector 04/19/13 (13-011) 1248, App I Training Requirements and Qualification Journal for Uranium Recovery Project Manager/Technical Reviewer 04/19/13 (13-011) 1248 App J RESERVED 1248 App K Low-Level Waste Project Manager Qualification Journal 06/27/16 (16-014) 1248 App L Performance Assessment Technical Reviewer Qualification Journal 06/27/16 (16-014) 1300 Incident Response 1301 Response to Non-Emergency Incidents Involving Radioactive Material 10/20/00 (00-022) 1302 Action Levels for Radiation Exposures and Contamination Associated with Materials Events Involving Members of the Public 07/14/05 (05-019) 1303 Requesting Emergency Acceptance of Radioactive Material by the U.S.

Department of Energy 11/29/07 (07-037) 1304 Reserved for Independent Split Sampling Program for Residual Radioactivity 1330 Response to Transportation Accidents Involving Radioactive Materials 10/06/04 (04-025) 1360 Use of Physician and Scientific Consultants in the Medical Consultant Program 11/02/06 (06-033) 1400 Reserved Issue Date: 01/05/18 8 TABLE OF CONTENTS

1415 State Contracts for Environmental Monitoring 06/28/91 (91-009) 1500 Reserved 1600 Emergency Preparedness 1601 Communication Protocol for Assessing Offsite Emergency Preparedness Following a Natural Disaster 08/27/13 (13-018) 1700 Reserved 1800 Reserved 1900 Reserved 2000 Reserved 2100 Reserved 2200 Nuclear Security and Incident Response 2200 Security Inspection Program for Construction 09/07/12 (12-020) 2200, App A Security Construction Inspection Program 09/07/12 (12-020) 2201 Security Inspection Program for Commercial Nuclear Power Reactors 09/22/15 (15-017) 2201, App A Security Baseline Inspection Program 11/09/16 (16-029) 2201, App B Supplemental Inspection Program 09/22/15 (15-017) 2201, App C Generic, Special, and Infrequent Inspections 09/22/15 (15-017) 2201, App D Facility Status Reviews for Security and Safeguards Inspection Program 09/22/15 (15-017) 2201/003 Reserved for Fitness for Duty Part 26 Subpart K 2201/004 Inspection of Implementation of Interim Cyber Security Milestones 1-7 12/22/14 (14-031) 2201/005 Inspection of TVA WB1, Implementation of the Cyber Security Program Required by 10 CFR 73.54 and 10 CFR 73.55 07/03/14 (14-015) 2202 Security Inspection Program for Decommissioning Reactors 08/27/14 (14-019) 2202, App A Security Core Inspection Program 08/27/14 (14-019) 2202, App B Security Discretionary Inspection Program 10/06/14 (14-023) 2300 High Level Waste Issue Date: 01/05/18 9 TABLE OF CONTENTS

2300 Yucca Mountain Inspection Program License Application Review Period 09/11/08 (08-026) 2400 Low Level Waste Program 2401 Near-Surface Low-Level Radioactive Waste Disposal Facility Inspection Program 11/27/01 (01-028) 2410 Conduct of Observation Audits 07/12/00 (00-012) 2500 Reactor Inspection Program 2500 Reactor Inspection Program 11/06/86 (reactivated 09-020) 2501 Construction Inspection Program: Early Site Permit (ESP) 06/06/13 (13-013) 2502 Construction Inspection Program: Pre-Combined License (Pre-COL) Phase 12/13/10 (10-026) 2503 Construction Inspection Program: Inspections of Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) 07/05/12 (12-012) 2504 Construction Inspection Program: Inspections of Construction and Operational Programs 10/24/12 (12-025) 2505 Periodic Assessment of Construction Inspection Program Results 01/06/17 (17-001) 2506 Construction Reactor Oversight Process General Guidance and Basis Document 02/20/17 (17-004) 2507 Construction Inspection Program: Vendor Inspections 10/03/13 (13-024) 2508 Construction Inspection Program: Design Certification 09/06/16 (16-022) 2512 Light Water Reactor Inspection Program - Construction Phase 12/17/86 (reactivated 07-032) 2512 App I Light Water Reactor Inspection Program - Construction Phase -

Procedure List 10/16/07 (07-032) 2513 Light Water Reactor Inspection Program - Preoperational Testing and Operational Preparedness Phase 08/05/08 (Reactivated 08-023) 2513, App A Light Water Reactor - Preoperational Testing Phase 08/05/08 (reactivated 08-023) 2513, App B Light Water Reactor - Operational Preparedness Phase 08/05/08 (reactivated 08-023) 2515 Light Water Inspection Program - Operations Phase 03/28/17 (17-008) 2515, App A Risk-Informed Baseline Inspection Program 03/08/13 (13-008) 2515, App B Supplemental Inspection Program 12/18/15 (15-031) 2515, App C Special and Infrequently Performed Inspections 06/24/15 (15-012) 2515, App D Plant Status 10/03/17 (17-020) 2515, App E Inspection Program Modifications during a Pandemic 01/26/07 (07-004) 2515, App F Reactor Construction Activities near Operating Unit(s) 06/02/11 (11-009) 2515, App G Baseline Inspection Guidance for Power Reactors Preparing for Transition to Decommissioning Phase 02/01/16 (16-004)

Issue Date: 01/05/18 10 TABLE OF CONTENTS

2515/176 Emergency Diesel Generator Technical Specification Surveillance Requirements Regarding Endurance and Margin Testing 05/16/08 08-015 2515/179 Verification of Licensee Responses To NRC Requirement Rev. 1 for Inventories of Materials Tracked in the National Source Tracking System Pursuant to Title 10, Code of Federal Regulations, Part 20.2207 (10 CFR 20.2207) 05/27/10 (10-014) 2515/190 Inspection of Licensees Proposed Interim Actions as a Result of the Near-Term Task Force Recommendation 2.1 - Flooding Evaluation 09/04/15 (15-016) 2515/191 Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans 12/23/15 (15-032) 2515/192 Inspection of The Licensees Interim Corrective Actions Associated With Interim Enforcement Policy for the Open Phase Condition (OPC) Design Vulnerabilities In Electric Power Systems 11/09/16 (16-029) 2515/193 Inspection of the Implementation of Order EA-13-109, Order Modifying Licensees with Regard to Reliable Hardened Containment Vents Capable of Operation under Severe Accident Conditions, 10/10/17 (17-022) 2515/194 Inspection of the Licensees Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerabilities in Electric Power Systems (NRC Bulletin 2012-01) 10/31/17 (17-024) 2516 Policy and Guidance for the License Renewal Inspection Programs 08/13/13 (13-017) 2518 Reserved for Construction Inspection Program: Advanced Reactors, Pre Construction Permit (CP) 2519 Construction Significance Determination Process 12/06/17 (17-028) 2522 Construction Reactor Oversight Process Self-Assessment Program 07/28/14 (14-017) 2522, App A Construction Reactor Oversight Process Self-Assessment Metrics 10/03/17 (17-021) 2523 NRC Application of the Reactor Operating Experience Program in NRC Oversight Processes 06/19/13 (13-014) 2530 Integrated Design Inspection Program 04/24/85 (reactivated 10-006) 2535 Design Verification Programs 03/24/89 (reactivated 10-006) 2545 Research and Test Reactor Inspection Program 06/23/04 (04-018) 2550 Non-Power Protection Facilities (NPUFs) Licensed Under 10 CFR Part 50: Construction Inspection Program (CIP) 12/14/15 (15-029) 2561 Decommissioning Power Reactor Inspection Program 04/14/03 (03-012) 2600 Fuel Cycle Facility Inspection Program 2600 Fuel Cycle Facility Operational Safety and Safeguards Inspection Program 12/20/17 (17-030) 2600, App A Guidance for Conducting Fuel Cycle Inspections 12/20/17 (17-030) 2600, App B NRC Core Inspection Requirements, Tables 1 and 2 09/24/15 (15-018) 2600, App C Fuel Cycle Resident Inspection Program 09/24/15 (15-018) 2600, App D Fuel Cycle Facility Inspection Planning 09/24/15 (15-018)

Issue Date: 01/05/18 11 TABLE OF CONTENTS

2600/016 Inspection of Activities Associated with NRC Generic Letter 2015-01 11/09/16 (16-029) 2601 Reactive Inspection Decision Making Process for Fuel Facilities 09/20/16 (16-023) 2602 Decommissioning Oversight and Inspection Program for Fuel Cycle Facilities and Materials Licensees 07/29/08 (08-021) 2603 Reserved for Fuel Cycle Facility Construction Inspection Program Assessment 2604 Licensee Performance Review 09/20/16 (16-023) 2606 Assessment of the Change in Risk Resulting From a Violation at a Fuel Cycle Facility 04/01/16 (16-010) 2606, E-2 Evaluation Based on Specific Licensee ISAs 09/26/12 (12-022) 2620 On-Site Construction Reviews of Remedial Action at Inactive Uranium Mill Tailing Sites (Title I, Uranium Mill Tailings Radiation Control Act) 10/05/01 (01-020) 2630 Mixed Oxide Fuel Fabrication Facility Construction Inspection Program 09/20/16 (16-023) 2635 Reserved for Uranium Enrichment Facility Construction and Pre-Operational Readiness Review Inspection Programs 2641 In-Situ Leach Facilities Inspection Program 08/25/00 (00-014) 2681 Physical Protection and Transport of SNM and Irradiated Fuel Inspections of Fuel Facilities 10/27/17 (17-023) 2681/009 Inspection Guidance and Requirements for Physical Protection of the Transfer, Loading and Shipment of Irradiated Special Nuclear Material from General Atomics Facility, San Diego, California to U.S. Department of Energy, Idaho National Laboratory, Scoville, Idaho 08/12/10 (10-017) 2682 Technical Assistance for Safeguards MC&A Inspections at Fuel Facilities 06/18/84 (84-18) 2683 MC&A Safeguards Inspection of Fuel Facilities 05/09/14 (14-011) 2690 Inspection Program for Dry Storage of Spent Reactor Fuel at Independent Spent Fuel Storage Installations and for 10 CFR Part 71 Transportation Packagings 03/09/12 (12-004) 2694 Fuel Cycle Facility Construction and Pre-operational Readiness Review Inspection Programs 0830/17 (17-017) 2696 Louisiana Energy Services Gas Centrifuge Facility Construction and Pre-Operational Readiness Review Inspection Programs 10/19/06 (06-028) 2700 Licensee Contractor and Vendor Inspection Program 2800 Materials Inspection Program 2800 Materials Inspection Program 09/12/17 (17-018) 2800/030 Verification of the Status of Devices Authorized For Use Under a General License 05/30/00 (00-011) 2800/032 Follow-up - Materials Safeguard Advisory 10/31/01 (01-023) 2800/036 Inspection of Manufacturing and Distribution Licensees 09/13/04 (04-024) 2800/037 Safety Procedures for Panoramic Irradiators Rev 1 07/14/05 (05-019)

