| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 5, 2018 Mr. Bryan S. Ford Senior Manager Fleet Regulator Assurance Entergy Operations, Inc. |
| -0001 April 5, 2018 Mr. Bryan S. Ford Senior Manager Fleet Regulator Assurance Entergy Operations, Inc. | |
| 1340 Echelon Parkway Jackson, MS 39213 | | 1340 Echelon Parkway Jackson, MS 39213 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| REQUEST FOR ADDITIONAL INFORMATION REGARDING ENTERGY OPERATIONS, INC.'S DECOMMISSIONING FUNDING PLAN UPDATE FOR BIG ROCK POINT, INDIAN POINT NUCLEAR GENERATING STATIONS UNITS 1, 2, AND 3, PILGRIM NUCLEAR POWER STATION, PALISADES NUCLEAR PLANT, JAMES A. FITZPATRICK NUCLEAR POWER PLANT, AND VERMONT YANKEE NUCLEAR POWER STATION INDEPENDENT SPENT FUEL STORAGE INSTALLATIONS DOCKET NOS. 72 | | REQUEST FOR ADDITIONAL INFORMATION REGARDING ENTERGY OPERATIONS, INC.S DECOMMISSIONING FUNDING PLAN UPDATE FOR BIG ROCK POINT, INDIAN POINT NUCLEAR GENERATING STATIONS UNITS 1, 2, AND 3, PILGRIM NUCLEAR POWER STATION, PALISADES NUCLEAR PLANT, JAMES A. FITZPATRICK NUCLEAR POWER PLANT, AND VERMONT YANKEE NUCLEAR POWER STATION INDEPENDENT SPENT FUEL STORAGE INSTALLATIONS DOCKET NOS. 72-43, 72-51, 72-1044, 72-07, 72-12, AND 72-59 |
| -43, 72-51, 72-1 0 44, 72-0 7, 72-12, AND 72 | |
| -59 | |
|
| |
|
| ==Dear Mr. Ford:== | | ==Dear Mr. Ford:== |
| By letter dated December 17, 2015, Entergy Nuclear Operations, Inc. (Entergy) submitted, for U.S. Nuclear Regulatory Commission (NRC) staff review and approval, decommissioning funding plan updates (DFP Updates) for the independent spent fuel storage installations (ISFSIs) at Big Rock Point, Indian Point Nuclear Generating Stations Units 1, 2, and 3 (Indian Point 1, 2, and 3), Pilgrim Nuclear Power Station (Pilgrim), Palisades Nuclear Plant (Palisades), James A. FitzPatrick Nuclear Power Plant (FitzPatrick), and Vermont Yankee Nuclear Power Station (Vermont Yankee)
| |
| (Agencywide Documents Access and Management System Accession No. ML15351A524). The NRC staff reviewed Entergy's DFP updates for each ISFSI and believes Entergy's submittal was not sufficient to meet the intent of the requirement in Title 10 of the Code of Federal Regulations (10 CFR) 72.30(c). Specifically, the DFP updates do not provide sufficient information to allow the NRC to determine that the events listed in 10 CFR 72.30(c)(1)
| |
| -(4) ha ve been considered.
| |
| The NRC staff need the information identified in the enclosure to this letter. We request that you provide this information within forty
| |
| -five (45) working day of the date of this letter
| |
| . Inform us at your earliest convenience, but no later than 2 weeks prior to the due date, if you are not able to provide the information by that date.
| |
| To assist us in re
| |
| -scheduling your review, you should include a new proposed submittal date and the reasons for the delay.
| |
| Discussion of the request for additional information (RAI) and RAI response date occurred March 28, 2018. In future correspondence related to this request, please reference CAC No. 001028, the Docket Numbers, and EPID Number s listed in the table.
| |
|
| |
|
| ISFSI Docket Numb er EPID Numbers Big Rock Point 72-43 L-2017- FPR-0007 Indian Point 72-51 L-2017-FPR-0035 Pilgrim 72-1044 L-2017-FPR-0054 Palisades 72-07 L-2017-FPR-0050 Fitzpatrick 72-12 L-2017-FPR-0026 Vermont Yankee 72-59 L-2017-FPR-0071 The staff is available to clarify these questions, and if necessary to meet and discuss your proposed responses. | | By letter dated December 17, 2015, Entergy Nuclear Operations, Inc. (Entergy) submitted, for U.S. Nuclear Regulatory Commission (NRC) staff review and approval, decommissioning funding plan updates (DFP Updates) for the independent spent fuel storage installations (ISFSIs) at Big Rock Point, Indian Point Nuclear Generating Stations Units 1, 2, and 3 (Indian Point 1, 2, and 3), Pilgrim Nuclear Power Station (Pilgrim), Palisades Nuclear Plant (Palisades), |
| If you have any questions regarding this matter, please contact me by e-mail at pamela.longmire@nrc.gov | | James A. FitzPatrick Nuclear Power Plant (FitzPatrick), and Vermont Yankee Nuclear Power Station (Vermont Yankee) (Agencywide Documents Access and Management System Accession No. ML15351A524). The NRC staff reviewed Entergys DFP updates for each ISFSI and believes Entergys submittal was not sufficient to meet the intent of the requirement in Title 10 of the Code of Federal Regulations (10 CFR) 72.30(c). Specifically, the DFP updates do not provide sufficient information to allow the NRC to determine that the events listed in 10 CFR 72.30(c)(1)-(4) have been considered. |
| . Sincerely, /RA John McKirgan Acting for
| | The NRC staff need the information identified in the enclosure to this letter. We request that you provide this information within forty-five (45) working day of the date of this letter. Inform us at your earliest convenience, but no later than 2 weeks prior to the due date, if you are not able to provide the information by that date. To assist us in re-scheduling your review, you should include a new proposed submittal date and the reasons for the delay. Discussion of the request for additional information (RAI) and RAI response date occurred March 28, 2018. |
| / Pamela Longmire, Ph.D.
| | In future correspondence related to this request, please reference CAC No. 001028, the Docket Numbers, and EPID Numbers listed in the table. |
| Spent Fuel Licensing Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards Docket No s.: 72-43, 72-51, 72-1044, 72-07, 72-12, and 72 | | |
| -59 CAC No.: | | B. Ford ISFSI Docket Number EPID Numbers Big Rock Point 72-43 L-2017- FPR-0007 Indian Point 72-51 L-2017-FPR-0035 Pilgrim 72-1044 L-2017-FPR-0054 Palisades 72-07 L-2017-FPR-0050 Fitzpatrick 72-12 L-2017-FPR-0026 Vermont Yankee 72-59 L-2017-FPR-0071 The staff is available to clarify these questions, and if necessary to meet and discuss your proposed responses. If you have any questions regarding this matter, please contact me by e-mail at pamela.longmire@nrc.gov. |
| 001028 EPID s: L-2017- FPR-000 7 , L-2017-FPR-00 35 , L-2017-FPR-00 54 , L-2017-FPR-0050, L-2017-FPR-0026, and L-2017-FPR-00 71 | | Sincerely, |
| | /RA John McKirgan Acting for/ |
| | Pamela Longmire, Ph.D. |
| | Spent Fuel Licensing Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards Docket Nos.: 72-43, 72-51, 72-1044, 72-07, 72-12, and 72-59 CAC No.: 001028 EPIDs: L-2017- FPR-0007, L-2017-FPR-0035, L-2017-FPR-0054, L-2017-FPR-0050, L-2017-FPR-0026, and L-2017-FPR-0071 |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
Line 51: |
Line 42: |
| Request for Additional Information | | Request for Additional Information |
|
| |
|
| REQUEST FOR ADDITIONAL INFORMATION REGARDING ENTERGY OPERATIONS, INC.'S DECOMMISSIONING FUNDING PLAN UPDATE FOR BIG ROCK POINT, INDIAN POINT NUCLEAR GENERATING STATIONS UNITS 1, 2, AND 3, PILGRIM NUCLEAR POWER STATION, PALISADES NUCLEAR PLANT, JAMES A. FITZPATRICK NUCLEAR POWER PLANT, AND VERMONT YANKEE NUCLEAR POWER STATION INDEPENDENT SPENT FUEL STORAGE INSTALLATIONS DOCKET NOS. 72 | | B. Ford REQUEST FOR ADDITIONAL INFORMATION REGARDING ENTERGY OPERATIONS, INC.S DECOMMISSIONING FUNDING PLAN UPDATE FOR BIG ROCK POINT, INDIAN POINT NUCLEAR GENERATING STATIONS UNITS 1, 2, AND 3, PILGRIM NUCLEAR POWER STATION, PALISADES NUCLEAR PLANT, JAMES A. FITZPATRICK NUCLEAR POWER PLANT, AND VERMONT YANKEE NUCLEAR POWER STATION INDEPENDENT SPENT FUEL STORAGE INSTALLATIONS DOCKET NOS. 72-43, 72-51, 72-1044, 72-07, 72-12, AND 72-59, DOCUMENT DATE: April 5, 2018 DISTRIBUTION: |
