| issue date = 07/16/1976
| issue date = 07/16/1976
| title = LER 1976-20-00 for R.E. Ginna, Unit 1, on Completion of Monthly Surveillance Test of 1A Emergency Generator (Eg), Operator Opened Bus 14 Breaker from Eg and Received Diesel Generator Supply Breaker Overcurrent Trip Alarm
| title = LER 1976-20-00 for R.E. Ginna, Unit 1, on Completion of Monthly Surveillance Test of 1A Emergency Generator (Eg), Operator Opened Bus 14 Breaker from Eg and Received Diesel Generator Supply Breaker Overcurrent Trip Alarm
| author name = White L D
| author name = White L
| author affiliation = Rochester Gas & Electric Corp
| author affiliation = Rochester Gas & Electric Corp
| addressee name = O'Reilly J P
| addressee name = O'Reilly J
| addressee affiliation = NRC/IE, NRC/RGN-I
| addressee affiliation = NRC/IE, NRC/RGN-I
| docket = 05000244
| docket = 05000244
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:0 ps(ZZilsP sszstE ,~'/jZjPi rrsIIZ saws'uzi(>>ROCHESTER GAS AND ELECTRIC CORPORATION I NCT'i~i~OSIS~0/(~-, IIgIC I L o 89 EAST AVENUE, ROCHESTER, N.Y.14649 LEON D.WHITE, JR.VICC PRESIDENT TCLCPHONE A~CA COO@Tia 546-2700 July 16, lll6 Mr.James P.O'Reilly, Director U.S.Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania 19406  
{{#Wiki_filter:0
                                                                                          'i ~ i ~ OSIS ~ 0 I      NCT ps(ZZilsP   sszstE
,~'/jZjPi 'uzi(>>
saws rrsIIZ                                                                  /(                   ~-, IIgIC I
L ROCHESTER GAS AND ELECTRIC CORPORATION          o 89 EAST AVENUE, ROCHESTER, N.Y. 14649 LEON D. WHITE, JR.                                                           TCLCPHONE VICC PRESIDENT                                                   A~CA COO@ Tia 546-2700 July 16, lll6 Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania       19406


==Subject:==
==Subject:==
Reportable Occurrence 76-20 (14-day report), Bus 14 breaker frord'A Emergency'enerator R.E.Ginna Nuclear Power Plant, Unit No.1 Docket 5fo.50-244  
Reportable Occurrence 76-20 (14-day report), Bus 14 breaker frord'A Emergency'enerator R. E. Ginna Nuclear Power Plant, Unit No. 1 Docket 5fo. 50-244


==Dear Mr.O'Reilly:==
==Dear Mr. O'Reilly:==
In accordance with Technical Specifications, Article,6.9.2a, the attached report of Reportable Occurrence 76-20, 14-day, is hereby submitted; Two additional copies of this letter and the attachment are enclosed.Very truly yours,~M/Attachment cc: Dr.Ernst Volgenau (40)Mr.William G.McDonald (3) 9 D 4 CONTROL BLOCK: 1 UCEN SEE NAME 1 0 0 14 15~o>N Y R E G 7 89 LER 76-20/1T LICENSEE EVENT REPOR iPLEA8E PRINT ALL REQUIRED INFORMATION) 6 UCENSE EVENT LCENSE NUMBER TYPE TYPE 0 0 0 0 0-0 0 4 1 1 1 1, L0001iI 25 26 30 31 32 REPORT REPORT CATEGORY TYPE SOURCE DOCKET NUMBER EVENT DATE REPORT DATE[QQ~IQQNT~T 1, 0 5 0-0 2 4 4 0 7 0 9 7 6 0 7 1 6 7 6 7 8 57 58 59 60 61 68 69 74 75 80 EVENT DESCRIPTION Qpg On completion of monthly surveillance test of lA Emergency Generator (EG), operator 7 89 80 tOp~]trip alarm.Knowing this alarm was invalid, operator attempted to reset breaker elec-7 8 9 80 tOOI trically with control switch.Alarm did not clear.1B EG was not started.Electrician 7 8 9 80 oreman was notified at once and he immediately went (cont'd.under Additional Factors)7 8 9 PRME SYSTEM CAUSE COMPONENT CODE CODE COMPONENT CODE SUPPLER[QO7I~BE E c K T B R K~N 7 8 9 10 11 12 17 43 CAUSE DESCRIPTION
 
