IR 05000250/2017005: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 08/22/2017
| issue date = 08/22/2017
| title = Updated Inspection Plan for Turkey Point Nuclear Generating Station, Unit 3 and Unit 4 - (Report 05000250/2017005 and 05000251/2017005)
| title = Updated Inspection Plan for Turkey Point Nuclear Generating Station, Unit 3 and Unit 4 - (Report 05000250/2017005 and 05000251/2017005)
| author name = Suggs L B
| author name = Suggs L
| author affiliation = NRC/RGN-II/DRP/RPB3
| author affiliation = NRC/RGN-II/DRP/RPB3
| addressee name = Nazar M
| addressee name = Nazar M
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303
{{#Wiki_filter:==SUBJECT:==
-1257 August 22 , 201 7 Mr. Mano Nazar President and Chief Nuclear Officer Nuclear Division Florida Power & Light Company Mail Stop: EX/JB 700 Universe Blvd.
UPDATED INSPECTION PLAN FOR TURKEY POINT NUCLEAR GENERATING STATION , UNIT 3 AND UNIT 4 - (REPORT 05000 250/201 7 00 5 AND 05000 251/201 7 00 5)
 
Juno Beach, FL 33408
 
SUBJECT: UPDATED INSPECTION PLAN FOR TURKEY POINT NUCLEAR GENERATING STATION , UNIT 3 AND UNIT 4 - (REPORT 05000 250/201 7 00 5 AND 05000 251/201 7 00 5)


==Dear Mr. Nazar:==
==Dear Mr. Nazar:==
The enclosed inspection plan lists the inspections scheduled through June 30 , 20 19 for Turkey Point Nuclear Generating Station Unit 3 and Unit 4. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
The enclosed inspection plan lists the inspections scheduled through June 30 , 20 19 for Turkey Point Nuclear Generating Station Unit 3 and Unit 4. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.


This inspection plan does not include the pl an for security
This inspection plan does not include the pl an for security-related inspections, which will be sent via separate, non-publicly available correspondence.
-related inspections, which will be sent via separate, non
-publicly available correspondence.


The NRC plans on conducting one non-routine inspection per Temporary Instruction 2515/191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi
The NRC plans on conducting one non-routine inspection per Temporary Instruction 2515/191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans." In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
-Unit Dose Assessment Plans." In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).


Please contact me at 404-997-4539 with any questions you have regarding this letter.
Please contact me at 404-997-4539 with any questions you have regarding this letter.
Line 45: Line 37:
Turkey Point Inspection/Activity Plan (0 9/0 1/201 7 - 06/30/201 9) cc: Distribution via Listserv  
Turkey Point Inspection/Activity Plan (0 9/0 1/201 7 - 06/30/201 9) cc: Distribution via Listserv  


