ML18018B158: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:Tennessee Valley Authority, Sequoyah Nuclear Plant, P.O. Box 2000, Soddy Daisy, Tennessee 37384 January 18, 2018 10 CFR 50.4 10 CFR 50.46 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328
 
==Subject:==
10 CFR 50.46 30-Day Report for Sequoyah Nuclear Plant, Units 1 and 2
 
==Reference:==
Letter from TVA to NRC, "10 CFR 50.46 Annual Report for Sequoyah Nuclear Plant, Units 1 and 2," dated November 28, 2017 (ML17332A033)
The purpose ofthis letter is to provide the 30-Day Report ofchanges or errors discovered in the emergency core cooling system (ECCS) evaluation model for Sequoyah Nuclear Plant (SQN), Units 1 and 2. This report is required in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 50.46, "Acceptance Criteria for ECCS for Light-Water Nuclear Power Reactors," paragraph (a)(3)(ii), which states, in part, that a holder of an operating license is required to report significant changes or errors and its estimated effect on the limiting ECCS analysis to the NRC within 30 days.
As defined in 10 CFR 50.46(a)(3)(i), a significant change affecting an ECCS evaluation model includes one which results in a calculated peak fuel cladding temperature (PCT) different by more than 50°F from the temperature calculated for the limiting transient using the last acceptable model, or is a cumulation of changes and errors such that the sum of the absolute magnitudes ofthe respective temperature changes is greaterthan 50°F. This report is the result ofan error in the realistic large break loss ofcoolant accident (RLBLOCA) analysis and the small break loss ofcoolant accident (SBLOCA) analysis stemming from an incorrect input of the cladding dimensions for surface area of swollen fuel. Correction of this error results in an increase in the metal-water reaction heat generated during the event and an increase in PCT. The increase in PCT for the RLBLOCA analysis is estimated to be 61 °F, which results in a revised licensing basis PCT for the RLBLOCA of 2001°F. The increase in PCT for the SBLOCA analysis is estimated to be 0°F, which results in no additional cumulative change to the PCT of1543°F. Previous PCT results were provided in the referenced letter. This change is considered significant in accordance with 10 CFR 50.46(a)(3)(i). Therefore, a 30-day report is required for the RLBLOCA and SBLOCA analyses. The local oxidation and whole core hydrogen generated forthe RLBLOCA and SBLOCA analyses remain within the 10 CFR 50.46 acceptance criteria with the correction of this error.
printed on recycled paper
 
U.S. Nuclear Regulatory Commission Page 2 January 18, 2018 10 CFR 50.46(a)(3)(H) also requires the licensee to provide a proposed schedule for providing a reanalysis, or taking other action as may be needed to show compliance with the 10 CFR 50.46 requirements. TVA has concluded that no further action is required to show compliance with 10 CFR 50.46 requirements, because the RLBLOCA and SBLOCA analyses continue to meet all 10 CFR 50.46 acceptance criteria.
There are no regulatory commitments associated with this submittal. Should you have any questions, please contact Mike McBrearty at (423) 843-7170.
fony L. Williams Site Vice President Sequoyah Nuclear Plant cc:
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Sequoyah Nuclear Plant NRC Project Manager - Sequoyah Nuclear Plant}}

Latest revision as of 04:33, 22 October 2019

Submittal of 10CFR 50.46 30-Day Report
ML18018B158
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 01/18/2018
From: Anthony Williams
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML18018B158 (2)


Text

Tennessee Valley Authority, Sequoyah Nuclear Plant, P.O. Box 2000, Soddy Daisy, Tennessee 37384 January 18, 2018 10 CFR 50.4 10 CFR 50.46 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328

Subject:

10 CFR 50.46 30-Day Report for Sequoyah Nuclear Plant, Units 1 and 2

Reference:

Letter from TVA to NRC, "10 CFR 50.46 Annual Report for Sequoyah Nuclear Plant, Units 1 and 2," dated November 28, 2017 (ML17332A033)

The purpose ofthis letter is to provide the 30-Day Report ofchanges or errors discovered in the emergency core cooling system (ECCS) evaluation model for Sequoyah Nuclear Plant (SQN), Units 1 and 2. This report is required in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 50.46, "Acceptance Criteria for ECCS for Light-Water Nuclear Power Reactors," paragraph (a)(3)(ii), which states, in part, that a holder of an operating license is required to report significant changes or errors and its estimated effect on the limiting ECCS analysis to the NRC within 30 days.

As defined in 10 CFR 50.46(a)(3)(i), a significant change affecting an ECCS evaluation model includes one which results in a calculated peak fuel cladding temperature (PCT) different by more than 50°F from the temperature calculated for the limiting transient using the last acceptable model, or is a cumulation of changes and errors such that the sum of the absolute magnitudes ofthe respective temperature changes is greaterthan 50°F. This report is the result ofan error in the realistic large break loss ofcoolant accident (RLBLOCA) analysis and the small break loss ofcoolant accident (SBLOCA) analysis stemming from an incorrect input of the cladding dimensions for surface area of swollen fuel. Correction of this error results in an increase in the metal-water reaction heat generated during the event and an increase in PCT. The increase in PCT for the RLBLOCA analysis is estimated to be 61 °F, which results in a revised licensing basis PCT for the RLBLOCA of 2001°F. The increase in PCT for the SBLOCA analysis is estimated to be 0°F, which results in no additional cumulative change to the PCT of1543°F. Previous PCT results were provided in the referenced letter. This change is considered significant in accordance with 10 CFR 50.46(a)(3)(i). Therefore, a 30-day report is required for the RLBLOCA and SBLOCA analyses. The local oxidation and whole core hydrogen generated forthe RLBLOCA and SBLOCA analyses remain within the 10 CFR 50.46 acceptance criteria with the correction of this error.

printed on recycled paper

U.S. Nuclear Regulatory Commission Page 2 January 18, 2018 10 CFR 50.46(a)(3)(H) also requires the licensee to provide a proposed schedule for providing a reanalysis, or taking other action as may be needed to show compliance with the 10 CFR 50.46 requirements. TVA has concluded that no further action is required to show compliance with 10 CFR 50.46 requirements, because the RLBLOCA and SBLOCA analyses continue to meet all 10 CFR 50.46 acceptance criteria.

There are no regulatory commitments associated with this submittal. Should you have any questions, please contact Mike McBrearty at (423) 843-7170.

fony L. Williams Site Vice President Sequoyah Nuclear Plant cc:

NRC Regional Administrator - Region II NRC Senior Resident Inspector - Sequoyah Nuclear Plant NRC Project Manager - Sequoyah Nuclear Plant