ML18142B884: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 03/25/1975
| issue date = 03/25/1975
| title = LER 1975-006-00 for R. E. Ginna, Unplanned Insertion of Greater than 0.5% K/K with Reactor Subcritical
| title = LER 1975-006-00 for R. E. Ginna, Unplanned Insertion of Greater than 0.5% K/K with Reactor Subcritical
| author name = White L D
| author name = White L
| author affiliation = Rochester Gas & Electric Corp
| author affiliation = Rochester Gas & Electric Corp
| addressee name = O'Reilly J P
| addressee name = O'Reilly J
| addressee affiliation = NRC/IE, NRC/RGN-I
| addressee affiliation = NRC/IE, NRC/RGN-I
| docket = 05000244
| docket = 05000244
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:NRC DISTRIBUTION FOR PART 50 DQCI<ET MATERIAL (TEIt/IPORARY FORM)CONTROL NQ:~~~MM FILE.INCID"-!.'T
{{#Wiki_filter:NRC DISTRIBUTION FOR PART 50 DQCI<ET MATERIAL (TEIt/IPORARY FORM)
!'."-PC."..T FI F RQM: Roches ter Gas&Elec.Co~Rochester, N.Y.I DATE OF DOC 3-25-75 4-3-75 XX DATE REC'D LTR TWX RPT OTHER TO: James P.O'Reilly.ORIG i Signed CC OTHER SENT AEC PDR SENT LOCAL PDR XXX XXXX CLASS UNC LASS XXX PROPINFO INPUT NO CYS REC'D DOCKET NO: '50-244.DESCRIPTION:
CONTROL NQ:~~~MM FILE. INCID"-!.'T !'."-PC."..T FI F RQM: Roches     ter Gas &   Elec. Co ~ DATE OF DOC      DATE REC'D            LTR          TWX    RPT          OTHER Rochester,     N. Y.               3-25-75           4-3-75               XX I
Ltr.trans the following..
                                                    .ORIG          CC      OTHER             SENT AEC PDR                      XXX TO:
~PLANT NAiiIE: RE Ginna 8i ENCLOSURES:
James   P. O'Reilly               i Signed                                     SENT LOCAL PDR                       XXXX CLASS       UNC LASS         PROPINFO           INPUT       NO CYS REC'D                 DOCKET NO:
Abnorm Occurr.8 75-06;on 3-12-75 con-cerning, boron concentration reduced in-advertently from 2068 ppm to 1975ppm..~0 FOR ACTIQI II/liUFQ RMATIQiil"VCR 4-4-75 BUTLER (L)W/Copies CLARK (L)W/t.nnjes PARR fl I W/Copies KNIEL (L)W/Copies S CHWENCER (L)W/Copies STOLZ (L)W/Copies VASSu,i.l O (I}W/t;opies PURPLE (L).W<opies ZIEMAIIIiII(L)
XXX                                                                                          '50-244
W/Copies DICKER (E)W/Conies KNIGHTON (E)vl/Copies YOUNGBLOOD (E)W/Copies REGAN (E)W/Copies LEAR (L)W/Conies SPF I,R'vV/Copies W/Copies REG F IL TECH REVIEW~SCHROEDF R QGC, ROOI'.1 P-506A MACCARY GOSSI CK/STAF F KNI G HT~CASE PAWLICKI GIAN BUSSO SHAO BOYD STE LLO MOOR E (L)"-+~HOUSTON DEYOUNG (L)'"-~NQVAK SKQVHOLT (L)<<ROSS GOLLER (L)(Ltr)<<IPPOLITQ P;COLLINS-"'EDESCO DENISE LONG REG QPR LAINAS DEFILE 5 REGIOfl (2)BENAROYA'~T.R.iVILSON(A)<<VOLLMER STEELE INTERNAL DISTRIBUTION DFNTOiN GAMIM I LL KASTN ER BALLARD SPANGLER LIC ASST DIGGS (L)'EAR liN (L)GOULBOUR NE KREUTZER (F)LEE (L)MAIG BET (L)REED (E)SERVICE (L)SHEPPARD (L)SLATER (E)Sic)1TH (L)TEETS (L)WILLIAMS (E)Wl LSPN (L)INGRAiUI (L)'.H.~"E.P.J.M.ENVIRO S.MULLER M.DICKER~S.KN,'GHTQIV
