|
|
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:Robert G. Schaaf}} | | {{#Wiki_filter:NRR-DRMAPEm Resource From: Schaaf, Robert Sent: Tuesday, May 28, 2019 1:01 PM To: 'Wells, Russell Douglas'; 'tjorf@tva.gov' Cc: Hulvey, Kimberly Dawn; 'Edmondson, Carla'; Brown, Michael Anthony; Shoop, Undine; Hon, Andrew |
| | |
| | ==Subject:== |
| | Sequoyah Nuclear Plant and Watts Bar Nuclear Plant - Final Request for Additional Information Related to Request for Alternative to OM Code Requirements (EPID L-2019-LLR-0005) |
| | Attachments: Sequoyah and Watts Bar TDAFW RR Final RAI (L-2019-LLR-0005).pdf |
| | : Russ, By letter dated January 18, 2019 (Agencywide Documents Access and Management System (ADAMS) |
| | Accession No. ML19018A118), the Tennessee Valley Authority (TVA) submitted requests for an alternative to the inservice testing requirements of the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Sequoyah Nuclear Plant (SQN), Units 1 and 2, and the Watts Bar Nuclear Plant (WBN), Units 1 and 2. The requested alternative would apply to testing of the turbine driven auxiliary feedwater pumps (TDAFWP) for SQN Units 1 and 2 (alternative request RP 09) and WBN Units 1 and 2 (alternative request IST-RR-6). |
| | The U.S. Nuclear Regulatory Commission (NRC) staff has determined that additional information, as described in the attached request for additional information (RAI), is required for the staff to complete its review of the subject request. This RAI was transmitted to TVA as draft on May 14, 2019. |
| | On May 22, 2019, a teleconference was held regarding the draft RAI in which TVA identified the need for additional time to fully respond to the RAI. Specifically, TVA discussed the schedule for upcoming planned pump surveillance testing that would inform its response to the RAI, and requested 60 days from the date of the teleconference to provide TVAs response. The staff has determined that the requested response period is acceptable. Therefore, please provide TVAs response to the attached RAI by July 22, 2019, in order to enable the staff to complete its review in accordance with TVAs requested schedule for completion of the review. |
| | Please call me at 301-415-6020 if you have any additional questions regarding this request for information. |
| | : Regards, Robert G. Schaaf Senior Project Manager |
| | ================================ |
| | U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Operating Reactor Licensing Mail Stop O-8B1A |
| | ================================ |
| | 301-415-6020 Robert.Schaaf@nrc.gov 1 |
| | |
| | Hearing Identifier: NRR_DRMA Email Number: 12 Mail Envelope Properties (BN7PR09MB269062A374A2C15619256502F91E0) |
| | |
| | ==Subject:== |
| | Sequoyah Nuclear Plant and Watts Bar Nuclear Plant - Final Request for Additional Information Related to Request for Alternative to OM Code Requirements (EPID L-2019-LLR-0005) |
| | Sent Date: 5/28/2019 1:01:16 PM Received Date: 5/28/2019 1:01:17 PM From: Schaaf, Robert Created By: Robert.Schaaf@nrc.gov Recipients: |
| | "Hulvey, Kimberly Dawn" <kdhulvey@tva.gov> |
| | Tracking Status: None |
| | "'Edmondson, Carla'" <cedmondson@tva.gov> |
| | Tracking Status: None "Brown, Michael Anthony" <mabrown6@tva.gov> |
| | Tracking Status: None "Shoop, Undine" <Undine.Shoop@nrc.gov> |
| | Tracking Status: None "Hon, Andrew" <Andrew.Hon@nrc.gov> |
| | Tracking Status: None |
| | "'Wells, Russell Douglas'" <rdwells0@tva.gov> |
| | Tracking Status: None |
| | "'tjorf@tva.gov'" <tjorf@tva.gov> |
| | Tracking Status: None Post Office: BN7PR09MB2690.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2057 5/28/2019 1:01:17 PM Sequoyah and Watts Bar TDAFW RR Final RAI (L-2019-LLR-0005).pdf 83156 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: |
| | Recipients Received: |
| | |
