ML14364A363: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 11/24/2014
| issue date = 11/24/2014
| title = 2014 Braidwood Station Initial License Examination Form ES-301-2
| title = 2014 Braidwood Station Initial License Examination Form ES-301-2
| author name = McNeil D R
| author name = Mcneil D
| author affiliation = NRC/RGN-III/DRS/OLB
| author affiliation = NRC/RGN-III/DRS/OLB
| addressee name =  
| addressee name =  

Revision as of 04:39, 21 June 2019

2014 Braidwood Station Initial License Examination Form ES-301-2
ML14364A363
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 11/24/2014
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
Shared Package
ML14344A990 List:
References
ES-301-2 50-456/OL-14, 50-457/OL-14
Download: ML14364A363 (2)


Text

ES-301 Control Room/In

-Plant Systems Outline Form ES-301-2 Facility: Braidwood Station Date of Examination: 11/10/14 Exam Level: RO SRO-I SRO-U Operating Test Number: 2014301 Control Room Systems@ (8 for RO); (7 for SRO

-I); (2 or 3 for SRO

-U, including 1 ESF)

System / JPM Title Type Code* Safety Function a. SIM-102 Perform Movable Control Assembly Quarterly Surveillance D, S , P 1 b. SIM-205 Raise SI Accumulator level using 1B SI pump A, N, S 2 c. SIM-302 Transfer to Cold Leg Recirculation A, D, L, S 3 d. SIM-416S CD/CB Pump Trip N, S 4S e. SIM-510 Start 1A CS pump for Surveillance M , S 5 f. SIM-608A Synchronize 1A DG and respond to Gov Adj and overspeed trip failures A, D, S , L 6 g. SIM-711 Place Channel Service Status from "Out of Service" to "I n Service" N, S 7 h. SIM-801 Respond to a RCP Thermal Barrier Leak A, D, P, S 8 In-Plant Systems

@ (3 for RO); (3 for SRO

-I); (3 or 2 for SRO

-U) i. IP-104 Local Reactor Trip A, D, E 1 j. IP-206 Local reset of Phase A D, E 2 k. IP-409S Locally start the 2B AF pump D, R 4S @ All RO and SRO

-I control room (and in

-plant) systems must be different and serve different safety functions; all 5 SRO

-U systems must serve different safety functions; in

-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO

-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in

-plant (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 < 9 / < 8 / < 4 > 1 / > 1 / > 1 > 1 / > 1 / > 1 > 2 / > 2 / > 1

< 3 / < 3 / < 2 (randomly selected)

> 1 / > 1 / > 1 ES-301 Control Room/In

-Plant Systems Outline Form ES-301-2 Facility: Braidwood Station Date of Examination: 11/10/14 Exam Level: RO SRO-I SRO-U Operating Test Number: 2014301 Control Room Systems@ (8 for RO); (7 for SRO

-I); (2 or 3 for SRO

-U, including 1 ESF)

System / JPM Title Type Code*

Safety Function a. SI M-102 Perform Movable Control Assembly Quarterly Surveillance D, S , P 1 b. SIM-205 Raise SI Accumulator level using 1B SI pump A, N, S 2 c. SIM-302 Transfer to Cold Leg Recirculation A, D, L, S 3 d. SIM-416 S CD/CB Pump Trip N , S 4S e. n/a n/a n/a f. SIM-608A Synchronize 1A DG and respond to Gov Adj and overspeed trip failures A, D, S , L 6 g. SIM-711 Place Channel Service Status from "Out of Service" to "In Service" N, S 7 h. SIM-801 Respond to a RCP Thermal Barrier Leak A, D, P, S 8 In-Plant Systems

@ (3 for RO); (3 for SRO

-I); (3 or 2 for SRO

-U) i. IP-104 Local Reactor Trip A, D, E 1 j. IP-206 Local reset of Phase A D, E 2 k. IP-409S Locally start the 2B AF pump D, R 4S @ All RO and SRO

-I control room (and in

-plant) systems must be different and serve different safety functions; all 5 SRO

-U systems must serve different safety functions; in

-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO

-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in

-plant (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 < 9 / < 8 / < 4 > 1 / > 1 / > 1 > 1 / > 1 / > 1 > 2 / > 2 / > 1

< 3 / < 3 / < 2 (randomly selected)

> 1 / > 1 / > 1