ML OFFICE RII:DRP RII:DRP NAME LPressley LSuggs DATE 8/16/2017 8/21/2017 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteTurkey PointInspection / Activity Plan 09/01/2017
ML OFFICE RII:DRP RII:DRP NAME LPressley LSuggs DATE 8/16/2017 8/21/2017 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteTurkey PointInspection / Activity Plan 09/01/2017-06/30/2019 Page 1 of 3 08/18/2017 15:02:28OL RQ-REQUAL INSPECTION 2 3, 4 IP Licensed Operator Requalification Program7111111B 08/28/2017 09/01/2017OL EXAM-INITIAL LICENSE EXAM PREP 3 3 TURKEY POINT/MAY2017 INITIAL EXAM AT POWER FACILITIES V23492 09/18/2017 09/22/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 1 3 3, 4 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/02/2017 10/06/2017 3, 4 IP Occupational ALARA Planning and Controls71124.02 10/02/2017 10/06/2017 3, 4 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 10/02/2017 10/06/2017 3, 4 IP Occupational Dose Assessment71124.04 10/02/2017 10/06/2017 3, 4 IP Radiation Monitoring Instrumentation71124.05 10/02/2017 10/06/2017 3, 4 IP Performance Indicator Verification71151 10/02/2017 10/06/2017 ISI-UNIT 4 IN-SERVICE INSPECTION 1 4 IP Inservice Inspection Activities - PWR7111108P 10/09/2017 10/13/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 2 2 3, 4 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/16/2017 10/20/2017 3, 4 IP Occupational ALARA Planning and Controls71124.02 10/16/2017 10/20/2017 3, 4 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 10/16/2017 10/20/2017 3, 4 IP Occupational Dose Assessment71124.04 10/16/2017 10/20/2017 3, 4 IP Radiation Monitoring Instrumentation71124.05 10/16/2017 10/20/2017 3, 4 IP Performance Indicator Verification71151 10/16/2017 10/20/2017OL EXAM-INITIAL LICENSE EXAM 3 3 TURKEY POINT/MAY2017 INITIAL EXAM AT POWER FACILITIES V23492 10/23/201711/10/2017 EP-EP PROGRAM INSPECTION 3 3, 4 IP A lert and Notification System Testing7111402 01/22/2018 01/26/2018 3, 4 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 01/22/2018 01/26/2018 3, 4 IP Emergency Action Level and Emergency Plan Changes7111404 01/22/2018 01/26/2018 3, 4 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 01/22/2018 01/26/2018 3, 4 IP Performance Indicator Verification71151 01/22/2018 01/26/2018 MODS-PLANT MODIFICATIONS INSPECTION 3 3, 4 IP Evaluations of Changes, Tests, and Experiments7111117T 02/05/2018 02/09/2018 RP-RP PUBLIC INSPECTION 2 3, 4 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 02/12/2018 02/16/2018 3, 4 IP Radiological Environmental Monitoring Program71124.07 02/12/2018 02/16/2018 3, 4 IP Occupational Exposure Control Effectiveness71151-OR01 02/12/2018 02/16/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
-06/30/2019 Page 1 of 3 08/18/2017 15:02:28OL RQ-REQUAL INSPECTION 2 3, 4 IP Licensed Operator Requalification Program7111111B 08/28/2017 09/01/2017OL EXAM-INITIAL LICENSE EXAM PREP 3 3 TURKEY POINT/MAY2017 INITIAL EXAM AT POWER FACILITIES V23492 09/18/2017 09/22/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 1 3 3, 4 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/02/2017 10/06/2017 3, 4 IP Occupational ALARA Planning and Controls71124.02 10/02/2017 10/06/2017 3, 4 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 10/02/2017 10/06/2017 3, 4 IP Occupational Dose Assessment71124.04 10/02/2017 10/06/2017 3, 4 IP Radiation Monitoring Instrumentation71124.05 10/02/2017 10/06/2017 3, 4 IP Performance Indicator Verification71151 10/02/2017 10/06/2017 ISI-UNIT 4 IN-SERVICE INSPECTION 1 4 IP Inservice Inspection Activities - PWR7111108P 10/09/2017 10/13/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 2 2 3, 4 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/16/2017 10/20/2017 3, 4 IP Occupational ALARA Planning and Controls71124.02 10/16/2017 10/20/2017 3, 4 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 10/16/2017 10/20/2017 3, 4 IP Occupational Dose Assessment71124.04 10/16/2017 10/20/2017 3, 4 IP Radiation Monitoring Instrumentation71124.05 10/16/2017 10/20/2017 3, 4 IP Performance Indicator Verification71151 10/16/2017 10/20/2017OL EXAM-INITIAL LICENSE EXAM 3 3 TURKEY POINT/MAY2017 INITIAL EXAM AT POWER FACILITIES V23492 10/23/201711/10/2017 EP-EP PROGRAM INSPECTION 3 3, 4 IP A lert and Notification System Testing7111402 01/22/2018 01/26/2018 3, 4 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 01/22/2018 01/26/2018 3, 4 IP Emergency Action Level and Emergency Plan Changes7111404 01/22/2018 01/26/2018 3, 4 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 01/22/2018 01/26/2018 3, 4 IP Performance Indicator Verification71151 01/22/2018 01/26/2018 MODS-PLANT MODIFICATIONS INSPECTION 3 3, 4 IP Evaluations of Changes, Tests, and Experiments7111117T 02/05/2018 02/09/2018 RP-RP PUBLIC INSPECTION 2 3, 4 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 02/12/2018 02/16/2018 3, 4 IP Radiological Environmental Monitoring Program71124.07 02/12/2018 02/16/2018 3, 4 IP Occupational Exposure Control Effectiveness71151-OR01 02/12/2018 02/16/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.


Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteTurkey PointInspection / Activity Plan 09/01/2017
Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteTurkey PointInspection / Activity Plan 09/01/2017-06/30/2019 Page 2 of 3 08/18/2017 15:02:28 RP-RP PUBLIC INSPECTION 2 3, 4 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 02/12/2018 02/16/2018TI-191-MITIGATING STRATEGIES 3 3, 4 IP Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/191 03/05/2018 03/09/2018 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 4 3, 4 IP Problem Identification and Resolution71152B 08/06/2018 08/10/2018 3, 4 IP Problem Identification and Resolution71152 08/20/2018 08/24/2018 ISI-UNIT 3 IN-SERVICE INSPECTION 1 3 IP Inservice Inspection Activities - PWR7111108P 10/08/2018 10/12/2018 SGISI-UNIT 3 SG IN-SERVICE INSPECTION 1 3 IP Inservice Inspection Activities - PWR7111108P 10/08/2018 10/12/2018 RP-RAD HAZARD AND TRANSPORTATION 2 3, 4 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/15/2018 10/19/2018 3, 4 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 10/15/2018 10/19/2018OL EXAM-INITIAL LICENSE EXAM PREP 3 3 TURKEY POINT / JANUARY 2019 INITIAL EXAM AT POWER FACLITIES V23517 12/03/2018 12/07/2018OL EXAM-INITIAL LICENSE EXAM 3 3 TURKEY POINT / JANUARY 2019 INITIAL EXAM AT POWER FACLITIES V23517 01/07/2019 01/25/2019 EP-EP EXERCISE INSPECTION 3 3, 4 IP Exercise Evaluation7111401 02/18/2019 02/22/2019 3, 4 IP Emergency Action Level and Emergency Plan Changes7111404 02/18/2019 02/22/2019 3, 4 IP Exercise Evaluation - Scenario Review7111408 02/18/2019 02/22/2019 3, 4 IP Performance Indicator Verification71151 02/18/2019 02/22/2019 ISI-UNIT 4 IN-SERVICE INSPECTION 1 4 IP Inservice Inspection Activities - PWR7111108P 03/18/2019 03/22/2019 RP-RP OCCUPATIONAL WEEK 1 2 3, 4 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/18/2019 03/22/2019 3, 4 IP Occupational ALARA Planning and Controls71124.02 03/18/2019 03/22/2019 3, 4 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 03/18/2019 03/22/2019 3, 4 IP Occupational Dose Assessment71124.04 03/18/2019 03/22/2019 3, 4 IP Radiation Monitoring Instrumentation71124.05 03/18/2019 03/22/2019 3, 4 IP Occupational Exposure Control Effectiveness71151-OR01 03/18/2019 03/22/2019 3, 4 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 03/18/2019 03/22/2019 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
-06/30/2019 Page 2 of 3 08/18/2017 15:02:28 RP-RP PUBLIC INSPECTION 2 3, 4 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 02/12/2018 02/16/2018TI-191-MITIGATING STRATEGIES 3 3, 4 IP Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/191 03/05/2018 03/09/2018 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 4 3, 4 IP Problem Identification and Resolution71152B 08/06/2018 08/10/2018 3, 4 IP Problem Identification and Resolution71152 08/20/2018 08/24/2018 ISI-UNIT 3 IN-SERVICE INSPECTION 1 3 IP Inservice Inspection Activities - PWR7111108P 10/08/2018 10/12/2018 SGISI-UNIT 3 SG IN-SERVICE INSPECTION 1 3 IP Inservice Inspection Activities - PWR7111108P 10/08/2018 10/12/2018 RP-RAD HAZARD AND TRANSPORTATION 2 3, 4 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/15/2018 10/19/2018 3, 4 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 10/15/2018 10/19/2018OL EXAM-INITIAL LICENSE EXAM PREP 3 3 TURKEY POINT / JANUARY 2019 INITIAL EXAM AT POWER FACLITIES V23517 12/03/2018 12/07/2018OL EXAM-INITIAL LICENSE EXAM 3 3 TURKEY POINT / JANUARY 2019 INITIAL EXAM AT POWER FACLITIES V23517 01/07/2019 01/25/2019 EP-EP EXERCISE INSPECTION 3 3, 4 IP Exercise Evaluation7111401 02/18/2019 02/22/2019 3, 4 IP Emergency Action Level and Emergency Plan Changes7111404 02/18/2019 02/22/2019 3, 4 IP Exercise Evaluation - Scenario Review7111408 02/18/2019 02/22/2019 3, 4 IP Performance Indicator Verification71151 02/18/2019 02/22/2019 ISI-UNIT 4 IN-SERVICE INSPECTION 1 4 IP Inservice Inspection Activities - PWR7111108P 03/18/2019 03/22/2019 RP-RP OCCUPATIONAL WEEK 1 2 3, 4 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/18/2019 03/22/2019 3, 4 IP Occupational ALARA Planning and Controls71124.02 03/18/2019 03/22/2019 3, 4 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 03/18/2019 03/22/2019 3, 4 IP Occupational Dose Assessment71124.04 03/18/2019 03/22/2019 3, 4 IP Radiation Monitoring Instrumentation71124.05 03/18/2019 03/22/2019 3, 4 IP Occupational Exposure Control Effectiveness71151-OR01 03/18/2019 03/22/2019 3, 4 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 03/18/2019 03/22/2019 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.


Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteTurkey PointInspection / Activity Plan 09/01/2017
Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteTurkey PointInspection / Activity Plan 09/01/2017-06/30/2019 Page 3 of 3 08/18/2017 15:02:28 SGISI-UNIT 4 SG IN-SERVICE INSPECTION 1 4 IP Inservice Inspection Activities - PWR7111108P 03/18/2019 03/22/2019 RP-RP OCCUPATIONAL WEEK 2 3 3, 4 IP Radiological Hazard Assessment and Exposure Controls71124.01 04/15/2019 04/19/2019 3, 4 IP Occupational ALARA Planning and Controls71124.02 04/15/2019 04/19/2019 3, 4 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 04/15/2019 04/19/2019 3, 4 IP Occupational Dose Assessment71124.04 04/15/2019 04/19/2019 3, 4 IP Radiation Monitoring Instrumentation71124.05 04/15/2019 04/19/2019 3, 4 IP Occupational Exposure Control Effectiveness71151-OR01 04/15/2019 04/19/2019 3, 4 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 04/15/2019 04/19/2019 EQI-DESIGN BASES ASSURANCE INSPECTION (PROGR 3 3, 4 IP Design Bases Assurance Inspection (Programs)7111121N 04/22/2019 04/26/2019 3, 4 IP Design Bases Assurance Inspection (Programs)7111121N 05/13/2019 05/17/2019 3, 4 IP Design Bases Assurance Inspection (Programs)7111121N 06/03/2019 06/07/2019 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
-06/30/2019 Page 3 of 3 08/18/2017 15:02:28 SGISI-UNIT 4 SG IN-SERVICE INSPECTION 1 4 IP Inservice Inspection Activities - PWR7111108P 03/18/2019 03/22/2019 RP-RP OCCUPATIONAL WEEK 2 3 3, 4 IP Radiological Hazard Assessment and Exposure Controls71124.01 04/15/2019 04/19/2019 3, 4 IP Occupational ALARA Planning and Controls71124.02 04/15/2019 04/19/2019 3, 4 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 04/15/2019 04/19/2019 3, 4 IP Occupational Dose Assessment71124.04 04/15/2019 04/19/2019 3, 4 IP Radiation Monitoring Instrumentation71124.05 04/15/2019 04/19/2019 3, 4 IP Occupational Exposure Control Effectiveness71151-OR01 04/15/2019 04/19/2019 3, 4 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 04/15/2019 04/19/2019 EQI-DESIGN BASES ASSURANCE INSPECTION (PROGR 3 3, 4 IP Design Bases Assurance Inspection (Programs)7111121N 04/22/2019 04/26/2019 3, 4 IP Design Bases Assurance Inspection (Programs)7111121N 05/13/2019 05/17/2019 3, 4 IP Design Bases Assurance Inspection (Programs)7111121N 06/03/2019 06/07/2019 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
}}
}}

