ML14360A017: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 12/19/2014
| issue date = 12/19/2014
| title = Boiling Water Reactor (LACBWR) and ISFSI - Notification of Change in President and Chief Executive Officer
| title = Boiling Water Reactor (LACBWR) and ISFSI - Notification of Change in President and Chief Executive Officer
| author name = Palmberg R M
| author name = Palmberg R
| author affiliation = Dairyland Power Cooperative
| author affiliation = Dairyland Power Cooperative
| addressee name =  
| addressee name =  

Revision as of 04:49, 21 June 2019

Boiling Water Reactor (LACBWR) and ISFSI - Notification of Change in President and Chief Executive Officer
ML14360A017
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 12/19/2014
From: Palmberg R
Dairyland Power Cooperative
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
LAC-14325
Download: ML14360A017 (1)


Text

ROBERT M. PALMBERG Vice President, Generation DAIRYLAND POWER COOPERATIVE December 19, 2014 In reply, please refer to LAC-14325 DOCKET NO. 5 0-409 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555

Dear Sir/Madam:

SUBJECT:

La Crosse Boiling Water Reactor (LACBWR) and ISFSI -Notification of Change in President and Chief Executive Officer This is to notify you that effective December 29, 2014, Ms. Barbara A. Nick will become the President and Chief Executive Officer for Dairyland Power Cooperative (DPC) replacing William Berg.Ms. Nick's contact information for U. S. Nuclear Regulatory Commission correspondence will be: Barbara A. Nick, President and CEO Dairyland Power Cooperative 3200 East Ave. S., P.O. Box 817 La Crosse, WI 54602 608.787.1258

-direct 920.621.8908

-cell 608.787.1469

-fax ban@dairynet.com If you have any questions please feel free to contact me.Sincerely, Robert M. Palmberg Vice President

-Generation cc: Bill Berg Don Egge Lane Peters Barbara Nick Robert Orlikowski, NRC Region Hi Branch Chief Cynthia Pederson NRC Region III Administrator Marlayna Vaaler, NRC Project Manager Tom Zaremba (Wheeler, Van Sickle, & Anderson)AIq P S;)x(A Touchstone Energy" Cooperative

  • b 3200 East Ave. S.
  • PO Box 817 e La Crosse, WI 54602-0817
  • 608-787-1233 e 608-787-1462 fax 9 www.dairynet.com Dairyland Power Cooperative is an equal opportunity provider and employer.

ROBERT M. PALMBERG Vice President, Generation DAIRYLAND POWER COOPERATIVE December 19, 2014 In reply, please refer to LAC-14325 DOCKET NO. 5 0-409 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555

Dear Sir/Madam:

SUBJECT:

La Crosse Boiling Water Reactor (LACBWR) and ISFSI -Notification of Change in President and Chief Executive Officer This is to notify you that effective December 29, 2014, Ms. Barbara A. Nick will become the President and Chief Executive Officer for Dairyland Power Cooperative (DPC) replacing William Berg.Ms. Nick's contact information for U. S. Nuclear Regulatory Commission correspondence will be: Barbara A. Nick, President and CEO Dairyland Power Cooperative 3200 East Ave. S., P.O. Box 817 La Crosse, WI 54602 608.787.1258

-direct 920.621.8908

-cell 608.787.1469

-fax ban@dairynet.com If you have any questions please feel free to contact me.Sincerely, Robert M. Palmberg Vice President

-Generation cc: Bill Berg Don Egge Lane Peters Barbara Nick Robert Orlikowski, NRC Region Hi Branch Chief Cynthia Pederson NRC Region III Administrator Marlayna Vaaler, NRC Project Manager Tom Zaremba (Wheeler, Van Sickle, & Anderson)AIq P S;)x(A Touchstone Energy" Cooperative

  • b 3200 East Ave. S.
  • PO Box 817 e La Crosse, WI 54602-0817
  • 608-787-1233 e 608-787-1462 fax 9 www.dairynet.com Dairyland Power Cooperative is an equal opportunity provider and employer.