ML18162A287: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(5 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 06/07/2018 | | issue date = 06/07/2018 | ||
| title = 2018 Fermi Ile Administrative Files Form ES-201-1 | | title = 2018 Fermi Ile Administrative Files Form ES-201-1 | ||
| author name = Zoia C | | author name = Zoia C | ||
| author affiliation = NRC/RGN-III/DRS | | author affiliation = NRC/RGN-III/DRS | ||
| addressee name = | | addressee name = | ||
Line 9: | Line 9: | ||
| docket = 05000341 | | docket = 05000341 | ||
| license number = NPF-043 | | license number = NPF-043 | ||
| contact person = Zoia C | | contact person = Zoia C | ||
| package number = ML17164A399 | | package number = ML17164A399 | ||
| document type = License-Operator, Part 55 Examination Related Material | | document type = License-Operator, Part 55 Examination Related Material | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:ES-201 Examination Preparation Checklist Form ES-201-1 | {{#Wiki_filter:ES-201 Examination Preparation Checklist Form ES-201-1 Facility: Fermi 2 Date of Examination: 2/26/2018 - 3/2/2018 Developed by: Written: Facility NRC // Operating: Facility NRC Chief Target Task Description (Reference) Examiners Date* | ||
2/26/2018 - 3/2/2018 | Initials | ||
-b). For NRC-prepared exams, arrangements are made for the facility to submit reference materials (C.1.e; C.3.c; Attachment 3). CDZ -210 2. NRC examiners and facility contact assigned (C.1.d; C.2.f). | : 1. Examination administration date confirmed (C.1.a; C.2.a-b). For NRC-prepared exams, | ||
-240 arrangements are made for the facility to submit reference materials (C.1.e; C.3.c; Attachment 3). CDZ | |||
-401, D.1.b). | -210 2. NRC examiners and facility contact assigned (C.1.d; C.2.f). CDZ | ||
: 3. Facility contact briefed on security and other requirements (C.2.c). As applicable, the facility | |||
-prepared exams (C.1.e; C.3.c; Attachment 3). N/A -210 5. Corporate notification letter sent (C.2.e). | -210 contact submits to the NRC any prescreened K/As for elimination from the written examination CDZ outline, with a description of the facilitys prescreening process (ES-401, D.1.b). | ||
-210 4. Reference material due for NRC-prepared exams (C.1.e; C.3.c; Attachment 3). N/A | |||
-401-1/2 or ES-401N-1/2 and ES-401-3 or ES-401N-3) sent to facility contact (must be on the exam security agreement) (C.1.e | -210 5. Corporate notification letter sent (C.2.e). CDZ | ||
-f; C.2.h; C.3.d-e). | : 6. NRC-developed written examination outline (ES-401-1/2 or ES-401N-1/2 and ES-401-3 or | ||
-201-2, ES-201-3, ES-301-1, ES-301-2, ES-301-5, and ES-D-1, as applicable (C.1.e | -195 ES-401N-3) sent to facility contact (must be on the exam security agreement) (C.1.e-f; C.2.h; CDZ C.3.d-e). | ||
-f; C.3.d-e). CDZ | : 7. Operating test outline(s) and other checklists due, including Forms ES-201-2, ES-201-3, ES-301-1, | ||
-301-3, ES-301-4, ES-301-5, ES-301-6, ES-401-6, ES-401N-6, and any Form ES | -150 ES-301-2, ES-301-5, and ES-D-1, as applicable (C.1.e-f; C.3.d-e). CDZ | ||
-201-2 and ES-201-3 updates); and reference materials due (C.1.e-h; C.3.d). | : 8. Operating test outline(s) reviewed by the NRC and feedback provided to facility licensee (C.2.h; | ||
-g). | -136 C.3.d-e). CDZ | ||
-202). N/A -50 12. Written exam and operating test reviews completed (C.3.f). | : 9. Proposed examinations (written, JPMs, and scenarios, as applicable) and outlines (Forms ES-301-1, ES-301-2, ES-D-1, ES-401-1/2 or ES-401N-1/2, and ES-401-3 or ES-401N-3); CDZ | ||
-75 supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, ES-401-6, ES-401N-6, and any Form ES-201-2 and ES-201-3 updates); and reference materials due (C.1.e-h; C.3.d). | |||
-l; C.2.h; C.3.g). The NRC and the facility licensee conduct exam preparatory week. | : 10. Examinations prepared by the NRC are approved by the NRC supervisor and forwarded for | ||
-75 N/A facility licensee review (C.1.i; C.2.h; C.3.f-g). | |||
-202). CDZ | -60 11. Preliminary waiver/excusal requests due (C.1.m; C.2.c; ES-202). N/A | ||
-202). CDZ -7 16. Written examinations and operating tests approved by the NRC supervisor (C.2.j | -50 12. Written exam and operating test reviews completed (C.3.f). CDZ | ||
-k; C.3.h). CDZ -7 17. Request facility licensee management feedback on the examination (C.2.l). | : 13. Examination review results discussed between the NRC and facility licensee (C.1.i; C.1.k-l; | ||
-35 C.2.h; C.3.g). The NRC and the facility licensee conduct exam preparatory week. CDZ | |||
-202, C.3.j; ES-204). | : 14. Preliminary license applications and waiver/excusal requests, as applicable (NRC Form 398) due | ||
-30 (C.1.m; C.2.i; ES-202). CDZ | |||
CDZ | : 15. Final license applications and waiver/excusal requests, as applicable (NRC Form 398), due and | ||