Issue Date: 01/05/18 12 TABLE OF CONTENTS

2800/038 Inspection of the Implementation of Increased Controls for Licensees Authorized to Possess Risk Significant Radioactive Material 03/30/06 (06-008) 2800/039 Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in the National Source Tracking System Pursuant to Title 10 Code of Federal Regulations, Part 20.2207 (10 CFR 20.2207) 04/09/09 (09-011) 2800/040 Material Control and Accounting at Nuclear Power Plants and Wet Storage Sites 03/07/11 (11-002) 2800/041 10 CFR Part 37 Materials Security Review at Facilities with a Title 10 Code of Federal Regulations Part 73 Physical Protection Program 07/01/15 (15-013) 2800/043 Inspection of Facilities Potentially Contaminated with Discrete Radium-226 Sources 01/06/17 (17-001) 2801 Uranium Mill 11e.(2) Byproduct Material Disposal Site and Facility Inspection Program 08/25/00 (00-014) 2810 Master Materials License Oversight and Inspection Program 10/11/12 (12-023) 2815 Construction and Preoperational Inspection of Panoramic, Wet-Source-Storage Gamma Irradiators 03/27/01 (01-010) 2882 Transfer of NRC License Files to Agreement State(s) 12/03/01 (01-029) 2900 Performance Appraisal Program 2901 Team Inspections 08/24/01 (01-016) 2920 Construction Appraisal Team Inspection Program 03/29/85 (85-11) 3000 Management Meetings 30050 Construction Permit Corporate Management Meeting 04/01/80 (reactivated 07-034) 30703 Management Meetings - Entrance and Exit Interviews 01/01/82 (reactivated 08-008) 30800 Initial Management Meeting - Materials Licensees 10/01/76 (76-26) 3100 Reserved 3200 Reserved 3300 Reserved 3400 Reserved Issue Date: 01/05/18 13 TABLE OF CONTENTS

3500 Quality Assurance 35002 Early Site Permit Pre-Docketing Quality Assurance Controls Meeting 05/29/03 (03-018) 35004 Pre-Docketing Early Site Permit Quality Assurance Controls Inspection 05/29/03 (03-018) 35006 Post-Docketing Early Site Permit Quality Assurance Controls Inspection 05/29/03 (03-018) 35007 Quality Assurance Program Implementation During Construction and Pre-Construction Activities 12/08/16 (16-032) 35012 Early Site Permit Quality Assurance Controls Assessment and Conclusion 05/29/03 (03-018) 35017 Quality Assurance Implementation Inspection 07/29/08 (08-021) 35023 Reserved for Design Reliability Assurance Program 35031 Reserved for Design Certification Pre-Meeting 35032 Reserved for Pre-Docketing Design Certification Quality Assurance Controls Inspection 35033 Reserved for Post-Docketing Design Certification Quality Assurance Controls Inspection 35034 Design Certification Testing Inspection 01/27/10 (10-003) 35060 Licensee Management of QA Activities 04/01/83 (reactivated 07-032) 35061 In-Depth QA Inspection of Performance 11/19/85 (reactivated 07-034) 35065 Procurement, Receiving, and Storage 04/01/83 (Reactivated 07-032) 35101 QA Program Implementation Inspection for Operational Programs 07/08/16 (16-015) 35301 Preoperational Testing - Quality Assurance 08/06/03 (03-028) 35701 Quality Assurance Program Review 09/17/01 (01-017) 35710 Reserved for Quality Assurance Inspection of Digital Computer Software 35750 QA Program Measuring and Test Equipment 04/14/92 (reactivated 08-032) 35960 QA Program Evaluation of Engineering Organization 10/01/82 (reactivated 07-034) 35962 Reserved for Part 52 QA Program Evaluation of Engineering Service Organization 3600 Organization and Administration 36100 Inspection of 10 CFR Parts 21 and 50.55(e) Programs for Reporting Defects and Noncompliance 02/13/12 (12-002) 36100.01 Inspection of 10 CFR Part 21 and Programs for Reporting Defects and Noncompliance During Construction 02/13/12 (12-002) 36301 Operational Staffing 07/01/77 (reactivated 08-032) 36302 Part 52. Operational Staffing 08/19/08 (08-024) 36801 Organization, Management, and Cost Controls at Permanently Shutdown Reactors 08/11/97 (97-012)

Issue Date: 01/05/18 14 TABLE OF CONTENTS

3700 Design, Design Changes, Modifications 37002 Construction Refurbishment Process - Watts Bar Unit 2 02/05/10 (10-005) 37051 Verification of As-Builts 12/04/87 (reactivated 07-032) 37055 Onsite Design Activities 04/01/83 (reactivated 07-032) 37060 Inspections under the 10CFR Part 50.69 Special Program 09/14/11 (11-016) 37301 Comparison of As-Built Plant to FSAR Description 03/14/14 (14-008) 37700 Design Changes, and Modifications 09/17/01 (01-017) 37801 Safety Reviews, Design Changes, and Modifications at Permanently Shutdown Reactors 08/11/97 (97-012) 37803 Reserved 37804 Aircraft Impact Assessment Inspection 02/09/12 (12-001) 37805 Engineering Design Verification Inspections 04/25/11 (11-007) 3800 Procurement 3900 Records 39701 Records Program 09/17/01 (01-017) 4000 Review and Audit 40001 Resolution of Employee Concerns 06/03/97 (97-006) 40002 Inspections to Review Allegations 06/28/02 (02-024) 40100 Independent Safety Culture Assessment Follow-up 04/09/15 (15-005) 40505 Reserved for Effectiveness of Process to Identify, Resolve, and Prevent Construction Problems 40600 Licensee Program for Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Management 07/28/14 (14-017) 40801 Self-Assessment, Auditing, and Corrective Action at Permanently Shutdown Reactors 08/11/97 (97-012) 4100 Training 41301 Pre-Licensing Review of Training and Qualification Programs 02/18/87 (reactivated 08-032) 41500 Training and Qualification Effectiveness 06/13/95 (95-007) 41501 Review of Training and Qualification Programs 04/27/16 (16-011) 41502 Nuclear Power Plant Simulation Facilities 10/16/12 (12-024)

Issue Date: 01/05/18 15 TABLE OF CONTENTS

4200 Procedures 42001 Emergency Operating Procedures 06/28/91 (91-009) 42051 Fire Prevention and Protection 10/01/77 (reactivated 08-004) 42401 Part 52, Plant Procedures10/27/10 (10-022) 42453 Part 52, Operating Procedures Inspection 08/19/08 (08-024) 42454 Part 52, Emergency Operating Procedures 09/09/13 (13-020) 42700 Plant Procedures 11/15/95 (95-015) 4300 Vendor Procedures 43002 Routine Inspections of Nuclear Vendors 01/27/17 (17-002) 43003 Reactive Inspections of Nuclear Vendors 12/14/15 (15-029) 43004 Inspection of Commercial-Grade Dedication Programs 01/27/17 (17-002) 43005 NRC Oversight of Third-Party Organizations Implementing Quality Assurance Requirements 10/08/15 (15-019) 43006 Inspection of the Implementation of Mitigation Strategies Orders Regarding the Use of National Response Centers 09/30/16 (16-025) 4400 Reserved 4500 Geotechnical/Foundation 45051 Geotechnical/Foundation Activities Procedure Review 05/29/03 (03-018) 45051.A Geotechnical/Foundation Activities Procedure Review 03/23/84 (reactivated 08-004) 45052 Review of Geotechnical and Site Characterization Activities 10/03/07 (07-030) 45053 Geotechnical/Foundation Activities Work Observation 03/23/84 (reactivated 07-034) 45055 Geotechnical/Foundation Activities Record Review 03/23/84 (reactivated 07-034) 4600 Structural Concrete 46051 Structural Concrete Procedure Review 07/01/83 (reactivated 07-034) 46053 Structural Concrete Work Observation 07/01/83 (reactivated 07-034) 46055 Structural Concrete Record Review 07/01/83 (reactivated 07-034) 46061 Structural Masonry Construction 12/17/86 (reactivated 07-034) 46071 Concrete Expansion Anchors 12/17/86 (reactivated 07-034) 4700 Containment (Post-Tensioning)

Issue Date: 01/05/18 16 TABLE OF CONTENTS

4800 Structural Steel and Supports 48051 Structural Steel and Supports Procedure Review 12/17/86 (reactivated 07-032) 48053 Structural Steel and Supports Work Observation 12/17/86 (reactivated 07-032) 48055 Structural Steel and Supports Record Review 07/01/83 (reactivated 07-032) 4900 Piping 49001 Inspection of Erosion/Corrosion Monitoring Programs 12/11/98 (98-019) 49051 Reactor Coolant Pressure Boundary Piping QA Review 08/16/82 (reactivated 07-032) 49053 Reactor Coolant Pressure Boundary Piping - Work Observation 11/19/85 (reactivated 07-032) 49055 Reactor Coolant Pressure Boundary Piping Record Review 08/16/82 (reactivated 07-034) 49061 Safety-Related Piping 10/01/82 (reactivated 07-034) 49063 Piping - Work Observation 11/19/85 (reactivated 07-034) 49065 Safety-Related Piping-Records Review 10/01/82 (reactivated 07-034) 5000 Mechanical Components and Equipment 50001 Steam Generator Replacement Inspection 09/12/17 (17-018) 50002 Steam Generators 12/31/96 (96-024) 50003 Pressurizer Replacement Inspection 09/12/17 (17-018) 50051 Reactor Vessels and Internals QA Review 08/16/82 (reactivated 07-034) 50053 Reactor Vessel and Internals Work Observation 08/16/82 (reactivated 07-034) 50054 Reactor Vessel Material Surveillance Program 12/04/08 (08-034) 50055 Reactor Vessel and Internals Record Review 08/16/82 (reactivated 07-034) 50054 Reserved for Reactor Vessel Material Surveillance Program 50071 (Safety-Related Components - Procedure Review 04/01/83 (reactivated 07-034) 50073 Mechanical Components - Work Observation 11/19/85 (reactivated 07-034) 50075 Safety Related Components - Records Review 04/01/83 (reactivated 07-034) 50090 Pipe Support and Restraint Systems 08/06/03 (03-028) 50095 Spent Fuel Storage Racks 03/14/94 (reactivated 07-034) 50100 Heating, Ventilating, and Air Conditioning Systems 08/06/03 (03-028)