  . DESCRIPTION:                                                  ENCLOSURES:
~M.YOUNG BLOOD REGAN S.PROJECT LDR G.V.HAR LESS EXT ANAL Dl TRIBUTIOiN.e J.0'/7 INO.BRAIiitiAN SA LTZi'1 AN (L)', MF LTZ PLANS MCDONALD CH'APIVIAN DUBE (Ltr)E.COUP" PETER SOLI HARTFIELD (2)<<KLECKERi EISENHUr WIG G I NTQ8'F.VilLLI!S~>A'g'tt-~LOCAl PDR 1 IC (ABERNA Y)(l)(2)(1-NATIOiNAL LABS NSI C (BUCHAIIIAIN) 1-W.PENiiIINGTON, Rm E.201 GT ASLB 1-CON SU LTAIN TS Iileivton Ant)erson NE Will AR K/8 LUIS/I E/AG BA 6 I AN ACRS 3'.a TG LIC ASST~~SE;D G:~Y TZ!i D aY,"~703.A3 1-PD R.SAN/LA/N Y 1-BRQOKHAVEN
Ltr. trans     the following..   ~                             Abnorm Occurr. 8 75-06; on 3-12-75 con-cerning, boron concentration reduced in-advertently from 2068 ppm to 1975ppm.. ~
.iAT LAB 1-G.ULFilKSQN, Oi"l L 1-AGMED (RUTH GUSSMAiV Rrn 8-127 GT 1-J.D.RUiIIKLES, Rrn E.201.....GT ROCHESTER GAS AND ELECTRIC CORPORATION PCS 7 0 II K I htKtt D 89 EAST AVENUE, ROCHESTER, N.Y, 14649 LEON D.WHITE, JR.VICE PRESIDENT QCCI(Llil IJRII~<1 I I Ohthtllc*'h~hI March 25, 1975 T E L E P ht O N E ARE*CODE 71K 546-2700 Mr.James P.O'Reilly, Director U.S.Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania 19406  
PLANT NAiiIE:          RE  Ginna  8i                                  0 FOR ACTIQIII/liUFQRMATIQiil                                "VCR     4-4-75 BUTLER (L)                   S CHWENCER (L) ZIEMAIIIiII(L)                REGAN (E)
W/ Copies                   W/ Copies          W/ Copies               W/ Copies CLARK (L)                   STOLZ (L)           DICKER (E)                LEAR (L)
W/ t .nnjes                  W/ Copies           W/ Conies                W/ Conies PARR fl I                    VASSu,i.l O (I }   KNIGHTON (E)              SPF I,R W/ Copies                    W/ t;opies         vl/ Copies              'vV/ Copies KNIEL (L)                   PURPLE (L)         YOUNGBLOOD (E)
W/ Copies                   .W < opies          W/ Copies                 W/ Copies INTERNAL DISTRIBUTION REG F IL                     TECH REVIEW         DFNTOiN                  LIC ASST                                INO  .
                              ~SCHROEDF R                                     DIGGS (L)                      BRAIiitiAN QGC, ROOI'.1 P-506A         MACCARY             GAMIMI LL              H.        liN (L)
                                                                                            'EAR SA LTZi'1AN GOSSI CK/STAF F               KNIG HT             KASTN ER          ~ "E. GOULBOUR NE              (L)',  MF LTZ