* Target dates are based on facility | -14 Form ES-201-4 prepared (C.1.m; C.2.k; ES-202). CDZ | ||
-prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted on a case | -7 16. Written examinations and operating tests approved by the NRC supervisor (C.2.j-k; C.3.h). CDZ | ||
-by-case basis in coordination with the facility licensee.}} | -7 17. Request facility licensee management feedback on the examination (C.2.l). CDZ | ||
: 18. Final applications reviewed; one or two (if more than 10) applications audited to confirm | |||
-7 qualifications/eligibility; and examination approval and waiver/excusal letters sent (C.2.k; CDZ Attachment 5; ES-202, C.3.j; ES-204). | |||
-7 19. Proctoring/written exam administration guidelines reviewed with facility licensee (C.3.k). CDZ | |||
-7 20. Approved scenarios and job performance measures distributed to NRC examiners (C.3.i). CDZ | |||
* Target dates are based on facility-prepared examinations and the examination date identified in the corporate notification letter. | |||
These dates are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.}} |
Latest revision as of 23:33, 20 October 2019
ML18162A287 | |
Person / Time | |
---|---|
Site: | Fermi ![]() |
Issue date: | 06/07/2018 |
From: | Chuck Zoia Division of Reactor Safety III |
To: | Detroit Edison |
Zoia C | |
Shared Package | |
ML17164A399 | List: |
References | |
Download: ML18162A287 (1) | |
Text
ES-201 Examination Preparation Checklist Form ES-201-1 Facility: Fermi 2 Date of Examination: 2/26/2018 - 3/2/2018 Developed by: Written: Facility NRC // Operating: Facility NRC Chief Target Task Description (Reference) Examiners Date*
Initials
- 1. Examination administration date confirmed (C.1.a; C.2.a-b). For NRC-prepared exams,
-240 arrangements are made for the facility to submit reference materials (C.1.e; C.3.c; Attachment 3). CDZ
-210 2. NRC examiners and facility contact assigned (C.1.d; C.2.f). CDZ
- 3. Facility contact briefed on security and other requirements (C.2.c). As applicable, the facility
-210 contact submits to the NRC any prescreened K/As for elimination from the written examination CDZ outline, with a description of the facilitys prescreening process (ES-401, D.1.b).
-210 4. Reference material due for NRC-prepared exams (C.1.e; C.3.c; Attachment 3). N/A
-210 5. Corporate notification letter sent (C.2.e). CDZ
- 6. NRC-developed written examination outline (ES-401-1/2 or ES-401N-1/2 and ES-401-3 or
-195 ES-401N-3) sent to facility contact (must be on the exam security agreement) (C.1.e-f; C.2.h; CDZ C.3.d-e).
- 7. Operating test outline(s) and other checklists due, including Forms ES-201-2, ES-201-3, ES-301-1,
-150 ES-301-2, ES-301-5, and ES-D-1, as applicable (C.1.e-f; C.3.d-e). CDZ
- 8. Operating test outline(s) reviewed by the NRC and feedback provided to facility licensee (C.2.h;
-136 C.3.d-e). CDZ
- 9. Proposed examinations (written, JPMs, and scenarios, as applicable) and outlines (Forms ES-301-1, ES-301-2, ES-D-1, ES-401-1/2 or ES-401N-1/2, and ES-401-3 or ES-401N-3); CDZ
-75 supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, ES-401-6, ES-401N-6, and any Form ES-201-2 and ES-201-3 updates); and reference materials due (C.1.e-h; C.3.d).
- 10. Examinations prepared by the NRC are approved by the NRC supervisor and forwarded for
-75 N/A facility licensee review (C.1.i; C.2.h; C.3.f-g).
-60 11. Preliminary waiver/excusal requests due (C.1.m; C.2.c; ES-202). N/A
-50 12. Written exam and operating test reviews completed (C.3.f). CDZ
- 13. Examination review results discussed between the NRC and facility licensee (C.1.i; C.1.k-l;
-35 C.2.h; C.3.g). The NRC and the facility licensee conduct exam preparatory week. CDZ
- 14. Preliminary license applications and waiver/excusal requests, as applicable (NRC Form 398) due
-30 (C.1.m; C.2.i; ES-202). CDZ
- 15. Final license applications and waiver/excusal requests, as applicable (NRC Form 398), due and
-14 Form ES-201-4 prepared (C.1.m; C.2.k; ES-202). CDZ
-7 16. Written examinations and operating tests approved by the NRC supervisor (C.2.j-k; C.3.h). CDZ
-7 17. Request facility licensee management feedback on the examination (C.2.l). CDZ
- 18. Final applications reviewed; one or two (if more than 10) applications audited to confirm
-7 qualifications/eligibility; and examination approval and waiver/excusal letters sent (C.2.k; CDZ Attachment 5; ES-202, C.3.j; ES-204).
-7 19. Proctoring/written exam administration guidelines reviewed with facility licensee (C.3.k). CDZ
-7 20. Approved scenarios and job performance measures distributed to NRC examiners (C.3.i). CDZ
- Target dates are based on facility-prepared examinations and the examination date identified in the corporate notification letter.
These dates are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.