| issue date = 06/07/2018
| issue date = 06/07/2018
| title = 2018 Fermi Ile Administrative Files Form ES-201-1
| title = 2018 Fermi Ile Administrative Files Form ES-201-1
| author name = Zoia C D
| author name = Zoia C
| author affiliation = NRC/RGN-III/DRS
| author affiliation = NRC/RGN-III/DRS
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000341
| docket = 05000341
| license number = NPF-043
| license number = NPF-043
| contact person = Zoia C D
| contact person = Zoia C
| package number = ML17164A399
| package number = ML17164A399
| document type = License-Operator, Part 55 Examination Related Material
| document type = License-Operator, Part 55 Examination Related Material
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ES-201 Examination Preparation Checklist Form ES-201-1   Facility: Fermi 2 Date of Examination:
{{#Wiki_filter:ES-201                                     Examination Preparation Checklist                                     Form ES-201-1 Facility:                 Fermi 2                                         Date of Examination:     2/26/2018 - 3/2/2018 Developed by: Written: Facility           NRC       //   Operating:    Facility   NRC Chief Target                                             Task Description (Reference)                                         Examiners Date*
2/26/2018 - 3/2/2018 Developed by: Written: Facility       NRC       //   Operating:    Facility       NRC     Target Date* Task Description (Reference) Chief Examiner's Initials -240 1. Examination administration date confirmed (C.1.a; C.2.a
Initials
-b). For NRC-prepared exams, arrangements are made for the facility to submit reference materials (C.1.e; C.3.c; Attachment 3). CDZ -210 2. NRC examiners and facility contact assigned (C.1.d; C.2.f).
: 1. Examination administration date confirmed (C.1.a; C.2.a-b). For NRC-prepared exams,
CDZ -210 3. Facility contact briefed on security and other requirements (C.2.c). As applicable, the facility contact submits to the NRC any prescreened K/As for elimination from the written examination outline, with a description of the facility's prescreening process (ES
  -240 arrangements are made for the facility to submit reference materials (C.1.e; C.3.c; Attachment 3).         CDZ
-401, D.1.b).
  -210     2. NRC examiners and facility contact assigned (C.1.d; C.2.f).                                               CDZ
CDZ -210 4. Reference material due for NRC
: 3. Facility contact briefed on security and other requirements (C.2.c). As applicable, the facility
-prepared exams (C.1.e; C.3.c; Attachment 3). N/A -210 5. Corporate notification letter sent (C.2.e).
  -210          contact submits to the NRC any prescreened K/As for elimination from the written examination               CDZ outline, with a description of the facilitys prescreening process (ES-401, D.1.b).
CDZ -195 6. NRC-developed written examination outline (ES
  -210     4. Reference material due for NRC-prepared exams (C.1.e; C.3.c; Attachment 3).                                 N/A
-401-1/2 or ES-401N-1/2 and ES-401-3 or ES-401N-3) sent to facility contact (must be on the exam security agreement) (C.1.e
  -210     5. Corporate notification letter sent (C.2.e).                                                               CDZ
-f; C.2.h; C.3.d-e). CDZ -150 7. Operating test outline(s) and other checklists due, including Forms ES
: 6. NRC-developed written examination outline (ES-401-1/2 or ES-401N-1/2 and ES-401-3 or
-201-2, ES-201-3, ES-301-1, ES-301-2, ES-301-5, and ES-D-1, as applicable (C.1.e
  -195          ES-401N-3) sent to facility contact (must be on the exam security agreement) (C.1.e-f; C.2.h;             CDZ C.3.d-e).
-f; C.3.d-e). CDZ -136 8. Operating test outline(s) reviewed by the NRC and feedback provided to facility licensee (C.2.h; C.3.d-e). CDZ -75 9. Proposed examinations (written, JPMs, and scenarios, as applicable) and outlines (Forms ES-301-1, ES-301-2, ES-D-1, ES-401-1/2 or ES-401N-1/2, and ES-401-3 or ES-401N-3); supporting documentation (including Forms ES
: 7. Operating test outline(s) and other checklists due, including Forms ES-201-2, ES-201-3, ES-301-1,
-301-3, ES-301-4, ES-301-5, ES-301-6, ES-401-6, ES-401N-6, and any Form ES
  -150 ES-301-2, ES-301-5, and ES-D-1, as applicable (C.1.e-f; C.3.d-e).                                         CDZ
