ML16286A482: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 09/16/2016
| issue date = 09/16/2016
| title = 2016 Braidwood Administered Written Exam W Answers
| title = 2016 Braidwood Administered Written Exam W Answers
| author name = Walton R K
| author name = Walton R
| author affiliation = NRC/RGN-III/DRS/OB
| author affiliation = NRC/RGN-III/DRS/OB
| addressee name =  
| addressee name =  

Revision as of 22:38, 19 June 2019

2016 Braidwood Administered Written Exam W Answers
ML16286A482
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 09/16/2016
From: Walton R
Operations Branch III
To:
Shared Package
ML16306A161 List:
References
Download: ML16286A482 (283)


Text

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 1 of 283 29 July 2016 1 ID: 1267496 Points: 1.00 Braidwood U

-1 is being ramped from 50% to 75% reactor power.

____________

A. B. C. D.

Answer: B Answer Explanation Bwd 2016 NRC Exam Question:

  1. 1 History: New for Bwd 2016 NRC exam High Cog K/A: 002 RCS K5.10 Knowledge of the operational implications of the following concepts as they apply to the RCS: Relationship between reactor power and RCS differential temperature.

TIER: 2 GROUP: 2 Task No: R-GP-027 Obj No: T.GP03-05 10CFR55 Link:

transient conditions, including coolant chemistry, causes and effects of temperature, pressure anges, effects of load changes, and operating limitations and reasons for these operating characteristics.

Technical Reference with Revision Number: Big note RC

- Answer Explanation:

The Bwd Unit

-1 DeltaT range is 0to 60proportional to and changes linearly with DeltaT, 30power DeltaT.

Choice B is which is plausible because Bwds DeltaT meters read in percent power from 0 to 100%.

which is plausible because Bwds OTDT setpoint is 132 EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 2 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 3 of 283 29 July 2016 2 ID: 1267508 Points: 1.00

- Unit 1 was at 100% power, normal alignment.

- Subsequently, Power Range N

- - Currently the RPS bistables for N- - -coincidenc. A. 1 of 3 2 of 3 B. 2 of 3 1 of 3 C. 2 of 3 3 of 3 D. 3 of 3 2 of 3 Answer: B EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 2 History: New for Bwd 2016 NRC exam High Cog K/A: 015 Nuclear Instrumentation RPS.

The question meets the K/A, requires examinee knowledge of effect that a loss of NIs has on RPS. When an NI channel fails, the channel is typically placed in bypass until such time as the to be placed in trip.

TIER: 2 GROUP: 2 Task No: R-OA-055 Obj No: S-NI3-05-A through G 10CFR55 Link:

systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Technical Reference with Revision Number: big note NI

-- lesson plan I1-NI-XL-03 Answer Explanation:

SSPS input relays are energized regardless of bis-energized regardless of bistable Choice B is c EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 5 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 6 of 283 29 July 2016 3 ID: 1267570 Points: 1.00

- Unit 1 is at 99.7% power, normal alignment.

- The crew has recently established excess letdown flow per BwOP CV

-15, EXCESS LETDOWN OPERATIONS.

establishing excess letdown flow?

A- B- C- D- A. A B. B C. C D. D Answer: B EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 7 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 3 History: New for Bwd 2016 NRC exam High Cog K/A: 016 Non-Nuclear Instrumentation Ability to manually operate and/or monitor in the control room: Recorders.

RO 2.7 SRO 2.6 The changing plant condition.

TIER: 2 GROUP: 2 Task No: R-CV-007 Obj No: S.CV1-05-I 10CFR55 Link:

characteristics of the facility.

Technical Reference with Revision Number:

BwOP CV--15 Answer Explanation:

When aligning excess letdown to the operating unit, a slight drop pected because the excess letdown line intersects with the seal return line. This raises backpressure on the seal leakoff line and slightly lowers flow.

Choice A is incorrect, This represents a near total loss of seal flow.

Choice B is correct, see explan Choice C is incorrect, This represents a rise of approx. 1 gpm per RCP.

Choice D is incorrect, This represents a rise to approx. the seal flow that would represent a failed RCP seal.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 8 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 9 of 283 29 July 2016 4 ID: 1267589 Points: 1.00

- The spent fuel - - -

A. 1' - 2' B. - 5' C. 17' - 18' D. 23' -

Answer: C EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 10 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question: History: -- Low Cog K/A: RO 2.7 SRO 2.9 The question leak occurs.

TIER: 2 GROUP: 2 Task No: Obj No: -05 10CFR55 Link:

10 Technical Reference with Revision Number: --

Answer Explanation: - 001 open.

Choice C is correct.

Choice D is incorrect. This is the approximate t EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 11 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 12 of 283 29 July 2016 5 ID: 1268888 Points: 1.00

- A Unit 1 xenon free reactor startup is in progress from a maintenance outage at MOL.

- The reactor was taken critical by withdrawing control rods.

- Reactor power was stable at 10

-8 amps in the intermediate range for recording critical data.

- The RO then withdraws control rods 10 steps.

A. B. and stabilize -8 amps AND below the POAH.

C. temporarily, THEN drop back to 10

-8 amps. D.

Answer: D EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 13 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 5 History: Bank Bwd NOPS High Cog K/A:

The question meets the K/A TIER: 2 GROUP: 2 Task No: R-GP-007 Obj No: -02 10CFR55 Link:

transient conditions, including coolant chemistry, causes and effects of temperature, pressure ns for these operating characteristics.

Technical Reference with Revision Number:

LP I1-RT-XL- Answer Explanation:

When control rods are withdrawn from a stable critical condition below perature - Choice B is EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016 6 ID: 1267590 Points: 1.00

- Unit 1 is at 100% power, normal alignment.

- An alarm on the RM

-11 indicates 0PR16J, SG Green to RED.

A. 1SD02PA/B, Blowdown Condenser Hotwell Pumps, TRIP.

B. C. 1PS179A-D, SG Blowdown Sample D.

Answer: D Answer Explanation Bwd 2016 NRC Exam Question:

  1. 6 History: New for Bwd 2016 NRC exam Low Cog K/A: 035 SGS K1.11 Knowledge of the physical connections and/or cause

-effect relationships between the S/GS and the following systems: PRM

-systems. RO 3.1 SRO 3.1 The question meets the K/A because the candidate must know the interlock of the process rad monitors that monitor SG blowdown .

TIER: 2 GROUP: 2 Task No: R-AR-011 Obj No: S.WX1-05-A 10CFR55 Link:

systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features Technical Reference with Revision Number: Big note AR

- Answer Explanation:

A high radiation signal from 0PR016J will swap SG blowdown flow from the main condenser to the SG blowdown monitor tanks by closing 0WX119A and opening 0WX058A. Choice Choice B is incorrect. This is an interlock for high blowdown condenser pressure Choice C is incorrect. This is an interlock for high radiation in the 1PR008J, SG Blowdown sample flow rad monitor.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 15 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 16 of 283 29 July 2016 7 ID: 1267612 Points: 1.00

- Unit 1 is at 100% power.

- Steam pressure is 1005 psig.

- Steam Dump Mode Select switch is in the STEAM PRESSURE mode.

- 1PK-507, Steam The following then occurs:

- The U1 NSO initiates a load reduction to 50% power.

A. NOT open prior to reaching 50% power.

B. begin to OPEN at approximately 61% power.

C. begin to OPEN at approximately 69% power.

D.

Answer: B EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 17 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 7 History: Bank from 2009 Bwd NRC exam High Cog K/A: Dump System A3.05.Ability to monitor automatic operation of the SDS, including: Main steam pressure RO 2.9 SRO 2.9 The question meets the K/A, requires examinee ability to monitor changing steam pressure and predict impact of on steam dumps controls.

TIER: 2 GROUP: 2 Task No: R-DU-001 Obj No: S-DU1-03-A 10CFR55 Link:

systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Technical Reference with Revision Number: big note MS

--DU-XL-6a page 7 Answer Explanation:

psig. Using interpolation:

Choice A is incorrect, but plausible. Because steam pressure rises as power drops, a commom error would be to interpolate from the wrong end of the steam band resulting in an answer of Choice D is incorrect, but plausible. Using U

-

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 18 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 19 of 283 29 July 2016 8 ID: 1267628 Points: 1.00

- U-1 was at 100% power normally aligned.

- A reactor trip occurs.

- -ENERGIZED.

- -

local operator action at th-start the load?

A. Circulating Water Pump B. Non- C. Station Air Compressor D. Containment Chiller

Answer: C EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 20 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 8 History: New for Bwd 2016 NRC exam High Cog K/A: G2.1.30 Ability to locate and operate components, including local controls The question meets the K/A because the candidate must know that the SAC feed breakers are unique loads on the non-TIER: 2 GROUP: 2 Task No: R-SA-001 Obj No: S.SA1-1-02-A 10CFR55 Link:

systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Technical Reference with Revision Number:

ILT Lesson plan I1

-SA-XL-BwOP SA- Answer Explanation:

SAC feed breakers are unique loads on the non

-three distBraidwood. After aloss of offsite power on Unit 1 while the unit was shutdown, the associated bus power was restored.

Choice C is correct, see explanation a

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 21 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 22 of 283 29 July 2016 9 ID: 1267630 Points: 1.00

- U-1 was at 100% power, normally aligned.

- The 1A SX Pump is OPERATING.

The following then occurs:

- -ENERGIZES.

- 15 seconds later, the reactor is MANUALLY tripped.

- A. BOTH 1A and 1B SX pumps will be SHUTDOW N. B. BOTH 1A and 1B SX pumps will be OPERATING.

C. 1A SX pump will be OPERATING and 1B SX pump will be SHUTDOWN.

D. 1B SX pump will be OPERATING and 1A SX pump will be SHUTDOWN.

Answer: D EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 23 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 9 History: New for Bwd 2016 NRC exam High Cog K/A: 075 Circulating Water System K2.03Knowledge of bus power supplies to the following: Emergency/essential SWS pumps RO 2.6 SRO 2.7 The question meets the K/A because the candidate must know the SX pump power supplies and the breaker control power supplies.

TIER: 2 GROUP: 2 Task No: R-SX-002 Obj No: S.SX1-05-C 10CFR55 Link:

Technical Reference with Revision Number:

Big Note AC

--Drawing 20E Answer Explanation:

When DC bus 111 faults, The 1A SX pump will lose control power to it's breaker in the closed position. When the LOOP occurs, -energize and will not re

-energize because the 1A DG will not start nor re

--energize. The 1B SX pump will start on the LOOP DG sequencer 25 seconds after the 1B DG re

-

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 25 of 283 29 July 2016 10 ID: 1267632 Points: 1.00

- - so it can be repaired/tested at the EM shop.

- Currently all alarms are clear on panel 1PM09J.

detection zone?

A. TROUBLE B. TROUBLE WIRE OPEN C. D. OPEN Answer: A EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 26 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 10 History: Bank from 2009 Bwd NRC exam Low Cog K/A: on the RO 2.6 SRO 2.9

The question meets the K/A, requires examinee ability to monitor the bypass of a fire zone detector. TIER: 2 GROUP: 2 Task No: R--002 Obj No: S--08 10CFR55 Link:

systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features Technical Reference with Revision Number: - Answer Explanation: larm in the associated zone on 1PM09J MCR panel.

Choice B is incorrect, a TROUBLE WIRE OPEN alarm results when the trouble alarm circuit is opened between the AEER and the MCR TROUBLE alarm annunciator.

Choice C

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 27 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 28 of 283 29 July 2016 11 ID: 1267954 Points: 1.00

- Unit 1 is at 100% power, normal alignment.

- A. Pressurizer Relief Tank.

B. Reactor Coolant Drain Tank.

C. D. Answer: A EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 29 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 11 History: -RC2- Low Cog K/A: 003 RCPS RO 2.8 SRO 3.1

The question meets the K/A because the candidate must know the plant affects if RCP seal TIER: 2 GROUP: 1 Task No: Obj No: 10CFR55 Link:

systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features Technical Reference with Revision Number:

Big Note CV

- Answer Explanation:

When a phase A signal actuates, the RCP seal leakoff containment T is isolated. Choice B is incorrect but plausible because the #2 RCP seals are normally directed to the RCDT. Choice C is incorrect but plausible because the #3 RCP seals are normally directed to the containment floor drain sump.

the containment floor drain sump and the reactor cthe confusion.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 30 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 31 of 283 29 July 2016 12 ID: 1267955 Points: 1.00

- Unit 1 was at 100% power, normal alignment.

The following occurs: - Bus 132X faults and is DE-ENERGIZED.

- Simultaneously, an RCS LOCA occurs causing a Reactor Trip and SI.

pressure conditions, ______________ will A. 1MOV- B. 1MOV- C. 1SOV- D. 1SOV- Answer: B EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 32 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 12 History: New for Bwd 2016 NRC exam Low Cog K/A: K2.05 Knowledge of bus power supplies to the following: MOVs RO 2.7 SRO 2.9 The question meets the K/A because the candidate must know the power supplies to the

TIER: 2 GROUP: 1 Task No: R-CV-006 Obj No: S.CV1-16-C 10CFR55 Link:

systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features Technical Reference with Revision Number: 20E Answer Explanation:

bldg during ECCS recirc phase.

Choice C i EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 33 of 283 29 July 2016 13 ID: 1267958 Points: 1.00

- The Unit 1 RO is re

-aligning the 1A RH pump from shutdown cooling to ECCS cold leg injection.

- The RO is about to OPEN 1SI8812A, A. 1CS001A, PP 1A RWST SUCT VLV must be OPEN.

B. C. 1SI8811A, CNMT SUMP 1A ISOL VLV must be CLOSED.

D. 1RH8701A, RC LOOP 1A TO RH PP 1A SUCT ISOL VLV must be CLOSED.

Answer: C Answer Explanation Bwd 2016 NRC Exam Question:

  1. 13 History: New for Bwd 2016 NRC exam Low Cog K/A: 005 RHRS Modes of operation RO 3.2 SRO 3.5

The question meets the K/A because the candidate must know the interlocks of RH system ode of operation.

TIER: 2 GROUP: 1 Task No: R--013 Obj No: S.EC1-07-A 10CFR55 Link:

systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features Technical Reference with Revision Number: Big note ECCS

-

Answer Explanation:

must both be closed to enable manual opening of 1SI8812A.

Choice A is incorrect, 1CS001A Choice D is incorrect, 1RH8701A is interlocked such that 1SI8812A must be closed to open

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 35 of 283 29 July 2016 14 ID: 1267960 Points: 1.00

- Unit 1 is at 100% power with pressurizer pressure channel, 1P

- - ALL other equipment is in a normal alignment.

- Subsequently, pressurizer pressure transmitter 1PT

- - -1.1, SI TERMINATION.

- The RO depresses BOTH SI RESET pushbuttons.

- The BYPASS

- PERMISSIVE LIGHTS silence, acknowledge, and reset pushbuttons are depressed.

- PERMISSIVE LIGHTS will be lit?

A. SI ACTUATED B. PZR LOW PRESS SI BLOCK PERMISSIVE P11 C. PZR SI BLOCKED TRN A D. AUTO SI BLOCKED

Answer: D EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 36 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question: History: Bank from Bwd 2009 NRC Exam High Cog K/A: 006 Emergency Core Cooling

The question meets the K/A because the candidate must know actions that will block automatic SI actuation.

TIER: 2 GROUP: 1 Task No: R-EP-036 Obj No: -06 10CFR55 Link:

systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features Technical Reference with Revision Number: Lesson plan I1

--XL-1-BP- 0. Answer Explanation:

Choice A is incorrect, SI ACTUATED will go dark after reset pushbuttons are depressed.

