ML18142B884: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 03/25/1975
| issue date = 03/25/1975
| title = LER 1975-006-00 for R. E. Ginna, Unplanned Insertion of Greater than 0.5% K/K with Reactor Subcritical
| title = LER 1975-006-00 for R. E. Ginna, Unplanned Insertion of Greater than 0.5% K/K with Reactor Subcritical
| author name = White L D
| author name = White L
| author affiliation = Rochester Gas & Electric Corp
| author affiliation = Rochester Gas & Electric Corp
| addressee name = O'Reilly J P
| addressee name = O'Reilly J
| addressee affiliation = NRC/IE, NRC/RGN-I
| addressee affiliation = NRC/IE, NRC/RGN-I
| docket = 05000244
| docket = 05000244
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:NRC DISTRIBUTION FOR PART 50 DQCI<ET MATERIAL (TEIt/IPORARY FORM)
CONTROL NQ:~~~MM FILE. INCID"-!.'T !'."-PC."..T FI F RQM: Roches      ter  Gas &  Elec. Co ~ DATE OF DOC      DATE REC'D            LTR          TWX    RPT          OTHER Rochester,      N. Y.              3-25-75          4-3-75                XX I
                                                    .ORIG          CC      OTHER            SENT AEC PDR                      XXX TO:
James    P. O'Reilly              i Signed                                    SENT LOCAL PDR                      XXXX CLASS      UNC LASS        PROPINFO            INPUT        NO CYS REC'D                  DOCKET NO:
XXX                                                                                          '50-244
  . DESCRIPTION:                                                  ENCLOSURES:
Ltr. trans      the  following..  ~                            Abnorm Occurr. 8 75-06; on 3-12-75 con-cerning, boron concentration reduced in-advertently from 2068 ppm to 1975ppm.. ~
PLANT NAiiIE:          RE  Ginna  8i                                  0 FOR ACTIQIII/liUFQRMATIQiil                                "VCR      4-4-75 BUTLER (L)                  S CHWENCER (L) ZIEMAIIIiII(L)                REGAN (E)
W/ Copies                    W/ Copies          W/ Copies                W/ Copies CLARK (L)                    STOLZ (L)          DICKER (E)                LEAR (L)
W/ t .nnjes                  W/ Copies          W/ Conies                W/ Conies PARR fl I                    VASSu,i.l O (I }    KNIGHTON (E)              SPF I,R W/ Copies                    W/ t;opies          vl/ Copies              'vV/ Copies KNIEL (L)                    PURPLE (L)          YOUNGBLOOD (E)
W/ Copies                  .W < opies          W/ Copies                W/ Copies INTERNAL DISTRIBUTION REG F IL                    TECH REVIEW        DFNTOiN                  LIC ASST                                INO  .
                              ~SCHROEDF R                                    DIGGS (L)                      BRAIiitiAN QGC, ROOI'.1 P-506A          MACCARY            GAMIMI LL              H.        liN (L)
                                                                                            'EAR SA LTZi'1AN GOSSI CK/STAF F              KNIG HT            KASTN ER          ~ "E. GOULBOUR NE              (L)',  MF LTZ
~CASE                            PAWLICKI            BALLARD              P. KREUTZER (F)
GIAN BUSSO                  SHAO                SPANGLER              J. LEE (L)                        PLANS DEFILE                                                                                                        MCDONALD BOYD                        STE LLO                                  M. MAIG BET (L)
                            "-+~ HOUSTON              ENVIRO                S. REED (E)                        CH'APIVIAN MOOR E (L)
DEYOUNG (L) '"-~NQVAK                            MULLER                M. SERVICE (L)          '.          DUBE (Ltr)
E. COUP" SKQVHOLT (L)
GOLLER (L) (Ltr)
P; COLLINS        -"
                              <<ROSS
                              <<IPPOLITQ
                          'EDESCO DICKER KN,'GHTQIV YOUNG BLOOD
                                                                    ~~S. M.
SHEPPARD (L)
SLATER (E)
Sic)1TH (L)
PETER
                                                                                                                .0'/7 SOLI HARTFIELD (2)
DENISE                      LONG                REGAN                S. TEETS (L)                    <<KLECKERi REG QPR                      LAINAS              PROJECT LDR          G. WILLIAMS(E)                      EISENHUr BENAROYA                                  V. Wl LSPN (L)                      WIG G I NTQ8' 5 REGIOfl (2)
'~T.R. iVILSON( A)              <<VOLLMER              HAR LESS                INGRAiUI (L)                      F. VilLLI        !S STEELE                                                                                                  ~ >A'g 'tt-  ~
EXT ANAL Dl TRIBUTIOiN
                                                            .e J LOCAl PDR                                                                                    PD R.SAN/LA/NY 1 IC  (ABERNA        Y) (l)(2)(1 NATIOiNALLABS                                      1 BRQOKHAVEN iAT LAB W. PENiiIINGTON, Rm E.201 GT                    1                            .
NSI C (BUCHAIIIAIN)                1 CON SU LTAINTS                                  1    G. ULFilKSQN, Oi "lL ASLB                              1 AGMED (RUTH GUSSMAiV Iileivton Ant)erson                    NE WillAR K/8 LUIS/I E/AG BA6 I AN              1 Rrn 8-127 GT ACRS 3'.a TG LIC ASST                                                                      J. D. RUiIIKLES, Rrn E.201
      ~~ SE; D G:~Y TZ!i D aY,"~703.A3                                                            1
                                                                                                .....GT
 
