|
|
Line 1: |
Line 1: |
| #REDIRECT [[IR 05000285/2012302]]
| | {{Adams |
| | | number = ML12180A452 |
| | | issue date = 06/28/2012 |
| | | title = Notification of NRC Retake Operator Licensing Examination 05000285/2012302 |
| | | author name = Haire M |
| | | author affiliation = NRC/RGN-IV/DRS/OB |
| | | addressee name = Bannister D |
| | | addressee affiliation = Omaha Public Power District |
| | | docket = 05000285 |
| | | license number = DPR-040 |
| | | contact person = vlm/Steely C |
| | | case reference number = 50-285/OL-12-302 |
| | | document type = Letter, License-Operator, Part 55 Examination Related Material |
| | | page count = 3 |
| | }} |
| | See also: [[see also::IR 05000285/2012302]] |
| | |
| | =Text= |
| | {{#Wiki_filter:June 28, 2012 |
| | David J. Bannister, Vice President and Chief Nuclear Officer |
| | Omaha Public Power District Fort Calhoun Station FC-2-4 P.O. Box 550 Fort Calhoun, NE 68023-0550 |
| | |
| | SUBJECT: FORT CALHOUN STATION - NOTIFICATION OF NRC RETAKE OPERATOR LICENSING EXAMINATION 05000285/2012302 |
| | Dear Mr. Bannister: |
| | In a telephone conversation on June 6, 2012, between Messrs. Tom Giebelhausen, Manager Operations Training and Simulator, and Chris Steely, Chief Examiner, arrangements were made for the administration of licensing examinations at Fort Calhoun Station on September 21, 2012. |
| | As agreed during the telephone conversation, your staff will prepare the examination based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power |
| | Reactors," Revision 9, Supplement 1, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1. The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered. |
| | |
| | To meet the above schedule, it will be necessary for your staff to furnish the examination outline by July 13, 2012. The written examination and reference materials identified in Attachment 3 to ES-201 will be due by August 13, 2012. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outline, examination, and tests before they are submitted to the NRC |
| | for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. |
| | In order to conduct the requested written examinations, it will be necessary for your staff to |
| | provide adequate space and accommodations in accordance with ES-402. |
| | Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations are being administered. |
| | UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511 |
| | D. Bannister - 2 - |
| | To permit timely NRC review and evaluation, your staff should submit preliminary operator and senior operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first |
| | examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date. |
| | This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on February 28, 2013. The public reporting burden for this collection of information is estimated to average 50 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch |
| | (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV. The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number. |
| | |
| | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html. Thank you for your cooperation in this matter. Mr. Giebelhausen has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Steely at 817-200-1432, or myself at 817-200-1159. |
| | Sincerely, |
| | /RA/ |
| | Mark S. Haire, Chief Operations Branch Division of Reactor Safety |
| | Docket: 50-285 License: DPR-40 |
| | |
| | Distribution made electronically to Fort Calhoun |
| | |
| | |
| | ML12180A452 ADAMS: No Yes SUNSI Review Complete Reviewer Initials: CDS |
| | Publicly Available Non-Sensitive |
| | Non-publicly Available Sensitive OE: DRS/OB C: DRS/C OB |
| | CDS MSH /RA/ /RA/ 06/20/2012 06/22/2012 |
| | }} |
|
---|
Category:Letter