Choice B is incorrect, P11 will light when 2 of 3 pressurizer pressure channels is below 1930 --11. switches are taken to block. Choice D is correct, resetting SI later than 1 minute after an auto SI will block auto SI and light the AUTO SI BLOCKED alarm.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 37 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 38 of 28 3 29 July 2016 15 ID: 1267961 Points: 1.00

- Unit 1 is at 100% power, normal alignment.

- A slow and steady rise in PRT - Annunciator 1 A7, PRT LEVEL HIGH/LOW has just alarmed.

A. B. C. D.

Answer: D EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 39 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 15 History: Low Cog K/A: with operating the PRTS controls including: Maintaining quench tank water RO 2.9 SRO 3.1 The question meets the K/A because examinee must be able to monitor changes in parameters TIER: 2 GROUP: 1 Task No: R-EP-036 Obj No: 3D.EP-02-E 10CFR55 Link:

systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features Technical Reference with Revision Number: Big note RY

- Answer Explanation:

A is i C is incorrect. Plausible if the examinee thinks the RCDT 1A pump will start when 1RY8031 is opened. D is correct. See explanation.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016 16 ID: 1267962 Points: 1.00

- Braidwood Station is in a dual unit outage.

- - The U-0 Component Cooling HX is aligned to Unit 2.

- The 1A RH Train is in Shutdown Cooling Mode.

- The 2B RH Train is in Shutdown Cooling Mode.

- The MCR crew desires to raise SX flow to maximize cooldown rate capabilities.

throttling OPEN 0SX007, U

-cooldown rate capabilities for...

A. BOTH Units.

B. ONLY Unit 1.

C. ONLY Unit 2.

D. NEITHER unit.

Answer: A EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 16 History: New for 2016 Bwd NRC exam High Cog K/A: K1.01 Knowledge of the physical connections and/or cause

-effect relationships between the CCWS and the following systems: SWS RO 3.1 SRO 3.1 The question meets the K/A because examinee must know the CC system alignment and how it is affected by the SWS, and affects the RH system.

TIER: 2 GROUP: 1 Task No: R-CC-002 Obj No: S.CC1-02-B 10CFR55 Link:

safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features Technical Reference with Revision Number:

Big Note CC

-- Answer Explanation:

With the U

-0 CC HX aligned to U-2, U-2 CC system will be supplying the CC system. Therefore adjusting SX flow to the U

-0 CC HX will raise cooldown capabilities of both units RH systems A is correct. See explanation.

B is incorrect. this would be true if U

-0 Hx was aligned to U

-1. See explanation.

C is incorrect. See explanation.

D is incorrect. See explanation. Neither unit is plausible because CC can be aligned in post units cool down rate would be affected by 0SX007 position.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016 17 ID: 1267968 Points: 1.00

- Unit 1 is at 50% power, normal alignment.

- PZR -- The following occurs:

- 1PK- operator action, RCS pressure will INITIALLY...

A. LOWER to the low PZR pressure reactor trip setpoint.

B. LOWER and stabilize ABOVE the low PZR pressure reactor trip setpoint.

C. RISE to the high PZR pressure reactor trip setpoint.

D. RISE and PZR pressure will be controlled near 2315

-2335 psig by a PZR PORV.

Answer: B EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 17 History: Bank from Bwd LORT High Cog K/A: 010 Pressurizer Pressure Control K1.03 Knowledge of the physical connections and/or cause

-effect relationships between the PZR PCS and the following systems: RCS RO 3.6 SRO 3.7 The question meets the K/A because the candidate must know how a malfunction in the PZR PCS affects the actual RCS pressure.

TIER: 2 GROUP: 1 Task No: R-OA-100 Obj No: S.RY1-21-E 10CFR55 Link:

systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features Technical Reference with Revision Number: Big note RY

- Answer Explanation:

-10, 1700#- -setpoint.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016 18 ID: 1267969 Points: 1.00

- Unit 1 was at 100% power, normal alignment.

- Subsequently, a loss of DC bus 111 occurs.

- The crew initiates a manual reactor trip and enters 1BwEP

-0, REACTOR TRIP OR SI.

Note:

- -1PM05J. -

A. and from BOTH TSLB

-lights. B. - C. and from TSLB

- D. but NOT from either its position indication lights OR TSLB

- Answer: C EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 18 History: Bank from Bwd 2011 NRC Exam Low Cog K/A: K1.02 Knowledge of the physical connections and/or cause effect relationships between the RPS and the following systems: 125V DC system

Question meets K/A, requires examinee knowledge of how the loss of DC bus will affect the RPS indications.

TIER: 2 GROUP: 1 Task No: R-EP-011 Obj No: 3D.EP-01-A 10CFR55 Link: and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Technical Reference with Revision Number: 20E Answer Explanation:

Power to the position indication lights for RTA come from the reactor trip

-ss of the DC bus 111.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 50 of 283 29 July 2016 19 ID: 1267988 Points: 1.00

- Unit 1 is at 100% power.

- -2, UNIT ONE SSPS, REACTOR TRIP BREAKER, AND REACTOR TRIP BYPASS BREAKER SURVEILLANCE with the following conditions:

- - 1B Reactor

- 1B Input Error Inhibit switch is in INHIBIT.

- 1B Mode Selector switch is in TEST.

- 1B Multiplexer Test switch is in INHIBIT.

- 1A Multiplexer Test switch is in NORMAL.

All other systems are normally aligned, then:

- Pressurizer Pressure drops below the automatic SI setpoint.

A. and BYB w B. SI actuation will NOT occur on either SSPS train, AND RTA, RTB, and BYB will ALL remain CLOSED.

C. SI actuation will occur on ONLY the 1A SSPS train, AND ONLY RTA and BYB will D. SI actuation will occur on BOTH SSPS trains, AND RTA, RTB, and BYB will ALL OPEN.

Answer: C EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 51 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 19 History: High Cog K/A: K5.02 Knowledge of the operational implications of the following concepts as they apply to the RO 2.9 SRO 3.3

The question meets the K/A because the candidate must know how safety system logic and reliability changes during testing.

TIER: 2 GROUP: 1 Task No: R--013 Obj No: -08 10CFR55 Link:

systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Technical Reference with Revision Number: Lesson Plan I1

-RP-XL-, page 19 and - Answer Explanation: SSPS mode switch in test presignal from train A Choice D is incorrect, see ex EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 52 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 53 of 283 29 July 2016 20 ID: 1267989 Points: 1.00

- Unit 1 is at full power.

- - A reactor trip and Safety Injection occur due to high containment pressure.

After the SI A. B. seconds later in low speed.

C. immediately in low speed.

D. Answer: D EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 20 History: Bank from Bwd LORT Low Cog K/A: 022 Containment Cooling System Correlation of fan speed and flowpath changes with containment pressure

The question meets the K/A because the candidate must know changes.

TIER: 2 GROUP: 1 Task No: R-VP- Obj No: S.VP1.08-A 10CFR55 Link:

systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Technical Reference with Revision Number: 20E Answer Explanation:

20 second time time delay creating plausibility for the distractors.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 55 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 56 of 283 29 July 2016 21 ID: 1268008 Points: 1.00

- Unit 2 has experienced a reactor trip and SI from full power due to an RCS LOCA.

- 2SI8811A, CNMT SUMP 2A ISOL VLV, failed to automatically open when the appropriate plant conditions exist.

- ALL other plant equipment operates as expected.

- The crew is currently performing 2BwEP ES

-1.3, RECIRC, Attachment A, CONTAINMENT SUMP ISOLATION VALVES

. - 2SI8811A was JUST manually opened and the 2A RH Pump and the 2A CS Pump were restarted.

- 2CS009A, PP 2A SUMP SUCT VLV, is CLOSED.

- ________ because _________________.

A. B. C. currently exists D. 2A CS pump in PTL Answer: C EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 57 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 21 History: New for Bwd 2016 NRC exam High Cog K/A: 026 Containment Spray System recirculation transfer The question meets the K/A because the candidate must know the 2A CS pump suction alignment after performing 2BwEP ES

-1.3 Attach A. and must know the mitigation strategy on the OAS page.

TIER: 2 GROUP: 1 Task No: R-CS-003 Obj No: S.CS1-08-B 10CFR55 Link:

Technical Reference with Revision Number: Big Note CS Answer Explanation:

Because the 2SI8811A did not auto open when required, the crew would -1.3 Attach A, which would delay the time that CS dr-1.3 and realign the pump to the ECCS recirc alignment. To align the 2A CS pump to the sump, the Choice A is incorrect, 2A CS pump must be placed in PTL per OAS.

Choice B is incorrect, 2A CS pump must be placed in PTL per OAS.

Choice D iRWST to support pump operation.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 58 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 59 of 283 29 July 2016 22 ID: 1268009 Points: 1.00

- Unit 1 is at 50% power, normal alignment.

- The RO is about to initiate an MSR OOS.

- The -expected to automatically CLOSE?

A. B. C. D.

Answer: A EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 60 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 22 History: Bank from Bwd Systems Low Cog K/A: 039 A3.02 Ability to monitor automatic operation of the MRSS, including: Isolation of the MRSS RO 3.1 SRO 3.5 The question meets the K/A because the candidate must know the auto functions of the MSR controller to properly monitor operations.

TIER: 2 GROUP: 1 Task No: R-MS- Obj No: S.MT1-08 10CFR55 Link:

systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Technical Reference with Revision Number: Lesson plan I1

-MT-XL-note MS- Answer Explanation:

om each e taken OOS it ramps closed the A grouped by trains in either A/D and B/C configuration or by the entire MSR A/C and B/D configuration.

nothing from the 1B MSR.

Choice C is incorrect, this w EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 61 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 62 of 283 29 July 2016 23 ID: 1268010 Points: 1.00

- Unit 1 is at 80% power, normal alignment.

- - - - U- the turbine with change. A. program DEHC and initiate a 20 MW/min load drop to 780 MW.

B. manually trip the reactor and enter 1BwEP

-INJECTION.

C. D. program DEHC and initiate a 250 MW/min load drop to 700 MW.

Answer: D EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 63 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 23 History: Bank from Bwd 2009 NRC Exam Low Cog K/A: rictions for RO 2.7 SRO 2.9 pumps. TIER: 2 GROUP: 1 Task No: R-OA- Obj No: -20 10CFR55 Link:

nt and auxiliary systems that affect the facility. Technical Reference with Revision Number: 1BwOA SEC- Answer Explanation:

Per 1BwOA SEC

-1, the turbine is runback to 700 MW at 250 MW per min a manual runback cannot be executed.

Choice C is incorrect, there is no action in 1BwOA SEC

-and is a success path for regaining a heat sink in emergency procedures.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 65 of 283 29 July 2016 24 ID: 1269468 Points: 1.00

- A U-2 plant heatup is in progress per 2BwGP 100

-1, PLANT HEATUP.

- conditions, feed flow should be maintained in the...

A. - B. C. hammer in the auxilary feedwater nozzle.

D. Answer: C EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 66 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question: History: New for Bwd 2016 NRC exam Low Cog K/A: K5.05 Knowledge of the operational implications of the following concepts as the apply to the RO 2.7 SRO 3.2

The question meets the K/A, requires examinee knowledge of the feed flow requirements to TIER: 2 GROUP: 1 Task No: R-GP- Obj No: 3B.GP-01-A-3 10CFR55 Link:

auxiliary systems that affect the facility. Technical Reference with Revision Number:

2BwGP 100-Answer Explanation:

Per 2BwGP 100

- Choice A is incorrect, but plausible because 2BwGP 100

-3 contains a precaution that states temperature drops. To minimize the potential for this occurrence do not hold reactor power between 2% and 12% unless permission from the Shift Manager has bee

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 67 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 68 of 283 29 July 2016 25 ID: 1268014 Points: 1.00

- Unit 1 is at full power, normal alignment with the following exception:

- 1BwOSR 3.8.1.2

-1, 1A DIESEL GENERATOR OPERABILITY SURVEILLANCE, is in progress.

- The following then occurs:

- --1 Lockout Relay.

_______. ____ mode.

A. B. REMAIN closed C. -CLOSE D. -CLOSE Answer: B EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 69 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 25 History: New for Bwd 2016 NRC exam High Cog K/A: 062 A. C. Electrical Distribution on the following: ED/G

The question meets the K/A, requires examinee knowledge of the effect of a AC distribution malfunction has on the DGs.

TIER: 2 GROUP: 1 Task No: R-DG-011 Obj No: S.AP1-11-C 10CFR55 Link:

safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Technical Reference with Revision Number: ILT Lesson plan I1

-AP-XL-- Answer Explanation:

When a DG is initially paralleled to the SATs, it is operating in droop Thereforisochronous mode.

Choice B is corre

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 70 of 283 29 July 2016 26 ID: 1271429 Points: 1.00 Which of the following electrical busses supplies power to the 1TO05P, Main Turbine Emergency Oil Pump? A. AC Bus 132X B. MCC 133Z2 C. DC Bus 111 D. DC Bus 123 Answer: D Answer Explanation Bwd 2016 NRC Exam Question:

  1. 26 History: New for Bwd 2016 NRC exam Low Cog K/A: 063 D.C. Electrical Distribution K2.01 Knowledge of bus power supplies to the following: Major DC loads RO 2.9 SRO 3.1 The question meets the K/A by requiring knowledge of the power supply to a major DC load, the Main Turbine Emergency Oil Pump.

TIER: 2 GROUP: 1 Task No: R-TO- Obj No: S.DC2-02 10CFR55 Link: systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Technical Reference with Revision Number: 20E Answer Explanation:

1TO05P, Main Turbine Emergency Oil Pump is supplied by 250 VDC Bus 123. The 1TO05P is the second backup source of supplying oil to the main turbine in the Choice A is incorrect, but plausible because the 1TO06P Bearing Oil Pump is supplied by AC bus 132X. Choice B is incorrect, but plausible because MCC 133Z2 powers other turbine non

-s Choice C is incorrect, but plausible because the Main Turbine Emergency Oil Pump name Choice D is

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 71 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 72 of 283 29 July 2016 27 ID: 1268029 Points: 1.00

- Unit 1 is at 100% power.

- - The 1B DG did NOT start.

- An EO is locally performing 1BwOA ELEC

- - When Which of the following DC buses will the EO check that the associated breaker is closed for each indicating light on the 1B DG local control panel?

DC POWER ON/BUS # 1 Light DC POWER ON/BUS # 2 Light A. Bus 111 Bus 112 B. Bus 112 Bus 111 C. Bus 112 Bus 112 D. Bus 112 Answer: C EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 73 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 27 History: Bank from 2011 Bwd NRC exam Low Cog K/A: Knowledge of bus power supplies to the following:

K2.03 Control power RO 3.2 SRO 3.6 The question meets the K/A, requires examinee knowledge of DG control bus power supplies.

TIER: 2 GROUP: 1 Task No: R-OA-013 Obj No: S.DG1-03-D 10CFR55 Link:

systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

. Technical Reference with Revision Number: 20E-1- Answer Explanation:

Each DG has two control power circuits which supply different multiple functions of the DG separate supply breaker on DC bus 112.

Choice A is incorrect, this would assume that circuit #1 is fed from bus 111 and circuit #2 is fed Choice B is incorrect, this would assume that circuit #1 is fed from bus 112 and circuit #2 is fed Choice D is incorrect, this would assume that circuit #1 is fed from bus 112 and circuit #2 is fed -This is plausible since 1BwOA ELEC

-3 allows the DG to be started with circuit #2 de

-

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 75 of 283 29 July 2016 28 ID: 1268031 Points: 1.00

- A release of 0WX01T, Liquid RadWaste Release Tank, is in progress with 0PR01J, LIQUID RELEASE The following occurs:

- An audible alarm occurs on the RM

-11. - The 0PS101, LIQ RADWASTE, icon indicates DARK BLUE.

- The channel status display indicates a loss of sample flow has occurred.

_____ failure and the release ______ AUTOMATICALLY isolate.

A. B. C. D. Answer: D EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 76 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 28 History: New for Bwd 2016 NRC exam Low Cog K/A: 073 Process Radiation Monitoring K3.01 Knowledge Question meets K/A

- question requires examinee knowledge of the effect of a PRM system malfunction on an effluent release.

TIER: 2 GROUP: 1 Task No: R-AR-002 Obj No: S.AR1--B-1 10CFR55 Link:

Technical Reference with Revision Number: Big Note AR

-

Answer Explanation:

A loss of sample flow will cause an operate failure and will terminate the The distractor of an equipment failure would occur on a loss of and an equipment failure does not actuate the interlocks of the rad skid.

D is correct, see explanation EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 77 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 78 of 283 29 July 2016 29 ID: 1268032 Points: 1.00

- Unit 1 is at 100% power.

- -replacement.

Subsequently:

- - 1B SX pump can NOT be started.

- Unit 1 reactor is tripped.

- A feedwater isolation occurs.

-

which of the following is correct? A. B. C. D. Answer: A EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 79 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 29 History: High Cog K/A: RO 3.7 SRO 3.9 upon pump design.

TIER: 2 GROUP: 1 Task No: R--008 Obj No: - 10CFR55 Link: systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Technical Reference with Revision Number: Lesson plan I1

--XL-- Answer Explanation:

With neither Unit 1 SX Aended indefinitely by A is correct. See explanation.

B is incorrect. See explanation.

C is incorrect. See explanation.

D is incorrect. See explanation.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 80 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 81 of 283 29 July 2016 30 ID: 1271448 Points: 1.00

- Unit 1 is at 100% power, normal alignment.

- The U-1 Station Air Compressor is in operation.

- The U-1 Instrument Air Dryer is aligned.

- Annunciators alarm and the RO notes the following 2 alarms LIT on 0PM01J.

- NO other alarms are LIT.

- pressure has been stable as indicated below.

-

A. a standby station air compressor STARTED.

B. the U- C. the U- D. BOTH U-1 instrument air dryer towers simultaneously went to drying mode for 5 minutes.

Answer: B EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 82 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 30 History: New for 2016 Bwd NRC exam High Cog K/A: A3.01 Ability to monitor automatic operation of the IAS, including: Air pressure RO 3.1 SRO 3.2 The question meets the K/A, requires examinee ability to monitor an automatic operation of the instrument air system.

TIER: 2 GROUP: 1 Task No: R-IA-002 Obj No: 3C.IA-01-A 10CFR55 Link: systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Technical Reference with Revision Number:

BwAR 0 Answer Explanation:

Choice A is incorrect, but plausible because a low air pressure condition in the station air unaffected.

rmally Choice D is incorrect, but plausible because the instrument

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 83 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016 31 ID: 1268048 Points: 1.00

- Unit 1 is at 100% power, normal alignment.

Subsequently the following occurs:

- -1 SI and Phase A isolation.

A. B. 0A train penetration ISOLATED by either a closed MOV or a NOT isolated.

C. NOT isolated.

D.

Answer: D EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 85 of 283 29 July 2016 Answer Explanation

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 86 of 283 29 July 2016 Bwd 2016 NRC Exam Question:

  1. 31 History: Bank from Bwd Systems High Cog K/A: 103 Containment System

e predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Phase A and B isolation RO 3.5 SRO 3.8 The question meets the K/A because the candidate must predict the impacts of a containment phase A. -

TIER: 2 GROUP: 1 Task No: R-EP-037 Obj No: 3D.EP-19-A 10CFR55 Link:

of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Technical Reference with Revision Number: Big Note WO

- Answer Explanation:

configuration.

m not isolating Choice C is incor EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 87 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 88 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 89 of 283 29 July 2016 32 ID: 1268215 Points: 1.00

- Unit 1 is at 100% power, normal alignment.

- The U-1 Boric Acid Storage Tank system is aligned and running on recirculation per BwOP AB-10, RECIRCING A BORIC ACID TANK.

- An EO performing field rounds reports the following to the MCR:

- The U- - The U-1 Boric Acid system recirculation flow has dropped to ZERO.

- 1AB03P, Boric Acid Transfer Pump, is running but NOT damaged.

- In response to the plugged filter, the U

-1 RO then stops 1AB03P, Boric Acid Transfer Pump.

-up to the VCT, boric acid flow from 1AB03P...

A. B. C. required. D. BORATED WATER SOURCES OPERATING, entry is required.

Answer: B EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 90 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 32 History: New for Bwd 2016 NRC exam High Cog K/A: K6.10 Knowledge of the effect of a loss or malfunction on the following CVCS components: Boric acid storage tank/boron injection tank recirculation flow path RO 2.7 SRO 3.1 The question meets the K/A because the candidate must know the effects of a malfunction in the recirc flowpath of the AB system.

TIER: 2 GROUP: 1 Task No: R-CV-005 Obj No: S.CV2-07-A 10CFR55 Link:

systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Technical Reference with Revision Number: Big note CV

- Answer Explanation: Normal standby alignment of a AB pump has a mini flow recirc path open that bypasses the AB filter. When a boric acid transfer pump is recirculating a boric acid

-up by manually or auto opening gh the filter. If the filter becomes plugged while in -up because the filter bypass line is isolated make-up line. TRM 3.1.b requires:

1. One additional OPERABLE flow path from the RWST, or
2. An OPERABLE flow pa 1CV112E, therefore the loss of the flowpath from the BAST does not require a TRM 3.1.b entry.

TRM 3.1.f is only required when TRM 3.1.b is also required, therefore TRM 3.1.f entry is also not required in normal plant configuration.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 91 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 92 of 283 29 July 2016 33 ID: 1268226 Points: 1.00

- Unit 1 is in Mode 5 with the 1A RH train in shutdown cooling mode.

- The RO was monitoring RH system performance on the plant process caused the noted indications?

A. CONT VLV. B. C. D.

Answer: A EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 93 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 33 History: New for Bwd 2016 NRC exam High Cog K/A: 005 RHRS RO 3.9 SRO 3.8 status based upon the PPC.

TIER: 2 GROUP: 1 Task No: R-RH- Obj No: -05 10CFR55 Link:

systems, including instrumentation, signals, interlocks, failure modes, and automatic an d

manual features Technical Reference with Revision Number:

ILT lesson plan I1

-RH-XL-big note RH

-

Answer Explanation:

Choice B is incorrect, a stroke of 1RH610 would temporarily lower total system flow until to drop. but not significantly change system flow. The subtle change in CC flow on the PPC represented

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 95 of 283 29 July 2016 34 ID: 1268235 Points: 1.00

- Unit 1 was at full power, normal alignment.

- A U-1 SI actuation then occurs.

A. 1CV112B/C CLOSED B. 1CV112D/E OPEN C. 1SI8801A/B OPEN D. 1SI8105/8106 CLOSED

Answer: A EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 96 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

History: New for Bwd 2016 NRC exam High Cog K/A: 006 Emergency Core Cooling flowpaths prior to recirculation RO 3.9 SRO 3.8

The question meets the K/A because the candidate must know interlocks of ECCS position prior to recirc phase and predict how the indications will appear in the MCR.

TIER: 2 GROUP: 1 Task No: R--001 Obj No: S.EC1-09-B 10CFR55 Link:

systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features Technical Reference with Revision Number:

20E Answer Explanation:

light indications that are

normal charging to ECCS injection phase.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 97 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 98 of 283 29 July 2016 35 ID: 1268231 Points: 1.00

- Unit 1 is at full power, normal alignment.

- Annunciator 1 -M/U ON, alarms and the following SER points print:

- -LOSED - Annunciator 1 A5, CC SURGE TANK LEVEL HIGH/LOW

- - - Annunciator 1 E3, SX TO CC SURGE TANK TROUBLE, alarms and the following SER points print:

-0266 SX M/U TO CC SURGE TK VALVE 1CC202A OPEN

- - -

A. 0% - 22% B. 23% - 30% C. 31% - D. - 50% Answer: B EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 99 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 35 History: New for 2016 NRC exam High Cog K/A: A3.01 Ability to monitor automatic operation of the CCWS, including: Setpoints on instrument applicable to the CCWS RO 3.2 SRO 3.0

The question meets the K/A because examinee must know the CC system setpoints for CC surge tank make

- TIER: 2 GROUP: 1 Task No: R-CC-003 Obj No: S.CC1-10 10CFR55 Link:

systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features Technical Reference with Revision Number: BwAR 1 Answer Explanation:

CC surge tank make up occurs at the following setpoints:

50% - 1CC183, WM supply to CC surge tank opens

- 1CC182, PW supply to CC surge tank opens 30% - pen. 22% - A is incorrect. In this range the B train of SX make

-up would also open. Because the sx is a open B is correct. See explanation.

C is incorrect. This would be the range if the WM and PW make

- D is incorrect. This would be the range if the WM make

-up EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 100 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 101 of 283 29 July 2016 36 ID: 1268271 Points: 1.00

- Unit 1 has had a reactor trip and SI from full power.

- The crew is currently performing 1BwEP

-Mode status lights

- LIT -

A. B. . C. D. Answer: A EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 102 of 283 29 July 2016 Answer Explanation

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 103 of 283 29 July 2016 Bwd 2016 NRC Exam Question:

  1. 36 History: New for Bwd 2016 NRC exam High Cog K/A: 022 Containment Cooling System Gen 01.23 Ability to perform specific system and integrated plant procedures during all modes of plant operation.

The question meets the K/A because the candidate must know which component to manually re-configure in the RNO column of 1BwEP

-0. TIER: 2 GROUP: 1 Task No: R-VP-011 Obj No: S.VP1-06 10CFR55 Link:

systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Technical Reference with Revision Number: Big note VP

- Answer Explanation:

feed telectrical contact diagram below.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 105 of 283 29 July 2016 37 ID: 1268276 Points: 1.00

- Unit 1 was operating at full power when a near simultaneous loss of an electrical bus and SI occurred

- 5 minutes later, the RO notes the following indications on 1PM06J.

- A. B. C. D. Answer: B EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 106 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 37 History: New for Bwd 2016 NRC exam High Cog K/A: of a The question meets the K/A, requires examinee ability to interpret control room indications to only tests first part of K/A IAW NUREG ES

-question.

TIER: 2 GROUP: 1 Task No: R--002 Obj No: -15 10CFR55 Link:

nt and auxiliary systems that affect the facility.

Technical Reference with Revision Number:

- Answer Explanation:

A loss of Instrument Bus 111 after the SI signal would cause the - Chstarted and zero 1A discharge pressure would be indicated.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 107 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 108 of 283 29 July 2016 38 ID: 1268284 Points: 1.00

- Unit 1 is at 100% power, normal alignment.

A MCR annunciator alarms on 1PM01J and the RO notes the following indications:

which of the following malfunctions occurred?

A. DC Battery Charger 112 Supply Breaker TRIPPED.

B. DC Battery Charger 112 Output Breaker TRIPPED.

C. D. Answer: C EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 109 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 38 History: New for 2016 Bwd NRC exam High Cog K/A: 063 D.C. Electrical Distribution power fuses.

RO 2.8 SRO 3.1 The question meets the K/A by requiring the ability to determine status of DC bus supply breakers from MCR indications.

TIER: 2 GROUP: 1 Task No: R-DC-003 Obj No: S.DC1-09 10CFR55 Link: control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Technical Reference with Revision Number: Big note DC

- Answer Explanation:

The combination of annunciator 1 E10 lit Choice A is incorrect, DC Battery Charger 112 Supply Breaker TRIPPED would cause alarm 1

-

22- Choice B is incorrect, DC Battery Charger 112 Output Breaker TRIPPED would cause alarm 1

-

22- Choice C is correct, see explanation

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 110 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 111 of 283 29 July 2016 39 ID: 1268328 Points: 1.00

- Unit 1 is at 50% power.

- Control Rods are in MANUAL.

- All other equipment is in a normal alignment.

- A. A power range NI detector B. A turbine impulse pressure transmitter C. A narrow range Tcold RTD D. An RCS loop Delta T channel Answer: C EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 112 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 39 History: New for 2016 Bwd NRC exam High Cog K/A: A2.01 Ability to The question meets the K/A by requiring the ability to monitor pressure control instrumentation and determine failed input.

TIER: 1 GROUP: 2 Task No: R-RY-015 Obj No: S.RY1-20 10CFR55 Link: systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Technical Reference with Revision Number:

Big note RY

- Answer Explanation:

Choice A is incorrect, but plausible because PRNIs feed other control and trip circuits including OTDT, rod control and turbine feedback loops.

Choice B is incorrect, but plausible because turbine impulse pressure feeds the Tref circuit.

Choice C is correct, see Choice D is incorrect, but plausible because delta Ts feed other control and trip circuits including OTDT, OPDT and control rod insertion limits.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 113 of 283 29 July 2016 40 ID: 1268342 Points: 1.00

-3, DROPPED OR MISALIGNED ROD, annunciator 1 EXPECTED from Unit 1 Rod Control Power Cabinet...

A. 1AC B. 2AC C. 1BD D. 2BD Answer: B Answer Explanation Bwd 2016 NRC Exam Question:

History: Bank from 2011 Bwd NRC Exam High Cog K/A: APE 003 Dropped Control Rod Knowledge of the interrelations between the Dropped Control Rod and the following:

AK2.05 RO 2.5 SRO 2.8 The question meets the K/A, requires examinee knowledge of the interrelations between a dropped rod and the logic circuits in the rod control system.

TIER: 1 GROUP: 2 Task No: R-OA-065 Obj No: 3D.OA-75 10CFR55 Link:

systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Technical Reference with Revision Number: Lesson plan I1

-OA-XL-1BwOA ROD- Answer Explanation:

-energized to all the rods in the affected group EXCEPT the affected rod, and all the rods in the opposite group of failure in the 2AC power cabinet since demand current does not equal actual current for any rod in that group. Choices with the BD rod bank power cabinets are plausible because it is a common misconception for students to confuse power supplies and logic cabinets with control banks and groups.

Choice C is incorrect, see ex EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 115 of 283 29 July 2016 41 ID: 1268388 Points: 1.00

- -500T1, GAS DECAY TANK - - radiation ALARM setpoint.

A. BOTH the 0A and 0B GDT tanks effluent will be AUTOMATICALLY isolated.

B. the 0A GDT tank effluent must be MANUALLY isolated, but the 0B GDT effluent can NOT be isolated.

C. BOTH the 0A and 0B GDT tanks effluent will be MANUALLY isolated by CLOSING D. the 0A GDT tank effluent will be AUTOMATICALLY isolated, but the 0B GDT effluent can NOT be isolated.

Answer: D EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 116 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

History: Bank from 2011 NRC exam High Cog K/A: APE 060 Accidental Gaseous Radwaste Release Ability to monitor automatic operation of the Waste Gas Disposal System including:

The question meets the K/A, requires examinee knowledge of waste gas system rad monitor high alarm.

TIER: 1 GROUP: 2 Task No: R-GW-001 Obj No: 3S.GW-01 10CFR55 Link: systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Technical Reference with Revision Number: Big note RW

- Answer Explanation:

discharge header intersects the waste gas release header upstream of the 0PR02J rad monitor header intersection point. Therefore, a high rad signal, whiwill isolate the tank that has a release in progress, but will not isolate a tank with a failed relief isolated.

Choice A is incorrect, 0B tank can not be isolated.

Choice B is incorrect, 0A tank will be automatically isolated.

Choice C is incorrect, 0A tank will be automatically isolated, 0B tank can not be isolated.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 117 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 118 of 283 29 July 2016 42 ID: 1268389 Points: 1.00

- A fire has occurred in the plant and annunciator 0 - - specific actions listed in BwAR 0 A. B. Start the Emergency Diesel Generators and run unloaded to ensure readiness for a loss C. Transfer the non

- on site power.

D. Swap the U

-1 CV pump suction from the VCT to the RWST and de

-energize the suction Answer: D EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 119 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

History: New for Bwd 2016 NRC exam Low Cog K/A: RO 2.5 SRO 3.3

plant fire procedure.

TIER: 1 GROUP: 2 Task No: R--002 Obj No: -18 10CFR55 Link: operating procedures for the facility Technical Reference with Revision Number: BwAR 0 Answer Explanation:

A note in BwAR 0 oss of suction to a running CV pump:

following as a precautionary meas -1BwOA SEC-1. Choice B is incorrect, but plausible because starting the DGs in standby is a precautionary action taken in 1BwOA SECURITY

-1. -

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 120 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 121 of 283 29 July 2016 43 ID: 1268412 Points: 1.00

- Unit 1 was at 100% power, normal alignment.

- - NOT close automatically.

- g which train of Phase A did NOT auto actuate.

- The US suspects that a SSPS master relay failed.

actuate? A. 1CV8100/8112, SEAL WTR RTRN CNMT ISOL VLVS B. C. D. 1SD005A/B, S/G 1A/1D BLWDN SAMPLE ISOL VLVS

Answer: A EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 122 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question: History: - Low Cog K/A: APE 069 Loss of Containment Integrity A1.01 Ability to operate and / or monitor the following as they apply to the Loss of Containment RO 3.5 SRO 3.7

determine the cause.

TIER: 1 GROUP: 2 Task No: S-OA-067 Obj No: T.OA23-07 10CFR55 Link:

gn, components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Technical Reference with Revision Number: 1BwOA PRI- Answer Explanation:

-13 Choice B indication of a single train actuation.

penetrations that EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 123 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016 44 ID: 1269473 Points: 1.00

- Unit 1 was at 100% power, normal alignment.

Then the following occurred:

- An RCS LOCA.

- The reactor tripped, coincident with a loss of offsite power - - - The 1A CV pump TRIPPED. - The inability to obtain adequate ECCS injection flow has caused an Inadequate Core Cooling condition.

- -C.1, RESPONSE TO INADEQUATE CORE COOLING. depressurize the SGs from the MCR are the 1MS018...

A. B. C. D. Answer: D EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 125 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

History: New for Bwd 2016 NRC exam High Cog K/A: The question meets the K/A, requires examinee ability to determine which SG PORVs will be TIER: 1 GROUP: 2 Task No: R--019 Obj No: S.MS1-19 10CFR55 Link:

y systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Technical Reference with Revision Number: Big note MS

-

Answer Explanation: The SG PORV pump and control power are fed froPORV 1A and 1D are fed from bus 131X. PORV 1B and 1C are fed from bus 132X. With bus -energized, bus 132X will be de

-energized. Therefore the 1B and 1C PORVs will not Choice A is incorrect, but plausible because A and D PORVs would be correct before the UPS modification.

Choice B is incorrect, but plausible because C and D are the PORVs with UPS.

Choice C is incorrect, but plausible if the candidate confuses the normal power supplies and EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 126 of 283 29 July 2016 45 ID: 1268468 Points: 1.00

- - The crew has entered emergency procedures and is performing mitigation actions in the procedures.

- The US assigned the BOP the task of monitoring the RM

- A. 1PR01J, CNMT PURGE.

B. C. 1PR11J, CNMT ATMOS.

D. 1AR020J, CONTAINMENT HI RNG.

Answer: D Answer Explanation Bwd 2016 NRC Exam Question:

History: Bank from Bwd EOPS Low Cog K/A: EPE W/E16 High Containment Radiation A2.02 Adherence to appropriate procedures and operation within the limitations in the facility's license and amendments criteria which is then used in decision making process of emergency procedure flowpaths.

TIER: 1 GROUP: 2 Task No: R-EP-009 Obj No: T.EP00-06 10CFR55 Link:

operating procedures for the facility

Technical Reference with Revision Number: 1BwEP- Answer Explanation:

note at the beginning of 1BwEP

-s applicable throughout the WOG EP series. The note lists 1AR020/021 rad skids as the rad monitor to containment radiation monitors used in either emergency plan procedures or abnormal operating procedures.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 127 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 128 of 283 29 July 2016 46 ID: 1268474 Points: 1.00

- Unit 1 has experienced a small break RCS LOCA.

- RCS pressure is currently 2200 psig and stable.

- The crew is performing 1BwEP ES

-1.2, POST LOCA COOLDOWN AND DEPRESSURIZATION, and is about to initiate an RCS cooldown using steam dumps.

As PZR pressure drops during the cooldown, which of the following is the MAXIMUM indicated PZR pressure that the NSO can block the Steamline Low Pressure SI signal?

A. 2100 psig B. 2000 psig C. 1900 psig D. 1800 psig Answer: C EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 129 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

History: Bank from 2011 Bwd NRC Exam Low Cog K/A: W/E03 LOCA Cooldown and Depressurization K1.03 Knowledge of the operational implications of the following concepts as they apply to the The question meets the K/A, requires examinee indicating signals and remedial actions during a post LOCA Cooldown and Depressurization.

TIER: 1 GROUP: 2 Task No: R-EP-003 Obj No: T.EP02-01-D 10CFR55 Link: safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features Technical Reference with Revision Number: 1BwEP ES-Answer Explanation:

1BwEP ES-1930 psig performed until below the P

-

Choice A is incorrect, pressure is not yet below P

-11. Choice B is incorrect, pressure is not yet below P-11. Choice D is incorrect, pressure is below P

-11, but stem asks for earliest pressure that SI can be blocked. It is important not to wait too long to block SI as the steam generators will be depressurizing also as the cooldown continues and the SI signal must be blocked before the setpoint is reached.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 130 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 131 of 283 29 July 2016 47 ID: 1268475 Points: 1.00

- - The crew is currently performing 1BwEP ES

-0.2, NATURAL CIRCULATION COOLDOWN.

Per 1BwEP ES

-_______ are running. The bases for this step is to aid in cooling of the _____________. A. B. C. D. Answer: B EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 132 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

History: New for Bwd 2016 NRC exam Low Cog K/A: W/E09 Natural Circulation Operations including primary coolant, emergency coolant, the the operation of the facility TIER: 1 GROUP: 2 Task No: R-EP-002 Obj No: T.EP01-06-D 10CFR55 Link: emergency operating procedures for the facility Technical Reference with Revision Number:

BD-EP ES--0.2 Answer Explanation:

1BwEP ES-bypass flow is minimal due to flow restrictions and as the RCS is cooled down and depressurized, a localized loss of subcooling could occur in the head.

Choice A is incorrect, but plausible because this is the CRDM fans normal function.

Choice D is incorrect, but plausible because this is also a normal at power function of the Rx

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 133 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016 48 ID: 1268488 Points: 1.00

- - All equipment operated as designed.

- -2 setpoint.

- The Unit 1 NSO has just depressed the following annunciator push buttons associated with 1PM05J in the following order:

- NO - -2 setpoint.

of the following?

1-11-A1, MANUAL RX TRIP 1-11-A8, S/G 1A LEVEL LO

-2 RX TRIP A. 1-11- B. 1-11- C. 1-11- D. 1-11-Answer: C EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 135 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

History: Bank from Bwd ILT systems High Cog K/A: EPE 007 Reactor Trip K2.03 Knowledge of the interrelations between a reactor trip and the following: Reactor trip status panel RO 3.5 SRO 3.6

The question meets the K/A because the candidate must know the status of the reactor trip first out panel when multiple reactor trip signals are generated.

TIER: 1 GROUP: 1 Task No: R-AN-006 Obj No: S.AN1-03-A 10CFR55 Link:

systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Technical Reference with Revision Number: Lesson plan I1

-AN-XL-pages 12-big note AN

- Answer Explanation:

The reactor trip status panel contains a logic circuit that will light the first reactor trip signal annunciator red and then subsequent reactor trip signals will light in white bulbs. The manual Rx trmust be reset with a key switch that is unique to the first out block of annunciatorssignals will remain lit solid.

Choice A is incorrect, this is the opposite flashing/not flashing configuration.

Choice D is incorrect, manual

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 136 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 137 of 283 29 July 2016 49 ID: 1268490 Points: 1.00 Which of the following conditions is the OTDT reactor trip designed to protect against?

A. An uncontrolled rod withdrawal from start

-up conditions.

B. A trip of all feedwater pumps from at power conditions.

C. D. A main steam line break from at power conditions.

Answer: C EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 138 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

History: New for Bwd 2016 NRC exam Low Cog K/A: APE 008 Pressurizer Vapor Space Accident Gen 02.38 Knowledge of conditions and limitations in the facility license.

The question meets the K/A, requires examinee knowledge of limitations in the facility license, 10CFR55 Link: systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

TIER: 1 GROUP: 1 Task No: R-EP-032 Obj No: S.RC1-07 Technical Reference with Revision Number:

Lesson Plan I1

-RP-XL-- Answer Explanation:

The DNB accident family terminated by OTDT trip and backed up by the low pressurizer pressure trip. This is the type of Choice A is incorrect, Start

-up accidents are protected against by the Nuclear Instrument high neutron flux trips of the Source and Intermediate Ranges and the low power high neutron flux trip of the Power Range.

Choice B is incorrect, Loss of Heat Sink accidents are protected against by the Lo

-trip and the Turbine Trip/Reactor Trip.

at ALL power against by OPDT and backed up by low steam line pressure SI/RX trip.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 139 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016 50 ID: 1271568 Points: 1.00

- Unit 1 was at full power for the past 9 months, normal alignment, MOL.

- An RCS LOCA occurred.

- A reactor trip and SI were initiated and all equipment operated as designed.

- Plant conditions indicated a small break LOCA.

- The crew is currently performing 1BwEP ES

-1.2, POST LOCA COOLDOWN AND DEPRESSURIZATION.

ES-1.2? A. B. The RCS depressurization.

C. The restarting of an RCP.

D. The shutdown of the RH pumps from ECCS injection.

Answer: A EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 50 History: New for 2016 Bwd NRC exam High Cog K/A: EPE 009 Small Break LOCA A2.32 Ability to determine or interpret the following as they apply to a small break LOCA: SDM RO 3.2 SRO 3.6

during a small break LOCA that affect SDM.

TIER: 1 GROUP: 1 Task No: R-RK-005 Obj No: 3B.GP-02-1-2 10CFR55 Link: transient conditions, including coolant chemistry, causes and effects of temperature, pressure , effects of load changes, and operating limitations and reasons for these operating characteristics.

Technical Reference with Revision Number: 1BwEP ES- Answer Explanation: ne-1.2 contains a note just prior to the RCS cooldown.

Choice B i1BwEP ES-cause SDM to rise as the higher cooling flow is supplied with highly borated water from the RWST.

ES-borated water in the leg being started. This is a concern during a SG tube rupture with backflow core. Choice D is incorrect, but plausible because securing ECCS pumps reduces the rate of borated water being added to RH pump shutoff head in ECCS injection mode. Stopping the RH pumps is not a concern for SDM because the pumps will not be injecting into the RCS when running.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016 51 ID: 1269477 Points: 1.00

- Unit 1 has experienced a Large Break LOCA combined with a Loss of Offsite Power from 100% power.

- ALL systems operate as designed.

rt A. 1. RH 2. CV 3. SI B. 1. CV 2. RH 3. SI C. 1. CV 2. SI 3. RH D. 1. SI 2. CV 3. RH Answer: C EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 51 History: Bank from Bwd 2011 NRC exam High Cog K/A: EPE 011 Large Break LOCA K2.02 Knowledge of the interrelations between the following and a Large Break LOCA: pumps RO 2.6 SRO 2.7 The question meets the K/A, requires examinee knowledge of interrelation between a large break LOCA and ECCS pumps.

TIER: 1 GROU P: 1 Task No: R--001 Obj No: B 10CFR55 Link:

Technical Reference with Revision Number:

I1-EC-XL- Bwd Big Note DG

- Answer Explanation:

With a loss of Offsite power and SI actuated, the ECCS pumps will 0 sec., SI at 5 sec. and RH at 10 sec.

Choice A is incorrect, see explanation EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016 52 ID: 1268508 Points: 1.00

- Unit 1 was in Mode 1, normal alignment.

- NOT re-open. -1 RCPs... A. can remain running if RCP seal injection flows are maintained in their normal operating range. B. MUST be tripped due to a loss of CC to ONLY the motor bearing oil cooler heat exchangers.

C. MUST be tripped due to a loss of CC to ONLY the thermal barrier heat exchangers.

D. MUST be tripped due to a loss of CC to the motor bearing oil cooler heat exchangers AND thermal barrier heat exchangers.

Answer: B EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 52 History: New for Bwd 2016 NRC exam Low Cog K/A: APE 015 Reactor Coolant Pump malfunctions K3.02 Knowledge of the reasons for the following responses as they apply to the Reactor Coolant Pump Malfunctions: CCW lineup and flow paths to RCP oil coolers RO 3.0 SRO 3.1

The question meets the K/A because the candidate must know why the RCP would need to be TIER: 1 GROUP: 1 Task No: R-OA-027 Obj No: 10CFR55 Link:

systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Technical Reference with Revision Number: Lesson Plan I1

-RC-XL-page 21, 1BwOA PRI- Answer Explanation:

BwAR 1-5-A7 directs the operator to reset the Phase B and re

-Subsequently the BwAR directs a reactor trip and RCP trips if CC cannot be established to the motor bearing heat exchangers. CC flow to the RCPs has a common supply line for both the motor bearing heat exchangers and the thermal barriers. The return lines are separate and e return from the motor bearing heat exchangers.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016 53 ID: 1268509 Points: 1.00 In 1BwOA PRI

-indications:

- - - Charging Pump Discharge Pressure

- Charging Pump Amps

The reason these parameters are monitored is to determine if there are indications of a...

A. seized pump shaft.

B. gas bound pump.

C. sheared pump shaft.

D. degraded pump impeller.

Answer: B EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 150 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 53 History: New for Bwd 2016 NRC exam Low Cog K/A: APE 022 Loss of Reactor Coolant Makeup K3.02 Knowledge of the reasons for the following responses as they apply to the Loss of Reactor Coolant Makeup: Actions contained in SOPs and EOPs for RCPs, loss of makeup, loss of charging, and abnormal charging RO 3.5 SRO 3.8 The question meets the K/A because the candidate must know why the CV pump/RCP parameters are checked in 1BwOA PRI

-15. TIER: 1 GROUP: 1 Task No: R-OA-031 Obj No: T.OA23A- 10CFR55 Link:

operating procedures for the facility.

Technical Reference with Revision Number: 1BwOA PRI- Answer Explanation:

The listed parameters are checked for fluctuating indication in 1BwOA PRI-dure directs the standby pump to be Choice B is correct, see explanation a EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 151 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 152 of 283 29 July 2016 54 ID: 1268510 Points: 1.00

- Unit 2 is in Mode 5.

- All systems are normally aligned.

- 2A RH pump is running in the shutdown cooling mode per BwOP RH-6. - - - The following occurs:

- -

A. - B. - C. - D. - Answer: A EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 153 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

History: Bank from 2013 Bwd Cert exam High Cog K/A: A1.01 Ability to operate and/or monitor the following as they apply to the Loss of Residual Heat System: RCS/RHRS cooldown rates RO 3.6 SRO 3.7

Question meets KA

- question requires examinee to predict impact of RCS leak on RH operation and RCS temperature.

10CFR55 Link:

systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

TIER: 1 GROUP: 1 Task No: R-RH- Obj No: 3D.OA-09-D Technical Reference with Revision Number: Lesson plan I1

-RH-XL-note rh-1 Answer Explanation:

A leak downstream of the RH HX would cause flow to initially drop but Since less flow coming out of the RH HX would make it back to the RCS and more flow actuall y bypasses the RH HX, RCS temperature would rise.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 155 of 283 29 July 2016 55 ID: 1268529 Points: 1.00

- Unit 1 is in Mode 3 at NOP/NOT.

- - PZR pressure channel 1P

- Subsequently the following occurs:

- 1PT- - SI ACTUATES and all equipment functions as designed.

- - - Pressurizer pressure is 2280 psig and slowly RISING.

- 1PK- ______. A. B. C. D. On Answer: C EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 156 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 55 History: New for Bwd 2016 NRC exam High Cog K/A: APE 027 Pressurizer Pressure Control System Malfunction K1.03 Knowledge of the operational implications of the following concepts as they apply to Pressurizer Pressure Control Malfunctions:

RO 2.6 SRO 2.9

The question meets the K/A by knowing the operational implications of a potential loss of saturation conditions in the pressurizer. Backup heaters are energized during pressurizer TIER: 1 GROUP: 1 Task No: R-OA-100 Obj No: T.OA11-25 10CFR55 Link: and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Technical Reference with Revision Number: Big Note RY

--Control Answer Explanation: When SI actuates from Mode 3, NOP/NOT conditions, RCS temp will drop slowly due to the injection of ECCS flow and pressure will rise slowly due to the pressurizer tially be at minimum and master pressure controller demand will not demand heaters to be on and will demand PZR demand and turn on the backup heaters. PZR sprays will not be open because the SI will cause a containment phase A isolation and isolate instrument air to containment failing the PZR spray Choice A

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 157 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 158 of 283 29 July 2016 56 ID: 1268531 Points: 1.00 concern during a/an ______

___. A. B. Transient Without Scram C. D. Answer: B EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 159 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 56 History: New for Bwd 2016 NRC exam Low Cog K/A: EPE 029 ATWS Gen 02.25 Knowledge of the bases in Technical Specifications for limiting conditions for operations and safety limits.

The question meets the K/A by requiring the examinee to know tech spec safety limits.

TIER: 1 GROUP: 1 Task No: R--018 Obj No: S.TS1-03-D 10CFR55 Link: transient conditions, including coolant chemistry, causes and effects of temperature, pressure load changes, and operating limitations and reasons for these operating characteristics.

Technical Reference with Revision Number: Lesson plan I1

--XL-Technical specification 2.0 Safety Limits Answer Explanation:

Because of the fissconcern is rising RCS temperature which then causes a rising RCS pressure that will exceed the design pressure of the RCS. In contrast, the primary concern during a loss of heat sink pressure will rise as temperature rises, the relief capabilities of the pressurizer will not be exceeded. The RCS pressure safety limit listed in Tech Specs is 2735 psig. The distractor of 3107 psig is the hydrostatic test pressure limit.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 160 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 161 of 283 29 July 2016 57 ID: 1268538 Points: 1.00

- - Currently the crew is performing 1BwEP

-3, STEAM GENERATOR TUBE RUPTURE, at step 6, Initiate RCS Cooldown.

- the RCS cooldown.

- The crew is about to re

-maximum rate with the steam dumps.

in ____. ____. A. B. C. D.

Answer: C EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 162 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 57 History: New for Bwd 2016 NRC exam High Cog K/A: EPE 038 SGTR A02.05 Ability to determine or interpret the following as they apply to a SGTR: Causes and consequences of shrink and swell in S/Gs RO 2.8 SRO 2.9

The question meets the K/A by requiring the examinee to know the causes of shrink and swell in the SGs. TIER: 1 GROUP: 1 Task No: R-EP-012 Obj No: A.HT3-08-B 10CFR55 Link: transient conditions, including coolant chemistry, causes and effects of temperature, pressure changes, effects of load changes, and operating limitations and reasons for these operating characteristics.

Technical Reference with Revision Number: Lesson plan I1

-HT-XL- Answer Explanation:

k occurs when a step feedwater flow entering the SG downcomer region causes a sudden contraction or collapse of steam bubbles in the downcomer region. This causes a redistribution of the water mass in the would create steam demand and lower SG pressure. The lowering of pressure causes a sudden expansion or formation of steam bubbles in the tube area. This causes a redistribution of the

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 163 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016 58 ID: 1268545 Points: 1.00

- Unit 1 plant startup was in progress.

- A main steamline break then occurred.

- -P.1, RESPONSE TO IMMINENT PRESSURIZED THERMAL SHOCK CONDITION. - -P.1, conditions requiring a RCS temperature soak were identified.

-P.1, the temperature soak specifies that...

A. an immediate RCS cooldown CAN continue, BUT the cooldown rate is restricted to LESS than Tech Spec limits.

B. NO further RCS cooldown UNTIL restrictions.

C. NO further RCS cooldown for a specified time period, THEN the cooldown rate is restricted TO Tech Spec RCS cooldown limits.

D. NO further RCS cooldown for a specified time period, THEN the cooldown rate is restricted to LESS than Tech Spec RCS cooldown limits.

Answer: D EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 165 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 58 History: Bank from Bwd EOPS Low Cog K/A: K01.01 Knowledge of the operational implications of the following concepts as they apply to Steam Line Rupture: Consequences of PTS

The question meets the K/A by requiring the examinee to know the operational consequences of PTS conditions.

TIER: 1 GROUP: 1 Task No: R--022 Obj No: -02 10CFR55 Link: transient conditions, including coolant chemistry, causes and effects of temperature, pressure f load changes, and operating limitations and reasons for these operating characteristics.

Technical Reference with Revision Number: - Answer Explanation:

-P.1 list criteria for a soak and the restrictions there after. The restrictions are to not cool down for a one hour period remains in effect for any subsequent procedure that may be applicable.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 166 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 167 of 283 29 July 2016 59 ID: 1268554 Points: 1.00

- Unit 1 is experiencing a loss of heat sink condition with the following plant conditions:

- - RCS pressure is 2200 psig.

- - - attempting to re

-

A. RCS pressure rises to 2300 psig.

B. Containment pressure rises to 5.2 psig.

C. D. 1A CV pumps trips.

Answer: C EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 168 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 59 History: Bank from 2011 Bwd NRC Exam High Cog K/A:

TIER: 1 GROUP: 1 Task No: R--029 Obj No: -08 10CFR55 Link: operating procedures for the facility.

Technical Reference with Revision Number: -

Answer Explanation: -H.1 OAS page list bleed and feed criteria after performance of step 3 as any of the following.

RCS pressure >2335 due to loss of heat sink.

pressure which makes it plausible.

ld not meet bleed and feed criteria.

Choice D is incorrect, 1B CV pp would still be running.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 169 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 170 of 283 29 July 2016 60 ID: 1268556 Points: 1.00

- Unit 1 has experienced an extended Loss of All AC Power. - The crew is performing 1BwCA

-DEPRESSURIZE ALL INTACT SGs TO 260 PSIG.

A. B. C. Minimize SG tube differential pressure.

D.

Answer: D EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 171 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 60 History: Bank from 2011 Bwd NRC exam Low Cog K/A: EPE055 K03.02 Knowledge of the reasons for the following responses as they apply to the Station Blackout: Actions contained in EOP for loss of offsite and onsite power.

The question meets the K/A, requires examinee knowledge of reasons for actions contained in the emergency procedure for loss of all AC power.

TIER: 1 GROUP: 1 Task No: R-CA-009 Obj No: 3D.CA-01-C 10CFR55 Link:

operating procedures for the facility.

Technical Reference with Revision Number: WOG Background Document for CA

-page 106 Answer Explanation: Per the WOG background document for CA

-0.0, the basis for depressurizing the SGs is to reduce RCS temperature and pressure to reduce RCP seal -0.0, operator action is taken to reduce SG pressures prior to allowing them to reach the SG safety m imminent RCP seal failure.

no reason to depressurize to raise flow.

Choiand pressure will be dropping and not challenging the pressurizer safety setpoints.

entually EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 172 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 173 of 283 29 July 2016 61 ID: 1268611 Points: 1.00

- Unit 1 was at 100% power, normal alignment.

Subsequently:

- A SAT fault results in a loss of offsite power.

- All equipment operates as designed.

A. rise B. C. - D. -2 setpoint.

Answer: A EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 61 History: -- High Cog K/A: 056 Loss of Off

-site Power A02.81 Ability to determine and interpret the following as they apply to the Loss of Offsite and pressure gauge RO 3.7 SRO 3.8

10CFR55 Link:

systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

TIER: 1 GROUP: 1 Task No: R-OA-005 Obj No: -12 Technical Reference with Revision Number: Lesson plan I1

--XL-- Answer Explanation:

On a loss of off

--energize momentarily until the DGs re

--

. A is correct. See explanation.

would continue to rise isolation will occur.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 175 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 176 of 283 29 July 2016 62 ID: 1268612 Points: 1.00

- Unit 2 was at full power, normal alignment.

- A loss of BOTH U

-2 SX pumps occurred last shift.

- -1 and U-2 SX systems. - Per 2BwOA PRI

-8, ESSENTIAL SERVICE WATER temperatures by performing 2BwOSR 0.1

- - 2A INLET TEMP

- - 2A OUTLET TEMP

-

- 2C INLET TEMP - - 2C OUTLET TEMP

-

- 2B INLET TEMP

- - 2B OUTLET TEMP

- - 2D INLET TEMP

- - 2D OUTLET TEMP

- be recorded for Te A. B. C. D.

Answer: C EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 177 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 62 History: - High Cog K/A: The question meets the K/A because the candidate must know how to properly calculate TIER: 1 GROUP: 1 Task No: R-AM-006 Obj No: S.VP1-06 10CFR55 Link:

operating procedures for the facility.

Technical Reference with Revision Number: 2BwOSR 0.1- Answer Explanation:

shut down, their inlet temps are not used be used. p should not be used.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 178 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 179 of 283 29 July 2016 63 ID: 1268629 Points: 1.00

- Unit 1 was at 100% power. - -energized due to a bus fault.

Subsequently:

- - -1 containment penetration area. - The crew transitions to 1BwCA

-1.2, LOCA OUTSIDE CONTAINMENT, with ALL 1A train ECCS pumps still operating.

The following indications are CURRENTLY noted on 1PM05J/6J:

- RCS wide range pressure is 1700 psig and stable.

- 1A RH discharge flow is 0 gpm.

- 1A SI pump discharge flow is 200 gpm.

- High Head SI flow is 300 gpm.

The leak can be reduced by closing...

A. 1RH8716A, RH HX 1A DSCH XTIE VLV.

B. 1SI8801A, CHG PMPS TO COLD LEGS INJ ISOL VLV. C. D. 1SI8835, SI PMPS TO COLD LEGS ISOL VLV.

Answer: D EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 180 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 63 History: High Cog K/A: The question meets the K/A because the candidate must determine success path in emergency procedure based upon MCR indications.

TIER: 1 GROUP: 1 Task No: R-CA- Obj No: -03 10CFR55 Link: emergency systems

Technical Reference with Revision Number: Big note ECCS

- Answer Explanation:

Shut off head for the ECCS pumps are as follows: RH

-200 psid, SI

-1500 psid, CV-2600 psid. At the current RCS pressure of 1700 psid the onlindicated flow is the CV pump. Therefore, if the SI pump indicates 200 gpm and assuming the leak is RWST water, it is logical to conclude that the leak is somewhere on the SI pump discharge line. 1BwCA

-1.2 step 2.d, isolates each of the ECCS pump discharge paths one at a Choice A is incorrect, RH pump flow is normal for current RCS pressure.

Choice B is incorrect, CV pump flow is normal for current RCS pressure.

Choice C is incorrect, RH pump flow is normal for current RCS pressure.

Choice D is correct, SI pump flow is abnormal for current RCS pressur

e.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 181 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 182 of 283 29 July 2016 64 ID: 1268642 Points: 1.00

- An RCS LOCA occurred on Unit 1.

- 1SI8811A/B, CNMT SUMP ISOL VLVs, are CLOSED and CANNOT be opened.

- 1BwCA- - -1.1. -1.1 requires that the NSO maintain a MINIMUM primary plant A. B. C. 31% in RVLIS HEAD region.

D. 15% in RVLIS PLENUM region.

Answer: D EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 183 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

History: Modified from

- Low Cog K/A: W/E11 Loss of Emergency Coolant Recirculation A01.03 The question meets the K/A, requires examinee knowledge of desired results associated with loss of emergency coolant recirc.

TIER: 1 GROUP: 1 Task No: R-CA-003 Obj No: 3D.CA-02-B 10CFR55 Link: operating procedures for the facility Technical Reference with Revision Number: 1BwCA- Answer Explanation:1BwCA-1.1 Continuous Action Summary requires the operator to raise RCS make-up flow if either the CETCs rise or if the RVLIS plenum region drops below 15%. iteria used in other emergency procedures to raise ECCS flow 1BwEP ES-0.2. reduced in 1BwEP

-0 Choice C is incorrect, 31% in the RVLIS head region would represent the first indication that Choice D is correct, see explan EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 185 of 283 29 July 2016 65 ID: 1268648 Points: 1.00

- Unit 1 at 100% power in a normal alignment.

- 1VI-MP006, MAIN GENERATOR 1 OUTPUT VARS, indicates 200 MVARS out.

Subsequently:

- - TSO reports A. lowered. To return MVAR load to a STABLE 200 MVARS OUT, the crew will take the VOLT adjuster control switch to RAISE.

B. did NOT necessary.

C. rose. To return MVAR load to a STABLE 200 MVARS OUT, the crew will take the BASE adjuster control switch to LOWER.

D. rose. To return MVAR load to a STABLE 200 MVARS OUT, the crew will take the VOLT adjuster control switch to LOWER.

Answer: D EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 186 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 65 History: - High Cog K/A: APE 077 Generator Voltage and Electric Grid Disturbances K02.07 Knowledge of the interrelations between Generator Voltage and Electric Grid Disturbances and the following:Turbine / generator control RO 3.6 SRO 3.7

generator TIER: 1 GROUP: 1 Task No: R-MP-001 Obj No: S.MP2-05-A. 10CFR55 Link: transient conditions, including coolant chemistry, causes and effects of temperature, pressure operating characteristics.

Technical Reference with Revision Number: Lesson plan I1

-MP-XL- Answer Explanation:

r

A is incorrect. See explanation.

B is incorrect. See explanation. C is incorrect. See explanation.

D is correct. See explanation.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 187 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 188 of 283 29 July 2016 66 ID: 1268688 Points: 1.00

- Unit 1 reactor power is 65% and stable.

- Main Generator load is 800 MW and stable.

- 1C zone Main Condenser pressure is 1.6 inches HgA and stable.

The following occurs:

- constant rate of 0.2 inches HgA/minute.

- 1109: A ramp down at 10 MW/minute is commenced in an attempt to stabilize condenser pressure.

- - The RO is directed to monitor current parameters and keep the crew informed before reaching reactor trip criteria.

llowing is the closest approximate time that the unit will first 1? A. 111 9. B. C. 1127. D. 1132.

Answer: C EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 189 of 283 29 July 2016 Answer Explanation Provide reference: 1BwOA SEC

-3 rev 106 page 12 of 14, Figure 1BwOA SEC 1 Bwd 2016 NRC Exam Question:

  1. 66 History: Bank from Bwd 2009 NRC exam High Cog K/A: The question meets the K/A, requires examinee ability to use a graph to determine conditions

TIER: 3 GROUP: 1 Task No: R-AM-022 Obj No: A.MX6-01-A 10CFR55 Link:

operating procedures for the facility.

