MONTHYEARML24197A0622024-07-15015 July 2024 Retake Exam Form 5.1-1 Postexamination Check Sheet IR 05000341/20243022024-07-0909 July 2024 NRC Initial License Reexamination Report 05000341/2024302 ML24173A0992024-06-14014 June 2024 Retake Exam Form 1.3-1 Examination Security Agreement ML24173A1002024-06-14014 June 2024 Retake Exam Form 2.1-1 Examination Preparation Checklist ML24173A1012024-06-14014 June 2024 Retake Exam Post-Exam Cover Letter & Comments ML24155A0852024-06-11011 June 2024 Operator Licensing Reexamination Approval Letter - Fermi Power Plant, June 2024 ML24173A0862024-06-0505 June 2024 Retake Exam Form 2.3-2 Operating Test Quality Checklist NRC-24-0038, Retake Exam Proposed Exam Submittal Letter2024-05-22022 May 2024 Retake Exam Proposed Exam Submittal Letter NRC-24-0031, Retake Exam Outline Submittal Letter2024-04-22022 April 2024 Retake Exam Outline Submittal Letter ML24107B1372024-04-18018 April 2024 Confirmation of Initial License Reexamination June 2024 IR 05000341/20243012024-04-0101 April 2024 NRC Initial License Examination Report 05000341/2024301 ML24149A1102024-03-13013 March 2024 Form 1.3-1, Examination Security ML24149A1152024-03-13013 March 2024 Form 5.1-1 Post Examination Check Sheet (Fermi 2024) ML24149A1132024-03-13013 March 2024 Form 2.1-1, Examination Preparation Checklist (Fermi 2024) ML24045A1602024-02-14014 February 2024 Operator Licensing Examination Approval - Fermi Power Plant, February 2024 ML24149A0702024-02-14014 February 2024 Form 3.4-1 Events and Evolutions Checklist (Fermi 2024 Ile - Final) ML24149A0682024-02-14014 February 2024 NRC Form 2.3-1 Examination Outline Quality Checklist ML24149A0862024-01-0505 January 2024 Form 2.3-4, Written Exam Quality Checklist, Fermi 2024 Ile ML24149A0852024-01-0505 January 2024 Form 2.3-2, Operating Test Quality Checklist, Fermi 2024 Ile NRC-23-0078, Initial Licensed Operator Exam Materials - NRC Cover Letter 75-Day2023-12-13013 December 2023 Initial Licensed Operator Exam Materials - NRC Cover Letter 75-Day NRC-23-0067, NRC-23-0067 signed-150 Day Outline Submittal2023-09-29029 September 2023 NRC-23-0067 signed-150 Day Outline Submittal IR 05000341/20233012023-08-16016 August 2023 NRC Initial License Examination Report 05000341/2023301 ML23213A0302023-08-11011 August 2023 Form 5.1-1 Postexamination Check Sheet ML23212A8732023-07-31031 July 2023 Form 1.3-1 Examination Security Checklist ML23200A2552023-06-28028 June 2023 Post-Exam Letter with Comments and Exam Analysis ML23200A2182023-06-28028 June 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Final ML23200A2572023-06-19019 June 2023 Form 2.1-1 Examination Prep Checklist ML23200A2562023-06-19019 June 2023 IP 21 Operator Licensing Exam Schedule ML23166A0892023-06-15015 June 2023 Operator Licensing Examination Approval Fermi Power Plant, June 2023 ML23200A1852023-06-0202 June 2023 Form 2.3-2 Operating Test Quality Checklist ML23200A1862023-06-0202 June 2023 Form 2.3-4 Written Exam Quality Checklist ML23200A1842023-04-0606 April 2023 Proposed Exam Submittal Letter ML23074A1972023-03-16016 March 2023 Confirmation of Initial License Examination February 2024 ML23200A2212023-02-0808 February 2023 Form 2.3-1 Outline Quality Checklist ML23200A2162023-01-20020 January 2023 Outline Submittal Letter ML23200A2172023-01-20020 January 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Draft ML22322A1082022-11-18018 November 2022 Confirmation of Initial License Examination ML21258A0602021-09-15015 September 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21326A1532021-06-16016 June 2021 ES-401-1 and ES-401-3_Initial ML21327A4272021-06-16016 June 2021 Post Exam Submittal Letter ML21327A4252021-06-16016 June 2021 ES-403-1 ML21327A4242021-06-16016 June 2021 ES-201-3 ML21327A4212021-06-16016 June 2021 ES-201-1 ML21327A1062021-06-16016 June 2021 Proposed Exam Submittal Letter ML21327A1042021-06-16016 June 2021 ES-301-4 ML21327A0952021-06-16016 June 2021 ES-301-3 ML21327A0922021-06-16016 June 2021 ES-301-6 ML21326A1242021-06-16016 June 2021 Licensee Outline Submittal Letter ML21326A1212021-06-16016 June 2021 ES-301-5 ML21326A1202021-06-16016 June 2021 ES-201-2 2024-07-09