MONTHYEARLIC-24-0015, Response to Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (DQAP) – Clarification of Request for Additional Information Response2024-11-20020 November 2024 Response to Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (DQAP) – Clarification of Request for Additional Information Response IR 05000285/20240032024-10-29029 October 2024 NRC Inspection Report 05000285/2024003 LIC-24-0012, Independent Spent Fuel Storage Installation - Response to Proposed Revision to Decommissioning Quality Assurance Plan (DQAP) - Request for Additional Information2024-10-0707 October 2024 Independent Spent Fuel Storage Installation - Response to Proposed Revision to Decommissioning Quality Assurance Plan (DQAP) - Request for Additional Information LIC-24-0011, Independent Spent Fuel Storage Installation - Response to Application for License Amendment Request to Revise the License Termination Plan - Supplemental Information Needed, EPID L-2024-LLA-00952024-10-0202 October 2024 Independent Spent Fuel Storage Installation - Response to Application for License Amendment Request to Revise the License Termination Plan - Supplemental Information Needed, EPID L-2024-LLA-0095 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24243A1042024-09-12012 September 2024 Proposed Revision to the OPPD FCS DQAP - Request for Additional Information (License No. DPR-40, Docket Nos. 50-285, 72-054, and 71-0256) ML24255A0962024-09-12012 September 2024 License Amendment Request to Revise the License Termination Plan - Request Supplemental Information (License No. DPR-40, Docket No. 50-285) IR 05000285/20240022024-08-21021 August 2024 NRC Inspection Report 05000285/2024002 ML24235A0822024-08-10010 August 2024 Response to Fort Calhoun Station, Unit No. 1 - Phase 1 Final Status Survey Report to Support Approved License Termination Plan - Request for Additional Information - Request for Additional Information (EPID L-2024-DFR-0002) July 8, 2024 ML24183A3222024-07-0808 July 2024 Proposed Revision to the Omaha Public Power District Fort Calhoun Station Decommissioning Quality Assurance Plan - Acceptance Review ML24180A2082024-07-0808 July 2024 Phase 1 Final Status Survey Reports Request for Additional Information Letter LIC-24-0007, License Amendment Request (LAR) to Revise License Termination Plan (LTP)2024-06-18018 June 2024 License Amendment Request (LAR) to Revise License Termination Plan (LTP) IR 05000285/20240012024-06-0505 June 2024 NRC Inspection Report 05000285/2024001 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities LIC-24-0008, Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI2024-05-16016 May 2024 Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI LIC-24-0003, Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report2024-04-25025 April 2024 Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-24-0006, (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan2024-04-17017 April 2024 (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan ML24079A1702024-03-10010 March 2024 ISFSI, Unit 1 - 10 CFR 50.59 Report, Quality Assurance (QA) Program Changes, Technical Specification Basis Changes, 10 CFR 71.106 Quality Assurance Program Approval, Aging Management Review, Commitment Revisions and Revision of Updated Safe LIC-24-0005, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2024-03-0101 March 2024 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-24-0002, Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report2024-02-27027 February 2024 Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report ML24019A1672024-01-31031 January 2024 Issuance of Amendment to Renewed Facility License to Add License Condition to Include License Termination Plan Requirements IR 05000285/20230062023-12-21021 December 2023 NRC Inspection Report 05000285/2023006 LIC-23-0007, Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Request for Additional Information2023-12-0606 December 2023 Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Request for Additional Information IR 05000285/20230052023-11-0202 November 2023 NRC Inspection Room 05000285/2023005 ML23276A0042023-09-28028 September 2023 U.S. EPA Response Letter to NRC Letter on Consultation and Finality on Decommissioning and Decontamination of Contaminated Sites MOU - Fort Calhoun Station, Unit 1 – (License No. DPR-40, Docket No. 50-285) IR 05000285/20230042023-09-13013 September 2023 NRC Inspection Report 05000285/2023-004 LIC-23-0005, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 20232023-08-24024 August 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 ML23234A2412023-08-18018 August 2023 Email - Letter to M Porath Re Ft Calhoun Unit 1 LTP EA Section 7 Informal Consultation Request ML23234A2392023-08-18018 August 2023 Letter to B Harisis Re Ft Calhoun Unit 1 LTP EA State of Nebraska Comment Request.Pdf IR 05000285/20230032023-07-10010 