[QDg ear had occurred on shunt trip alarm switch 80 COMPONENT MANUFACTURER W 1 2 0 Y 44 48 47 linkage preventing breaker to reset elec-7 8 9 80 Jog trically.With the 1B EG running, shunt trip assembly spring tension was increased and 7 89 80 Qpg opened Bus 14 breaker from EG and received Diesel generator supply breaker overcurrent 7 89 4 FACIUTY STATUS POWER~E~10 0 NA 7 8 9 10 12 13 FORM OF ACTIVITY COATENT RELEASEO OF RELEASE AMOUNT OF ACTIVITY 1 2 NA 7 8 9 10 11 PERSONNEL EXPOSURES 7 89 11 12 13 4 PERSONNEL INJURIES NUMBER DESCRIPTION Piij~00 0 NA 7 89 11 12 OTHER STATUS OFFSITE CONSEQUENCES NA METHOD OF DISCOVERY b 44 45 46 44 45 NA DISCOVERY DESCRIPTION NA LOCATION OF RELEASE 7 8 9~10 breaker was operated successfully several times.The (cont'd.on attached sheet)80 80 80 80 80 80 7 89 LOSS OR DAMAGE TO FACILITY TYPE DESCRIPTION H 7 89 10 PUBLICITY 7 89 NA NA 80 80 80 ADDITIONAL FACTORS Q~g (cont'd.from Event Description) to location of breaker to investigate.
In accordance with Technical Specifications, Article,6.9.2a, the attached report of Reportable Occurrence 76-20, 14-day, is hereby submitted; Two additional copies of this letter and the attachment are enclosed.
He reset 7 89 Q~g breaker manually.(Reportable Occurrence 76-20, 14-day).80 7 89 NAME: j.C.Noon 80 PHQNE.716/546-2700, ext.291-215 GPO 881 667 4"l Licensee Event Report Reportable Occurrence 50-244/76-20 Cause Descri tion (cont'd.)breaker was then returned to service and both EG's returned to standby.The PORC recommended that the alarm response cards be updated to state that the other EG is to be placed in service immediately on notification of one EG or its electrical bus ties being inoperable.
Very truly yours,
CAR 1084 has been issued to document this corrective action.
                                                      ~M/
FQ E'~<~;Vd'VlSSA8d so GNHi 9LSl 08"""@.u'tu's'~GBAl-'9B~}}
Attachment cc: Dr. Ernst Volgenau (40)
Mr. William G. McDonald (3)
 