| | REQUEST FOR ADDITIONAL INFORMATION REGARDING ALTERNATIVE REQUESTS RP 09 AND IST-RR-6 TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 FOURTH 10-YEAR INTERVAL INSERVICE TESTING PROGRAM WATTS BAR NUCLEAR PLANT UNIT 1 THIRD 10-YEAR INTERVAL INSERVICE TESTING PROGRAM WATTS BAR NUCLEAR PLANT UNIT 2 FIRST 10-YEAR INTERVAL INSERVICE TESTING PROGRAM DOCKET NOS. 50-327, 50-328, 50-390 AND 50-391 By letter dated January 19, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession Number ML19018A118), Tennessee Valley Authority (TVA, the licensee) requested to use alternatives to specified requirements of the American Society of Mechanical Engineers (ASME) Operations and Maintenance (OM) Code for the Sequoyah Nuclear Plant (SQN), Units 1 and 2, and the Watts Bar Nuclear Plant (WBN), Units 1 and 2. |
| | The NRC staff has determined that the following additional information is needed to complete its review of TVAs ASME OM Code alternative request. |
| | RAI EMIB-1 Regulatory Basis If repair, replacement, or routine servicing that could affect reference values of a turbine driven auxiliary feedwater (TDAFWP) is performed during an outage, ASME OM Code ISTB-3310 requires a Group A, comprehensive, or preservice test to be performed to confirm existing reference values or establish new reference values before declaring the pump operable. These tests require vibration monitoring during the test. |
| | Issue Description Section V of the licensees request states that if repair, replacement, or routine servicing that could affect reference values of a TDAFW pump is performed during an outage, then initial pump operability for compliance with Technical Specification (TS) Limiting Condition for Operation 3.7.5 will be established by performance of the required TS Surveillance Requirement (SR) 3.7.5.2 pump test in Mode 3 with the required steam pressure test conditions. The SR 3.7.5.2 required test will be performed using the fixed resistance pump minimum flow recirculation path, in which pump speed is set, then flow and differential pressure are measured and compared to acceptance criteria established in accordance with OM Code provisions ISTB-3300, ISTB-5122, and Table ISTB-5121-1. This acceptance criteria is truncated if necessary to ensure the pump minimum design limits are met. |
| | It appears that the test that TVA is proposing (the TS SR 3.7.5.2 pump test) is equivalent to a less rigorous Group B test and does not require vibration monitoring. Section VII of TVAs |
| | |
| | alternative request references a similar alternative request for the Virgil C. Summer Nuclear Station Unit 1 (Summer) as a precedent. The NRC staff notes that in the Summer alternative request, the licensee stated that vibration data would also be obtained in accordance with ISTB-3540 as part of SR 3.7.5.2 when it is conducted following repair, replacement, or routine servicing. |
| | Information Needed Clarify and discuss whether vibration data will be obtained during the proposed TS SR 3.7.5.2 pump test following repair, replacement, or routine servicing to insure operational readiness of the TDAFW pump, consistent with the requirements of the OM Code.}} |
Letter Sequence RAI |
---|
EPID:L-2019-LLR-0005, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternatives RP 09 (Sqn)And IST-RR-6 (WBN) (Open) |
|
|
|
---|
Category:E-Mail
MONTHYEARML24309A0552024-11-0101 November 2024 NRR E-mail Capture - Request for Additional Information - TVA LAR to Revised Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 Re TS Table 3.3.2-1, Function 5 ML24304A3752024-10-29029 October 2024 NRR E-mail Capture - Request for Additional Information - License Amendment Request (LAR) to Revise Watts Bar Updated Final Safety Analysis Report (UFSAR) for Hydrologic Analysis ML24281A0072024-10-0202 October 2024 NRR E-mail Capture - Acceptance Review Results for the Sequoyah License Amendment Request to Modify the FHA Analysis, Tech Spec TS 3.9.4 and Tech Spec 3.3.6 (L-2024-LLA-0117) ML24274A2762024-09-24024 September 2024 Email from K.Green to S.Hughes, Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, Hydrologic LAR to Revise the UFSAR ML24260A0322024-09-10010 September 2024 NRR E-mail Capture - Request for Additional Information Regarding the Watts Bar Unit 2 Steam Generator Tube Inspection Report for U2R5 ML24215A3152024-07-24024 July 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-276-A, Revision 