PCS 7 0 II K I
htKtt ROCHESTER GAS AND ELECTRIC CORPORATION                D 89 EAST AVENUE, ROCHESTER, N.Y, 14649 LEON D. WHITE, JR.                                                                T E L E P ht O N E VICE PRESIDENT                    QCCI(Llil IJRII~<
ARE* CODE 71K      546-2700 1
I March 25, 1975 I Ohthtllc *'h~hI Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania              19406
 
==Subject:==
Abnormal Occurrence 75-06, Unplanned insertion of greater than 0.5%+k/k with the reactor subcritical.
R. E. Qinna Nuclear Power Plant, Unit No. 1 Docket No. 50-244
 
==Dear Mr. O'Reilly:==
 
In accordance with Technical Specifications, Article 6. 6.2a, the attached report of Abnormal Occurrence 75-06 is hereby submitted. Two additional copies of this letter and the attachment are enclosed.
Very truly yours, L. D. White, Jr.
Attachment cc: Mr. Donald P. Knuth (40)
 
I~
g~
 
CONTROL BLOCK:
                                                      ~      LICENSEE EVENT REPOR'I (PLEASE PRINT ALL REQUIRED IIIIFORMATIOIII)
LICENSEE                                                                                UCENSE                EVENT NAME                                  LICENSE NUMBER                                    TYPE                  TYPE gg N          Y R E          G      1        0  0    0      0  0    0    0  0        0        4  1    1    1    1',~01 7 89                                  14    15                                                      26                    30    31    32 REPORT      REPORT
~    7    8 CATEGORY I
57 D    I 58 TYPE T
59
                                                ~
SOURCE 60    61 0  5 DOCKET NUMBER o    0      2    4    4 68    69 0  3 EVENT DATE 1  2    7    5 74    75 0    3 REPORT DATE 2    5    7    5 80 I
EVENT DESCRIPTION
[oO~]        Durin ste          s  to rovide additional purification of reactor coolant, with the reactor at 7    8 9                                                                                                                                                  80 cold shutdown, fboron concentration was reduced inadvertently from 2068 ppm to 1975 7      89                                                                                                                                                '0 Innsj          ppm,) an insertion of more than 0.5% reactivity. Boron concentration was restored to 7 8 9                                                                                                                                                      80 Qpg            above 2000 ppm in preparation for refueling.                                (Abnormal Occurrence 50-244/75-06) 7    8 9                                                                                                                                                  80 IOOI 7 8 9                                                                    PIEME                                                                              80 SYSTEM      CAUSE                                        COMPONENT              COMPONENT CODE        CODE              COMPONENT CODE              SUPPLER              MANUFACTURER          VIDLA11DN
[P]~CG 8 9 D          D      E  MI      N X            ~N              W    1    2    0            N 7            10          11        12                          17        43          44                47          48 CAUSE DESCRIPTION toOs]          The procedure to valve in a converted deborating to cation demineralizer                                              was'n 7    8 9                                                                                                                                                  80
[opg]          error; a deborating demineralizer was valved in instead.                                    Measures to prevent 7    8 9                                                                                                                                                  80
    ~10          recurrence are given on the attached page.