Revision as of 06:40, 19 June 2019

Updated Inspection Plan for Turkey Point Nuclear Generating Station, Unit 3 and Unit 4 - (Report 05000250/2017005 and 05000251/2017005)
ML17234A358
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/22/2017
From: Ladonna Suggs
NRC/RGN-II/DRP/RPB3
To: Nazar M
Florida Power & Light Co
References
IR 2017005
Download: ML17234A358 (6)


Text

SUBJECT:

UPDATED INSPECTION PLAN FOR TURKEY POINT NUCLEAR GENERATING STATION , UNIT 3 AND UNIT 4 - (REPORT 05000 250/201 7 00 5 AND 05000 251/201 7 00 5)

Dear Mr. Nazar:

The enclosed inspection plan lists the inspections scheduled through June 30 , 20 19 for Turkey Point Nuclear Generating Station Unit 3 and Unit 4. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

This inspection plan does not include the pl an for security-related inspections, which will be sent via separate, non-publicly available correspondence.

The NRC plans on conducting one non-routine inspection per Temporary Instruction 2515/191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans." In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4539 with any questions you have regarding this letter.

Sincerely,

/RA/

LaDonna B. Suggs, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos.:

50-2 5 0, 50-251 License Nos.:

DPR-31 , DPR-41 Enclosure:

Turkey Point Inspection/Activity Plan (0 9/0 1/201 7 - 06/30/201 9) cc: Distribution via Listserv