Issue Date: 01/05/18 17 TABLE OF CONTENTS

5100 Electrical Components and Systems 51051 Electrical Components and Systems - Procedure Review 03/30/84 (reactivated 07-034) 51053 Electrical Components and systems - Work Observation 08/06/03 (03-028) 51055 Electrical Components and Systems - Record Review 08/06/03 (03-028) 51061 Electrical Cable - Procedure Review 08/06/03 (03-028) 51063 Electric Cable - Work Observation 11/19/85 (reactivated 07-034) 51065 Electric Cable - Record Review 03/30/84 (reactivated 07-034) 51080 Part 52, Environmental Qualifications (EQ) Program for Electrical and Mechanical Equipment 06/26/17 (17-013) 5200 Instrumentation Systems and Components 52003 Digital Instrumentation and Control Modification Inspection 10/31/08 (08-031) 52051 Instrument Components and Systems - Procedure Review 03/30/84 (reactivated 07-034) 52053 Instrument Components and Systems - Work Observation 03/30/84 (reactivated 07-034) 52055 Instrument Components and Systems - Record Review 03/30/84 (reactivated 07-034) 5300 Containment Penetrations 53051 Containment Penetrations (Mechanical) Procedure Review 01/27/84 (reactivated 07-034) 53053 Containment Penetrations (Mechanical) Work Observation 01/27/84 (reactivated 07-034) 53055 Containment Penetrations (Mechanical) Record Review 01/17/84 (reactivated 07-034) 5400 Cleanliness 5500 Welding 55050 Nuclear Welding General Inspection Procedure 06/20/83 (83-06) 55093 Reactor Vessels Internals (Welding) Observation of Welding and Associated Activities 07/01/7 (reactivated 07-034) 55100 Structural Welding General Inspection Procedure 06/20/83 (83-06) 55150 Weld Verification Checklist 06/20/83 (reactivated 07-034) 5600 Calibration 56700 Calibration 03/23/05 (05-008)

Issue Date: 01/05/18 18 TABLE OF CONTENTS

5700 Nondestructive Examination, Destructive Examination and Fabrication Testing 57050 Visual Testing Examination 03/09/99 (99-003) 57060 Liquid Penetrant Testing Examination 03/09/99 (99-003) 57070 Magnetic Particle Testing Examination 03/09/99 (99-003) 57080 Ultrasonic Testing Examination 03/09/99 (99-003) 57090 Nondestructive Examination Procedure Radiographic Examination Procedure Review/Work Observation/Record Review 06/14/93 (93-005) 5800 Special Processes 5900 Reserve Shutdown System 6000 Fuel Fabrication, Handling and Storage 60501 Fuel Receipt and Storage 04/30/75 (reactivated 08-032) 60705 Preparation for Refueling 07/27/95 (95-009) 60710 Refueling Activities 07/27/95 (95-009) 60715 Spent Fuel Safety at Operating Reactors 10/30/15 (15-022) 60801 Spent Fuel Pool Safety at Permanently Shutdown Reactors 08/11/97 (16-001) 60845 Operation of Intra-Unit Fuel Transfer Canister and Cask System 04/26/12 (12-007) 60851 Design Control of ISFSI Components 01/16/08 (08-003) 60852 ISFSI Component Fabrication by Outside Fabricators 01/16/08 (08-003) 60853 On-Site Fabrication of Components and Construction of an ISFSI 01/16/08 (08-003) 60854 Preoperational Testing of an Independent Spent Fuel Storage Installation 01/16/08 (08-003) 60854.1 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 09/05/06 (06-022) 60855 Operation of an Independent Spent Fuel Storage Installation 01/16/08 (08-003) 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 09/05/06 (06-022) 60856 Review of 10 CFR 72.212(b) Evaluations 03/05/08 (08-010) 60856.1 Review of 10 CFR 72.212(b) Evaluations at Operating Plants 02/02/04 (04-003) 60857 Review of 10 CFR 72.48 Evaluations 10/24/07 (07-033) 60858 Away-From-Reactor ISFSI Inspection Guidance 05/03/07 (07-015) 60859 Reserved for Welding Verification Checklist for Transportation and ISFSI Components 60860 Reserved for Nondestructive Examination Procedure Visual Examination Procedure Review/Work Observation/Record Review of Transportation and ISFSI Components Issue Date: 01/05/18 19 TABLE OF CONTENTS

60861 Reserved for Nondestructive Examination Procedure Liquid Penetrant Examination Procedure Review/Work Observation/Record Review of Transportation ISFSI Components 60862 Reserved for Nondestructive Examination Procedure Magnetic Particle Examination Procedure Review/Work Observation/Record Review of Transportation ISFSI Components 60863 Reserved for Nondestructive Examination Procedure Ultrasonic Examination Procedure Review/Work Observation/Record Review 60864 Reserved for Nondestructive Examination Procedure Radiographic Examination Procedure Review/Work Observation/Record Review of Transportation and ISFSI Components 6100 Surveillance 61705 Calibration of Nuclear Instrumentation Systems 05/12/86 (86-25) 61706 Core Thermal Power Evaluation 07/14/86 (86-36) 61707 Determination of Reactor Shutdown Margin 10/11/85 (85-31) 61708 Isothermal and Moderator Temperature Coefficient Determinations 10/11/85 (85-31) 61709 Total Power Coefficient of Reactivity at Pressurized Water Reactors 07/14/86 (86-36) 61710 Control Rod Worth Measurements (PWR) 10/11/85 (85-31) 61715 Verification of Containment Integrity 12/23/86 (86-60) 61720 Containment Local Leak Rate Testing 10/03/85 (85-30) 61726 Surveillance Observations 06/24/98 (98-010) 61728 Independent Measurement of RCS Leak Rates for a PWR 01/01/84 (84-02) 6200 Maintenance 62002 Inspection of Structures, Passive Components, and Civil Engineering Features at Nuclear Power Plants 12/31/96 (96-024) 62003 Inspection of Steel and Concrete Containments at Nuclear Power Plants 06/11/97 (97-008) 62706 Maintenance Rule 12/13/00 (00-028) 62708 Motor-Operated Valve Capability 10/23/13 (13-026) 62709 Configuration Risk Assessment and Risk Management Process 12/28/00 (00-029) 62710 Power-Operated Gate Valve Pressure Locking and Thermal Binding 04/30/10 (10-013) 62711 Reserved for Operational Reliability Assurance Process 62712 Part 52, Maintenance Rule 08/13/13 (13-017) 62801 Maintenance and Surveillance at Permanently Shutdown Reactors 08/11/97 (97-012)

Issue Date: 01/05/18 20 TABLE OF CONTENTS

6300 Construction Testing 63050 Containment Structural Integrity Test 07/01/83 (reactivated 07-034) 6400 Fire Prevention/Protection 64051 Procedures - Fire Prevention/Protection 07/01/79 (reactivated 07-034) 64053 Fire Loop Installation 07/01/79 (reactivated 07-034) 64102 Reserved for Part 52 Post fire Safe Shutdown, Emergency Lighting and Oil Collection Capabilities 64704 Fire Protection Program 06/24/98 (98-010) 64705 Part 52, Fire Protection Operational Program 10/03/07 (07-030) 6500 10 CFR Part 52 ITAAC Inspections 65001 Inspections of Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Related Work 08/13/13 (13-017) 65001.01 Inspection of ITAAC-Related Foundations & Buildings 04/18/14 (14-010) 65001.02 Inspection of ITAAC-Related Installation of Structural Concrete 11/22/11 (11-037) 65001.03 Inspection of ITAAC-Related Installation of Piping 08/19/08 (08-024) 65001.04 Inspection of ITAAC-Related Installation of Pipe Supports and Restraints 08/13/14 (14-018) 65001.05 Inspection of ITAAC-Related Installation of Reactor Pressure Vessel and Internals 08/19/08 (08/19/08) 65001.06 Inspection of ITAAC-Related Installation o Mechanical Components 01/27/15 (15-001) 65001.07 Inspection of ITAAC-Related Installation of Valves 07/29/08 (08-021) 65001.08 Inspection of ITAAC-Related Installation of Electric Components and Systems 08/19/08 (08-024) 65001.09 Inspection of ITAAC-Related Installation of Electric and Fiber Optic Cable 08/05/09 (09-019) 65001.10 Inspection of ITAAC-Related Installation of Instrument Components and Systems 10/20/08 (08-029) 65001.11 Construction Inspection Program Inspection of ITAAC-Related Containment Integrity and Containment Penetration 08/19/08 (08-024) 65001.12 Inspection of ITAAC-Related Installation of Heating, Ventilating, and Air Conditioning Systems 07/29/08 (08-021) 65001.13 Inspection of ITAAC-Related Installation of Load Handling Equipment and Fuel Racks 08/05/09 (09-019) 65001.14 Inspection of ITAAC-Related Installation of Complex Systems with Multiple Components 06/24/15 (15-012) 65001.15 Inspection of ITAAC-Related Installation of Fire Protection Equipment 07/01/08 (08-019) 65001.16 Inspection of ITAAC-Related Engineering 06/20/14 (14-013) 65001.17 Inspection of ITAAC-Related Security Structures, Systems, and Components 09/30/16 (16-025) 65001.18 Inspection of Emergency Planning ITAAC 10/30/08 (08-030)