~CASE                           PAWLICKI             BALLARD              P. KREUTZER (F)
GIAN BUSSO                   SHAO               SPANGLER              J. LEE (L)                        PLANS DEFILE                                                                                                        MCDONALD BOYD                         STE LLO                                   M. MAIG BET (L)
                            "-+~ HOUSTON             ENVIRO                S. REED (E)                        CH'APIVIAN MOOR E (L)
DEYOUNG (L) '"-~NQVAK                           MULLER                M. SERVICE (L)          '.          DUBE (Ltr)
E. COUP" SKQVHOLT (L)
GOLLER (L) (Ltr)
P; COLLINS         -"
                              <<ROSS
                              <<IPPOLITQ
                          'EDESCO DICKER KN,'GHTQIV YOUNG BLOOD
                                                                    ~~S. M.
SHEPPARD (L)
SLATER (E)
Sic)1TH (L)
PETER
                                                                                                                .0'/7 SOLI HARTFIELD (2)
DENISE                      LONG                REGAN                S. TEETS (L)                     <<KLECKERi REG QPR                      LAINAS              PROJECT LDR          G. WILLIAMS(E)                     EISENHUr BENAROYA                                  V. Wl LSPN (L)                     WIG G I NTQ8' 5 REGIOfl (2)
'~T.R. iVILSON( A)              <<VOLLMER              HAR LESS                 INGRAiUI (L)                       F. VilLLI         !S STEELE                                                                                                  ~ >A'g 'tt-   ~
EXT ANAL Dl TRIBUTIOiN
                                                            .e J LOCAl PDR                                                                                   PD R.SAN/LA/NY 1 IC   (ABERNA         Y) (l)(2)(1 NATIOiNALLABS                                      1 BRQOKHAVEN iAT LAB W. PENiiIINGTON, Rm E.201 GT                   1                            .
NSI C (BUCHAIIIAIN)                1 CON SU LTAINTS                                  1    G. ULFilKSQN, Oi "lL ASLB                              1 AGMED (RUTH GUSSMAiV Iileivton Ant)erson                   NE WillAR K/8 LUIS/I E/AG BA6 I AN             1 Rrn 8-127 GT ACRS 3'.a TG LIC ASST                                                                       J. D. RUiIIKLES, Rrn E.201
      ~~ SE; D G:~Y TZ!i D aY,"~703.A3                                                           1
                                                                                                .....GT
 