2 TS 3.8.1, AC Sources ML24177A1412024-06-11011 June 2024 NRR E-mail Capture - Audit Plan Related to Review of the Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, LAR to Revise Technical Specification Table 3.3.2-1 Function 5 ML24157A3152024-06-0303 June 2024 2024 Sequoyah Commercial Grade Dedication Inspection Information Request ML24152A1542024-05-31031 May 2024 Document Request for Sequoyah Nuclear Plant - Radiation Protection Inspection - Inspection Report 2024-03 ML24155A1372024-05-29029 May 2024 Email from K. Green to S. Hughes Request for Additional Information Related to License Amendment Request to Revise Residual Heat Removal Flow Rate ML24156A0062024-05-22022 May 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Recapture Low-Power Testing Time ML24128A1802024-05-0707 May 2024 NRR E-mail Capture - Acceptance Review for Sequoyah License Amendment Request to Modify TS 3.8.1 and TS 3.8.2 (L-2024-LLA-0047) ML24130A0132024-05-0707 May 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.7.11 for MCR Chiller Completion Time ML24123A0882024-05-0202 May 2024 NRR E-mail Capture - Correction Acceptance Review Results for the Browns Ferry, Sequoyah, and Watts Bar License Amendment Request to Revise TS 5.4.1 or 5.7.1 (L-2024-LLA-0039) ML24122B4872024-04-30030 April 2024 NRR E-mail Capture - Acceptance Review Results for the Browns Ferry, Sequoyah, and Watts Bar License Amendment Request to Revise TS 5.4.1 or 5.7.1 (L-2024-LLA-0039) ML24144A2322024-04-20020 April 2024 Tennessee Multi-Sector Permit (Tmsp), 2024 Annual Discharge Monitoring Report for Outfalls SW-3, SW-3, and SW-9 ML24116A2012024-04-17017 April 2024 Nrctva ISFSI CBS (RFI) ML24082A0662024-04-17017 April 2024 Email to Stuart Rymer on Exemption Decision for Watts Bar ML24082A0682024-04-10010 April 2024 Email to Stuart Rymer Re_ Availability of EA-FONSI for Watts Bar ML24100A8392024-04-0909 April 2024 Response from State of Tn Regarding Review of Environmental Assessment for Watts Bar Exemption Request ML24100A8402024-04-0808 April 2024 Email to State of Tn Requesting Review of Environmental Assessment for Watts Bar Exemption Request ML24074A4252024-03-14014 March 2024 NRR E-mail Capture - Sequoyah Hydrologic Analysis License Amendment Request - Notification of Change to Estimated Completion and Hours ML24071A0982024-03-0707 March 2024 NRR E-mail Capture - Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce RHR Flow Rate ML24059A4052024-02-28028 February 2024 Document Request for Sequoyah Nuclear Plant - Radiation Protection Inspection - Inspection Report 2024-02 ML24058A0962024-02-26026 February 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant License Amendment Request to Revise UFSAR for Hydrologic Analysis ML24053A0302024-02-21021 February 2024 NRR E-mail Capture - Request for Steam Generator (SG) Tube Inspection Call for Sequoyah, Unit 1 ML24047A2792024-02-15015 February 2024 RAI Related to the Exemption Request for 10 CFR 37.11 ML24045A0312024-02-14014 February 2024 NRR E-mail Capture - Request for Additional Information Related to the Exemption Request for the 10 CFR Part 73 Enhanced Weapons Rule ML24045A1002024-02-13013 February 2024 NRR E-mail Capture - Request for Additional Information Related to the Sequoyah Exemption Request for the 10 CFR Part 73 Enhanced Weapons Rule ML24033A0562024-02-0101 February 2024 NRR E-mail Capture - Correction Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-427-A, Revision 2 Regarding Degraded Barriers ML24032A0202024-01-31031 January 2024 NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2023 ML24036A0132024-01-23023 January 2024 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar Nuclear Plants, License Amendment Request to Revise TS Table 3.3.2-1, Function 5, Turbine Trip and Feedwater Isolation ML24022A2592024-01-22022 January 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Revise TS LCO 3.8.2 to Remove Note C-S Diesel Generator ML24016A0762024-01-16016 January 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2 - License Amendment Request to Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications ML23347A0642023-12-13013 December 2023 12-13-23 Email from Kimberly Green to Wells, Russell, Subject: Results of NRC SUNSI Review of Watts Bar Nuclear Plant Dual-Unit UFSAR, Amendment 5 ML23334A0932023-11-28028 November 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Surveillance Requirement 3.9.5.1 to Reduce RHR Flow Rate During Mode 6 ML23319A1662023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant, Exemption Request Related to 10 CFR 37.11(c)(2) ML23275A0272023-09-29029 September 2023 Submittal of Discharge Monitoring Report (DMR) Quality Assurance Study 43 Final Report 2023 ML23254A2872023-09-11011 September 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Table 1.1-1 Re Number of Required Rvh Closure Bolts ML23236A2562023-08-24024 August 2023 NRR E-mail Capture - Acceptance Review Results for the Sequoyah and Watts Bar License Amendment Request to Adopt TSTF-567 (L-2023-LLA-0106) ML23191A8672023-07-10010 July 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML23166A1142023-06-15015 June 2023 Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2023-03 ML23165A2862023-06-14014 June 2023 Tennessee Multi-Sector Permit (Tmsp), 2023 Annual Discharge Monitoring Report for Outfalls SW-1, SW-16, SW-17, SW-18, SW-19, and SW-21 ML23150A2472023-05-25025 May 2023 NRR E-mail Capture - Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods ML23116A1492023-04-21021 April 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods ML23075A0032023-03-13013 March 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1, 2, and 3, License Amendment Request to Revise TS 3.7.11, Required Actions A.1 and E.1 Footnotes Re Date for the Modification ML23072A0722023-03-10010 March 2023 NRR E-mail Capture - (External_Sender) State Consultation - Sequoyah Nuclear Plant, Units 1 and 2; and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML23067A2372023-03-0808 March 2023 WB_2023-02_RP_inspection_doc_request ML23062A5952023-02-27027 February 2023 Staff follow-up Questions to TVAs 12/19/2022 Response of the Staffs Rsi Regarding 08/04/2022 SQN Exemption Request ML23058A1312023-02-27027 February 2023 FW: TVA Intentions on EA-22-129 2024-09-24
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24309A0552024-11-0101 November 2024 NRR E-mail Capture - Request for Additional Information - TVA LAR to Revised Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 Re TS Table 3.3.2-1, Function 5 ML24304A3752024-10-29029 October 2024 NRR E-mail Capture - Request for Additional Information - License Amendment Request (LAR) to Revise Watts Bar Updated Final Safety Analysis Report (UFSAR) for Hydrologic Analysis ML24260A0322024-09-10010 September 2024 NRR E-mail Capture - Request for Additional Information Regarding the Watts Bar Unit 2 Steam Generator Tube Inspection Report for U2R5 ML24152A1542024-05-31031 May 2024 Document Request for Sequoyah Nuclear Plant - Radiation Protection Inspection - Inspection Report 2024-03 ML24155A1372024-05-29029 May 2024 Email from K. Green to S. Hughes Request for Additional Information Related to License Amendment Request to Revise Residual Heat Removal Flow Rate ML24120A1182024-04-29029 April 2024 – Notification of NRC Supplemental Inspection (95001) and Request for Information ML24116A2012024-04-17017 April 2024 Nrctva ISFSI CBS (RFI) ML24045A0312024-02-14014 February 2024 NRR E-mail Capture - Request for Additional Information Related to the Exemption Request for the 10 CFR Part 73 Enhanced Weapons Rule ML24045A1002024-02-13013 February 2024 NRR E-mail Capture - Request for Additional Information Related to the Sequoyah Exemption Request for the 10 CFR Part 73 Enhanced Weapons Rule ML23307A0822023-11-0808 November 2023 Request for Additional Information – August 4, 2022, Exemption Request for Deviating from the Conditions of Certificate of Compliance No. 1032, Amendment No. 3, Related to Sequoyah Nuclear Plant Independent Spent Fuel Storage Installation ML23307A0832023-11-0808 November 2023 Enclosure - Request for Additional Information HDI-Sequoyah NDE Exemption Request 10-30-2023 ML23166A1142023-06-15015 June 2023 Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2023-03 ML23067A2372023-03-0808 March 2023 WB_2023-02_RP_inspection_doc_request ML23062A5942023-02-27027 February 2023 Enclosure - NRC SQN Exemption Rsi Response Staff Follow Up Questions ML23062A5952023-02-27027 February 2023 Staff follow-up Questions to TVAs 12/19/2022 Response of the Staffs Rsi Regarding 08/04/2022 SQN Exemption Request ML23030A3512023-01-25025 January 2023 Notification of Watts Bar Nuclear Plant - Design Bases Assurance Inspection (Programs) and Initial Information Request ML22343A0692022-12-0808 December 2022 NRR E-mail Capture - Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML22257A0622022-09-14014 September 2022 Requalification Program Inspection - Sequoyah Nuclear Plant ML22255A0842022-09-0909 September 2022 Document Request for Sequoyah Nuclear Plant - Radiation Protection Inspection - Inspection Report 2022-04 ML22227A0272022-08-11011 August 2022 NRR E-mail Capture - Request for Additional Information Related to Alternative Requests RP-11 for Sequoyah Nuclear Plant, Units 1 and 2, and IST-RR-9 for Watts Bar Nuclear Plant, Units 1 and 2 ML22214A1582022-08-0202 August 2022 NRR E-mail Capture - Request for Additional Information for Sequoyah Units 1 and 2 License Amendment Request for Fire and Seismic PRA Modification to 10 CFR 50.69 (L-2022-LLA-0033) ML22151A0102022-05-27027 May 2022 NRR E-mail Capture - Revised Request for Additional Information Re Sequoyah Nuclear Plant Alternative Request RV-02 ML22151A0092022-05-26026 May 2022 NRR E-mail Capture - Request for Additional Information Re Sequoyah Nuclear Plant Alternative Request RV-02 ML22146A3322022-05-26026 May 2022 NRR E-mail Capture - Request for Additional Information Related to Sequoyah Nuclear Plants LAR to Adopt TSTF-505 ML22144A1002022-05-12012 May 2022 NRR E-mail Capture - Request for Additional Information Related to TVAs Request to Revised the TVA Plants Radiological Emergency Plans ML22115A1402022-04-25025 April 2022 NRR E-mail Capture - Requests for Confirmation of Information and Additional Information Regarding Watts Bar Nuclear Plant, Unit 2 Exemption Request Re 10 CFR Part 26 (L-2022-LLE-0017) ML22083A2372022-03-24024 March 2022 NRR E-mail Capture - Request for Additional Information and Confirmation of Information Related to TVAs Request for Changes to Watts Bar Nuclear Plant, Units 1 and 2, Technical Specification 3.7.8 ML22056A3802022-02-25025 February 2022 Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2022-02 ML21267A1392021-09-23023 September 2021 Document Request for Upcoming RP Inspection at Watts Bar ML21237A4952021-08-25025 August 2021 Document Request for Sequoyah Nuclear Plant - Radiation Protection Inspection - Inspection Report 2021-04 ML21221A2602021-08-0909 August 2021 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise Watts Bar, Unit 1 Tech Specs Related to Continuous Opening of the Auxiliary Building Secondary Containment Enclosure Boundary ML21160A0352021-06-0303 June 2021 Document Request for Sequoyah Nuclear Plant - Radiation Protection Inspection - Inspection Report 2021-03 ML21102A1312021-04-19019 April 2021 Request for Withholding Information from Public Disclosure for Watts Bar Nuclear Plant, Unit 1 ML21095A0482021-04-0505 April 2021 NRR E-mail Capture - Sequoyah Nuclear Plant, Units 1 and 2 - Request for Additional Information Regarding Request to Transition to Westinghouse Fuel ML21092A0972021-04-0202 April 2021 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML21095A0402021-04-0202 April 2021 NRR E-mail Capture - Request for Additional Information Re Generic Letter 95-05 90-Day Report and LAR to Adjust Growth Rate for Thot (EPIDs L-2021-LRO-0003 and L-2021-LLA-0026) ML21095A0422021-04-0202 April 2021 NRR E-mail Capture - Added Clarification to RAI 2 for Thot LAR ML21095A0412021-04-0101 April 2021 NRR E-mail Capture - Revised Draft RAI - Combined RAI Set for Watts Bar Unit 2 90-Day Report and Thot LAR (EPIDs L-2021-LRO-0003 and L-2021-LLA-0026) ML21095A0442021-04-0101 April 2021 NRR E-mail Capture - Revised Draft RAI - Combined RAI Set for Watts Bar