Issue Date: 01/05/18 21 TABLE OF CONTENTS

65001.19 Inspection of Installation of ITAAC-Related Radiation Monitoring Components and Systems 10/20/08 (08-029) 65001.20 Inspection of Safety-Related Piping Design Acceptance Criteria (DAC)-

Related ITAAC 06/02/11 (11-009) 65001.21 Inspection of Pipe Rupture Hazard Analysis Design Acceptance Criteria (DAC) - Related ITAAC 11/07/11 (11-029) 65001.22 Inspection of Digital Instrumentation and Control (DI&C) System/Software Design Acceptance Criteria (DAC) - Related ITAAC 12/19/11 (11-041) 65001.23 Inspection of Human Factors Engineering Integrated System Validation ITAAC 12/22/14 (14-031) 65001.23, App A Inspection Guide for AP1000 Human Factors Engineering Integrated System Validation 12/22/14 (14-031) 65001.A ITAAC Attributes for As-Built Inspection 09/25/13 (13-023) 65001.B Inspection of the ITAAC-Related Welding Program 09/25/13 (13-023) 65001.C Inspection of the ITAAC-Related Construction Test Program 04/18/14 (14-010) 65001.D Inspection of the ITAAC-Related Operational Testing Program 05/09/14 (14-011) 65001.E Inspection of the ITAAC-Related Qualification Program 06/20/14 (14-013) 65001.F Inspection of the ITAAC-Related Design and Fabrication Requirements 09/20/13 (13-022) 65051 Low-Level Radioactive Waste Storage Facilities 06/13/86 (reactivated 07-034) 6600 Reserved 6700 Reserved 6800 Reserved 6900 Non-Power Reactor Inspection 69001 Class II Research and Test Reactors 02/03/04 (04-004) 69002 Class III Research and Test Reactors 02/03/04 (04-004) 69003 Class I Research and Test Reactor Operator Licenses, Requalification, and Medical Examinations 02/03/04 (04-004) 69004 Class I Research and Test Reactor Effluent and Environmental Monitoring 02/03/047 (04-004) 69005 Class I Research and Test Reactor Experiments 02/03/04 (04-004) 69006 Class I Research and Test Reactors Organization and Operations and Maintenance Activities 02/03/04 (04-004) 69007 Class I Research and Test Reactor Review and Audit and Design Change Functions 02/03/04 (04-004) 69008 Class I Research and Test Reactor Procedures 02/03/04 (04-004)

Issue Date: 01/05/18 22 TABLE OF CONTENTS

69009 Class I Research and Test Reactor Fuel Movement 02/03/04 (04-004) 69010 Class I Research and Test Reactor Surveillance 02/03/04 (04-004) 69011 Class I Research and Test Reactor Emergency Preparedness 02/03/04 (04-004) 69012 Class I Research and Test Reactors Radiation Protection 02/03/04 (04-004) 69013 Research and Test Reactor Decommissioning 02/03/04 (04-004) 69020 Inspections of Safety-Related Items (and Services) During Construction of Non-Power Production and Utilization Facilities 12/14/15 (15-029) 69021 Inspections of Quality Assurance Program Implementation During Construction of Non-Power Production and Utilization Facilities 09/12/17 (17-018) 69022 Inspections of Operational Readiness During Construction of Non-Power Production and Utilization Facilities 12/14/15 (15-029) 7000 Preoperational Testing 70300 Preoperational Test Procedure Test Review 10/01/83 (reactivated 08-032) 70301 Overall Preoperational Test Program Review Requirements 10/01/83 (reactivated 08-032) 70302 Preoperational Test Program Implementation 10/01/83 (reactivated 08-032) 70304 Engineered Safety Features Test - Preoperational Test Procedure Review 08/06/03 (03-028) 70305 Reactor Protection System Test Preoperational Test Procedure Review Preoperational Testing Procedure Verification 01/01/79 (reactivated 08-032) 70306 Loss of Offsite Power Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003) 70307 Containment Integrated Leak Rate Test - Procedure Review 03/07/86 (86-13) 70308 Preoperational Hot Functional Testing - PWR Procedure Review) 10/01/83 (reactivated 08-032) 70311 Preoperational Testing Procedure Verification 10/01/83 (reactivated 08-032) 70312 Preoperational Test Witnessing 10/01/83 (reactivated 08-032) 70313 Containment Integrated Leak Rate Test 11/12/85 (85-36) 70314 HFT Witnessing 10/01/81 (reactivated 08-032) 70315 Engineered Safety Features Test Preoperational Test Witnessing) 01/01/79 (reactivated 08-032) 70316 Loss of Offsite Power Test Preoperational Test Witnessing 01/01/79 (reactivated 08-032) 70317 Reactor Protection System Test Preoperational Test Witnessing 01/01/79 (reactivated 08-032) 70323 Containment Leak Rate Test Results Evaluation 10/03/85 (85-30) 70324 Preoperational Test Results Evaluation - Integrated Hot Functional Test 04/01/77 (reactivated 08-032)

Issue Date: 01/05/18 23 TABLE OF CONTENTS

70325 Preoperational Test Results Evaluation - Reactor Protection System 01/01/79 (reactivated 08-032) 70326 Preoperational Test Results Evaluation - Loss of Offsite Power 01/01/79 (reactivated 08-032) 70329 Preoperational Test Result Evaluation Verification 10/01/83 (reactivated 08-032) 70331 Vibration Test- Preoperational Test Procedure Review 01/01/79 (reactivated 09-003) 70332 Control Rod System Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003) 70333 Chemical Control System Test - Preoperation Test Procedure Review 01/01/79 (reactivated 09-003) 70334 Engineered Safety Features Act. System Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003) 70335 Safety and Relief Valve Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003) 70336 Residual / Decay Heat Removal System Test - Preoperational Test Review 01/01/79 (reactivated 09-003) 70337 Main Stream Isolation Valve Test - Preoperational Test Procedure Review) 01/01/79 (reactivated 09-003) 70338 Auxilliary Feedwater System Test -Preoperational Test Procedure Review 01/01/79 (reactivated 09-003) 70339 Component Cooling Water System Test - Preoperational; Test Procedure Review 01/01/79 (reactivated 09-003) 70340 D.C. Power System Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003) 70341 Emergency/Standby Power Supply System Test - Preoperational Teat Procedure Review 01/01/79 (reactivated 09-003) 70342 Containment Combustable Gas Control System Test -

Preoperational Test Procedure Review 01/01/79 (reactivated 09-003) 70344 Containment Isolation Vales Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003) 70345 Containment Heat/Cool/Vent. System Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003) 70346 Aux. Bldg. Heat /Cool/Vent. System Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003) 70347 Pressurizer and Level Control System Test- Preoperational Test Procedure Review 01/01/79 (reactivated 09-003) 70348 Main Feedwater Control System Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003) 70349 Reactor Coolant Leak Detection System Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003) 70350 Loose Parts Monitoring System Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003) 70351 Integrated Reactor Control System Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003) 70352 Remote Reactor Shutdown Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003)

Issue Date: 01/05/18 24 TABLE OF CONTENTS

70353 Cranes, Hoists and Lifting Equipment Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003) 70354 Nuclear Instrumentation System Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003) 70355 Compressed Gas System Test - Preoperational Test Procedure Review 01/01/79 (reactivated 09-003) 70362 Reactor Coolant System Hydrostatic Test Procedure Review 10/01/83 (reactivated 08-032) 70367 Inspection of Pre-operational Test Program 01/15/14 (14-001) 70368 Part 52 Containment Leak Rate Testing (Programmatic) 06/26/17 (17-013) 70369 Reserved for Part 52 Containment Leak Rate Testing 70370 Testing Piping Support and Restraint Systems 03/07/86 (86-13) 70371 Reserved for Part 52 Testing of Pipe Support and Restraint System 70400 Preoperational Test Results Evaluation 10/01/83 (reactivated 08-032) 70431 Vibration Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70432 Control Rod System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70433 Chemical Control System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70434 Engineered Safety Features Act. System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70435 Safety and Relief Valves Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70436 Residual / Decay Heat Removal System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70437 Main Stream Isolation Valve Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70438 Auxiliary Feedwater System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70439 Component Cooling Water System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70440 D.C. Power System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70441 Emergency / Standby Power Supply System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70442 Containment Combustible Gas Control System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70443 Containment Spray System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70444 Containment Isolation Valve Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70445 Containment Heat/Cool/Vent. System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70446 Auxiliary Bldg. Heat/Cool/Vent. System Test - Preoperational Test Witnessing 01/22/09 (09-003) 70447 Pressurizer and Level Control System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003)

Issue Date: 01/05/18 25 TABLE OF CONTENTS

70448 Main Feedwater Control System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70449 Reactor Coolant Leak Detection System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70450 Loose Parts Monitoring System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70451 Integrated Reactor Control System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70452 Remote Reactor Shutdown Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70453 Cranes, Hoists and Lifting Equipment Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70454 Nuclear Instrumentation System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70455 Compressed Gas System Test - Preoperational Test Witnessing 01/01/79 (reactivated 09-003) 70462 Reactor Coolant System Hydrostatic Test - Test Witnessing 08/13/14 14-018 70562 Reactor Coolant System Hydrostatic Test Results Evaluation 08/13/14 14-018 70701 Reserved 70702 Inspection of Preoperational Test Performance 12/06/17 (17-028) 7100 Operations (License & TS Requirements) 71002 License Renewal Inspection 11/23/11 (11-038) 71003 Post-Approval Site Inspection for License Renewal 07/08/16 (16-015) 71004 Power Uprate 05/15/17 (17-010) 71007 Reactor Vessel Head Replacement Inspection 10/03/17 (17-020) 71013 Site Inspections at Plants with Timely Renewal Applications 09/25/13 (13-023) 71111 Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity 10/28/11 (11-025) 71111.01 Adverse Weather Protection 11/28/17 (17-027) 71111.04 Equipment Alignment 09/24/14 (14-022) 71111.05AQ Fire Protection (Annual / Quarterly) 09/30/10 (10-020) 71111.05T Fire Protection (Triennial) 01/31/13 (13-004) 71111.05XT Fire Protection - NFPA 805 (Triennial) 01/31/13 (13-004) 71111.06 Flood Protection Measures 11/25/15 (15-027) 71111.07 Heat Sink Performance 12/08/16 (16-032) 71111.08 In-service Inspection Activities 12/21/16 (16-035) 71111.11 Licensed Operator Requalification Program 09/24/14 (14-022) 71111.12 Maintenance Effectiveness 02/03/16 (16-005) 71111.13 Maintenance Risk Assessments and Emergent Work Control 12/20/17 (17-030) 71111.15 Operability Determinations and Functionality Assessments 12/21/16 (16-035) 71111.17T Evaluations of Changes, Tests, and Experiments 12/08/16 (16-032)

