ML16279A381: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 10/05/2016
| issue date = 10/05/2016
| title = Ginna Nuclear Power Plant - Request for Additional Information Regarding: Deletion of E BAR Definition and Revision to Reactor Coolant System Specific Activity Technical Specifications
| title = Ginna Nuclear Power Plant - Request for Additional Information Regarding: Deletion of E BAR Definition and Revision to Reactor Coolant System Specific Activity Technical Specifications
| author name = Mozafari B L
| author name = Mozafari B
| author affiliation = NRC/NRR/DORL/LPLI-1
| author affiliation = NRC/NRR/DORL/LPLI-1
| addressee name = Lynch L
| addressee name = Lynch L

Revision as of 21:57, 19 June 2019

Ginna Nuclear Power Plant - Request for Additional Information Regarding: Deletion of E BAR Definition and Revision to Reactor Coolant System Specific Activity Technical Specifications
ML16279A381
Person / Time
Site: Ginna Constellation icon.png
Issue date: 10/05/2016
From: Mozafari B
Plant Licensing Branch 1
To: Lynch L
Exelon Generation Co
References
MF7339
Download: ML16279A381 (4)


Text

1 NRR-PMDAPEm Resource From: Mozafari, Brenda Sent: Wednesday, October 05, 2016 12:31 PM To:'Lynch, Laura:(GenCo-Nuc)'

Cc: Tate, Travis; Bucholtz, Kristy

Shoop, Undine; Render, Diane

Subject:

FW: Draft RAI regarding CAC 7339, TSTF-490 Importance:High(This Draft is sent to facilitate clarification call at 1pm today. The final version will be processed and available in ADAMS)

Laura, while we are finalizing the administrative processing of the clarification of the RAI I am providing the draft shown

below:

SUBJECT:

R.E. GINNA NUCLEAR POWER PLANT - REQUEST FOR ADDITIONAL INFORMATION REGARDING: DELETION OF E BAR DEFINITION AND REVISION TO REACTOR COOLANT SYSTEM SPECIFIC ACTIVITY TECHNICAL SPECIFICATIONS (CAC NO. MF7339)

Dear Mr. Hanson:

By letter dated February 4, 2016, as supplemented by lett ers dated April 14, and June 28, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession Number ML16035A015, ML16105A243, and ML16180A448), Exelon Generation Company, LLC the licensee, proposes changes to R. E. Ginna Nuclear Power Plant (Ginna) Technical Specifications (TS). The licensee's amendment would revise Ginna's TS Reactor Coolant System (RCS) Specific Activity definition and associated surveillance requirements. The proposed changes would replace the current TS limit for RCS gross specific activity with a new limit for RCS noble gas specific activity. The noble gas specific activity limit would be based on a new dose equivalent Xenon-133 definition that would replace the current E-Bar average disintegration energy definition. The changes are consistent with Technical Specification Task Force (TSTF) Standard Technical Specification Traveler, TSTF-490, Revision 0, "Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec."

The Nuclear Regulatory Commission staff is reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI).

On October 5, 2016, Exelon staff was informed that a response to the RAI would be needed within 30 days of the date of this letter.

2REQUEST FOR ADDITIONAL INFORMATION REGARDING DELETION OF E BAR DEFINITION AND REVISION TO REACTOR COOLANT SYSTEM SPECIFIC ACTIVITY TECHNICAL SPECIFICATIONS R. E. GINNA NUCLEAR POWER PLANT, LLC EXELON GENERATION COMPANY, LLC DOCKET NOS. 50-244 R. E. GINNA NUCLEAR POWER PLANT

By the application dated February 4, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession Number ML16035A015), Exelon Generation Company, LLC the licensee, proposes changes to R. E. Ginna Nuclear Power Plant (Ginna) Technical Specifications (TS). The licensee's amendment would revise Ginna's TS Reactor Coolant System (RCS) Specific Activity definition and associated surveillance requirements. The proposed changes would replace the current TS limit for RCS gross specific activity with a new limit for RCS noble gas specific activity. The noble gas specific activity limit would be based on a new dose equivalent Xenon-133 definition that would replace the current E-Bar () average disintegration energy definition. The changes are consistent with Technical Specification Task Force (TSTF) Standard Technical Specification Traveler, TSTF-490, Revision 0, "Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec."

