ML12180A452: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 1: Line 1:
#REDIRECT [[IR 05000285/2012302]]
{{Adams
| number = ML12180A452
| issue date = 06/28/2012
| title = Notification of NRC Retake Operator Licensing Examination 05000285/2012302
| author name = Haire M
| author affiliation = NRC/RGN-IV/DRS/OB
| addressee name = Bannister D
| addressee affiliation = Omaha Public Power District
| docket = 05000285
| license number = DPR-040
| contact person = vlm/Steely C
| case reference number = 50-285/OL-12-302
| document type = Letter, License-Operator, Part 55 Examination Related Material
| page count = 3
}}
See also: [[see also::IR 05000285/2012302]]
 
=Text=
{{#Wiki_filter:June 28, 2012
  David J. Bannister, Vice President    and Chief Nuclear Officer
Omaha Public Power District Fort Calhoun Station FC-2-4  P.O. Box 550 Fort Calhoun, NE  68023-0550
SUBJECT: FORT CALHOUN STATION - NOTIFICATION OF NRC RETAKE OPERATOR LICENSING EXAMINATION 05000285/2012302 
Dear Mr. Bannister:
In a telephone conversation on June 6, 2012, between Messrs. Tom Giebelhausen, Manager Operations Training and Simulator, and Chris Steely, Chief Examiner, arrangements were made for the administration of licensing examinations at Fort Calhoun Station on September 21, 2012.
As agreed during the telephone conversation, your staff will prepare the examination based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power
Reactors," Revision 9, Supplement 1, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1.  The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered. 
To meet the above schedule, it will be necessary for your staff to furnish the examination outline by July 13, 2012.  The written examination and reference materials identified in Attachment 3 to ES-201 will be due by August 13, 2012.  Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outline, examination, and tests before they are submitted to the NRC
for review and approval.  All materials shall be complete and ready-to-use.  We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked.  Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. 
In order to conduct the requested written examinations, it will be necessary for your staff to
provide adequate space and accommodations in accordance with ES-402. 
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations are being administered.
UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511
D. Bannister - 2 -
To permit timely NRC review and evaluation, your staff should submit preliminary operator and senior operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first
examination date.  If the applications are not received at least 30 days before the examination date, a postponement may be necessary.  Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  These information collections were approved by OMB, under approval number 3150-0018, which expires on February 28, 2013.  The public reporting burden for this collection of information is estimated to average 50 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations,  and completing and reviewing the collection of information.  Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch
(T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV.  The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).  ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.  Thank you for your cooperation in this matter.  Mr. Giebelhausen has been advised of the policies and guidelines referenced in this letter.  If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Steely at 817-200-1432, or myself at 817-200-1159.
      Sincerely, 
      /RA/ 
      Mark S. Haire, Chief Operations Branch      Division of Reactor Safety
Docket:  50-285 License:  DPR-40
 
Distribution made electronically to Fort Calhoun
 
 
ML12180A452 ADAMS:    No      Yes  SUNSI Review Complete Reviewer Initials:  CDS
  Publicly Available  Non-Sensitive
  Non-publicly Available  Sensitive OE: DRS/OB C: DRS/C OB
  CDS MSH  /RA/ /RA/  06/20/2012 06/22/2012
}}

Revision as of 14:28, 15 July 2019

Notification of NRC Retake Operator Licensing Examination 05000285/2012302
ML12180A452
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 06/28/2012
From: Mark Haire
Operations Branch IV
To: Bannister D
Omaha Public Power District
vlm/Steely C
References
50-285/OL-12-302
Download: ML12180A452 (3)


See also: IR 05000285/2012302

Text

June 28, 2012

David J. Bannister, Vice President and Chief Nuclear Officer

Omaha Public Power District Fort Calhoun Station FC-2-4 P.O. Box 550 Fort Calhoun, NE 68023-0550

SUBJECT: FORT CALHOUN STATION - NOTIFICATION OF NRC RETAKE OPERATOR LICENSING EXAMINATION 05000285/2012302

Dear Mr. Bannister:

In a telephone conversation on June 6, 2012, between Messrs. Tom Giebelhausen, Manager Operations Training and Simulator, and Chris Steely, Chief Examiner, arrangements were made for the administration of licensing examinations at Fort Calhoun Station on September 21, 2012.

As agreed during the telephone conversation, your staff will prepare the examination based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power

Reactors," Revision 9, Supplement 1, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1. The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination outline by July 13, 2012. The written examination and reference materials identified in Attachment 3 to ES-201 will be due by August 13, 2012. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outline, examination, and tests before they are submitted to the NRC

for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations, it will be necessary for your staff to

provide adequate space and accommodations in accordance with ES-402.

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations are being administered.

UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511

D. Bannister - 2 -

To permit timely NRC review and evaluation, your staff should submit preliminary operator and senior operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first

examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on February 28, 2013. The public reporting burden for this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch

(T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV. The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html. Thank you for your cooperation in this matter. Mr. Giebelhausen has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Steely at 817-200-1432, or myself at 817-200-1159.

Sincerely,

/RA/

Mark S. Haire, Chief Operations Branch Division of Reactor Safety

Docket: 50-285 License: DPR-40

Distribution made electronically to Fort Calhoun

ML12180A452 ADAMS: No Yes SUNSI Review Complete Reviewer Initials: CDS

Publicly Available Non-Sensitive

Non-publicly Available Sensitive OE: DRS/OB C: DRS/C OB

CDS MSH /RA/ /RA/ 06/20/2012 06/22/2012