| -43, 72-51, 72-1044, 72-07, 72-12, AND 72-59, DOCUMENT DATE: April 5, 2018 DISTRIBUTION: | | SFM R/F JMcKirgan ABowers SHarwell KLois MHenderson BWatson KConway JParrott G:/SFST/72.30 Decommissioning Funding Plans/RAIs/Entergy(2)/Entergy(2)-RAI.docx G:/SFST/72.30 Decommissioning Funding Plans/RAIs/Entergy(2)/Entergy(2)- |
| SFM R/F JMcKirgan ABowers SHarwell KLois MHenderson BWatson KConway JParrott G:/SFST/72.30 Decommissioning Funding Plans/RAIs/Entergy(2)/Entergy(2)-RAI.docx G:/SFST/72.30 Decommissioning Funding Plans/RAIs/Entergy(2)/Entergy(2)-Enclosure.docx ADAMS Package No.: ML18094B091 LTR: ML18094B093 Enc.: ML18094B092 C = COVER E = COVER & ENCLOSURE N = NO COPY OFC NMSS/DSFM NMSS/DSFM NMSS/DSFM NAME PLongmire WWheatley JMcKirgan DATE 3/28/18 03/29/18 04/05/18 OFFICIAL RECORD COPY}} | | Enclosure.docx ADAMS Package No.: ML18094B091 LTR: ML18094B093 Enc.: ML18094B092 C = COVER E = COVER & ENCLOSURE N = NO COPY OFC NMSS/DSFM NMSS/DSFM NMSS/DSFM NAME PLongmire WWheatley JMcKirgan DATE 3/28/18 03/29/18 04/05/18 OFFICIAL RECORD COPY}} |
Letter Sequence RAI |
---|
EPID:L-2017-FPR-0007, Package: RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for ISFSI Docket Nos.: 72-43, 72-51, 72-1044, 72-07, 72-12, and 72-59 (Open) EPID:L-2017-FPR-0026, Package: RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for ISFSI Docket Nos.: 72-43, 72-51, 72-1044, 72-07, 72-12, and 72-59 (Open) EPID:L-2017-FPR-0035, Package: RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for ISFSI Docket Nos.: 72-43, 72-51, 72-1044, 72-07, 72-12, and 72-59 (Open) EPID:L-2017-FPR-0050, Package: RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for ISFSI Docket Nos.: 72-43, 72-51, 72-1044, 72-07, 72-12, and 72-59 (Open) EPID:L-2017-FPR-0054, Package: RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for ISFSI Docket Nos.: 72-43, 72-51, 72-1044, 72-07, 72-12, and 72-59 (Open) EPID:L-2017-FPR-0071, Package: RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for ISFSI Docket Nos.: 72-43, 72-51, 72-1044, 72-07, 72-12, and 72-59 (Open) |
|
MONTHYEARML18094B0932018-04-0505 April 2018 Letter to B. S. Ford RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for ISFSI Docket Nos.: 72-43, 72-51, 72-1044, 72-07, 72-12, and 72-59 Project stage: RAI ML18094B0912018-04-0505 April 2018 Package: RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for ISFSI Docket Nos.: 72-43, 72-51, 72-1044, 72-07, 72-12, and 72-59 Project stage: Request ML18094B0922018-04-0505 April 2018 Enclosurequest for Additional Information (Letter to B. S. Ford RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for ISFSI Docket Nos.: 72-43, 72-51, 72-1044, 72-07, 72-12, and 72-59) Project stage: RAI ML21054A1322021-04-14014 April 2021 U.S. NRC Analysis of Entergy Nuclear Operations, Inc'S Initial and Updated Decommissioning Funding Plans for the Big Rock Point, Indian Point, Pilgrim, Palisades, Fitzpatrick, and Vermont Yankee Independent Spent Fuel Storage Installations Project stage: Other 2018-04-05
[Table View] |
Letter to B. S. Ford RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for ISFSI Docket Nos.: 72-43, 72-51, 72-1044, 72-07, 72-12, and 72-59ML18094B093 |
Person / Time |
---|
Site: |
Palisades, Indian Point, Pilgrim, Vermont Yankee, Big Rock Point, FitzPatrick |
---|
Issue date: |
04/05/2018 |
---|
From: |
Pamela Longmire Spent Fuel Licensing Branch |
---|
To: |
Ford B Entergy Operations |
---|
Longmire P |
Shared Package |
---|
ML18094B091 |
List: |
---|
References |
---|
CAC 001028, EPID No.: L-2017-FPR-0007, EPID No.: L-2017-FPR-0026, EPID No.: L-2017-FPR-0035, EPID No.: L-2017-FPR-0050, EPID No.: L-2017-FPR-0054, EPID No.: L-2017-FPR-0071 |
Download: ML18094B093 (3) |
|
|
---|
Category:Letter
