ML18033A023: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:DISCUSSION TOPICS PUBLIC MEETING BETWEEN THE NUCLEAR REGULATORY COMMISSION AND THE NUCLEAR ENERGY INSTITUTE, SOUTHERN ENERGY, DUKE ENERGY, AND ENTERGY REGARDING TORNADO MISSILE RISK EVALUATOR PILOT SUBMITTALS FEBRUARY 7, 2018
: 1. Discuss the basis for one-a-time (i.e., not aggregated) sensitivity analyses.
: 2. Discuss the basis for 30 threshold for distinguishing between near ground vs. elevated targets.
: 3. Discuss how the grade level is defined relative to 30 foot threshold.
: 4. Discuss the basis for the zonal vs uniform adjustment factor.
: 5. Discuss whether any other events were considered outside of a loss of offsite power.
: 6. Discuss the basis for the Vogtle site-specific missile counts and why construction missiles are considered temporary.
: 7. Discuss the distribution of missile types that are considered in the Vogtle analysis.
: 8. Describe the actions proposed should the risk acceptance guidelines or associated methodology assumptions are exceeded.}}

Latest revision as of 00:59, 22 October 2019

Meeting Slides - February 7, 2018, Public Meeting Concerning Pilot Topics and Feedback on Tornado Missile Risk Evaluator Methodology
ML18033A023
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 02/07/2018
From: Ellen Brown
Special Projects and Process Branch
To:
Brown E, NRC/NRR/LSPB, 415-2315
References
Download: ML18033A023 (1)


Text

DISCUSSION TOPICS PUBLIC MEETING BETWEEN THE NUCLEAR REGULATORY COMMISSION AND THE NUCLEAR ENERGY INSTITUTE, SOUTHERN ENERGY, DUKE ENERGY, AND ENTERGY REGARDING TORNADO MISSILE RISK EVALUATOR PILOT SUBMITTALS FEBRUARY 7, 2018

1. Discuss the basis for one-a-time (i.e., not aggregated) sensitivity analyses.
2. Discuss the basis for 30 threshold for distinguishing between near ground vs. elevated targets.
3. Discuss how the grade level is defined relative to 30 foot threshold.
4. Discuss the basis for the zonal vs uniform adjustment factor.
5. Discuss whether any other events were considered outside of a loss of offsite power.
6. Discuss the basis for the Vogtle site-specific missile counts and why construction missiles are considered temporary.
7. Discuss the distribution of missile types that are considered in the Vogtle analysis.
8. Describe the actions proposed should the risk acceptance guidelines or associated methodology assumptions are exceeded.