Issue Date: 01/05/18 26 TABLE OF CONTENTS

71111.18 Plant Modifications 11/17/16 (16-031) 71111.19 Post Maintenance Testing 09/24/14 (14-022) 71111.20 Refueling and Other Outage Activities 11/28/17 (17-027) 71111.21M Component Design Bases Inspection (Teams) 12/08/16 (16-032) 71111.21N Component Design Bases Inspection (Programs) 12/08/16 (16-032) 71111.22 Surveillance Testing 06/15/15 (15-011) 71113 Reserved for Review of License Renewal Commitments for Plants in Timely Renewal 71114 Reactor Safety-Emergency Preparedness 05/29/12 (12-008) 71114.01 Exercise Evaluation 07/21/16 (16-017) 71114.02 Alert and Notification System Evaluation 07/21/16 (16-017) 71114.03 Emergency Response Organization Staffing and Augmentation System 07/21/16 (16-017) 71114.04 Emergency Action Level and Emergency Plan Changes 07/21/16 (16-017) 71114.05 Maintenance of Emergency Preparedness 07/21/16 (16-017))

71114.06 Drill Evaluation 07/21/16 (16-017) 71114.07 Exercise Evaluation-Hostile Action (HA) Event 07/21/16 (16-017) 71114.08 Exercise Evaluation-Scenario Review 07/21/16 (16-017) 71124 Radiation Safety - Public and Occupational 12/21/17 (17-031) 71124.01 Radiological Hazard Assessment and Exposure Controls 12/21/17 (17-031) 71124.02 Occupational ALARA Planning and Controls 12/21/17 (17-031) 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 12/21/17 (17-031) 71124.04 Occupational Dose Assessment 12/21/17 (17-031) 71124.05 Radiation Monitoring Instrumentation 04/01/16 (17-031) 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 12/21/17 (17-031) 71124.07 Public Radiation Safety 12/21/17 (17-031) 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 12/21/17 (17-031) 71130 Security 04/20/15 (15-006) 71130.01 Access Authorization 09/30/16 (16-024) 71130.02 Access Control 09/30/16 (16-024) 71130.03 Contingency Response - Force-On-Force Testing 12/22/16 (16-035) 71130.04 Equipment Performance, Testing and Maintenance 09/30/16 (16-024) 71130.05 Protective Strategy Evaluation 09/30/16 (16-024) 71130.06 Protection of Safeguards Information 09/30/16 (16-024) 71130.07 Security Training 09/30/16 (16-024) 71130.08 Fitness for Duty Program 09/30/16 (16-024) 71130.10P Cyber Security 05/15/17 (17-010) 71130.11 Material Control & Accounting (MC&A) 12/10/08 (08-035) 71130.12 Reserved for Physical Protection of Shipments of Irradiated Fuel 71130.13 Reserved for Security Inspections Conducted by Resident Inspectors 71130.14 Review of Power Reactor Target Sets 09/12/17 (17-018) 71150 Discrepant or Unreported Performance Indicator Data 01/04/07 (07-001) 71151 Performance Indicator Verification 05/03/17 (17-009) 71152 Problem Identification and Resolution 02/26/15 (15-003) 71153 Follow-up of Events and Notices of Enforcement Discretion 12/17/15 (15-030)

Issue Date: 01/05/18 27 TABLE OF CONTENTS

71302 Preoperational Test Program Implementation Verification 10/01/83 (reactivated 08-032) 71303 Part 52, Technical Specifications Review 10/20/08 (08-029) 71714 Cold Weather Preparations 09/17/01 (01-017) 71715 Sustained Control Room and Plant Observation 04/14/92 (92-004) 71801 Decommissioning Performance and Status Review at Permanently Shutdown Reactors 08/11/97 (97-012) 71841 Human Performance 12/12/00 (00-027) 7200 Startup Testing 72303 Startup Testing for ABWR: Test Procedure Review, Test Witnessing, and Test Results Evaluation 09/05/06 (06-021) 72304 Startup Testing for AP 1000: Test Procedure Review, Test Witnessing, and Test Results Evaluation 09/05/06 (06-021) 72401 Part 52, Inspection of Startup Test Program 06/24/14 (14-014) 72501 Reserved for Part 52 Initial Fuel Load Procedure Review 72525 Reserved for Part 52 Initial Fuel Load Witnessing 7300 In-service Inspection 73052 In-service Inspection - Review of Procedures 01/14/86 (86-03) 73053 Pre-service Inspection - Observation of Work and Work Activities 01/01/79 (reactivated 07-034) 73054 Part 52, Pre-service and In-service Inspection - Review of Program 05/03/17 (17-009) 73055 Pre-service Inspection Data Review and Evaluation 01/01/79 (reactivated 07-034) 73753 In-service Inspection 06/24/98 (98-010) 73754 Part 52 - Preservice Inspection - Non-Destructive Examination 12/12/13 (13-028) 73755 In-service Inspection - Data Review and Evaluation 10/27/10 (10-022) 73756 In-service Testing of Pumps and Valves 07/27/95 (95-009) 73757 Part 52 In-service Inspection - Data Review and Evaluation 02/07/14 (14-005) 73758 Part 52, Functional Design and Qualification, and Preservice and Inservice Testing Programs for Pumps, Valves and Dynamic Restraints 04/19/13 (13-011) 7400 Reserved 7500 Reserved 7600 Reserved Issue Date: 01/05/18 28 TABLE OF CONTENTS

7700 Reserved 7800 High Level Waste 78010 10 CFR Part 21 Program 09/11/08 (08-026) 7900 Water Chemistry 79501 LWR Water Chemistry Control and Chemical Analysis - Audits 02/24/89 (reactivated 08-032) 79502 Plant Systems Affecting Plant Water Chemistry 12/31/91 (reactivated 08-032) 79503 Reserved for Part 52 LWR Water Chem. Control & Chem. Analysis (Pre-Op and Supp) 79504 Reserved for Part 52 Plant systems Affecting Plant Water Chem.

79702 Control and monitoring of Radiological Source Term 04/17/00 (00-006) 8000 Environmental Protection 80211 Reserved for Part 52 Environmental Protection - Initial & Periodic Inspection 80521 Radiological Environmental Monitoring (Preoperational and Supplemental) 01/01/84 (reactivated 08-032) 80522 Part 52, Radiological Environmental Monitoring Program (REMP) 07/01/08 (08-019) 80600 Reserved for Independent Assessment of Site Radiological Conditions 80721 Radiological Environmental Monitoring 09/17/01(01-017) 8100 Physical Security 81000 Security 08/27/13 (13-018) 81000.01 Access Authorization 09/07/12 (12-020) 81000.02 Access Control 09/07/12 (12-020) 81000.03 Performance Evaluation Program 09/07/12 (12-020) 81000.04 Equipment Performance, Testing and Maintenance 09/07/12 (12-020) 81000.05 Protective Strategy Evaluation 01/03/13 (13-001) 81000.07 Security Training 09/07/12 (12-020) 81000.08 Fitness for Duty Operational Program 09/07/12 (12-020) 81000.09 Cyber Security Inspection for Construction 09/30/16 (16-025) 81000.10 Security Organization, Management Effectiveness, Program Reviews and Audits 09/07/12 (12-020) 81000.11 Material Control and Accounting 09/07/12 (12-020) 81000.14 Review of New Reactor Target Sets 12/19/13 (13-029) 81018 Physical Security Plan and Implementing Procedures 05/24/07 (07-17) 81019 Reserved for Part 52 Security Plan & Implementing Procedures 81020 Management Effectiveness - Security Program 06/13/07 (07-019) 81021 Reserved for Part 52 Management Effectiveness Issue Date: 01/05/18 29 TABLE OF CONTENTS

81023 Reserved for Part 52 Security Organization 81022 Security Organization 06/13/07 (07-019) 81034 Security Program Audit 09/10/07 (07-027) 81035 Reserved for Part 52 Security Audit Program 81038 Records and Reports 09/10/07 (07-027) 81039 Reserved for Part 52 Records & Reports 81042 Testing and Maintenance 04/12/07 (07-013) 81043 Reserved for Part 52 Testing & Maintenance 81046 Locks, Keys, and Combinations 09/10/07 (07-027) 81047 Reserved for Part 52 Locks, Keys & Combinations 81052 Physical Barriers - Protected Areas 09/10/07 (07-027) 81053 Reserved for Part 52 Physical Barriers - Protected Areas 81054 Physical Barriers - Vital Areas, Material Access Areas, and Controlled Access Areas 09/10/07 (07-027) 81055 Reserved for Part 52 Physical Barriers - Vital Areas, Material Access Areas & Controlled Access Areas 81058 Security System Power Supply 09/10/07 (07-027) 81059 Reserved for Part 52 Security System Power Supply 81062 Lighting 09/10/07 (07-027) 81063 Reserved for Part 52 Lighting 81064 Compensatory Measures 09/10/07 (07-027) 81065 Reserved for Part 52 Compensatory Measures 81066 Assessment Aids 09/10/07 (07-027) 81067 Reserved for Part 52 Assessment Aides 81070 Access Control - Personnel 12/22/08 (08-037) 81071 Reserved for Part 52 Access Control - Personnel 81072 Access Control (Power Reactor) - Packages 05/09/84 (84-15) 81073 Access Control (Fuel Facility) - Packages, Material, and Strategic Special Nuclear Material (SSNM) 08/05/09 (09-019) 81074 Access Control - Vehicles 12/22/08 (08-037) 81075 Reserved for Part 52 Access Control - (Power Reactors) - Packages 81076 Reserved for Part 52 Access Control - Vehicles 81078 Detection Aids - Protected Areas 11/23/09 (09-028) 81079 Reserved for Part 52 Detection Aids - Protected Areas 81080 Detection Aids - MAA and CAA 12/22/08 (08-037) 81081 Reserved for Part 52 Detection Aids - VA, MAA, & CAA 81084 Alarm Stations 09/10/07 (07-027) 81085 Reserved for Part 52 Alarm Stations 81088 Communications 09/10/07 (07-027) 81089 Reserved for Part 52 Communications 81120 Inspection Requirements and Guidance for Additional Security Measures for the Physical Protection in Transit for Radioactive Material Quantities of Concern 04/01/10 (10-010)