MONTHYEARML24276A1332024-10-17017 October 2024 Issuance of Amendment No. 357 Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision-4, and Administrative Changes ML24282B0302024-10-11011 October 2024 Project Manager Assignment RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests PNP 2024-014, Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances2024-10-0909 October 2024 Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances PNP 2024-037, Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-0202024-10-0404 October 2024 Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-020 ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing JAFP-24-0051, Reply to Preliminary White Finding and Apparent Violation in NRC Inspection Report 05000333/2024011; EA-24-0882024-10-0303 October 2024 Reply to Preliminary White Finding and Apparent Violation in NRC Inspection Report 05000333/2024011; EA-24-088 BVY 24-026, Pre-Notice of Disbursement from Decommissioning Trust2024-10-0202 October 2024 Pre-Notice of Disbursement from Decommissioning Trust ML24267A2962024-10-0101 October 2024 Summary of Conference Call Regarding Steam Generator Tube Inspections ML24270A0742024-09-30030 September 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, & Opportunity for a Hearing (EPID L-2024-LLA-0134) - LTR ML24270A1452024-09-26026 September 2024 Notice of Enforcement Discretion for James A. Fitzpatrick Nuclear Power Plant JAFP-24-0046, Request for Enforcement Discretion for Technical Specification (TS) 3.3.2.1 Control Rod Block Instrumentation2024-09-25025 September 2024 Request for Enforcement Discretion for Technical Specification (TS) 3.3.2.1 Control Rod Block Instrumentation JAFP-24-0047, License Amendment Request – Temporary Addition to TS 3.3.2.1 Condition C, Control Rod Block Instrumentation to Support Upgrade to Rod Worth Minimizer Software2024-09-25025 September 2024 License Amendment Request – Temporary Addition to TS 3.3.2.1 Condition C, Control Rod Block Instrumentation to Support Upgrade to Rod Worth Minimizer Software JAFP-24-0045, Supplemental Information for License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications2024-09-20020 September 2024 Supplemental Information for License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications ML24263A1712024-09-20020 September 2024 Environmental Request for Additional Information IR 05000333/20240112024-09-19019 September 2024 Follow-up to Inspection Procedure 71153 Report 05000333/2024011 and Preliminary White Finding and Apparent Violation ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status JAFP-24-0044, Core Operating Limits Report Cycle 272024-09-16016 September 2024 Core Operating Limits Report Cycle 27 JAFP-24-0043, Revision to Commitment Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues2024-09-12012 September 2024 Revision to Commitment Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues ML24219A4202024-09-12012 September 2024 Change in Estimated Hours and Review Schedule for Licensing Actions Submitted to Support Resumption of Power Operations (Epids L-2023-LLE-0025, L-2023-LLM-0005, L-2023-LLA-0174, L-2024-LLA-0013, L-2024-LLA-0060, L-2024-LLA-0071) IR 05000255/20244022024-09-0606 September 2024 Public: Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2024402 05000333/LER-2024-002, Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation2024-09-0404 September 2024 Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation ML24165A0382024-09-0404 September 2024 Issuance of Amendment No. 356 Update Fuel Handling Accident Analysis IR 05000333/20240052024-08-29029 August 2024 Updated Inspection Plan for James A. Fitzpatrick Nuclear Power Plant (Report 05000333/2024005) 05000333/LER-2024-001-01, EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket2024-08-21021 August 2024 EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket IR 05000293/20240022024-08-21021 August 2024 NRC Inspection Report No. 05000293/2024002 PNP 2024-029, Notice of Payroll Transition at Palisades Nuclear Plant2024-08-15015 August 2024 Notice of Payroll Transition at Palisades Nuclear Plant IR 05000255/20240022024-08-0909 August 2024 NRC Inspection Report No. 05000255/2024002 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000333/20240022024-08-0707 August 2024 Integrated Inspection Report 05000333/2024002 IR 05000003/20240022024-08-0606 August 2024 NRC Inspection Report 05000003/2024002, 