July 2023 – NRC Inspection Report 05000285/2023003 ML23082A2202023-06-26026 June 2023 Consultation on the Decommissioning of the Fort Calhoun Station Unit 1 Pressurized Water Reactor in Fort Calhoun, Nebraska IR 05000285/20230022023-06-0505 June 2023 NRC Inspection Report 05000285/2023002 ML23151A0032023-06-0505 June 2023 – Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 LIC-23-0004, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2023-04-20020 April 2023 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-23-0003, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2023-03-15015 March 2023 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-23-0001, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information2023-02-27027 February 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000285/20230012023-02-24024 February 2023 NRC Inspection Report 05000285/2023001 LIC-23-0002, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2023-02-20020 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report ML23020A0462023-01-19019 January 2023 Threatened and Endangered Species List: Nebraska Ecological Services Field Office IR 05000285/20220062023-01-0505 January 2023 NRC Inspection Report 05000285/2022-006 ML22357A0662022-12-30030 December 2022 Technical RAI Submittal Letter on License Amendment Request for Approval of License Termination Plan IR 05000285/20220052022-10-26026 October 2022 NRC Inspection Report 05000285/2022-005 ML22276A1052022-09-30030 September 2022 Conclusion of Consultation Under Section 106 NHPA for Ft. Calhoun Station LTP ML22258A2732022-09-29029 September 2022 Letter to John Swigart, SHPO; Re., Conclusion of Consultation Under Section 106 Hnpa Fort Calhoun Station Unit 1 ML22265A0262022-09-26026 September 2022 U.S. Nuclear Regulatory Commissions Analysis of Omaha Public Power Districts Decommissioning Status Report (License No. DPR-40, Docket No. 50-285) IR 05000285/20220042022-09-14014 September 2022 NRC Inspection Report 05000285/2022004 ML22138A1292022-08-0303 August 2022 Letter to Tiauna Carnes, Chairperson, Sac and Fox Nation of Missouri in Kansas, Re., Ft Calhoun LTP Section 106 ML22138A1242022-08-0303 August 2022 Letter to Mr. Reggie Wassana, Governor, Cheyenne and Arapaho Tribes, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22138A1212022-08-0303 August 2022 Letter to Mr. Edgar Kent, Chairman, Iowa Tribe of Oklahoma, Re., Ft Calhoun LTP Section 106 2024-09-18
[Table view] Category:License-Operator
MONTHYEARML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 LIC-16-0056, Response to RIS 2016-09, Preparation and Scheduling of Operator Licensing Examinations.2016-07-0707 July 2016 Response to RIS 2016-09, Preparation and Scheduling of Operator Licensing Examinations. ML16089A0712016-03-29029 March 2016 Generic Fundamentals Examination Results for March 9, 2016 IR 05000285/20153012016-01-20020 January 2016 Er 05000285/2015301; 12/07/2015 - 01/13/2016; Fort Calhoun Station; Initial Operator Licensing Examination Report ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML16012A3272015-12-14014 December 2015 2015-12 Draft Outline Comments ML16012A3242015-12-14014 December 2015 2015-12 Draft Outlines ML16012A3372015-12-14014 December 2015 2015-12-DRAFT Written Examination Comments ML16012A3392015-12-14014 December 2015 2015-12 Draft Operating Test ML16012A3452015-12-14014 December 2015 2015-12 Draft Operating Test Comments ML16012A3652015-12-14014 December 2015 2015-12 Final Operating Test ML16012A3672015-12-14014 December 2015 2015-12 Post-Examination Comments ML16012A3492015-12-14014 December 2015 2015-12-FINAL Outlines ML16021A1072015-12-14014 December 2015 2015-12 Public Forms ML15334A4862015-11-30030 November 2015 2015-12-Exam Approval Ltr_ LIC-15-0137, Revised Final Initial Licensed Operator Examination2015-11-24024 November 2015 Revised Final Initial Licensed Operator Examination LIC-15-0127, for Calhoun Station, Unit 1 - Provides the Final Reactor Operator (RO) and Senior Reactor Operator (SRO) License Applications2015-11-24024 November 2015 for Calhoun Station, Unit 1 - Provides the Final Reactor Operator (RO) and Senior Reactor Operator (SRO) License Applications ML14237A2332014-07-31031 July 2014 ANO2-2014-07 Draft Operating Test Comments ML14237A2292014-07-31031 July 2014 