Technical Reference with Revision Number: 1BwOA SEC- Answer Explanation: Using 1BwOA SEC 1: - Choice B is incopressure rise with no ramp.

criteria EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 190 of 283 29 July 2016 67 ID: 1268708 Points: 1.00

- Unit 1 is performing an INITIAL power ascension following a refueling outage.

- in... A. -8, GENERIC REACTOR CONTROL GUIDANCE, limits.

B. AUTOMATIC to ensure Shutdown Margin is maintained in accordance with Tech Spec Rod Insertion Limits.

C. MANUAL to ensure D. MANUAL to ensure fuel conditioning rod withdrawal rate limits are NOT exceeded.

Answer: D Answer Explanation Bwd 2016 NRC Exam Question:

  1. 67 History: New for Bwd 2016 NRC exam Low Cog K/A: Gen 2.1.32 Ability to explain and apply system limits and precautions.

The question meets the K/A, requires examinee ability explain limitations of rod control.

TIER: 3 GROUP: 1 Task No: R-GP-007 Obj No: 3B.GP-02-A-3 10CFR55 Link: operating procedures for the facility.

Technical Reference with Revision Number:

1BwGP 100- Answer Explanation:

Per 1BwGP 100

-3, Limitation E.1.c.9, Do not use automatic rod control during the initial power power ascension, rod withdrawal is limited to 3 steps per hour until rods are withdrawn to at least 227 steps at no less than 98% power. The distractors are all limits than need to be control mode of operation.

Choice B is incorrect, see

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 191 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 192 of 283 29 July 2016 68 ID: 1268709 Points: 1.00

- Unit 1 is at 100% power, normal alignment.

- cubicle inspections.

- The inspections require each breaker to be racked out, inspected/cleaned, and then racked back in.

Which one of the following normally open breakers, would require an LCO 3.8.1, AC SOURCES

-OPERATING, entry during the inspection?

A. B. C. D. ACB 1572 Answer: B EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 193 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 68 History: Bank from Bwd 2009 NRC exam High Cog K/A: as degraded power sources, on the status of limiting conditions for operations.

The question meets the K/A, requires examinee ability to analyze effect of maintenance

TIER: 3 CATEGORY: 2 Task No: R-AP-001 Obj No: 3C.AP-01-B 10CFR55 Link:

operating procedures for the facility

Technical Reference with Revision Number:

-1, BIG NOTE AC-Answer Explanation:

transmission network and the onsite Class 1E AC Electrical Power Distribution System are The qualified circuits are normal feeds from SATs and

Cross-to recognize the breaker function solely from the numberi

Choice B is correct, Racking osource for both units requiring LCO 3.8.1 entry on both units.

- Choice D is incorrect, 1572 is SAT feed to non

-bus 157. No LCO is required.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016 69 ID: 1269483 Points: 1.00

- Unit 1 is preparing for a reactor startup following a refueling outage.

- An NSO has been assigned the task of performing low power physics testing.

Prior to performing the low A. Standard Pre

-Job Briefing.

B. Tailored Pre

-Job Briefing.

C. D. Answer: D Answer Explanation Bwd 2016 NRC Exam Question:

  1. 69 History: New for Bwd 2016 NRC exam Low Cog K/A: Gen 2.2.07 Knowledge of the process for conducting special or infrequent tests.

RO 2.9 SRO 3.6

The question meets the K/A, requires examinee knowledge of process for conducting infrequent tests.

TIER: 3 CATEGORY: 2 Task No: R-AM-133 Obj No: 3E.AM-133 10CFR55 Link:

operating procedures for the facility Technical Reference with Revision Number: HU-AA- Answer Explanation:

HU-AA-HU-AA-1211 that are common to low power physics testing. To correctly answer the question -AA-1211 memorized, Choice A is incorrect,

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 195 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 196 of 283 29 July 2016 70 ID: 1268711 Points: 1.00

- Plant - Loop 1A T AVE - Loop 1B T AVE - Loop 1C T AVE - Loop 1D T AVE - T - The Rod Bank Select Switch is in MANUAL.

If the Rod Bank Select Switch is placed in AUTO, the control rods would initially ...

A. B. step IN at 8 steps/minute.

C. NOT step. D. step OUT at 8 steps/minute.

Answer: B EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 197 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 70 History: Modified from Bwd 2009 NRC Exam High Cog K/A: conditions.

The TIER: 3 CATEGORY: 2 Task No: R-RD-001 Obj No: 3C.RD-02-A 10CFR55 Link: mechanisms and instrumentation.

Technical Reference with Revision Number:

Big note RD

- Answer Explanation: nel and compares it to Tref to calculate demand. Also uses rate of change between auctioneered high NI channel and P-from 8 to 72 steps per/min.

Choice C is incorrect, would be correct

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 198 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 199 of 283 29 July 2016 71 ID: 1268728 Points: 1.00

- An audible alarm on the RM

- - The RO notes the below indications.

the alert set A. B. -watered. C. transferred to a bulk radwaste liner.

D. Radiography of the U

- Answer: A EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 200 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 71 History: New for Bwd 2016 NRC exam High Cog K/A: radiation or contamination hazards that may arise during normal, The question meets the K/A, requires examinee knowledge of locations associated with

TIER: 3 CATEGORY: 3 Task No: R-AR-002 Obj No: S.AR1-09 10CFR55 Link: Technical Reference with Revision Number: - Answer Explanation: The area rad monitor channel 3AS110 in alert status is located in the aux detector channels on the same RM

-

-11. Choice D is incorrect, the CC associates the RM

-below

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 201 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 202 of 283 29 July 2016 72 ID: 1268736 Points: 1.00

- Both units are at full power, normal alignment.

- The 0A VC train is in normal operation per BwOP VC

-SYSTEM. - The 0B VC train is in standby.

The following then occurs: - Building trackway is reported to the MCR.

- - The RO notes all MCR rad monitor icons on the RM

-11 GRID 2, PROCESS AIR MONITORS, are currently GREEN.

-11, the RO will trend the...

A. 0PR31J or 0PR32J, OUT AIR IN OA.

B. J, OUT AIR IN OB.

C. 0PR35J or 0PR36J, TURB AIR IN OA.

D. 0PR37J or 0PR38J, TURB AIR IN OB.

Answer: A EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 203 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 72 History: Bank from Bwd 2011 NRC exam High Cog K/A: Gen 2.3.5 Ability to use radiation monitoring systems, such as fixed radiation monitors and RO 2.9 SRO 2.9 The question meets the K/A, requires examinee ability to use radiation monitoring systems.

TIER: 3 GROUP: 3 Task No: R-AR-002 Obj No: -02 10CFR55 Link: systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Technical Reference with Revision Number:

Bwd ILT LP I1

-VC-XL- Bwd ILT LP I1

-AR-XL- Big note VC

- Answer Explanation: not online because the sample pumps wi

Choice A running, this plenum would not experience intake air flow.

flow unless the 0A VC system was manually or automatically swapped to emergency mode.

intake air flow unless the 0B VC system was manually started in emergency mode.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 205 of 283 29 July 2016 73 ID: 1269488 Points: 1.00

- The unit 1 RO is responding to a reactor trip.

- 1BwEP- Immediate Actions of 1BwEP

-0? A. The RO manually tripping RCPs after RCP trip criteria has been met.

B. The RO dispatching an EO to LOCALLY trip the PMG output breaker after a loss of DC bus 113 occurred.

C. The RO manually actuating Main Steam Isolation after a Main Steamline Break has been diagnosed.

D. The RO manually starting an ECCS pump that failed to automatically start after an RCS LOCA occurred.

Answer: C EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 206 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 73 History: New for Bwd 2016 NRC exam Low Cog K/A: The question meets the K/A, requires examinee ability to know their responsibility during EOP usage situation.

TIER: 3 CATEGORY: Task No: R-AM-133 Obj No: 3E.AM-133 10CFR55 Link: operating procedures for the facility.

Technical Reference with Revision Number:

OP-BR-103-102- Answer Explanation:

OP-BR-103-102-immediate actions for a reactor trip after step 1 is complete to actuate MSI if a main steamline intended to interrupt the immediate actions of 1BwEP

-0. Choice A is incorrect, tripping RCPs when trip criteria is met is on the OAS of 1BwEP

-0, but is not an exception to the immediate actions.

Choice B is incorrect, dispatching an EO to trip the PMG output breaker is step 2 of 1BwOA ELEC-1, immediately after trip the reactor and performing immediate actions of 1BwEP

-0. It is not an exception to the immediate actions.

Choice D is incorrect, starting ECCS equipment that failed to start is an action that can be taken

-1 or in step 6 RNO of 1BwEP

-0. It is not an exception to the immediate actions.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 207 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 208 of 283 29 July 2016 74 ID: 1268770 Points: 1.00

- Unit 1 was at full power, normal alignment.

- A condition occurs requiring a reactor trip when an automatic reactor trip fails to happen.

- The RO was NOT able to trip the reactor from either of the main control room reactor trip switches.

- The Unit 1 main turbine was tripped.

- per minute.

- Current reactor power is 75% and slowly dropping.

-S-1, RESPONSE TO NUCLEAR POWER GENERATION/ATWS, the RO will...

A. allow rods to continue to insert in automatic.

B. place the ROD BANK SELECT switch in MAN and insert rods.

C. place the ROD BANK SELECT switch in CBD and insert rods.

D. place the ROD BANK SELECT switch in SBD and insert rods.

Answer: B EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 209 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

History: New for Bwd 2016 NRC exam Low Cog K/A: immediate operation of system components and controls.

The question meets the K/A, requires examinee ability to know the immediate actions required to control the control rod system during an ATWS.

TIER: 3 CATEGORY: Task No: R--018 Obj No: -02 10CFR55 Link: operating procedures for the facility.

Technical Reference with Revision Number:

-S- Answer Explanation: -S-1, control rods will be is the speed that the Rod control system will insert Rods in the manual position. The Rod control system should be taken to manual and the RO should insert Rods in manual to continue the banks in the manual position,

minute. Choice B is cor d.

this bank is inserted.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 210 of 283 29 July 2016 75 ID: 1268771 Points: 1.00 The Braidwood Emergency Procedures are organized into two complimentary categories. These include EVENT based responses of ____Barrier based responses of ________. A. B. C. D. Answer: C Answer Explanation Bwd 2016 NRC Exam Question:

  1. 75 History: New for Bwd 2016 NRC exam Low Cog K/A: The question meets the K/A, requires examinee knowledge of how emergency procedures were TIER: 3 CATEGORY: Task No: R-AM-022 Obj No: T.EP00-07 10CFR55 Link: operating procedures for the facility. Technical Reference with Revision Number:

Lesson plan I1-EP-XL- Answer Explanation: The concept of Westinghouse Owners Group Emergency Response Guidelines Choi

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 211 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 212 of 283 29 July 2016 76 ID: 1267649 Points: 1.00 clusion area for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> OR rem A. B. C. D.

Answer: D EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 213 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question: #76 History: Bank from Bwd 2009 NRC exam Low Cog K/A: 035 Steam Generator Gen 02.22 Knowledge of limiting conditions for operations and safety limits.

The question meets the K/A, requires examinee knowledge of safety limits found in the bases TIER: 2 GROUP: 2 Task No: S-TS-006 Obj No: 8E.TS-006 10CFR55 Link:

Technical Reference with Revision Number:

-1 ILT lesson plan I1

-BZ-XL- SRO Justification:

Answer Explanation:

ion area and 5 rem TEDE for an occupancy of the MCR.

Cho EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 215 of 283 29 July 2016 77 ID: 1267650 Points: 1.00

- Unit-1 was shutdown 5 DAYS AGO and is currently in Mode 6.

- - Radiation Monitors, actuation function ____ required to be OPERABLE per Tech Specs because _____________________.

A. -accident offsite doses being maintained within B. atmosphere MAY be open and operator action CANNOT ensure post

-accident offsite C. D. and operator action is sufficient to ensure post

- Answer: D EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 216 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question

  1. 77 History: New for Bwd 2016 NRC exam Low Cog K/A: handling TIER: 2 GROUP: 2 Task No: S-TS-006 Obj No: A 10CFR55 Link:

and their bases Technical Reference with Revision Number: B 3.3.6 REV 97 page B 3.3.6

- SRO Justification:

ause requires knowledge of the Tech Spec bases of LCO 3.3.6.

Answer Explanation:

Per LCO 3.3.6 bases, While in MODES 5 and 6 without fuel handling in tion isolation instrumentation need not be OPERABLE since the potential for -accident offsite Choice A is incorrect, see

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 217 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 218 of 283 29 July 2016 78 ID: 1268851 Points: 1.00

- Unit 1 is at full power, normal alignment.

- 1BwOS MS-Q1, MAIN STEAM DUMP VALVE STROKE SURVEILLANCE, is in progress.

- -close. - - 1BwOS MS- dump demand signal of ______ and the US will track the position of 1MS003C in the _____________________.

A. B. C. D. Answer: C EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 219 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 78 History: New for Bwd 2016 NRC exam High Cog K/A: consequences of those malfunctions or operations: RO 2.8 SRO 3.1

The question meets the K/A because the candidate must predict the results of a loss of a steam dump and use procedures to control the effects of the malfunction.

TIER: 2 GROUP: 2 Task No: S-OA-103 Obj No: S.DU1-11 10CFR55 Link:

appropriate procedures during normal, abnormal, and emergency situations.

Technical Reference with Revision Number:

OP-AA-108-- SRO Justification:

functions at Braidwood.

Answer Explanation:

steam dumps and then manually stroking them from as demand rises from 0% to Group 1 Group 2 Group 3 Demand signal 0%-25% 26%-50% 51%-75% 76%-100% -75%. 0% to 50% is a pla The correct tracking mechanism is the Equipment Status Log, which tracks equipment status tags that identify temporary status of equipment position to ensure configuration control per OP

-AA-108-101. The degraded equipment log is a plausible distractor as it would be used for a similar purpose if the malfunction was on an SSC that is safety related.

Choice

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 220 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 221 of 283 29 July 2016 79 ID: 1267661 Points: 1.00

- in progress on Unit 1.

- -C.1, RESPONSE TO INADEQUATE CORE COOLING.

- At step 3, CHECK RCP SUPPORT CONDITIONS, support conditions were NOT established due to NO CC flow to the RCPs and high bearing temperatures.

- Continued attempts to re

- - - - - Containment is ADVERSE.

- S 1A 18% 1B 21% 1C 1D 28% A. opening both Pressurizer PORVs.

B. remain at step 16 until support conditions are established, then start the 1D RCP.

C. immediately start the 1D RCP.

D. transition to SACRG

-1, SEVERE ACCIDENT CONTROL ROOM GUIDELINE INITIAL RESPONSE. Answer: A EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 222 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 79 History: Bank from 2009 Bwd NRC exam High Cog K/A: 003 RCPs consequences of those malfunctions or operations: Problems associated with RCP motors, including faulty motors and current, and winding and bearing temperature problems RO 2.7 SRO 3.1 The question meets the K/A, requires examinee to use the procedure to mitigate the consequences of RCPs with bearing temperature problems.

TIER: 2 GROUP: 1 Task No: S--009 Obj No: -002-A 10CFR55 Link:

appropriate procedures during normal, abnormal, and emergency situations.

Technical Reference with Revision Number:

- SRO Justification:

ause in the accident conditions described, the SRO would be directing the crew operations with a procedure step critical to reactor safety, especially when the sink to mitigate the inadequate core cooling.