PCS 7 0 II K I
htKtt ROCHESTER GAS AND ELECTRIC CORPORATION                D 89 EAST AVENUE, ROCHESTER, N.Y, 14649 LEON D. WHITE, JR.                                                                 T E L E P ht O N E VICE PRESIDENT                     QCCI(Llil IJRII~<
ARE* CODE 71K      546-2700 1
I March 25, 1975 I Ohthtllc *'h~hI Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania               19406


==Subject:==
==Subject:==
Abnormal Occurrence 75-06, Unplanned insertion of greater than 0.5%+k/k with the reactor subcritical.
Abnormal Occurrence 75-06, Unplanned insertion of greater than 0.5%+k/k with the reactor subcritical.
R.E.Qinna Nuclear Power Plant, Unit No.1 Docket No.50-244  
R. E. Qinna Nuclear Power Plant, Unit No. 1 Docket No. 50-244
 
==Dear Mr. O'Reilly:==
 
In accordance with Technical Specifications, Article 6. 6.2a, the attached report of Abnormal Occurrence 75-06 is hereby submitted. Two additional copies of this letter and the attachment are enclosed.
Very truly yours, L. D. White, Jr.
Attachment cc: Mr. Donald P. Knuth (40)
 
I~
g~
 
CONTROL BLOCK:
                                                      ~      LICENSEE EVENT REPOR'I (PLEASE PRINT ALL REQUIRED IIIIFORMATIOIII)
LICENSEE                                                                                UCENSE                EVENT NAME                                  LICENSE NUMBER                                    TYPE                  TYPE gg N          Y R E          G      1        0  0    0      0  0    0    0  0        0        4  1    1    1    1',~01 7 89                                  14    15                                                      26                    30    31    32 REPORT      REPORT
~    7    8 CATEGORY I
57 D    I 58 TYPE T
59
                                                ~
SOURCE 60    61 0  5 DOCKET NUMBER o    0      2    4    4 68    69 0  3 EVENT DATE 1  2    7    5 74    75 0    3 REPORT DATE 2    5    7    5 80 I
EVENT DESCRIPTION
[oO~]        Durin ste          s  to rovide additional purification of reactor coolant, with the reactor at 7    8 9                                                                                                                                                  80 cold shutdown, fboron concentration was reduced inadvertently from 2068 ppm to 1975 7      89                                                                                                                                                '0 Innsj          ppm,) an insertion of more than 0.5% reactivity. Boron concentration was restored to 7 8 9                                                                                                                                                      80 Qpg            above 2000 ppm in preparation for refueling.                                (Abnormal Occurrence 50-244/75-06) 7    8 9                                                                                                                                                  80 IOOI 7 8 9                                                                    PIEME                                                                              80 SYSTEM      CAUSE                                        COMPONENT              COMPONENT CODE        CODE              COMPONENT CODE              SUPPLER              MANUFACTURER          VIDLA11DN
[P]~CG 8 9 D          D      E  MI      N X            ~N              W    1    2    0            N 7            10          11        12                          17        43          44                47          48 CAUSE DESCRIPTION toOs]          The procedure to valve in a converted deborating to cation demineralizer                                              was'n 7    8 9                                                                                                                                                  80
[opg]          error; a deborating demineralizer was valved in instead.                                    Measures to prevent 7    8 9                                                                                                                                                  80
    ~10          recurrence are given on the attached page.
7    89      FACIUTY                                                          METHOD OF 80 STATUS          IE  POWER                OTHER STATUS          DISCOVERY                        DISCOVERY DESCRIPTION Q~g              G          ~oo          o                  N/A                    b          Anal sis of reactor coolant sam le 7    8      9            10        . 12 13                          44      45      46                                                            80 FORM OF ACTIVITY      COATENT RELEASEO    OF RELEASE            AMOUNT OF ACTIVITY                                              LOCATION OF RELEASE H            H                      N/A                                                  N/A 7      8      9              10      11                                    44        45                                                                  80 PERSONNEL EXPOSURES NUMBER        TYPE        DESCRIPTION P~7s      ~OO        O        B                  N A 7      89              11    12      13                                                                                                                  80 PERSONNEL INJURIES NUMBER          DESCRIPTION
            ~oo        o                      N/A 7      8 9              11  12                                                                                                                            80 OFFSITE CONSEQUENCES
  @~5            N/A 7    t89                                                                                                                                                  80 LOSS OR DAMAGE TO FACILITY TYPE      DESCRIPTION Qig        2                  N/A 7      89          10                                                                                                                                      80 PUBLICITY N/A 7      89                                                                                                                                                  80 ADDITIONAL FACTORS Jig            In 1972 cation resins were placed in one of two Deborating Demineralizers after 89                                                                                                                                                  80 Qqg            cation demineralizer failure.
7  s  89                                                                                                                                                  80 NAME:                  Bruce A. Snow                                              PHDNE. 716-546-2700, Ext. 291-214 GPO  882 ~ 88T
 
0 l Licensee Event Report                                                            2.
50-244/75-06 Measures to Prevent Recurrence
: a. Correct the deficient procedure, S-3.3D, Cation Dem'ineralizer Operation.
The corrected procedure was reviewed in a Plant Operations Review Committee Meeting f35-75 on March 14, 1975.
: b. Provide positive identification of the cation demineralizer at the location of the valve hand wheels. A sign for this location will be completed before May 1, 1975.
: c. Review other procedures associated with the cation demineralizer to verify adequacy. This was completed on March 18, 1975 by the Operations Engineer.