(Note this IP contains safeguards material) 81200 Security 08/27/14 (14-019) 81200.01 Access Authorization for Decommissioning Nuclear Power Reactors 10/21/14 (14-025) 81200.02 Access Control for Decommissioning Nuclear Power Reactors 08/27/14 (14-019) 81200.03 Reserved for Decommissioning Force-on-Force Testing Issue Date: 01/05/18 30 TABLE OF CONTENTS

81200.04 Equipment Performance, Testing, and Maintenance for Decommissioning Nuclear Power Reactors 08/27/14 (14-019) 81200.05 Protective Strategy Evaluation and Performance Evaluation Program for Decommissioning Nuclear Power Reactors 10/21/14 (14-025) 81200.06 Protection of Safeguards Information for Decommissioning Nuclear Power Reactors 08/27/14 (14-019) 81200.07 Security Training for Decommissioning Nuclear Power Reactor 10/21/14 (14-025) 81200.08 Reserved for Decommissioning Fitness for Duty Program 81200.10 Reserved for Decommissioning Cyber Security 81200.11 Reserved for Decommissioning Material Control and Accounting 81200.14 Review of Decommissioning Target Sets 01/15/14 (14-001) 81310 Physical Protection of Shipments of Irradiated Fuel 12/22/08 (08-037) 81311 Physical Security Requirements for Independent Spent Fuel Storage Installations 08/25/17 (17-016) 81335 Physical Protection of Shipments of Special Nuclear Material of Moderate Strategic Significance (SNM-MSS) 12/02/09 (09-029) 81340 Physical Protection of Shipments of Special Nuclear Material of Low Strategic Significance (SNM-LSS) 11/23/09 (09-028) 81360 General Requirements for Physical Protection of Formula Quantities of Special Nuclear Material in Transit 12/02/09 (09-029) 81365 Records, Reports, and Planning for Physical Protection of Formula Quantities of Special Nuclear Material in Transit 11/23/09 (09-028) 81370 Specific Requirements for Physical Protection of Formula Quantities of Special Nuclear Materials in Transit 12/22/08 (08-037) 81402 Reports of Safeguards Events 11/23/09 (09-028) 81411 Physical Protection for Reactors with Formula Quantities of Special Nuclear Material 11/04/85 (85-34) 81421 Fixed Site Physical Protection of Special Nuclear Material of Moderate Strategic Significance 11/23/09 (09-028) 81431 Fixed Site Physical Protection of Special Nuclear Material of Low Strategic Significance 10/24/12 (12-025) 81501 Personnel Training and Qualification - General Requirements 12/02/09 (09-029) 81502 Fitness for Duty Program 12/22/08 (08-037) 81503 Reserved for Part 52 Personnel Training and Qualification - Gen.

Requirements 81504 Fitness for Duty Program for Construction 10/15/09 (09-024) 81601 Safeguards Contingency Plan - Implementation Review 12/22/08 (08-037) 81602 Reserved for Part 52 Safeguards Contingency Plan - Implementation Review 81700 RESERVED for Materials Security 81700.01 Category I Fuel Cycle Facility Strategic Special Nuclear Material Security Controls 05/15/17 (17-010) 81700.02 Category I Fuel Cycle Facility Access Control Measures 05/15/17 (17-010)

Issue Date: 01/05/18 31 TABLE OF CONTENTS

81700.04 Category I Fuel Cycle Facility Security Equipment Performance, Testing and Maintenance 05/15/17 (17-010) 81700.05 Category I Fuel Cycle Facility Physical Protection Program and Protective Strategy 05/15/17 (17-010) 81700.06 Licensee Conducted Force-on-Force Exercises at Category I Fuel Cycle Facilities 10/27/17 (17-023) 81700.07 Category I Fuel Cycle Facility Security Training 05/15/17 (17-010) 81700.08 Category I Fuel Cycle Facility Fitness-for-Duty Programs 05/15/17 (17-010) 81700.09 Security Measures for Licensed Facilities 10/26/15 (15-021) 81700.10 Protection of Safeguards Information at Category I Fuel Cycle Facilities 05/15/17 (17-010) 81700.11 Annual Observation of Licensee Conducted Force-on-Force Exercises at Category I Fuel Cycle Facilities 10/27/17 (17-023) 81810 Protection of Safeguards Information 09/10/07 (07-027) 81811 Protection of Safeguards Information By Design Certification Applicants and Vendors 09/06/16 (16-022) 81815 Authorization for Access to National Security Information (NSI) and Restricted Data (RD) 06/27/14 (14-014) 81820 Physical Protection Facility Approval and Safeguarding of National Security Information (NSI) and Restricted Data (RD) 06/27/14 (14-014) 8200 Emergency Planning 82001 Evaluation of Emergency Preparedness 05/22/00 (00-010) 82002 Part 52, Emergency Preparedness Program 14/28/14 (14-026) 82002.01 Facilities and Equipment 11/08/11 (11-030) 82002.02 Procedure Quality 11/08/11 (11-030) 82002.03 Review of Exercise Objectives and Exercise Scenario for Power Reactors 11/08/11 (11-030) 82002.04 Emergency Preparedness Exercises 11/08/11 (11-030) 82002.05 Emergency Response Organization On-Shift Staffing and Augmentation Drills 11/08/11 (11-030) 82002.06 Emergency Response Organization, Dose Assessment Drills 11/08/11 (11-030) 82002.07 Operational Status of the Emergency Preparedness Program 11/08/11 (11-030) 82002.08 RESERVED for Inspection Of Site Specific Implementation Of 10 Cfr 50.54(HH)(2) Phase 1, 2, And 3 Mitigating Strategies For Nuclear Power Plants Referencing The Ap1000 Certified Design 82201 Emergency Detection and Classification 03/23/05 (05-008) 82202 Protective Action Decision Making 03/23/05 (05-008) 82301 Evaluation of Exercises for Power Plants 04/24/13 (13-012) 82302 Review of Exercise Objectives and Scenarios for Power Reactors 04/24/13 (13-012) 82401 Decommissioning Emergency Preparedness Scenario Review and Exercise Evaluation 09/04/14 (14-020) 82501 Decommissioning Emergency Preparedness Program Evaluation 09/04/14 (14-020)

Issue Date: 01/05/18 32 TABLE OF CONTENTS

82701 Operational Status of the Emergency Preparedness Program 04/24/13 (13-012) 8300 Radiation Protection 83100 Occupational Exposure During SAFSTOR and DECON 12/30/91 (91-022) 83311 Reserved for Part 52, Radiation Protection During Construction 83501 Significant Uncontrolled Radiation Exposures 04/17/00 (00-006) 83502.01 Radioactive Gaseous and Liquid Treatment and Monitoring Systems 04/17/00 (00-006) 83502.02 Radioactive Material Process and Transportation 04/17/00 (00-006) 83502.03 Radiological Environmental Monitoring Program and Radioactive Material Control Program 04/17/00 (00-006) 83522 Radiation Protection, Plant Chemistry, Radwaste, and Environmental:

Organization and Management Controls 12/31/91 (reactivated 08-032) 83523 Radiation Protection, Plant Chemistry, Radwaste, Transportation and Environmental: Training and Qualifications 01/01/84 (reactivated 08-032) 83524 External Occupational Exposure Control and Personal Dosimetry (Preoperational and Supplemental) 01/01/84 (reactivated 08-032) 83525 Internal Exposure Control and Assessment (Preoperational and Supplemental) 01/01/84 (reactivated 08-032) 83526 Control of Radioactive Materials and Contamination, Surveys, and Monitoring (Preoperational and Supplemental) 01/01/84 (reactivated 08-032) 83527 Facilities and Equipment (Preoperational and Supplemental) 01/01/84 (reactivated 08-032) 83529 Reserved for Part 52 Radiation Protection - Startup 83531 Part 52 Life Cycle Minimization of Contamination and Groundwater Protection Program 12/21/16 (16-035) 83532 Reserved for Part 52 Radiation Protection, Plant Chemistry, and Radwaste Training 83533 Part 52 External Occupational Exposure Control and Personal Dosimetry 10/27/10 (10-022) 83534 Part 52, Internal Exposure Control and Assessment 10/27/10 (10-022) 83535 Part 52, Control of Radioactive Materials and Contamination, Surveys, and Monitoring 10/27/10 (10-022) 83536 Part 52 Facilities and Equipment 10/27/10 (10-022) 83537 Part 52 Maintaining Occupational Exposures ALARA 10/27/10 (10-022) 83722 Radiation Protection, Plant Chemistry, and Radwaste: Organization and Management Controls (Minimum/Basic) 09/17/01 (01-017) 83723 General Employee, Radiation Safety, Plant Chemistry, Radwaste, and Transportation Training 12/16/03 (03-041) 83724 External Occupational Exposure Control and Personal Dosimetry 04/17/00 (00-006) 83725 Internal Exposure Control and Assessment 04/17/00 (00-006) 83726 Control of Radioactive Materials and Contamination, Surveys and Monitoring 11/13/14 (14-027) 83727 Facilities and Equipment (Basic) 09/17/01 (01-017) 83728 Maintaining Occupational Exposures ALARA 04/17/00 (00-006) 83729 Occupational Exposure during Extended Outages 12/31/91 (91-021) 83746 Offsite Dose Calculation Manual (ODCM) 07/29/08 (08-021)