Answer Explanation:

conditions. In addition, if nstarted. This is a concern for creep rupture failure mechanism of SG tubes. This is a decision point for implementing a section of the procedure. The RNO of step 16.b. implements the next mitigating strategy by restoring air to containment and opening both PZR PORVs in an attempt to reduce RCS pressure and allow for low head injection. SACRG

-1 will not be transitioned to support conditions are not necessary.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 223 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016 80 ID: 1267662 Points: 1.00

- A SGTR is in progress on Unit 1.

- The crew is performing 1BwEP

-3, STEAM GENERATOR TUBE RUPTURE, step 16, Depressurize RCS - will only open to an Current plant conditions are:

- Containment Pressure is 0.3 psig and STABLE.

- Ruptured SG pressure is 1115 psig and STABLE.

- RCS pressure is 2000 psig and DROPPING at 50 psig/min.

- Pres ___ and the SRO will direct the crew to _____________________.

A. depressurization with current spray flow B. C. D. open BOTH PZR PORVs Answer: B EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 225 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 80 History: New for Bwd 2016 NRC exam High Cog K/A: 010 Pressurizer Pressure Control System consequences of those malfunctions or operations: Problems associatfailures RO 3.9 SRO 3.9 The question meets the K/A, requires examinee to use the procedure to mitigate the consequences of inadequate spray flow for pressure control.

TIER: 2 GROUP: 1 Task No: S-EP-058 Obj No: -08 10CFR55 Link: appropriate procedures during normal, abnormal, and emergency situations.

Technical Reference with Revision Number: 1BwEP- SRO Justification:

The question Answer Explanation:

1BwEP-spray until depressurization criteria are satisfied. The criteria is:

- RCS pressure

- - - - - pressure will reach ruptured SG pressure in 8.85 min. Therefore, the depressurization rate is NOT adequate because the PZR will fill to 68% before the RCS is depressurized far enough to stop the leak. A note prior to step 16 directs the crew to step 17 if normal spray is NOT adequate. Step 17 directs opening only one PORV while continuing to spray.

Choice C EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 226 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 227 of 283 29 July 2016 81 ID: 1267717 Points: 1.00

- Unit 1 was at 100% power, normal alignment.

- - The crew tripped the reactor, actuated SI and entered the appropriate emergency procedures.

- Currently the crew is performing 1BwEP

-Isolation.

- ALL MSIVs are CLOSED.

- An audible alarm is then noted on the RM

- - -01 mr/hr. - _______ and the procedural flowpath going forward will be _____________________.

A. complete 1A SG isolation in 1BwEP

-2, THEN transition to 1BwEP

-3, SG TUBE RUPTURE. B. -2, THEN transition to 1BwEP

-3, SG TUBE RUPTURE. C. IATELY transition to 1BwEP

-3, SG TUBE RUPTURE.

D. -3, SG TUBE RUPTURE.

Answer: B EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 228 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 81 History: New for Bwd 2016 NRC exam High Cog K/A: 039 Main and Reheat Steam System of those malfunctions or operations: Indications and alarms for main steam and area radiation The question meets the K/A, requires examinee to use the procedure to mitigate the consequences of alarms for SGTR and select the procedural flowpath for mitigation.

TIER: 2 GROUP: 1 Task No: S-EP-053 Obj No: T.EP03-03 10CFR55 Link:

appropriate procedures during normal, abnormal, and emergency situations.

Technical Reference with Revision Number: 1BwEP- SRO Justification:

procedural flowpath.

Answer Explanation:

With the current RM

-11 indications, the 1BwEP-2 is a higher priority than 1BwEP

-3 as the diagnostic steps are sequenced in 1BwEP

-0. In 1BwEP-Therefore the correct procedure flowpath is to complete the isolation of 1A SG in 1BwEP

-2 prior to transitioning to 1BwEP

-3.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 229 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 230 of 283 29 July 2016 82 ID: 1267745 Points: 1.00 conditions on BOTH Units:

- 1PR030J AND 2PR030J, Unit 1 AND Unit 2 Wide Range Gas Monitors, are INOPERABLE.

- - - - - - - n 0A, is RUNNING.

- - 1PB128, Unit 1 Vent Stack Effluent Low Range Gas, is 5.0 E

-07 microCi/cc.

- -03 microCi/cc..

- 2PB128, Unit 2 Vent -07 microCi/cc

- - A. B. C. D.

Answer: B EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 231 of 283 29 July 2016 Answer Explanation Attach reference EP

-AA-121-F-01, section 2 (pages 4 & 5), Manual Station Release Rate Determination Bwd 2016 NRC Exam Question:

  1. 82 History: Bank from Bwd ILT NOPS High Cog K/A: 073 Process Rad Monitoring containment cond The question meets the K/A because the candidate must know the logic of fan configurations and assess TIER: 2 GROUP: 2 Task No: S.ZP-015 Obj No: T.ZP1- 10CFR55 Link:

Technical Reference with Revision Number:

Lesson plan I1

-ZP-XL- EP-AA-121-- SRO Justification:

This calculation is a SRO function because the SM is acting as the Shift Emergency Director during an accident. Answer Explanation:

-AA-121--01, station release rate is the sum of both units -- Choice A is incorrect, Choice B is Choice C is incorrect Choice D is incorrect

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 232 of 283 29 July 2016 83 ID: 1269033 Points: 1.00 The Tech Spec limits for the amount of stored diesel fuel oil that is required to be maintained on site is for each diesel generator to supply...

Note:

LOCA - Loss of Coolant Accident LOOP - Loss of Off Site Power A. 3 days of post design basis LOCA load demand.

B. 7 days of post design basis LOCA load demand.

C. demand. D. 30 days of post LOOP shutdown load demand.

Answer: B Answer Explanation Bwd 2016 NRC Exam Question:

  1. 83 History: Bank from Bwd 2011 NRC exam Low Cog K/A: Gen 2.1.32 Ability to explain and apply system limits and precautions.

The question meets the K/A, requires examinee ability to explain system limits.

TIER: 2 Group: 1 Task No: S-AM-003 Obj No: 7E.AM-003-A 10CFR55 Link: and their bases.

Technical Reference with Revision Number: SRO Justification: pec bases.

Answer Explanation: Tech Spec 3.8.3 bases states the DG are supplied with enough stored oil for 7 days of post design basis LOCA loads.

Choice B Choice D is incorrect, 30 days is action completion time for TS 3.8.3 fuel oil properties out of tolerance.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 233 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016 84 ID: 1267788 Points: 1.00

- Unit 1 is in Mode 2, reactor start

-up in progress.

- - - The crew enters 1BwOA ROD

-3, DROPPED OR MISALIGNED ROD. _______ and then _______________. A. -2, REACTOR STARTUP, step 1 B. -2, REACTOR STARTUP, step 1 C. -0, REACTOR TRIP OR SI, CONCURRENTLY with 1BwOA ROD

-3 D. -0, REACTOR TRIP OR SI, ONLY Answer: D EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 235 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

History: New for Bwd 2016 NRC exam Low Cog K/A: 000005 Inoperable/Stuck Control Rod EOPs conjunction with EOPs.

TIER: 1 GROUP: 2 Task No: S-OA-092 Obj No: -03 10CFR55 Link:

appropriate procedures during normal, abnormal, and emergency situations Technical Reference with Revision Number: 1BwOA ROD- SRO Justification:

-3 beyond the RO knowledge, the question stem puts the crew in an i Answer Explanation:

Per 1BwOA ROD

-3, if the reactor is in Mode 2 and any rod misalignment is encountered, the reactor is tripped and 1BwEP

-0 is transitioned to. Unlike many other AOPs, 1BwOA ROD-3 is not performed concurrently, because once the reactor is tripped, the -3 are no longer applicable.

Choice B is incorrec EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 236 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 237 of 283 29 July 2016 85 ID: 1267828 Points: 1.00

- Unit 2 is at full power, normal alignment.

- A rising trend in 2PR027J, SJAE Radiation Monitor, is detected.

- The crew enters 2BwOA SEC

-8, STEAM GENERATOR TUBE LEAK.

- conditions.

- mline Radiation Monitors indicate NO _______________. If Tech Spec entry conditions are met, the bases for MAXIMUM allowable Primary to Secondary leak rate is _______________. A. - B. -chemistry.

C. D. PR08J, SG Blowdown Sample Radiation Monitor.

Answer: B EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 238 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 85 History: New for Bwd 2016 NRC exam Low Cog K/A: 000037 SG Tube Leak Gen

TIER: 1 GROUP: 2 Task No: S-OA-110 Obj No: -03 10CFR55 Link:

and their bases.

Technical Reference with Revision Number:

2BwOA Sec- -5 SRO Justification:

Answer Explanation:

The 2PR027J is typically a leading indicator of a small SGTL. Per 2BwOA SEC-8, alternate rad monitors for identifying which SG is leaking are:

- - N- The limit of 150 gallons per day per SG is based on the operational LEAKAGE performance criterion in NEI 97

-06, Steam Generator Program Guidelines Program operational LEAKAGE performance criterion in NEI 97

-operational primary to secondary leakage through any one SG shall be limited to 150 gallons with SG tube degradation mechanisms that likelihood of degrading further to a steam generator tube rupture. The operational leakage rate criterion in conjunction with thmeasure for minimizing the frequency of steam generator tube ruptures.

rad monitors that would detect SG primary to secondary tube leakage.

-8 to determine which SG is leaking as it typically monitors flow from all SG with blowdown flow aligned EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 239 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016 86 ID: 1267829 Points: 1.00

- Unit 1 was at full power, normal alignment.

- - The crew entered 1BwOA PRI

-5, CONTROL ROOM INACCESSIBILITY.

- The reactor is tripped.

- TWO control rods did NOT fully insert after the reactor trip.

- ALL other equipment operated as expected.

- The crew initiates boration from the MCR in accordance with 1BwOA PRI

-5. - - The SRO has decided to use guidance in 1BwEP ES

-0.1, REACTOR TRIP OR SI, for emergency boration. ES-0.1 for the stuck control rods in...

A. 3 minutes. B. 33 minutes.

C. 75 minutes.

D. 138 minutes.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016 Answer: B Answer Explanation Bwd 2016 NRC Exam Question:

  1. 86 History: New for Bwd 2016 NRC exam High Cog K/A: A 02.02 Ability to determine and interpret the following as they apply to the Control Room The question meets the K/A, requires examinee to be able to determine and interpret boric acid flow from the RSP.

TIER: 1 GROUP: 2 Task No: S-OA- Obj No: T.EP01-06-C 10CFR55 Link:

appropriate procedures during normal, abnormal, and emergency situations.

Technical Reference with Revision Number: 1BwOA PRI-, 1BwEP ES-0.1 SRO Justification:

be to

el. Answer Explanation:

1BwOA PRI--5 does not direct the amount of boration. Under these conditions 1BwEP ES

-0.1 contains guidance of 33 minutes. All the distractors are emergency boration amounts for other conditions as described in 1BwEP ES

-0.1. Choice A is incorrect, am Choice C is incorrect, amount for borating if on natural circulation.

Choice D is incorrect, amount for 2 stuck control rods if borating from the RWST.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016 87 ID: 1267833 Points: 1.00

- CETCs are 650 - RCS pressure is 2100 psig.

_____ path and maintaining an adequate____. A. B. C. D. ORANGE Answer: A EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016 Answer Explanation Provide

Reference:

1BwST

-2, pages 1 & 3 (DO NOT include page 2)

Bwd 2016 NRC Exam Question:

  1. 87 History: New for Bwd 2016 NRC exam High Cog K/A: W/E07 Saturated Core Cooling A 02.02 Adherence to appropriate procedures and operation within the limitations in the facility's license and amendments RO 3.3 SRO 3.9

The question meets the K/A, requires examinee to adhere to status tree procedure and know bases of operations within facilities license TIER: 1 GROUP: 2 Task No: S--009 Obj No: --C 10CFR55 Link:

appropriate procedures during normal, abnormal, and emergency situations.

Technical Reference with Revision Number:

1BwST-B 2.1.1-1 SRO Justification:

Answer Explanation:

ST 2-1 therefore the subcooling is unacceptable and a yellow path is result of status trees. The bases of Tech Spec 2.1.1 reads: In MODE 1, the Departure fshall be maintained

>

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016 88 ID: 1267853 Points: 1.00

- Unit 1 is at full power, normal alignment.

The following occurs:

- Annunciator 1 - - The crew enters 1BwOA PRI

-RCP has a thermal barrier leak.

_____. PRI-_____. A. -1, ACCESS TO CONTAINMENT, Attachment 2, Containment Entry Checklist.

B. OOLING WATER SYSTEM C. D. -1, ACCESS TO CONTAINMENT, Attachment 2, Containment Entry Checklist Answer: A EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question: #88 History: New for Bwd 2016 NRC question High Cog K/A: 000026 Loss of Component Cooling Water system, and understand how operator action

indications and understand that the Sm direction is going to require a containment entry.

TIER: 1 GROUP: 1 Task No: S-AM-009 Obj No: T.AM17-01 10CFR55 Link:

appropriate procedures during normal, abnormal, and emergency situations.

Technical Reference with Revision Number: 1BwOA PRI

--1 SRO Justification:

an SRO function.

Answer Explanation:

An automatic interlock for alarm 1 containment entry is required to -1 is applicable. 1BwOL 3.7.7 is not applicable because the CC supply to the RCP thermal barriers is -require EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016 89 ID: 1267855 Points: 1.00

- Unit 1 was at full power, normal alignment.

The following occurs:

- The 1A SG PORV fails OPEN and CANNOT be closed.

- The crew trips the reactor and attempts to main steam isolate, but NO MSIVs will close.

- An EO locally CLOSES the 1MS019A, 1A the status, the 1A SG PORV is...

A. B. INOPERABLE, because the C. INOPERABLE, because the PORV CANNOT stroke fully, ONLY.

D. INOPERABLE, because the SG PORV CANNOT stroke fully AND INOPERABLE, Answer: C EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 250 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question: #89 History: New for Bwd 2016 NRC exam Low Cog K/A: WE12 Uncontrolled Depressurization of all SGs resultant operational effects.

The question meets the K/A, because it requires knowledge of the impact of locally isolating a SG PORV.

TIER: 1 GROUP: 1 Task No: S-TS-006 Obj No: S.MS1-15-D 10CFR55 Link:

and their bases.

Technical Reference with Revision Number:

-3 SRO Justification:

Answer Explanation:

OPERABLE when it is capable of not render it or its SG PORV line inoperable. Operator Choice A is

ckup supply to PORVs without UPS supplies are not required to be operable. It is an additional requirement for the C and D PORVs.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 251 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 252 of 283 29 July 2016 90 ID: 1267888 Points: 1.00

- Unit 1 was ramping up from 80% to full power.

- ALL systems were normally aligned

- The NSO was performing intermittent The following occurs:

- Instrument bus 113 faults and is de

-energized.

- The RO notes annunciator 1 is _______ and the procedure steps the crew will perform to clear the annunciator 1 B5 alarm are in _________. A. - B. - C. - D. -

Answer: D EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 253 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 90 History: New for Bwd 2016 NRC exam Low Cog K/A: 057 Loss of Vital AC Instrument Bus A02.19 Ability to determine and interpret the following as they apply to the Loss of Vital AC instrument bus.

RO The question meets the K/A, because it requires knowledge plant interlocks resulting from a loss of an instrument bus.

TIER: 1 GROUP: 1 Task No: S-OA- Obj No: T.OA10-06 10CFR55 Link:

appropriate procedures during normal, abnormal, and emergency situations.

Technical Reference with Revision Number:

BwAR 1-10--105 page 3 SRO Justification:

bypass the alarm function that are not in the initial BwOA procedure that would not be entered initially for the malfunction.