ANO2-2014-07 Draft Operating Test ML14237A2072014-07-31031 July 2014 ANO2-2014-07 Draft Outlines ML14181A3842014-06-30030 June 2014 Generic Fundamentals Examination Results June 2014 LIC-14-0076, 2014-05 Post Exam Analysis2014-06-0606 June 2014 2014-05 Post Exam Analysis ML14184B2982014-05-23023 May 2014 2014-04 Public Forms ML14181A0302014-05-22022 May 2014 2014-05 Final Operating Test ML14184B1482014-05-22022 May 2014 2014-05 Draft Operating Test ML14184B1472014-05-22022 May 2014 2014-04 Draft Written Exam ML14184B1492014-05-22022 May 2014 2014-05 Draft Written Exam Comments ML14184B3092014-05-22022 May 2014 2014-05 Draft Outline ML14184B3212014-05-22022 May 2014 2014-05-Draft Outline Comments ML14267A3282014-05-22022 May 2014 2014-05 Final Outlines ML14184B1632014-05-22022 May 2014 2014-05-Draft Operating Test Comments ML14128A1182014-05-0808 May 2014 2014-05-Examination Approval ML14063A6242014-03-0404 March 2014 IR 05000285-14-301, 02/16/2013, Fort Calhoun, Revision to Notification of NRC Initial Operator ML12291A7362012-09-21021 September 2012 09 Post Exam Analysis ML12291A7322012-09-21021 September 2012 2012-09 Final Written Exam ML12325A3882012-09-21021 September 2012 Fc 2012-09 Draft Outlines ML12325A3962012-09-21021 September 2012 FC-2012-09-DRAFT Outline Comments ML12325A3982012-09-21021 September 2012 2012-09 Draft Retake Written Exam ML12325A4082012-09-21021 September 2012 Fc 2012-09 Final Outlines ML12325A4142012-09-21021 September 2012 Fc 2012-09 Post Exam Analysis ML12325A4202012-09-21021 September 2012 09 Public Forms ML12325A4032012-09-21021 September 2012 FC-2012-09 Draft Written Exam Comments Steely ML1226300422012-09-19019 September 2012 NRC Initial Operator Licensing Examination Approval ML12180A4522012-06-28028 June 2012 Notification of NRC Retake Operator Licensing Examination 05000285/2012302 LIC-12-0055, FCS 2012-04 Post Exam Comments and Analysis2012-04-26026 April 2012 FCS 2012-04 Post Exam Comments and Analysis ML12157A2832012-04-20020 April 2012 FCS 2012-04 Draft Operating Test Comments ML12153A2782012-04-20020 April 2012 FC-2012-04 Final Written and Op Test Outlines ML12156A0032012-04-20020 April 2012 FC-2012-04 Final Operating Test ML12156A0052012-04-20020 April 2012 2012-04 Final Written Exam ML12156A3292012-04-20020 April 2012 FC-2012-04 Draft Outlines 2017-01-13
[Table view] Category:Part 55 Examination Related Material
MONTHYEARLIC-16-0056, Response to RIS 2016-09, Preparation and Scheduling of Operator Licensing Examinations.2016-07-0707 July 2016 Response to RIS 2016-09, Preparation and Scheduling of Operator Licensing Examinations. ML16089A0712016-03-29029 March 2016 Generic Fundamentals Examination Results for March 9, 2016 IR 05000285/20153012016-01-20020 January 2016 Er 05000285/2015301; 12/07/2015 - 01/13/2016; Fort Calhoun Station; Initial Operator Licensing Examination Report ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML16012A3392015-12-14014 December 2015 2015-12 Draft Operating Test ML16012A3242015-12-14014 December 2015 2015-12 Draft Outlines ML16012A3272015-12-14014 December 2015 2015-12 Draft Outline Comments ML16012A3372015-12-14014 December 2015 2015-12-DRAFT Written Examination Comments ML16012A3452015-12-14014 December 2015 2015-12 Draft Operating Test Comments ML16012A3492015-12-14014 December 2015 2015-12-FINAL Outlines ML16012A3652015-12-14014 December 2015 2015-12 Final Operating Test ML16012A3672015-12-14014 December 2015 2015-12 Post-Examination Comments ML16021A1072015-12-14014 December 2015 2015-12 Public Forms ML15334A4862015-11-30030 November 2015 2015-12-Exam Approval Ltr_ ML14237A2332014-07-31031 July 2014 ANO2-2014-07 Draft Operating Test Comments ML14237A2292014-07-31031 July 2014 ANO2-2014-07 Draft Operating Test ML14237A2072014-07-31031 July 2014 ANO2-2014-07 Draft Outlines ML14181A3842014-06-30030 June 2014 Generic Fundamentals Examination Results June 2014 LIC-14-0076, 2014-05 Post Exam Analysis2014-06-0606 June 2014 2014-05 Post Exam Analysis ML14184B2982014-05-23023 May 2014 2014-04 Public Forms ML14184B3092014-05-22022 May 2014 2014-05 Draft Outline ML14184B1632014-05-22022 May 2014 2014-05-Draft Operating Test Comments ML14184B1492014-05-22022 May 2014 2014-05 Draft Written Exam Comments ML14184B1482014-05-22022 May 2014 2014-05 Draft Operating Test ML14184B1472014-05-22022 May 2014 2014-04 Draft Written Exam ML14267A3282014-05-22022 May 2014 2014-05 Final Outlines ML14181A0302014-05-22022 May 2014 2014-05 Final Operating Test ML14184B3212014-05-22022 May 2014 2014-05-Draft Outline Comments ML14128A1182014-05-0808 May 2014 2014-05-Examination Approval ML12291A7362012-09-21021 September 2012 09 Post Exam Analysis ML12291A7322012-09-21021 September 2012 2012-09 Final Written Exam ML12325A3882012-09-21021 September 2012 Fc 2012-09 Draft Outlines ML12325A3962012-09-21021 September 2012 FC-2012-09-DRAFT Outline Comments ML12325A3982012-09-21021 September 2012 2012-09 Draft Retake Written Exam ML12325A4082012-09-21021 September 2012 Fc 2012-09 Final Outlines ML12325A4142012-09-21021 September 2012 Fc 2012-09 Post Exam Analysis ML12325A4202012-09-21021 September 2012 09 Public Forms ML12325A4032012-09-21021 September 2012 FC-2012-09 Draft Written Exam Comments Steely ML1226300422012-09-19019 September 2012 NRC Initial Operator Licensing Examination Approval ML12180A4522012-06-28028 June 2012 Notification of NRC Retake Operator Licensing Examination 05000285/2012302 LIC-12-0055, FCS 2012-04 Post Exam Comments and Analysis2012-04-26026 April 2012 FCS 2012-04 Post Exam Comments and Analysis ML12156A3392012-04-20020 April 2012 FCS 2012-04 Draft Outline Comments ML12153A2782012-04-20020 April 2012 FC-2012-04 Final Written and Op Test Outlines ML12156A0032012-04-20020 April 2012 FC-2012-04 Final Operating Test ML12156A0052012-04-20020 April 2012 2012-04 Final Written Exam ML12156A3292012-04-20020 April 2012 FC-2012-04 Draft Outlines ML12156A3432012-04-20020 April 2012 FC-2012-04 Draft Operating Test ML12157A2832012-04-20020 April 2012 FCS 2012-04 Draft Operating Test Comments ML12157A3912012-04-20020 April 2012 2012-04 Draft Written Exam ML12191A2402012-04-20020 April 2012 04 Public Forms 2016-07-07
[Table view] |
See also: IR 05000285/2012302
Text
June 28, 2012
David J. Bannister, Vice President and Chief Nuclear Officer
Omaha Public Power District Fort Calhoun Station FC-2-4 P.O. Box 550 Fort Calhoun, NE 68023-0550
SUBJECT: FORT CALHOUN STATION - NOTIFICATION OF NRC RETAKE OPERATOR LICENSING EXAMINATION 05000285/2012302
Dear Mr. Bannister:
In a telephone conversation on June 6, 2012, between Messrs. Tom Giebelhausen, Manager Operations Training and Simulator, and Chris Steely, Chief Examiner, arrangements were made for the administration of licensing examinations at Fort Calhoun Station on September 21, 2012.
As agreed during the telephone conversation, your staff will prepare the examination based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power
Reactors," Revision 9, Supplement 1, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1. The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination outline by July 13, 2012. The written examination and reference materials identified in Attachment 3 to ES-201 will be due by August 13, 2012. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outline, examination, and tests before they are submitted to the NRC
for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examinations, it will be necessary for your staff to
provide adequate space and accommodations in accordance with ES-402.
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations are being administered.
UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511
D. Bannister - 2 -
To permit timely NRC review and evaluation, your staff should submit preliminary operator and senior operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on February 28, 2013. The public reporting burden for this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch
(T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV. The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html. Thank you for your cooperation in this matter. Mr. Giebelhausen has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Steely at 817-200-1432, or myself at 817-200-1159.
Sincerely,
/RA/
Mark S. Haire, Chief Operations Branch Division of Reactor Safety
Docket: 50-285 License: DPR-40
Distribution made electronically to Fort Calhoun
ML12180A452 ADAMS: No Yes SUNSI Review Complete Reviewer Initials: CDS
Publicly Available Non-Sensitive
Non-publicly Available Sensitive OE: DRS/OB C: DRS/C OB
CDS MSH /RA/ /RA/ 06/20/2012 06/22/2012