05000247/2024002, 05000286/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 PNP 2024-032, Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-07-31031 July 2024 Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations JAFP-24-0034, 10 CFR 50.46 Annual Report2024-07-31031 July 2024 10 CFR 50.46 Annual Report ML24208A0492024-07-30030 July 2024 Notice of Consideration of Issuance of Amendments to Facility Operating Licenses and Proposed No Significant Hazards Consideration Determination (Letter) BVY 24-024, Pre-Notice of Disbursement from Decommissioning Trust2024-07-30030 July 2024 Pre-Notice of Disbursement from Decommissioning Trust JAFP-24-0036, Supplement to License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2024-07-29029 July 2024 Supplement to License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis ML24206A0572024-07-25025 July 2024 PRM-50-125 - Letter to Alan Blind; Docketing of Petition for Rulemaking and Sufficiency Review Status (10 CFR Part 50) PNP 2024-033, Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations2024-07-24024 July 2024 Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations JAFP-24-0033, Response to Request for Information Pertaining to a Licensed Operator Positive Fitness-For-Duty Test2024-07-23023 July 2024 Response to Request for Information Pertaining to a Licensed Operator Positive Fitness-For-Duty Test IR 05000333/20244032024-07-18018 July 2024 Biennial Problem Identification and Resolution Inspection Report 05000333/2024403 (Cover Letter Only) PNP 2024-031, Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-07-18018 July 2024 Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000255/20240112024-07-15015 July 2024 Nuclear Plant - Restart Inspection Report 05000255/2024011 IR 05000333/20244012024-07-15015 July 2024 Security Baseline Inspection 05000333/2024401 RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions ML24190A1932024-07-0909 July 2024 Correction Letter of Amendment No. 355 Revise Technical Specifications Section 3.4.3.1, Safety Relief Valves Setpoint Lower Tolerance PNP 2024-027, Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2024-07-0909 July 2024 Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations IR 05000333/20240102024-07-0808 July 2024 Commercial Grade Dedication Inspection Report 05000333/2024010 ML24184A1662024-07-0303 July 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24137A0142024-07-0202 July 2024 OEDO-24-00011 - 2.206 Petition for Misuse of Palisades Decommissioning Trust Fund (EPID L-2023-CRS-0008) - Letter 2024-09-06
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 5, 2018 Mr. Bryan S. Ford Senior Manager Fleet Regulator Assurance Entergy Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION REGARDING ENTERGY OPERATIONS, INC.S DECOMMISSIONING FUNDING PLAN UPDATE FOR BIG ROCK POINT, INDIAN POINT NUCLEAR GENERATING STATIONS UNITS 1, 2, AND 3, PILGRIM NUCLEAR POWER STATION, PALISADES NUCLEAR PLANT, JAMES A. FITZPATRICK NUCLEAR POWER PLANT, AND VERMONT YANKEE NUCLEAR POWER STATION INDEPENDENT SPENT FUEL STORAGE INSTALLATIONS DOCKET NOS. 72-43, 72-51, 72-1044, 72-07, 72-12, AND 72-59
Dear Mr. Ford:
By letter dated December 17, 2015, Entergy Nuclear Operations, Inc. (Entergy) submitted, for U.S. Nuclear Regulatory Commission (NRC) staff review and approval, decommissioning funding plan updates (DFP Updates) for the independent spent fuel storage installations (ISFSIs) at Big Rock Point, Indian Point Nuclear Generating Stations Units 1, 2, and 3 (Indian Point 1, 2, and 3), Pilgrim Nuclear Power Station (Pilgrim), Palisades Nuclear Plant (Palisades),
James A. FitzPatrick Nuclear Power Plant (FitzPatrick), and Vermont Yankee Nuclear Power Station (Vermont Yankee) (Agencywide Documents Access and Management System Accession No. ML15351A524). The NRC staff reviewed Entergys DFP updates for each ISFSI and believes Entergys submittal was not sufficient to meet the intent of the requirement in Title 10 of the Code of Federal Regulations (10 CFR) 72.30(c). Specifically, the DFP updates do not provide sufficient information to allow the NRC to determine that the events listed in 10 CFR 72.30(c)(1)-(4) have been considered.