7    89      FACIUTY                                                          METHOD OF 80 STATUS          IE  POWER                OTHER STATUS          DISCOVERY                        DISCOVERY DESCRIPTION Q~g              G          ~oo          o                  N/A                    b          Anal sis of reactor coolant sam le 7    8      9            10        . 12 13                          44      45      46                                                            80 FORM OF ACTIVITY      COATENT RELEASEO    OF RELEASE            AMOUNT OF ACTIVITY                                              LOCATION OF RELEASE H            H                      N/A                                                  N/A 7      8      9              10      11                                    44        45                                                                  80 PERSONNEL EXPOSURES NUMBER        TYPE        DESCRIPTION P~7s      ~OO        O        B                  N A 7      89              11    12      13                                                                                                                  80 PERSONNEL INJURIES NUMBER          DESCRIPTION
            ~oo        o                      N/A 7      8 9              11  12                                                                                                                            80 OFFSITE CONSEQUENCES
  @~5            N/A 7    t89                                                                                                                                                  80 LOSS OR DAMAGE TO FACILITY TYPE      DESCRIPTION Qig        2                  N/A 7      89          10                                                                                                                                      80 PUBLICITY N/A 7      89                                                                                                                                                  80 ADDITIONAL FACTORS Jig            In 1972 cation resins were placed in one of two Deborating Demineralizers after 89                                                                                                                                                  80 Qqg            cation demineralizer failure.
7  s  89                                                                                                                                                  80 NAME:                  Bruce A. Snow                                              PHDNE. 716-546-2700, Ext. 291-214 GPO  882 ~ 88T
 
0 l Licensee Event Report                                                            2.
50-244/75-06 Measures to Prevent Recurrence
: a. Correct the deficient procedure, S-3.3D, Cation Dem'ineralizer Operation.
The corrected procedure was reviewed in a Plant Operations Review Committee Meeting f35-75 on March 14, 1975.
: b. Provide positive identification of the cation demineralizer at the location of the valve hand wheels. A sign for this location will be completed before May 1, 1975.
: c. Review other procedures associated with the cation demineralizer to verify adequacy. This was completed on March 18, 1975 by the Operations Engineer.
 
1 A/ ~ v
,E}}

Latest revision as of 02:19, 21 October 2019

LER 1975-006-00 for R. E. Ginna, Unplanned Insertion of Greater than 0.5% K/K with Reactor Subcritical
ML18142B884
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/25/1975
From: White L
Rochester Gas & Electric Corp
To: O'Reilly J
NRC/IE, NRC Region 1
References
LER 1975-006-00
Download: ML18142B884 (7)


Text

NRC DISTRIBUTION FOR PART 50 DQCI<ET MATERIAL (TEIt/IPORARY FORM)

CONTROL NQ:~~~MM FILE. INCID"-!.'T !'."-PC."..T FI F RQM: Roches ter Gas & Elec. Co ~ DATE OF DOC DATE REC'D LTR TWX RPT OTHER Rochester, N. Y. 3-25-75 4-3-75 XX I

.ORIG CC OTHER SENT AEC PDR XXX TO:

James P. O'Reilly i Signed SENT LOCAL PDR XXXX CLASS UNC LASS PROPINFO INPUT NO CYS REC'D DOCKET NO:

XXX '50-244

. DESCRIPTION: ENCLOSURES:

Ltr. trans the following.. ~ Abnorm Occurr. 8 75-06; on 3-12-75 con-cerning, boron concentration reduced in-advertently from 2068 ppm to 1975ppm.. ~

PLANT NAiiIE: RE Ginna 8i 0 FOR ACTIQIII/liUFQRMATIQiil "VCR 4-4-75 BUTLER (L) S CHWENCER (L) ZIEMAIIIiII(L) REGAN (E)

W/ Copies W/ Copies W/ Copies W/ Copies CLARK (L) STOLZ (L) DICKER (E) LEAR (L)

W/ t .nnjes W/ Copies W/ Conies W/ Conies PARR fl I VASSu,i.l O (I } KNIGHTON (E) SPF I,R W/ Copies W/ t;opies vl/ Copies 'vV/ Copies KNIEL (L) PURPLE (L) YOUNGBLOOD (E)

W/ Copies .W < opies W/ Copies W/ Copies INTERNAL DISTRIBUTION REG F IL TECH REVIEW DFNTOiN LIC ASST INO .

~SCHROEDF R DIGGS (L) BRAIiitiAN QGC, ROOI'.1 P-506A MACCARY GAMIMI LL H. liN (L)

'EAR SA LTZi'1AN GOSSI CK/STAF F KNIG HT KASTN ER ~ "E. GOULBOUR NE (L)', MF LTZ

~CASE PAWLICKI BALLARD P. KREUTZER (F)

GIAN BUSSO SHAO SPANGLER J. LEE (L) PLANS DEFILE MCDONALD BOYD STE LLO M. MAIG BET (L)

"-+~ HOUSTON ENVIRO S. REED (E) CH'APIVIAN MOOR E (L)

DEYOUNG (L) '"-~NQVAK MULLER M. SERVICE (L) '. DUBE (Ltr)

E. COUP" SKQVHOLT (L)

GOLLER (L) (Ltr)

P; COLLINS -"

<<ROSS

<<IPPOLITQ

'EDESCO DICKER KN,'GHTQIV YOUNG BLOOD

~~S. M.

SHEPPARD (L)

SLATER (E)

Sic)1TH (L)

PETER

.0'/7 SOLI HARTFIELD (2)

DENISE LONG REGAN S. TEETS (L) <<KLECKERi REG QPR LAINAS PROJECT LDR G. WILLIAMS(E) EISENHUr BENAROYA V. Wl LSPN (L) WIG G I NTQ8' 5 REGIOfl (2)

'~T.R. iVILSON( A) <<VOLLMER HAR LESS INGRAiUI (L) F. VilLLI !S STEELE ~ >A'g 'tt- ~

EXT ANAL Dl TRIBUTIOiN

.e J LOCAl PDR PD R.SAN/LA/NY 1 IC (ABERNA Y) (l)(2)(1 NATIOiNALLABS 1 BRQOKHAVEN iAT LAB W. PENiiIINGTON, Rm E.201 GT 1 .

NSI C (BUCHAIIIAIN) 1 CON SU LTAINTS 1 G. ULFilKSQN, Oi "lL ASLB 1 AGMED (RUTH GUSSMAiV Iileivton Ant)erson NE WillAR K/8 LUIS/I E/AG BA6 I AN 1 Rrn 8-127 GT ACRS 3'.a TG LIC ASST J. D. RUiIIKLES, Rrn E.201

~~ SE; D G:~Y TZ!i D aY,"~703.A3 1

.....GT

PCS 7 0 II K I

htKtt ROCHESTER GAS AND ELECTRIC CORPORATION D 89 EAST AVENUE, ROCHESTER, N.Y, 14649 LEON D. WHITE, JR. T E L E P ht O N E VICE PRESIDENT QCCI(Llil IJRII~<

ARE* CODE 71K 546-2700 1

I March 25, 1975 I Ohthtllc *'h~hI Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania 19406

Subject:

Abnormal Occurrence 75-06, Unplanned insertion of greater than 0.5%+k/k with the reactor subcritical.

