| issue date = 06/26/1985
| issue date = 06/26/1985
| title = Rev 2 to Operating Procedure 0030119, Post-Trip Review.
| title = Rev 2 to Operating Procedure 0030119, Post-Trip Review.
| author name = BARROW J H, SAGER D A
| author name = Barrow J, Sager D
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  

Revision as of 08:04, 19 June 2019

Rev 2 to Operating Procedure 0030119, Post-Trip Review.
ML17216A310
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 06/26/1985
From: Barrow J, Sager D
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17216A309 List:
References
0030119, 30119, NUDOCS 8510180090
Download: ML17216A310 (13)


Text

ATTACHMENT 2 OPERATING PROCEDURE NO.0030I I 9 REVISION 2"POST TRIP REVIEW" PDR ADOCK 05000335 P l Page 1 of 12 FLORIDA POWER 6 LIGHT COMPANY ST~LUCIE PLANT OPERATING PROCEDURE NO~0030119 REVISION 2 I.0 TITLE: POST TRIP REVIEW 2,0 REVIEW AND APPROVAL: Reviewed.by Facility Review Group Approved by J.H.Barrow (for)Revision 2 Reviewed by F R G Plant Manager Jul 25 1983 Au ust 11 1983-PO 19 PS FOR lNFQRMAT)ON ONLY This document is not controlted.

Before use, verify informetion with e controlled document.Approved by A 3 oO PURPOSE: Plant Manager Co-2t'9%-This procedure will identify any abnormal circumstances associated with a plant trip by evaluating plant conditions immediately prior to and immediately after the trip.4+0 LIMITS AND PRECAUTIONS:

4.1 It is important that the First Out annunciator reset, RPS Trip Unit indicating lights, and any electrical system protection relay flags not be reset until their status is noted in this Post Trip Review Check List.This data is particularly important if the plant, Sequence of Events Recorder has malfunctioned.

5 0 RELATED SYSTEM STATUS: N/A 6 eO RE FERE'iCES:

N/A~/R2 A.signed copy of this procedure with the applicable strip charts and printouts attached shall be retained as QA records in accordance with QI 17-PR/PSL-1

~/R2 S OPS (DATE I JDOCT Procedure IDOCN 0030119 I ISYS I (COMP Comnleted[ITM 2 Page 2 of 12 ST.LUCIE PLANT OPERATING PROCEDURE NO~0030119, REVISION 2 POST TRIP REVIEW 8+0 INSTRUCTIONS:

8.1 This procedure will be performed following any unplanned reactor trip after plant conditions have been stabilized.

The procedure need not be performed following a planned shutdown.8.2 Input from all plant personnel is vital to the correct identification of the cause of the plant trip and of any related malfunctions.

8.3 All data pertinent to the plant trip should be collected and kept with this procedure.

If recorder charts are used in this evaluation, a clear copy should be made, and the chart returned to its recorder.8.4 All blanks on the"POST-TRIP REVIEW CHECK LIST" should be filled in, use N/A where not applicable.

Page 3 of 12 ST~LUCIE PLAiVZ OPERATING PROCEDURE NO.0030119, REVISIOiV 2 POST TRIP REVIEW POST TRIP REVIEW CHECK LIST UNIT: DATE//Tli&: PART 1: INITIAL CONDITIONS A.Plant status prior to reactor trip (circle): , (1)Unit Startup Operations (2)Steady State Operations (3)Load Changes During Routine Power Operations (4)Unit Shutdown Operations (5)Other: B.Reactor Power: C.PORV Block Valves: MV-1403 (1476)(Circle)OPEN MV-1405 (1477)(Circle)OPEN CLOSED CLOSED D.Status of Control<tations (Circle): (1)DEH (2)"A" MPRV (3)"B" MFRV (4)SBCS (5)PZRe LEVEL (6)PZR.SPRAY (7)PZR.PRESS"'AN AUTO AUTO AUTO AUTO AUTO AUTO AUTO Off"Normal status of any Trains/Portions of Safety Systems (If NORMAL mark"iN/A")(1)REACTOR PROTECTIVE SYSTEM (2)SAFETY INJECTION SYSTEiM STo LUCIE PLANT OPERATING PROCEDURE NO.0030119, REVISION 2 POST TRIP REVIEW Page 4 of 12 POST TRIP REVIEW CHECK LIST PART 1: (continued)