-201-2 and ES-201-3 updates); and reference materials due (C.1.e-h; C.3.d). CDZ -75 10. Examinations prepared by the NRC are approved by the NRC supervisor and forwarded for facility licensee review (C.1.i; C.2.h; C.3.f
: 8. Operating test outline(s) reviewed by the NRC and feedback provided to facility licensee (C.2.h;
-g). N/A -60 11. Preliminary waiver/excusal requests due (C.1.m; C.2.c; ES
  -136 C.3.d-e).                                                                                                 CDZ
-202). N/A -50 12. Written exam and operating test reviews completed (C.3.f).
: 9. Proposed examinations (written, JPMs, and scenarios, as applicable) and outlines (Forms ES-301-1, ES-301-2, ES-D-1, ES-401-1/2 or ES-401N-1/2, and ES-401-3 or ES-401N-3);                         CDZ
CDZ -35 13. Examination review results discussed between the NRC and facility licensee (C.1.i; C.1.k
  -75          supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, ES-401-6, ES-401N-6, and any Form ES-201-2 and ES-201-3 updates); and reference materials due (C.1.e-h; C.3.d).
-l; C.2.h; C.3.g). The NRC and the facility licensee conduct exam preparatory week.
: 10. Examinations prepared by the NRC are approved by the NRC supervisor and forwarded for
CDZ -30 14. Preliminary license applications and waiver/excusal requests, as applicable (NRC Form 398) due (C.1.m; C.2.i; ES
  -75                                                                                                                      N/A facility licensee review (C.1.i; C.2.h; C.3.f-g).
-202). CDZ -14 15. Final license applications and waiver/excusal requests, as applicable (NRC Form 398), due and Form ES-201-4 prepared (C.1.m; C.2.k; ES
  -60     11. Preliminary waiver/excusal requests due (C.1.m; C.2.c; ES-202).                                             N/A
-202). CDZ -7 16. Written examinations and operating tests approved by the NRC supervisor (C.2.j
  -50     12. Written exam and operating test reviews completed (C.3.f).                                                 CDZ
-k; C.3.h). CDZ -7 17. Request facility licensee management feedback on the examination (C.2.l).
: 13. Examination review results discussed between the NRC and facility licensee (C.1.i; C.1.k-l;
CDZ -7 18. Final applications reviewed; one or two (if more than 10) applications audited to confirm qualifications/eligibility; and examination approval and waiver/excusal letters sent (C.2.k; Attachment 5; ES
  -35 C.2.h; C.3.g). The NRC and the facility licensee conduct exam preparatory week.                           CDZ
-202, C.3.j; ES-204). CDZ -7 19. Proctoring/written exam administration guidelines reviewed with facility licensee (C.3.k).
: 14. Preliminary license applications and waiver/excusal requests, as applicable (NRC Form 398) due
CDZ -7 20. Approved scenarios and job performance measures distributed to NRC examiners (C.3.i).
  -30 (C.1.m; C.2.i; ES-202).                                                                                   CDZ
CDZ
: 15. Final license applications and waiver/excusal requests, as applicable (NRC Form 398), due and
* Target dates are based on facility
  -14 Form ES-201-4 prepared (C.1.m; C.2.k; ES-202).                                                             CDZ
-prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted on a case
    -7     16. Written examinations and operating tests approved by the NRC supervisor (C.2.j-k; C.3.h).                   CDZ
-by-case basis in coordination with the facility licensee.}}
    -7     17. Request facility licensee management feedback on the examination (C.2.l).                                   CDZ
: 18. Final applications reviewed; one or two (if more than 10) applications audited to confirm
    -7          qualifications/eligibility; and examination approval and waiver/excusal letters sent (C.2.k;               CDZ Attachment 5; ES-202, C.3.j; ES-204).
    -7     19. Proctoring/written exam administration guidelines reviewed with facility licensee (C.3.k).                 CDZ
    -7     20. Approved scenarios and job performance measures distributed to NRC examiners (C.3.i).                       CDZ
* Target dates are based on facility-prepared examinations and the examination date identified in the corporate notification letter.
These dates are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.}}