Issue Date: 01/05/18 33 TABLE OF CONTENTS

83750 Occupational Radiation Exposure 06/06/02 (02-023) 83801 Inspection of Remedial and Final Surveys at Permanently Shutdown Reactors 07/26/16 (16-018) 83822 Radiation Protection 09/07/00 (00-016) 83890 Closeout Inspection and Survey 05/01/03 (03-013) 8400 Radioactive Waste Management 84100 Special Nuclear Material Inspections At Near Surface Low-Level Waste Disposal Facilities In Agreement States 11/27/01 (01-028) 84101 Radioactive Waste Management 12/30/91 (91-022) 84522 Solid Wastes (Preoperational and Supplemental) 01/01/84 (reactivated 08-032) 84523 Liquids and Liquid Wastes (Preoperational and Supplemental) 01/01/84 (reactivated 08-032) 84524 Gaseous Waste System (Preoperational and Supplemental) 01/01/84 (reactivated 08-032) 84525 Quality Assurance and Confirmatory Measurements for In-Plant Radiochemical Analysis (Preoperational and Supplemental) 5/23/85 (reactivated 08-032) 84526 Reserved for Part 52 Radwaste - Startup 84527 Part 52, Solid Waste Management System 07/01/08 (08-019) 84528 Part 52 Liquid Waste Management Program 10/19/16 (16-027) 84529 Part 52, Gaseous Waste Management Program 10/19/16 (16-027) 84750 Radioactive Waste Treatment, and Effluent and Environmental Monitoring 03/15/94 (94-006) 84850 Radioactive Waste Management - Inspection of Waste Generator Requirements of 10 CFR 20 and 10 CFR 61 12/22/08 (08-037) 84900 Low-Level Radioactive Waste Storage 12/22/08 (08-037)

(Preoperational and Supplemental) 8500 Material Control and Accountability 85102 Material Control and Accounting - Reactors 03/29/85 (85-10) 85103 RESERVED for Material Control and Accounting - Decommissioning Power Reactors 85200 MC&A for Licensees Possessing Less Than or Equal to One Effective Kilogram of SNM 04/10/85 (85-15) 85203 Management Structure and Controls 08/10/16 (16-020) 85205 Facility Operations and Internal Controls 08/10/16 (16-020) 85207 Measurement Systems 01/17/86 (86-04) 85209 Measurement Control and Statistics 04/10/85 (85-15) 85211 Physical Inventory 01/17/86 (86-04) 85303 Material Control and Accounting Management Structure and Personnel Training and Qualification 08/10/16 (16-020) 85305 Item Monitoring 11/15/16 (16-030) 85307 Process Monitoring 11/15/16 (16-030) 85309 Measurement Systems and Control 10/20/10 (10-021)

Issue Date: 01/05/18 34 TABLE OF CONTENTS

85311 Physical Inventory Program 11/15/10 (10-023) 85313 Alarm Resolution Program 11/15/16 (16-030) 85315 Internal Control 12/21/2010 (10-027) 85401 Management Structure 11/15/16 (16-030) 85402 Measurement Program 10/20/10 (10-021) 85403 Measurement Control Program 10/20/10 (10-021) 85404 Physical Inventory Program for Low Enriched Uranium Fuel Facilities 11/15/10 (10-023) 85405 Item Control 09/09/10 (10-019) 85406 Resolution Program for Low Enriched Uranium Fuel Facilities 11/15/10 (10-023) 85407 Assessment Program 11/29/10 (10-024) 85408 Recordkeeping 11/29/10 (10-024) 85420 Inspection of IAEA Safeguards for Inspectors at Power Reactors 06/22/88 (88-07) 85501 Physical Inventory Program for Uranium Enrichment Facilities 11/15/10 (10-023) 85502 Detection Program for Uranium Enrichment Facilities 12/21/10 (10-027) 85503 Resolution Program for Uranium Enrichment Facilities 11/15/10 (10-023) 8600 Spent Fuel and Other Radioactive Material Packaging and Shipping 86001 Design, Fabrication, Testing, and Maintenance of Transportation Packagings 01/16/08 (08-003) 86730 Transportation of Radioactive Materials (49 CFR Parts 100-179 and 10 CFR Part 71) 04/17/00 (00-006) 86740 Inspection of Transportation Activities 10/30/08 (08-030) 86750 Solid Radioactive Waste Management and Transportation of Radioactive Materials 03/15/94 (94-006) 8700 Materials Safety Inspection 87102 Maintaining Effluents from Materials Facilities As Low As Is Reasonably Achievable (ALRA) 04/04/00 (00-005) 87103 Inspection of Material Licensees Involved in an Incident or Bankruptcy Filing 11/03/00 (00-023) 87104 Decommissioning Inspection Procedure for Materials Licensees 07/29/02 (02-029) 87121 Industrial Radiography Programs 12/17/14 (14-030) 87122 Irradiator Programs 12/31/02 (02-047) 87123 Well Logging Programs 11/25/03 (03-037) 87124 Fixed and Portable Gauge Programs 11/25/03 (03-037) 87125 Materials Processor/Manufacturer Programs 09/28/05 (05-027) 87126 Industrial/Academic/Research Programs 09/28/05 (05-027) 87127 Radiopharmacy Programs 07/01/08 (08-018) 87128 Manufacturing and Distribution of Exempt Products 01/27/17 (17-002) 87129 Master Materials Program 09/15/03 (03-034)

Issue Date: 01/05/18 35 TABLE OF CONTENTS

87130 Nuclear Medicine Programs, Written Directive Not Required 10/24/02 (02-041) 87131 Nuclear Medicine Programs, Written Directive Required 08/24/11 (11-014) 87132 Brachytherapy Programs 02/26/15 (15-003) 87133 Medical Gamma Sterotactic Radiosurgery and Teletherapy Programs 08/24/11 (11-014) 87134 Medical Broad-Scope Programs 08/24/11 (11-014) 87135 Panoramic and Underwater Irradiator Security Program 10/30/08 (08-030) 87136 Manufacturing and Distribution (M&D) Security Program 10/30/08 (08-030) 87137 10 CFR Part 37 Materials Security Programs 04/03/14 (14-009) 87138 RESERVED for 10 CFR Part 37, Physical Protection Of Category 1 And Category 2 Quantities Of Radioactive Material At Facilities With A 10 CFR Part 73 Physical Protection Program 87250 Locating Missing Materials Licensees 10/29/01 (01-022) 87654 Uranium Mill, In-Situ Uranium Recovery, and 11e.(2) Byproduct Material Site Decommissioning Inspection 03/19/02 (02-010) 8800 Fuel Facility Inspection 88001 On-Site Construction 04/15/94 (94-011) 88003 Reactive Inspection for Events at Fuel Cycle Facilities 03/16/15 (15-004) 88004 Reserved for Adverse Weather Protection 88005 Management Organization and Controls 09/05/06 (06-020) 88010 Training 02/07/14 (14-005) 88015 Nuclear Criticality Safety 08/11/15 (15-0215) 88020 Operational Safety 01/23/14 (14-003) 88025 Maintenance and Surveillance Testing 01/23/14 (14-003) 88030 Radiation Protection 03/06/14 (14-007) 88035 Radioactive Waste Management 02/07/14 (14-005) 88045 Effluent Control and Environmental Protection 02/07/14 (14-005) 88050 Emergency Preparedness 03/06/14 (14-007) 88051 Evaluation of Exercises and Drills 03/06/14 (14-007) 88054 Fire Protection (Triennial) 03/06/14 (14-007) 88055 Fire Protection (Annual) 01/23/14 (14-003) 88070 Plant Modification 09/20/16 (16-023) 88071 Configuration Management Program 03/06/14 (14-007) 88075 Event Follow-up 03/16/15 (15-004) 88100 Plant Operations 12/30/96 (96-026) 88101 Configuration Control 12/30/96 (96-026) 88102 Surveillance Observations 12/30/96 (96-026) 88103 Maintenance Observations 12/30/96 (96-026) 88104 Decommissioning Inspection Procedure for Fuel Cycle Facilities 07/03/02 (02-026) 88106 Quality Assurance: Program Development and Implementation (Pre-licensing and Construction) 02/07/07 (07-006) 88107 Quality Assurance: Design and Documentation Control (Pre-licensing and Construction) 05/18/05 (05-013)

Issue Date: 01/05/18 36 TABLE OF CONTENTS

88108 Quality Assurance: Control of Materials, Equipment, and Services (Pre-licensing and Construction) 02/07/07 (07-006) 88109 Quality Assurance: Inspection, Test Control, and Control of Measuring and Test Equipment (Pre-licensing and Construction) 06/20/07 (07-020) 88110 Quality Assurance: Problem Identification, Resolution and Corrective Action 05/18/05 (05-013) 88111 10 CFR, Part 21, Inspection-Facility Construction 02/07/07 (07-006) 88112 Reserved for Software Validation 88113 Control of the Electronic Management of Data 02/07/07 (07-006) 88114 Quality Affecting Item Procurement (10 CFR Part 21) and Commercial Grade Item Dedication Process [Reactive] 10/25/06 (06-030) 88115 Supplier/Vendor Inspection (Construction Phase) 10/25/06 (06-030) 88117 Facility Changes (License Application) and Change Process (10 CFR 70.72) (Pre-Licensing and Construction) 09/20/16 (16-023) 88120 Reserved Draft Construction and Operational Readiness Inspections for the Internal Isotopes Uranium Deconversion Facility 88121 Reserved Draft Operational Readiness Reviews for Uranium Deconversion Facilities 88130 Resident Inspection Program for On-Site Construction Activities at the Mixed Oxide Fuel Fabrication Facility 03/02/16 (16-009) 88131 Geotechnical/Foundation Activities 10/25/06 (06-030) 88132 Structural Concrete Activities 10/25/06 (06-030) 88133 Structural Steel and Supports Activities 7/25/07 (07-023) 88134 Quality Assurance: Piping Relied on for Safety 05/18/05 (05-013) 88135 Resident Inspection Program for Category I Fuel Cycle Facilities 02/07/14 (14-005) 88135.02 Resident Inspection Program Plant Status Activities 05/21/15 (15-010) 88135.04 ISA Implementation 01/31/14 (14-004) 88135.05 Fire Protection 01/31/14 (14-004) 88135.17 Permanent Plant Modifications 01/31/14 (14-004) 88135.19 Post Maintenance Testing 01/31/14 (14-004) 88135.22 Surveillance Testing 01/31/14 (14-004) 88136 Mechanical Components 7/25/07 (07-023) 88137 Electric Cable 04/01/10 (10-010) 88138 Electrical Components and Systems 08/08/07 (07-024) 88139 Ventilation and Confinement Systems 08/08/07 (07-024) 88140 Instrumentation and Controls Systems 04/01/10 (10-010) 88141 Fire Prevention and Protection 08/08/07 (07-024) 88142 Underground Fire Water Loop and Equipment Installation 08/08/07 (07-024) 88143 Pipe Supports and Restraints 7/25/07 (07-023) 88150 Reserved for Training and Qualification of Plant Personnel 88151 Reserved for Facility Changes and Change Process (10 CFR70.72) 88152 Reserved for Physical Protection Equipment and Barriers 88153 Reserved for Material Control and Accounting 88154 Reserved for Fire Safety and Protection Systems 88155 Reserved for Functional Verifications of IROFS 88156 Reserved for Integrated Safety Analysis Implementation 88157 Reserved for Waste Management Equipment and Systems 88158 Reserved for Environmental Protection - Initial and Periodic Inspections 88159 Reserved for Process Enclosures and Vessels Issue Date: 01/05/18 37 TABLE OF CONTENTS