9 D LER     76-20/1T CONTROL BLOCK:
4      LICENSEE EVENT                   REPOR iPLEA8E PRINT ALL REQUIRED INFORMATION) 1                        6 UCEN SEE                                                                                    UCENSE             EVENT NAME                                    LCENSE NUMBER                                     TYPE               TYPE
  ~o>      N    Y    R    E    G    1        0  0        0   0   0   0   0   0         0         4     1   1   1   1,   L0001iI
                  ~
7 89                                14    15                                              25     26                   30   31     32 REPORT     REPORT CATEGORY       TYPE     SOURCE               DOCKET NUMBER                           EVENT DATE                     REPORT DATE
[QQ~IQQNT                       T         1,       0   5   0   0       2   4   4         0   7     0   9   7   6     0   7   1   6   7   6 7     8         57     58       59         60   61                                   68     69                         74   75                       80 EVENT DESCRIPTION Qpg       On completion           of monthly surveillance test of lA Emergency Generator (EG), operator 7    89                                                                                                                                                80 Qpg opened Bus 14 breaker from EG and received Diesel generator supply breaker overcurrent 7 89                                                                                                                                                     80 tOp~] trip alarm. Knowing this alarm was invalid, operator attempted to reset breaker elec-7 8 9 tOOI trically with control switch. Alarm did not clear. 1B EG was not started. Electrician 80 7 8 9 oreman was notified at once and he immediately went (cont'd. under Additional Factors) 80 7     8 9                                                               PRME                                                                             80 SYSTEM     CAUSE                                         COMPONENT              COMPONENT CODE       CODE             COMPONENT CODE               SUPPLER             MANUFACTURER
[QO7I   ~BE             E           c   K T     B   R   K           ~N             W    1    2    0            Y 7   8 9 10             11       12                         17       43           44                  47          48 CAUSE DESCRIPTION
[QDg         ear had occurred on shunt trip alarm switch linkage preventing breaker to reset elec-7   8 9                                                                                                                                                 80 Jog       trically. With the               1B EG   running, shunt trip assembly spring tension was increased and 7 8 9                                                                                                                                                    80
~10 breaker was operated successfully several times. The (cont'd. on attached sheet) 7 89                               4 80 FACIUTY                                                           METHOD OF STATUS             POWER                 OTHER STATUS            DISCOVERY                          DISCOVERY DESCRIPTION
              ~E           ~10           0             NA                        b                          NA 7   8       9             10             12 13                           44      45      46                                                          80 FORM OF ACTIVITY     COATENT RELEASEO     OF RELEASE             AMOUNT OF ACTIVITY                                               LOCATION OF RELEASE 1 2                                             NA                                                      NA 7     8       9               10       11                                   44        45                                                                  80 PERSONNEL EXPOSURES 7     89               11     12       13                   4 80 PERSONNEL INJURIES NUMBER           DESCRIPTION Piij     ~00       0                             NA 7     89               11   12                                                                                                                           80 OFFSITE CONSEQUENCES NA 7     89                                                                                                                                                80 LOSS OR DAMAGE TO FACILITY TYPE     DESCRIPTION H                                       NA 7     89         10                                                                                                                                     80 PUBLICITY NA 7     89                                                                                                                                                 80 ADDITIONAL FACTORS Q~g (cont'd. from Event Description) to location of breaker to investigate. He reset 7     89                                                                                                                                                 80 Q~g breaker manually. (Reportable Occurrence 76-20, 14-day) .
7 89                                                                                                                                                     80 NAME:                   j.C. Noon                                                   PHQNE. 716/546-2700,           ext. 291-215 GPO   881 667
 
4 "l
 
Licensee Event Report Reportable Occurrence 50-244/76-20 Cause Descri tion (cont'd.)
breaker was then returned to service and both EG's returned to standby.
The PORC recommended that the alarm response cards be updated to state that the other EG is to be placed in service immediately on notification of one EG or its electrical bus ties being inoperable.
CAR 1084 has been   issued to document this corrective action.
 
E' ~ <~
FQ GNHi
;Vd 'VlSSA8d so 9LSl 08 """
        @.u 'tu 's '~
GBAl-'9B~}}

Latest revision as of 02:22, 21 October 2019

LER 1976-20-00 for R.E. Ginna, Unit 1, on Completion of Monthly Surveillance Test of 1A Emergency Generator (Eg), Operator Opened Bus 14 Breaker from Eg and Received Diesel Generator Supply Breaker Overcurrent Trip Alarm
ML18142B275
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/16/1976
From: White L
Rochester Gas & Electric Corp
To: O'Reilly J
NRC/IE, NRC Region 1
References
LER 1976-20-00
Download: ML18142B275 (6)


Text

0

'i ~ i ~ OSIS ~ 0 I NCT ps(ZZilsP sszstE

,~'/jZjPi 'uzi(>>

saws rrsIIZ /( ~-, IIgIC I

L ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649 LEON D. WHITE, JR. TCLCPHONE VICC PRESIDENT A~CA COO@ Tia 546-2700 July 16, lll6 Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania 19406

Subject:

Reportable Occurrence 76-20 (14-day report), Bus 14 breaker frord'A Emergency'enerator R. E. Ginna Nuclear Power Plant, Unit No. 1 Docket 5fo. 50-244

Dear Mr. O'Reilly:

In accordance with Technical Specifications, Article,6.9.2a, the attached report of Reportable Occurrence 76-20, 14-day, is hereby submitted; Two additional copies of this letter and the attachment are enclosed.

Very truly yours,

~M/

Attachment cc: Dr. Ernst Volgenau (40)

Mr. William G. McDonald (3)

9 D LER 76-20/1T CONTROL BLOCK:

4 LICENSEE EVENT REPOR iPLEA8E PRINT ALL REQUIRED INFORMATION) 1 6 UCEN SEE UCENSE EVENT NAME LCENSE NUMBER TYPE TYPE

~o> N Y R E G 1 0 0 0 0 0 0 0 0 0 4 1 1 1 1, L0001iI

~

7 89 14 15 25 26 30 31 32 REPORT REPORT CATEGORY TYPE SOURCE DOCKET NUMBER EVENT DATE REPORT DATE

[QQ~IQQNT T 1, 0 5 0 0 2 4 4 0 7 0 9 7 6 0 7 1 6 7 6 7 8 57 58 59 60 61 68 69 74 75 80 EVENT DESCRIPTION Qpg On completion of monthly surveillance test of lA Emergency Generator (EG), operator 7 89 80 Qpg opened Bus 14 breaker from EG and received Diesel generator supply breaker overcurrent 7 89 80 tOp~] trip alarm. Knowing this alarm was invalid, operator attempted to reset breaker elec-7 8 9 tOOI trically with control switch. Alarm did not clear. 1B EG was not started. Electrician 80 7 8 9 oreman was notified at once and he immediately went (cont'd. under Additional Factors) 80 7 8 9 PRME 80 SYSTEM CAUSE COMPONENT COMPONENT CODE CODE COMPONENT CODE SUPPLER MANUFACTURER

[QO7I ~BE E c K T B R K ~N W 1 2 0 Y 7 8 9 10 11 12 17 43 44 47 48 CAUSE DESCRIPTION

[QDg ear had occurred on shunt trip alarm switch linkage preventing breaker to reset elec-7 8 9 80 Jog trically. With the 1B EG running, shunt trip assembly spring tension was increased and 7 8 9 80

~10 breaker was operated successfully several times. The (cont'd. on attached sheet) 7 89 4 80 FACIUTY METHOD OF STATUS POWER OTHER STATUS DISCOVERY DISCOVERY DESCRIPTION

~E ~10 0 NA b NA 7 8 9 10 12 13 44 45 46 80 FORM OF ACTIVITY COATENT RELEASEO OF RELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE 1 2 NA NA 7 8 9 10 11 44 45 80 PERSONNEL EXPOSURES 7 89 11 12 13 4 80 PERSONNEL INJURIES NUMBER DESCRIPTION Piij ~00 0 NA 7 89 11 12 80 OFFSITE CONSEQUENCES NA 7 89 80 LOSS OR DAMAGE TO FACILITY TYPE DESCRIPTION H NA 7 89 10 80 PUBLICITY NA 7 89 80 ADDITIONAL FACTORS Q~g (cont'd. from Event Description) to location of breaker to investigate. He reset 7 89 80 Q~g breaker manually. (Reportable Occurrence 76-20, 14-day) .

7 89 80 NAME: j.C. Noon PHQNE. 716/546-2700, ext. 291-215 GPO 881 667

4 "l

Licensee Event Report Reportable Occurrence 50-244/76-20 Cause Descri tion (cont'd.)

breaker was then returned to service and both EG's returned to standby.

The PORC recommended that the alarm response cards be updated to state that the other EG is to be placed in service immediately on notification of one EG or its electrical bus ties being inoperable.

CAR 1084 has been issued to document this corrective action.