R. E. Qinna Nuclear Power Plant, Unit No. 1 Docket No. 50-244

Dear Mr. O'Reilly:

In accordance with Technical Specifications, Article 6. 6.2a, the attached report of Abnormal Occurrence 75-06 is hereby submitted. Two additional copies of this letter and the attachment are enclosed.

Very truly yours, L. D. White, Jr.

Attachment cc: Mr. Donald P. Knuth (40)

I~

g~

CONTROL BLOCK:

~ LICENSEE EVENT REPOR'I (PLEASE PRINT ALL REQUIRED IIIIFORMATIOIII)

LICENSEE UCENSE EVENT NAME LICENSE NUMBER TYPE TYPE gg N Y R E G 1 0 0 0 0 0 0 0 0 0 4 1 1 1 1',~01 7 89 14 15 26 30 31 32 REPORT REPORT

~ 7 8 CATEGORY I

57 D I 58 TYPE T

59

~

SOURCE 60 61 0 5 DOCKET NUMBER o 0 2 4 4 68 69 0 3 EVENT DATE 1 2 7 5 74 75 0 3 REPORT DATE 2 5 7 5 80 I

EVENT DESCRIPTION

[oO~] Durin ste s to rovide additional purification of reactor coolant, with the reactor at 7 8 9 80 cold shutdown, fboron concentration was reduced inadvertently from 2068 ppm to 1975 7 89 '0 Innsj ppm,) an insertion of more than 0.5% reactivity. Boron concentration was restored to 7 8 9 80 Qpg above 2000 ppm in preparation for refueling. (Abnormal Occurrence 50-244/75-06) 7 8 9 80 IOOI 7 8 9 PIEME 80 SYSTEM CAUSE COMPONENT COMPONENT CODE CODE COMPONENT CODE SUPPLER MANUFACTURER VIDLA11DN

[P]~CG 8 9 D D E MI N X ~N W 1 2 0 N 7 10 11 12 17 43 44 47 48 CAUSE DESCRIPTION toOs] The procedure to valve in a converted deborating to cation demineralizer was'n 7 8 9 80

[opg] error; a deborating demineralizer was valved in instead. Measures to prevent 7 8 9 80

~10 recurrence are given on the attached page.

7 89 FACIUTY METHOD OF 80 STATUS IE POWER OTHER STATUS DISCOVERY DISCOVERY DESCRIPTION Q~g G ~oo o N/A b Anal sis of reactor coolant sam le 7 8 9 10 . 12 13 44 45 46 80 FORM OF ACTIVITY COATENT RELEASEO OF RELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE H H N/A N/A 7 8 9 10 11 44 45 80 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION P~7s ~OO O B N A 7 89 11 12 13 80 PERSONNEL INJURIES NUMBER DESCRIPTION

~oo o N/A 7 8 9 11 12 80 OFFSITE CONSEQUENCES

@~5 N/A 7 t89 80 LOSS OR DAMAGE TO FACILITY TYPE DESCRIPTION Qig 2 N/A 7 89 10 80 PUBLICITY N/A 7 89 80 ADDITIONAL FACTORS Jig In 1972 cation resins were placed in one of two Deborating Demineralizers after 89 80 Qqg cation demineralizer failure.

7 s 89 80 NAME: Bruce A. Snow PHDNE. 716-546-2700, Ext. 291-214 GPO 882 ~ 88T

0 l Licensee Event Report 2.

50-244/75-06 Measures to Prevent Recurrence

a. Correct the deficient procedure, S-3.3D, Cation Dem'ineralizer Operation.

The corrected procedure was reviewed in a Plant Operations Review Committee Meeting f35-75 on March 14, 1975.

b. Provide positive identification of the cation demineralizer at the location of the valve hand wheels. A sign for this location will be completed before May 1, 1975.
c. Review other procedures associated with the cation demineralizer to verify adequacy. This was completed on March 18, 1975 by the Operations Engineer.

1 A/ ~ v

,E