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24197A0622024-07-15015 July 2024 Retake Exam Form 5.1-1 Postexamination Check Sheet IR 05000341/20243022024-07-0909 July 2024 NRC Initial License Reexamination Report 05000341/2024302 ML24173A0992024-06-14014 June 2024 Retake Exam Form 1.3-1 Examination Security Agreement ML24173A1002024-06-14014 June 2024 Retake Exam Form 2.1-1 Examination Preparation Checklist ML24173A1012024-06-14014 June 2024 Retake Exam Post-Exam Cover Letter & Comments ML24155A0852024-06-11011 June 2024 Operator Licensing Reexamination Approval Letter - Fermi Power Plant, June 2024 ML24173A0862024-06-0505 June 2024 Retake Exam Form 2.3-2 Operating Test Quality Checklist NRC-24-0038, Retake Exam Proposed Exam Submittal Letter2024-05-22022 May 2024 Retake Exam Proposed Exam Submittal Letter NRC-24-0031, Retake Exam Outline Submittal Letter2024-04-22022 April 2024 Retake Exam Outline Submittal Letter ML24107B1372024-04-18018 April 2024 Confirmation of Initial License Reexamination June 2024 IR 05000341/20243012024-04-0101 April 2024 NRC Initial License Examination Report 05000341/2024301 ML24149A1102024-03-13013 March 2024 Form 1.3-1, Examination Security ML24149A1152024-03-13013 March 2024 Form 5.1-1 Post Examination Check Sheet (Fermi 2024) ML24149A1132024-03-13013 March 2024 Form 2.1-1, Examination Preparation Checklist (Fermi 2024) ML24045A1602024-02-14014 February 2024 Operator Licensing Examination Approval - Fermi Power Plant, February 2024 ML24149A0702024-02-14014 February 2024 Form 3.4-1 Events and Evolutions Checklist (Fermi 2024 Ile - Final) ML24149A0682024-02-14014 February 2024 NRC Form 2.3-1 Examination Outline Quality Checklist ML24149A0862024-01-0505 January 2024 Form 2.3-4, Written Exam Quality Checklist, Fermi 2024 Ile ML24149A0852024-01-0505 January 2024 Form 2.3-2, Operating Test Quality Checklist, Fermi 2024 Ile NRC-23-0078, Initial Licensed Operator Exam Materials - NRC Cover Letter 75-Day2023-12-13013 December 2023 Initial Licensed Operator Exam Materials - NRC Cover Letter 75-Day NRC-23-0067, NRC-23-0067 signed-150 Day Outline Submittal2023-09-29029 September 2023 NRC-23-0067 signed-150 Day Outline Submittal IR 05000341/20233012023-08-16016 August 2023 NRC Initial License Examination Report 05000341/2023301 ML23213A0302023-08-11011 August 2023 Form 5.1-1 Postexamination Check Sheet ML23212A8732023-07-31031 July 2023 Form 1.3-1 Examination Security Checklist ML23200A2552023-06-28028 June 2023 Post-Exam Letter with Comments and Exam Analysis ML23200A2182023-06-28028 June 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Final ML23200A2572023-06-19019 June 2023 Form 2.1-1 Examination Prep Checklist ML23200A2562023-06-19019 June 2023 IP 21 Operator Licensing Exam Schedule ML23166A0892023-06-15015 June 2023 Operator Licensing Examination Approval Fermi Power Plant, June 2023 ML23200A1852023-06-0202 June 2023 Form 2.3-2 Operating Test Quality Checklist ML23200A1862023-06-0202 June 2023 Form 2.3-4 Written Exam Quality Checklist ML23200A1842023-04-0606 April 2023 Proposed Exam Submittal Letter ML23074A1972023-03-16016 March 2023 Confirmation of Initial License Examination February 2024 ML23200A2212023-02-0808 February 2023 Form 2.3-1 Outline Quality Checklist ML23200A2162023-01-20020 January 2023 Outline Submittal Letter ML23200A2172023-01-20020 January 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Draft ML22322A1082022-11-18018 November 2022 Confirmation of Initial License Examination ML21258A0602021-09-15015 September 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21326A1532021-06-16016 