During the Nuclear Regulatory Commission (NRC) staff's review of the impact of implementing TSTF-490 the NRC staff determined that more information was needed to complete the review. The NRC staff requested the licensee provide additional justification for the proposed change to increase the Completion Time of Required Action B.1 to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> and why it is acceptable to be in an unanalyzed condition for 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> (ADAMS accession Number ML16075A119). On April 14, 2016 the licensee responded to the NRC staff's request and on June 28, 2016 submitted a supplement to their response (ADAMS Accession Numbers ML16105A243 and ML16180A448).

The licensee's response provided a sensitivity analysis that varied dose equivalent Xenon-133 (DEX). The sensitivity analysis concluded that the DEX necessary to challenge the Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Section 50.67 limit is substantially greater than the proposed DEX TS limit, and without further dose equivalent Iodine-131 spiking, would require more than 100 percent of fuel rods to be failed. This analysis was performed specifically for the steam generator tube rupture and main steam link break accidents. The NRC staff has reviewed the licensee's response and has determined that the sensitivity analysis is not complete because it lacks an evaluation of the failure of small lines carrying primary coolant outside containment comparison to the 10 CFR 100 limits.

A review of NUREG-0944, "Safety Evaluation Report Related to a Full-Term Operating License for the R.E. Ginna Nuclear Power Plant," NUREG-0821, "Integrated Plant Safety Assessment Systematic Evaluation Program R. E. Ginna Nuclear Power Plant," and Ginna's updated final safety analysis report shows that the failure of small lines carrying coolant outside containment is part of Ginna's current licensing basis. The NRC staff notes that further review determined that an alternative source term was not implemented for this failure analysis. Therefore, the failure of small lines carrying coolant outside containment utilizes Ginna's original license source term and the doses calculated must continue to remain below 10 percent of the thyroid and whole body doses stated 10 CFR 100, as stated in standard review plan 15.6.2, "Radiological Consequences of the Failure of Small Lines Carrying Primary Coolant outside Containment."

ARCB-RAI-1

3The NRC staff is requesting that the licensee please provide additional justification for the proposed change to increase the TS Completion Time of Required Action B.1 to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> that explains why it is acceptable to be in an unanalyzed condition for 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> with regard to the failure of sm all lines carrying primary coolant outside containment or alternatively the licensee can request to maintain the current TS completion time for the gross specific activity not with limit of 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

Brenda L. Mozafari Project Manager - Nine Mile 1 & 2 Power Plants U.S. Nuclear Regulatory Commission NRR/DORL/LPLI-1

Office: O8 D10 Mail Stop: O8 C2A Phone: 301-415-2020

Hearing Identifier: NRR_PMDA Email Number: 3091 Mail Envelope Properties (75b7e5d5a6af4da4806bab94b1fd652d)

Subject:

FW: Draft RAI regarding CAC 7339, TSTF-490 Sent Date: 10/5/2016 12:30:30 PM Received Date: 10/5/2016 12:30:31 PM From: Mozafari, Brenda Created By: Brenda.Mozafari@nrc.gov Recipients: "Tate, Travis" <Travis.Tate@nrc.gov>

Tracking Status: None "Bucholtz, Kristy" <Kristy.Bucholtz@nrc.gov> Tracking Status: None "Shoop, Undine" <Undine.Shoop@nrc.gov> Tracking Status: None "Render, Diane" <Diane.Render@nrc.gov> Tracking Status: None "'Lynch, Laura:(GenCo-Nuc)'" <Laura.Lynch@exeloncorp.com>

Tracking Status: None Post Office: HQPWMSMRS01.nrc.gov

Files Size Date & Time MESSAGE 6265 10/5/2016 12:30:31 PM

Options Priority: High Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: