ML083020488: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 10/28/2008
| issue date = 10/28/2008
| title = B.5.b Inspection Report 2008007 W/O Enclosure - OUO Removed
| title = B.5.b Inspection Report 2008007 W/O Enclosure - OUO Removed
| author name = Shaeffer S M
| author name = Shaeffer S
| author affiliation = NRC/RGN-II/DRP/RPB2
| author affiliation = NRC/RGN-II/DRP/RPB2
| addressee name = Madison D R
| addressee name = Madison D
| addressee affiliation = Southern Nuclear Operating Co, Inc
| addressee affiliation = Southern Nuclear Operating Co, Inc
| docket = 05000321, 05000366
| docket = 05000321, 05000366

Revision as of 06:33, 12 July 2019

B.5.b Inspection Report 2008007 W/O Enclosure - OUO Removed
ML083020488
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 10/28/2008
From: Scott Shaeffer
NRC/RGN-II/DRP/RPB2
To: Madison D
Southern Nuclear Operating Co
References
Download: ML083020488 (5)


Text

OFFICIAL USE ONLY

- SECURITY-RELATED INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 DOCUMENT TRANSMITTED HEREWITH CONTAINS OFFICIAL USE ONLY

- SECURITY RELATED INFORMATION. WHEN SEPARATED FROM ENCLOSURE, THIS DOCUMENT IS DECONTROLLED October 28, 2008 Mr. Dennis R. Madison Vice President - Hatch Southern Nuclear Operating Company, Inc. Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513

SUBJECT:

HATCH NUCLEAR PLANT - TI 2515/171 VERIFICATION OF SITE SPECIFIC IMPLEMENTATION OF B.5.b PHASE 2 AND 3 MITIGATING STRATEGIES INSPECTION REPORT NO. 05000321/2008007 AND 05000366/2008007

Dear Mr. Madison:

On September 18, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a team inspection at your Hatch Nuclear Plant. The enclosed report documents the results of the inspection, which were discussed on September 18, 2008, with Mr. John Lewis and other members of your staff.

The inspection examined activities conducted under your license as they relate to the implementation of B.5.b Phase 2 and 3 mitigating strategies, your compliance with the Commissions rules and regulations, and with the conditions of your operating license. Within these areas, the inspection involved examination of selected procedures and representative records, observations of activities, and interviews with personnel.

Based on the results of the inspection, one NRC-identified finding of very low safety significance was identified. However, because this violation was of very low safety significance and because it was entered into your corrective action program, the NRC is treating the issue as a Non-Cited Violation in accordance with Section VI.A.1 of the NRC's Enforcement Policy. If you contest this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the United States Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at Hatch.

OFFICIAL USE ONLY

- SECURITY-RELATED INFORMATION SNC 2 DOCUMENT TRANSMITTED HEREWITH CONTAINS OFFICIAL USE ONLY

- SECURITY RELATED INFORMATION. WHEN SEPARATED FROM ENCLOSURE, THIS DOCUMENT IS DECONTROLLED In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.

Sincerely, /RA/ Scott M. Shaeffer, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos.: 50-321, 50-366 License Nos.: DPR-57, NPF-5

Enclosure:

Inspection Report 05000321, 05000366/2008007 w/

Attachment:

Supplemental Information cc w/encl: (See page 3)

_________________________ X SUNSI REVIEW COMPLETE CWR OFFICE RII:DRP RII:DRP RII:DRP RII:DRS RII:DRS NRR:PSPB SIGNATURE CWR /RA/ SMS /RA? via email via email via email via email NAME CRapp* SShaeffer PNiebaum GLaska JMiller DNelson DATE 10/28/2008 10/27/2008 10/16/2008 10/15/2008 10/15/2008 10/21/2008 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL USE ONLY

- SECURITY-RELATED INFORMATION SNC 3 DOCUMENT TRANSMITTED HEREWITH CONTAINS OFFICIAL USE ONLY

- SECURITY RELATED INFORMATION. WHEN SEPARATED FROM ENCLOSURE, THIS DOCUMENT IS DECONTROLLED cc w/encl: L. Mike Stinson Vice President Fleet Operations Support Southern Nuclear Operating Company, Inc. P.O. Box 1295 Birmingham, AL 35201-1295 Moanica Caston Vice President and General Counsel Southern Nuclear Operating Company, Inc. Bin B-022 P.O. Box 1295 Birmingham, AL 35201-1295 Raymond D. Baker Licensing Manager Licensing-Hatch Southern Nuclear Operating Company, Inc. P.O. Box 1295 Birmingham, AL 35201-1295

cc w/Inspection Summary: Jeffrey T. Gasser Executive Vice President Southern Nuclear Operating Company, Inc.

P.O. Box 1295 Birmingham, AL 35201-1295 David H. Jones Vice President Engineering Southern Nuclear Operating Company, Inc. P.O. Box 1295 Birmingham, AL 35201-1295

cc w/o encl

Arthur H. Domby, Esq. Troutman Sanders Nations Bank Plaza 600 Peachtree Street, NE, Suite 5200 Atlanta, GA 30308-2216

Laurence Bergen Oglethorpe Power Corporation 2100 East Exchange Place Tucker, GA 30085-1349 Dr. Carol Couch Director Environmental Protection Department of Natural Resources 2 Martin Luther King Drive, S.E.

Suite 1152 East Tower Atlanta, GA 30334 Cynthia Sanders Program Manager Radioactive Materials Program Department of Natural Resources 4220 International Parkway Suite 110 Atlanta, GA 30354 Chairman Appling County Commissioners County Courthouse 69 Tippins Street, Suite 201 Baxley, GA 31513

Mr. K. Rosanski Resident Manager Oglethorpe Power Corporation Hatch Nuclear Plant P.O. Box 2010 Baxley, GA 31515 Senior Engineer Power Supply Municipal Electric Authority of Georgia 1470 Riveredge Parkway NW Atlanta, GA 30328-4684 Reece McAlister Executive Secretary Public Service Commission 244 Washington Street, SW Atlanta, GA 30334 OFFICIAL USE ONLY

- SECURIT Y-RELATED INFORMATION SNC 4 DOCUMENT TRANSMITTED HEREWITH CONTAINS OFFICIAL USE ONLY

- SECURITY RELATED INFORMATION. WHEN SEPARATED FROM ENCLOSURE, THIS DOCUMENT IS DECONTROLLED Letter to Dennis R. Madison from Scott M. Shaeffer dated October 28, 2008

SUBJECT:

HATCH NUCLEAR PLANT - TI 2515/171 VERIFICATION OF SITE SPECIFIC IMPLEMENTATION OF B.5.b PHASE 2 AND 3 MITIGATING STRATEGIES INSPECTION REPORT NO. 05000321, 05000366/2008007 Distribution w/encl:

C. Evans, RII L. Slack, RII OE Mail RIDSNRRDIRS PUBLIC R. Martin, NRR