The NRC staff need the information identified in the enclosure to this letter. We request that you provide this information within forty-five (45) working day of the date of this letter. Inform us at your earliest convenience, but no later than 2 weeks prior to the due date, if you are not able to provide the information by that date. To assist us in re-scheduling your review, you should include a new proposed submittal date and the reasons for the delay. Discussion of the request for additional information (RAI) and RAI response date occurred March 28, 2018.
In future correspondence related to this request, please reference CAC No. 001028, the Docket Numbers, and EPID Numbers listed in the table.
B. Ford ISFSI Docket Number EPID Numbers Big Rock Point 72-43 L-2017- FPR-0007 Indian Point 72-51 L-2017-FPR-0035 Pilgrim 72-1044 L-2017-FPR-0054 Palisades 72-07 L-2017-FPR-0050 Fitzpatrick 72-12 L-2017-FPR-0026 Vermont Yankee 72-59 L-2017-FPR-0071 The staff is available to clarify these questions, and if necessary to meet and discuss your proposed responses. If you have any questions regarding this matter, please contact me by e-mail at pamela.longmire@nrc.gov.
Sincerely,
/RA John McKirgan Acting for/
Pamela Longmire, Ph.D.
Spent Fuel Licensing Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards Docket Nos.: 72-43, 72-51, 72-1044, 72-07, 72-12, and 72-59 CAC No.: 001028 EPIDs: L-2017- FPR-0007, L-2017-FPR-0035, L-2017-FPR-0054, L-2017-FPR-0050, L-2017-FPR-0026, and L-2017-FPR-0071
Enclosure:
Request for Additional Information
B. Ford REQUEST FOR ADDITIONAL INFORMATION REGARDING ENTERGY OPERATIONS, INC.S DECOMMISSIONING FUNDING PLAN UPDATE FOR BIG ROCK POINT, INDIAN POINT NUCLEAR GENERATING STATIONS UNITS 1, 2, AND 3, PILGRIM NUCLEAR POWER STATION, PALISADES NUCLEAR PLANT, JAMES A. FITZPATRICK NUCLEAR POWER PLANT, AND VERMONT YANKEE NUCLEAR POWER STATION INDEPENDENT SPENT FUEL STORAGE INSTALLATIONS DOCKET NOS. 72-43, 72-51, 72-1044, 72-07, 72-12, AND 72-59, DOCUMENT DATE: April 5, 2018 DISTRIBUTION:
SFM R/F JMcKirgan ABowers SHarwell KLois MHenderson BWatson KConway JParrott G:/SFST/72.30 Decommissioning Funding Plans/RAIs/Entergy(2)/Entergy(2)-RAI.docx G:/SFST/72.30 Decommissioning Funding Plans/RAIs/Entergy(2)/Entergy(2)-
Enclosure.docx ADAMS Package No.: ML18094B091 LTR: ML18094B093 Enc.: ML18094B092 C = COVER E = COVER & ENCLOSURE N = NO COPY OFC NMSS/DSFM NMSS/DSFM NMSS/DSFM NAME PLongmire WWheatley JMcKirgan DATE 3/28/18 03/29/18 04/05/18 OFFICIAL RECORD COPY