(3)CONTAINME'iiT SPRAY SYSTEM (4)CONTAINMENT ISOLATION SYSTEM (S)HAIN STEAM ISOLATION SYSTEM (6)AUXILIARY FEEDWATER SYSTEM (7)EMERGENCY DIESEL GE'NERATORS P.Test Surveillances In Progress (If NONE Hark"N/A")TEST NUMBER STATUS/STEP Page 5 of 12 ST.LUCIE FLAN OPERATING PROCEDURE NO.0030119, REVISION 2 POST TRIP REVIEW POST TRIP REVIEW CHECK LIST PART 2: P-LANT RESPONSE I A.Safety System Actuation'and Performance (1)Reactor Protection System (a)Trip actuated by: MANUAL REASON:)+AUTOMATIC RPS TRIP UNITS ACTUATED: (b)First Out annunciator RTGB 102/202: r (c)RPS Actuation Time: Time Last TCB Opened Time Trip Logic Satisfied Actuation Time (Difference)

SOE SOE (0.043 Sec.MAK)(d)TCB>>l through TCB-8 OPEN IM YES IM NO (e)All rod bottom lights energized)~YES ((NO (2)ENGINEERED SAFETY FEATURE ACTUATION (CHECK): (a)SIAS (b)CIAS (c)CSAS (d)MSIS (e)(f)If any ESF was required, did it function properly?I I YES I&NO (3)Did PZR Code Safety Valves lift: JNO)YES, Reseating Confirmed by:

Page 6 of 12 ST+LUCIE PLANT OPERATING PROCEDURE NO~0030119, REVISION 2 POST TRIP REVIEW POST TRIP REVIEW CHECK LIST PART 2: (continued)

(4)Did Hain Steam Code Safety Valves Lift?[NO~YES, Reseat ing Conf irmed by: B.Control System Response: (1)Pressurizer pressure and level control responded normally to this transient.

YES NO.Did the PZR PORVs open (two or more High Pressurizer Pressure Bistables tripped at any time during transient.

)NO YES~Did the PZR PORVs reclose?NO YES.Reseating Confirmed by: (2)Did the following secondary systems function as required for this transient?(a)SBCS YES NO (b)Feedwater Control System YES NO (c)Generator Lockout YES NO C.Plant Electrical Alignment (Check)BEFORE TRIP AFTER TRIP*Auxiliary Transformer

  • Startup Transformer Diesel Generator*Satisfactory automatic transfer of Auxiliary to Startup transformers meets the.requirements of Unit 2 Tech.Spec.4.8.1.1.1.b for automatic transfer.Sign off appropriate paragraph in AP 2-0010125, Check Sheet 412.D.Manual Actions: (1)Were any control stations taken from auto to manual?!~NO.~YES~Specify station and time/sequence.

0 Page 7 of 12 ST~LUCIE PLANT OPERATING PROCEDURE NO~0030119, REVISION 2 POST TRIP REVIEW POST TRIP REVIEW CHECK LIST PART 2.(continued)

(2)Other Manual Actions: E.Radiological Response (Include abnormal ARMS and PR!G indications):

PE Plant Response Comments: G.Attach DDPS, SOE Printouts, and any other printout or chart used to determine cause of reactor trip or to show any abnormal condition during trip.!~NO ATTACHMENTS

~ATTACHMENTS (LIST)

Page S of 12 ST~LUCIE PLAÃE OPERATING PROCEDURE iNO~0030119, REVISION 2 POST TRIP REVIEW POST TRIP REVIEW CHECK LIST PART 3: PLANT PERSONNEL STATEMENTS A.Operations Personnel on Duty During Event: The following personnel were directly involved with the event and may be able to supplement the information in this report if clarification is needed.Bo For complicated transients, or situations where the Sequence of Events Recorder fails, attach statements from personnel involved with the trip concerning the events that preceded and followed the trip.Each individual should submit a statement concerning the way they remember the event.If handwritten statements are prepared, include the plant conditions prior to the trip, your indications that a problem existed, vour action as a result of those indications, noted equipment malfunctions or inadequacies, any unusual plant conditions or annunciators, and any identified procedure deficiencies.