ML OFFICE RII:DRP RII:DRP NAME LPressley LSuggs DATE 8/16/2017 8/21/2017 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteTurkey PointInspection / Activity Plan 09/01/2017-06/30/2019 Page 1 of 3 08/18/2017 15:02:28OL RQ-REQUAL INSPECTION 2 3, 4 IP Licensed Operator Requalification Program7111111B 08/28/2017 09/01/2017OL EXAM-INITIAL LICENSE EXAM PREP 3 3 TURKEY POINT/MAY2017 INITIAL EXAM AT POWER FACILITIES V23492 09/18/2017 09/22/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 1 3 3, 4 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/02/2017 10/06/2017 3, 4 IP Occupational ALARA Planning and Controls71124.02 10/02/2017 10/06/2017 3, 4 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 10/02/2017 10/06/2017 3, 4 IP Occupational Dose Assessment71124.04 10/02/2017 10/06/2017 3, 4 IP Radiation Monitoring Instrumentation71124.05 10/02/2017 10/06/2017 3, 4 IP Performance Indicator Verification71151 10/02/2017 10/06/2017 ISI-UNIT 4 IN-SERVICE INSPECTION 1 4 IP Inservice Inspection Activities - PWR7111108P 10/09/2017 10/13/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 2 2 3, 4 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/16/2017 10/20/2017 3, 4 IP Occupational ALARA Planning and Controls71124.02 10/16/2017 10/20/2017 3, 4 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 10/16/2017 10/20/2017 3, 4 IP Occupational Dose Assessment71124.04 10/16/2017 10/20/2017 3, 4 IP Radiation Monitoring Instrumentation71124.05 10/16/2017 10/20/2017 3, 4 IP Performance Indicator Verification71151 10/16/2017 10/20/2017OL EXAM-INITIAL LICENSE EXAM 3 3 TURKEY POINT/MAY2017 INITIAL EXAM AT POWER FACILITIES V23492 10/23/201711/10/2017 EP-EP PROGRAM INSPECTION 3 3, 4 IP A lert and Notification System Testing7111402 01/22/2018 01/26/2018 3, 4 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 01/22/2018 01/26/2018 3, 4 IP Emergency Action Level and Emergency Plan Changes7111404 01/22/2018 01/26/2018 3, 4 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 01/22/2018 01/26/2018 3, 4 IP Performance Indicator Verification71151 01/22/2018 01/26/2018 MODS-PLANT MODIFICATIONS INSPECTION 3 3, 4 IP Evaluations of Changes, Tests, and Experiments7111117T 02/05/2018 02/09/2018 RP-RP PUBLIC INSPECTION 2 3, 4 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 02/12/2018 02/16/2018 3, 4 IP Radiological Environmental Monitoring Program71124.07 02/12/2018 02/16/2018 3, 4 IP Occupational Exposure Control Effectiveness71151-OR01 02/12/2018 02/16/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteTurkey PointInspection / Activity Plan 09/01/2017-06/30/2019 Page 2 of 3 08/18/2017 15:02:28 RP-RP PUBLIC INSPECTION 2 3, 4 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 02/12/2018 02/16/2018TI-191-MITIGATING STRATEGIES 3 3, 4 IP Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/191 03/05/2018 03/09/2018 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 4 3, 4 IP Problem Identification and Resolution71152B 08/06/2018 08/10/2018 3, 4 IP Problem Identification and Resolution71152 08/20/2018 08/24/2018 ISI-UNIT 3 IN-SERVICE INSPECTION 1 3 IP Inservice Inspection Activities - PWR7111108P 10/08/2018 10/12/2018 SGISI-UNIT 3 SG IN-SERVICE INSPECTION 1 3 IP Inservice Inspection Activities - PWR7111108P 10/08/2018 10/12/2018 RP-RAD HAZARD AND TRANSPORTATION 2 3, 4 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/15/2018 10/19/2018 3, 4 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 10/15/2018 10/19/2018OL EXAM-INITIAL LICENSE EXAM PREP 3 3 TURKEY POINT / JANUARY 2019 INITIAL EXAM AT POWER FACLITIES V23517 12/03/2018 12/07/2018OL EXAM-INITIAL LICENSE EXAM 3 3 TURKEY POINT / JANUARY 2019 INITIAL EXAM AT POWER FACLITIES V23517 01/07/2019 01/25/2019 EP-EP EXERCISE INSPECTION 3 3, 4 IP Exercise Evaluation7111401 02/18/2019 02/22/2019 3, 4 IP Emergency Action Level and Emergency Plan Changes7111404 02/18/2019 02/22/2019 3, 4 IP Exercise Evaluation - Scenario Review7111408 02/18/2019 02/22/2019 3, 4 IP Performance Indicator Verification71151 02/18/2019 02/22/2019 ISI-UNIT 4 IN-SERVICE INSPECTION 1 4 IP Inservice Inspection Activities - PWR7111108P 03/18/2019 03/22/2019 RP-RP OCCUPATIONAL WEEK 1 2 3, 4 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/18/2019 03/22/2019 3, 4 IP Occupational ALARA Planning and Controls71124.02 03/18/2019 03/22/2019 3, 4 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 03/18/2019 03/22/2019 3, 4 IP Occupational Dose Assessment71124.04 03/18/2019 03/22/2019 3, 4 IP Radiation Monitoring Instrumentation71124.05 03/18/2019 03/22/2019 3, 4 IP Occupational Exposure Control Effectiveness71151-OR01 03/18/2019 03/22/2019 3, 4 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 03/18/2019 03/22/2019 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteTurkey PointInspection / Activity Plan 09/01/2017-06/30/2019 Page 3 of 3 08/18/2017 15:02:28 SGISI-UNIT 4 SG IN-SERVICE INSPECTION 1 4 IP Inservice Inspection Activities - PWR7111108P 03/18/2019 03/22/2019 RP-RP OCCUPATIONAL WEEK 2 3 3, 4 IP Radiological Hazard Assessment and Exposure Controls71124.01 04/15/2019 04/19/2019 3, 4 IP Occupational ALARA Planning and Controls71124.02 04/15/2019 04/19/2019 3, 4 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 04/15/2019 04/19/2019 3, 4 IP Occupational Dose Assessment71124.04 04/15/2019 04/19/2019 3, 4 IP Radiation Monitoring Instrumentation71124.05 04/15/2019 04/19/2019 3, 4 IP Occupational Exposure Control Effectiveness71151-OR01 04/15/2019 04/19/2019 3, 4 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 04/15/2019 04/19/2019 EQI-DESIGN BASES ASSURANCE INSPECTION (PROGR 3 3, 4 IP Design Bases Assurance Inspection (Programs)7111121N 04/22/2019 04/26/2019 3, 4 IP Design Bases Assurance Inspection (Programs)7111121N 05/13/2019 05/17/2019 3, 4 IP Design Bases Assurance Inspection (Programs)7111121N 06/03/2019 06/07/2019 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.