Latest revision as of 23:33, 20 October 2019

2018 Fermi Ile Administrative Files Form ES-201-1
ML18162A287
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/07/2018
From: Chuck Zoia
Division of Reactor Safety III
To:
Detroit Edison
Zoia C
Shared Package
ML17164A399 List:
References
Download: ML18162A287 (1)


Text

ES-201 Examination Preparation Checklist Form ES-201-1 Facility: Fermi 2 Date of Examination: 2/26/2018 - 3/2/2018 Developed by: Written: Facility NRC // Operating: Facility NRC Chief Target Task Description (Reference) Examiners Date*

Initials

1. Examination administration date confirmed (C.1.a; C.2.a-b). For NRC-prepared exams,

-240 arrangements are made for the facility to submit reference materials (C.1.e; C.3.c; Attachment 3). CDZ

-210 2. NRC examiners and facility contact assigned (C.1.d; C.2.f). CDZ

3. Facility contact briefed on security and other requirements (C.2.c). As applicable, the facility

-210 contact submits to the NRC any prescreened K/As for elimination from the written examination CDZ outline, with a description of the facilitys prescreening process (ES-401, D.1.b).

-210 4. Reference material due for NRC-prepared exams (C.1.e; C.3.c; Attachment 3). N/A

-210 5. Corporate notification letter sent (C.2.e). CDZ

6. NRC-developed written examination outline (ES-401-1/2 or ES-401N-1/2 and ES-401-3 or

-195 ES-401N-3) sent to facility contact (must be on the exam security agreement) (C.1.e-f; C.2.h; CDZ C.3.d-e).

7. Operating test outline(s) and other checklists due, including Forms ES-201-2, ES-201-3, ES-301-1,

-150 ES-301-2, ES-301-5, and ES-D-1, as applicable (C.1.e-f; C.3.d-e). CDZ

8. Operating test outline(s) reviewed by the NRC and feedback provided to facility licensee (C.2.h;

-136 C.3.d-e). CDZ

9. Proposed examinations (written, JPMs, and scenarios, as applicable) and outlines (Forms ES-301-1, ES-301-2, ES-D-1, ES-401-1/2 or ES-401N-1/2, and ES-401-3 or ES-401N-3); CDZ

-75 supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, ES-401-6, ES-401N-6, and any Form ES-201-2 and ES-201-3 updates); and reference materials due (C.1.e-h; C.3.d).

10. Examinations prepared by the NRC are approved by the NRC supervisor and forwarded for

-75 N/A facility licensee review (C.1.i; C.2.h; C.3.f-g).

-60 11. Preliminary waiver/excusal requests due (C.1.m; C.2.c; ES-202). N/A

-50 12. Written exam and operating test reviews completed (C.3.f). CDZ

13. Examination review results discussed between the NRC and facility licensee (C.1.i; C.1.k-l;

-35 C.2.h; C.3.g). The NRC and the facility licensee conduct exam preparatory week. CDZ

14. Preliminary license applications and waiver/excusal requests, as applicable (NRC Form 398) due

-30 (C.1.m; C.2.i; ES-202). CDZ

15. Final license applications and waiver/excusal requests, as applicable (NRC Form 398), due and

-14 Form ES-201-4 prepared (C.1.m; C.2.k; ES-202). CDZ

-7 16. Written examinations and operating tests approved by the NRC supervisor (C.2.j-k; C.3.h). CDZ

-7 17. Request facility licensee management feedback on the examination (C.2.l). CDZ

18. Final applications reviewed; one or two (if more than 10) applications audited to confirm

-7 qualifications/eligibility; and examination approval and waiver/excusal letters sent (C.2.k; CDZ Attachment 5; ES-202, C.3.j; ES-204).

-7 19. Proctoring/written exam administration guidelines reviewed with facility licensee (C.3.k). CDZ

-7 20. Approved scenarios and job performance measures distributed to NRC examiners (C.3.i). CDZ

  • Target dates are based on facility-prepared examinations and the examination date identified in the corporate notification letter.

These dates are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.