==Dear Mr.O'Reilly:==
1 A/ ~ v
In accordance with Technical Specifications, Article 6.6.2a, the attached report of Abnormal Occurrence 75-06 is hereby submitted.
,E}}
Two additional copies of this letter and the attachment are enclosed.Very truly yours, L.D.White, Jr.Attachment cc: Mr.Donald P.Knuth (40)
I~g~
CONTROL BLOCK:~LICENSEE EVENT REPOR'I (PLEASE PRINT ALL REQUIRED IIIIFORMATIOIII)
LICENSEE NAME gg N Y R E G 1 0 7 89 14 15 LICENSE NUMBER 0-0 0 0 0 0-0 0 UCENSE TYPE EVENT TYPE 4 1 1 1 1',~01 26 30 31 32 REPORT REPORT CATEGORY TYPE SOURCE DOCKET NUMBER I D I T~0 5 o-0 2 4~7 8 57 58 59 60 61 EVENT DATE 4 0 3 1 2 7 5 68 69 74 REPORT DATE 0 3 2 5 7 5 75 80 EVENT DESCRIPTION
[oO~]Durin ste s to rovide additional purification of reactor coolant, with the reactor at 7 8 9 80 I cold shutdown, fboron concentration was reduced inadvertently from 2068 ppm to 1975 7 89'0 Innsj ppm,)an insertion of more than 0.5%reactivity.
Boron concentration was restored to 7 8 9 80 Qpg above 2000 ppm in preparation for refueling.(Abnormal Occurrence 50-244/75-06) 7 8 9 IOOI 7 8 9 PIEME SYSTEM CAUSE COMPONENT COMPONENT CODE CODE COMPONENT CODE SUPPLER MANUFACTURER VIDLA11DN[P]~CG D D E MI N X~N W 1 2 0 N 7 8 9 10 11 12 17 43 44 47 48 CAUSE DESCRIPTION toOs]The procedure to valve in a converted deborating to cation demineralizer was'n 7 8 9[opg]error;a deborating demineralizer was valved in instead.Measures to prevent 80 80 80 80 80 7 89 FACIUTY STATUS IE POWER Q~g G~oo o 7 8 9 10.12 13 FORM OF ACTIVITY COATENT RELEASEO OF RELEASE H H 7 8 9 10 11 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION P~7s~OO O B N A 7 89 11 12 13 PERSONNEL INJURIES NUMBER DESCRIPTION
~oo o N/A 7 8 9 11 12 OFFSITE CONSEQUENCES
@~5 N/A METHOD OF DISCOVERY DISCOVERY DESCRIPTION b Anal sis of reactor coolant sam le 44 45 46 80 OTHER STATUS N/A LOCATION OF RELEASE AMOUNT OF ACTIVITY N/A N/A 44 45 80 80 80 7 8 9~10 recurrence are given on the attached page.7 t89 LOSS OR DAMAGE TO FACILITY TYPE DESCRIPTION Qig 2 N/A 7 89 10 PUBLICITY N/A 7 89 ADDITIONAL FACTORS Jig In 1972 cation resins were placed in one of two Deborating Demineralizers after 89 80 80 80 80 NAME: Bruce A.Snow Qqg cation demineralizer failure.7 s 89 80 PHDNE.716-546-2700, Ext.291-214 GPO 882~88T 0 l Licensee Event Report 50-244/75-06 2.Measures to Prevent Recurrence a.Correct the deficient procedure, S-3.3D, Cation Dem'ineralizer Operation.
The corrected procedure was reviewed in a Plant Operations Review Committee Meeting f35-75 on March 14, 1975.b.Provide positive identification of the cation demineralizer at the location of the valve hand wheels.A sign for this location will be completed before May 1, 1975.c.Review other procedures associated with the cation demineralizer to verify adequacy.This was completed on March 18, 1975 by the Operations Engineer.
1 A/~v ,E}}

Latest revision as of 02:19, 21 October 2019

LER 1975-006-00 for R. E. Ginna, Unplanned Insertion of Greater than 0.5% K/K with Reactor Subcritical
ML18142B884
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/25/1975
From: White L
Rochester Gas & Electric Corp
To: O'Reilly J
NRC/IE, NRC Region 1
References
LER 1975-006-00
Download: ML18142B884 (7)


Text

NRC DISTRIBUTION FOR PART 50 DQCI<ET MATERIAL (TEIt/IPORARY FORM)

CONTROL NQ:~~~MM FILE. INCID"-!.'T !'."-PC."..T FI F RQM: Roches ter Gas & Elec. Co ~ DATE OF DOC DATE REC'D LTR TWX RPT OTHER Rochester, N. Y. 3-25-75 4-3-75 XX I

.ORIG CC OTHER SENT AEC PDR XXX TO:

James P. O'Reilly i Signed SENT LOCAL PDR XXXX CLASS UNC LASS PROPINFO INPUT NO CYS REC'D DOCKET NO:

XXX '50-244

. DESCRIPTION: ENCLOSURES:

Ltr. trans the following.. ~ Abnorm Occurr. 8 75-06; on 3-12-75 con-cerning, boron concentration reduced in-advertently from 2068 ppm to 1975ppm.. ~

PLANT NAiiIE: RE Ginna 8i 0 FOR ACTIQIII/liUFQRMATIQiil "VCR 4-4-75 BUTLER (L) S CHWENCER (L) ZIEMAIIIiII(L) REGAN (E)

W/ Copies W/ Copies W/ Copies W/ Copies CLARK (L) STOLZ (L) DICKER (E) LEAR (L)

W/ t .nnjes W/ Copies W/ Conies W/ Conies PARR fl I VASSu,i.l O (I } KNIGHTON (E) SPF I,R W/ Copies W/ t;opies vl/ Copies 'vV/ Copies KNIEL (L) PURPLE (L) YOUNGBLOOD (E)

W/ Copies .W < opies W/ Copies W/ Copies INTERNAL DISTRIBUTION REG F IL TECH REVIEW DFNTOiN LIC ASST INO .

~SCHROEDF R DIGGS (L) BRAIiitiAN QGC, ROOI'.1 P-506A MACCARY GAMIMI LL H. liN (L)

'EAR SA LTZi'1AN GOSSI CK/STAF F KNIG HT KASTN ER ~ "E. GOULBOUR NE (L)', MF LTZ

~CASE PAWLICKI BALLARD P. KREUTZER (F)

GIAN BUSSO SHAO SPANGLER J. LEE (L) PLANS DEFILE MCDONALD BOYD STE LLO M. MAIG BET (L)

"-+~ HOUSTON ENVIRO S. REED (E) CH'APIVIAN MOOR E (L)

DEYOUNG (L) '"-~NQVAK MULLER M. SERVICE (L) '. DUBE (Ltr)

E. COUP" SKQVHOLT (L)

GOLLER (L) (Ltr)

P; COLLINS -"

<<ROSS

<<IPPOLITQ

'EDESCO DICKER KN,'GHTQIV YOUNG BLOOD

~~S. M.

SHEPPARD (L)

SLATER (E)

Sic)1TH (L)

PETER

.0'/7 SOLI HARTFIELD (2)

DENISE LONG REGAN S. TEETS (L) <<KLECKERi REG QPR LAINAS PROJECT LDR G. WILLIAMS(E) EISENHUr BENAROYA V. Wl LSPN (L) WIG G I NTQ8' 5 REGIOfl (2)

'~T.R. iVILSON( A) <<VOLLMER HAR LESS INGRAiUI (L) F. VilLLI !S STEELE ~ >A'g 'tt- ~

EXT ANAL Dl TRIBUTIOiN

.e J LOCAl PDR PD R.SAN/LA/NY 1 IC (ABERNA Y) (l)(2)(1 NATIOiNALLABS 1 BRQOKHAVEN iAT LAB W. PENiiIINGTON, Rm E.201 GT 1 .

NSI C (BUCHAIIIAIN) 1 CON SU LTAINTS 1 G. ULFilKSQN, Oi "lL ASLB 1 AGMED (RUTH GUSSMAiV Iileivton Ant)erson NE WillAR K/8 LUIS/I E/AG BA6 I AN 1 Rrn 8-127 GT ACRS 3'.a TG LIC ASST J. D. RUiIIKLES, Rrn E.201

~~ SE; D G:~Y TZ!i D aY,"~703.A3 1

.....GT

PCS 7 0 II K I

htKtt ROCHESTER GAS AND ELECTRIC CORPORATION D 89 EAST AVENUE, ROCHESTER, N.Y, 14649 LEON D. WHITE, JR. T E L E P ht O N E VICE PRESIDENT QCCI(Llil IJRII~<

ARE* CODE 71K 546-2700 1

I March 25, 1975 I Ohthtllc *'h~hI Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania 19406

Subject:

Abnormal Occurrence 75-06, Unplanned insertion of greater than 0.5%+k/k with the reactor subcritical.