Unit 2 90-Day Report and Thot LAR (EPIDs L-2021-LRO-0003 and L-2021-LLA-0026) ML21091A0772021-04-0101 April 2021 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise Technical Specification 5.7.2.19, Containment Leakage Rate Testing Program ML21095A0462021-03-22022 March 2021 NRR E-mail Capture - Draft Request for Additional Information Regarding Tva'S Generic Letter 95-05 90-Day Report for Watts Bar Unit 2 ML21039A6402021-02-0808 February 2021 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise the Watts Bar Nuclear Plant, Unit 1 Technical Specifications Related to Steam Generator Tube Inspection Frequency ML21012A2032021-01-11011 January 2021 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise the Watts Bar UFSAR to Use Alternate Probability of Detection ML20350B5592020-12-15015 December 2020 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Adopt Traveler TSTF-490 Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec ML20338A3202020-12-0303 December 2020 Notification of an NRC Fire Protection Team Inspection (NRC Inspection Report 05000390/2021011 and 05000391/2021011) and Request for Information ML20322A4412020-11-17017 November 2020 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise TS 3.7.11 Related to the MCR Chiller Replacement ML20322A4392020-11-0505 November 2020 NRR E-mail Capture - Draft Request for Additional Information Regarding Tva'S Request to Revise TS 3.7.11 Related to the MCR Chiller Replacement ML20308A3512020-11-0202 November 2020 Request for Additional Information on WBN Request for Exemption from 10 CFR Part 73, Appendix B, Section VI for the Conduct of an Annual Force-on-Force Exercise (EPID L-2020-LLE-0165 (COVID-19)) ML20259A4782020-09-15015 September 2020 Emergency Preparedness Program Inspection Request for Information ML20261H4172020-09-14014 September 2020 NRR E-mail Capture - Sequoyah Nuclear Plant, Units 1 and 2 - Request for Additional Information Regarding Hydrologic UFSAR Update 2024-09-10
[Table view] |
Text
NRR-DRMAPEm Resource From: Schaaf, Robert Sent: Tuesday, May 28, 2019 1:01 PM To: 'Wells, Russell Douglas'; 'tjorf@tva.gov' Cc: Hulvey, Kimberly Dawn; 'Edmondson, Carla'; Brown, Michael Anthony; Shoop, Undine; Hon, Andrew
Subject:
Sequoyah Nuclear Plant and Watts Bar Nuclear Plant - Final Request for Additional Information Related to Request for Alternative to OM Code Requirements (EPID L-2019-LLR-0005)
Attachments: Sequoyah and Watts Bar TDAFW RR Final RAI (L-2019-LLR-0005).pdf
- Russ, By letter dated January 18, 2019 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML19018A118), the Tennessee Valley Authority (TVA) submitted requests for an alternative to the inservice testing requirements of the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Sequoyah Nuclear Plant (SQN), Units 1 and 2, and the Watts Bar Nuclear Plant (WBN), Units 1 and 2. The requested alternative would apply to testing of the turbine driven auxiliary feedwater pumps (TDAFWP) for SQN Units 1 and 2 (alternative request RP 09) and WBN Units 1 and 2 (alternative request IST-RR-6).
The U.S. Nuclear Regulatory Commission (NRC) staff has determined that additional information, as described in the attached request for additional information (RAI), is required for the staff to complete its review of the subject request. This RAI was transmitted to TVA as draft on May 14, 2019.
On May 22, 2019, a teleconference was held regarding the draft RAI in which TVA identified the need for additional time to fully respond to the RAI. Specifically, TVA discussed the schedule for upcoming planned pump surveillance testing that would inform its response to the RAI, and requested 60 days from the date of the teleconference to provide TVAs response. The staff has determined that the requested response period is acceptable. Therefore, please provide TVAs response to the attached RAI by July 22, 2019, in order to enable the staff to complete its review in accordance with TVAs requested schedule for completion of the review.
Please call me at 301-415-6020 if you have any additional questions regarding this request for information.
- Regards, Robert G. Schaaf Senior Project Manager
====================
U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Operating Reactor Licensing Mail Stop O-8B1A
====================
301-415-6020 Robert.Schaaf@nrc.gov 1
Hearing Identifier: NRR_DRMA Email Number: 12 Mail Envelope Properties (BN7PR09MB269062A374A2C15619256502F91E0)
Subject:
Sequoyah Nuclear Plant and Watts Bar Nuclear Plant - Final Request for Additional Information Related to Request for Alternative to OM Code Requirements (EPID L-2019-LLR-0005)
Sent Date: 5/28/2019 1:01:16 PM Received Date: 5/28/2019 1:01:17 PM From: Schaaf, Robert Created By: Robert.Schaaf@nrc.gov Recipients:
"Hulvey, Kimberly Dawn" <kdhulvey@tva.gov>
Tracking Status: None
"'Edmondson, Carla'" <cedmondson@tva.gov>
Tracking Status: None "Brown, Michael Anthony" <mabrown6@tva.gov>
Tracking Status: None "Shoop, Undine" <Undine.Shoop@nrc.gov>
Tracking Status: None "Hon, Andrew" <Andrew.Hon@nrc.gov>
Tracking Status: None
"'Wells, Russell Douglas'" <rdwells0@tva.gov>
Tracking Status: None
"'tjorf@tva.gov'" <tjorf@tva.gov>
Tracking Status: None Post Office: BN7PR09MB2690.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2057 5/28/2019 1:01:17 PM Sequoyah and Watts Bar TDAFW RR Final RAI (L-2019-LLR-0005).pdf 83156 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
REQUEST FOR ADDITIONAL INFORMATION REGARDING ALTERNATIVE REQUESTS RP 09 AND IST-RR-6 TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 FOURTH 10-YEAR INTERVAL INSERVICE TESTING PROGRAM WATTS BAR NUCLEAR PLANT UNIT 1 THIRD 10-YEAR INTERVAL INSERVICE TESTING PROGRAM WATTS BAR NUCLEAR PLANT UNIT 2 FIRST 10-YEAR INTERVAL INSERVICE TESTING PROGRAM DOCKET NOS. 50-327, 50-328, 50-390 AND 50-391 By letter dated January 19, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession Number ML19018A118), Tennessee Valley Authority (TVA, the licensee) requested to use alternatives to specified requirements of the American Society of Mechanical Engineers (ASME) Operations and Maintenance (OM) Code for the Sequoyah Nuclear Plant (SQN), Units 1 and 2, and the Watts Bar Nuclear Plant (WBN), Units 1 and 2.
The NRC staff has determined that the following additional information is needed to complete its review of TVAs ASME OM Code alternative request.
RAI EMIB-1 Regulatory Basis If repair, replacement, or routine servicing that could affect reference values of a turbine driven auxiliary feedwater (TDAFWP) is performed during an outage, ASME OM Code ISTB-3310 requires a Group A, comprehensive, or preservice test to be performed to confirm existing reference values or establish new reference values before declaring the pump operable. These tests require vibration monitoring during the test.
Issue Description Section V of the licensees request states that if repair, replacement, or routine servicing that could affect reference values of a TDAFW pump is performed during an outage, then initial pump operability for compliance with Technical Specification (TS) Limiting Condition for Operation 3.7.5 will be established by performance of the required TS Surveillance Requirement (SR) 3.7.5.2 pump test in Mode 3 with the required steam pressure test conditions. The SR 3.7.5.2 required test will be performed using the fixed resistance pump minimum flow recirculation path, in which pump speed is set, then flow and differential pressure are measured and compared to acceptance criteria established in accordance with OM Code provisions ISTB-3300, ISTB-5122, and Table ISTB-5121-1. This acceptance criteria is truncated if necessary to ensure the pump minimum design limits are met.
It appears that the test that TVA is proposing (the TS SR 3.7.5.2 pump test) is equivalent to a less rigorous Group B test and does not require vibration monitoring.Section VII of TVAs
alternative request references a similar alternative request for the Virgil C. Summer Nuclear Station Unit 1 (Summer) as a precedent. The NRC staff notes that in the Summer alternative request, the licensee stated that vibration data would also be obtained in accordance with ISTB-3540 as part of SR 3.7.5.2 when it is conducted following repair, replacement, or routine servicing.
Information Needed Clarify and discuss whether vibration data will be obtained during the proposed TS SR 3.7.5.2 pump test following repair, replacement, or routine servicing to insure operational readiness of the TDAFW pump, consistent with the requirements of the OM Code.