June 2021 ES-401-1 and ES-401-3_Initial ML21327A4272021-06-16016 June 2021 Post Exam Submittal Letter ML21327A4252021-06-16016 June 2021 ES-403-1 ML21327A4242021-06-16016 June 2021 ES-201-3 ML21327A4212021-06-16016 June 2021 ES-201-1 ML21327A1062021-06-16016 June 2021 Proposed Exam Submittal Letter ML21327A1042021-06-16016 June 2021 ES-301-4 ML21327A0952021-06-16016 June 2021 ES-301-3 ML21327A0922021-06-16016 June 2021 ES-301-6 ML21326A1242021-06-16016 June 2021 Licensee Outline Submittal Letter ML21326A1212021-06-16016 June 2021 ES-301-5 ML21326A1202021-06-16016 June 2021 ES-201-2 2024-07-09
[Table view] |
Text
ES-401 Record of Rejected K/As Form ES-401-4 Tier / Randomly Reason for Rejection Group Selected K/A Tier 272000 (SF7, SF9 Question R64. We do not have any relationships between radiation 2/Group 2 RMS) Radiation monitoring and Aux Building ventilation. Dont have Aux Building (RO) Monitoring: ventilation.
K3.08 Knowledge of REPLACED by 272000 (SF7, SF9 RMS) Radiation Monitoring: K3.10 the effect that a loss Knowledge of the effect that a loss or malfunction of the RADIATION or malfunction of the MONITORING System will have on following: Control room RADIATION ventilation.
MONITORING System will have on following: Auxiliary building ventilation.
Tier 205000 (SF4 SCS) Question R29: We don't monitor RR loop temps while in SDC (loop temps 2/Group 1 Shutdown Cooling are not reliable without forced RR flow). Our plant is not analyzed for RR (RO) pumps to be running in SDC A4.12 Ability to manually operate REPLACED by 205000 (SF4 SCS) Shutdown Cooling: A4.11 Ability to and/or monitor in the manually operate and/or monitor in the control room: Heat exchanger control room: cooling flow.
Recirculation loop temperatures.
Tier 205000 (SF4 SCS) Question S86:Our plant is not analyzed for RR pumps to be running in 2/Group 1 Shutdown Cooling SDC, so I cant meet this K/A because the conditions for a trip would not (SRO) occur.
A2.11 Ability to (a) predict the impacts of REPLACED by A2.06 Ability to (a) predict the impacts of the following the following on the on the SHUTDOWN COOLING SYSTEM (RHR SHUTDOWN SHUTDOWN COOLING MODE) ; and (b) based on those predictions, use procedures to COOLING SYSTEM correct, control, or mitigate the consequences of those abnormal conditions (RHR SHUTDOWN or operations: SDC/RHR pump trips COOLING MODE) ;
and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations:
Recirculation pump trips.
ES-401 Record of Rejected K/As Form ES-401-4 Tier 295004 (APE 4) Question R03: No procedural guidance for ground fault isolation/fault 1/Group 1 Partial or Total Loss determination for operators. At Fermi 2 this is done under maintenance.
(RO) of DC Power All an operator does is write a CARD.
K3.02 Knowledge of REPLACED by K3.03 Knowledge of the reasons for the following the reasons for the responses as they apply to PARTIAL OR COMPLETE LOSS OF D.C.
following responses POWER: Reactor SCRAM: Plant-Specific.
as they apply to PARTIAL OR COMPLETE LOSS OF D.C. POWER:
Ground isolation/fault determination.
Tier 300000 (SF8 IA) Question S90: Air system is highly sampled on this sample plan. (S87) 2/Group 1 Instrument Air (R08) (R46) The K/A for S90 risks double jeopardy on this topic.
(SRO) Recommend keeping the generic (G4.46) and changing the System to 264000 (SF6 EGE) Emergency Generators (Diesel/Jet) EDG which is the G4.46 Ability to system on the sample plan above Instrument Air to minimize the impact on verify that the alarms the sample plan.
are consistent with the Accepted by chief examiner.
plant conditions.
Tier 234000 (SF8 FH) Question R61: Question was found to be Unsat (U) due to low LOD (LOD 2/Group 2 Fuel-Handling 1). During onsite validation week, no suitable replacement could be found (RO) Equipment or written. Decision was made to replace K/A in the sample plan.