88160 Reserved for Utilities and Bulk Chemicals 88161 Corrective Action Program (CAP) Implementation at Fuel Cycle Facilities 07/28/14 (14-017) 8900 Fuel Facility and Materials Special Program 89001 In-Situ Leach (ISL) Facilities 09/02/97 (97-013) 9000 Reportable Matters and Report Reviews 90001 Construction Regulatory Response Column Inspections 10/27/10 (10-022) 90002 Construction Degraded Performance Column Inspections 10/28/14 (14-026) 90003 Construction Multiple/Repetitive Degraded Cornerstone Column Inspection 10/28/14 (14-026) 90502 Reserved for Part 52 Reportable Matters - Test Program 90700 Feedback of Operational Experience Information at Operating Power Reactors 03/23/05 (05-008) 90712 In-office Review of Written Reports of Non-routine Events at Power Reactor Facilities 12/31/98 (98-020) 90713 In Office Review of Periodic and Special Reports 09/17/01 (01-017) 90714 Non-routine Reporting Program 09/17/01 (01-017) 9100 Title 10 Requirements 9200 Planned Non-Routine Activities 92050 Review of Quality Assurance for Extended Construction Delay 04/04/00 (00-005) 92700 Onsite Follow-up of Written Reports of Non-routine Events at Power Reactor Facilities 12/31/98 (98-020) 92701 Follow-up 03/13/07 (07-010) 92702 Follow-up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, and Alternative Dispute Resolution Confirmatory Orders 01/10/08 (08-001) 92703 Follow-up of Confirmatory Action Letters 05/13/09 (09-012) 92709 Licensee Strike Contingency Plans 03/14/14 (14-008) 92711 Continued Implementation of Strike Plans During an Extended Strike 03/14/14 (14-008) 92712 Resumption of Normal Operations After a Strike 03/14/14 (14-008) 92714 Reserved for Part 52 Follow-up 92717 IE Bulletins for Information and IE Information Notice Followup 09/25/85 (reactivated 10-020) 92720 Corrective Action 09/28/98 (reactivated 07-034)

Issue Date: 01/05/18 38 TABLE OF CONTENTS

92721 Reserved for Part 52 Follow-up on Corrective Actions for Violations and Deviations 92722 Follow up Inspection for Any Severity Level I or II Traditional Enforcement Violation or for Two or More Severity Level III Traditional Enforcement Violations in a 12-Month Period 08/11/09 (09-020) 92723 Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area is a 12-Month Period 08/11/09 (09-020) 92901 Follow-up - Plant Operations 09/17/01 (01-017) 92902 Follow-up - Maintenance 09/17/01 (01-017) 92903 Follow-up - Engineering 09/17/01 (01-017) 92904 Follow-up - Plant Support 09/17/01 (01-017) 9300 Non-Routine Activities 93002 Managing Fatigue 11/09/09 (09-026) 93100 Safety-Conscious Work Environment Issue of Concern Follow-up 04/09/15 (15-005) 93702 Prompt Onsite Response to Events at Operating Power Reactors 09/17/01 (01-017) 93800 Augmented Inspection Team 11/15/17 (17-025) 93801 Safety System Functional Inspection (SSFI) 07/25/96 (96-016) 93802 Operational Safety Team Inspection (OSTI) 11/27/89 (89-015) 93803 Safety Systems Outage Modifications Inspection 04/27/89 (89-008) 93804 Risk-Based Operational Safety and Performance Inspection 01/15/92 (92-001) 93805 Maintenance Program 08/06/93 (93-070) 93806 Operational Readiness Assessment Team Inspections 09/29/98 (98-015) 93807 Systems Based Instrumentation and Control Inspection 01/29/93 (93-001) 93810 Service Water System Operational Performance Inspection (SWSOPI) 09/14/98 (98-013) 93811 Electrical Distribution System Functional Inspection (EDSFI) 02/03/99 (99-002) 93812 Special Inspection 11/15/17 (17-025) 93813 Reserved for Part 52 Operational Readiness Assessment Team Inspection 93814 Independent Design Verification Program 11/15/10 (10-023) 93815 Part 52, Operational Programs Implementation Inspection 12/23/11 (11-043) 9400 Technical Activities of an Administrative Nature 94300 Status of Plant Readiness for an Operating Licensee 02/14/86 (Reactivated 07-034) 94301 Reserved for Part 52 Status of 10 CFR 52 Plant Readiness for Fuel Load Issue Date: 01/05/18 39 TABLE OF CONTENTS

9500 Strategic Determination Actions 95001 Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area 08/24/16 (16-021) 95002 Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area 02/09/11 (11-001) 95003 Supplemental Inspection for Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple Yellow Inputs or One Red Input 12/18/15 (15-031) 95003.01 Emergency Preparedness 01/15/09 (09-002) 95003.02 Guidance for Conducting an Independent NRC Safety Culture Assessment) 04/03/14 (14-009) 9600 Materials Safety and Security 96001 NRC Force-on-Force Inspections at Category 1 Fuel Cycle Facilities 12/22/14 (12-031) 9700 Reserved 9800 Reserved 9900 Guidance2 9900 Technical Guidance 05/12/86 (86-26)

PART GUIDANCE Technical Guidance ASME Section III American Society of Mechanical Engineers ASME Boiler and Pressure Vessel Code,Section III 06/16/89 (89-011)

ASME Section III American Society of Mechanical Engineers ASME Boiler and & XI Pressure Vessel Code,Section III & XI 11/12/96 (96-022)

ASME Section XI American Society of Mechanical Engineers ASME Boiler and Pressure Vessel Code,Section XI 12/08/86 (86-54) 2

[XXXX.XX] attached to each document in Part 9900, is the file name for that document.

Issue Date: 01/05/18 40 TABLE OF CONTENTS

ASME Section XI American Society of Mechanical Engineers ASME,Section XI 05/12/86 (86-26)

STS Sec 1.0 Operability 05/12/86 (86-26)

STS Sec 1.0 Definitions 12/08/86 (86-54)

STS Sec 3.0 Acceptable Measurement Tolerances for Technical Specification Limits 10/01/78 (78-35)

STS Sec 3/4.6.4 Containment and Drywell Isolation Valves 06/09/88 (88-06)

STS Sec 3.7.5 Ultimate Heat Sink 11/25/88 (88-17)

STS Sec 3/4.8.1 TDI Diesel Generator Air Roll Tests 06/09/88 (88-06)

STS Sec 4.2.8.X.X Surveillance Requirements - 125-Volt Battery Bank 10/01/79 (79-22)

STS Sec 4.5.1 Standard Technical Specifications (BWR) 05/12/86 (86-26)

STS Sec 4.8.1.1.2 Surveillance Testing of Diesel Generator Lockout Feature 05/12/86 (86-26)

STS Surveillance Sections - Locked or Otherwise Secured Components 10/01/77 (77-25)

STS Interp Licensee Technical Specification Interpretations 02/03/97 (97-001)

Maintenance Voluntary Entry into Limiting Conditions for Operation Action Statements to Perform Preventive Maintenance 01/17/02 (02-001)

Assessing On-Line Leak Sealing of ASME Code Class 1 & 2 07/15/97 (97-011)

Filled Organic Coatings Used in Maintenance of Safety Related Equipment 10/11/94 (94-018)

Preconditioning of Structures, Systems, and Components (SSCs)

Before Determining Operability 09/28/98 (98-014) [PRECOND.TG]

Mechanical Freeze Plugs 06/14/93 (93-005)

Steam Generator Plugs and Sleeving Repairs 08/01/94 (94-014)

Steam Generator Tube-to-Secondary Leakage 09/09/03 (03-033)

Issue Date: 01/05/18 41 TABLE OF CONTENTS

[TG_Mech SGTUBELKG.wpd]

Ice Condenser System Inspections 06/06/05 (05-015)

Operations Notice of Enforcement Discretion for Gaseous Diffusion Plants 05/03/99 (99-008) [NOEDGAS.TG]

Operation - Safety and Compliance 09/11/07 (07-028)

[TG 9900 SAFETY]

PART 10 CFR GUIDANCE 10 Title 10 of the Code of Federal Regulations 12/08/86 (86-54) 10 CFR71 and 49 CFR171-178 Transportation of Radioactive Material 12/01/04 (04-027) 50.55(e) Construction Deficiency Reporting 01/31/89 (89-002) 50.55a Codes and Standards 02/22/73 (73-9) 50.59 10 CFR 50.59, Changes, Tests, and Experiments 03/13/01 (01-008) [50_59.CFR]

Part 50, App A Definition of Leak-Before-Break Analysis 09/26/96 (96-020)

Part 50 Appendix J, Containment Integrated Leak Rate Testing 12/08/86 (86-54) 70.51 Material Balance, Inventory, and Records Requirements 12/19/74 (74-11) 70.52 Report of Accidental Criticality or Loss of Special Nuclear Material 11/15/74 (74-010)

Interpretations END Issue Date: 01/05/18 42 TABLE OF CONTENTS