Answer Explanation:

On a loss of instrument bus 113, PRNI N

--energized. This will cause a single power range High flux rod stop bistable input to alarm 1 B5. The coincidence for this - rod stop alarms --he AVAILABLE distractor plausible. Also -5 and C- The procedure entered for this malfunction is 1BwOA ELEC

--1. 1BwOA ELEC

-2 contains a transition to BwOA INST

-1 if the instrument bus is dead and cannot be re

-energized.

Choice C is correct,

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 255 of 283 29 July 2016 91 ID: 1267891 Points: 1.00

- Unit 1 was at full power, normal alignment.

The following occurs:

- DC bus 113 faults and is de

-energized.

- The crew manually trips the reactor.

- 30 seconds later, an EO locally trips the PMG output breaker.

- All equipment operates as expected.

_______ MCR annunciators will be UNAVAILABLE, and after 15 minutes, _______ EAL condition is applicable.

A. B. C. -safety related ONLY D. -safety related ONLY

Answer: A EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 256 of 283 29 July 2016 Answer Explanation Provide

Reference:

EP

-AA-1001 Addendum 3, EMERGENCY ACTION LEVELS FOR BRAIDWOOD STATION, pages 13

-36 (Hot and Cold Matrixes BW 2

-1 to BW 2-24) Bwd 2016 NRC Exam Question:

  1. 91 History: New for Bwd 2016 NRC exam High Cog K/A: 058 Loss of DC Power A02.03 Ability to determine and interpret the following as they apply to the Loss of DC Power: RO 3.5 SRO 3.9 The question meets the K/A, because it requires knothe ability to monitor plant systems.

TIER: 1 GROUP: 1 Task No: S-ZP-008 Obj No: T.OA02-03 10CFR55 Link:

appropriate procedures during normal, abnormal, and emergency situations.

Technical Reference with Revision Number: 1BwOA ELEC

--AA-1001 2-5 SRO Justification:

determination.

Answer Explanation:

On a loss of Non

-157 also. Bus supplies to the 1PA19J, Annunciator Logic Cabinet. With both power supplies lost, NO had bee-safety related annunciator sections.

unciators EAL classification is applicable.

.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 257 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 258 of 283 29 July 2016 92 ID: 1267908 Points: 1.00

- Unit 1 is at 50% power.

Subsequently:

- - The crew enters 1BwOA SEC

-IR. - controller was taken to manual and throttled to reduce - PZR pressure is 2275 psig and slowly rising.

- - -of the following would require an IMMEDIATE reactor trip?

A. B. The operating CV pump is tripped.

C. Pressurizer pressure rises to 2350 psig.

D.

Answer: C EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 259 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 92 History: High Cog K/A: 065 Loss of Instrument Air The question meets the K/A, because it requires detailed knowledge of 1BwOA SEC

- TIER: 1 GROUP: 1 Task No: S-OA-103 Obj No: T.OA39-05 10CFR55 Link:

appropriate procedures during normal, abnormal, and emergency situations.

Technical Reference with Revision Number:

1BwOA SEC-SRO Justification:

- Answer Explanation

Since PZR pressure is 2275 psig PZR PORVs. Per 1BwOA SEC

-using PZR heaters or sprays it directs the crew trip the reactor.

-not the reactor to be tripped.

B is incorrect. As long as CC flow is maintained to the RCPs and RCP temperatures are monitored to not exceed limits, tripping the reactor is not required when no CV pump is running.

C is correct. See explanation.

-makeup and swap CV pump suction to the RWST if RMCS makeup is not adequate.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 260 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 261 of 283 29 July 2016 93 ID: 1267909 Points: 1.00

- A LOCA has occurred on Unit 1.

During the initial performance of 1BwEP

-following plant conditions are noted: - Containment pressure is 6 psig and rising.

- - RCS pressure is 1750 psig and stable.

- S/G pressures are 1175 psig.

- - , 1C S/G 26%, 1D S/G 30%

A. 1BwEP-currently adequate.

B. -C.2 RESPONSE TO DEGRADED CORE COOLING, because core cooling is the highest priority safety function NOT being met.

C. --H.1 will be performed because a secondary heat sink is necessary.

D. -HEAT SINK, then immediately -C.2 RESPONSE TO DEGRADED CORE COOLING because a secondary heat sink is NOT required.

Answer: C EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 262 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 93 History: Bank from 2009 Bwd NRC exam High Cog K/A: A02.02 Adherence to appropriate procedures and operation within the limitations in the facility*s license and amendments.

RO 3.7 The question meets the K/A, because it requires proper emergency procedure adherence.

TIER: 1 GROUP: 1 Task No: S-EP-005 Obj No: -03 10CFR55 Link:

appropriate procedures during normal, abnormal, and emergency situations.

Technical Reference with Revision Number: 1BwEP- SRO Justification:

appropriate procedure. In this condition the procedure transition is prior to status tree monitoring and not to a major EOP.

Answer Explanation:

Requirement is 31% or greater. This would be the transition otherwise that is why it is plausible.

Choice B is incorrect, status tree monitoring does not take effect until after the crew has transitioned out of 1BwEP

--C.2 is not appropriate at this time resent for core cooling.

-H.1 is directed in step 15 of EP

--pressure is greater than SG pressures. Since RCS pressure is greater, a heat sink is required -H.1 steps will be performed.

Choice D is incorrect, will not immediately transition back to EP

-0. Heat sink is required. See answer explanation.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 263 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016 94 ID: 1267911 Points: 1.00

- Unit 1 was operating at 100% power, normal alignment for the past 6 months.

- power. uencies specifically require an - A. within limits.

B. C. -131 within limits.

D. -131 within limits.

Answer: C EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 265 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

History: Bank from 2009 Bwd NRC exam High Cog K/A: Gen: Conduct of Operations RO 2.7 SRO 3.5

TIER: 3 GROUP: 1 Task No: S-TS-008 Obj No: 8E.TS-008 10CFR55 Link:

and their bases.

Technical Reference with Revision Number: -2 SRO Justification:

frequency is met by contacting the chemistry department following a turbine ramp of

> 15% RTP within a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> period.

Answer Explanation:

Choice A is incorrect, RCoxygen are in accordance with EPRI PWR Primary Water Chemistry Guidelines. These frequencies are designated in chemistry procedure CY

-AP-120-100 with no specific requirement for additional sa chemistry procedure, the knowledge requirement is only that there is no frequency requirement change in the TRM because of a unit ramp.

Choice B is incorrect, RCS operational leakag

increase the frequency, only states that 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> of steady state ops must be complete prior to nce. -after a ramp of

> from 100% to approx. 700 MW at 250 MW/min. This would exceed the rate of > 15% RTP within a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> period, thus requiring the change in frequency to within 2 to 6 hrs following the ramp.

-days with no specific frequency requirement change because of a unit ramp.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 266 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 267 of 283 29 July 2016 95 ID: 1267912 Points: 1.00

License to be present?

A. 1 ONLY B. C. D. Answer: C EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 268 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 95 History: -- Low Cog K/A: Gen: Conduct of Operations 2.1.36 Knowledge of

TIER: 3 GROUP: 1 Task No: S--005 Obj No: T.GP06-05 10CFR55 Link:

Technical Reference with Revision Number:

OU-AP- SRO Justification:

procedure requirements and limitations are required with core alterations, and also when a core alteration is occurring.

Answer Explanation:

Per OU-AP-alteration is in progress. Core Alts are defined in Tech Specs as: CORE ALTERATION shall be pool do not require an SRO licensed sa non-actions.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 269 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 270 of 283 29 July 2016 96 ID: 1267929 Points: 1.00

- Unit 1 is at full power, normal alignment.

- - LCO 3.8.9, Distribution Systems, Cond. A is entered with an 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> completion time to restore the bus to operable. - 1A SI pump room. NO other equipment is affected by the leak.

- LCO 3.7.8, SX System, Cond. A is entered with an 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> completion time to repair SX to the 1A SI pump. - - LCO 3.8.9 is exited.

-OPERATING, entry for the 1A SI pump.

try is REQUIRED NO later than...

A. B. C. 1200 on 1/8/16.

D. 1800 on 1/15/16.

Answer: A EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 271 of 283 29 July 2016 Answer Explanation Provide

Reference:

1BwOL 3.5.2

Bwd 2016 NRC Exam Question:

  1. 96 History: New for Bwd 2016 NRC exam High Cog K/A: Gen: Equipment Control 2.2.21 Knowledge of pre

- and post-maintenance operability requirements.

operability requirements.

TIER: 3 GROUP: 2 Task No: S-TS-006 Obj No: S.TS1-06-A 10CFR55 Link:

and their bases.

Technical Reference with Revision Number:

-3 SRO Justification: implementing delayed LCO entries.

Answer Explanation:

Per LCO 3.0.6, Rule become inoperable during the Completion Time for restoration of the first SUPPORT SYSTEM, allowed Completion Time of the SUPPORT SYSTEMs, or 2 times the Completion Time for he time the second SUPPORT SYSTEM . This is applied at the time the second support system is declared inoperable. 1BwOL 3.5.2 is supplied because the intent is not to know the rule from memory, but rather be able to ap Choice B is incorrect, This is the rule applied from the time bus

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 272 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 273 of 283 29 July 2016 97 ID: 1267932 Points: 1.00

- Unit 1 Main Turbine was just runback from 100% power due to a secondary pump trip.

- The crew is performing 1BwOA SEC

-1, SECONDARY PUMP TRIP.

- Annunciator 1 A6, ROD BANK LO

-2 INSERTION LIMIT, is LIT.

- Annunciator 1 B6, ROD BANK LOW INSERTION LIMIT, is LIT.

- 1BwOSR 3.1.1.1

-

- 1BwOA PRI-2, EMERGENCY BORATION

- BwOP CV- BORATION METHOD

-1, the US will direct the crew to borate the RCS per...

A. 1BwOA PRI-2, and boration is required by Tech Specs.

B. 1BwOA PRI-2, but boration is NOT required by Tech Specs.

C. BwOP CV-6, but boration is NOT required by Tech Specs.

D. BwOP CV-6, and boration is required by Tech Specs.

Answer: D EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question

  1. 97 History: - Low Cog K/A: Gen: Equipment Control 2.2.39 Knowledge of less than or equal to one hour Technical Specification action statements for systems.

The question meets the K/A because the candidate must know 1 hr or less action statement in tech specs.

TIER: 3 GROUP: 2 Task No: S-OA-096 Obj No: T.OA36-03 10CFR55 Link:

appropriate procedures during normal, abnormal, and emergency situations.

Technical Reference with Revision Number: 1BwOA SEC-98 page 3.1.6

-1 SRO Justification: conditions and selection of proper procedure.

Answer Explanation:

below the RIL LO

-2 alarm, 1BwOA SEC

-1 requires borating the RCS and Tech Specs require either SDM be adequate or boration. The COLR minimum requirement for SDM is 1300 pcm. Therefore, at 1BwOA PRI-2 entry criteria for emergency boration.

A is incorrect, 1BwOA PRI

-2 entry conditions not met.

B is incorrect, 1BwOA PRI

-2 entry conditions not met.

C is incorrect, boration is required by tech specs.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 275 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 276 of 283 29 July 2016 98 ID: 1267933 Points: 1.00

- A Unit 2 containment release is pending.

- The SRO is filling out RP

-BR-release with the current exhaust fan configuration.

Currently, the RUNNING Aux Bldg Vent Stacks exhaust fans are:

- - - - 0VW03CA, RADWASTE BLDG EXH

- ALL other Aux Bldg Vent Stacks exhaust fans and charcoal booster fans are shutdown.

APPROVE the Unit 2 Containment Release?

A. 0VA02CA trips.

B. C. 0VL02CA trips.

D. 0VW03CA trips.

Answer: D EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 277 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 98 History: Bank from Bwd 2009 NRC exam High Cog K/A: Gen Radiation Control RO 2.0 SRO 3.8 The question meets the K/A because the candidate must know when conditions for a release are/are not met.

TIER: 3 GROUP: 3 Task No: S-HP-002 Obj No: S.VP1-09-B 10CFR55 Link:

Technical Reference with Revision Number:

RP-BR-SRO Justification:

he answer information is contained within the procedure Answer Explanation:

RP-BR-980 section D reads as follows:

or for either unit , to - When a containment release is in progress, RP

-BR-980 requires that sufficient exhaust fan flow configurations that meet this requirement:

1. at least 1 VA exh fan

alone satisfy the flow requirements.

Choice A is incorrect, 0VA02CA discharges to U

-1 stack, therefore would not affect U

-2 release.

-2 stack. Choice C is incorrect, 0VL02CA discharges to U

-1 stack, therefore would not affect U-2 release.

-2 stack, which is not sufficient for a containment release.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 278 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 279 of 283 29 July 2016 99 ID: 1269457 Points: 1.00

- An RCS LOCA occurred on Unit 1.

- The crew has implemented 1BwCA

-1.2, LOCA OUTSIDE CONTAINMENT.

- - - After completing the actions of 1BwCA

-1.2, RCS pressure is still lowering.

A. 1BwCA- B. 1BwEP- C. 1BwEP ES- D. 1BwEP ES-1.2, POST LOCA COOLDOWN AND DEPRESSURIZATION.

Answer: A EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 280 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 99 History: Bank from Bwd 2009 NRC exam High Cog K/A: Gen Emergency Procedures/Plan parameters that are entry

- The question meets the K/A because the candidate must be able to recognize entry conditions for an EOP.

TIER: 3 GROUP: Task No: S-CA-011 Obj No: T.CA2-02 10CFR55 Link:

appropriate procedures during normal, abnormal, and emergency situations.

Technical Reference with Revision Number: 1BwCA- SRO Justification: conditions and selection of emergency procedure.

Answer Explanation:

After completing actions of 1BwCA

-1.2, RCS pressure is lowering and leak is unisolable. 1BwCA

-1.2 directs transition to 1BwCA

-1.1 if an unisolable leak is present upon completing actions of 1BwCA

-1.2. Transition from 1BwCA

-1.2 is entry condition for 1BwCA-1.1. B is incorrect, transition to 1BwEP

-1 is directed if leak is isolate

d. C is incorrect, Not at RWST lo

-2 setpoint yet. Transition is directed to either 1BwEP

-1 or 1BwCA-1.1, depending if leak is isolated.

D is incorrect, transition is directed to 1BwCA

-1.1, this is plausible becasue the strategy used in 1BwEP ES-1.2 is similiar to the strategy used in 1BwCA

--1.2 does not account for the depletion of the RWST.

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 281 of 283 29 July 2016

EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 282 of 283 29 July 2016 100 ID: 1267953 Points: 1.00

- - The crew has entered 0BwOA SECURITY

-1, SECURITY THREAT.

- Personnel interface?

A. B. C. D.

Answer: B EXAMINATION ANSWER KEY 2016 NRC BWD OPS ILT CERT/NRC EXAM 2015 Page: 283 of 283 29 July 2016 Answer Explanation Bwd 2016 NRC Exam Question:

  1. 100 History: New for Bwd 2016 NRC exam Low Cog K/A: Gen: Emergency Procedures/Plan

- of which guideline is TIER: 3 GROUP: Task No: S-OA- Obj No: 7D.OA-060-B 10CFR55 Link:

appropriate procedures during normal, abnormal, and emergency situations.

Technical Reference with Revision Number:

0BwOA SECURITY

- SRO Justification:

The question is SRSROs. Answer Explanation:

only one referred to in 0BwOA SECURITY

-1 to refer to initially.

Choice B is correct, Security Personnel interface.

-acting core damage sequences.

Choice D is incorrect, The ODCM is intended for the calculation of radiation doses during -