Also, include any information you consider important for review of this unscheduled reactor trip and any actions necessary to prevent recurrence.(Use additional sheet if necessary)

Personnel statements at tached?(circle one)YES NO Examole Name: Position: Signature//Date'ime ST~LUCIE PLANT OPERATING PROCEDURE NO.0030119, REVISIOiN 2 POST TRIP REVIEW POST TRIP REVIEW CHECK LIST Page 9 of 12 PART 4: SE UENCE OF EVENTS Briefly describe the sequence of events preceding and following the reactor trip.'1 TIME EVEiNT DESCRIPTION PREPARED BY STA: APPROVED BY NPS/A%PS: DATE//DATE//

STA LUCIE PLAÃZ OPERATING PROCEDURE NOA 0030119, REVISION 2 POST TRIP REVIEW Page 10 of 12 POST TRIP REVIEW CHECK LIST PART 5: PRELIMINARY SAFETY ASSESSMENT: (Circle)RCS PRESSURE REMAIiNED ABOVE SETPOIANT FOR SIAS A RCS PRESSURE REMAIiiED BELOW SETPOINT FOR PZR CODE SAFETY ACTUATION'CS TEMP'ECREASE LESS THAN 100'F/HR.REACTOR COOLANT WAS CONTAINED WITHIN THE RCS AND QUENCH TANK+INDICATED PZR LEVEL REAQIIiiED ON SCALE~INDICATED WIDE RANGE STEAM GENERATOR LEVEL REMAIANED ON SCALE N YES NO YES it0 YES NO YES iNO YES NO YES NO PART 6: TRANSIEANT DATA FOR KEY PLANT PARAAWTERS:

RCS PRESSURE RCS TEMPERATURE PZR LEVEL S/G LEVEL MINIMUM MAXIMUM PART 7: UNEXPECTED ASPECT OF TRANSIENT BEHAVIOR: A.Compared with: Previous Trip on: Unit//Date IHE!!CEN-128 or FSAR Transient:

Vol!P Page 0 Significant Differences in Plant Response: j iNO.YES'otify NPS~EXPLAIN-'esolution of Differences Noted Above:

Page 11 of 12 ST~LUCIE PLANT OPERATING PROCEDURE ViO.0030119, REVISION 2 POST TRIP REVIEW POST TRIP REVIEW CHECK LIST PART 8: PROBABLE CAUSE OF TRIP: Comments: PART 9: IDENTIFICATION OF SYSTEMS WITH INADE UATE PERFORMANCE SYSTEM/COMPONENT DESCRIPTION OF PROBLEM PART 10: CORRECTIVE ACTIONS: Ensure both cause(s)of reactor trip (Part 8)and system(s)with identified inadequate performance (Part 9)are thoroughly addressed.

ST+LUCIE PLANT OPERATING PROCEDURE NO.0030119, REVISION 2 POST TRIP REVIEW Page 12 of 12 POST TRIP REVIEW CHECK LIST PART 11: NOTIFICATIONS A.ENS Notification to NRC within four hours for all Reactor Trips per 10 CFR 50~72 Time Notified: NRC Contact: B.Emergency Plan Implemented?

NO~YES.(If YES, give classification and explain.)PART 12: RESTART AUTHORIZATION:

If theicause of the plant trip cannot be determined by the Nuclear Plant Supervisor the unit will not be'eturned to power until an Independent Review of the event has been performed by the Faci'lity Review Group.A.Based upon the information available and this review, the cause of the Reactor Trip has been identified, no unsafe conditions exist.The Plant Manager or his designee authorizes restart.NUCLEAR PLAÃZ SUPERVISOR SHIFT TECHNICAL ADVISOR