R. E. Qinna Nuclear Power Plant, Unit No. 1 Docket No. 50-244

Dear Mr. O'Reilly:

In accordance with Technical Specifications, Article 6. 6.2a, the attached report of Abnormal Occurrence 75-06 is hereby submitted. Two additional copies of this letter and the attachment are enclosed.

Very truly yours, L. D. White, Jr.

Attachment cc: Mr. Donald P. Knuth (40)

I~

g~

CONTROL BLOCK:

~ LICENSEE EVENT REPOR'I (PLEASE PRINT ALL REQUIRED IIIIFORMATIOIII)

LICENSEE UCENSE EVENT NAME LICENSE NUMBER TYPE TYPE gg N Y R E G 1 0 0 0 0 0 0 0 0 0 4 1 1 1 1',~01 7 89 14 15 26 30 31 32 REPORT REPORT

~ 7 8 CATEGORY I

57 D I 58 TYPE T

59

~

SOURCE 60 61 0 5 DOCKET NUMBER o 0 2 4 4 68 69 0 3 EVENT DATE 1 2 7 5 74 75 0 3 REPORT DATE 2 5 7 5 80 I

EVENT DESCRIPTION

[oO~] Durin ste s to rovide additional purification of reactor coolant, with the reactor at 7 8 9 80 cold shutdown, fboron concentration was reduced inadvertently from 2068 ppm to 1975 7 89 '0 Innsj ppm,) an insertion of more than 0.5% reactivity. Boron concentration was restored to 7 8 9 80 Qpg above 2000 ppm in preparation for refueling. (Abnormal Occurrence 50-244/75-06) 7 8 9 80 IOOI 7 8 9 PIEME 80 SYSTEM CAUSE COMPONENT COMPONENT CODE CODE COMPONENT CODE SUPPLER MANUFACTURER VIDLA11DN

[P]~CG 8 9 D D E MI N X ~N W 1 2 0 N 7 10 11 12 17 43 44 47 48 CAUSE DESCRIPTION toOs] The procedure to valve in a converted deborating to cation demineralizer was'n 7 8 9 80

[opg] error; a deborating demineralizer was valved in instead. Measures to prevent 7 8 9 80

~10 recurrence are given on the attached page.

7 89 FACIUTY METHOD OF 80 STATUS IE POWER OTHER STATUS DISCOVERY DISCOVERY DESCRIPTION Q~g G ~oo o N/A b Anal sis of reactor coolant sam le 7 8 9 10 . 12 13 44 45 46 80 FORM OF ACTIVITY COATENT RELEASEO OF RELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE H H N/A N/A 7 8 9 10 11 44 45 80 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION P~7s ~OO O B N A 7 89 11 12 13 80 PERSONNEL INJURIES NUMBER DESCRIPTION

~oo o N/A 7 8 9 11 12 80 OFFSITE CONSEQUENCES

@~5 N/A 7 t89 80 LOSS OR DAMAGE TO FACILITY TYPE DESCRIPTION Qig 2 N/A 7 89 10 80 PUBLICITY N/A 7 89 80 ADDITIONAL FACTORS Jig In 1972 cation resins were placed in one of two Deborating Demineralizers after 89 80 Qqg cation demineralizer failure.

7 s 89 80 NAME: Bruce A. Snow PHDNE. 716-546-2700, Ext. 291-214 GPO 882 ~ 88T

0 l Licensee Event Report 2.

50-244/75-06 Measures to Prevent Recurrence

a. Correct the deficient procedure, S-3.3D, Cation Dem'ineralizer Operation.

The corrected procedure was reviewed in a Plant Operations Review Committee Meeting f35-75 on March 14, 1975.

b. Provide positive identification of the cation demineralizer at the location of the valve hand wheels. A sign for this location will be completed before May 1, 1975.
c. Review other procedures associated with the cation demineralizer to verify adequacy. This was completed on March 18, 1975 by the Operations Engineer.

1 A/ ~ v

,E